PL89982B1 - - Google Patents

Download PDF

Info

Publication number
PL89982B1
PL89982B1 PL1974172255A PL17225574A PL89982B1 PL 89982 B1 PL89982 B1 PL 89982B1 PL 1974172255 A PL1974172255 A PL 1974172255A PL 17225574 A PL17225574 A PL 17225574A PL 89982 B1 PL89982 B1 PL 89982B1
Authority
PL
Poland
Prior art keywords
support
sleeve
formwork
shaft
support sleeve
Prior art date
Application number
PL1974172255A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Publication of PL89982B1 publication Critical patent/PL89982B1/pl

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Adornments (AREA)

Description

Przedmiotem wynalazku jest stojak budowlany stanowiacy wspornik elementów oszalowania uzywanej© przy budowaniu betonowych lub podobnych stropów, podlóg, dachów, itp.Znane oszalowania w formie plyt, na które wylewa sie beton, wsparte sa na belkach rozmieszczonych miedzy rozsuwanymi podporami. Po stwardnieniu betonu podpory usuwa sie, a belki i plyty moga byó wtedy zdemontowane w celu ponownego ich utycia. Pozadane jest, aby co najmniej belki i plyty mogly byc jak najszybciej ponownie wykorzystane.Celem wynalazku jest opracowanie konstrukcji stojaka wspierajacego elementy oszalowania, który pozwala na usuniecie belek i plyt przed calkowitym stwardnieniem betonu, przy czym czesciowo stwardnialy beton jest bezposrednio wsparty na odpowiednio rozstawionych stojakach.Cel wynalazku osiagnieto przez to, ze stojak budowlany zawiera plyte górna przymocowana do korpusu stojaka lub do plyty dolnej za pomoca trzonu rurowego, na którym osadzona jest tuleja podporowa oraz wspornik elementów oszalowania, przy czym tuleja lub trzon maja skosna powierzchnie przeznaczona do wspólpracy z czlonem wystajacym ztrzona lub odpowiednio tulei polegajacej na tym, zt obrócenie tulei podporowej wokól trzonu powoduje podniesienie lub opuszczenie tulei w stosunku do plyty górnej, przy czym wspornik elementów oszalowania jest tak uksztaltowany i ustawiony, ze opiera sie na tulei podporowej i jest unieruchomiony wzgledem trzonu, a w drugim polozeniu katowym lub ustawieniu zwolnienia tulei w stosunku do trzona, wspornik elementów oszalowania ma swobode ruchu w dól wzdluz trzona wk.erunku od plyty ^""lak wiec w praktycznym zastosowaniu wspornik elementów oszalowania wspiera belki, na których spoczywaja plyty oszalowania betonowego a wymiary poszczególnych elementów sa tak dobrane, ze w poloze- TuZozymlub polozeniu górnym wspornika elementów oszalowania. ^.•7^"^^ wspólnej plaszczyznie z górna powierzchnia plyty górnej stojaka lub urzadzam, stojakowego. Po ota^mututo "oporowej wokól glównego trzona. tuleja podporowa a wraz z nia wspornik elementów^£"^j£ wo opuszcza sie nieznacznie umozliwiajac oderwanie plyt oszalowania od czesaowo stwardn"^^ ™ czym beton pozostaje wsparty na górnej czesci stojaka lub urzadzema jakowego a nasjn, po d.1*m obróceniu tuiei podporowej do polozenia demontazu, wspornik, elementów owiewam., a * «rówe£Mc i wsparte na nich plyty opadaja gwaltownie na wspornikach, co umozhw.a zdemontowon.e belek , P»y« w ¦¦¦--nowwnn ich uzycia.2 89 982 ponownego ich uzycia.Korzystnie tuleja podporowa zaopatrzona jest w wystajace na zewnatrz wystepy lub ucha, na których wsporniki elementów oszalowania spoczywaja w polozeniu wylnwania betonu, a wspornik elementów oszalowa¬ nia zaopatrzony jest w odpowiadajace im wystepy lub ucho, które w polozeniu demontazu ustawiaja sie naprzeciw wyciec, w wyniku obrócenia tulei podporowej wokól trzpienia, przy czym wsporniki elementów oszalowania moga opasc na tulei podporowej umozliwiajac przez to usuniecie belek I plyty.Ruch do dolu wspornika elementów oszalowania po tulei podporowej korzystnie ograniczony jest przez sworzen lub tym podobne wystajacy z polozonego pod nim trzona i wspóldzialajacy z wycieciami w siegajacym w zwyz korpusie rurowym wspornika elementów oszalowania.Przedmiot wynalazku uwidoczniono w przykladzie wykonania na rysunku, na którym fig. 1 przedstawia stojak budowlany w widoku bocznym w pozycji roboczej, zamocowany do szczytowej czesci rozsuwanej podpory; fig. 2- stojak wedlug fig. 1 obrócony o 90°; fig. 3 - stojak w widoku, podobnie jak na fig. 1, lecz w pozycji zwolnionej; fig. 4 - stojak w widoku, jak przedstawiono na fig. 2, lecz w pozycji zwolnionej.Stojak budowlany przedstawiony na rysunku jest przeznaczony do zamocowania na znormalizowanej plycie szczytowej rozsuwanej podpory przez przykrecenie srubami plyty dolnej 2 do plyty szczytowej podpory.Plyta górna 4 stojaka jest polaczona z^lyta dolna 2 za pomoca rurowego trzona 6, na którym zamontowana jest, z ograniczona mozliwoscia obrotu, tuleja 8. Wspornik 10 belki oszalowania zaopatrzony w pionowy korpus 12 rurowy umieszczony jest na trzonie 6 w poblizu plyty górnej 4. Podstawa wspornika 10 spoczywa na dwu uchach 14 wystajacych na zewnatrz z tulei podporowej 8. Przedstawiona schematycznie belka podporowa 16 spoczywa na wsporniku 10 po obu jego stronach i podpiera w znanym ukladzie plyty 18 oszalowania, których górna powierzchnia tworzy wspólna plaszczyzne z górna powierzchnia plyty górnej 4 urzadzenia stojakowego. Drugie konce belek wsparte sa na podobnych urzadzeniach stojakowych a.pozostale belki sa wsparte w analogiczny sposób tworzac w calosci wsparcie plyt oszalowania o pozadanej powierzchni.Z trzonu 6 w poblizu plyty dolnej 2 wystaje sworzen 20 wspólpracujacy ze skosna lub krzywkowa powierzchnia 22 uksztaltowana na dolnej krawedzi tulei podporowej 8. W polozeniu roboczym przedstawionym na fig. 1 i 2 tuleja podporowa 8 jest podtrzymywana przez sworzen 20 w pozycji górnej ponad plyte podstawowa 2.W przedstawionym polozeniu wylewa sie mase cementowa na górna powierzchnie plyt oszalowania i powierzchnie plyt górnych stojaka budowlanego.Po czesciowym stwardnieniu masy betonowej gdy zachodzi koniecznosc zdemontowania plyt 18 oszalowania oraz belek podporowych, wówczas obraca sie tuleje podporowa o kat 90° wokól trzona stojaka raczka 25 wystajaca z zewnetrznej powierzchni tulei podporowej 8. W czasie obrotu po skosnej powierzchni krzywki 22 nastepuje stopniowe obnizenie tulei wsporczej 8 wzgledem trzona 6 a wraz z nia obnizenie wspornika jak równiez belek 16 i plyt 18 wzgledem plyty górnej 4 i wzgledem czesciowo stwardnialej masy cementowej. Ruch ten jest wstepna faza demontazu plyt i belek podporowych z pozostawieniem plyty betonowej wspartej na plytach górnych 4 stojaków.Po obrocie o kat 90° ucha 14 sa ustawione naprzeciw wyciec 24 w korpusie rurowym 12 siegajacych wyzej po obu jego stronach. W polozeniu tym wspornik 10 i korpus 12 opada na tulei podporowej 8 a ucha 14 wchodza w wyciecia 24, co uwidoczniono na fig. 3 i 4.Zakres ruchu w dól wspornika ograniczony jest przez sworzen 26 wystajacy z trzona 6, który wchodzi w styk z górna powierzchnia 28 wyciec 30 wykonanych w rurowym korpusie 12 wspornika 10. Wyciecia 30 sa prostopadle do wyciec 24.W przedstawionej na fig. 3 i 4 pozycji zwolnionej lub pozycji demontazu mozna latwo usunac ze wspornika belki 16 i plyty 18 w celu powtórnego ich uzycia w innym miejscu, przy czym czesciowo stwardnialy beton 32 pozostaje nadal wsparty na górnej plycie 4 stojaka.Umieszczenie uch 14 i wyciec 24 moze byc odwrotne, tzn. tuleja podporowa 8 moze byc zaopatrzona w wyciecia a wspornik w ucha lub wystepy. Natomiast istotna cecha jest tylko to, ze obrót tulei wsporczej wzgledem wspornika powoduje wolne obnizenie wspornika w stosunku do plyty górnej 14 a nastepnie szybki ruch wspornika do pozycji zwolnionej lub pozycji demontazu.Równiez i powierzchnia 22 krzywki i sworzen 20 moga byc umieszczone w wycieciu wzdluz tulei 8.Wspornik 10 moze byc zamocowany do korpusu 12 rurowego w dowolnym miejscu wzdluz jego dlugosci stosownie do wymiarów belek i plyt, a nie tylko do dna tego korpusu.Trzon 6 rurowy moze stanowic górny element rozsuwanej podpory i w takim przypadku zbedna jest plyta dolna 2.89 982 3 PLThe subject of the invention is a construction stand constituting a support for formwork elements used in the construction of concrete or similar ceilings, floors, roofs, etc. The known formwork in the form of slabs onto which concrete is poured, is supported on beams arranged between extendable supports. After the concrete has hardened, the supports are removed and the beams and slabs can then be dismantled for re-weaving. It is desirable that at least the beams and slabs can be reused as quickly as possible. The object of the invention is to develop a rack structure supporting the formwork elements, which allows the beams and slabs to be removed before the concrete has completely hardened, with partially hardened concrete being directly supported by appropriately spaced props. The object of the invention is achieved by the fact that the construction stand comprises a top plate fixed to the body of the stand or to the bottom plate by means of a tubular shaft on which a support sleeve and a formwork element support are mounted, the sleeve or the shaft having an oblique surface intended for cooperation with the member. the protruding stem or, respectively, the sleeve, whereby turning the support sleeve around the stem raises or lowers the sleeve in relation to the upper plate, while the formwork element support is shaped and positioned so that it rests on the support sleeve and is immobilized against on the shaft, and in the second angular position or the position of the sleeve release in relation to the shaft, the formwork element support has free movement downwards along the shaft in the angle from the board ^ "" so in practical use, the formwork element bracket supports the beams on which the formwork panels rest concrete and the dimensions of the individual elements are selected in such a way that in the TuZozym position or in the upper position of the formwork element bracket. ^. • 7 ^ "^^ common plane with the upper surface of the top plate of the rack or the rack. The gold ^ mututo" abutment around the main shaft. the supporting sleeve and with it the support for the elements ^ £ "^ j £ wo lowers slightly, making it possible to detach the formwork panels from the combed hardened" ^^ ™, and the concrete remains supported on the upper part of the stand or the device after being rotated for 1 * m The support sleeve to be disassembled, the bracket, the elements are winded, and the * «even» and the plates supported on them fall rapidly on the brackets, which allows for the dismantled beams, P »y« w w - new use for them .2 89 982 The support sleeve is preferably provided with projecting lugs or lugs to the outside, on which the formwork element supports rest in the pouring position of the concrete, and the formwork element support is provided with corresponding lugs or lugs, which in position When dismantling, they align themselves with the cuts by rotating the support sleeve around the mandrel, while the formwork element supports can clamp on the support sleeve, thus allowing the removal of the beams and the panel. The form of the formwork elements after the supporting sleeve is preferably delimited by a bolt or the like protruding from the shank located below it and interacting with the cutouts in the tubular body extending into the form of the formwork element support. The subject of the invention is shown in the example of the embodiment in the drawing, where Fig. construction in side view in working position, attached to the top part of the extendable support; Fig. 2 - The stand according to Fig. 1 is turned through 90 °; Fig. 3 is a view similar to Fig. 1, but in a released position; Fig. 4 is a view as shown in Fig. 2, but in a released position. The construction stand shown in the drawing is intended to be fixed to the standard end plate of the extendable prop by screwing the bottom plate 2 to the prop top plate of the prop with screws. is connected to the bottom plate 2 by means of a tubular stem 6 on which a sleeve 8 is mounted with limited rotation ability. Formwork beam support 10, provided with a vertical tubular body 12, is placed on the stem 6 near the top panel 4. Support base 10 it rests on two lugs 14 projecting outwardly from the support sleeve 8. The schematically illustrated support beam 16 rests on both sides of the support 10 and supports in the known arrangement a formwork panel 18, the top surface of which forms a common plane with the upper surface of the top panel 4 of the stand device. The other ends of the beams are supported on similar trestle devices a. The other beams are supported in an analogous manner to completely support the formwork panels with the desired surface area. From the shank 6 near the bottom plate 2 a pin 20 protrudes cooperating with the oblique or cam surface 22 formed on the lower edge Support sleeve 8. In the operating position shown in Figures 1 and 2, the support sleeve 8 is supported by a pin 20 in its upper position above the base plate 2. In the position shown, cement is poured onto the top surface of the formwork panels and the top panels of the construction prop. partial hardening of the concrete mass, when it is necessary to dismantle the formwork plates 18 and the supporting beams, then the supporting sleeve rotates at an angle of 90 ° around the stand shank handle 25 protruding from the outer surface of the supporting sleeve 8. During rotation on the inclined surface of the cam 22, the supporting sleeve is gradually lowered 8 relative the shaft 6 and with it the lowering of the support as well as the beams 16 and the plates 18 with respect to the upper plate 4 and with regard to the partially hardened cement mass. This movement is the initial phase of the disassembly of the slabs and the supporting beams, leaving the concrete slab supported on the top slabs of the 4 racks. After a 90 ° rotation, the lugs 14 are aligned with the cutouts 24 in the tubular body 12 extending higher on both sides. In this position, the bracket 10 and the body 12 fall on the support sleeve 8 and the lugs 14 engage the cutouts 24, as shown in Figs. 3 and 4. The range of downward movement of the bracket is limited by a pin 26 extending from the shaft 6, which comes into contact with the upper surface 28 of the leakage 30 made in the tubular body 12 of the support 10. The cutouts 30 are perpendicular to the leakage 24. In the released position or disassembly position shown in Figs. 3 and 4, they can be easily removed from the beam support 16 and plate 18 for re-use in another location, the partially hardened concrete 32 still being supported on the upper plate 4 of the stand. The arrangement of the lugs 14 and the leakage 24 may be reversed, i.e. the support sleeve 8 may be provided with cuts and the bracket with lugs or protrusions. On the other hand, the only significant feature is that the rotation of the support sleeve with respect to the support causes the support to lower slowly in relation to the top plate 14 and then to a quick movement of the support to the released or disassembling position. Also the surface 22 of the cam and the pin 20 can be placed in the cut along the sleeve 8. The bracket 10 can be attached to the 12-tubular body anywhere along its length according to the dimensions of the beams and plates, and not just to the bottom of the body. The 6-tubular stem may be the top element of the extendable support and in this case, the bottom plate is redundant 2.89 982 3 PL

Claims (8)

Zastrzezenia patentowe 1. Stojak budowlany, znamienny tym, ze zawiera plyte górna (4) mocowana do korpusu stojaka lub do plyty dolnej (2) za posrednictwem trzona (6) rurowego, na którym osadzona jest obrotowo i przesuwnie tuleja podporowa (8) oraz wspornik (10) elementów oszalowania, przy czym tuleja (8) lub trzon (6) maja skosna powierzchnie (22) wspólpracujaca ze sworzniem (20) wystajacym z trzona (6) lub tulei (8), a obrócenie tulei (8) podporowej wokól trzona (6) powoduje podniesienie lub opuszczenie tulei w stosunku do plyty górnej, przy czym wspornik (10) elementów oszalowania jest tak uksztaltowany i ustawiony, ze opiera sie na tulei podporowej (8) i jest unieruchomiony wzgledem trzona (6), a w drugim polozeniu katowym lub ustawieniu zwolnienia tulei w stosunku do trzona, wspornik elementów oszalowania ma swobode ruchu w dól wzdluz trzona w kierunku od plyty górnej.Claims 1. A construction stand, characterized in that it comprises an upper plate (4) fixed to the body of the stand or to the bottom plate (2) by means of a tubular shaft (6), on which a supporting sleeve (8) and a support are rotatably and slidably mounted. (10) formwork elements, the sleeve (8) or shaft (6) having an oblique surface (22) cooperating with the pin (20) protruding from the shaft (6) or sleeve (8), and turning the support sleeve (8) around the shaft (6) raises or lowers the sleeve in relation to the top plate, while the formwork element bracket (10) is shaped and positioned so that it rests on the support sleeve (8) and is fixed against the stem (6), and in the second angular position or the position of the sleeve release with respect to the stem, the formwork element support is free to move downward along the stem away from the top plate. 2. Stojak wedlug zastrz. 1, znamienny tym, ze tuleja podporowa (8) zaopatrzona jest w co najmniej jeden wystajacy na zewnatrz wystep lub ucho (14), na których wspornik (10) elementów oszalowania opiera sie w polozeniu górnym lub polozeniu roboczym, przy czym wspornik (10) elementów oszalowania ma przynajmniej jedno wyciecie (24) odpowiadajace wystepowi lub uchu (14) i usytuowane tak, ze przy pokryciu sie wystepów lub uch z wycieciami w drugim polozeniu demontazu, wspornik elementów oszalowania (10) ma swobode przesuwu w dól po tulei podporowej (8).2. Stand according to claim 3. A method as claimed in claim 1, characterized in that the support sleeve (8) is provided with at least one projecting outward projection or lug (14) on which the formwork element bracket (10) rests in the upper or working position, the bracket (10) of the formwork elements has at least one cutout (24) corresponding to a projection or lug (14) and is positioned such that when the projections or lugs with cutouts overlap in a second dismantling position, the formwork element support (10) is free to slide down the support sleeve (8) ). 3. Stojak wedlug zastrz. 2, znamienny tym, ze posiada sworzen (26) wystajacy na zewnatrz z trzona i wspóldzialajacy z wycieciem (30) we wsporniku (10), ograniczajacy ruch wspornika (10) elementów oszalowania w dól po tulei podporowej (8).3. Stand according to claims A method according to claim 2, characterized in that it has a pin (26) extending outwardly from the shank and interacting with a cutout (30) in the support (10), limiting the movement of the formwork support (10) downward on the support sleeve (8). 4. Stojak wedlug zastrz. 1, znamienny tym, ze wspornik (10) elementów oszalowania zawiera rurowy korpus (12) o srednicy wiekszej od srednicy tulei podporowej (8), zaopatrzony w wystajace na zewnatrz wystepy, na których opieraja sie belki podporowe (16) tworzace wsparcie dla plyt (18) oszalowania.4. Stand according to claims The form of claim 1, characterized in that the formwork element support (10) comprises a tubular body (12) with a diameter greater than that of the support sleeve (8), provided with outwardly projecting projections on which the support beams (16) rest to support the panels ( 18) formwork. 5. Stojak wedlug zastrz, 1, lub 2, znamienny tym, ze tuleja podporowa (8) zaopatrzona jest w wystajaca na zewnatrz raczke (25).Stand according to claim 1 or 2, characterized in that the support sleeve (8) is provided with an outwardly projecting handle (25). 6. Stojak wedlug zastrz. 1, lub 3, znamienny tym, ze wspornik (10) elementów oszalowania jest w polozeniu roboczym umieszczony miedzy plyta górna (4) a tuleja podporowa (8).6. Stand according to claims A form according to claim 1 or 3, characterized in that the formwork element bracket (10) is placed in the working position between the upper plate (4) and the support sleeve (8). 7. Stojak wedlug zastrz. 1, z n a m,i e n n y tym, ze skosna powierzchnia (22) jest uksztaltowana na dolnej powierzchni tulei podporowej (8) i opiera sie o sworzen (20) wystajacy z trzona (6).89982 fO' •:wl 3. Sklad-Prac. Poligraf. UP PRL Druk-WOSJ „Wspólna Sc"av.a" Format A4. Naklad 120 + 17. Stand according to claims 1, with the fact that the sloping surface (22) is formed on the lower surface of the support sleeve (8) and rests against the pin (20) protruding from the shaft (6). 89982 fO '•: wl 3. Sklad-Prac. Typographer. UP PRL Druk-WOSJ "Wspólna Sc" av.a "A4 format. Mintage 120 + 1 8. Cena 10 zl PL8. Price PLN 10 PL
PL1974172255A 1973-06-29 1974-06-28 PL89982B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB3121273A GB1473846A (en) 1973-06-29 1973-06-29 Supports for concrete formwork

Publications (1)

Publication Number Publication Date
PL89982B1 true PL89982B1 (en) 1976-12-31

Family

ID=10319698

Family Applications (1)

Application Number Title Priority Date Filing Date
PL1974172255A PL89982B1 (en) 1973-06-29 1974-06-28

Country Status (13)

Country Link
US (1) US3915423A (en)
BE (1) BE816819A (en)
CA (1) CA1009208A (en)
DE (1) DE2431295A1 (en)
ES (1) ES427798A1 (en)
FI (1) FI198674A (en)
FR (1) FR2235251B3 (en)
GB (1) GB1473846A (en)
NL (1) NL7408768A (en)
NO (1) NO143762C (en)
PL (1) PL89982B1 (en)
SE (1) SE393423B (en)
ZA (1) ZA743839B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1532241A (en) * 1975-01-20 1978-11-15 Acrow Ltd Supports for concrete formwork
CA1059490A (en) * 1976-04-27 1979-07-31 Jack R. Tooley Apparatus for use in buildings
GB1551100A (en) * 1976-10-07 1979-08-22 Evans & Sons Ltd C Drop-head support assembly
DE3036306C2 (en) * 1980-09-26 1983-12-22 Josef 7611 Steinach Maier Stripping aid for slab formwork
GB2344609B (en) * 1998-12-08 2002-07-24 Sgb Services Plc Improvements in or relating to a scaffolding arrangement
KR20010044167A (en) * 2000-12-18 2001-06-05 윤요현 Method of earlier-separating dies for forming the lower part of con'c beam or slab from it
KR100462410B1 (en) * 2002-11-07 2004-12-17 페리유한회사 Method of manufactuning siab mold
US20060042179A1 (en) * 2004-08-05 2006-03-02 Peter Vanagan Slab formwork systems
BRPI0520046A2 (en) * 2005-02-23 2009-12-01 Ulma C Y E S Coop perimeter frame system and assembly and disassembly process for a perimeter frame system
US20070200048A1 (en) * 2006-02-28 2007-08-30 Pro-Shore, Llc Systems and methods for shoring concrete
DE102006055306B4 (en) * 2006-11-23 2010-10-07 Peri Gmbh Support head for slab formwork
FR2957957B1 (en) * 2010-03-26 2015-01-02 Deko STRUCTURES, SYSTEMS, AND METHODS FOR FORMING SLABS
US8763982B1 (en) * 2011-12-02 2014-07-01 David W Murrell Single whaler-backed form support bracket system
AU2015226826B2 (en) * 2014-03-04 2019-03-14 Form 700 Pty Ltd An adapter for a formwork support structure
AU2014215950B2 (en) * 2014-08-19 2019-09-19 Form 700 Pty Ltd Concrete formwork and a formwork support bracket
CN109680930A (en) * 2017-10-18 2019-04-26 五冶集团上海有限公司 Early-dismantling support system construction method
CA2994076A1 (en) * 2018-02-06 2019-08-06 Brand Shared Services Llc Formwork system
CN108425492A (en) * 2018-02-28 2018-08-21 福建省华银铝业有限公司 A kind of top plate supporting structure of building template
CN112627506B (en) * 2020-12-31 2021-12-14 东晟兴诚集团有限公司 Plastic building template and supporting device thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3239188A (en) * 1964-03-11 1966-03-08 Kwikform Ltd Shuttering system for use in building construction
GB1386966A (en) * 1971-04-28 1975-03-12 Kwikform Ltd Supporting structure for shuttering

Also Published As

Publication number Publication date
GB1473846A (en) 1977-05-18
ZA743839B (en) 1975-06-25
FR2235251B3 (en) 1977-05-06
FI198674A (en) 1974-12-30
NL7408768A (en) 1974-12-31
NO742333L (en) 1975-01-27
BE816819A (en) 1974-10-16
AU7060674A (en) 1976-01-08
NO143762B (en) 1980-12-29
US3915423A (en) 1975-10-28
NO143762C (en) 1981-04-08
SE7408192L (en) 1974-12-30
ES427798A1 (en) 1976-08-01
SE393423B (en) 1977-05-09
CA1009208A (en) 1977-04-26
DE2431295A1 (en) 1975-01-23
FR2235251A1 (en) 1975-01-24

Similar Documents

Publication Publication Date Title
PL89982B1 (en)
US3784151A (en) Formwork for use in supporting shuttering
EP1587999B1 (en) Concrete slab form system
US3239188A (en) Shuttering system for use in building construction
US4056254A (en) Supports or concrete formwork
KR20020067965A (en) Overhanging form system and method of using the same
KR20110135259A (en) Drop apparatus for supporter
EP3029217B1 (en) Formwork for a hanging beam
JP2002061198A (en) Construction method for steel pipe column, and pile head processing construction method to cast-in-place pile for same method
JP2010144374A (en) Erection member for temporary structure
KR100346280B1 (en) A horizontal utensil for a wall mould of the cement concrete building
KR20100102798A (en) Bracket for construction materials
US11408188B1 (en) Suspended translating platform
US3693929A (en) Hanger device useful in forming concrete structural slabs
KR100734185B1 (en) Uphold rod which has an angle control function an slab panel for bridge
CN110359429A (en) A kind of dam concrete steel template structure and its construction installation method
KR101714591B1 (en) Exterior insulation system intergrated insulatin material using the gangform
KR200249907Y1 (en) Device for adjusting level of a concrete form
CN113550475B (en) Prefabricated floor slab mounting structure
KR200375139Y1 (en) Lower Part Fixing Structure of Gang Form
DE9400637U1 (en) Ceiling shut-off block with integrated thermal insulation
KR200238510Y1 (en) Spacer supporting steel in steel concrete used in construction
KR100931532B1 (en) Apparatus for fixing gang form system
EP1321602A1 (en) Formwork for concrete structure
RU2163959C2 (en) Joint of concrete structural components