RU2620453C1 - Method of carrier equipment check with connection line control and information exchange registration - Google Patents

Method of carrier equipment check with connection line control and information exchange registration Download PDF

Info

Publication number
RU2620453C1
RU2620453C1 RU2016102210A RU2016102210A RU2620453C1 RU 2620453 C1 RU2620453 C1 RU 2620453C1 RU 2016102210 A RU2016102210 A RU 2016102210A RU 2016102210 A RU2016102210 A RU 2016102210A RU 2620453 C1 RU2620453 C1 RU 2620453C1
Authority
RU
Russia
Prior art keywords
information exchange
central control
control module
communication lines
equipment
Prior art date
Application number
RU2016102210A
Other languages
Russian (ru)
Inventor
Николай Анатольевич Васильев
Станислав Игоревич Сычев
Владислав Сергеевич Поляков
Original Assignee
Акционерное общество "Корпорация "Тактическое ракетное вооружение"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество "Корпорация "Тактическое ракетное вооружение" filed Critical Акционерное общество "Корпорация "Тактическое ракетное вооружение"
Priority to RU2016102210A priority Critical patent/RU2620453C1/en
Application granted granted Critical
Publication of RU2620453C1 publication Critical patent/RU2620453C1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/28Error detection; Error correction; Monitoring by checking the correct order of processing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

FIELD: radio engineering, communication.
SUBSTANCE: to check the carrier equipment with the communication line control and the registration of the information exchange, the voltage supply is fed to the carrier launcher power converter, the converted voltage from the power converter is fed to the central control module, the switching module and the built-in simulator, the check mode is set of the communication lines by the central control unit, check of all communication lines of the switching modules is performed with a missile and a transport-launch container for a short, the potential difference and resistance between the communication lines are measured, the test results are transmitted to the central control module, the simulation mode and the used channels, the type of the simulated missiles, the presence and types of the simulated errors of the information exchange are set, the simulation is performed, the results are transmitted to the central control module, the registration mode is set, the information exchange is peformed in accordance with the particular data of the information exchange, the results are transmitted and the information exchange is recorded in the central control module, and a conclusion is made about the serviceability of the carrier equipment on the basis of the obtained data.
EFFECT: information exchange registration and connection line control of equipment for preparation and launch of a carrier and a missile.
1 dwg

Description

Техническое решение относится к информационно-измерительным системам и предназначено для проверки исправности аппаратуры носителей, используемых для размещения беспилотных летательных аппаратов, в частности ракет, и контроля линий связи между беспилотным летательным аппаратом и аппаратурой носителя.The technical solution relates to information-measuring systems and is intended to check the serviceability of the carrier equipment used to place unmanned aerial vehicles, in particular missiles, and to control communication lines between an unmanned aerial vehicle and carrier equipment.

Из уровня техники известен способ проверки аппаратуры носителя (RU, патент на изобретение №2377649, опубл. 27.12.2009, МПК G06G 7/48, G06F 11/28, F41F 3/04), при котором осуществляют имитацию функционирования ракеты, в том числе и при ошибках цифрового обмена и возможных ошибках разовых команд, наглядно отображают ход и результаты проверки. Перед проведением проверки взаимодействия имитатора ракеты с аппаратурой носителя осуществляют проверку линий связи между ракетой и аппаратурой носителя путем поочередного подключения к разъему устройства имитации проверяемых каналов аппаратуры носителя. Данный способ реализован при помощи устройства, включающего в себя управляющий модуль, модули ввода-вывода цифровых данных и разовых команд, задания параметров информационного обмена, задания ошибок цифрового обмена и разовых команд. Недостатками данного способа являются отсутствие возможности контроля линий связи с помощью штатного подключения проверочного устройства, невозможность одновременной регистрации информационного обмена, а также невозможность проверки при наличии ракеты в транспортно-пусковом контейнере.The prior art method for testing media equipment (RU, patent for the invention No. 2377649, publ. 12/27/2009, IPC G06G 7/48, G06F 11/28, F41F 3/04), which imitate the functioning of the rocket, including and with digital exchange errors and possible errors of one-time commands, visually display the progress and results of the check. Before checking the interaction of the rocket simulator with the carrier equipment, the communication lines between the rocket and the carrier equipment are checked by alternately connecting the tested equipment channels to the simulation device connector. This method is implemented using a device that includes a control module, input / output modules for digital data and one-time commands, setting information exchange parameters, setting digital exchange errors and one-time commands. The disadvantages of this method are the inability to control communication lines using the standard connection of the test device, the impossibility of simultaneously registering information exchange, as well as the inability to check if there is a rocket in the transport-launch container.

Из уровня техники известен способ проверки аппаратуры носителя, позволяющий отрабатывать безопасный пуск авиационной управляемой ракеты (RU, патент на изобретение №2422910, МПК G09B 19/00, G06F 11/28, F41F 3/04), при котором к аппаратуре носителя через бортовой разъем подключают учебно-летную ракету, имитируют функционирование и токопотребление ракеты, записывают информационный обмен на внутреннее запоминающее устройств и проводят послеполетный анализ. Недостатками данного способа являются недостаточно высокая достоверность проверки из-за невозможности контроля линий связи аппаратуры носителя и ракеты, невозможность одновременной регистрации информационного обмена, а также невозможность отработки действий летчика во внештатных ситуациях.The prior art method of testing carrier equipment, allowing to work out the safe launch of an aircraft guided missile (RU, patent for invention No. 2422910, IPC G09B 19/00, G06F 11/28, F41F 3/04), in which to the carrier equipment through the onboard connector they connect the training flight rocket, simulate the functioning and current consumption of the rocket, record information exchange on the internal memory of the devices and conduct post-flight analysis. The disadvantages of this method are the insufficiently high reliability of the check due to the impossibility of monitoring the communication lines of the carrier equipment and the rocket, the impossibility of simultaneously registering information exchange, and the inability to practice the pilot's actions in emergency situations.

Задачей предлагаемого изобретения является устранение вышеперечисленных недостатков, создание способа проверки аппаратуры носителя, позволяющего одновременно регистрировать информационный обмен, а также осуществлять контроль линий связи аппаратуры подготовки и пуска носителя и ракеты с использованием штатных соединений.The objective of the invention is to eliminate the above disadvantages, the creation of a method for checking the equipment of the carrier, allowing you to simultaneously record information exchange, as well as monitor the communication lines of the equipment for the preparation and launch of the carrier and missiles using standard connections.

Поставленная задача решается за счет того, что способ проверки аппаратуры носителя с контролем линий связи и регистрацией информационного обмена осуществляют следующим образом: подают напряжение питания на преобразователь питания пусковой установки носителя, преобразованное напряжение питания от преобразователя питания подают на центральный управляющий модуль, коммутирующий модуль и встроенный имитатор, с помощью центрального управляющего модуля задают режим проверки линий связи, осуществляют проверку всех линий связи коммутирующих модулей с ракетой и транспортно-пусковым контейнером на короткое замыкание, измеряют разности потенциалов и сопротивления между линиями связи, передают результаты проверки в центральный управляющий модуль, задают режим имитации и задействованные каналы, тип имитируемых ракет, наличие и типы имитируемых ошибок информационного обмена, осуществляют имитацию, результаты работы и данные записанного информационного обмена передают в центральный управляющий модуль, задают режим регистрации, осуществляют информационный обмен в соответствии с протоколом информационного обмена аппаратуры подготовки и пуска носителя с ракетой, результаты работы и данные записанного информационного обмена передают в центральный управляющий модуль, на основе полученных данных делают заключение об исправности аппаратуры носителя.The problem is solved due to the fact that the method of testing the media equipment with the control of communication lines and recording information exchange is as follows: supply voltage to the power converter of the launcher, the converted voltage from the power converter is supplied to the central control module, the switching module and the built-in the simulator, using the central control module set the mode of checking communication lines, check all communication lines short circuit, measure the potential difference and resistance between the communication lines, transfer the test results to the central control module, set the simulation mode and channels involved, the type of simulated missiles, the presence and types of simulated information exchange errors, simulation, the results of work and the data of the recorded information exchange are transmitted to the central control module, set the registration mode, carry out information exchange in accordance In accordance with the protocol of information exchange of equipment for preparing and launching a carrier with a rocket, the results of work and data of the recorded information exchange are transmitted to the central control module, on the basis of the data received, a conclusion is made about the serviceability of the carrier equipment.

Сущность изобретения поясняется фиг. 1, на которой представлена структурная схема одного из вариантов корабельного ракетного комплекса для реализации способа проверки аппаратуры носителя с контролем линий связи и регистрацией информационного обмена.The invention is illustrated in FIG. 1, which shows a structural diagram of one of the variants of the ship’s missile system for implementing a method of testing carrier equipment with monitoring communication lines and recording information exchange.

На фиг. 1 обозначены:In FIG. 1 marked:

1 - ракета;1 - rocket;

2 - транспортно-пусковой контейнер;2 - transport and launch container;

3 - блок соединителей;3 - connector block;

4 - коммутирующий модуль;4 - switching module;

5 - встроенный имитатор;5 - built-in simulator;

6 - центральный управляющий модуль;6 - central control module;

7 - преобразователь питания;7 - power converter;

8 - основание пусковой установки;8 - base launcher;

9 - автоматизированная система боевого управления.9 - automated combat control system.

Предлагаемый способ заключается в том, что подают питающее напряжение 27 В и 36 В (400 Гц) от аппаратуры носителя на преобразователь питания 7, преобразованное напряжение от преобразователя питания 7 подают на центральный управляющий модуль 6, коммутирующий модуль 4 и встроенный имитатор 5. С помощью центрального управляющего модуля 6 задают режим проверки линий связи, осуществляют проверку всех линий связи коммутирующих модулей 4 каждого из четырех каналов корабельного ракетного комплекса с ракетой 1 и транспортно-пусковым контейнером 2 на короткое замыкание. Затем измеряют разности потенциалов и сопротивления между линиями связи и передают результаты проверки в центральный управляющий модуль 6. Задают режим имитации и задействованные каналы, тип имитируемых ракет 1, наличие и типы имитируемых ошибок информационного обмена, осуществляют имитацию. Результаты работы и записанные данные информационного обмена передают в центральный управляющий модуль 6. При выборе режима регистрации осуществляют информационный обмен в соответствии с протоколом информационного обмена аппаратуры носителя с ракетой 1, результаты работы и записанные данные информационного обмена передают в центральный управляющий модуль 6, на основе полученных данных делают заключение об исправности аппаратуры пусковой установки.The proposed method consists in the fact that the supply voltage of 27 V and 36 V (400 Hz) is supplied from the carrier equipment to the power converter 7, the converted voltage from the power converter 7 is supplied to the central control module 6, the switching module 4 and the built-in simulator 5. Using central control module 6 set the mode of checking communication lines, check all communication lines of the switching modules 4 of each of the four channels of the ship’s missile system with missile 1 and transport and launch container 2 at swelling circuit. Then the potential differences and resistance between the communication lines are measured and the test results are transmitted to the central control unit 6. The simulation mode and the channels involved are set, the type of simulated missiles 1, the presence and types of simulated information exchange errors, and the simulation is carried out. The results of work and the recorded data of information exchange are transmitted to the central control module 6. When the registration mode is selected, information exchange is carried out in accordance with the protocol of information exchange of the carrier equipment with rocket 1, the results of work and the recorded data of information exchange are transmitted to the central control module 6, based on the received data. data make a conclusion about the health of the equipment launcher.

Предлагаемый способ реализован с помощью встроенного палубного имитатора 5, имеющего три режима работы: режим проверки линий связи (ПЛС), режим имитации и режим регистрации.The proposed method is implemented using the built-in deck simulator 5, which has three operating modes: communication line check mode (PLC), simulation mode and registration mode.

В режиме ПЛС осуществляют проверку всех линий связи аппаратуры пусковой установки носителя с ракетой на короткое замыкание, измеряют разности потенциалов (кроме опасных цепей) и сопротивлений между линиями связи, измеряют сопротивления изоляции между положительными/отрицательными полюсами питающих напряжений и корпусом. Результаты проверки встроенный имитатор 5 передает в центральный управляющий модуль 6.In PLC mode, all communication lines of the launcher launcher equipment with the missile are checked for short circuits, potential differences (except for hazardous circuits) and resistances between communication lines are measured, insulation resistances between the positive / negative poles of the supply voltage and the housing are measured. The test results are transmitted by the built-in simulator 5 to the central control unit 6.

В режиме имитации осуществляют имитацию наличия ракеты 1 в транспортно-пусковом контейнере 2 и реализуют информационный обмен с аппаратурой пусковой установки носителя. Для проверки реакции аппаратуры пусковой установки носителя на нештатные ситуации производят имитацию ошибок информационного обмена. Результаты проверки встроенный имитатор 5 передает в центральный управляющий модуль 6.In the simulation mode, they simulate the presence of rocket 1 in the transport and launch container 2 and implement information exchange with the equipment of the launch vehicle launcher. To check the response of the equipment of the launcher of the carrier to emergency situations, an imitation of information exchange errors is performed. The test results are transmitted by the built-in simulator 5 to the central control unit 6.

В режиме регистрации осуществляют регистрацию информационного обмена аппаратуры пусковой установки носителя с ракетой, включая цифровой обмен, аналоговые сигналы и питающие напряжения. Зарегистрированную информацию встроенный имитатор передает в центральный управляющий модуль 6.In the registration mode, the information exchange of the carrier launcher equipment with the rocket is recorded, including digital exchange, analog signals and supply voltages. The registered information is transmitted by the built-in simulator to the central control unit 6.

Управление имитатором 5: выбор режимов работы имитируемой ракеты, задание ошибок информационного обмена осуществляют с центрального управляющего модуля 6, при этом связь встроенного имитатора 5 с центральным управляющим модулем 6 может быть осуществлена с помощью Ethernet или RS.Control of the simulator 5: the choice of the operating modes of the simulated rocket, the error of information exchange is carried out from the central control unit 6, while the communication of the built-in simulator 5 with the central control module 6 can be carried out using Ethernet or RS.

На фиг. 1 представлен вариант реализации способа для корабельного комплекса с четырьмя ракетами 1, размещенными в транспортно-пусковых контейнерах 2. Первые группы входов-выходов транспортно-пусковых контейнеров соединена с первыми группами входов-выходов соответствующих блоков соединителей 3, расположенных в коммутирующем модуле 4. Первая группа входов-выходов коммутирующего модуля 4 первого канала соединена с первой группой входов-выходов (разъемом транспортно-пускового контейнера 2), вторая группа входов-выходов коммутирующего модуля 4 соединена с бортразъемом первой проверяемой ракеты 1, третья группа входов-выходов коммутирующего модуля 4 соединена с разъемом стартового двигателя проверяемой ракеты 1. Четвертые группы входов коммутирующих модулей 4 первого, второго, третьего и четвертого каналов соединены соответственно с первой, второй, третьей и четвертой группами выходов преобразователя питания 7. Пятые группы входов-выходов коммутирующих модулей 4 первого, второго, третьего и четвертого каналов соединены соответственно с первой, второй, третьей и четвертой группами центрального управляющего модуля 6. Основание пусковой установки 8 выполнено в виде размещенного на палубе корабля фундамента, в котором расположены: встроенный имитатор 5, центральный управляющий модуль 6 и преобразователь питания 7. Третья группа входов-выходов проверяемой ракеты 1 (разъем стартового двигателя) соединена с первой группой входов-выходов коммутирующего модуля 4.In FIG. 1 shows an embodiment of a method for a ship complex with four missiles 1 located in transport and launch containers 2. The first groups of inputs and outputs of the transport and launch containers are connected to the first groups of inputs and outputs of the corresponding blocks of connectors 3 located in the switching module 4. The first group the inputs and outputs of the switching module 4 of the first channel is connected to the first group of inputs and outputs (connector transport-launch container 2), the second group of inputs and outputs of the switching module 4 is connected inena with the board connector of the first tested rocket 1, the third group of inputs and outputs of the switching module 4 is connected to the connector of the starting engine of the tested rocket 1. The fourth group of inputs of the switching modules 4 of the first, second, third and fourth channels are connected respectively to the first, second, third and fourth groups outputs of the power converter 7. Fifth groups of inputs and outputs of the switching modules 4 of the first, second, third and fourth channels are connected respectively to the first, second, third and fourth groups of the central control module 6. The base of the launcher 8 is made in the form of a foundation placed on the deck of the ship, in which are located: an integrated simulator 5, a central control module 6 and a power converter 7. The third group of inputs and outputs of the tested rocket 1 (connector of the launch engine) is connected to the first group of inputs and outputs of the switching module 4.

Предлагаемый способ может быть реализован с помощью палубного имитатора в составе малогабаритной аппаратуры подготовки и пуска ракеты, разрабатываемой для корабельного ракетного комплекса «Уран-МК». Встроенный палубный имитатор 5 встраивают в систему связей коммутирующего модуля 4 с ракетой с помощью параллельных отводов всех линий связи. В отличие от существующих имитаторов, он не требует отстыковки штатных жгутов пусковой установки, места для хранения, а также отдельного внешнего питания.The proposed method can be implemented using a deck simulator as part of small-sized equipment for the preparation and launch of a rocket, developed for the Uran-MK shipboard missile system. An integrated deck simulator 5 is integrated into the communication system of the switching module 4 with the missile using parallel taps of all communication lines. Unlike existing simulators, it does not require undocking of standard launcher harnesses, storage space, as well as a separate external power supply.

Рассмотрим работу системы на примере работы схемы, представленной на фиг. 1.Consider the operation of the system using the example of the circuit shown in FIG. one.

Подают напряжение питания 27 В и 36 В (400 Гц) на преобразователь питания 7, преобразованное напряжение передают в блок соединителей 3, встроенный имитатор 5 и центральный управляющий модуль 6. Центральный управляющий модуль 6 устанавливает информационную связь (Ethernet) с автоматизированной системой боевого управления (АСБУ), задающей режим работы всего корабельного комплекса. С помощью коммутирующего модуля 4 устанавливают информационную связь (RS-422) с центральным управляющим модулем 6, и задают режим его работы. Встроенный имитатор 5 устанавливает информационную связь (RS-422) с центральным управляющим модулем 6, задающим режим его работы.The supply voltage of 27 V and 36 V (400 Hz) is supplied to the power converter 7, the converted voltage is transmitted to the connector block 3, the built-in simulator 5 and the central control module 6. The central control module 6 establishes an information connection (Ethernet) with an automated combat control system ( ASBU), which sets the operating mode of the entire ship complex. Using the switching module 4 establish an information connection (RS-422) with the Central control module 6, and set the mode of operation. The built-in simulator 5 establishes an information connection (RS-422) with the central control unit 6, specifying the mode of its operation.

В режиме проверки линий связи центральный управляющий модуль 6 задает рабочий режим проверки линий связи встроенному имитатору 5, который переходит в режим проверки линий связи и осуществляет проверку всех линий связи коммутирующих модулей 4 каждого из каналов с ракетой 1 и транспортно-пусковым контейнером 2 на короткое замыкание, измеряет разности потенциалов (кроме опасных цепей) и сопротивлений между линиями связи каждого коммутирующего модуля 4 с ракетой 1 и транспортно-пусковым контейнером 2, измеряет сопротивление изоляции между положительными/отрицательными полюсами питающих напряжений и корпусом. Результаты проверки встроенный имитатор 5 передает в центральный управляющий модуль 6, который передает их в АСБУ.In the communication line test mode, the central control module 6 sets the operating mode of the communication line test to the built-in simulator 5, which switches to the communication line test mode and checks all communication lines of the switching modules 4 of each channel with the rocket 1 and the transport and launch container 2 for short circuit , measures the potential differences (except for hazardous circuits) and resistances between the communication lines of each switching module 4 with the rocket 1 and the transport and launch container 2, measures the insulation resistance between the floor negative / negative supply voltage poles and housing. The results of the verification, the built-in simulator 5 transmits to the central control unit 6, which transmits them to the ASBU.

В режиме имитации центральный управляющий модуль 6 задает рабочий режим имитации встроенному имитатору 5 и передает во встроенный имитатор 5 параметры имитации (задействованные каналы, тип имитируемых ракет 1, наличие и типы имитируемых ошибок информационного обмена). Встроенный имитатор 5 проверяет наличие ракет 1 в транспортно-пусковых контейнерах 2 заданных каналов, при их отсутствии встроенный имитатор 5 переходит в режим имитации ракеты в транспортно-пусковом контейнере 2 с учетом параметров, полученных от центрального управляющего модуля 6, и передает в центральный управляющий модуль 6 данные о своей готовности и выставленных параметрах имитации. Получив данные о готовности встроенного имитатора 5 и верные параметры имитации, центральный управляющий модуль 6 передает в соответствующие коммутирующие модули 4 данные о выборе одного из штатных режимов работы и данные для наполнения информационных массивов носителя. Коммутирующий модуль 4 переходит в заданный режим работы и осуществляет информационный обмен в соответствии с протоколом информационного обмена АПП носителя с ракетой 1. Результаты работы и записанные данные информационного обмена со встроенным имитатором 5 коммутирующий модуль 4 передает в центральный управляющий модуль 6. Центральный управляющий модуль 6 передает данные, полученные от коммутирующих модулей 4 и встроенного имитатора 5 в АСБУ.In the simulation mode, the central control unit 6 sets the operating mode of the simulation to the built-in simulator 5 and transmits the simulation parameters (channels involved, the type of simulated missiles 1, the presence and types of simulated information exchange errors) to the built-in simulator 5. The built-in simulator 5 checks the presence of missiles 1 in the transport-launch containers 2 of the specified channels, if they are absent, the built-in simulator 5 switches to the simulation mode of the rocket in the transport-launch container 2, taking into account the parameters received from the central control module 6, and transfers it to the central control module 6 data on their readiness and simulation parameters set. Having received data on the readiness of the built-in simulator 5 and the correct simulation parameters, the central control module 6 transmits to the corresponding switching modules 4 data on the selection of one of the standard operating modes and data for filling information media arrays. The switching module 4 goes into a predetermined mode of operation and carries out information exchange in accordance with the information exchange protocol of the carrier’s AMS with the rocket 1. The results of the work and the recorded data of the information exchange with the built-in simulator 5 transfers the switching module 4 to the central control module 6. The central control module 6 transmits data received from the switching modules 4 and the built-in simulator 5 in ASBU.

В режиме регистрации центральный управляющий модуль 6 задает режим регистрации встроенному имитатору 5, передает в коммутационные модули 4 соответствующих каналов заданный режим работы и данные для наполнения информационных массивов носителя. Коммутирующий модуль 4 осуществляет информационный обмен в соответствии с протоколом информационного обмена АПП носителя с ракетой 1. Результаты работы и записанные данные информационного обмена с ракетой 1 в транспортно-пусковом контейнере 2 коммутационный модуль 4 передает в центральный управляющий модуль 6. Объективно зарегистрированные данные информационного обмена коммутационных модулей 4 с ракетами 1 в транспортно-пусковых контейнерах 2 встроенный имитатор 5 передает в центральный управляющий модуль 6, который передает их в АСБУ.In the registration mode, the central control module 6 sets the registration mode to the built-in simulator 5, transmits to the switching modules 4 of the corresponding channels the specified operating mode and data for filling the media information arrays. The switching module 4 carries out the information exchange in accordance with the information exchange protocol of the carrier's AMS with the rocket 1. The operation results and the recorded data of the information exchange with the rocket 1 in the transport and launch container 2, the switching module 4 transfers to the central control module 6. Objectively recorded data of the switching information exchange modules 4 with missiles 1 in transport and launch containers 2, the built-in simulator 5 transfers to the central control module 6, which transfers them to the ASBU.

Встроенный имитатор 5 обеспечивает проверку готовности пусковой установки носителя с использованием реальных информационных и электрических связей пусковой установки носителя с ракетой, в том числе имитацию нештатных ситуаций, и позволяет проводить проверку линий связи аппаратуры носителя с ракетой и регистрировать информационный обмен. При осуществлении данного способа используются только штатные подключения и виды соединений, это позволяет уменьшить время проведения проверочных работ и повысить надежность соединений, а также уменьшить количество личного состава, необходимого для обслуживания ракетного комплекса. Предлагаемый способ может быть использован для проверки аппаратуры различных типов носителей, например корабельных или наземных.The built-in simulator 5 provides verification of the readiness of the launch vehicle launcher using real information and electrical connections of the launch vehicle launcher with a missile, including simulation of abnormal situations, and allows you to check the communication lines of the carrier equipment with the missile and record information exchange. When implementing this method, only standard connections and types of connections are used, this allows to reduce the time of verification work and increase the reliability of connections, as well as reduce the number of personnel needed to service the missile system. The proposed method can be used to test equipment of various types of media, such as ship or ground.

Представленные чертеж и описание позволяют осуществить способ промышленным способом, что характеризует предлагаемое изобретение как промышленно применимое.The presented drawing and description allow the implementation of the method in an industrial way, which characterizes the invention as industrially applicable.

Claims (1)

Способ проверки аппаратуры носителя с контролем линий связи и регистрацией информационного обмена, при котором подают напряжение питания на преобразователь питания пусковой установки носителя, преобразованное напряжение от преобразователя питания подают на центральный управляющий модуль, коммутирующий модуль и встроенный имитатор, с помощью центрального управляющего модуля задают режим проверки линий связи, осуществляют проверку всех линий связи коммутирующих модулей с ракетой и транспортно-пусковым контейнером на короткое замыкание, измеряют разности потенциалов и сопротивления между линиями связи, передают результаты проверки в центральный управляющий модуль, задают режим имитации и задействованные каналы, тип имитируемых ракет, наличие и типы имитируемых ошибок информационного обмена, осуществляют имитацию, результаты работы и записанный информационный обмен передают в центральный управляющий модуль, задают режим регистрации, осуществляют информационный обмен в соответствии с протоколом информационного обмена аппаратуры подготовки и пуска носителя с ракетой, результаты работы и записанный информационный обмен передают в центральный управляющий модуль, на основе полученных данных делают заключение об исправности аппаратуры носителя.A method for checking media equipment with monitoring communication lines and registering information exchange, in which a supply voltage is supplied to the power converter of the launcher of the carrier, the converted voltage from the power converter is fed to the central control module, the switching module and the built-in simulator, and the central control module sets the test mode communication lines, check all communication lines of the switching modules with the rocket and the transport and launch container for a short circuit power, measure the potential and resistance differences between the communication lines, transfer the test results to the central control module, set the simulation mode and the channels involved, the type of simulated missiles, the presence and types of simulated information exchange errors, simulate, the results of work and the recorded information exchange are transferred to the central the control module, set the registration mode, carry out information exchange in accordance with the protocol of information exchange of equipment for the preparation and launch of the medium with p With the help of the data, the results of work and the recorded information exchange are transferred to the central control module, on the basis of the data obtained, a conclusion is made about the serviceability of the media equipment.
RU2016102210A 2016-01-26 2016-01-26 Method of carrier equipment check with connection line control and information exchange registration RU2620453C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016102210A RU2620453C1 (en) 2016-01-26 2016-01-26 Method of carrier equipment check with connection line control and information exchange registration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016102210A RU2620453C1 (en) 2016-01-26 2016-01-26 Method of carrier equipment check with connection line control and information exchange registration

Publications (1)

Publication Number Publication Date
RU2620453C1 true RU2620453C1 (en) 2017-05-25

Family

ID=58881957

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016102210A RU2620453C1 (en) 2016-01-26 2016-01-26 Method of carrier equipment check with connection line control and information exchange registration

Country Status (1)

Country Link
RU (1) RU2620453C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109407548A (en) * 2018-10-26 2019-03-01 广西电网有限责任公司电力科学研究院 A kind of power line carrier, PLC downstream station modular simulation test macro host node bottom plate
RU2728493C1 (en) * 2019-12-25 2020-07-29 Акционерное общество "Корпорация "Тактическое ракетное вооружение" Method of recording and processing information during testing of unmanned aerial vehicles and device for its implementation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2414746C2 (en) * 2009-03-17 2011-03-20 Открытое акционерное общество "Корпорация "Тактическое ракетное вооружение" Method of imitating interaction between missile and carrier equipment and device for realising said metod
RU2499979C1 (en) * 2012-04-28 2013-11-27 Российская Федерация, от имени которой выступает Министерство обороны Российской Федерации Method of rocket electric and info exchange test
CN103591857A (en) * 2013-11-26 2014-02-19 中北大学 Rocket composite simulation test device
CN103869808A (en) * 2014-03-24 2014-06-18 上海航天电子通讯设备研究所 Carrier rocket equivalent device system based on distribution technology
CN103901881A (en) * 2014-04-14 2014-07-02 上海航天电子通讯设备研究所 Device compatible with multiple test states for carrier rocket equivalent device system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2414746C2 (en) * 2009-03-17 2011-03-20 Открытое акционерное общество "Корпорация "Тактическое ракетное вооружение" Method of imitating interaction between missile and carrier equipment and device for realising said metod
RU2499979C1 (en) * 2012-04-28 2013-11-27 Российская Федерация, от имени которой выступает Министерство обороны Российской Федерации Method of rocket electric and info exchange test
CN103591857A (en) * 2013-11-26 2014-02-19 中北大学 Rocket composite simulation test device
CN103869808A (en) * 2014-03-24 2014-06-18 上海航天电子通讯设备研究所 Carrier rocket equivalent device system based on distribution technology
CN103901881A (en) * 2014-04-14 2014-07-02 上海航天电子通讯设备研究所 Device compatible with multiple test states for carrier rocket equivalent device system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109407548A (en) * 2018-10-26 2019-03-01 广西电网有限责任公司电力科学研究院 A kind of power line carrier, PLC downstream station modular simulation test macro host node bottom plate
RU2728493C1 (en) * 2019-12-25 2020-07-29 Акционерное общество "Корпорация "Тактическое ракетное вооружение" Method of recording and processing information during testing of unmanned aerial vehicles and device for its implementation

Similar Documents

Publication Publication Date Title
US11990060B2 (en) System and method for virtual reality vehicle training field
RU2620453C1 (en) Method of carrier equipment check with connection line control and information exchange registration
WO2016013711A1 (en) System for evaluating reliability of dynamic positioning system, and method therefor
KR20180070131A (en) Apparatus and method for simulation trainning for guidance weapons
RU2499979C1 (en) Method of rocket electric and info exchange test
US20100209880A1 (en) Missile simulator
KR100808026B1 (en) Simulator apparatus for flight test system and simulation method by the same
CN109856474B (en) Test system of safe computing platform of subregion in medium speed magnetic levitation system
Matthes et al. How to build a rover: An overview of the Mars 2020 mission's Vehicle System Testbed
Yamazaki et al. HEPTA-Sat Training Program: International knowledge transfer using hands-on type CubeSat education
RU2475696C1 (en) Method of controlling electric parameters of weapons system and computer-aided complex to this end
US7280954B2 (en) System operation test facilitating program and method
CN109656231A (en) The communication test system of magnetic floating traffic vehicle-mounted running control
RU2377649C2 (en) Method of simulating electrical communication of rocket with carrier equipment and device for realising said method
RU75079U1 (en) DEVICE OF SIMULATION OF ELECTRICAL AND INFORMATION INTERACTION OF ROCKET WITH CARRIER EQUIPMENT
RU2728493C1 (en) Method of recording and processing information during testing of unmanned aerial vehicles and device for its implementation
RU2636430C1 (en) Method of imitation of unmanned aerial vehicle for homing aid adjustment during flight tests
RU2414669C1 (en) Method of recording and processing digital information when checking missiles
RU2414746C2 (en) Method of imitating interaction between missile and carrier equipment and device for realising said metod
RU2205441C1 (en) Test complex for check of on-board systems of unmanned flying vehile
CN114719671A (en) Missile load simulation device and method for missile launching vehicle of weapon system
RU2440607C1 (en) Device for imitating carrier apparatus for controlling information exchange with rocket
RU2684979C1 (en) Control unit bench testing products of rocket and space technology
DE102015002563B3 (en) Missile launcher
Koriem et al. Function Testing Platform (SKTST) for the Educational Satellite “Space Keys”