KR920007715Y1 - Trust for half precast concrete slab - Google Patents

Trust for half precast concrete slab Download PDF

Info

Publication number
KR920007715Y1
KR920007715Y1 KR2019900002715U KR900002715U KR920007715Y1 KR 920007715 Y1 KR920007715 Y1 KR 920007715Y1 KR 2019900002715 U KR2019900002715 U KR 2019900002715U KR 900002715 U KR900002715 U KR 900002715U KR 920007715 Y1 KR920007715 Y1 KR 920007715Y1
Authority
KR
South Korea
Prior art keywords
truss
angle
slab
lower chords
concrete slab
Prior art date
Application number
KR2019900002715U
Other languages
Korean (ko)
Other versions
KR910016932U (en
Inventor
박형철
Original Assignee
주식회사 대 우
김우중
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대 우, 김우중 filed Critical 주식회사 대 우
Priority to KR2019900002715U priority Critical patent/KR920007715Y1/en
Publication of KR910016932U publication Critical patent/KR910016932U/en
Application granted granted Critical
Publication of KR920007715Y1 publication Critical patent/KR920007715Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • E04C5/0609Closed cages composed of two or more coacting cage parts, e.g. transversally hinged or nested parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

내용 없음.No content.

Description

하프 프리캐스트(HALF PRECAST) 콘크리트 슬라브(SLAB)용 앵글(ANGLE)입체트러스(TRUSS)Half precast (ANGLE) solid truss (TRUSS) for concrete slab (SLAB)

제l도 (a)는 본 고안의 일체 트러스 사시도, (b)는 본 고안의 입체 트러스 측면도, (c)는 본 고안의 입체 트러스 정면도.Figure 1 (a) is a perspective view of the integrated truss of the present invention, (b) is a three-dimensional truss side view of the present invention, (c) is a three-dimensional truss front view of the present invention.

제2도, 제3도, 제4도 (a)(b)(c)는 본 고안의 다른 실시예 입체 트러스.2, 3, 4 (a) (b) (c) is another embodiment three-dimensional truss of the present invention.

제5도는 본 고안에 의해 완성된 하프 프리 캐스트 콘크리트 슬라브 단면도.5 is a cross-sectional half-precast concrete slab completed by the present invention.

제6도는 본 고안의 설치사용 상태 단면도.6 is a cross-sectional view of the installation and use of the present invention.

제7도는 종래의 입체 철근트러스 사시도.7 is a perspective view of a conventional three-dimensional rebar truss.

*도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 입체트러스 2 : 상현재1: solid truss 2: phase present

3, 3' : 하현재 4 : 앵글3, 3 ': lower chord 4: angle

5, 5', 5" : 세모서리 6, 6', 6" : 홈5, 5 ', 5 ": Corner 6, 6', 6": Home

7, 7', 7" : 안착홈 8, 8', 8" : 삽입공7, 7 ', 7 ": Settling groove 8, 8', 8": Insertion hole

e : 하프 프리캐스트 콘크리트슬라브 f : 벽이나 보e: half precast concrete slab f: wall or beam

g : 현장타설 콘크리트 h : 합성슬라브g: Cast-in-place concrete h: Synthetic slab

Ll : 일정간격 L2 : 소정위치Ll: Constant interval L2: Predetermined position

본 고안은 철근 콘크리트조 또는 철골 철근 콘트리트조 건건물의 바닥판이나 벽에 거푸집 공법으로 설치되는 하프프리 캐스트(HALF PRECAST)콘크리트 슬라브(SLAB)에 보강재로 매설되는 앵글(ANGLE)입체 트러스(TRUSS)에 관한 것으로서, 특히, 입체트러스를 구성하는 상현재와 하현재를 연결하는 사현재를 개별제작되는 삼각형상의 앵글로 연결시켜 입체 트러스를 구성하여 제작을 용이하게 하고, 용접공정을 대폭 줄여 시공시간 단축은 물론 시공을 용이하게 할 수 있고, 인양시 후쿠(HOOK)걸이용으로 사용하면서, 프리캐스트 콘크리트 슬라브의 단면 성능을 향상시키고, 가설후의 균열 및 과도한 처짐을 방지하여 줄 수 있도록한 하프 프리캐스트 콘크리트 슬라브용 앵글 입체트러스에 관한 것이다.The present invention is an angle solid truss (ANGLE) truss embedded as a reinforcement in a half precast concrete slab (SLAB) installed in the bottom plate or wall of a reinforced concrete or steel reinforced concrete concrete building. In particular, the quadruple connecting the upper chord and the lower chord constituting the three-dimensional truss is connected to the triangular angles to be individually manufactured to construct a three-dimensional truss to facilitate manufacturing, and greatly reduce the welding process and shorten the construction time. Of course, half precast concrete can be used to facilitate construction and to improve the cross-sectional performance of precast concrete slabs while preventing the cracks and excessive sagging after construction, while being used as hooks for lifting. An angle solid truss for slabs.

일반적으로 최근 건설환경은 자재값의 폭등, 노무자의 부족, 그리고, 건축주와 사회저 요구에 의해서 주어진 공기내에 공사를 수행하지 않으면 안된다. 이를 위해서는 구조, 시공, 설비기술, 외장 바닥판등의 개별 생산기술을 건축물 개개의 특수성을 고려하여 최적으로 조합 시켜 이러한 상승효과에 의해 고도의 생산성과 건축기능을 실현하는 시스템 공법을 필요로하게 되었던 것이다.In general, the recent construction environment has to be carried out in the air given by the increase in the price of materials, the shortage of laborers, and the demands of the owner and the society. To this end, it is necessary to combine the individual production technologies such as structure, construction, facility technology and exterior floor boards optimally by taking into account the specific characteristics of the building. will be.

그러나, 기존의 현장타설 철근 콘크리트로(RC조)의 바닥판 시공은 오랜기관 양생이 필요하고 콘크리트 타설시 하중이 커서 지보공의 소요 갯수가 많아지고, 거푸집의 설치 해제 작업에 대한 노무가 필요한데 이는 노무인력이 감소하고 있는 상황을 고려할 때 슬라브 거푸집의 시공 합리화가 시급하다.However, the existing construction of the floor slab of RC concrete furnaces requires long-term curing and large loads when placing concrete, resulting in a large number of supporters and labor for installing and removing formwork. Considering the decreasing manpower, it is urgent to rationalize the construction of slab formwork.

그리고 기존 모든 프리캐스트 콘크리트 공법(ALL PC공법)은 많은 실적이 있지만 설비, 배관등에 대응하기 힘들고, 접합부에 누음, 누수가 심하고, 접합부와의 고정도가 낮고, 단순지지로 되어 처짐에 불리하는등 많은 단점을 갖고 있다.And all the existing precast concrete methods (ALL PC method) have a lot of results, but it is difficult to cope with facilities, piping, etc. It has a disadvantage.

따라서 상기의 인력 부족에 대한 최근 건설환경과 기존의 철근 콘크리트조(RC조)와 프리캐스트 콘크리트조(PC조)의 단점을 해결하기 위해 개발된 것중의 하나가 하프 프리캐스트 콘크리트 슬라브로서 이는 벽이나 보등에 하프 프리캐스트 콘크리트 슬라브를 가설한 후 그 위에 철근을 배근한 후에 현장에서 상부에 콘크리트(TOPPINGCONC)를 타설하여 합성 슬리브를 형성하는 공법인 무지보공으로 하거나 지보공 갯수를 감소시킬 수 있고, 그 평탄한 면을 직접 천정면으로 이용하며 슬라브의 균열이나 청짐을 방지하고, 작업을 용이하게 할 목적으로 하프프리캐스트 콘트리트 슬라브용 입체 철근 트러스를 사용하였던 것이다.Therefore, one of the ones developed to solve the shortcomings of the recent construction environment and the existing reinforced concrete (RC) and precast concrete (PC) tanks due to the lack of manpower is half precast concrete slab, After laying half precast concrete slab on beams, reinforcing steel bars on it, and then placing concrete (TOPPINGCONC) on the top at the site, it can be made into non-hollow construction or a method of forming composite sleeves, or the number of supporting grounds can be reduced. 3D reinforced truss for half precast concrete slab was used to prevent cracks and filling of slabs and to facilitate the work.

이와같은 목적으로 이용되는 종래의 하프 프리캐스트 콘크리트 슬라브용 입체 철근 트러스(TRUSS)를 보면 제7도에서 보는 바와같이 상현재(b)와 하현재(c)를 연속적인 파형으로 제작되는 사현재(d)의 상, 하에 설치한 후 용접고정하여 입체 철근트러스(a)를 제작하기 때문에 사현재를 파형으로 만들기 위해 기계를 제작하여야 하므로 기계 제작에 많은 난점이 있었고, 제작 단가(Cost)가 상승되는 문제점이 있었으며, 특히 파형으로 연속제작되는 사현재와 상, 하현재를 용접 고정시키기가 어려워 작업능률이 저하되는 등의 문제점이 있었던 것이다.In the conventional three-dimensional reinforced trusses (TRUSS) for the half-precast concrete slab used for this purpose, as shown in FIG. Since the three-dimensional rebar truss (a) is manufactured by welding fixing after installation at the top and bottom of d), there are many difficulties in manufacturing the machine because the machine must be manufactured to make the wave current into a wave shape, and the manufacturing cost is increased. There was a problem, in particular, it is difficult to weld fixed four poles and the upper and lower chords, which are continuously produced by the waveform, there was a problem such as work efficiency is reduced.

본 고안은 상기와 같은 종래의 문제점을 보완하고져, 하프 프리캐스트 콘크리트 슬라브용 입체 철근트러스를 구성하는 상현재와 하현재를 고정하는 사현재를 별도로 제작되며 각 모서리에 안착홈과 삽입공을 갖는 삼각형상의 앵글을 사용하므로써, 사현재 제작용 기계제작을 하여야 하는 난점을 해결하고, 조립철근트러스의 제작도 용이하게 하고, 용접공정을 대폭 감소시킬수 있으며, 이에 따라 제작 단가도 절감시키고, 시공시 전기설비등 각종배관이 용이하여 시공시간 단축과 시공의 용이성을 도모할 수 있게 한것으로서 이하 본 고안을 첨부한 도면에 의하여 상세히 설명하면 다음과 같다.The present invention complements the conventional problems as described above, and separately manufactured four poles for fixing the upper chord and the lower chord constituting the three-dimensional reinforcement truss for half precast concrete slab, each triangle has a seating groove and insertion hole By using the angle of the top, it is possible to solve the problem of manufacturing the machine for the current production, to make the fabrication of the rebar truss easily, and to greatly reduce the welding process, thereby reducing the manufacturing cost and the electrical equipment during the construction. Various pipes and the like are easy to shorten the construction time and ease of construction as described in detail by the accompanying drawings of the present invention as follows.

통상적으로 하프 프리캐스트 콘크리트 슬라이브(e)에 제5도에서 보는 바와같이 매설되어, 벽이나 보(f)등에 가설하여 현장 콘크리트(g)를 타설하여 합성슬라브(h)를 구성하며 상, 하현재와 사현재로 구성되는 입체트러스(1)에 있어서, 상기 입체트러스(1)를 구성하는 한본 상현재(2)와 두본의 하현재(3)(3')를 제1도(a)(b)(c)에서 보는 바와같이 일정 높이와 간격(L1),(L2)을 유지하여 평행하게 설치하고, 상기 상현재(2)와 하현재(3)(3')각각을 그 길이 방향의 소정위치(L3)에서 삼각형상의 앵글(4)로 연결고정하여 입체트러스(1)를 구성하는데, 이 삼각형상의 앵글(4)은 상단모서리(5)의 외측과 하단양 모서리(5')(5")의 내측에 각각홈(6)(6')(6")을 형성하여 하현재(3)(3')는 앵글(4)의 하측 양 모서리(5')(5")의 홈(6')(6")에 끼워주고, 상현재(2)는 앵글(4)의 상단모서리(5)외측홈(6)에 끼워준후 각각의 접점들을 용접하여 상, 하현재(2)(3)(3')와 함께 입체트러스(1)를 구성하여, 제5도와 제6도에서 보는 바와같이 형틀에서 복수개의 입체트러스(1)가 일정 거리(L4)을 유지하며 하프 프리케스트 콘크리트 슬라브(e)에 매설된 후 벽이나 보(f)등에 가설되어 현장콘크리트 (g)를 그 상부에 타설하여 합성슬라브(h)를 이루게 된다.Typically, half-precast concrete slab (e) is buried as shown in FIG. 5, and it is installed on a wall or beam (f), and casts concrete (g) to form a composite slab (h). In the three-dimensional truss (1) consisting of a present and four chords, the Hanbon upper chord (2) constituting the three-dimensional truss (1) and the lower chord (3) (3 ') of the two bones is shown in FIG. b) As shown in (c), the upper and lower chords 2 and 3, 3 'are installed in parallel with each other, while maintaining a predetermined height and spacing L1 and L2. Connected and fixed to a triangular angle (4) at a predetermined position (L3) to form a three-dimensional truss (1), the triangular angle (4) is the outer edge of the upper edge (5) and the lower edges (5 ') (5) Grooves 6, 6 'and 6 " are formed in the inner side of " " so that the lower chords 3 and 3' are formed at the grooves of the lower two corners 5 'and 5 " 6 ') (6 "), and the upper chord (2) is inserted into the outer groove (6) of the upper edge (5) of the angle (4). After inserting, each contact is welded to form a three-dimensional truss 1 together with the upper and lower chords (2), (3) and (3 '), and as shown in FIG. 5 and FIG. 1) is placed on the half precast concrete slab (e) while maintaining a certain distance (L4), and then placed on a wall or beam (f) to cast the site concrete (g) on top to form a synthetic slab (h). do.

상기와 같이 이용되는 입체트러스(1)는 적절히 변형이 가능하게 된다.The three-dimensional truss 1 used as described above can be appropriately deformed.

이하 본 고안의 다른 실시예를 설명하면 다음과 같다.Hereinafter, another embodiment of the present invention will be described.

[다른 실시예 1]Other Example 1

제2도 (a)(b)(c)에서 보는 바와같이 상현재(2)와 하현재(3)(3')를 그 길이 방향의 일정위치(L3)에서 연결 고정하는 삼각형상 앵글(4)의 세모서리(5)(5')(5")의 외측에 안착홈(7)(7')(7")을 형성하여 앵글(4)의 세모서리(5)(5')(5")외측에 상, 하현재(2)(3)(3')를 연결 고정하여 입체트러스(1)를 구성할 수 있다.As shown in FIG. 2 (a) (b) (c), the triangular angle 4 which connects and fixes the upper chord 2 and the lower chord 3 and 3 'at a predetermined position L3 in the longitudinal direction thereof. ), Recesses 7, 7 ′, 7 ″ are formed on the outside of the edges 5, 5 ′, 5 ″ of the edges, and the edges 5, 5 ′, 5 of the angle 4. The solid truss 1 can be configured by connecting and fixing the upper and lower chords 2, 3, 3 'outside the ").

[다른 실시예 2]Other Example 2

제3도 (a)(b)(c)에서 보는바와 같이 상현재(2)와 하현재(3)(3')를 그길이 방향의 소정위치에서 연결고정하는 삼각형상의 앵글(4)세모서리(5)(5')(5")면에 삽입공(8)(8')(8")을 형성하여 상, 하현재(2)(3')(3")를 각 모서리에 형성된 삽입공(8)(8')(8")에 끼워 고정하여 입체트러스(1)를 구성할 수 있다.As shown in FIG. 3 (a) (b) (c), a triangular angle (4) corner for fixing the upper chord 2 and the lower chord 3 and 3 'at a predetermined position in the length direction thereof. (5) (5 ') (5 ") insert hole (8) (8') (8") is formed on the surface to insert upper and lower chords (2) (3 ') (3 ") at each corner The three-dimensional truss 1 can be configured by being fixed to the balls 8, 8 ', 8 ".

[다른 실시예 3]Other Example 3

제4도 (a)(b)(c)에서 보는 바와같이 상현재(2)와 하현재(3)(3')를 그 길이 방향의 소정 위치에서 연결 고정하는 삼각형상의 앵글(4)세모서리(5)(5')(5")의 내측으로 상, 하 현재(2)(3)(3')를 설치고정하여 입체트러스(1)를 구성할 수 있다.As shown in Fig. 4 (a) (b) (c), the triangular angle 4 corners for connecting and fixing the upper chord 2 and the lower chord 3 and 3 'at a predetermined position in the longitudinal direction thereof. (5) The three-dimensional truss 1 can be configured by mounting and fixing the upper and lower chords 2, 3, 3 'inside the 5', 5 '.

이상에서 설명한 바와같이 하프 프리캐스트 콘트리트 슬라브에 매설되는 입체트러스를 구성하고 있는 상, 하현재를 그 길이 방향의 소정위치에서 분리제작되는 삼각형상의 앵글로 연결 고정하므로서 기계제작의 난점을 해결할 수 있고, 또한 입체트러스의 제작성에 있어서도 용접 공정을 대폭 감속시켜 제작 단가를 줄일 수 있을 뿐아니라, 프리캐스트 콘크리트 슬라브의 단면성능 향상과 가설후 균열및 처짐을 방지할 수 있으며, 시공면에서도 전기 설비등의 각종 배관이 용이하므로 시공시간의 단축과 시공의 용이성을 도모할 수 있는 효과를 얻고자 한 것이다.As described above, it is possible to solve the difficulty of machine manufacturing by fixing the upper and lower chords constituting the three-dimensional truss embedded in the half precast concrete slab by the triangle-shaped angle separated from the predetermined position in the longitudinal direction. In addition, the manufacturing cost of the three-dimensional truss can be greatly reduced by reducing the welding process, as well as improving the cross-sectional performance of precast concrete slabs and preventing cracking and sagging after construction. Since various piping is easy, it is intended to obtain an effect that can shorten the construction time and facilitate the construction.

Claims (4)

통상적으로 하프 프리캐스트 콘트리트 슬라브(e)에 매설되어 벽이나 보(f)등에 가설하여 현장 콘크리트(g)를 타설 하여 합성슬라브(h)를 구축하는, 상, 하현재와 사현재로 구성되는 입체트러스(1)에 있어서, 상기 입체트러스(1)를 구성하는 상, 하현재(2)(3)(3')를 상단외측 모서리(5)와 하단 양내측 모서리(5')(5")에 홈(6)(6')(6")을 갖는 삼각형상의 앵글(4)로서 소정높이(Ll)를 유지하며 평행하게 일정간격(L3)에서 연결고정시켜 입체트러스(1)를 구성함을 특징으로한 하프 프리캐스트(HALF PRECASTypically, a three-dimensional structure consisting of upper, lower chords, and four chords, which are embedded in a half precast concrete slab (e) and installed on a wall or beam (f), and then put on-site concrete (g) to build a composite slab (h). In the truss 1, the upper and lower chords 2, 3 and 3 'constituting the three-dimensional truss 1 are formed by the upper outer edge 5 and the lower both inner edge 5' and 5 ". It is a triangular angle 4 having grooves 6, 6 'and 6 ", which maintains a predetermined height Ll and is connected at fixed intervals L3 in parallel to form a solid truss 1. HALF PRECAS FEATURES T)콘크리트 슬라브(SLAB)용 앵글(ANGLE)입체 트러스(TRUSS).T) ANGLE three-dimensional truss for concrete slab (SLAB). 제1항에 있어서, 상기 상, 하현재(2)(3)(3')를 그 길이 방향의 소정위치(L3)에서 연결고정하는 삼각형상의 앵글(4)세모서리(5)(5')(5")의 외측에 안착홈(7)(7')(7")을 형성하여 상, 하현재(2)(3)(3')를 앵글(4)의 세모서리(5)(5')(5")외측에 고정하여 입체 트러스(1)를 구성함을 특징으로한 하프 프리 캐스트(HALF PRECAST)콘크리트 슬라브(SLAB)용 앵글(ANGLE)입체트러스(TRUSS).The triangular angle (4) edge (5) (5 ') according to claim 1, wherein the upper and lower chords (2) (3) (3') are fixed at a predetermined position (L3) in the longitudinal direction. Forming recesses 7, 7 ′, 7 ″ are formed outside the 5 ″, and the upper and lower chords 2, 3, 3 ′ are formed by the corners 5, 5 of the angle 4. ANGLE solid truss for HALF PRECAST concrete slab (SLAB), characterized by a three-dimensional truss (1) fixed to the outside of ") (5 "). 제1항에 있어서, 상기 상, 하현재(2)(3)(3')를 그 길이 방향의 소정위치(L3)에서 연결 고정하는 삼각형상의 앵글(4)세모서리(5)(5')(5")면에 삽입공(8)(8')(8")을 형성하여, 상하현재(2)(3)(3')를 세모서리(5)(5')(5")의 삽입공(8)(8')(8")에 끼워 고정시켜 입체 트러스(1)를 구성함을 특징으로 하는 프리캐스트(HALF PRE-CAST) 콘크리트 슬라브(SLAB)용 앵글(AN GLE)입체트러스(TRUSS).The triangular angle (4) edge (5) (5 ') according to claim 1, wherein the upper and lower chords (2) (3) (3') are fixed at a predetermined position (L3) in the longitudinal direction. Insertion holes 8, 8 ', 8' are formed in the (5 ") plane, and the upper and lower chords 2, 3, 3 'are made of the edges 5, 5', 5". AN GLE solid truss for HALF PRE-CAST concrete slab (SLAB), characterized in that the three-dimensional truss 1 is formed by being fitted into the insertion holes 8, 8 'and 8 ". (TRUSS). 제1항에 있어서, 상기 상, 하현재(2)(3)(3')를 그 길이 방향의 소정위치(L2)에서 연결 고정하는 삼각형상의 앵글(4)세모서리(5)(5')(5")각 내측에 상, 하현재(2) (3)(3')를 설치고정하여 입체트러스(1)를 구성함을 특징으로한 하프 프리케스트(HALF PRE-CAST)콘크리트 슬라브(SLAB)용 앵글(ANGLE)입체트러스(TRUSS).The triangular angle (4) edge (5) (5 ') according to claim 1, wherein the upper and lower chords (2) (3) (3') are fixed at a predetermined position (L2) in the longitudinal direction. HALF PRE-CAST CONCRETE SLAB (SLAB) characterized by constituting a solid truss (1) by fixing the upper and lower chords (2) and (3) (3 ') inside each (5 "). Angle (ANGLE) solid truss (TRUSS).
KR2019900002715U 1990-03-07 1990-03-07 Trust for half precast concrete slab KR920007715Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019900002715U KR920007715Y1 (en) 1990-03-07 1990-03-07 Trust for half precast concrete slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019900002715U KR920007715Y1 (en) 1990-03-07 1990-03-07 Trust for half precast concrete slab

Publications (2)

Publication Number Publication Date
KR910016932U KR910016932U (en) 1991-10-28
KR920007715Y1 true KR920007715Y1 (en) 1992-10-17

Family

ID=19296591

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019900002715U KR920007715Y1 (en) 1990-03-07 1990-03-07 Trust for half precast concrete slab

Country Status (1)

Country Link
KR (1) KR920007715Y1 (en)

Also Published As

Publication number Publication date
KR910016932U (en) 1991-10-28

Similar Documents

Publication Publication Date Title
US6434900B1 (en) Prefabricated concrete wall system
CA1179519A (en) Precast building element and method
CN111734018A (en) Formwork structure, disassembly-free mold and concrete wall construction method
CN114108917A (en) Height-adjustable assembly type composite floor slab construction method
CA1145584A (en) Concrete form system
EP0825307A1 (en) Concrete wing floor element
KR100304861B1 (en) Insulation Precast Concrete Panel
US5074095A (en) Pre-cast concrete panel and joist assembly and method of construction
CN209703805U (en) A kind of novel superposed superstructure suitable for steel construction H profile steel beam
EP0016478A2 (en) Wall made of a plurality of pre cast cementitious panels
EP0054026B1 (en) Lost formwork for use when casting concrete floors
KR920007715Y1 (en) Trust for half precast concrete slab
JP2754369B2 (en) Rebar unit for void slab of building structure
US7073300B1 (en) Reinforced concrete part for producing foundations of buildings
JP2022161709A (en) Precast concrete foundation material for forming mat foundation, forming device for forming precast concrete foundation material, forming method for precast concrete foundation material using forming device, and forming method for mat foundation using precast concrete foundation material
JPH10219708A (en) Precast concrete block for continuous footing and continuous footing method by use thereof
CN213204438U (en) Semi-prefabricated and semi-cast-in-place building component
CN221118905U (en) Truss composite floor slab
KR960001240B1 (en) Half precast concrete slab
RU2762271C1 (en) Construction flooring system
JPH02311639A (en) Construction of composite floor
CN220620635U (en) Two-way close rib steel bar truss concrete hollow superstructure composite board
KR100198278B1 (en) Folding wire mesh deck
GB2249329A (en) Concrete floor beams
KR920009316B1 (en) Reinforcing elements for half precast concrete slab

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20011010

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee