SU387072A1 - SHIELD FOR TUNNEL CONSTRUCTION - Google Patents

SHIELD FOR TUNNEL CONSTRUCTION

Info

Publication number
SU387072A1
SU387072A1 SU1652249A SU1652249A SU387072A1 SU 387072 A1 SU387072 A1 SU 387072A1 SU 1652249 A SU1652249 A SU 1652249A SU 1652249 A SU1652249 A SU 1652249A SU 387072 A1 SU387072 A1 SU 387072A1
Authority
SU
USSR - Soviet Union
Prior art keywords
lining
shield
shell
rock
tunnel construction
Prior art date
Application number
SU1652249A
Other languages
Russian (ru)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1652249A priority Critical patent/SU387072A1/en
Application granted granted Critical
Publication of SU387072A1 publication Critical patent/SU387072A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

Изобретение относитс  к обл1асти подземного строительства и может быть использовано при сооружении тоннелей щитовым способом со сборной обделкой.The invention relates to the area of underground construction and can be used in the construction of tunnels shield method with team lining.

Известны щиты дл  сооружени  тоннел , содержащие ножевое и опорное кольца, оболочку С хвостовой частью, приспособлени  дл  разработки породы и сборки колец обделки и полый кольцевой элемент из эластичного материала , заполн емый рабочей средой под давлением .Known shields for the construction of the tunnel, containing a knife and support rings, a shell with a tail part, tools for working out the rock and assembling lining rings and a hollow ring element made of elastic material, filled with working medium under pressure.

Цель изобретени  - обеспечить равномерное обжатие сборной обделки, установку ее в соосное с выработкой положение и герметизацию строительного зазора между обделкой и породой.The purpose of the invention is to ensure uniform compression of the team lining, placing it in a coaxial position with the production and sealing of the construction gap between the lining and the rock.

Достигаетс  это тем, что полый кольцевой из эластичного материала элемент, заполн емый рабочей средой под давлением, смонтирован на торце хвостовой части оболочки щита , между обделкой и породой, причем рабоча  среда в полость элемента подаетс  через образованный в хвостовой части оболочки канал , другой конец .которого выведен за пределы участка оболочки, на котором осуществл ют монтаж сборной обделки.This is achieved by the fact that the hollow annular of elastic material element filled with working medium under pressure is mounted at the end of the tail section of the shield shell between the lining and the rock, and the working medium into the element cavity is fed through the other end formed in the tail portion of the shell. which is brought outside the shell area on which the assembly of the lining assembly is carried out.

На фиг. 1 FIG. one

изобрал ен разрез; на продольный на фиг. 1.depicted en incision; longitudinal to FIG. one.

Щит дл  сооружени  тоннел  состоит из ножевого 1 и опорного 2 колец, оболочки 3 с хвостовой частью, приспособлений 4 к 5 дл  разработки породы и сборки «олец обделкиThe shield for the construction of the tunnel consists of a knife 1 and a support 2 rings, a shell 3 with a tail, devices 4 to 5 for the development of rock and assembly of "lining

соответственно и .полого кольцевого из эластичного материала занолн емого рабочей средой под давлением элемента 6, смонтированного на торце хвостовой части оболочки 3 щита , между обделкой 7 и породой 8, таким образом , чтобы все части креплени  не выступали за пределы толщины оболочки щита, причем рабоча  среда в полость элемента 6 подаетс  через образованный в хвостовой части оболочки 3 .канал 9, другой конец 10 которого выведен за пределы участка оболочки, на котором провод т монтаж сборной обделки 7. .Предлагаемый щит работает следующим образом .respectively and a hollow annular of elastic material filled by pressure medium element 6, mounted on the end of the tail section of the shield shell 3, between the lining 7 and the rock 8, so that all parts of the mount do not protrude beyond the thickness of the shield shell, and The medium in the cavity of the element 6 is fed through the channel 9 formed in the tail section of the shell 3. The other end 10 of which is extended outside the shell section where the assembly lining 7 is mounted. The proposed shield works as follows BrAZ.

После разработки породы на длину, равнуюAfter developing the breed for a length equal to

ширине кольца обделки 7, и перемещени  щита при помощи щитовых домкратов 11 в эластичный полый элемент 6 подают через канал 9 рабочую среду под давлением.the width of the ring lining 7, and the movement of the shield using shield jacks 11 into the elastic hollow element 6 is fed through the channel 9, the working medium under pressure.

При этом эластичный элемент 6 заполн ет пространство между первым собранным кольцом обделки 7 и породой 8, перекрывает строительный зазор, обжимает обделку и позвол ет установить ее в соосное -с выработкой положение . Затем в зазор между обделкой 7 иIn this case, the elastic element 6 fills the space between the first assembled ring of the lining 7 and the rock 8, closes the construction gap, compresses the lining and allows it to be set in a coaxial-with-development position. Then into the gap between lining 7 and

породой 8 нагнетают через инъекторы 12 схватывающийс  тампонажный материал 13.the rock 8 is pumped through injectors 12 by means of plugging material 13.

Одновременно продолжают разработку породы с помощью приспособлени  4 и сборку очередного кольца обделки с помощью приспособлени  5.At the same time, the development of the rock is continued with the help of tool 4 and the assembly of the next lining ring with the help of tool 5.

После схватывани  тампонажного материаала 13 давление рабочей среды в элементе 6 сбрасываетс  и цикл повтор етс .After the cement material 13 has set, the pressure of the working medium in the element 6 is released and the cycle is repeated.

Предмет изобретени Subject invention

Щит дл  сооружени  тоннел , содержащий ножевое и опорное кольца, оболочку с хвостовой частью, приспособлени  дл  разработки породы и сборки колец обделки и полый кольцевой из эластичного материала элемент, заполн емый рабочей средой под давлением, отличающийс  тем, что, с целью обеспечени  возможности осуществлени  равномерного обжати  сборной обделки, установки ее в соосное с выработкой положение и герметизации зазора между обделкой и породой, полый кольцевой из эластичного материла элемент, заполн емый рабочей средой под давлением,A shield for building a tunnel containing a blade and support rings, a shell with a tail, tools for working out the rock and assembling the lining rings and a hollow annular ring of elastic material filled with pressurized working medium, characterized in that in order to ensure uniform compressing the team lining, placing it in a coaxial position with the development, and sealing the gap between the lining and the rock, a hollow annular of elastic material element filled with pressure medium .

смонтирован на торце хво-стовой части оболочки щита между обделкой и породой, причем рабоча  среда,в полость элемента подаетс  через образованный в хвостовой части оболочки канал, другой конец которого выведен заmounted at the end of the tail part of the shield shell between the lining and the rock, the working medium being fed into the cavity of the element through a channel formed in the tail portion of the shell, the other end of which is

пределы участка оболочки, на котором осуществл ют монтаж сборной обделки.the limits of the shell section at which the assembly of the lining is erected.

В 7 8B 7 8

Жii«5v ЛV Av//д v/ cC9 Mv/лy/xV37/ v/л x//lIiii "5v LV Av // d v / cC9 Mv / ly / xV37 / v / l x // l

(Раг. / J9 /// //V//6 /. 68/J(Par. / J9 /// // V // 6 /. 68 / J

SU1652249A 1971-04-23 1971-04-23 SHIELD FOR TUNNEL CONSTRUCTION SU387072A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1652249A SU387072A1 (en) 1971-04-23 1971-04-23 SHIELD FOR TUNNEL CONSTRUCTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1652249A SU387072A1 (en) 1971-04-23 1971-04-23 SHIELD FOR TUNNEL CONSTRUCTION

Publications (1)

Publication Number Publication Date
SU387072A1 true SU387072A1 (en) 1973-06-21

Family

ID=20473971

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1652249A SU387072A1 (en) 1971-04-23 1971-04-23 SHIELD FOR TUNNEL CONSTRUCTION

Country Status (1)

Country Link
SU (1) SU387072A1 (en)

Similar Documents

Publication Publication Date Title
GB1074613A (en) Tunnelling machine and method for constructing a lined tunnel
GB1209329A (en) Shell reinforcement for underground works
MX160838A (en) IMPROVEMENTS IN A DEVICE TO PUSH A SHIELD FOR USE IN THE FORMATION OF TUNNELS
GB1381292A (en) Tunnelling
GB1404359A (en) Method and apparatus for producing a concrete lining in a gallery tunnel or shaft
US3834170A (en) Process of, and a plant for, constructing tunnels
GB1408641A (en) Tunnelling shields
GB1107061A (en) Improvements in or relating to tunnel sets
ATE2455T1 (en) PROCEDURE FOR MAKING A CLAD TUNNEL AND EXTENSION SEGMENT FOR IT.
SU387072A1 (en) SHIELD FOR TUNNEL CONSTRUCTION
GB1363887A (en) Mining
ES400968A1 (en) Consolidation of rock strata
SU499823A3 (en) A device for the construction of the lining of underground structures
IE34332B1 (en) Improvements in tunnels or tunneling
FR2336543A1 (en) Tunnelling shield able to negotiate unstable sections - injects filling material behind ring of lining segments using resilient seals
FR2435599A1 (en) Helicoidal mine tunnel lining - uses arch blocks assembled by cylindrical shield and held together by rods and ties cemented to ground
GB1213046A (en) Method of construction of tunnel linings
GB1501430A (en) Method for producing a cylindrical lining segment frame for underground works
GB1362251A (en) Method of and apparatus for driving and lining tunnels
GB1073468A (en) An improved method of and means for constructing concrete lined tunnels and the like
GB1335676A (en) Constructing a tunnel
GB999822A (en) An improved method of driving pipes through the ground
GB1283546A (en) Method of mining material from a mine face with a rotary mining head
SU693012A1 (en) System of mining gently sloping and sloping seams