RU2195397C1 - Mobile foam concrete preparation plant - Google Patents

Mobile foam concrete preparation plant Download PDF

Info

Publication number
RU2195397C1
RU2195397C1 RU2001111722/03A RU2001111722A RU2195397C1 RU 2195397 C1 RU2195397 C1 RU 2195397C1 RU 2001111722/03 A RU2001111722/03 A RU 2001111722/03A RU 2001111722 A RU2001111722 A RU 2001111722A RU 2195397 C1 RU2195397 C1 RU 2195397C1
Authority
RU
Russia
Prior art keywords
installation
housing
hopper
bins
dry components
Prior art date
Application number
RU2001111722/03A
Other languages
Russian (ru)
Inventor
О.Г. Гордилов
Original Assignee
Гордилов Олег Григорьевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Гордилов Олег Григорьевич filed Critical Гордилов Олег Григорьевич
Priority to RU2001111722/03A priority Critical patent/RU2195397C1/en
Application granted granted Critical
Publication of RU2195397C1 publication Critical patent/RU2195397C1/en

Links

Images

Abstract

FIELD: plants for preparation of foam concrete mixes. SUBSTANCE: mobile plant includes reservoirs for water and foaming agent, dry component batchers, mixer, foam generator, compressor and bins for dry components; each bin consists of lower funnel-shaped part and upper part made in form of vertical reservoir connected with lower part. Proposed plant consists of two working units mounted one above other. Upper unit is quick-detachable. Each unit has housing. Upper part of each bin and water reservoir are located in housing of upper unit. Lower part of each bin and other items of equipment are arranged in housing of lower unit. Upper and lower parts of each bin are quick-detachable. Housings of units have holes for connection of upper and lower parts of each bins through these holes. EFFECT: increased height of working volume of bins for dry components. 7 cl, 2 dwg

Description

Изобретение относится к строительству и может быть использовано для непрерывного приготовления пенобетона непосредственно на строящихся объектах. The invention relates to construction and can be used for continuous preparation of foam concrete directly at the facilities under construction.

Известна мобильная установка для приготовления пенобетона, содержащая бункеры для сухих компонентов, емкость с пенообразователем, пеногенератор, компрессор, смеситель и дозаторы (авт. св. СССР 340540, кл. В 28 С 5/14, 1972 г. ). Данная установка не позволяет получать пенобетон высокого качества. A well-known mobile installation for the preparation of foam concrete containing bins for dry components, a container with a foaming agent, a foam generator, a compressor, a mixer and dispensers (ed. St. USSR 340540, class B 28 C 5/14, 1972). This installation does not allow to obtain high-quality foam concrete.

Наиболее близким техническим решением (прототипом) по отношению к предлагаемой установке является мобильная установка для приготовления пенобетона, содержащая бункеры для сухих компонентов, емкости для воды и пенообразователя, смеситель, пеногенератор, компрессор, дозаторы и трубопроводы (авт. св. СССР 1745550, кл. В 28 С 5/38, БИ 25, 1992 г.). The closest technical solution (prototype) in relation to the proposed installation is a mobile installation for the preparation of foam concrete containing bins for dry components, containers for water and a foaming agent, mixer, foam generator, compressor, dispensers and pipelines (ed. St. USSR 1745550, cl. B 28 C 5/38, BI 25, 1992).

Габаритные размеры данной установки, смонтированной на шасси, ограничиваются действующими на автомобильном транспорте нормативами на габариты перевозимых грузов. В связи с этим ограничиваются высота бункеров для сухих компонентов и свободное пространство между рабочими агрегатами и механизмами установки. В свою очередь, ограничение высоты указанных бункеров снижает стабильность рабочих характеристик и качество пенобетона из-за нестабильности дозировки сухих компонентов, вызываемой нарушением сплошности их потоков на входе в загрузочные отверстия дозаторов, и снижает продолжительность цикла работы установки на одной заправке бункеров сухими компонентами за счет ограничения рабочего объема бункеров, а ограничение свободного пространства между рабочими агрегатами и механизмами установки усложняет и делает опасной ее эксплуатацию, техническое обслуживание и ремонт. The overall dimensions of this installation, mounted on the chassis, are limited by the standards applicable to road transport on the dimensions of goods transported by road. In this regard, the height of the bins for dry components and the free space between the working units and the installation mechanisms are limited. In turn, limiting the height of these bins reduces the stability of the operating characteristics and the quality of the foam concrete due to the instability of the dosage of dry components caused by the disruption of the continuity of their flows at the inlet to the loading openings of the dispensers, and reduces the cycle time of the unit at one filling of bins with dry components due to the limitation the working volume of the bunkers, and the limitation of free space between the working units and the installation mechanisms complicates and makes its operation dangerous, those Maintenance and repair.

Технической задачей изобретения является увеличение высоты и рабочего объема бункеров для сухих компонентов и свободного пространства между рабочими агрегатами и механизмами установки. An object of the invention is to increase the height and working volume of the bins for dry components and the free space between the work units and the installation mechanisms.

Техническим результатом изобретения является обеспечение высокого качества пенобетона за счет стабильной дозировки его исходных сухих компонентов, поддерживаемой высоким статическим давлением столба указанных компонентов, действующим в зоне загрузочных отверстий дозаторов за счет большой высоты бункеров с сухими компонентами, а также увеличение продолжительности цикла работы установки на одной заправке бункеров сухими компонентами за счет увеличения рабочего объема бункеров. Кроме того, техническим результатом изобретения является упрощение и повышение безопасности эксплуатации, технического обслуживания и ремонта установки за счет увеличения свободного пространства между ее рабочими агрегатами и механизмами, обеспечивающего свободный доступ к указанным агрегатам и механизмам. The technical result of the invention is to ensure high quality foam concrete due to the stable dosage of its initial dry components, supported by high static column pressure of these components, acting in the area of the dispenser loading holes due to the high height of the hoppers with dry components, as well as increasing the length of the installation cycle at one filling station bins with dry components by increasing the working volume of the bins. In addition, the technical result of the invention is to simplify and improve the safety of operation, maintenance and repair of the installation by increasing the free space between its working units and mechanisms, providing free access to these units and mechanisms.

Сущность изобретения заключается в том, что предлагаемая мобильная установка для приготовления пенобетона, содержащая оборудование, включающее емкости для воды и пенообразователя, дозаторы сухих компонентов, смеситель, пеногенератор, компрессор и бункеры для сухих компонентов, каждый из которых состоит из нижней воронкообразной части и соединенной с ней верхней части, выполненной в виде вертикально расположенной емкости, выполнена в виде двух рабочих блоков, устанавливаемых друг на друга в рабочем положении установки, при этом верхний блок выполнен быстросъемным, а каждый из блоков снабжен корпусом, причем верхняя часть каждого бункера и емкость для воды размещены в корпусе верхнего блока, а нижняя часть каждого бункера и остальное оборудование - в корпусе нижнего блока, при этом верхняя и нижняя часть каждого бункера выполнены быстроразъемными, а в корпусах рабочих блоков выполнены отверстия с возможностью соединения через них верхней и нижней частей каждого из бункеров. The essence of the invention lies in the fact that the proposed mobile installation for the preparation of foam concrete containing equipment including containers for water and a foaming agent, dry component dispensers, a mixer, a foam generator, a compressor and hoppers for dry components, each of which consists of a lower funnel-shaped part and connected to the upper part, made in the form of a vertically located container, made in the form of two working blocks mounted on top of each other in the working position of the installation, while the upper the unit is quick-detachable, and each of the units is equipped with a housing, the upper part of each hopper and a water tank located in the upper unit housing, and the lower part of each hopper and other equipment in the lower unit housing, while the upper and lower parts of each hopper are quick-detachable and in the housings of the working blocks holes are made with the possibility of connecting through them the upper and lower parts of each of the bins.

Установка может быть выполнена с высотой верхней части каждого бункера, составляющей не менее двух метров. Installation can be performed with a height of the upper part of each hopper of at least two meters.

Дозаторы сухих компонентов в установке могут быть выполнены в виде шнековых механизмов, ось каждого из которых направлена вверх под углом 5-30o к плоскости основания корпуса нижнего блока.Dispensers of dry components in the installation can be made in the form of screw mechanisms, the axis of each of which is directed upward at an angle of 5-30 o to the plane of the base of the lower unit.

Между корпусами рабочих блоков установки может быть установлено уплотнение для каждого бункера, имеющее отверстие, совмещенное с выполненными в указанных корпусах отверстиями, через которые соединяются верхняя и нижняя части каждого из бункеров. Between the housings of the working blocks of the installation, a seal can be installed for each hopper, having an opening combined with the holes made in the said housings, through which the upper and lower parts of each hopper are connected.

Установка может быть снабжена накопителем пенобетона, установленным в корпусе нижнего блока на выходе смесителя и выполненным в виде лотка, в нижней части которого установлен продольно расположенный шнековый насос для подачи пенобетона из установки на строящийся объект или в формы. The installation can be equipped with a foam concrete accumulator installed in the housing of the lower unit at the mixer outlet and made in the form of a tray, in the lower part of which a longitudinally arranged screw pump is installed to supply foam concrete from the installation to the building under construction or into molds.

Установка может быть снабжена устройством для подогрева воды, размещенным в корпусе нижнего блока и обеспечивающим нормальное функционирование установки при низкой температуре окружающей среды. The installation can be equipped with a device for heating water, placed in the housing of the lower unit and ensuring the normal functioning of the installation at low ambient temperature.

В качестве корпусов рабочих блоков в установке могут быть использованы известные стандартные контейнеры, например контейнеры, используемые для перевозки грузов различными видами транспорта, и/или для других целей. Known standard containers, for example containers used for transporting goods by various means of transport, and / or for other purposes, can be used as enclosures of working blocks in the installation.

Сущность изобретения поясняется чертежами, на которых изображены:
на фиг.1 - схема мобильной установки для приготовления пенобетона;
на фиг.2 - узел I на фиг. 1.
The invention is illustrated by drawings, which depict:
figure 1 - diagram of a mobile installation for the preparation of foam;
in Fig.2 - node I in Fig. 1.

Установка состоит из нижнего блока 1, размещенного в корпусе 2, и верхнего быстросъемного блока 3, размещенного в корпусе 4, и содержит оборудование, включающее пульт управления 5, подключенный к наружной линии 6 электроснабжения установки, емкость 7 для воды с заправочным трубопроводом 8, подключаемым к наружной водопроводной сети или к нагнетательному шлангу автоводовозки или насоса, подкачивающего воду из какого-либо водоема, емкость 9 для раствора пенообразователя, смеситель 10, пеногенератор 11, накопитель 12, выполненный в виде лотка, в нижней части которого размещен продольно расположенный (вдоль днища лотка) шнековый подающий насос 13 с выходным патрубком 14, компрессор 15 с редукционным клапаном 16, соединенный трубопроводом 17 с пеногенератором 11, насос 18, подключенный к емкости 9 и соединенный трубопроводом 19 с пеногенератором 11, устройство 20 для подогрева воды (например, водогрейный котел, работающий на газе, угле или электричестве), соединенное трубопроводами 21 и 22 с емкостью 7, трубопровод 23, соединяющий емкость 7 со смесителем 10, и трубопровод 24, соединяющий емкость 7 с емкостью 9 через перекрывной кран 25, насос 26 для подачи воды в смеситель 10, дозатор воды 27, дозатор пенообразователя 28, бункер 29 для сухого вяжущего компонента (например, цемента), бункер 30 для сухого заполняющего компонента или смеси нескольких заполнителей (например, песка, золы, шлака и т.п.) и дозаторы сухих компонентов 31 и 32. The installation consists of a lower unit 1, located in the housing 2, and an upper quick-detachable unit 3, located in the housing 4, and contains equipment including a control panel 5 connected to the external power supply line 6 of the installation, a water tank 7 with a filling pipe 8 connected to the external water supply network or to the delivery hose of a car or a pump that pumps water from a reservoir, a container 9 for a foaming agent solution, a mixer 10, a foam generator 11, a storage device 12, made in the form of a tray, to the bottom parts of which are placed a longitudinally located (along the bottom of the tray) screw feed pump 13 with an outlet pipe 14, a compressor 15 with a pressure reducing valve 16 connected by a pipe 17 to a foam generator 11, a pump 18 connected to a tank 9 and connected by a pipe 19 to a foam generator 11, the device 20 for heating water (for example, a gas, coal or electricity boiler) connected by pipelines 21 and 22 with a tank 7, a pipe 23 connecting a tank 7 with a mixer 10, and a pipe 24 connecting a tank 7 with a tank 9 through a shut-off valve 25, a pump 26 for supplying water to the mixer 10, a water dispenser 27, a foaming agent dispenser 28, a hopper 29 for a dry binder component (e.g., cement), a hopper 30 for a dry filling component, or a mixture of several aggregates (e.g. sand , ash, slag, etc.) and dry component dispensers 31 and 32.

Каждый из бункеров 29 и 30 состоит из нижней воронкообразной части 33 и соединенной с ней верхней части 34, выполненной в виде вертикально расположенной емкости, снабженной заправочной трубой 35 и воздушным рукавным фильтром 36, через который отводится воздух из бункера при его заправке сухими компонентами, нагнетаемыми сжатым воздухом. Верхняя часть 34 каждого из бункеров 29 и 30 и емкость 7 для воды размещены в корпусе 4 верхнего блока 3, а нижняя часть 33 каждого из указанных бункеров и остальное оборудование установки - в корпусе 2 нижнего блока 1. При этом верхняя часть 34 каждого из бункеров 29 и 30 закреплена на нижнем основании корпуса 4 (фиг.2), а нижняя часть 33 - на верхнем основании корпуса 2. Each of the bins 29 and 30 consists of a lower funnel-shaped part 33 and an upper part 34 connected to it, made in the form of a vertically arranged container, equipped with a filling pipe 35 and an air bag filter 36, through which air is removed from the hopper when it is filled with dry components pumped compressed air. The upper part 34 of each of the bins 29 and 30 and the water tank 7 are placed in the housing 4 of the upper block 3, and the lower part 33 of each of these bins and the rest of the installation equipment in the housing 2 of the lower block 1. At the same time, the upper part 34 of each of the bins 29 and 30 are fixed on the lower base of the housing 4 (figure 2), and the lower part 33 is on the upper base of the housing 2.

Для облегчения приведения установки в рабочее и транспортное положение трубопроводы 8, 21 и 22 могут быть выполнены в виде шлангов с быстросъемными наконечниками (например, наконечниками с накидными гайками) для оперативного подключения трубопровода 8 к водопроводной сети и трубопроводов 21 и 22 к емкости 7, а части 33 и 34 каждого из бункеров 29 и 30 выполнены быстроразъемными, для чего в корпусах 2 и 4 выполнены отверстия 37 и 38 с возможностью соединения через них указанных частей бункеров. Для исключения утечек сухих компонентов по зазору между корпусами 2 и 4 между ними установлено уплотнение 39 для каждого из бункеров 29 и 30, имеющее отверстие 40, совмещенное с выполненными в указанных корпусах отверстиями 37 и 38. Каждое отверстие 37 в корпусе 2 может быть снабжено быстросъемной крышкой, надеваемой сверху уплотнения 39 при транспортировке и хранении установки. To facilitate bringing the installation into working and transport position, pipelines 8, 21 and 22 can be made in the form of hoses with quick-release lugs (for example, lugs with union nuts) for the quick connection of pipeline 8 to the water supply network and pipelines 21 and 22 to tank 7, and parts 33 and 34 of each of the hoppers 29 and 30 are quick disconnect, for which holes 37 and 38 are made in the housings 2 and 4 with the possibility of connecting these parts of the hoppers through them. To prevent leakage of dry components in the gap between the housings 2 and 4, a seal 39 is installed between each of the bins 29 and 30, having an opening 40, combined with holes 37 and 38 made in the said housings. Each hole 37 in the housing 2 can be equipped with a quick-detachable a cover worn on top of the seal 39 during transportation and storage of the installation.

Для облегчения подачи сухих компонентов самотеком из бункеров 29 и 30 к дозаторам 31 и 32 без потери сплошности потоков указанных компонентов высота верхней части 34 каждого из бункеров 29 и 30 составляет не менее двух метров. Дозаторы 31 и 32 сухих компонентов пенобетона выполнены в виде шнековых механизмов, ось каждого из которых направлена вверх под углом α по отношению к плоскости основания корпуса 2 нижнего блока 1, за счет чего увеличивается высота нижней части 33 каждого из бункеров 29 и 30, что способствует поддержанию стабильного дозирования сухих компонентов за счет увеличения статического давления указанных компонентов в зоне загрузочных отверстий дозаторов 31 и 32. Величина угла α составляет 5-30o.To facilitate the supply of dry components by gravity from the hoppers 29 and 30 to the dispensers 31 and 32 without loss of continuity of flows of these components, the height of the upper part 34 of each of the hoppers 29 and 30 is at least two meters. The dispensers 31 and 32 of the dry components of the foam concrete are made in the form of screw mechanisms, the axis of each of which is directed upward at an angle α relative to the plane of the base of the housing 2 of the lower block 1, thereby increasing the height of the lower part 33 of each of the bins 29 and 30, which contributes to maintaining stable dosing of dry components by increasing the static pressure of these components in the area of the loading holes of the dispensers 31 and 32. The angle α is 5-30 o .

В корпусах 2 и 4 выполнены отверстия для прохода трубопроводов 8, 21 и 22 к емкости 7, в боковых стенках корпуса 2 нижнего блока 1 выполнена входная дверь или входной проем, отверстие для прохода выходного патрубка 14, выпускающего готовый пенобетон, и отверстия для прохода заправочного трубопровода 8 и линии 6 электроснабжения, а в верхней части корпуса 4 верхнего блока 3 выполнены отверстия для прохода заправочной трубы 35 и воздушного фильтра 36 каждого из бункеров 29 и 30. In the cases 2 and 4 holes are made for passage of pipelines 8, 21 and 22 to the tank 7, in the side walls of the case 2 of the lower unit 1 there is an entrance door or entrance opening, an opening for the passage of the outlet pipe 14, which releases the finished foam concrete, and holes for the passage of refueling the pipeline 8 and the power supply line 6, and in the upper part of the housing 4 of the upper block 3, holes are made for the passage of the filling pipe 35 and the air filter 36 of each of the bins 29 and 30.

Установка снабжена также такими известными элементами, как шиберные заслонки, устанавливаемые над загрузочными отверстиями дозаторов 31 и 32 и находящиеся в закрытом положении в процессе заправки бункеров 29 и 30 сухими компонентами, а также манометры для измерения давления на выходе трубопроводов 17, 19 и 23, перепускные трубопроводы, соединяющие всасывающую и нагнетательную линии (вход и выход) каждого из насосов 18 и 26, установленные в указанных трубопроводах перепускные регулировочные краны, используемые в качестве дополнительных дозаторов воды и раствора пенообразователя, ресивер и перекрывной кран, устанавливаемые на выходе компрессора 15, электроприводы дозаторов 31 и 32, смесителя 10, подающего насоса 13, насосов 18 и 26, компрессора 15 и различных регулирующих и управляющих органов (например, дозаторов 27 и 28), подключенных к пульту управления 5, и переливной патрубок, сообщающий верхнюю часть емкости 7 с внешним пространством через отверстие в корпусе 4 и служащий для контроля заполнения емкости 7 водой и слива из нее избытка воды. Указанные элементы не показаны на представленной на фиг.1 схеме установки в целях ее упрощения. The installation is also equipped with such well-known elements as slide gates installed above the loading openings of the dispensers 31 and 32 and which are in the closed position during refueling of the hoppers 29 and 30 with dry components, as well as pressure gauges for measuring the outlet pressure of the pipelines 17, 19 and 23, bypass valves pipelines connecting the suction and discharge lines (inlet and outlet) of each of the pumps 18 and 26, the overflow control valves installed in these pipelines, used as additional dispensers water and a foaming agent solution, a receiver and a stopcock installed at the outlet of the compressor 15, electric drives of dispensers 31 and 32, a mixer 10, a feed pump 13, pumps 18 and 26, a compressor 15 and various regulatory and control bodies (for example, dispensers 27 and 28) connected to the control panel 5, and an overflow pipe that communicates the upper part of the tank 7 with external space through an opening in the housing 4 and serves to control the filling of the tank 7 with water and the discharge of excess water from it. These elements are not shown in the installation diagram shown in figure 1 in order to simplify it.

Для обеспечения возможности использования установки в местах, где отсутствует водопроводная сеть и нет водовозок, она может быть снабжена собственным насосом для подачи воды в емкость 7 по трубопроводу 8, который может быть установлен в корпусе 2 нижнего блока 1 и снабжен всасывающим трубопроводом с возможностью подачи по нему в емкость 7 воды из ближайшего естественного или искусственного водоема. To ensure the possibility of using the installation in places where there is no water supply network and there is no water carrier, it can be equipped with its own pump for supplying water to the tank 7 through a pipe 8, which can be installed in the housing 2 of the lower unit 1 and is equipped with a suction pipe with the possibility of supplying him into the tank 7 of water from the nearest natural or artificial reservoir.

В целях облегчения и ускорения изготовления установки в качестве корпусов 2 и 4 ее рабочих блоков 1 и 3 могут быть использованы стандартные серийно выпускаемые и/или бывшие в употреблении контейнеры, например контейнеры, используемые для перевозки грузов различными видами транспорта (автомобильным, железнодорожным, водным, воздушным) и/или для других целей. In order to facilitate and accelerate the manufacture of the installation, standard commercially available and / or used containers, for example containers used for transportation of goods by various types of transport (road, rail, water, can be used as buildings 2 and 4 of its working blocks 1 and 3) by air) and / or for other purposes.

Установка может быть снабжена собственным шасси с платформой с возможностью размещения на ней в один уровень ее рабочих блоков 1 и 3 или выполнена с возможностью перевозки к строящемуся объекту транспортным средством (например, автомобильным, железнодорожным, водным или воздушным). При этом габаритные размеры рабочих блоков 1 и 3 установки не превышают по величине действующие транспортные нормативы на габариты грузов, перевозимых на том виде транспорта, который используется для перевозки установки. Каждый из корпусов 2 и 4 установки снабжен монтажными захватными элементами (например, скобами) для их подъема подъемными механизмами при погрузке установки на транспортное средство, выгрузке с него, а также при монтаже и демонтаже установки. Для облегчения стыковки блоков 1 и 3 в двухуровневом положении с совмещением отверстий 37 и 38 корпусов 2 и 4 по месту стыковки последних в два уровня на углах одного из указанных корпусов установлены конусные штыри-ориентаторы, а на углах второго проделаны ответные посадочные углубления под указанные штыри аналогично элементам ориентации, используемым в контейнерах различного назначения для их взаимной стыковки при установке в двух и более уровнях. The installation can be equipped with its own chassis with a platform with the possibility of placing it on one level of its working blocks 1 and 3 or made with the possibility of transportation to a building under construction by a vehicle (for example, automobile, railway, water or air). At the same time, the overall dimensions of the working blocks 1 and 3 of the installation do not exceed the current transport standards for the dimensions of the goods transported by the type of transport that is used to transport the installation. Each of the buildings 2 and 4 of the installation is equipped with mounting gripping elements (for example, brackets) for lifting them by lifting mechanisms when loading the installation onto the vehicle, unloading from it, as well as during installation and dismantling of the installation. To facilitate the docking of blocks 1 and 3 in a two-level position with a combination of the holes 37 and 38 of the buildings 2 and 4, conical pin-orientators are installed at the corners of one of the indicated blocks at the place of the last one’s docking, and the reciprocal landing recesses for the specified pins are made at the corners of the second similar to orientation elements used in containers for various purposes for their mutual docking when installed in two or more levels.

Установка работает следующим образом. Installation works as follows.

Сухие компоненты из бункеров 29 и 30 подаются дозаторами 31 и 32 в смеситель 10, а в пеногенератор 11 подается воздух от компрессора 15 и раствор пенообразователя, нагнетаемый из емкости 9 насосом 18. В смесителе 10 сухие компоненты смешиваются с водой затворения, нагнетаемой насосом 26, и пеной, вырабатываемой пеногенератором 11. Готовый пенобетон с выхода смесителя 10 поступает в накопитель 12, из которого шнековым насосом 13 подается по наружному трубопроводу, соединенному с выходным патрубком 14 указанного насоса, на строящийся объект или в рабочие формы. Компонентный состав пенобетона регулируется дозаторами 27, 28, 31 и 32 и редукционным клапаном 16. Управление работой электроприводов установки осуществляется с пульта управления 5. Dry components from the bins 29 and 30 are fed by dispensers 31 and 32 to the mixer 10, and air is supplied to the foam generator 11 from the compressor 15 and the foaming solution pumped from the tank 9 by the pump 18. In the mixer 10, the dry components are mixed with the mixing water pumped by the pump 26, and foam produced by the foam generator 11. The finished foam concrete from the outlet of the mixer 10 enters the accumulator 12, from which it is fed by a screw pump 13 through an external pipeline connected to the outlet pipe 14 of the specified pump, to the object under construction or to working fo we. The component composition of foam concrete is regulated by dispensers 27, 28, 31 and 32 and a pressure reducing valve 16. The operation of the electric drives of the installation is controlled from the control panel 5.

При низкой температуре окружающей среды воду из емкости 7 по трубопроводу 22 направляют в устройство для подогрева 20 и после ее нагревания по обратному трубопроводу 21 возвращают в емкость 7, откуда подают насосом 26 в смеситель 10 и через кран 25 - в емкость 9 для приготовления рабочего раствора пенообразователя. At a low ambient temperature, water from a tank 7 is sent through a pipe 22 to a heating device 20 and after heating it is returned via a return pipe 21 to a tank 7, from where it is pumped 26 to a mixer 10 and through a tap 25 to a tank 9 for preparing a working solution foaming agent.

Для приведения установки в транспортное положение верхний блок 3 снимают с нижнего блока 1. При этом перед снятием верхнего блока 3 нижний конец трубопровода 8 отсоединяют от водопровода, трубопроводы 21 и 22 отсоединяют от емкости 7, пульт управления 5 отключают от линии электроснабжения 6, а с выходного патрубка 14 подающего насоса 13 снимают шланг, подающий пенобетон на строящийся объект. При наличии в конструкции установки платформы с шасси при подготовке установки к транспортировке верхний блок 3 снимают с помощью подъемного механизма (например, легкого автокрана) с нижнего блока 1 и устанавливают на платформу шасси рядом с блоком 1, а после окончания транспортировки установки для ее приведения в рабочее положение верхний блок 3 с помощью подъемного механизма вновь устанавливают на нижний блок 1. To bring the installation into transport position, the upper block 3 is removed from the lower block 1. In this case, before removing the upper block 3, the lower end of the pipeline 8 is disconnected from the water supply, the pipelines 21 and 22 are disconnected from the tank 7, the control panel 5 is disconnected from the power supply line 6, and the outlet pipe 14 of the feed pump 13 remove the hose supplying foam concrete to the building under construction. If there is a platform with a chassis in the design of the installation, when preparing the installation for transportation, the upper block 3 is removed using a lifting mechanism (for example, a light truck crane) from the lower block 1 and installed on the chassis platform next to block 1, and after the installation has been transported to bring it into operating position of the upper block 3 using the lifting mechanism is again installed on the lower block 1.

При отсутствии в составе установки собственного шасси для ее приведения в транспортное положение верхний блок 3 снимают с нижнего блока 1 и устанавливают на транспортное средство, после чего поднимают с рабочей площадки нижний блок 1 и также устанавливают на транспортное средство в один уровень с блоком 3, а после окончания транспортировки установки для ее приведения в рабочее положение вначале с транспортного средства снимают нижний блок 1 и устанавливают его на рабочую площадку, после чего с транспортного средства снимают верхний блок 3 и устанавливают его на нижний блок 1. If the installation does not have its own chassis for bringing it into transport position, the upper block 3 is removed from the lower block 1 and installed on the vehicle, then the lower block 1 is lifted from the platform and also installed on the vehicle at the same level with block 3, and after the transportation of the installation to bring it into working position, first lower unit 1 is removed from the vehicle and installed on the working platform, after which the upper unit 3 is removed and install it on the lower block 1.

При этом в обоих случаях при установке верхнего блока 3 на нижний блок 1 обеспечивают совмещение отверстий 37 и 38 (фиг.2) в корпусах 2 и 4 с целью обеспечения герметичного стыка верхней 34 и нижней 33 частей каждого из бункеров 29 и 30 и свободного прохода сухих компонентов из верхней 34 в нижнюю 33 часть каждого из указанных бункеров. После установки блока 3 на блок 1 пульт управления 5 подключают к линии электроснабжения 6, трубопровод 8 соединяют с водопроводом, трубопроводы 21 и 22 соединяют с емкостью 7, а на выходной патрубок 14 подающего насоса 13 надевают шланг, по которому готовый пенобетон подается на строящийся объект или в рабочие формы. Заправка бункеров 29 и 30 сухими компонентами выполняется через заправочные трубы 35, например, от автоцементовоза. Moreover, in both cases, when installing the upper block 3 on the lower block 1, the holes 37 and 38 (Fig. 2) are combined in the housings 2 and 4 in order to ensure a tight joint of the upper 34 and lower 33 parts of each of the bins 29 and 30 and free passage dry components from the upper 34 to the lower 33 of each of these bins. After installing block 3 on block 1, the control panel 5 is connected to the power supply line 6, the pipe 8 is connected to the water supply, the pipes 21 and 22 are connected to the tank 7, and a hose is put on the outlet pipe 14 of the feed pump 13, through which the finished foam concrete is supplied to the building under construction or in working forms. The filling of the hoppers 29 and 30 with dry components is carried out through the filling pipes 35, for example, from a cement truck.

Выполнение установки в виде размещенных в двух уровнях рабочих блоков 1 и 3 и наклонное расположение дозаторов 31 и 32 позволяет более чем в 2 раза увеличить высоту бункеров 29 и 30 для сухих компонентов и за счет этого значительно повысить статическое давление столба сухих компонентов, действующее в зоне загрузочных отверстий дозаторов 31 и 32, благодаря чему обеспечивается равномерная загрузка дозаторов сухими компонентами без потери сплошности их потока, за счет чего поддерживается стабильное дозирование сухих компонентов в смеситель 10, что, в конечном итоге, позволяет повысить качество пенобетона. При этом исключается необходимость применения различного рода нагнетателей для подачи сухих компонентов из бункеров к дозаторам, что упрощает конструкцию установки и снижает затраты электроэнергии на ее работу. The installation in the form of working blocks 1 and 3 located at two levels and the inclined location of the dispensers 31 and 32 allows more than 2 times to increase the height of the bins 29 and 30 for dry components and thereby significantly increase the static pressure of the column of dry components in the zone loading holes of dispensers 31 and 32, which ensures uniform loading of dispensers with dry components without loss of continuity of their flow, due to which stable dosing of dry components in the mixer 10 is maintained, which , ultimately, improves the quality of foam concrete. This eliminates the need for various kinds of blowers to supply dry components from the hoppers to the dispensers, which simplifies the design of the installation and reduces the cost of electricity for its operation.

Двухуровневая компоновка установки позволяет также расположить смеситель 10 в непосредственной близости от бункеров 29 и 30, благодаря чему уменьшается длина дозаторов 31 и 32, за счет чего снижаются их вес и затраты электроэнергии на их привод. Вместе с тем, увеличение высоты бункеров для сухих компонентов позволяет также увеличить их рабочий объем и соответственно продолжительность цикла работы установки на одной заправке бункеров сухими компонентами. The two-level layout of the installation also allows you to place the mixer 10 in the immediate vicinity of the hoppers 29 and 30, thereby reducing the length of the dispensers 31 and 32, thereby reducing their weight and energy consumption for their drive. However, increasing the height of the bins for dry components also allows you to increase their working volume and, accordingly, the duration of the installation cycle at one filling of bins with dry components.

Кроме того, двухуровневое исполнение конструкции установки обеспечивает значительное увеличение свободного пространства между ее рабочими агрегатами и механизмами без увеличения длины и ширины установки. За счет этого обеспечивается свободный доступ к указанным агрегатам и механизмам, благодаря чему упрощается и становится более безопасной эксплуатация, техническое обслуживание и ремонт установки. In addition, the two-level execution of the installation design provides a significant increase in the free space between its working units and mechanisms without increasing the length and width of the installation. Due to this, free access to these units and mechanisms is ensured, which simplifies and makes safer operation, maintenance and repair of the installation.

Несмотря на расположение рабочих блоков установки в двух уровнях она отличается высокой оперативностью приведения в рабочее положение, поскольку не требует для этого никаких сложных и трудоемких сборочных, монтажных и наладочных работ. Для приведения установки в рабочее положение выполняются простейшие операции по установке верхнего блока 3 на нижний блок 1 и подключению к установке водопровода, линии электроснабжения и шланга, подающего готовый пенобетон на строящийся объект. Также просто и оперативно установка приводится и в транспортное положение. Despite the location of the working units of the installation at two levels, it is characterized by high efficiency of putting it into working position, since it does not require any complex and labor-intensive assembly, installation and commissioning work. To bring the installation into working position, the simplest operations are carried out to install the upper block 3 on the lower block 1 and connect to the installation of the water supply system, power supply line and hose, which supplies the finished foam concrete to the building under construction. It is also simple and quick to install in transport position.

Использование в установке в качестве корпусов 2 и 4 рабочих блоков 1 и 3 готовых контейнеров позволяет упростить и ускорить изготовление установки и в ряде случаев снизить затраты на ее изготовление, особенно при использовании в качестве корпусов установки бывших в употреблении контейнеров. The use of ready-made containers in the installation as enclosures 2 and 4 of the working blocks 1 and 3 makes it possible to simplify and speed up the manufacture of the installation and, in some cases, reduce the cost of its manufacture, especially when used containers are used containers.

Наличие в конструкции установки накопителя 12, снабженного шнековым насосом 13, обеспечивает подачу готового пенобетона на достаточно большое расстояние и большую высоту. The presence in the design of the installation of the drive 12, equipped with a screw pump 13, provides the supply of finished foam concrete at a sufficiently large distance and great height.

Claims (7)

1. Мобильная установка для приготовления пенобетона, содержащая оборудование, включающее емкости для воды и пенообразователя, дозаторы сухих компонентов, смеситель, пеногенератор, компрессор и бункеры для сухих компонентов, каждый из которых состоит из нижней воронкообразной части и соединенной с ней верхней части, выполненной в виде вертикально расположенной емкости, отличающаяся тем, что она выполнена в виде двух рабочих блоков, устанавливаемых друг на друга в рабочем положении установки, при этом верхний блок выполнен быстросъемным, а каждый из блоков снабжен корпусом, причем верхняя часть каждого бункера и емкость для воды размещены в корпусе верхнего блока, а нижняя часть каждого бункера и остальное оборудование - в корпусе нижнего блока, при этом верхняя и нижняя часть каждого бункера выполнены быстросъемными, а в корпусах блоков выполнены отверстия с возможностью соединения через них верхней и нижней частей каждого из бункеров. 1. Mobile installation for the preparation of foam concrete containing equipment, including containers for water and a foaming agent, dry component dispensers, a mixer, a foam generator, a compressor and hoppers for dry components, each of which consists of a lower funnel-shaped part and an upper part connected to it, made in in the form of a vertically located container, characterized in that it is made in the form of two working blocks mounted on top of each other in the working position of the installation, while the upper block is made quick-detachable, and each of the blocks is equipped with a housing, with the upper part of each hopper and a water tank located in the upper block housing, and the lower part of each hopper and other equipment in the lower block housing, while the upper and lower parts of each hopper are quick-detachable, and in the cases blocks made holes with the possibility of connecting through them the upper and lower parts of each of the bins. 2. Установка по п. 1, отличающаяся тем, что высота верхней части каждого бункера составляет не менее 2 м. 2. Installation according to claim 1, characterized in that the height of the upper part of each hopper is at least 2 m. 3. Установка по п. 1, отличающаяся тем, что дозаторы сухих компонентов выполнены в виде шнековых механизмов, ось каждого из которых направлена вверх под углом 5-30o к плоскости основания корпуса нижнего блока.3. Installation according to claim 1, characterized in that the dosers of the dry components are made in the form of screw mechanisms, the axis of each of which is directed upward at an angle of 5-30 o to the plane of the base of the lower unit body. 4. Установка по п. 1, отличающаяся тем, что между корпусами ее рабочих блоков установлено уплотнение для каждого бункера, имеющее отверстие, совмещенное с выполненными в указанных корпусах отверстиями, через которые соединяются верхняя и нижняя части каждого из бункеров. 4. Installation according to claim 1, characterized in that a seal for each hopper is installed between the housings of its working blocks, having an opening combined with holes made in the said housings, through which the upper and lower parts of each hopper are connected. 5. Установка по п. 1, отличающаяся тем, что она снабжена накопителем, установленным в корпусе нижнего блока на выходе смесителя и выполненным в виде лотка, в нижней части которого установлен продольно расположенный шнековый насос для подачи пенобетона из установки. 5. Installation under item 1, characterized in that it is equipped with a drive installed in the housing of the lower unit at the outlet of the mixer and made in the form of a tray, in the lower part of which is installed a longitudinally located screw pump for supplying foam concrete from the installation. 6. Установка по п. 1, отличающаяся тем, что она снабжена устройством для подогрева воды, размещенным в корпусе нижнего блока. 6. Installation according to claim 1, characterized in that it is equipped with a device for heating water, located in the housing of the lower unit. 7. Установка по любому из пп. 1-6, отличающаяся тем, что в ней в качестве корпусов рабочих блоков используются стандартные контейнеры, например контейнеры, используемые для перевозки грузов различными видами транспорта и/или для других целей. 7. Installation according to any one of paragraphs. 1-6, characterized in that it uses standard containers, for example containers used for transporting goods by various modes of transport and / or for other purposes, as enclosures of work units.
RU2001111722/03A 2001-04-26 2001-04-26 Mobile foam concrete preparation plant RU2195397C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001111722/03A RU2195397C1 (en) 2001-04-26 2001-04-26 Mobile foam concrete preparation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001111722/03A RU2195397C1 (en) 2001-04-26 2001-04-26 Mobile foam concrete preparation plant

Publications (1)

Publication Number Publication Date
RU2195397C1 true RU2195397C1 (en) 2002-12-27

Family

ID=20249132

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001111722/03A RU2195397C1 (en) 2001-04-26 2001-04-26 Mobile foam concrete preparation plant

Country Status (1)

Country Link
RU (1) RU2195397C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2464165C2 (en) * 2010-01-11 2012-10-20 Абакар Ахмедпашаевич Акаев Mobile concrete-mixing plant
WO2022109686A1 (en) * 2020-11-30 2022-06-02 Волбот, Еоод Automatic mixer, apparatus for cement mortars and foam concrete

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2464165C2 (en) * 2010-01-11 2012-10-20 Абакар Ахмедпашаевич Акаев Mobile concrete-mixing plant
WO2022109686A1 (en) * 2020-11-30 2022-06-02 Волбот, Еоод Automatic mixer, apparatus for cement mortars and foam concrete

Similar Documents

Publication Publication Date Title
US11192077B2 (en) Blender unit with integrated container support frame
US20150238914A1 (en) Integrated process delivery at wellsite
CN111236981A (en) Underground coal mine movable integrated automatic grouting system and using method
CN104988835B (en) Modular asphalt cold-regeneration stirring equipment
CN101936069A (en) Jib concrete mixing pumper
CN210479661U (en) 20 feet powder material tank container
RU2195397C1 (en) Mobile foam concrete preparation plant
EP3113876B1 (en) Temporary addition or injection system
CN115709010A (en) Integrated process delivery at well site
WO2018122811A1 (en) A mobile loading system for concrete mixers
CN110950296B (en) Drilling fluid liquid material storage device and drilling fluid configuration system
US6425950B1 (en) Method for producing foaming substances, especially foaming cement substances, and corresponding device
CN205416035U (en) Remove grit feed proportioning system at stirring station
EA031366B1 (en) Mobile railway servicing complex
CN100471771C (en) Bulk transport system
US20060007775A1 (en) Mobile grout plant
CN210028903U (en) Close-range three-dimensional concrete transportation system
CN218700174U (en) On-spot preparation equipment of ultra high performance concrete and on-vehicle mix system
KR200172611Y1 (en) Auto continuous volumetric concrete mixer trailer
RU140951U1 (en) WAREHOUSE OF BULK MATERIALS
JP3190023U (en) Horizontal transfer tank
CN218173335U (en) Ton bag buggy conveyor
CN111088955B (en) Drilling fluid storage workstation
CN218019355U (en) Concrete working performance adjusting device for concrete transport vehicle
RU196958U1 (en) MIXING AND CHARGING MACHINE FOR UNDERGROUND MINING

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20060427