RU2209972C2 - Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks - Google Patents

Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks Download PDF

Info

Publication number
RU2209972C2
RU2209972C2 RU2001118598A RU2001118598A RU2209972C2 RU 2209972 C2 RU2209972 C2 RU 2209972C2 RU 2001118598 A RU2001118598 A RU 2001118598A RU 2001118598 A RU2001118598 A RU 2001118598A RU 2209972 C2 RU2209972 C2 RU 2209972C2
Authority
RU
Russia
Prior art keywords
ore
height
mining
layer
upper layer
Prior art date
Application number
RU2001118598A
Other languages
Russian (ru)
Other versions
RU2001118598A (en
Inventor
Н.П. Фофанов
Н.П. Каюдин
Ю.Н. Галинов
В.А. Овсейчук
А.А. Решетников
М.И. Капитонов
В.Б. Колесаев
В.К. Сурков
Original Assignee
Акционерное общество открытого типа "Приаргунское производственное горно-химическое объединение"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=29245618&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=RU2209972(C2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Акционерное общество открытого типа "Приаргунское производственное горно-химическое объединение" filed Critical Акционерное общество открытого типа "Приаргунское производственное горно-химическое объединение"
Priority to RU2001118598A priority Critical patent/RU2209972C2/en
Publication of RU2001118598A publication Critical patent/RU2001118598A/en
Application granted granted Critical
Publication of RU2209972C2 publication Critical patent/RU2209972C2/en

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

FIELD: mineral underground mining by layers with filling of mined-out space with hardening mixture. SUBSTANCE: method includes mining of mineral resources of extraction block by layers downcast with filling of mined-out space with hardening mixture, driving on layers of entires, mining of ore bodies by doubled in height stopes along deposit strike with extraction of ore bodies of upper layer from nonfilled stopes of lower layer. After extraction of upper layer resources, entires are driven across the strike of ore bodies below floor of worked layer at distance equaling two-fold height of layer, with height of entry equaling height of stope. Mined-out space of stopes is filled with hardening mixture. Extracted last is ore pillar of upper layer left above entry. Width of ore pillar is determined by calculation. EFFECT: reduced expenditures for ore mining due to increased intensity of extraction of block resources as a result of reduction of volumes of development work and reduced impoverishment of ore in its breaking. 3 cl, 4 dwg

Description

Изобретение относится к горной промышленности и может - быть использовано при слоевой выемке полезных ископаемых подземным способом в нисходящем порядке с закладкой выработанного пространства твердеющими смесями. The invention relates to the mining industry and can be used for layered mining of underground minerals in a descending order with the laying of the worked out space with hardening mixtures.

Известен способ разработки маломощных рудных тел слоевой выемкой полезных ископаемых в восходящем и нисходящем порядке с закладкой выработанного пространства твердеющими смесями [1]. Недостатком данного способа является необходимость проходки на каждом слое нарезных выработок вкрест простирания рудных тел, а также повышенное разубоживание руды при выемке маломощных рудных тел, определяемое габаритами применяемого оборудования. A known method of developing low-power ore bodies by layered mining of minerals in ascending and descending order with the laying of the worked out space by hardening mixtures [1]. The disadvantage of this method is the need for sinking on each layer of threaded workings across the strike of ore bodies, as well as increased dilution of ore during the extraction of low-power ore bodies, determined by the dimensions of the equipment used.

Наиболее близким техническим решением является способ разработки крутопадающих маломощных рудных тел слоевой выемкой в нисходящем и в восходящем порядке с отработкой верхнего слоя до закладки выработанного пространства [2]. The closest technical solution is a method for the development of steeply falling low-power ore bodies by a layered notch in a descending and ascending order with mining of the upper layer before laying the mined-out space [2].

Недостатком данного способа является большая трудоемкость возведения выдвижной рамной крепи, используемой для крепления очистного пространства при выемке запасов верхнего слоя, когда высота очистного пространства становится равной высоте двух слоев. The disadvantage of this method is the high complexity of the construction of a retractable frame lining used to attach the treatment space when excavating the reserves of the upper layer, when the height of the treatment space becomes equal to the height of two layers.

Цель изобретения - снижение затрат на добычу полезного ископаемого за счет увеличения интенсивности выемки очистного блока в результате сокращения объемов нарезных работ и снижения разубоживания руды при отбойке. The purpose of the invention is to reduce the cost of mining due to the increase in the intensity of the extraction of the treatment unit as a result of a reduction in the volume of rifling and reduction of ore dilution during breakdown.

Поставленная цель достигается тем, что после отработки запасов верхнего слоя нарезные выработки вкрест простирания рудных тел проходят ниже почвы сдвоенного по высоте отработанного слоя на расстоянии, равном двойной высоте слоя, с высотой нарезной выработки, равной высоте очистной заходки. Рудные тела на слое с нарезными выработками отрабатывают очистными заходками по простиранию залежи. До погашения выработанного пространства очистных заходок твердеющей смесью рудные тела верхнего слоя селективно отбивают из очистных заходок и временно оставляют в очистном пространстве. С навала горнорудной массы на границе между слоями устанавливают подвесную предохранительную крепь. Уборку временно оставленной горнорудной массы производят после окончания отбойки рудных тел верхнего слоя и установки предохранительной крепи. В последнюю очередь вынимают рудный целик верхнего слоя, оставляемый над нарезной выработкой. Ширину рудного целика определяют в зависимости от ширины нарезной выработки, длины применяемой погрузочно-доставочной машины, высоты слоя и угла естественного откоса отбитой руды. This goal is achieved by the fact that after mining the reserves of the upper layer, threaded excavations across the strike of ore bodies pass below the soil of a doubled height of the worked layer at a distance equal to the double height of the layer, with the height of the rifled excavation equal to the height of the treatment run. Ore bodies on a layer with rifted workings are mined by treatment approaches along strike of a deposit. Prior to the extinction of the worked out space of the treatment openings by the solidification mixture, the ore bodies of the upper layer are selectively beaten from the treatment openings and temporarily left in the treatment space. From the bulk of the ore mass, a suspended safety support is installed at the boundary between the layers. The temporarily abandoned ore mass is cleaned after the end of the ore bodies of the upper layer and the installation of safety support. Lastly, the ore pillar of the upper layer, which is left above the rifled mine, is removed. The width of the ore pillar is determined depending on the width of the rifled excavation, the length of the loading and delivery machine, the height of the layer and the angle of repose of the broken ore.

Способ осуществляют следующим образом. На фиг. 1 показан разрез вкрест простирания совместно залегающих крутопадающих маломощных рудных тел в устойчивых и средней устойчивости породах в стадии проведения нарезной выработки между восстающими и рудоспусками; на фиг. 2 показан разрез вкрест простирания крутопадающих маломощных рудных тел в стадии отработки очистных заходок; на фиг. 3 - разрез А-А на фиг. 2; на фиг. 4 - разрез Б-Б на фиг. 2. The method is as follows. In FIG. 1 shows a cross-sectional view of the strike of co-occurring steeply dipping low-power ore bodies in stable and medium-stable rocks at the stage of rifling excavation between uprising and ore passes; in FIG. 2 shows a cross-sectional view of the strike of steeply falling low-power ore bodies at the stage of mining treatment openings; in FIG. 3 is a section AA in FIG. 2; in FIG. 4 is a section BB in FIG. 2.

Участок совместно залегающих крутопадающих маломощных рудных тел в устойчивых и средней устойчивости породах по высоте этажа отрабатывают слоевой выемкой сдвоенными по высоте слоями в нисходящем порядке, для чего после отработки запасов верхнего слоя между восстающими 1 и рудоспусками 2 вкрест простирания рудных тел проводят нарезную выработку 3 ниже почвы отработанного слоя на расстоянии, равном двойной высоте слоя с высотой нарезной выработки, равной высоте очистной заходки 4. Рудное тело 5 верхнего слоя отбивают селективно из выработанного пространства очистных заходок 4 взрыванием шпуров 6 и временно оставляют в выработанном пространстве очистных заходок 4. Крепление кровли нижнего слоя производят после отбойки запасов верхнего слоя с навала отбитой и временно оставленной горнорудной массы 7 применением "расстрелов" или подвесной крепи 8 на крючьях со сплошной затяжкой. Временно оставленную горнорудную массу 7 отгружают погрузочно-доставочной машиной 10 под защитой предохранительной крепи. 8. Далее устанавливают закладочные перемычки 11, и через закладочные трубопроводы заполняют выработанное пространство очистных заходок твердеющей смесью 12. В последнюю очередь вынимают рудный целик 9 верхнего слоя, оставляемый над нарезной выработкой 3. Ширину (В) рудного целика 9 определяют из выражения
[b+2(l+h•tgα)]≤B≤Lбл, м,
где b - ширина нарезной выработки, м; b = 3,5 м;
2 - коэффициент, учитывающий расположение нарезной выработки посередине целика;
l - длина применяемой погрузочно-доставочной машины, м; для погрузочно-доставочной машины марки МПДН-1 l = 3,2 м;
h - высота отрабатываемого слоя, м; h = 3,0 м;
α - угол естественного откоса навала отбитой горнорудной массы верхнего слоя на почве нижнего слоя, градус;
В - ширина рудного целика, м;
Lбл - длина очистного блока, м.
A section of steeply dipping low-power ore bodies in stable and medium-stable rocks along the height of the floor is mined in a dredging layer, doubled in height in a descending order, for which, after mining the reserves of the upper layer between rising 1 and ore passes 2 across the strike of ore bodies, cut 3 is made below the soil the spent layer at a distance equal to the double height of the layer with the height of the rifled excavation equal to the height of the treatment run 4. The ore body 5 of the upper layer is beaten selectively from the working of the given space of the treatment openings 4 by blasting the holes 6 and temporarily left in the worked out space of the treatment openings 4. The roof of the lower layer is secured after breaking off the reserves of the upper layer from the pile of the broken and temporarily left ore mass 7 by using “shootings” or suspension support 8 on hooks with a continuous tightening . The temporarily abandoned mining mass 7 is shipped by a loading and delivery machine 10 under the protection of the protective lining. 8. Next, the filling jumper 11 is installed, and through the filling pipelines the worked out space of the treatment openings is filled with the hardening mixture 12. Lastly, the ore pillar 9 of the upper layer, which is left over the threaded workout 3. is taken out. The width (B) of the ore pillar 9 is determined from the expression
[b + 2 (l + h • tgα)] ≤B≤L bl , m,
where b is the width of the rifled excavation, m; b = 3.5 m;
2 - coefficient taking into account the location of the rifled mine in the middle of the pillar;
l is the length of the used loading and delivery machine, m; for a loading and delivery machine brand MPDN-1 l = 3.2 m;
h is the height of the worked out layer, m; h = 3.0 m;
α is the angle of repose of the pile of the repelled mining mass of the upper layer on the soil of the lower layer, degree;
In - the width of the ore pillar, m;
L bl - the length of the treatment unit, m

Использование предлагаемого способа разработки совместно залегающих крутопадающих маломощных рудных тел в устойчивых и средней устойчивости породах позволит сократить объем нарезных работ в очистном блоке в 2 раза, снизить разубоживание руды при отбойке на 20% и в целом затраты на добычу руды из очистного блока на 20÷25%. Кроме того, установка предохранительной крепи на границе двух слоев производится с навала отбитой горнорудной массы при высоте очистного пространства не более 3,0 м, что соответствует требованиям "Единых правил безопасности при разработке рудных, нерудных и россыпных месторождений подземным способом". Using the proposed method for the development of co-occurring steeply dipping low-power ore bodies in stable and medium-stable rocks will reduce the amount of threaded work in the treatment unit by 2 times, reduce ore dilution during breakdown by 20% and, in general, the cost of extracting ore from the treatment unit by 20 ÷ 25 % In addition, the installation of the protective lining at the border of two layers is carried out from the pile of broken-out ore mass at a treatment space height of not more than 3.0 m, which meets the requirements of the "Unified safety rules for the development of ore, non-metallic and placer deposits by underground method."

Источники информации
1. Закладочные работы в шахтах: Справочник / 3-11 Под ред. Бронникова Д. М., Цыгалова М.Н. - М.: Недра, 1989, с. 330 (рис. 22.10).
Sources of information
1. Bookmarking in mines: Handbook / 3-11 Ed. Bronnikova D.M., Tsygalova M.N. - M .: Nedra, 1989, p. 330 (Fig. 22.10).

2. Чесноков Н.И., Петросов А.А., Шевченко Б.Ф. Системы разработки месторождений урана с твердеющей закладкой. - М.: Атомиздат, 1975, с. 235. 2. Chesnokov N.I., Petrosov A.A., Shevchenko B.F. Hardening uranium mining systems. - M .: Atomizdat, 1975, p. 235.

Claims (3)

1. Способ разработки совместно залегающих крутопадающих маломощных рудных тел в устойчивых и средней устойчивости породах, включающий отработку запасов очистного блока слоевой выемкой в нисходящем порядке с закладкой выработанного пространства твердеющей смесью, проведение на слоях нарезных выработок, отработку рудных тел сдвоенными по высоте слоями очистными заходками по простиранию рудной залежи, с выемкой рудных тел верхнего слоя из незаложенных очистных заходок нижнего слоя, отличающийся тем, что после отработки запасов верхнего слоя проходят нарезные выработки вкрест простирания рудных тел ниже почвы отработанного слоя на расстоянии, равном двойной высоте слоя, с высотой нарезной выработки, равной высоте очистной заходки, выработанное пространство очистных заходок закладывают твердеющей смесью, в последнюю очередь вынимают рудный целик верхнего слоя, оставляемый над нарезной выработкой, причем ширина рудного целика определяется из выражения
[b+2•(l+h•tgα)]≤B≤Lбл, м,
где b - ширина нарезной выработки, м;
2 - коэффициент, учитывающий расположение нарезной выработки посередине целика;
l - длина применяемой погрузочно-доставочной машины, м;
h - высота отрабатываемого слоя, м;
α - угол естественного откоса навала отбитой горнорудной массы верхнего слоя на почве нижнего слоя, градус;
В - ширина рудного целика, м;
Lбл - длина очистного блока, м.
1. A method for the development of co-occurring steeply dipping low-power ore bodies in stable and medium-stable rocks, including working out the reserves of the treatment unit by a lay-out recess in the descending order with the laying of the worked-out space with a hardening mixture, conducting workings on the layers of rifled workings, working out the ore bodies by layers doubled in height by treatment openings according to the strike of the ore deposit, with the extraction of ore bodies of the upper layer from unplaced treatment openings of the lower layer, characterized in that after mining the reserves of the upper of the bed pass rifled excavations across the strike of the ore bodies below the soil of the worked layer at a distance equal to the double height of the bed, with the height of the rifled excavation equal to the height of the treatment lead; production, and the width of the ore pillar is determined from the expression
[b + 2 • (l + h • tgα)] ≤B≤L bl , m,
where b is the width of the rifled excavation, m;
2 - coefficient taking into account the location of the rifled mine in the middle of the pillar;
l is the length of the used loading and delivery machine, m;
h is the height of the worked out layer, m;
α is the angle of repose of the pile of the repelled mining mass of the upper layer on the soil of the lower layer, degree;
In - the width of the ore pillar, m;
L bl - the length of the treatment unit, m
2. Способ по п. 1, отличающийся тем, что крепление кровли нижнего слоя производят с навала горнорудной массы, селективно отбитой на верхнем слое. 2. The method according to p. 1, characterized in that the fastening of the roof of the lower layer is made from a pile of ore mass selectively beaten off on the upper layer. 3. Способ по п. 2, отличающийся тем, что отгрузку горнорудной массы осуществляют из очистных заходок под защитой предохранительной крепи после окончания отбойки запасов верхнего слоя. 3. The method according to p. 2, characterized in that the shipment of the ore mass is carried out from treatment openings under the protection of the protective lining after the end of the breaking of the reserves of the upper layer.
RU2001118598A 2001-07-04 2001-07-04 Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks RU2209972C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001118598A RU2209972C2 (en) 2001-07-04 2001-07-04 Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001118598A RU2209972C2 (en) 2001-07-04 2001-07-04 Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks

Publications (2)

Publication Number Publication Date
RU2001118598A RU2001118598A (en) 2003-06-20
RU2209972C2 true RU2209972C2 (en) 2003-08-10

Family

ID=29245618

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001118598A RU2209972C2 (en) 2001-07-04 2001-07-04 Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks

Country Status (1)

Country Link
RU (1) RU2209972C2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2445461C1 (en) * 2010-09-22 2012-03-20 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to mine thick steep deposits of unstable ores
RU2486340C2 (en) * 2011-08-01 2013-06-27 АКЦИОНЕРНАЯ КОМПАНИЯ "АЛРОСА" (открытое акционерное общество) Layered room-and-pillar system with complete stowing
RU2490461C1 (en) * 2012-03-13 2013-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method to mine thick steep deposits of unstable ores
RU2490459C1 (en) * 2012-03-13 2013-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method to mine thick steep deposits of unstable ores
CN103615251A (en) * 2013-12-10 2014-03-05 中国新型建材设计研究院 Strip-type mining method for thin ore body
RU2535859C1 (en) * 2013-08-09 2014-12-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Method of mining heavy steeply dipping deposits of unstable ore
CN105134217A (en) * 2015-07-13 2015-12-09 北京矿冶研究总院 Deep well unloading mining method
RU2624490C1 (en) * 2016-03-04 2017-07-04 Публичное акционерное общество Приаргунское производственное горно-химическое объединение (ПАО ППГХО) Method of the low and medium powered ore bodies preparation, cutting and mining
CN109989754A (en) * 2018-10-12 2019-07-09 安徽铜冠(庐江)矿业有限公司 Ultra-large stope large diameter, deep borehole high-stage open stope afterwards filling mining method and application
RU2755287C1 (en) * 2021-02-04 2021-09-14 Федеральное государственное бюджетное образовательное учреждение высшего образования "Забайкальский государственный университет" (ФГБОУ ВО "ЗабГУ") Method for developing thin and low-powered steel-falling ore bodies
RU2762170C1 (en) * 2021-02-04 2021-12-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Забайкальский государственный университет" (ФГБОУ ВО "ЗабГУ") Method for developing thin and low-powered steel-falling ore bodies
CN116335670A (en) * 2023-03-25 2023-06-27 山东黄金矿业(莱州)有限公司三山岛金矿 Mining method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ЧЕСНОКОВ Н.И. и др. Системы разработки месторождений урана с твердеющей закладкой. - М.: Атомиздат, 1975, с.235. *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2445461C1 (en) * 2010-09-22 2012-03-20 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to mine thick steep deposits of unstable ores
RU2486340C2 (en) * 2011-08-01 2013-06-27 АКЦИОНЕРНАЯ КОМПАНИЯ "АЛРОСА" (открытое акционерное общество) Layered room-and-pillar system with complete stowing
RU2490461C1 (en) * 2012-03-13 2013-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method to mine thick steep deposits of unstable ores
RU2490459C1 (en) * 2012-03-13 2013-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method to mine thick steep deposits of unstable ores
RU2535859C1 (en) * 2013-08-09 2014-12-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Method of mining heavy steeply dipping deposits of unstable ore
CN103615251B (en) * 2013-12-10 2016-01-20 中国新型建材设计研究院 Thin type ore body bar shaped mining methods
CN103615251A (en) * 2013-12-10 2014-03-05 中国新型建材设计研究院 Strip-type mining method for thin ore body
CN105134217A (en) * 2015-07-13 2015-12-09 北京矿冶研究总院 Deep well unloading mining method
CN105134217B (en) * 2015-07-13 2017-10-27 北京矿冶研究总院 Deep well unloading mining method
RU2624490C1 (en) * 2016-03-04 2017-07-04 Публичное акционерное общество Приаргунское производственное горно-химическое объединение (ПАО ППГХО) Method of the low and medium powered ore bodies preparation, cutting and mining
CN109989754A (en) * 2018-10-12 2019-07-09 安徽铜冠(庐江)矿业有限公司 Ultra-large stope large diameter, deep borehole high-stage open stope afterwards filling mining method and application
RU2755287C1 (en) * 2021-02-04 2021-09-14 Федеральное государственное бюджетное образовательное учреждение высшего образования "Забайкальский государственный университет" (ФГБОУ ВО "ЗабГУ") Method for developing thin and low-powered steel-falling ore bodies
RU2762170C1 (en) * 2021-02-04 2021-12-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Забайкальский государственный университет" (ФГБОУ ВО "ЗабГУ") Method for developing thin and low-powered steel-falling ore bodies
CN116335670A (en) * 2023-03-25 2023-06-27 山东黄金矿业(莱州)有限公司三山岛金矿 Mining method
CN116335670B (en) * 2023-03-25 2024-05-03 山东黄金矿业(莱州)有限公司三山岛金矿 Mining method

Similar Documents

Publication Publication Date Title
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN1982649A (en) Mining method
RU2209972C2 (en) Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN109630115A (en) Sublevel open stoping afterwards filling mining method for gently inclined medium thick orebody
CN114592867A (en) Temporary top pillar induced caving and sill pillar-free sublevel caving combined mining method
US4072352A (en) Method for mining of rock or ore according to the block caving principle in massive formations
CN1195149C (en) Roof bolt protection and sectioned empty field method for phosphorate rock mining
RU2757619C1 (en) Method for developing low-powered steel ore bodies
Stupnik et al. Technological measures to enhance efficiency of mining ore from stopes applying self-propelled equipment
RU2248448C1 (en) Method for extraction of steep-falling deposits of weak ores
RU2270338C1 (en) Method for preparation and excavation of inclined and steep mineral bed
RU2488693C1 (en) Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system
CN113187481A (en) Filling mining method for overburden rock concentrated grouting caving stoping
CA2295230C (en) Method for the combined exploitation of mining fields
CN105587321A (en) Collapse column bypassing extraction process
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2030581C1 (en) Method for combined mining of thick ore bodies
US2896929A (en) Method of driving rock excavations
SU1155757A1 (en) Method of mining mineral deposits
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
SU1188326A1 (en) Method of mining bedded deposits
RU2360113C2 (en) Method of treatment of transition zone at open-undeground development of mineral deposits

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20110705