SU397867A1 - METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION - Google Patents

METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION

Info

Publication number
SU397867A1
SU397867A1 SU1722531A SU1722531A SU397867A1 SU 397867 A1 SU397867 A1 SU 397867A1 SU 1722531 A SU1722531 A SU 1722531A SU 1722531 A SU1722531 A SU 1722531A SU 397867 A1 SU397867 A1 SU 397867A1
Authority
SU
USSR - Soviet Union
Prior art keywords
well
explosive
drills
used explosive
eliminating
Prior art date
Application number
SU1722531A
Other languages
Russian (ru)
Inventor
С. Г. Пшеничников А. Т. Казаков Ф. В. Ореховский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1722531A priority Critical patent/SU397867A1/en
Application granted granted Critical
Publication of SU397867A1 publication Critical patent/SU397867A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

ИзоЙретение относитс  к буровзрывным работам в сейсморазведке и может быть использовано при ликвидации отработанных взрывных скважин. Известны спосо-бы ликвидации использованных взрывных скважин, стволы которых сохранились без изменений до глубины 10-15 м, а нижн   часть не имеет котловых выемок. Способы заключаютс  в следующем. Производ т забутовку усть  скважины путем создани  «а нем выемки глубиной 1 м, которую заполн ют камнем на высоту 0,5 м, а затем засыпают землей. Осуществл ют заглушку усть  скважины круглым лесом: берут отрезок дерева ло диаметру скважины длиной 1,5 м, и в оди.н из его торцов прочно врезают перекладину длиной 1 м. Заглушку опускают в подготовленную выемку глубиной 1 м так, что,бы ее длинный конец погрузилс  в ствол скважи ы и удерживалс  перекладиной в устье скважины на уступе выемки, котора  зате.м засыпаетс  землей. Обрушивают верхнюю часть ствола скважины подвесными зар дами взрывчатых веществ, а воронку засыпают землей. Педостатки перечисленных спосо-бов ликвидации использованных взрывных скважин ;ледующие: 1.Низка  производительность ручных работ лри образовании выемок в устье скважин глубиною 1 м при такой же щирпне. 2..Большой расход строительных материалов (камн , леса) и взрывчатых веществ. 3.Увеличение плошади нарушени  природной структуры почвы при большом расширении усть  скважин выемками, что частично или полностью нарушает плодородность почвы на несколько лет, 4.Создание опасности дл  людей, животных и наземной самоходной техники, поскольку ликвидаци  скважин производитс  после полной отработки сейсморазведоч1;ого профил , а не после отстрела скважины. Цель изобретени  - разработка такого способа ликвидации использованных взрывных скважин, который позволил бы ускорить процесс их ликвидации, значительно сократ ть расход строительных и взрывчатых материалов , уменьшить нарушени  природной структуры почвы, предотвратить несчастные случаи с людь.ми и животными, а также аварии с наземной самоходной техникой. В соответствии с изобретением, поставленна  цель достигаетс  тем, что с нулевой отмет. ки усть  взрывной скважины, з стадии завершени  ее проектной глубины, производитс  одновре.менное бурение дополнительной выемки диаметром, большим диаметра скважины,The invention relates to drilling and blasting operations in seismic prospecting and can be used in the elimination of spent blast holes. There are known ways to eliminate used blastholes, the trunks of which remained unchanged to a depth of 10-15 m, and the lower part has no boiler notches. The methods are as follows. The wellhead is compacted by creating a recess 1 m deep, which is filled with a stone to a height of 0.5 m, and then covered with earth. A plug is made at the wellhead by a round wood: a piece of wood is taken over a 1.5 m long borehole, and one bar is firmly cut into one of its ends. The plug is lowered into the prepared dredge 1 m deep so that its long The end was plunged into the wellbore and held with a crossbar at the wellhead on a notch ledge, which was then filled with earth. Bring down the upper part of the wellbore with suspended charges of explosives, and fill the funnel with earth. The shortcomings of the listed methods for the elimination of explosive wells used are the following: 1. Low productivity of manual work in the formation of notches in the wellhead with a depth of 1 m with the same width. 2..Big consumption of building materials (stone, wood) and explosives. 3. Increasing the area of disturbing the natural structure of the soil with a large expansion of the wellhead notches, which partially or completely impairs the fertility of the soil for several years; and not after the shooting of the well. The purpose of the invention is to develop such a method of eliminating explosive wells used, which would speed up the process of their elimination, significantly reduce the consumption of building and explosive materials, reduce the disruption of the natural soil structure, prevent accidents with people and animals, as well as accidents with ground self technique. In accordance with the invention, the goal is achieved by starting from zero. KI of the explosive well, at the stage of completing its design depth, simultaneous drilling of an additional excavation with a diameter greater than the diameter of the well is performed,

которую тюсле использовани  взрывной скважины закрывают пробкой.which the use of an explosive well is plugged with.

На фнг. 1 и 2 показана схема осуществлени  предложенного способа.On fng. 1 and 2 show the implementation of the proposed method.

Когда буре)ше взрывной скважины находитс  в стадии завершени  н до ее проектной глубины остаетс  1,5-2,0 м, останавливаетс  вращение колонны труб и ниже ротора буровой установки на .квадратную штангу закрепл етс  режущее устройство дл  разбуриврлги  верхней части ствола скважины. После закреплени  устройства продолжаетс  бурение скважины при использоваиии двух режущих инструментов, нижний из .которых добуривает скважину обычным диаметром, нанример 140 мм, а верхний, начина  с усть  имеющейс  скважины, разбуривает ее .на глубину 1,5- 2,0 м диаметром 240 мм. По завершении бурени  взрывной скважины колонна бурильных труб поднимаетс  от забо  до выхода режущего устройства под ротор, а затем с квадратной штанги снимаетс  режущее устройство . После этого произво.дитс  промывка скважршы и демонтаж инструмента. При промывке скважины на имеющейс  в ее верх.ней части уступ частично оседает шлам, который улучшает закрепление проб.ки, предназначенной дл  перекрыти  ствола скважины и изготовленной из дерева, цемента или другого материала . Диа.метр пробки должен соответствовать диаметру верхней части ствола скважины , а длина должна составл ть два собственных диаметра. Такой размер пробки позвол ет надежно установить ее на устуне скважины .When the drill of the explosive well is in the completion stage and 1.5-2.0 m remains to its design depth, the rotation of the tubing stops and the cutting device for drilling the upper part of the wellbore is fixed below the rotor of the drilling rig. After fixing the device, the well continues to be drilled using two cutting tools, the bottom of which drills the well with the usual diameter, approximately 140 mm, and the upper one, starting with the mouth of the existing well, drills it to a depth of 1.5-2.0 m with a diameter of 240 mm . Upon completion of the drilling of the blast hole, the drill string rises from the bottom to the exit of the cutting device under the rotor, and then the cutting device is removed from the square rod. After this, the production is performed by flushing the well and dismounting the tool. When flushing a well, a ledge in the uppermost part of the ledge partially settles the sludge, which improves the fixation of the sample designed to shut off the wellbore and made of wood, cement or other material. The diameter of the plug should correspond to the diameter of the upper part of the wellbore, and the length should be two intrinsic diameters. This size of plug allows it to be reliably installed at the wellhead.

Устройство дл  разбуривани  верхней части ствола скважины может иметь различныеThe device for drilling the upper part of the wellbore may have different

конструкции, например, оно содержит: хомутconstructions, for example, it contains: clamp

/ с шарнирным соединением 2, кренежный/ swivel 2, short

болт 3 и режущие части 4.bolt 3 and cutting parts 4.

После использовани  взрывной скважины, т. е. завершени  в ней взрывов, взрывник с по.мощью шеста досылает пробку на уступ скважины и вдавливает ее в шла.м. Зате.м скважина засыпаетс  выбуренной породой с периодической плотной утрамбовкой. Верхн   часть ствола скважины засыпаетс  на 50 см растительным грунтом и также плотно утрамбовываетс .After using an explosive well, i.e., completing explosions therein, the explosive with a pole will send the plug to the ledge of the well and press it into the slag. Zat.m well is filled up with drilled rock with periodic dense ramming. The upper part of the borehole is filled up 50 cm in planting soil and also compacted tightly.

П «р е Я М е Т изобретени P «re e M e T Invention

Способ ликвидации использованных взрывных скважни в сейсморазведке путем образовани  выемки в верхней части ствола скважины с ее последующей забойкой, отличающийс  тем, что, с целью ускорени  работ и сокращени  расходов строительных и взрывчатых материалов, с нулевой отметки усть  взрывной скважины в стадии завершени  ее проектной глубины осуществл ют одновременное бурение дополнительной выемки диаметром , большим диаметра скважины, которую после использовани  взрывной скважины закрывают пробкой.The method of eliminating used blastholes in seismic exploration by forming a notch in the upper part of the wellbore with its subsequent tamping, characterized in that, in order to accelerate work and reduce the costs of construction and explosive materials, from the zero point of the explosive well, Simultaneous drilling of an additional excavation with a diameter greater than the diameter of the well, which, after using the explosive well, is closed with a plug, is used.

2 (риг. г.2 (rig.

SU1722531A 1971-12-08 1971-12-08 METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION SU397867A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1722531A SU397867A1 (en) 1971-12-08 1971-12-08 METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1722531A SU397867A1 (en) 1971-12-08 1971-12-08 METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION

Publications (1)

Publication Number Publication Date
SU397867A1 true SU397867A1 (en) 1973-09-17

Family

ID=20495487

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1722531A SU397867A1 (en) 1971-12-08 1971-12-08 METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION

Country Status (1)

Country Link
SU (1) SU397867A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2714407C2 (en) * 2018-02-15 2020-02-14 Виктор Сергеевич Федотенко Well boreing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2714407C2 (en) * 2018-02-15 2020-02-14 Виктор Сергеевич Федотенко Well boreing method

Similar Documents

Publication Publication Date Title
RU94029677A (en) Template and process for drilling and filling several boreholes
SU397867A1 (en) METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION
Abelev Compacting loess soils in the USSR
RU2059073C1 (en) Method for development of mineral deposits
RU98112829A (en) METHOD FOR DEPOSITING DEPOSITS OF USEFUL FOSSIL
RU2074944C1 (en) Drilling and supporting of multiface well
SU977789A1 (en) Method for plugging rocks
SU898080A1 (en) Mine shaft sinking method
SU1739008A1 (en) Method for construction of rising water-drainage well
SU107000A1 (en) Side grouser
SU901535A1 (en) Method for driving mine shafts
SU787611A1 (en) Method of driving and casing a multibottom well
Stow MODERN WATER-WELL DRILLING TECHNIQUES IN USE IN THE UNITED KINGDOM.
RU2077655C1 (en) Method for grouting boreholes
SU1070312A1 (en) Method of constructing a plugging pad
SU1559162A1 (en) Method of excavating materials from underground formations
SU1550070A1 (en) Method of constructing wells in friable saturated uncemented rock
SU142241A1 (en) METHOD OF BLOODING THE NEW WELLS IN SIDE
SU1139800A1 (en) Method of forming holes in earth
SU67892A1 (en) Method of drilling well
RU1809075C (en) Method for sinking of vertical shafts
SU1535999A1 (en) Method of plugging a hole
RU2023861C1 (en) Method for elimination of breakdown wherein drilling tool is stuck in central portion of drilled well
SU891936A1 (en) Method of sinking vertical mine workings
SU1352061A1 (en) Method of recovering materials from underground formations