RU2636992C1 - Method for bed preparation with stable rock in immediate back - Google Patents

Method for bed preparation with stable rock in immediate back Download PDF

Info

Publication number
RU2636992C1
RU2636992C1 RU2016135362A RU2016135362A RU2636992C1 RU 2636992 C1 RU2636992 C1 RU 2636992C1 RU 2016135362 A RU2016135362 A RU 2016135362A RU 2016135362 A RU2016135362 A RU 2016135362A RU 2636992 C1 RU2636992 C1 RU 2636992C1
Authority
RU
Russia
Prior art keywords
ventilation
drift
mining
excavation
drifts
Prior art date
Application number
RU2016135362A
Other languages
Russian (ru)
Inventor
Евгений Михайлович Балакирев
Роман Вячеславович Сагдаков
Тимур Талгатович Фатыхов
Александр Аркадьевич Романовский
Original Assignee
Акционерное общество "ВНИИ Галургии" (АО "ВНИИ Галургии")
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество "ВНИИ Галургии" (АО "ВНИИ Галургии") filed Critical Акционерное общество "ВНИИ Галургии" (АО "ВНИИ Галургии")
Priority to RU2016135362A priority Critical patent/RU2636992C1/en
Application granted granted Critical
Publication of RU2636992C1 publication Critical patent/RU2636992C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/20Methods of underground mining; Layouts therefor for rock salt or potash salt

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

FIELD: mining.
SUBSTANCE: method for bed preparation with stable rock in immediate back includes driving of production and ventilation drifts. Transportation of ore is carried out by a conveyer located in extraction drift. The extraction of minerals is performed by chamber system with extraction of block in retreat order. In the middle of the section the production and ventilation drifts are parallel to each other. At that they are periodically connected to each other by brake throughs in which the ventilation bulkheads are installed. The ventilation drift extends from production drift at a distance to exclude their mutual influence. The preparation scheme is applicable for two-bed mining.
EFFECT: invention makes it possible to reduce time for preparation of block for mining, increase development rate.
2 cl, 2 dwg

Description

Изобретение относится к горной промышленности и может быть использовано при разработке пластовых месторождений, например калийных, при камерной системе разработки и обратном порядке отработки в породах с устойчивой непосредственной кровлей.The invention relates to the mining industry and can be used in the development of reservoir deposits, for example, potash, with a chamber development system and the reverse mining procedure in rocks with a stable direct roof.

Известен способ подготовки полезных ископаемых при обратном порядке отработки, включающий нарезку выемочного участка путем проходки подготовительных выработок - полевых конвейерного и транспортного штреков, пластовых выемочных, вентиляционных штреков и разрезных выработок, последующую отработку запасов камерами (Методическое руководство по ведению горных работ на рудниках Верхнекамского калийного месторождения / Уральский филиал ВНИИГ. - М.: Недра, 1992. - С. 101, рис. 3.17, 3.18).A known method of preparing minerals in the reverse order of mining, including cutting a mining site by sinking preparatory workings - field conveyor and transport drifts, formation excavation drills, ventilation drifts and cutting workings, subsequent mining of reserves by chambers (Methodical guide for mining at the mines of the Verkhnekamsk potash deposit / Ural branch of VNIIG. - M .: Nedra, 1992. - P. 101, Fig. 3.17, 3.18).

Указанный способ трудоемок и предполагает большой объем горно-подготовительных работ, в т.ч. проведение двух штреков по пустой породе.The specified method is time-consuming and involves a large amount of mining and preparatory work, including holding two drifts on waste rock.

Известен также способ подготовки полезных ископаемых при устойчивых породах кровли, включающий проходку подготовительных выработок - полевого конвейерного штрека, пластовых выемочных, вентиляционных и вспомогательных вентиляционных штреков, последующую отработку запасов камерами (Методическое руководство по ведению горных работ на рудниках Верхнекамского калийного месторождения / Уральский филиал ВНИИГ. - М.: Недра, 1992. - С. 43, рис. 1.18).There is also a method of preparing minerals for stable roof rocks, including the excavation of preparatory workings - a field conveyor drift, formation excavation, ventilation and auxiliary ventilation drifts, subsequent mining of reserves by chambers (Methodological guide for mining at the mines of the Verkhnekamsk potash deposit / Ural branch of VNIIG. - M .: Nedra, 1992 .-- S. 43, Fig. 1.18).

К недостаткам указанного способа также следует отнести значительный объем горно-подготовительных работ, что увеличивает срок подготовки выемочного участка к отработке.The disadvantages of this method should also include a significant amount of mining and preparatory work, which increases the preparation time of the excavation site for mining.

Наиболее близким по технической сущности и достигаемому результату к предлагаемому является способ, заключающийся в подготовке выемочного участка путем проходки пластовых выработок - выемочного штрека по центру участка и вентиляционных штреков по его границам. Последующая отработка камер осуществляется комбайновыми комплексами, а транспортировка руды конвейером, располагающемся в выемочном штреке (Методическое руководство по ведению горных работ на рудниках Верхнекамского калийного месторождения / Уральский филиал ВНИИГ. - М: Недра, 1992. - С. 91, рис. 3.5).The closest in technical essence and the achieved result to the proposed one is the method, which consists in preparing a excavation site by sinking formation workings - a excavation drift in the center of the site and ventilation drifts at its borders. Subsequent mining of chambers is carried out by combine complexes, and ore is transported by a conveyor located in a dredging drift (Methodical guide for mining at the mines of the Verkhnekamsk potash deposit / Ural branch of VNIIG. - M: Nedra, 1992. - P. 91, Fig. 3.5).

Недостатком указанного способа является сложность проходки вентиляционных штреков по границам выемочного участка, так как для доставки горной массы на конвейер необходимо периодически проходить разрезные выработки между выемочным и вентиляционными штреками, что значительно увеличивает объем горно-подготовительных работ. Кроме того, вентиляционные штреки расположены на расстоянии от выемочного штрека, равном длине камеры (190-300 м), что определяет большую длину доставки горной массы на конвейер при проведении вентиляционных штреков, это снижает скорость проходки и увеличивает срок подготовки выемочного участка к отработке.The disadvantage of this method is the difficulty of driving the ventilation drifts along the boundaries of the excavation section, since for the delivery of the rock mass to the conveyor it is necessary to periodically pass through the openings between the excavation and ventilation drifts, which significantly increases the volume of mining and preparatory work. In addition, the ventilation drifts are located at a distance from the excavation drift equal to the length of the chamber (190-300 m), which determines the large length of the rock mass delivery to the conveyor during ventilation drifts, this reduces the speed of penetration and increases the preparation time for the excavation section for mining.

Технический результат предлагаемого изобретения заключается в сокращении сроков подготовки выемочного участка к отработке за счет проходки одного вентиляционного штрека, а также в повышении скорости проходки в результате уменьшения длины доставки породы от проходки вентиляционного штрека за счет расположения вентиляционного штрека вблизи выемочного.The technical result of the invention is to reduce the time for preparation of the excavation site for mining by driving one ventilation drift, as well as to increase the rate of penetration as a result of reducing the length of rock delivery from the penetration of the ventilation drift due to the location of the ventilation drift near the excavation drift.

Сущность изобретения поясняется чертежами: на фиг. 1 - схема подготовки выемочного участка; на фиг. 2 - схема отработки выемочного участка.The invention is illustrated by drawings: in FIG. 1 is a diagram of the preparation of a mining site; in FIG. 2 is a diagram of mining a mining site.

На чертежах обозначено: 1 - магистральный транспортный штрек, 2 - магистральный вентиляционный штрек; 3 - выемочный штрек; 4 - участковый вентиляционный штрек; 5 - сбойка; 6 - участковый конвейер; 7 - вентиляционная перемычка; 8 - вентилятор местного проветривания; 9 - очистная камера; 10 - граница выемочного участка; 11 - направление движения воздуха; 12 - направление движения фронта очистных работ.The drawings indicate: 1 - trunk transport drift, 2 - trunk ventilation drift; 3 - dredging drift; 4 - precinct ventilation drift; 5 - failure; 6 - precinct conveyor; 7 - ventilation jumper; 8 - local ventilation fan; 9 - treatment chamber; 10 - the boundary of the excavation site; 11 - direction of air movement; 12 - the direction of movement of the front of the treatment plant.

Способ осуществляется следующим образом.The method is as follows.

Подготовку выемочного участка начинают от магистрального транспортного штрека 1 и магистрального вентиляционного штрека 2. От указанных штреков вдоль выемочного участка проходят по пласту участковые подготовительные выработки: по центру участка выемочный штрек 3, параллельно выемочному - участковый вентиляционный штрек 4. Расстояние между выемочным и вентиляционным штреками определяют по условию исключения их взаимного влияния с целью обеспечения устойчивости выработок (на практике это расстояние обычно составляет 30-60 м). При проходке выемочного штрека 3 и участкового вентиляционного штрека 4 их соединяют между собой сбойками 5 для организации проветривания проходческих забоев и разгрузки на участковый конвейер 6 горной массы, получаемой от проходки участкового вентиляционного штрека 4. Расстояние между сбойками 5 соответствует техническим возможностям применяемых средств доставки. При каждом очередном соединении выемочного штрека 3 и участкового вентиляционного штрека 4 сбойкой 5, предыдущая сбойка изолируется путем установки в ней вентиляционной перемычки 7. Руда от проходки подготовительных выработок участковым конвейером 6 транспортируется до магистрального транспортного штрека 1, где перегружается на находящийся в нем конвейер и далее направляется к стволу (Фиг. 1).The preparation of the excavation section starts from the main transport drift 1 and the main ventilation drift 2. From these drifts along the excavation section, local preparatory workings pass along the seam: in the center of the section there is a excavation drift 3, parallel to the excavation one - the local ventilation drift 4. The distance between the excavation and ventilation drifts is determined by the condition of eliminating their mutual influence in order to ensure the stability of the workings (in practice, this distance is usually 30-60 m). When driving a dredging drift 3 and a local ventilation drift 4, they are interconnected by faults 5 for organizing the ventilation of the face and unloading the rock mass received from the penetration of a local ventilation drift 4. The distance between failures 5 corresponds to the technical capabilities of the delivery vehicles used. With each subsequent connection of the excavation drift 3 and the local ventilation drift 4 with a fault 5, the previous fault is isolated by installing a ventilation bridge 7. Ore from the excavation of the preparatory workings by the local conveyor 6 is transported to the main transport drift 1, where it is loaded onto the conveyor located in it and then sent to the trunk (Fig. 1).

В период проведения подготовительных выработок проветривание горнопроходческих работ осуществляется по следующей схеме. Свежий воздух из магистрального транспортного штрека 1 поступает в выемочный штрек 3 и движется по нему до неизолированной сбойки 5, далее вентилятором местного проветривания 8 подается в тупиковый забой выработки, находящейся в проходке. Омыв забой, воздух через сбойку 5 направляется в участковый вентиляционный штрек 4 и по нему удаляется в магистральный вентиляционный штрек 2, в общешахтную исходящую струю (Фиг. 1).During the preparatory workings, the ventilation of mining works is carried out according to the following scheme. Fresh air from the main transport drift 1 enters the excavation drift 3 and moves along it until an uninsulated fault 5, then the local ventilation fan 8 is fed into the dead end of the mine located in the tunnel. After washing the face, air through the fault 5 is sent to the precinct ventilation drift 4 and is removed through it to the main ventilation drift 2, into the mine shaft outgoing stream (Fig. 1).

По окончании проходки выемочного штрека 3 и участкового вентиляционного штрека 4 на всю длину выемочного участка, начинают отработку очистных камер 9 обратным порядком при движении фронта очистных работ от границы участка к магистральным штрекам. Отработку очистных камер 9 ведут из выемочного штрека 3. Отбитая руда доставляется по очистной камере 9 до выемочного штрека 3, где разгружается на участковый конвейер 6 и транспортируется до магистрального транспортного штрека 1, затем перегружается на находящийся в нем конвейер и далее направляется к стволу (Фиг. 2).At the end of the excavation drift drift 3 and the local ventilation drift 4 for the entire length of the excavation section, the treatment chambers 9 are started in reverse order when the front of the treatment works moves from the site boundary to the main drifts. The processing of the treatment chambers 9 is carried out from the extraction drift 3. The beaten ore is delivered through the treatment chamber 9 to the extraction drift 3, where it is unloaded to the local conveyor 6 and transported to the main transport drift 1, then loaded onto the conveyor located in it and then sent to the trunk (Fig. . 2).

При ведении очистных работ организация проветривания следующая. Свежий воздух из магистрального транспортного штрека 1 поступает в выемочный штрек 3 и движется до рабочей очистной камеры 9, далее вентилятором местного проветривания 8 подается в забой отрабатываемой камеры. Омыв забой, воздух из очистной камеры 9 удаляется в участковый вентиляционный штрек 4 и по нему в магистральный вентиляционный штрек 2, в общешахтную исходящую струю (Фиг. 2).When conducting treatment works, the organization of ventilation is as follows. Fresh air from the main transport drift 1 enters the extraction drift 3 and moves to the working treatment chamber 9, then the local ventilation fan 8 is fed into the bottom of the exhaust chamber. After washing the face, air from the treatment chamber 9 is removed to the local ventilation drift 4 and through it to the main ventilation drift 2, into the mine shaft outgoing stream (Fig. 2).

Схема подготовки применима также и для двухпластовой отработки.The preparation scheme is also applicable for two-layer mining.

Claims (2)

1. Способ пластовой подготовки при устойчивых породах непосредственной кровли, включающий проходку пластовых выемочного и вентиляционного штреков, транспортировку руды конвейером, расположенным в выемочном штреке, разработку полезного ископаемого камерной системой, отработку выемочного участка обратным порядком, отличающийся тем, что выемочный и вентиляционные штреки проходят параллельно друг другу посередине участка, при этом их периодически соединяют между собой сбойками, в которых устанавливают вентиляционные перемычки.1. The method of formation preparation for stable rocks of the immediate roof, including the sinking of formation dredging and ventilation drifts, the transportation of ore by a conveyor located in the dredging drift, the development of minerals by a chamber system, the mining of the dredging section in the reverse order, characterized in that the dredging and ventilation drifts run in parallel to each other in the middle of the plot, while they are periodically interconnected by failures, in which the ventilation jumpers are installed. 2. Способ по п. 1, отличающийся тем, что вентиляционный штрек проходят от выемочного штрека на расстоянии, исключающем их взаимное влияние.2. The method according to p. 1, characterized in that the ventilation drift pass from the excavation drift at a distance that excludes their mutual influence.
RU2016135362A 2016-08-30 2016-08-30 Method for bed preparation with stable rock in immediate back RU2636992C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016135362A RU2636992C1 (en) 2016-08-30 2016-08-30 Method for bed preparation with stable rock in immediate back

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016135362A RU2636992C1 (en) 2016-08-30 2016-08-30 Method for bed preparation with stable rock in immediate back

Publications (1)

Publication Number Publication Date
RU2636992C1 true RU2636992C1 (en) 2017-11-29

Family

ID=60581245

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016135362A RU2636992C1 (en) 2016-08-30 2016-08-30 Method for bed preparation with stable rock in immediate back

Country Status (1)

Country Link
RU (1) RU2636992C1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1099080A1 (en) * 1982-08-02 1984-06-23 Ордена Трудового Красного Знамени Производственное Объединение "Белорускалий" Им.50-Летия Ссср Method of mining gently sloping mineral beds
SU1234628A1 (en) * 1984-09-18 1986-05-30 Уральский филиал Всесоюзного научно-исследовательского и проектного института галургии Method of mining a suit of mineral beds
SU1289990A1 (en) * 1985-06-14 1987-02-15 Институт горного дела им.А.А.Скочинского Method of mining thick gently-sloping seams
SU1555491A1 (en) * 1987-12-02 1990-04-07 Пермский политехнический институт Method of mining a series of adjoining strata with complex hypsometry
RU2530102C1 (en) * 2013-04-01 2014-10-10 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method of preparation and mining contiguous flat seams

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1099080A1 (en) * 1982-08-02 1984-06-23 Ордена Трудового Красного Знамени Производственное Объединение "Белорускалий" Им.50-Летия Ссср Method of mining gently sloping mineral beds
SU1234628A1 (en) * 1984-09-18 1986-05-30 Уральский филиал Всесоюзного научно-исследовательского и проектного института галургии Method of mining a suit of mineral beds
SU1289990A1 (en) * 1985-06-14 1987-02-15 Институт горного дела им.А.А.Скочинского Method of mining thick gently-sloping seams
SU1555491A1 (en) * 1987-12-02 1990-04-07 Пермский политехнический институт Method of mining a series of adjoining strata with complex hypsometry
RU2530102C1 (en) * 2013-04-01 2014-10-10 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method of preparation and mining contiguous flat seams

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Методическое руководство по ведению горных работ на рудниках Верхнекамского калийного месторождения, Уральский филиал ВНИИГ, М, Недра, 1992, c.43, рис.1.18. *

Similar Documents

Publication Publication Date Title
RU2303132C1 (en) Method for bedded deposit development with heading-and-stall method
RU2636992C1 (en) Method for bed preparation with stable rock in immediate back
RU2433267C1 (en) Method of ore deposits mining by sublevel caving
RU2490454C1 (en) Method for open-underground mining of thick steep coal bed
RU2530102C1 (en) Method of preparation and mining contiguous flat seams
RU2536541C1 (en) Method of underground mining of pitching and underlay lodes
RU2490456C1 (en) Method for open-underground mining of thick flat coal bed
RU2502871C1 (en) Preparation method of stope bottoms
RU2585318C1 (en) Development of thick gently sloping potassium beds
RU2655502C1 (en) Method for preparing coal plast for processing
RU2642721C1 (en) Method of processing of a cutting site
RU2642193C1 (en) Method for developing horizontal and lower ore bodies of average capacity
RU2627803C1 (en) Method for chamber mining when preparing horizons
RU2720863C1 (en) Method for development of gently sloping formations of potassium salts by combine machines
RU2488693C1 (en) Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system
RU2254472C1 (en) Method for extraction of massive sloping potassium beds
RU2817486C1 (en) Method for development of flat beds of potassium salts by combine complexes
RU2709266C1 (en) Method of preparation and development of extraction unit by diagonal chambers
RU2563895C1 (en) Method of open and underground mining of series of semi-steep coal layers
RU2349753C2 (en) Method of development of elginskiy coal basin
RU2539090C1 (en) Transfer of muck
RU2555997C1 (en) Method of open-underground development of thick single steeply inclined coal seam
RU2248447C1 (en) Method for extraction of slanted extraction fields on gently sloping coal beds
RU2567576C1 (en) Development of thick flat-lying potash beds
RU2538016C1 (en) Treatment of potash seams