SU390277A1 - METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS - Google Patents

METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS

Info

Publication number
SU390277A1
SU390277A1 SU1660965A SU1660965A SU390277A1 SU 390277 A1 SU390277 A1 SU 390277A1 SU 1660965 A SU1660965 A SU 1660965A SU 1660965 A SU1660965 A SU 1660965A SU 390277 A1 SU390277 A1 SU 390277A1
Authority
SU
USSR - Soviet Union
Prior art keywords
passage
mining operations
hydrogeological conditions
vertical mining
complex hydrogeological
Prior art date
Application number
SU1660965A
Other languages
Russian (ru)
Inventor
А. Д. Гинзбург И. А.брамсом
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1660965A priority Critical patent/SU390277A1/en
Application granted granted Critical
Publication of SU390277A1 publication Critical patent/SU390277A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Description

Изобретение относитс  к способу проходки шахтных стволов или других объектов в сложных услови х.This invention relates to a method for penetrating shafts or other objects under difficult conditions.

При применении известного способа проходки с использованием опускной крепи и введением закрепл ющего материала через трубки, установленные в ее ножевой части при пересечении зоны контакта неустойчивых пород с подстилающими их крепкими возникают осложнени , вызванные тем, что ножева  часть крепи не может врезатьс  в крепкие породы, а это приводит к авари м-прорывам вышележащих плывунных пород.When applying the known method of penetration using sinking lining and introducing fixing material through tubes installed in its knife part, when crossing the zone of contact between unstable rocks and strong ones, complications arise due to the fact that the knife part of the lining cannot cut into hard rocks. This leads to a crash of m-breakthroughs of overlying quicksands.

Дл  повышени  эффективности работ в зоне контакта предлагаетс  через трубки, установленные в ножевой части крепи, пробуривать скважины в крепких породах и по ним подавать в зону контакта закрепл ющий материал .In order to increase the efficiency of work in the contact zone, it is proposed to drill holes in strong rocks through tubes installed in the blade part of the support and feed the fixing material along them into the contact zone.

Трубки / (см. чертеж) дл  инъекции закрепл ющего материала, имеющие открытый выход, УКрепл ют в ножевой части крепи 2. Диаметр трубок выбирают из расчета пропуска через них инъекторов или буровых коронок и буровых штанг дл  забуривани  оиважин в подстилающие крепкие породы. ПоTubes / (see drawing) for the injection of fixing material having an open exit. They are fastened in the knife part of the lining 2. The diameter of the tubes is chosen on the basis of injectors or drill bits and drill rods for drilling the rocks into the underlying hard rocks. By

ИAND

мере возведени  крепи труб-ки наращивают. При подходе ножевой части крепи в зоне контакта через трубки пропускают инъекторы, заглубл емые в подстилающие породы на 1,0-1,5 м, Если Же инъекторы не могут бЬ1ть заглублены даже с помощью вибраторов, то через трубки на необходимую глубину в подстилающих породах пробуривают окзажипы. Затем в них нагнетают различные химические реагенты (или цементный раствор), образующие водонепроницаемую завесу. После затвердевани  растворов, контактную зону пересекают обычными способами.as erected, pipe supports grow. At the approach of the knife part, lining in the contact zone through the tubes let injectors penetrate 1.0–1.5 m into the bedrock. If the same injector cannot be buried even with the help of vibrators, they drill through the tubes to the required depth in the bedrock zazhipy. Then they are injected with various chemical reagents (or cement mortar), forming a waterproof curtain. After the solutions solidify, the contact zone is crossed by conventional methods.

Предмет изобретени Subject invention

Способ прохОл ки вертикальных горных выработок в сложных гидрогеологических услови х с использованием опускной крепи и введением закрепл ющего материала через трубки , установленные в ее ножевой .части, отличающийс  тем, что, с целью повышени  эффективности работ при контакте неустойчивых пород с подстилающими крепкими, трубки ножевой части используют дл  бурени  скважин в подстилающих породах с последующим закреплением зоны контакта.The method of drilling vertical mine workings in complex hydrogeological conditions with the use of descending lining and the introduction of fixing material through the tubes installed in its knife. Part of the fact that, in order to increase the efficiency of work on contact of unstable rocks with the underlying strong, tube knife parts are used for drilling wells in the underlying rocks, followed by securing the contact zone.

Гг--4-T-SlGg - 4-T-Sl

QQ

SU1660965A 1971-05-24 1971-05-24 METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS SU390277A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1660965A SU390277A1 (en) 1971-05-24 1971-05-24 METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1660965A SU390277A1 (en) 1971-05-24 1971-05-24 METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS

Publications (1)

Publication Number Publication Date
SU390277A1 true SU390277A1 (en) 1973-07-11

Family

ID=20476564

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1660965A SU390277A1 (en) 1971-05-24 1971-05-24 METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS

Country Status (1)

Country Link
SU (1) SU390277A1 (en)

Similar Documents

Publication Publication Date Title
US3690106A (en) Method of treating permeable formations
GB1170610A (en) A method of Anchoring Rods or the like in Drill Holes in Earth or Rock
SU390277A1 (en) METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS
FR2360748A1 (en) REINFORCEMENT OF ROCKS
GB1209246A (en) Improvements in or relating to processes and apparatus for the construction of tunnels or the like in rock having zones differing in stability
GB1255128A (en) Improvements in or relating to core sampling of rock or soil
SU1033751A1 (en) Method of hydraulic isolation of rock about mine working
US3814185A (en) Method for interconnecting nuclear chimneys
ES446894A1 (en) Method of reinforcing rock strata
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU144809A1 (en) The way to develop powerful steeply dipping seams
SU1002594A1 (en) Method of advanced supporting of mine working with anchors
SU397867A1 (en) METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION
SU398747A1 (en) METHOD FOR DEVELOPING THE USEFUL PURCHASED
SU134242A1 (en) Chamber of mineral development system
SU810971A1 (en) Roof-control method
SU1129354A1 (en) Method of underground working of mineral deposits
SU1479655A1 (en) Method of water insulation of vertical shafts
SU885418A1 (en) Method of erecting untifiltration elements of hydraulic engineering structures
SU898080A1 (en) Mine shaft sinking method
SU1252492A1 (en) Method of driving an ascending mine working
SU1707200A1 (en) Method of mining flat stratified deposits
SU757713A1 (en) Method of excavating crumbling rock
SU1642012A1 (en) Method of supporting a development working
SU362924A1 (en) METHOD OF PREVENTING MOUNTAIN BREEDS