RU2685586C1 - Method for erection of constructive elements of building/construction from monolithic concrete and technological equipment for implementation thereof (invention group, options) - Google Patents
Method for erection of constructive elements of building/construction from monolithic concrete and technological equipment for implementation thereof (invention group, options) Download PDFInfo
- Publication number
- RU2685586C1 RU2685586C1 RU2017137181A RU2017137181A RU2685586C1 RU 2685586 C1 RU2685586 C1 RU 2685586C1 RU 2017137181 A RU2017137181 A RU 2017137181A RU 2017137181 A RU2017137181 A RU 2017137181A RU 2685586 C1 RU2685586 C1 RU 2685586C1
- Authority
- RU
- Russia
- Prior art keywords
- formwork
- vertical structures
- structures
- erected
- racks
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 239000004567 concrete Substances 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000009415 formwork Methods 0.000 claims abstract description 119
- 239000010410 layer Substances 0.000 claims abstract description 59
- 239000012634 fragment Substances 0.000 claims abstract description 19
- 239000000463 material Substances 0.000 claims abstract description 9
- 230000002787 reinforcement Effects 0.000 claims description 49
- 238000000465 moulding Methods 0.000 claims description 40
- 239000011150 reinforced concrete Substances 0.000 claims description 11
- 239000013013 elastic material Substances 0.000 claims description 8
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 2
- 238000009434 installation Methods 0.000 abstract description 5
- 239000002356 single layer Substances 0.000 abstract description 5
- 238000005265 energy consumption Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Группа изобретений относится к строительству и может быть использована при возведении многоэтажных монолитных зданий/сооружений.The group of inventions relates to the construction and can be used in the construction of multi-storey monolithic buildings / structures.
Известны способ возведения монолитных зданий и технологическая оснастка для его осуществления (группа изобретений, 1)There is a method of construction of monolithic buildings and technological equipment for its implementation (group of inventions, 1)
Способ по основному варианту включает возведение монолитного фрагмента здания: плита перекрытия всего здания - вертикальные конструкции вышележащего яруса-этажа всего здания. Основной принцип способа: возведение перекрытия яруса-этажа всего здания и после схватывания бетона перекрытия этого яруса-этажа укладка бетона вертикальных конструкций следующего яруса/этажа всего здания - выдержка во времени уложенного бетона до набора расчетной прочности - возведение очередного перекрытия и т.д. При производстве работ опалубку опирают на уложенные вертикальные конструкции здания. Технологическая оснастка включает, в том числе, подвижную опалубку и вертикальные щиты опалубки. Подвижная опалубка включает подъемные домкраты со стойками, на которых установлены П-образные домкратные рамы, стойки которых снабжены опорными пятами. Расположенные с каждой стороны возводимых вертикальных конструкций рамы соединены друг с другом жесткими связями. На опорных пятах стоек домкратных рам смонтированы с возможностью перемещения поперек возводимых вертикальных конструкций каретки, на которые установлены щиты вертикальной опалубки. При бетонировании домкратные рамы опираются на щиты вертикальной опалубки, которые установлены на нижележащие вертикальные конструкции. После достижения бетоном требуемой прочности домкратные рамы переопирают на стойки подъемных домкратов и опалубку поднимают на следующий ярус/этаж.The method according to the main variant includes the erection of a monolithic fragment of a building: the floor slab of the whole building - vertical structures of the overlying tier-floor of the whole building. The basic principle of the method is: erection of the floor tier overlap of the entire building and, after the concrete has set, the floor overlap of this tier floor, laying the concrete of the vertical structures of the next tier / floor of the whole building - stacking the laid concrete up to the set of design strength - erecting the next floor, etc. In the production of works formwork based on the laid vertical structure of the building. The tooling includes, among other things, mobile formwork and vertical formwork shields. The mobile formwork includes lifting jacks with racks, on which U-shaped jacking frames are installed, the racks of which are provided with supporting heels. Located on each side of the erected vertical frame structures are connected to each other by rigid ties. On the supporting heels of the racks of the jacking frames are mounted with the ability to move across the erected vertical structures of the carriage, on which are installed the shields of the vertical formwork. When concreting jacking frames rely on shields of vertical formwork, which are installed on the underlying vertical structures. After the concrete reaches the required strength, the jacking frames are re-laid on racks of lifting jacks and the formwork is raised to the next tier / floor.
В связи с тем, что при производстве работ домкратные рамы опираются на щиты вертикальной опалубки, то это предъявляет повышенные требования к прочностным характеристикам щитов. Это приводит к повышенному расходу металла для изготовления каркаса щитов, к повышенным энергозатратам на перемещение опалубки. Для возведения многослойных вертикальных конструкций при использовании известной подвижной опалубки необходимо время для достижения уложенным бетоном требуемой прочности, чтобы стало возможным переопереть домкратные рамы на подъемные домкраты, которые устанавливают на возведенные вертикальные конструкции, и сформировать формовочную полость нового слоя. Это увеличивает сроки строительства.Due to the fact that in the production of works the jacking frames rest on the shields of the vertical formwork, this places increased demands on the strength characteristics of the shields. This leads to an increased consumption of metal for the manufacture of the shield frame, to increased energy consumption for moving the formwork. For the construction of multi-layered vertical structures using known rolling formwork, time is required to achieve the required strength in concrete, so that it becomes possible to re-jack the jacking frames on lifting jacks, which are installed on the erected vertical structures, and to form the molding cavity of the new layer. This increases the construction time.
Задачами, на решение которых направлена группа изобретений, являются сокращение сроков строительства зданий/сооружений из монолитного железобетона, снижение материальных и трудовых затрат.The tasks to be solved by the group of inventions are the reduction of the construction time of buildings / structures made of monolithic reinforced concrete, the reduction of material and labor costs.
Поставленная задача решается тем, что способ возведения вертикальных конструкций здания/сооружения из монолитного железобетона включает технологические операции, в соответствии с которыми:The problem is solved in that the method of construction of vertical structures of the building / structure of monolithic reinforced concrete includes technological operations, in accordance with which:
- устанавливают на возведенные конструкции подъемные домкраты, содержащие заключенные в гильзы стойки, на которые установлены снабженные выносными опорами П-образные домкратные рамы, смежно и расположенные с каждой стороны возводимых вертикальных конструкций стойки которых соединяют друг с другом жесткими связями,- mounted on the erected structures lifting jacks, containing racks enclosed in sleeves, on which U-shaped jack frames equipped with outriggers are installed, adjacent and located on each side of the erected vertical structures, the racks are connected to each other with rigid connections,
- устанавливают арматурные каркасы вертикальных конструкций на всю высоту яруса/этажа с креплением их к выпускам арматуры ранее возведенных конструкций,- set the reinforcement cages of vertical structures to the entire height of the tier / floor with their attachment to the releases of the reinforcement of previously erected structures,
- устанавливают на стойки домкратных рам щиты опалубки для возведения вертикальных конструкций с жестким креплением между собой щитов, расположенных в одной плоскости, регулируют ширину формовочной полости и соединяют щиты, расположенные параллельно с другой стороны арматурного каркаса возводимых вертикальных конструкций при помощи стяжных устройств,- formwork boards for erecting vertical structures with rigid fixation between themselves of boards located in one plane are installed on jackstand racks of frames, regulate the width of the molding cavity and connect boards which are parallel to the other side of the reinforcement cage of erected vertical structures using coupling devices,
- укладывают бетон в формовочные полости возводимых вертикальных конструкций, при этом охватывающим стойки подъемных домкратов гильзам придают возвратно-вращательное или вращательное движение, далее, после достижения отформованными конструкциями 30-40% проектной прочности, опирают посредством выносных опор П-образные домкратные рамы на уложенные вертикальные конструкции, из которых извлекают стойки подъемных домкратов с охватывающими их гильзами, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости и отводят щиты опалубки от отформованной поверхности,- put the concrete into the molding cavities of the erected vertical structures, while the sleeves covering the racks of lifting jacks are given reciprocating or rotational motion, then, after reaching the molded structures 30-40% of the design strength, they are supported by means of the outboard supports U-shaped jacking frames on the vertical laid the structures from which the racks of lifting jacks with the sleeves covering them are removed, and then the cavities formed in the vertical structures are filled with concrete ny formwork panels molded from surface
- опирают стойки подъемных домкратов на возведенные конструкции и поднимают П-образные домкратные рамы с опалубкой на следующий ярус/этаж и цикл возведения вертикальных конструкций повторяют. Возведение вертикальных конструкций может осуществляться одновременно для всего здания/сооружения.- stand lifting jacks on the erected structures and raise the U-shaped jacking frame with formwork to the next tier / floor and repeat the cycle of construction of vertical structures. The construction of vertical structures can be carried out simultaneously for the entire building / structure.
Поставленная задача решается тем, что способ возведения многослойных вертикальных конструкций здания/сооружения из монолитного железобетона включает технологические операции, в соответствии с которыми:The problem is solved in that the method of construction of multi-layered vertical structures of the building / structure of monolithic reinforced concrete includes technological operations, in accordance with which:
- устанавливают на возведенные конструкции подъемные домкраты, содержащие заключенные в гильзы стойки, на которые установлены снабженные выносными опорами П-образные домкратные рамы, смежно и расположенные с каждой стороны возводимых вертикальных конструкций стойки которых соединяют друг с другом жесткими связями,- mounted on the erected structures lifting jacks, containing racks enclosed in sleeves, on which U-shaped jack frames equipped with outriggers are installed, adjacent and located on each side of the erected vertical structures, the racks are connected to each other with rigid connections,
- устанавливают арматурные каркасы вертикальных конструкций на всю высоту яруса/этажа с креплением их к выпускам арматуры ранее возведенных конструкций,- set the reinforcement cages of vertical structures to the entire height of the tier / floor with their attachment to the releases of the reinforcement of previously erected structures,
- устанавливают на стойки домкратных рам щиты опалубки для возведения вертикальных конструкций с жестким креплением между собой щитов, расположенных в одной плоскости, регулируют ширину формовочной полости и соединяют щиты, расположенные параллельно с другой стороны арматурного каркаса возводимых вертикальных конструкций при помощи стяжных устройств,- formwork boards for erecting vertical structures with rigid fixation between themselves of boards located in one plane are installed on jackstand racks of frames, regulate the width of the molding cavity and connect boards which are parallel to the other side of the reinforcement cage of erected vertical structures using coupling devices,
- укладывают бетон в формовочные полости возводимых вертикальных конструкций, при этом охватывающим стойки подъемных домкратов гильзам придают возвратно-вращательное или вращательное движение, далее, после достижения отформованными конструкциями распалубочной прочности отводят щиты опалубки с одной или двух сторон от отформованной поверхности, регулируют ширину формовочной полости нового слоя и заполняют ее формуемым материалом,- put the concrete into the molding cavities of the erected vertical structures, while the sleeves covering the racks of lifting jacks are given reciprocating or rotational motion, then, after reaching the shaped structures, the stripping strength is removed from the molded surface from one or two sides of the molded surface layer and fill it with moldable material
- после достижения основным (конструкционным) слоем 30-40% проектной прочности, опирают посредством выносных опор П-образные домкратные рамы на уложенные вертикальные конструкции, из которых извлекают стойки подъемных домкратов с охватывающими их гильзами, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости,- after reaching the basic (structural) layer of 30-40% of design strength, U-shaped jacking frames are supported by means of outriggers on the laid vertical structures, from which the jacks of the lifting jacks with their sleeves are removed, and then the cavities formed in the vertical structures are filled,
- отводят щиты опалубки от отформованной многослойной поверхности, опирают стойки подъемных домкратов на возведенный основной (конструкционный) слой вертикальной конструкции и поднимают П-образные домкратные рамы с опалубкой на следующий ярус/этаж и цикл возведения многослойных вертикальных конструкций повторяют.- take the formwork shields away from the formed multi-layered surface, support the jacks of the lifting jacks to the erected main (structural) layer of the vertical structure and lift the U-shaped jacking frames with the formwork to the next tier / floor and the cycle of the construction of the multi-layered vertical structures is repeated.
Перед заполнением бетоном формовочной полости основного (конструкционного) слоя на щиты опалубки с внутренней стороны могут быть навешены съемные выемкообразующие каркасы, а перед формированием последнего (наружного) слоя эти каркасы снимают.Before filling the molding cavity of the main (structural) layer with concrete, removable recess-forming frameworks can be hung from the inner side of the formwork panels, and before forming the last (outer) layer, these frameworks are removed.
На стойки домкратных рам могут быть установлены щиты, в палубе которых выполнены отверстия, в которые установлены втулки из упругого материала. После регулирования ширины формовочной полости основного (конструкционного) слоя, в отверстия вставляют стержневую арматуру, концы которой располагают по обе стороны плоскости щитов, а после отвода щитов перед формованием очередного слоя на вставленной стержневой арматуре закрепляют сеточный каркас.Shields can be installed on racks of jacking frames, in the deck of which holes are made, into which bushings of elastic material are installed. After adjusting the width of the molding cavity of the main (structural) layer, core reinforcement is inserted into the holes, the ends of which are placed on both sides of the plane of the shields, and after removal of the shields before forming the next layer, the grid frame is fixed to the inserted reinforcement.
Возведение вертикальных многослойных конструкций может осуществляться одновременно всего здания/сооружения.The construction of vertical multi-layer structures can be carried out simultaneously the entire building / structure.
Поставленная задача решается тем, что способ возведения фрагмента здания/сооружения «перекрытие - стена» из монолитного железобетона включает технологические операции, в соответствии с которыми:The task is solved by the fact that the method of erection of a fragment of a building / structure "overlap - wall" of monolithic reinforced concrete includes technological operations, in accordance with which:
- устанавливают на возведенные вертикальные конструкции подъемные домкраты, содержащие заключенные в гильзы стойки, на которые установлены снабженные выносными опорами П-образные домкратные рамы, смежно и расположенные с каждой стороны возводимых вертикальных конструкций стойки которых соединяют друг с другом жесткими связями,- mounted on the erected vertical structures lifting jacks, containing racks enclosed in sleeves, on which U-shaped jacking frames, equipped with outriggers, are mounted, adjacent and located on each side of the erected vertical structures, the racks are connected to each other with rigid connections,
- устанавливают опалубку перекрытия с арматурными каркасами и арматурные каркасы вертикальных конструкций на всю высоту яруса/этажа с креплением их к выпускам арматуры ранее возведенных вертикальных конструкций и арматуре перекрытия,- establish a ceiling formwork with reinforcement cages and reinforcement cages of vertical structures to the entire height of the tier / floor with their attachment to the issues of reinforcement of previously erected vertical structures and floor reinforcement,
- устанавливают на стойки домкратных рам щиты опалубки для возведения вертикальных конструкций с жестким креплением между собой щитов, расположенных в одной плоскости, регулируют ширину формовочной полости и соединяют щиты, расположенные параллельно с другой стороны арматурного каркаса возводимых вертикальных конструкций при помощи стяжных устройств, при этом низ щитов вертикальной опалубки располагают на уровне верха опалубки перекрытия,- formwork boards are installed on racks of jacking frames for erecting vertical structures with rigid mounting between themselves of boards located in one plane, adjust the width of the molding cavity and connect boards that are parallel to the other side of the reinforcement cage of erected vertical structures using tie-down devices, while the bottom shields vertical formwork have at the top of the ceiling formwork,
- укладывают бетон перекрытия и, на завершающей стадии его схватывания, укладывают бетон в формовочные полости возводимых вертикальных конструкций, при этом охватывающим стойки подъемных домкратов гильзам придают возвратно-вращательное или вращательное движение, далее, после достижения отформованными конструкциями 30-40% проектной прочности, опирают посредством выносных опор П-образные домкратные рамы на уложенные вертикальные конструкции, из которых извлекают стойки подъемных домкратов с охватывающими их гильзами, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости, отводят щиты опалубки от отформованной поверхности,- concrete is laid overlapping and, at the final stage of its setting, concrete is placed in the molding cavities of erected vertical structures, while the sleeves are attached to the molding racks of the lifting jacks, then, after the molded structures achieve 30-40% of the design strength, they support by means of outriggers U-shaped jacking frames on the laid vertical structures, from which the racks of lifting jacks with the sleeves covering them are removed, and then filled the concrete formed in the vertical structures of the cavity, remove the formwork panels from the molded surface,
- опирают стойки подъемных домкратов на возведенные вертикальные конструкции и поднимают П-образные домкратные рамы с опалубкой на следующий ярус/этаж и цикл возведения фрагмента здания повторяют.- they support racks of lifting jacks on erected vertical structures and lift U-shaped jacking frames with formwork to the next tier / floor and repeat the cycle of erecting a fragment of a building.
Возведение перекрытия и вертикальных конструкций всего здания/сооружения может осуществляться одновременно.Construction of floors and vertical structures of the entire building / structure can be carried out simultaneously.
Поставленная задача решается тем, что способ возведения фрагмента здания/сооружения «перекрытие - многослойная стена» из монолитного железобетона включает технологические операции, в соответствии с которыми:The problem is solved by the fact that the method of erection of a fragment of a building / structure "overlap - multilayer wall" of monolithic reinforced concrete includes technological operations, in accordance with which:
- устанавливают на возведенные конструкции подъемные домкраты, содержащие заключенные в гильзы стойки, на которые установлены снабженные выносными опорами П-образные домкратные рамы, смежно и расположенные с каждой стороны возводимых вертикальных конструкций стойки которых соединяют друг с другом жесткими связями,- mounted on the erected structures lifting jacks, containing racks enclosed in sleeves, on which U-shaped jack frames equipped with outriggers are installed, adjacent and located on each side of the erected vertical structures, the racks are connected to each other with rigid connections,
- устанавливают опалубку перекрытия с арматурными каркасами и арматурные каркасы вертикальных конструкций на всю высоту яруса/этажа с креплением их к выпускам арматуры ранее возведенных вертикальных конструкций и арматуры перекрытия,- establish a ceiling formwork with reinforcement cages and reinforcement cages of vertical structures to the full height of the tier / floor with their attachment to the issues of reinforcement of previously erected vertical structures and floor reinforcement,
- устанавливают на стойки домкратных рам щиты опалубки для возведения вертикальных конструкций с жестким креплением между собой щитов, расположенных в одной плоскости, регулируют ширину формовочной полости и соединяют щиты, расположенные параллельно с другой стороны арматурного каркаса возводимых вертикальных конструкций при помощи стяжных устройств, при этом низ щитов вертикальной опалубки располагают на уровне верха опалубки перекрытия,- formwork boards are installed on racks of jacking frames for erecting vertical structures with rigid mounting between themselves of boards located in one plane, adjust the width of the molding cavity and connect boards that are parallel to the other side of the reinforcement cage of erected vertical structures using tie-down devices, while the bottom shields vertical formwork have at the top of the ceiling formwork,
- укладывают бетон перекрытия и, на завершающей стадии схватывания бетона перекрытия, укладывают бетон в формовочные полости возводимых вертикальных конструкций, при этом охватывающим стойки подъемных домкратов гильзам придают возвратно-вращательное или вращательное движение, далее, после достижения отформованными вертикальными конструкциями распалубочной прочности с одной или двух сторон отводят щиты опалубки от отформованной вертикальной поверхности, регулируют ширину формовочной полости нового слоя и заполняют ее формуемым материалом,- stack concrete overlap and, at the final stage of concrete overlap setting, stack concrete into the molding cavities of erected vertical structures, while the sleeves are attached to the molding cavities of the lifting jacks, then, after having formed the vertical structures, the stripping strength with one or two sides take the formwork shields from the formed vertical surface, adjust the width of the molding cavity of the new layer and fill it with moldable material erialom,
- после достижения основным (конструкционным) слоем вертикальных конструкций 30-40% проектной прочности, опирают посредством выносных опор П-образные домкратные рамы на уложенные вертикальные конструкции, из которых извлекают стойки подъемных домкратов с охватывающими их гильзами, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости,- after the main (structural) layer of vertical structures reaches 30-40% of design strength, U-shaped jacking frames are supported by means of outriggers on the laid vertical structures, from which the jacks of the jacks with the sleeves covering them are removed, and then they are filled with concrete formed in vertical structures cavities
- отводят щиты опалубки от отформованной многослойной поверхности, опирают стойки подъемных домкратов на возведенный основной (конструкционный) слой вертикальной конструкции и поднимают П-образные домкратные рамы с опалубкой на следующий ярус/этаж и цикл возведения фрагмента здания/сооружения повторяют.- take the formwork shields away from the molded multi-layered surface, support the jacks of the lifting jacks to the erected main (structural) layer of the vertical structure and lift U-shaped jacking frames with the formwork to the next tier / floor and repeat the cycle of erection of the building fragment / structure.
Перед заполнением бетоном формовочной полости основного (конструкционного) слоя на щиты опалубки с внутренней стороны могут быть навешены съемные выемкообразующие каркасы, а перед формированием последнего (наружного) слоя каркасы снимают.Before filling the molding cavity of the main (structural) layer with concrete, removable recess-forming frameworks can be hung from the inner side of the formwork panels, and the skeletons are removed before the last (outer) layer is formed.
На стойки домкратных рам могут быть установлены щиты, в палубе которых выполнены отверстия, в которые установлены втулки из упругого материала. После регулирования ширины формовочной полости основного (конструкционного) слоя, в отверстия вставляют стержневую арматуру, концы которой располагают по обе стороны плоскости щитов, а после отвода щитов перед формованием очередного слоя на вставленной стержневой арматуре закрепляют сеточный каркас.Shields can be installed on racks of jacking frames, in the deck of which holes are made, into which bushings of elastic material are installed. After adjusting the width of the molding cavity of the main (structural) layer, core reinforcement is inserted into the holes, the ends of which are placed on both sides of the plane of the shields, and after removal of the shields before forming the next layer, the grid frame is fixed to the inserted reinforcement.
Возведение перекрытия и многослойных вертикальных конструкций всего здания/сооружения может осуществляться одновременно.The construction of floors and multi-layered vertical structures of the entire building / structure can be carried out simultaneously.
Поставленная задача решается также применением подвижной опалубки, которая включает подъемные домкраты со стойками, на которых установлены П-образные домкратные рамы, в основании каждой из стоек которых закреплены направляющие, в которых установлены с возможностью перемещения поперек возводимых вертикальных конструкций держатели щитов опалубки вертикальных конструкций с приводом их перемещения, а также, по меньшей мере, на одной из стоек домкратной рамы установлена выносная опора. На стойках подъемных домкратов и с зазором к ним закреплены с возможностью вращения и вертикального перемещения гильзы, нижний конец каждой из которых расположен в основании нижнего (концевого) штока подъемного домкрата. Стойки смежных домкратных рам, расположенные с каждой стороны возводимых вертикальных конструкций, соединены друг с другом жесткими связями. Подвижная опалубка также включает жестко соединенные друг с другом и закрепленные на держателях домкратных рам щиты вертикальной опалубки, каждый из которых содержит несущий каркас с краевыми профилями по периметру щита.The task is also solved by the use of mobile formwork, which includes lifting jacks with racks, on which U-shaped jacking frames are installed, at the base of each rack of which rails are fixed, in which the holders of formwork boards of vertical structures with a drive are mounted for moving across the erected vertical structures their movement, as well as, at least on one of the racks of the jacking frame, an outboard support is installed. On racks of lifting jacks and with a gap to them are fixed with the possibility of rotation and vertical movement of the sleeve, the lower end of each of which is located at the base of the lower (end) stem of the lifting jack. Racks of adjacent jacking frames, located on each side of the erected vertical structures, are connected to each other by rigid ties. The movable formwork also includes rigidly connected with each other and mounted on the holders of the jacking frame shields vertical formwork, each of which contains a supporting frame with edge profiles around the perimeter of the shield.
Выносные опоры домкратных рам могут быть снабжены приводом перемещения и установлены на каждой ее стойке в направляющих, расположенных под углом, предпочтительно 45 град., к возводимым вертикальным конструкциям, причем, направляющие перемещения выносных опор, расположенные на стойках каждой П-образной домкратной рамы, направлены в противоположные стороны от стоек вдоль возводимых вертикальных конструкций.The outrigger supports of jacking frames can be equipped with a displacement drive and mounted on each of its uprights in guides arranged at an angle, preferably 45 degrees, to the erected vertical structures; moreover, the outward supports of the outrigger supports located on the uprights of each U-shaped jacking frame are directed in opposite directions from racks along the erected vertical structures.
Привод вращения гильзы может быть установлен на расположенной на ее верхнем конце площадке и содержит зубчатое колесо, которое входит в зацепление с зубчатым кольцом, закрепленным на наружной поверхности верхнего участка стойки подъемного домкрата.The drive of rotation of the sleeve can be installed on the platform located at its upper end and contains a gear wheel which engages with a gear ring fixed on the outer surface of the upper section of the jack of the lifting jack.
Поставленная задача решается также применением щита вертикальной опалубки для возведения многослойных конструкций, который содержит несущий каркас с краевыми профилями по периметру щита, закрепленную на каркасе палубу, в которой выполнены отверстия, в которых установлены втулки из упругого материала. На торце верхнего краевого профиля щита может быть закреплен, по меньшей мере, один кронштейн с отверстиями под крепежные элементы для соединения с П-образной домкратной рамой.The task is also solved by using a shield of vertical formwork for the construction of multi-layer structures, which contains a supporting frame with edge profiles around the shield perimeter, mounted on the frame deck, which has holes in which bushings of elastic material are installed. At the end of the upper edge profile of the shield, at least one bracket with holes for fasteners for connection with the U-shaped jacking frame can be fixed.
В краевых профилях щита вертикальной опалубки могут быть выполнены отверстия под крепежные элементы для соединения с другими щитами. В палубе щита и элементах каркаса могут быть выполнены отверстия под стяжные устройства. Щит может быть выполнен на всю высоту яруса/этажа.In the edge profiles of the shield of the vertical formwork, holes can be made for fasteners for connection with other shields. Holes for tightening devices can be made in the deck of the shield and frame elements. The shield can be made to the full height of the tier / floor.
Совокупность признаков, как каждого отдельного изобретения, так и всех изобретений, включая конструктивные элементы (узлы, детали и т.п.) подвижной опалубки, используемых совместно, позволяют решить поставленную задачу. Установка с возможностью вращения и вертикального перемещения на стойки подъемных домкратов гильз, позволяет изолировать стойки в процессе бетонирования конструкций. В процессе реализации способов возведения конструктивных элементов здания/сооружения нагрузка от всей опалубки будет передаваться на ранее уложенные вертикальные конструкции посредством подъемных домкратов, а не посредством щитов, как у прототипа. Это позволит значительно снизить расход металла на каркас щитов, снизить вес щитов, что приведет к снижению энергозатрат на перемещение опалубки. Кроме того, становится возможным производить устройство дополнительных слоев конструкций сразу после достижения бетоном уложенного основного (конструкционного) слоя распалубочной прочности. Срок до распалубливания конструкций меньше, чем срок достижения уложенным бетоном прочности, при котором становится возможным передавать на него нагрузку от опалубки посредством подъемных домкратов. Это, в сравнении с прототипом, позволит снизить сроки строительства. Установка на стойках домкратных рам направляющих, в которых с возможностью перемещения в направлении поперек возводимых вертикальных конструкций держателей щитов вертикальной опалубки позволяет, как и у прототипа, регулировать толщину стены, в том числе уменьшать толщину стен вышележащих ярусов/этажей, что способствует снижению расхода стройматериалов. Установка на стойках домкратных рам выносных опор позволяет производить переустановку подвижной опалубки на уложенные вертикальные конструкции и извлечь подъемные домкраты для дальнейшего производства работ. Наличие съемных выемкообразующих каркасов, навешиваемых перед бетонированием на щиты вертикальной опалубки, а также применение щитов, в отверстия палубы которых устанавливаются арматурные стержни, на которые перед бетонированием очередного слоя крепится сеточный каркас позволяет улучшить сцепление слоев вертикальных конструкций. Это повышает надежность и качество строительства.The combination of features, both of each individual invention, and of all inventions, including structural elements (nodes, parts, etc.) of mobile formwork used in common, allows to solve the set task. Installation with the possibility of rotation and vertical movement of jacks of sleeves on racks of sleeves allows to isolate racks in the process of concreting of structures In the process of implementing the methods of erecting structural elements of a building / structure, the load from the entire formwork will be transferred to the previously laid vertical structures by means of lifting jacks, and not by means of shields, as in the prototype. This will significantly reduce the consumption of metal on the frame of the boards, reduce the weight of the boards, which will lead to a decrease in energy consumption for moving the formwork. In addition, it becomes possible to make the device additional layers of structures immediately after the concrete reaches the laid basic (structural) layer of stripping strength. The time to demolish structures is less than the time to achieve the strength of concrete laid, at which it becomes possible to transfer the load from the formwork to it by means of lifting jacks. This, in comparison with the prototype, will reduce construction time. Installation on racks of jacking frames of guides, in which, like the prototype, it is possible to adjust the wall thickness, including reducing the thickness of the walls of the overlying floors / floors, with the possibility of moving in the direction across the vertical formwork shields holders, thereby reducing the consumption of building materials. Installation on racks of jacking frames of outriggers allows to re-install the mobile formwork on the laid vertical structures and remove the lifting jacks for further work. The presence of removable vymokoobrazuyuschih frameworks, hung before concreting on the boards of vertical formwork, as well as the use of shields, in the deck holes of which reinforcing rods are mounted, on which the grid framework is attached to the concreting of the next layer, improves the adhesion of the vertical structures. This increases the reliability and quality of construction.
Изобретения поясняются чертежами, на которых:The invention is illustrated by drawings, in which:
Фиг. 1 - подвижная опалубка, вид вдоль возводимой однослойной стены, подъемные домкраты опираются в возведенную стену;FIG. 1 - mobile formwork, view along the erected single-layer wall, lifting jacks are supported in the erected wall;
Фиг. 2 - то же, что на Фиг. 1, расположенные друг напротив друга щиты образуют формовочную полость;FIG. 2 is the same as in FIG. 1, opposite each other shields form a molding cavity;
Фиг. 3 - вид опалубки и отформованного фрагмента здания «перекрытие - однослойная стена», опалубка перекрытия не показана;FIG. 3 is a view of the formwork and the molded fragment of the building “overlap - single-layer wall”, the ceiling formwork is not shown;
Фиг. 4 - то же, что на Фиг. 3, щиты опалубки разведены, частичный разрез отформованной стены, опалубка опирается на выносные опоры домкратных рам, а стойки подъемных домкратов извлечены (подняты их нижние секции);FIG. 4 is the same as in FIG. 3, the formwork shields are set apart, a partial section of the formed wall, the formwork rests on the outrigger supports of the jacking frames, and the jacks of the lifting jacks are removed (their lower sections are raised);
Фиг. 5 - то же, что на Фиг. 4, подъемные домкраты опираются в возведенную стену перед подъемом опалубки на очередной ярус/этаж;FIG. 5 is the same as in FIG. 4, lifting jacks are supported in the erected wall before lifting the formwork to the next tier / floor;
Фиг. 6 - основание стоек домкратных рам с прикрепленными щитамиFIG. 6 - the basis of racks of jacking frames with attached shields
Фиг. 7 - вид А на Фиг. 6;FIG. 7 is a view A of FIG. 6;
Фиг. 8 - разрез В-В на Фиг. 7;FIG. 8 is a section BB in FIG. 7;
Фиг. 9 - разрез С-С на Фиг. 7;FIG. 9 is a C-C section in FIG. 7;
Фиг. 10 - разрез верхней и нижней части подъемного домкрата подвижной опалубки;FIG. 10 - section of the upper and lower parts of the lifting jack of the mobile formwork;
Фиг. 11 - то же, что на Фиг. 2, но при возведении многослойной стены с использованием навешиваемых на щиты выемкообразующих каркасов;FIG. 11 is the same as in FIG. 2, but when erecting a multi-layered wall using recess-forming frameworks hinged on shields;
Фиг. 12 - вид опалубки и отформованного фрагмента здания «перекрытие - многослойная стена» с выемками в стене, опалубка перекрытия не показана;FIG. 12 is a view of the formwork and the formed fragment of the building “overlap - multilayer wall” with notches in the wall, the floor formwork is not shown;
Фиг. 13 - щит вертикальной опалубки с отверстиями в палубе для возведения многослойных стен;FIG. 13 - a shield of vertical formwork with holes in the deck for the construction of multilayer walls;
Фиг. 14 - вид опалубки вдоль возводимой многослойной стены с использованием щита с отверстиями в палубе, в которые введена стержневая арматура;FIG. 14 is a view of the formwork along the erected multi-layer wall using a shield with openings in the deck, into which rod reinforcement is inserted;
Фиг. 15 - вид опалубки и отформованного с использованием щита с отверстиями в палубе фрагмента здания «перекрытие - конструкционный слой стены», а на стержневой арматуре, выступающей из конструкционного слоя, закреплен сеточный каркас, опалубка перекрытия не показана.FIG. 15 - view of the formwork and the “overlap - structural layer of the wall” fragment of the building framed using a shield with holes in the building, and a skeleton frame is fixed on the core reinforcement projecting from the structural layer, the ceiling formwork is not shown.
В приводимом ниже примере конкретного исполнения подвижная опалубка включает подъемные домкраты со стойками 1, на которых установлены П-образные домкратные рамы 2, в основании каждой из стоек 3 которых закреплены направляющие 4, в которых установлены с возможностью перемещения поперек возводимых вертикальных конструкций 5 держатели 6 щитов 7 опалубки вертикальных конструкций с приводом их перемещения. На стойках 3 домкратной рамы 2 также установлены с возможностью перемещения выносные опоры 8. На стойках 1 подъемных домкратов и с зазором к ним закреплены с возможностью вращения и вертикального перемещения гильзы 9, нижний конец каждой из которых расположен в основании нижнего (концевого) штока подъемного домкрата. Стойки 3 смежных домкратных рам 2, расположенные с каждой стороны возводимых вертикальных конструкций 5, соединены друг с другом жесткими связями 10. Подвижная опалубка также содержит жестко соединенные друг с другом и закрепленные на держателях 6 домкратных рам 2 щиты 7 вертикальной опалубки, каждый из которых содержит несущий каркас с краевыми профилями по периметру щита. Выносные опоры 8 домкратных рам 2 снабжены приводом перемещения и установлены на каждой ее стойке 3 в направляющих 11, расположенных под углом, предпочтительно 45 град., к возводимым вертикальным конструкциям 5, и которые направлены в противоположные стороны от стоек 3 вдоль возводимых вертикальных конструкций 5. Очевидно, что выносные опоры 8 могут быть размещены только на одной из стоек 3 домкратных рам 2. В этом случае на смежных домкратных рамах 2 выносные опоры 8 будут закреплены на стойках 3 в шахматном порядке вдоль возводимых вертикальных конструкций 5. Это обеспечит надежное опирание всей опалубки на возведенные вертикальные конструкции при извлечении из них стоек 1 подъемных домкратов. Также очевидно, что выносные опоры 8 могут быть выполнены и размещены на стойках 3 наподобие выносных опор автокрана (выдвижные, откидные, поворотно-выдвижные, поворотно-откидные опоры и т.п.). Привод вращения гильзы 9 установлен на расположенной на ее верхнем конце площадке и содержит зубчатое колесо 12, которое входит в зацепление с зубчатым кольцом 13, закрепленным на наружной поверхности верхнего участка стойки 1 подъемного домкрата. При извлечении стоек 1 из вертикальных конструкций 5 зубчатое колесо 12 и зубчатое кольцо 13 выводятся из зацепления. Стойки 1 поднимаются и вместе с ними поднимаются гильзы 9.In the specific example below, the mobile formwork includes lifting jacks with
Подвижная опалубка также содержит щиты 7 вертикальной опалубки, которые содержат несущий каркас с краевыми профилями по периметру щита, На торце верхнего краевого профиля щита 7 может быть закреплен, по меньшей мере, один кронштейн 14 с отверстиями под крепежные элементы для соединения с держателями 6 П-образных домкратных рам 2. В краевых профилях щита вертикальной опалубки могут быть выполнены отверстия под крепежные элементы для соединения с другими щитами. В палубе щита и элементах каркаса могут быть выполнены отверстия под стяжные устройства. Щит может быть выполнен на всю высоту яруса/этажа. Для возведения многослойных конструкций могут быть использованы щиты 15, в палубе 16 которых выполнены отверстия 17, в которых установлены втулки из упругого материала. Также, для возведения многослойных конструкций могут быть использованы щиты 7, на которые с внутренней стороны навешиваются съемные выемкообразующие каркасы 18.The mobile formwork also contains
Возведение однослойных вертикальных конструкций осуществляют следующим образом.The construction of single-layer vertical structures is as follows.
Устанавливают на возведенные конструкции 5 подъемные домкраты, содержащие заключенные в гильзы 9 стойки 1, на которые установлены снабженные выносными опорами 8 П-образные домкратные рамы 2. Расположенные с каждой стороны возводимых вертикальных конструкций стойки 3 смежных домкратных рам 2 соединяют друг с другом жесткими связями 10. Устанавливают арматурные каркасы вертикальных конструкций на всю высоту яруса/этажа с креплением их к выпускам арматуры ранее возведенных конструкций. К держателям 6 крепят содержащие кронштейны 14 щиты 7 опалубки с жестким креплением между собой всех щитов 7, расположенных в одной плоскости. Перемещают держатели 6 в направляющих 4 и регулируют ширину формовочной полости. Соединяют щиты, расположенные параллельно с другой стороны арматурного каркаса возводимых вертикальных конструкций при помощи стяжных устройств. Укладывают бетон в формовочные полости возводимых вертикальных конструкций 5. Охватывающим стойки 1 подъемных домкратов гильзам 9 придают возвратно-вращательное или вращательное движение. После достижения отформованными конструкциями 30-40% проектной прочности, опирают посредством выносных опор 8 П-образные домкратные рамы 2 на уложенные вертикальные конструкции 5, из которых извлекают стойки 1 подъемных домкратов с охватывающими их гильзами 9, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости и отводят щиты опалубки от отформованной поверхности. Полости могут заполняться не на всю высоту (на чертежах не показано). В этом случае оставляют гнезда для последующей установки в них стоек 1 подъемных домкратов. После достижения бетоном требуемой прочности опирают стойки 1 подъемных домкратов на возведенные конструкции 5 и поднимают П-образные домкратные рамы 2 с опалубкой на следующий ярус/этаж и цикл возведения вертикальных конструкций повторяют. Возведение вертикальных конструкций может осуществляться одновременно для всего здания/сооружения.5 lifting jacks are installed on the erected structures containing 9
Возведение многослойных вертикальных конструкций осуществляют следующим образом.The construction of multilayer vertical structures is as follows.
Первые этапы возведение основного (конструкционного) слоя осуществляют так же, как было описано выше. После достижения отформованными конструкциями 5 (конструкционным слоем) распалубочной прочности отводят щиты 7 опалубки с одной или двух сторон от отформованной поверхности (на чертежах приведен пример, в котором щиты отводятся только с одной стороны для формирования второго слоя 22). Регулируют ширину формовочной полости нового слоя и заполняют ее формуемым материалом. После достижения основным (конструкционным) слоем 30-40% проектной прочности, опирают посредством выносных опор 8 П-образные домкратные рамы 2 на уложенные вертикальные конструкции 5 (конструкционный слой), из которых извлекают стойки 1 подъемных домкратов с охватывающими их гильзами 9, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости. Отводят щиты 7 опалубки от отформованной многослойной поверхности, опирают стойки 1 подъемных домкратов на возведенный основной (конструкционный) слой вертикальной конструкции 5 и поднимают П-образные домкратные рамы 2 с опалубкой на следующий ярус/этаж и цикл возведения многослойных вертикальных конструкций повторяют. В одном из возможных вариантов (Фиг. 11, 12) перед заполнением бетоном формовочной полости основного (конструкционного) слоя на щиты опалубки 7 с внутренней стороны навешивают съемные выемкообразующие каркасы 18, а перед формированием последнего (наружного) слоя каркасы снимают. По другому варианту (Фиг. 14, 15) на стойки 3 домкратных рам 2 устанавливают щиты 15 (Фиг. 13), в палубе 16 которых выполнены отверстия 17, в которые установлены втулки из упругого материала. После регулирования ширины формовочной полости основного (конструкционного) слоя, в отверстия 17 вставляют стержневую арматуру 19, концы которой располагают по обе стороны плоскости щитов 15, а после отвода щитов перед формованием очередного слоя на вставленной стержневой арматуре 19 закрепляют сеточный каркас 20. Возведение многослойных вертикальных конструкций может осуществляться одновременно для всего здания/сооружения. Очевидно, что одновременно можно возводить сразу два слоя, например, фасадный и изоляционный слои, снаружи конструкционного слоя. В этом случае щиты 7 или 15 отводятся от отформованного конструкционного слоя с двух сторон и производство работ осуществляется как было описано выше.The first stages of the construction of the main (structural) layer carried out in the same way as described above. After reaching the molded structures 5 (structural layer) of stripping strength,
Возведения фрагмента здания/сооружения «перекрытие - стена» из монолитного железобетона осуществляют следующим образом.The construction of a fragment of the building / structure "ceiling - wall" of monolithic reinforced concrete is as follows.
Устанавливают на возведенные конструкции 5 подъемные домкраты, содержащие заключенные в гильзы 9 стойки 1, на которые установлены снабженные выносными опорами 8 П-образные домкратные рамы 2. Расположенные с каждой стороны возводимых вертикальных конструкций стойки 3 смежных домкратных рам 2 соединяют друг с другом жесткими связями 10. Устанавливают опалубку перекрытия 21 с арматурными каркасами и арматурные каркасы вертикальных конструкций на всю высоту яруса/этажа с креплением их к выпускам арматуры ранее возведенных вертикальных конструкций и арматуре перекрытия. К держателям 6 крепят содержащие кронштейны 14 щиты 7 опалубки с жестким креплением между собой всех щитов 7, расположенных в одной плоскости, при этом низ щитов 7 вертикальной опалубки располагают на уровне верха опалубки перекрытия, Перемещают держатели 6 в направляющих 4 и регулируют ширину формовочной полости. Соединяют щиты 7, расположенные параллельно с другой стороны арматурного каркаса возводимых вертикальных конструкций при помощи стяжных устройств. Укладывают бетон перекрытия и, на завершающей стадии его схватывания, укладывают бетон в формовочные полости возводимых вертикальных конструкций, при этом охватывающим стойки 1 подъемных домкратов гильзам 9 придают возвратно-вращательное или вращательное движение. После достижения отформованными конструкциями 30-40% проектной прочности, опирают посредством выносных опор 8 П-образные домкратные рамы 2 на уложенные вертикальные конструкции 5 (конструкционный слой), из которых извлекают стойки 1 подъемных домкратов 2 с охватывающими их гильзами 9, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости, отводят щиты опалубки от отформованной поверхности. Опирают стойки 1 подъемных домкратов на возведенные вертикальные конструкции и поднимают П-образные домкратные рамы 2 с опалубкой на следующий ярус/этаж и цикл возведения фрагмента здания повторяют. Возведение перекрытия и вертикальных конструкций может осуществляться одновременно для всего здания/сооружения.5 lifting jacks are installed on the erected structures containing 9
Возведения фрагмента здания/сооружения «перекрытие - многослойная стена» из монолитного железобетона осуществляют следующим образом.The construction of a fragment of the building / structure "overlap - multilayer wall" of monolithic reinforced concrete is as follows.
Первые этапы работ производят так же, как и при возведении фрагмента «стена - перекрытие». После достижения основным (конструкционным) слоем распалубочной прочности с одной или двух сторон отводят щиты опалубки от отформованной вертикальной поверхности (на чертежах приведен пример, в котором щиты отводятся только с одной стороны для формирования второго слоя 22). Регулируют ширину формовочной полости нового слоя и заполняют ее формуемым материалом. После достижения основным (конструкционным) слоем вертикальных конструкций 30-40% проектной прочности, опирают посредством выносных опор 8 П-образные домкратные рамы 2 на основной слой, из которого извлекают стойки 1 подъемных домкратов с охватывающими их гильзами 9, после чего заполняют бетоном образовавшиеся в вертикальных конструкциях полости. Отводят щиты 7 опалубки от отформованной многослойной поверхности, опирают стойки 1 подъемных домкратов на возведенный основной (конструкционный) слой вертикальной конструкции и поднимают П-образные домкратные рамы 2 с опалубкой на следующий ярус/этаж и цикл возведения фрагмента здания/сооружения повторяют. Возможные варианты выполнения многослойных вертикальных конструкций изложен выше в соответствующем разделе описания. Возведение перекрытия и многослойных вертикальных конструкций может осуществляться одновременно для всего здания/сооружения.The first stages of work are carried out in the same way as in the construction of the “wall-overlap” fragment. After the main (structural) layer of stripping strength is reached, one-sided or two-sided shields formwork boards from the molded vertical surface (an example is shown in the drawings in which the shields are diverted from one side only to form the second layer 22). Adjust the width of the molding cavity of the new layer and fill it with moldable material. After the main (structural) layer of vertical structures reaches 30-40% of the design strength, they support 8 U-shaped jacking frames by means of outriggers on the main layer, from which the
Использование изобретений позволяет снизить материалоемкость технологической оснастки и энергозатраты на ее перемещение. Сокращаются сроки возведения зданий/сооружений с многослойными вертикальными конструкциями. При единовременном выполнении работ на всем здании/сооружении, так же как и у аналога, обеспечивается создание монолитного фрагмента здания: диск перекрытия всего здания - вертикальные конструкции вышележащего яруса/этажа, повышается жесткость и прочностные характеристики возводимых зданий/сооружений, что обуславливает возможность эффективного использования изобретений при строительстве в сейсмоактивных регионах.The use of inventions can reduce the consumption of materials and industrial equipment and energy consumption for its movement. Terms of construction of buildings / structures with multi-layered vertical structures are reduced. At one-time work on the entire building / structure, as well as the analogue, the creation of a monolithic fragment of the building is ensured: the overlapping disk of the entire building - vertical structures of the overlying tier / floor, increased rigidity and strength characteristics of the buildings / structures being constructed, which makes it possible to effectively use inventions in construction in seismically active regions.
Claims (42)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017137181A RU2685586C1 (en) | 2017-10-23 | 2017-10-23 | Method for erection of constructive elements of building/construction from monolithic concrete and technological equipment for implementation thereof (invention group, options) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017137181A RU2685586C1 (en) | 2017-10-23 | 2017-10-23 | Method for erection of constructive elements of building/construction from monolithic concrete and technological equipment for implementation thereof (invention group, options) |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2685586C1 true RU2685586C1 (en) | 2019-04-22 |
Family
ID=66314449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2017137181A RU2685586C1 (en) | 2017-10-23 | 2017-10-23 | Method for erection of constructive elements of building/construction from monolithic concrete and technological equipment for implementation thereof (invention group, options) |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2685586C1 (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0205063A2 (en) * | 1985-06-12 | 1986-12-17 | Gleitbau-Gesellschaft mit beschränkter Haftung | Sliding method and sliding form |
EP0471870A1 (en) * | 1990-08-21 | 1992-02-26 | Gleitbau-Gesellschaft mit beschränkter Haftung | Shuttering-system |
DE102006049037A1 (en) * | 2006-10-13 | 2008-04-24 | Lothar Bitschnau | Shuttering system for cement coating of walls (1) of tanks for holding media which attack cement comprises inner and outer shuttering attached to support carrying reel of protective sheet which is unrolled between inner shuttering and wall |
RU80484U1 (en) * | 2008-07-11 | 2009-02-10 | Закрытое акционерное общество "Опалубка русская" | FORMWORK SHIELD |
RU2401918C2 (en) * | 2008-07-22 | 2010-10-20 | Абакар Ахмедпашаевич Акаев | Method for erection of monolithic three-layered fence and inner walls of buildings and forming system for its realisation |
RU122678U1 (en) * | 2012-05-10 | 2012-12-10 | Общество с ограниченной ответственностью "Агрисовгаз" | FORMING SHIELD |
EA019375B1 (en) * | 2011-01-10 | 2014-03-31 | Николае Попеску | Process for erection of cast-in-situ buildings and production tooling for realization thereof |
-
2017
- 2017-10-23 RU RU2017137181A patent/RU2685586C1/en active IP Right Revival
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0205063A2 (en) * | 1985-06-12 | 1986-12-17 | Gleitbau-Gesellschaft mit beschränkter Haftung | Sliding method and sliding form |
EP0471870A1 (en) * | 1990-08-21 | 1992-02-26 | Gleitbau-Gesellschaft mit beschränkter Haftung | Shuttering-system |
DE102006049037A1 (en) * | 2006-10-13 | 2008-04-24 | Lothar Bitschnau | Shuttering system for cement coating of walls (1) of tanks for holding media which attack cement comprises inner and outer shuttering attached to support carrying reel of protective sheet which is unrolled between inner shuttering and wall |
RU80484U1 (en) * | 2008-07-11 | 2009-02-10 | Закрытое акционерное общество "Опалубка русская" | FORMWORK SHIELD |
RU2401918C2 (en) * | 2008-07-22 | 2010-10-20 | Абакар Ахмедпашаевич Акаев | Method for erection of monolithic three-layered fence and inner walls of buildings and forming system for its realisation |
EA019375B1 (en) * | 2011-01-10 | 2014-03-31 | Николае Попеску | Process for erection of cast-in-situ buildings and production tooling for realization thereof |
RU122678U1 (en) * | 2012-05-10 | 2012-12-10 | Общество с ограниченной ответственностью "Агрисовгаз" | FORMING SHIELD |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100968068B1 (en) | Multi-Horizontal Structure Member Forming Method | |
SG185173A1 (en) | A prefabricated element of a multi-storey building and a semi-prefabricating construction method thereof | |
EA019375B1 (en) | Process for erection of cast-in-situ buildings and production tooling for realization thereof | |
AU2020415710A1 (en) | Method of construction | |
CN111663659B (en) | Staggered floor synchronous construction method | |
CN108005373B (en) | Integrated lifting platform system and assembling method thereof | |
EP3470603B1 (en) | Method for erecting structural elements of building/construction of monolithic reinforced concrete and technological equipment to implement it | |
KR101116254B1 (en) | High-rise structure construction method by lifting up table-form | |
RU2685586C1 (en) | Method for erection of constructive elements of building/construction from monolithic concrete and technological equipment for implementation thereof (invention group, options) | |
RU2401918C2 (en) | Method for erection of monolithic three-layered fence and inner walls of buildings and forming system for its realisation | |
CN215367748U (en) | Assembled balcony | |
JP2009024449A (en) | Building internal staircase and method of constructing the same | |
KR101219466B1 (en) | Method for constructing framework and outer window simultaneously | |
JP5972113B2 (en) | Construction method of multistory parking lot | |
EA038868B1 (en) | Building construction method | |
CN111315941B (en) | Building construction method | |
AU2019204109B2 (en) | A wall frame component used within a building construction method | |
RU2716319C1 (en) | Method of erection of buildings and structures | |
JP2018076749A (en) | SITE PCa CONSTRUCTION METHOD OF PARAPETS | |
RU76040U1 (en) | VOLUME REINFORCED FRAME FOR ESTABLISHING MONOLITHIC REINFORCED CONCRETE COVERING | |
RU55399U1 (en) | FORMWORK SYSTEM | |
RU2574226C1 (en) | Method of construction using multi-cage mine hoist of height reinforced concrete pipes with large thickness of lining with small outlet diameter and large ratio of outlet diameter to diameter in base | |
KR20240017638A (en) | Interlayer lifting machine that carries formwork from a building | |
SU1747642A1 (en) | Method of erecting buildings by hoisting premanufactured storeys | |
CN106906897A (en) | A kind of construction method of skyscraper Liang Shi structural transition layers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20191024 |
|
NF4A | Reinstatement of patent |
Effective date: 20211020 |