SU1079784A2 - Method of assembling a building framework - Google Patents
Method of assembling a building framework Download PDFInfo
- Publication number
- SU1079784A2 SU1079784A2 SU833529361A SU3529361A SU1079784A2 SU 1079784 A2 SU1079784 A2 SU 1079784A2 SU 833529361 A SU833529361 A SU 833529361A SU 3529361 A SU3529361 A SU 3529361A SU 1079784 A2 SU1079784 A2 SU 1079784A2
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- floor
- slab
- attached
- building
- perimeter
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
СПОСОБ МОНТАЖА КАРКАСА ЗДАНИЯ по авт. св. № 730941, отличающийс тем, что, с целью повышени безопасности ведени работ на высоте, после подъема кровельной плиты на один этаж по ее периметру шарнирно прикрепл ют монтажные стойки с подкосами измен емой длины и ограждени , присоединенные к защитному экрану и стойкам на кронштейнах.METHOD OF INSTALLATION KARKAS BUILDING on the bus. St. No. 730941, characterized in that, in order to increase the safety of work at height, after raising the roofing slab to one floor around its perimeter, mounting racks with braces of variable length and fences attached to the protective screen and brackets are attached pivotally.
Description
ОABOUT
NN
СгCr
со сх cx
иг.1 Изобретение относитс к строительству, в частности к способам монтажа каркаса зданий, возводимых методом подъема. По основному авт. св. № 730941 известен способ монтажа каркаса здани , имеющего накет междуэтажных плит перекрытий из бетонных и тому подобных смесей, дл зданий, возводимых методом подъема этажей и перекрытий, включаюш,ий установку колонн нескольких этажей, изготовление плит перекрытий этажей и кровельной плиты на заданной отметке и последующий подъем кровельной плиты и плит перекрытий этажей на заданные отметки посредством гибких т г с захватами и подвески по периметру кровельной плиты защитного экрана, при этом сначала изготавливают плиты перекрыти первого, второго этажей и кровельную плиту, после чего последнюю поднимают на высоту этажа и на верхней поверхности плиты второго этажа бетонируют плиту перекрыти третьего этажа, после чего поднимают пакет плит на отметку второго этажа, затем на верхней поверхности пакета бетонируют плиту четвертого этажа, поднимают плиты второго , третьего и четвертого этажей на отметку следующего этажа, бетонируют на верхней поверхности плиту следующего этажа, поднимают пакет плит перекрытий этажей и кровельную плиту на отметку следующего этажа, после чего процесс повтор ют 1. Недостатком этого способа монтажа каркаса здани вл етс то, что не в полной мере обеспечиваетс безопасность ведени работ на высоте. Целью изобретени вл етс повыщение безопасности ведени работ на высоте. Цель достигаетс тем, что согласно способу монтажа каркаса здани после подъема кровельной плиты на один этаж по ее периметру шарнирно прикрепл ют монтажные стойки с подкосами измен емой длины и ограждени , присоединенные к защитному экрану и стойкам на кронщтейнах. На фиг. 1 изображена установка колонны с подъемниками, изготовление части дра жесткости и кровельной плиты; на фиг. 2 - подъем кровельной плиты на высоту этажа и прикрепление по ее периметру снизу вертикальных стоек с регулируемыми подкосами и ограждени ми; на фиг. 3промежуточный процесс, когда нижележащие плиты установлены на проектных отметках , а верхн плита бетонируетс под кровельной плитой; на фиг. 4 - план плиты перекрыти с расположенными по периметру ее стойками с регулируемыми подкосами и ограждени ми; на фиг. 5 - узел I на фиг. 2. Способ монтажа каркаса здани осуществл ют следующим образом. После установки колонн 1 здани и изготовлени дра 2 жесткости бетонируют кровельную плиту 3. Затем на колоннах 1 устанавливают подъемники 4 и осуществл ют подъем кровельной плиты на высоту этажа . После чего снизу к кровельной плите прикрепл ют вертикальные стойки 5 с регулируемыми подкосами 6 измен емой длины с помощью болтов 7. Далее к нижнему концу вертикальной стойки 5 прикрепл ют ограждени 8, которые присоедин ют к стойке 5 с помощью регулируемых кронщтейнов 9, к которым прикрепл ют также защитный экран 10 дл бетонировани плит перекрытий. Подкос 6 выполнен регулируемым с измен емой длиной дл облегчени монтажа жесткой системы, состо щей из плиты 3, вертикальной стойки 5 и подкоса 6. Кронштейн 9 выполнен регулируемым по длине дл обеспечени правильности сборки защитного экрана 10. Предлагаемый способ монтажа каркаса здани обеспечивает требовани техники безопасности при бетонировании плит на высоте, позвол ет с помощью кронштейнов вывер ть в проектное положение защитный экран и одновременно обеспечивает ограждение дл безопасности ведени работ.The invention relates to construction, in particular, to methods for mounting a frame of buildings erected by a lifting method. According to the main author. St. No. 730941 is known a method of mounting a building frame with a stack of interfloor floor slabs made of concrete and similar mixtures for buildings erected by the method of lifting floors and ceilings, including the installation of columns of several floors, the manufacture of floor slabs and a roofing slab at a given elevation and subsequent the rise of the roofing slab and floor slabs to predetermined elevations by means of flexible tg with clamps and hangers around the perimeter of the roofing slab of the protective screen, while first the slabs are made the first, second floors and roofing slab, after which the latter is raised to the height of the floor and on the upper surface of the slab of the second floor is concreted the slab of the third floor, after which the stack of plates is raised to the mark of the second floor, then the slab of the fourth floor is raised to the upper surface of the packet the second, third and fourth floors to the mark of the next floor, concrete on the upper surface of the slab of the next floor, raise the package of floor slabs and roofing slab to the mark of the next floor, After that the process was repeated 1. The disadvantage of this method of building the carcass assembly is that is not fully ensured safe work at height. The aim of the invention is to increase the safety of work at height. The goal is achieved in that, according to the method of mounting the building frame, after lifting the roofing slab to one floor along its perimeter, the mounting racks with braces of variable length and fences attached to the protective screen and racks on the brackets are hinged. FIG. 1 shows the installation of a column with lifts, the manufacture of part of the core stiffness and roofing slab; in fig. 2 - raising the roofing slab to the height of the floor and attaching along its perimeter from the bottom vertical posts with adjustable struts and fences; in fig. 3 An intermediate process where the underlying slabs are installed at design marks and the upper slab is concreted under the roof slab; in fig. 4 is a plan of the slab with its posts located along the perimeter with adjustable struts and fences; in fig. 5 shows the node I in FIG. 2. The method of mounting the building framework is carried out as follows. After the installation of the columns 1 of the building and the manufacture of the rigidity core 2, the roof slab 3 is concreted. Then, the lifts 4 are installed on the columns 1 and the roof slab is raised to the height of the floor. Then, vertical posts 5 with adjustable struts 6 of variable length are attached to the roof slab with bolts 7. Next, fences 8 are attached to the lower end of the vertical post 5, which are attached to the rack 5 with adjustable brackets 9, to which are attached A protective screen 10 for concreting floor slabs is also used. The brace 6 is adjustable with a variable length to facilitate the installation of a rigid system consisting of a plate 3, a vertical stand 5 and a brace 6. The bracket 9 is adjustable in length to ensure correct assembly of the protective screen 10. The proposed method of mounting the building frame meets safety requirements when concreting slabs at a height, it allows using the brackets to turn the protective screen into the design position and at the same time provides a fence for safety of work.
3ФигЛ3FigL
Риг.5Riga 5
иand
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833529361A SU1079784A2 (en) | 1983-01-13 | 1983-01-13 | Method of assembling a building framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833529361A SU1079784A2 (en) | 1983-01-13 | 1983-01-13 | Method of assembling a building framework |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU730941 Addition |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1079784A2 true SU1079784A2 (en) | 1984-03-15 |
Family
ID=21041704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833529361A SU1079784A2 (en) | 1983-01-13 | 1983-01-13 | Method of assembling a building framework |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1079784A2 (en) |
-
1983
- 1983-01-13 SU SU833529361A patent/SU1079784A2/en active
Non-Patent Citations (1)
Title |
---|
1. Авторское свидетельство СССР № 730941, кл. Е 04 В 1/18, 1977 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1079784A2 (en) | Method of assembling a building framework | |
US2578057A (en) | Apparatus for molding concrete floor slabs | |
SU1609917A1 (en) | Method and apparatus for manufacturing prefabricated-solid roof | |
KR100292219B1 (en) | System Form for Box Structure Forming | |
JPH01256636A (en) | Construction method of building | |
JP2621748B2 (en) | All-weather temporary shed | |
RU93010838A (en) | METHOD OF CONSTRUCTION OF MONOLITHIC BUILDING AND MOBILE FORMWORK FOR ITS IMPLEMENTATION | |
KR20010092469A (en) | Method of forming concrete floors | |
SU730941A1 (en) | Method of erecting the framework of building | |
JP2876991B2 (en) | Steel frame method for high-rise buildings | |
SU1260487A1 (en) | Movable forms | |
JPH0461943B2 (en) | ||
SU1035172A1 (en) | Jig for group mounting of foundation posts | |
JP3239154B2 (en) | Lift-up device for all-weather temporary roof | |
SU1242594A1 (en) | Hoistable scaffold for erecting ferroconcrete shells of structures | |
KR20010107166A (en) | A System Form for Making a Box-Structure | |
SU1263793A1 (en) | Method of erecting buildings with prefabricated solid skeleton | |
AU2015100194A4 (en) | Perimeter Screens | |
SU1110884A1 (en) | Suspended scaffolding | |
RU2097513C1 (en) | Process of erection of superstructure of building | |
JPH0411168A (en) | Constructing method for steel frame material in highrise structure | |
SU1726702A1 (en) | Method of construction skeleton of a building | |
JP2671967B2 (en) | High-rise building construction method and construction beam assembly equipment | |
SU1694822A1 (en) | Centering for concreting of floor of multistory building | |
SU773230A1 (en) | Three-dimensional block form |