Method for erection of a framework tower

Info

Publication number
PL418809A1
PL418809A1 PL418809A PL41880916A PL418809A1 PL 418809 A1 PL418809 A1 PL 418809A1 PL 418809 A PL418809 A PL 418809A PL 41880916 A PL41880916 A PL 41880916A PL 418809 A1 PL418809 A1 PL 418809A1
Authority
PL
Poland
Prior art keywords
tower
lattice
height
central
central lattice
Prior art date
Application number
PL418809A
Other languages
Polish (pl)
Inventor
Marcin Skwarek
Tomasz Sadowski
Magdalena Sadowska
Original Assignee
Green Energy Tower System Spółka Z Ograniczoną Odpowiedzialnością
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Green Energy Tower System Spółka Z Ograniczoną Odpowiedzialnością filed Critical Green Energy Tower System Spółka Z Ograniczoną Odpowiedzialnością
Priority to PL418809A priority Critical patent/PL418809A1/en
Publication of PL418809A1 publication Critical patent/PL418809A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

Zgłoszenie dotyczy sposobu wznoszenia kratowej wieży obejmującej centralny kratowy słup (1), umieszczony w środku ciężkości podstawy kratowego trzonu (2) wieży. Sposób charakteryzuje się tym, że obejmuje etap początkowy, w którym na uprzednio wykonanych fundamentach wznosi się najniższy segment zasadniczego kratowego trzonu (2) wieży, do wysokości stężeń poziomych (8) wieży oraz centralny kratowy słup (1), do wysokości przewyższającej wysokość kolejnego członu montażowego wieży, następnie, na wysokości stężeń poziomych (8) wieży montuje się system rolek pierwszych (9) prowadzących centralny kratowy słup (1) oraz zabudowuje się tymczasową ramę (10), zaopatrzoną w system dodatkowych prowadzących rolek drugich, a także zespół sprzężonych linowych wciągarek, następnie na szczycie centralnego kratowego słupa (1) montuje się ramię (13) żurawia montażowego, następnie na centralnym kratowym słupie (1) montuje się roboczy pomost (17) o zmiennym wysięgu oraz etap montażu właściwego, następujący po etapie początkowym, w którym przy użyciu ramienia (13) żurawia wynosi się elementy kolejnego członu montażowego wieży i scala się je, do wysokości kolejnego stężenia poziomego (8) wieży i mocuje się na tym poziomie prowadzące rolki pierwsze (9), następnie, przy użyciu systemu sprzężonych linowych wciągarek i lin, sukcesywnie podnosi się centralny kratowy słup (1), wraz z zabudowanym na nim ramieniem (13) żurawia i pomostem (17), następnie montuje się, od dołu, kolejne segmenty.The application relates to a method of erecting a lattice tower comprising a central lattice column (1) located in the center of gravity of the base of the lattice shaft (2) of the tower. The method is characterized in that it includes the initial stage, in which the lowest segment of the basic lattice shaft (2) of the tower rises to previously made foundations, up to the horizontal bracing (8) of the tower and the central lattice column (1), up to the height exceeding the height of the next member assembly tower, then, at the height of horizontal bracing (8) of the tower, the first roller system (9) leading the central lattice pole (1) is mounted and a temporary frame (10) fitted with a system of additional guiding second rollers, as well as a set of coupled rope winches, then on the top of the central lattice pole (1) the arm (13) of the assembly crane is mounted, then the central lattice pole (1) is mounted on the working platform (17) with variable reach and the actual assembly stage, after the initial stage, in which using the crane arm (13), the parts of the next part are lifted tower assembly platform and joins them to the height of the next horizontal brace (8) of the tower and the first guide rollers (9) are attached at this level, then, using a system of coupled rope winches and ropes, the central lattice column (1) is successively raised together with the crane arm (13) and platform (17) built on it, then further segments are assembled from below.

PL418809A 2016-09-23 2016-09-23 Method for erection of a framework tower PL418809A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL418809A PL418809A1 (en) 2016-09-23 2016-09-23 Method for erection of a framework tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL418809A PL418809A1 (en) 2016-09-23 2016-09-23 Method for erection of a framework tower

Publications (1)

Publication Number Publication Date
PL418809A1 true PL418809A1 (en) 2018-03-26

Family

ID=61661155

Family Applications (1)

Application Number Title Priority Date Filing Date
PL418809A PL418809A1 (en) 2016-09-23 2016-09-23 Method for erection of a framework tower

Country Status (1)

Country Link
PL (1) PL418809A1 (en)

Similar Documents

Publication Publication Date Title
US8584429B2 (en) Tower erection system and method
AU2013261673B2 (en) Self-climbing telescopic crane and method for mounting pre-fabricated concrete towers
ES2641818T3 (en) High rise building lifting concept
US10392794B2 (en) Structure and method of making the same
JP2011220102A (en) Construction method of hybrid-type tower for wind generator
AR081705A1 (en) MANUFACTURE FOR THE PRODUCTION BY MOLDING OF PREFABRICATED CONCRETE DOVELAS FOR THE CONSTRUCTION OF AEROGENERATOR TOWER TOWERS AND METHOD FOR THE EXPLOITATION OF FACTORY SUCH
CN104727545A (en) Hydraulic sliding-mode vertical transportation system and method for large water tower barrel
CN109057295B (en) Manufacturing method of steel structure lifting system
CN104727539A (en) Power maintenance operating platform
CN105672672B (en) A kind of pier stud construction system and construction method
CN103434933B (en) Large member hoisting in-position device and in-position method
PL418809A1 (en) Method for erection of a framework tower
CN204474202U (en) Large-tonnage steel member integrated hoisting fixture
CN207177305U (en) Prefabricated beam stretching jack suspension door frame
CN205047236U (en) Ditching shedder on tunnel cable ditch platform truck
CN203889953U (en) Internal-climbing steel beam moving device for internal-climbing tower crane
CN202897970U (en) Cradle support frame
FI20115794A0 (en) Method and arrangement for erecting a wind turbine
CN204251274U (en) Oil pumper leveling device
RU2009145244A (en) METHOD FOR REINFORCING MONOLITHIC REINFORCED CONCRETE BUILDINGS AND DEVICE FOR ITS IMPLEMENTATION
CN205348616U (en) Prefabricated formula steel stair
PL420928A1 (en) Method for assembling of wind power plants
EP2568165A3 (en) Wind turbine, method for building a wind turbine and method for increasing the height of an existing wind turbine
CN103318808A (en) Air duct installation lifter
FI20075334L (en) A method for erecting a building and the arrangement of columns used in erecting it