KR20230018089A - Charge Holder having external directional induction element and Blasting method thereby - Google Patents

Charge Holder having external directional induction element and Blasting method thereby Download PDF

Info

Publication number
KR20230018089A
KR20230018089A KR1020210099834A KR20210099834A KR20230018089A KR 20230018089 A KR20230018089 A KR 20230018089A KR 1020210099834 A KR1020210099834 A KR 1020210099834A KR 20210099834 A KR20210099834 A KR 20210099834A KR 20230018089 A KR20230018089 A KR 20230018089A
Authority
KR
South Korea
Prior art keywords
charge holder
bent
external
bent part
present
Prior art date
Application number
KR1020210099834A
Other languages
Korean (ko)
Other versions
KR102504139B1 (en
Inventor
이규항
Original Assignee
관악산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 관악산업 주식회사 filed Critical 관악산업 주식회사
Priority to KR1020210099834A priority Critical patent/KR102504139B1/en
Publication of KR20230018089A publication Critical patent/KR20230018089A/en
Application granted granted Critical
Publication of KR102504139B1 publication Critical patent/KR102504139B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/22Methods for holding or positioning for blasting cartridges or tamping cartridges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/14Hand-operated tamping or loading
    • F42D1/16Tamping tools
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/20Tamping cartridges, i.e. cartridges containing tamping material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention relates to a charge holder equipped with an exterior direction inducing unit and a blasting method using the same. The charge holder equipped with the exterior direction inducing unit according to the present invention comprises: an interior partition wall unit (100) having a plate-shaped member in the longitudinal direction; an exterior guide inducing unit (200) in which each bent unit (210) provided to have one interior angle is coupled to face each other on both sides of the interior partition wall unit (100); and an opening unit (300) formed while end parts of each bent unit (210) of the exterior guide inducing unit (200) are spaced apart from each other. An objective of the present invention is to control an unnecessary pressure on a blast rock cut slope with the charge holder.

Description

외부 방향유도부가 구비된 장약홀더 및 이를 이용한 발파공법{Charge Holder having external directional induction element and Blasting method thereby}Charge holder having external directional induction element and blasting method using the same {Charge Holder having external directional induction element and blasting method thereby}

본 발명은 장약홀더에 관한 것이다. 구체적으로는 외부 방향유도부가 구비된 장약홀더 및 이를 이용한 발파공법에 관한 것이다.The present invention relates to a charge holder. Specifically, it relates to a charge holder provided with an external direction guide and a blasting method using the same.

건설 및 토목 공사는 국가의 기간 산업으로서, 산업이 발달함에 따라 공사의 규모나 횟수가 많이 증가하고 있다.Construction and civil engineering works are key industries of the country, and as the industry develops, the size and number of construction works are greatly increased.

이러한 건설 및 토목 공사를 수행하기 위한 기초 공사로서 발파 작업은 도로건설, 터널, 도심지 인접구조물이 위치한 장소 등의 다양한 공사현장에서 자주 수행되는 작업이다.As a foundation work for carrying out these construction and civil works, blasting is a work that is frequently performed at various construction sites, such as road construction, tunnels, and places where adjacent structures in downtown areas are located.

발파작업(blasting operation)은 암반을 제거하기 위한 작업으로서, 일반적으로 폭약을 이용하여 수행되고 있다.A blasting operation is an operation for removing bedrock, and is generally performed using explosives.

암반사면 보호 목적으로 대형 브레이커를 사용한 정밀깎기 공법이 대부분 적용되고 있다. 보통암, 경암, 극경암 암반의 정밀깎기 공법 적용시 암반사면 정리에 따른 공기 증가로 타 공정 공기지연 및 비용 증가, 장기간 브레이커 소음 발생으로 민원 발생이 증가되고 있다. For the purpose of protecting rock slopes, precision cutting methods using large breakers are mostly applied. When the precision cutting method is applied to normal, hard, and extremely hard rock masses, civil complaints are increasing due to construction delays and costs for other processes due to the increase in construction time due to rock slope arrangement, and noise from the breaker for a long period of time.

이에, 원 암반에 영향을 최소화하고 소정의 계획한 방향으로만 균열을 발생시켜 정밀깎기 구간에서 폭약을 사용한 발파공법으로 대체하여 사면정리 공기 단축 및 전체공기 단축으로 비용 절감, 브레이커 소음 최소화로 민원발생 억제할 수 있는 발파공법의 필요성이 제기되고 있다.Therefore, by minimizing the impact on the original bedrock and generating cracks only in a predetermined planned direction, replacing it with a blasting method using explosives in the precision cutting section, reducing costs by shortening the slope cleanup period and overall period, and generating civil complaints by minimizing noise from the breaker The need for a blasting method that can suppress is being raised.

일반적 발파는 안정성과 경제성을 고려하여 폭약의 폭발 위력을 집중 사용하여 계획한 암반을 파쇄하므로, 계획된 절취면보다 많은 양의 암석이 절취 되거나 과잉균열이 발생하여 사면 안정성을 저해하는 문제점이 발생된다.Since general blasting crushes the planned bedrock by intensively using the explosive power of explosives in consideration of stability and economic feasibility, a larger amount of rock than the planned cutting surface is cut or excessive cracks occur, resulting in a problem of impairing slope stability.

이러한 문제점을 해결하기 위해서, 폭압을 제어하는 것이 매우 중요하다.To solve this problem, it is very important to control the pressure.

제어발파는 터널굴착 및 노천굴착에서 여굴을 적개하여 굴착면의 안정성을 높이고, 불필요한 굴착에 따른 추가보강을 감소시키기 위해 실시하는 작업이다. 이러한 제어발파법에는 천공 및 장약방법과 기폭방법에 따라 프리스플리팅, 쿠션블라스팅, 스무스블라스팅, 라이드릴링 등과 같이 일반적으로 사용되는 전통적인 방법이 있다. 또한, 발파공에 인공균열을 만든 장약공 노치를 이용하거나 특수한 형태로 제작되어 폭발력을 한 방향으로 유도하도록 고안된 장약홀더를 이용하는 방법이 있다.Controlled blasting is an operation performed to increase the stability of the excavated surface by reducing over-excavation in tunnel excavation and open-pit excavation, and to reduce additional reinforcement due to unnecessary excavation. These controlled blasting methods include commonly used traditional methods such as pre-splitting, cushion blasting, smooth blasting, and dry drilling depending on the drilling and charging method and the detonation method. In addition, there is a method using a charge hole notch made with artificial cracks in the blasting hole or a charge holder manufactured in a special shape and designed to induce the explosive force in one direction.

기존에도 한국특허등록 제10-1296273호와 같이, 장약홀더를 이용하는 방법이 있었다. 하지만, 이러한 종래기술은 암반 아래로 깊이 천공된 발파공에 장약홀더가 삽입될때, 암반의 경도를 고려하여 장약홀더의 형상을 달리하지 못하고, 동일한 형상을 채택함으로써, 보다 정밀한 제어가 되지 못하는 문제점이 있었다. Previously, as in Korean Patent Registration No. 10-1296273, there was a method using a charge holder. However, this prior art has a problem in that when the charge holder is inserted into a blast hole deeply drilled under the rock mass, the shape of the charge holder cannot be changed in consideration of the hardness of the rock mass, and the same shape is adopted, so that more precise control is not possible. .

(문헌 1) 한국특허등록 제10-1296273호 (2013.08.07)(Document 1) Korean Patent Registration No. 10-1296273 (2013.08.07)

본 발명에 따른 외부 방향유도부가 구비된 장약홀더 및 발파공법은 다음과 같은 해결과제를 가진다.The charge holder and the blasting method provided with an external direction guide according to the present invention have the following problems.

첫째, 발파암 절토사면에 불필요한 폭압을 장약홀더로 제어하고자 한다.First, it is intended to control the unnecessary pressure on the blast rock cutting slope with the charge holder.

둘째, 계획한 절토선으로 폭압을 유도하여, 절토면의 배면 충격을 감소시켜, 안정적인 사면절취를 하고자 한다.Second, by inducing pressure with the planned cutting line, it is intended to reduce the back impact of the cutting surface and to perform stable slope cutting.

셋째, 장약홀더 내부에서 발생된 폭발압을 원하는 방향의 외부로 배출하고자 한다.Third, it is intended to discharge the explosion pressure generated inside the charge holder to the outside in a desired direction.

넷째, 암반의 깊이에 따른 경도 차이를 장약홀더의 구조에 반영하여, 정밀한 제어를 하고자 한다.Fourth, the difference in hardness according to the depth of the bedrock is reflected in the structure of the charge holder to perform precise control.

본 발명의 해결과제는 이상에서 언급한 것들에 한정되지 않으며, 언급되지 아니한 다른 해결과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다. The problems of the present invention are not limited to those mentioned above, and other problems not mentioned will be clearly understood by those skilled in the art from the description below.

본 발명은 외부 방향유도부가 구비된 장약홀더로서, 판형 부재가 길이방향으로 구비된 내부 격벽부; 1개의 내각을 가지도록 구비된 각 절곡부가 상기 내부 격벽부의 양 측에서 상호 대향되도록 결합되는 외부 방향유도부; 및 상기 외부 방향유도부의 각 절곡부의 단부가 상호 이격되면서 형성된 개구부를 포함한다.The present invention is a charge holder provided with an external guide portion, comprising: an inner bulkhead portion having a plate-shaped member in a longitudinal direction; an external direction guide unit in which each bent portion having one interior angle is coupled to face each other at both sides of the inner partition wall portion; and an opening formed while the ends of each bent part of the external direction guide part are spaced apart from each other.

본 발명에 있어서, 상기 내부 격벽부는 판형 부재의 길이방향으로 이격 형성된 장약거치홈이 구비될 수 있다.In the present invention, the internal partition wall portion may be provided with mounting grooves formed spaced apart in the longitudinal direction of the plate-shaped member.

본 발명에 있어서, 상기 내부 격벽부의 일측에는 장약거치 보조홈이 더 구비될 수 있다.In the present invention, an auxiliary mounting groove may be further provided on one side of the inner bulkhead portion.

본 발명에 있어서, 상기 외부 방향유도부의 각 절곡부는 동일한 형상으로 구비되되, 각 내각이 마주보도록 상호 반대 방향으로 대향배치될 수 있다.In the present invention, each bent portion of the external direction guide portion is provided with the same shape, but may be disposed to face each other in opposite directions so that each inner angle faces each other.

본 발명에 있어서, 장약홀더의 하측에 배치된 일 절곡부의 내각이, 일 절곡부보다 상측에 배치된 타 절곡부의 내각보다 크게 구비되고, 하측에 구비된 일 절곡부의 개구부의 갭 간격이 상측에 구비된 타 절곡부의 개구부의 갭 간격보다 크게 구비될 수 있다.In the present invention, the inner angle of one bent part disposed on the lower side of the charge holder is larger than the inner angle of the other bent part disposed on the upper side of the one bent part, and the gap between the opening of one bent part provided on the lower side is provided on the upper side The gap interval of the opening of the other bent portion may be larger than that of the opening.

본 발명에 있어서, 장약홀더의 하측에 배치된 일 절곡부의 길이는 일 절곡부보다 상측에 배치된 타 절곡부의 길이보다 짧게 구비되고, 하측에 구비된 일 절곡부의 개구부의 갭 간격이 상측에 구비된 타 절곡부의 개구부의 갭 간격보다 크게 구비될 수 있다.In the present invention, the length of one bent part disposed on the lower side of the charge holder is shorter than the length of the other bent part disposed on the upper side than the one bent part, and the gap between the openings of one bent part provided on the lower side is provided on the upper side The gap interval of the opening of the other bent part may be larger than that of the gap.

본 발명에 있어서, 상기 외부 방향유도부의 절곡부의 각 단부에는 외측으로 절곡된 제1 추가절곡부가 연장형성될 수 있다.In the present invention, each end of the bent portion of the external direction guide portion may be formed by extending a first additional bent portion bent outward.

본 발명에 있어서, 상기 외부 방향유도부의 절곡부의 각 단부에는 내측으로 절곡된 제2 추가절곡부가 연장형성될 수 있다.In the present invention, each end of the bent portion of the external direction guidance portion may be formed with a second additional bent portion bent inwardly.

본 발명은 외부 방향유도부가 구비된 장약홀더를 이용한 발파공법으로서, 암반에 아래 방향으로 천공부를 형성하는 S1 단계; 및 상기 천공부에 청구항 1에 따른 장약홀더를 삽입하는 S2 단계; 및 상기 장약홀더에 장착된 화약에 의해 발파가 이루어지는 S3 단계를 포함한다.The present invention is a blasting method using a charge holder equipped with an external guide, comprising: S1 step of forming a perforation in a rock mass in a downward direction; and a step S2 of inserting the charge holder according to claim 1 into the hole. And a step S3 in which blasting is performed by the gunpowder mounted in the charge holder.

본 발명에 따른 외부 방향유도부가 구비된 장약홀더 및 발파공법은 다음과 같은 효과를 가진다.The charge holder and the blasting method provided with the external direction guide according to the present invention have the following effects.

첫째, 발파암 절토사면에 불필요한 폭압을 장약홀더로 제어하는 효과가 있다.First, there is an effect of controlling unnecessary pressure on the blast rock cutting slope with the charge holder.

둘째, 계획한 절토선으로 폭압을 유도하여, 절토면의 배면 충격을 감소시켜, 안정적인 사면절취를 하는 효과가 있다.Second, there is an effect of stably cutting the slope by inducing pressure with the planned cutting line and reducing the rear impact of the cutting surface.

셋째, 외부 방향유도부를 이용하여, 장약홀더 내부에서 발생된 폭발압을 원하는 방향의 외부로 배출하는 효과가 있다.Third, there is an effect of discharging the explosion pressure generated inside the charge holder to the outside in a desired direction by using an external direction guidance unit.

넷째, 암반 천공부에 삽입되는 장약홀더의 높이별로 절곡부의 구조를 다르게 조정하여, 폭발압의 배출을 더욱 정밀하게 제어하는 효과가 있다.Fourth, by adjusting the structure of the bending part differently according to the height of the charge holder inserted into the rock drilling part, there is an effect of more precisely controlling the discharge of the explosion pressure.

본 발명의 효과는 이상에서 언급된 것들에 한정되지 않으며, 언급되지 아니한 다른 효과들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to those mentioned above, and other effects not mentioned will be clearly understood by those skilled in the art from the description below.

도 1은 본 발명에 따른 외부 방향유도부가 구비된 장약홀더의 일 실시예이다.
도 2a 및 도 2b는 본 발명에 따른 장약홀더의 다른 도면이다.
도 3은 본 발명에 따른 장약홀더의 일 부분을 나타낸다.
도 4는 도 3의 장약홀더의 분해도이다.
도 5는 본 발명에 따른 장약홀더의 다른 각도의 실시예이다.
도 6은 본 발명에 따른 장약홀더의 장약거치홈에 거치된 장약이 폭발한때의 폭파유동을 나타낸다.
도 7은 암반에 형성된 천공부에 본 발명에 따른 장약홀더가 삽입된 상태도이다.
도 8은 본 발명에 따른 장약홀더의 일 실시예를 나타낸다.
도 9는 본 발명에 따른 장약홀더의 하측에 구비된 개구부의 갭 간격이, 상측에 구비된 개구부의 갭 간격보다 큰 실시예를 나타낸다.
도 10 및 도 11은 장약홀더의 하측에 구비된 일 절곡부의 개구부의 갭 간격이 상측에 구비된 타 절곡부의 개구부의 갭 간격보다 큰 실시예를 나타낸다.
도 12는 본 발명에 따른 외부 방향유도부(200)의 절곡부(210)의 각 단부에는 외측으로 절곡된 제1 추가절곡부(220)가 연장형성되는 실시예를 나타낸다.
도 13은 본 발명에 따른 외부 방향유도부(200)의 절곡부(210)의 각 단부에는 내측으로 절곡된 제2 추가절곡부(230)가 연장형성되는 실시예를 나타낸다.
1 is an embodiment of a charge holder provided with an external direction guide according to the present invention.
2a and 2b are other views of the charge holder according to the present invention.
Figure 3 shows a part of the charge holder according to the present invention.
Figure 4 is an exploded view of the charge holder of Figure 3;
5 is an embodiment of another angle of the charge holder according to the present invention.
Figure 6 shows the blasting flow when the charge mounted in the charge holder groove according to the present invention explodes.
7 is a state diagram in which the charge holder according to the present invention is inserted into a perforation formed in a bedrock.
8 shows an embodiment of a charge holder according to the present invention.
9 shows an embodiment in which the gap interval between the openings provided on the lower side of the charge holder according to the present invention is greater than the gap interval between the openings provided on the upper side.
10 and 11 show an embodiment in which the gap between the openings of one bent part provided on the lower side of the charge holder is larger than the gap between the openings of the other bent part provided on the upper side.
12 shows an embodiment in which the first additional bent part 220 bent outwardly is extended and formed at each end of the bent part 210 of the external direction guide part 200 according to the present invention.
13 shows an embodiment in which second additional bent parts 230 bent inwardly are extended and formed at each end of the bent part 210 of the external direction guide part 200 according to the present invention.

이하, 첨부한 도면을 참조하여, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 설명한다. 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 이해할 수 있는 바와 같이, 후술하는 실시예는 본 발명의 개념과 범위를 벗어나지 않는 한도 내에서 다양한 형태로 변형될 수 있다. 가능한 한 동일하거나 유사한 부분은 도면에서 동일한 도면부호를 사용하여 나타낸다.Hereinafter, with reference to the accompanying drawings, embodiments of the present invention will be described so that those skilled in the art can easily practice it. As can be easily understood by those skilled in the art to which the present invention pertains, the embodiments described below may be modified in various forms without departing from the concept and scope of the present invention. Where possible, identical or similar parts are indicated using the same reference numerals in the drawings.

본 명세서에서 사용되는 전문용어는 단지 특정 실시예를 언급하기 위한 것이며, 본 발명을 한정하는 것을 의도하지는 않는다. 여기서 사용되는 단수 형태들은 문구들이 이와 명백히 반대의 의미를 나타내지 않는 한 복수 형태들도 포함한다.The terminology used in this specification is only for referring to specific embodiments and is not intended to limit the present invention. As used herein, the singular forms also include the plural forms unless the phrases clearly indicate the opposite.

본 명세서에서 사용되는 "포함하는"의 의미는 특정 특성, 영역, 정수, 단계, 동작, 요소 및/또는 성분을 구체화하며, 다른 특정 특성, 영역, 정수, 단계, 동작, 요소, 성분 및/또는 군의 존재나 부가를 제외시키는 것은 아니다.As used herein, the meaning of "comprising" specifies particular characteristics, regions, integers, steps, operations, elements, and/or components, and other specific characteristics, regions, integers, steps, operations, elements, components, and/or components. It does not exclude the presence or addition of groups.

본 명세서에서 사용되는 기술용어 및 과학용어를 포함하는 모든 용어들은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 일반적으로 이해하는 의미와 동일한 의미를 가진다. 사전에 정의된 용어들은 관련기술문헌과 현재 개시된 내용에 부합하는 의미를 가지는 것으로 추가 해석되고, 정의되지 않는 한 이상적이거나 매우 공식적인 의미로 해석되지 않는다.All terms including technical terms and scientific terms used in this specification have the same meaning as commonly understood by a person of ordinary skill in the art to which the present invention belongs. The terms defined in the dictionary are additionally interpreted as having a meaning consistent with the related technical literature and the currently disclosed content, and are not interpreted in an ideal or very formal meaning unless defined.

본 명세서에서 사용되는 방향에 관한 표현, 예를 들어 전/후/좌/우의 표현, 상/하의 표현, 종방향/횡방향의 표현은 도면에 개시된 방향을 참고하여 해석될 수 있다.Expressions related to directions used in this specification, for example, expressions of front/back/left/right, top/bottom, and longitudinal/lateral directions may be interpreted with reference to directions disclosed in the drawings.

이하에서는 도면을 참고하여 본 발명을 설명하고자 한다. 참고로, 도면은 본 발명의 특징을 설명하기 위하여, 일부 과장되게 표현될 수도 있다. 이 경우, 본 명세서의 전 취지에 비추어 해석되는 것이 바람직하다.Hereinafter, the present invention will be described with reference to the drawings. For reference, the drawings may be partially exaggerated in order to explain the features of the present invention. In this case, it is preferable to interpret in light of the whole purpose of this specification.

도 1은 본 발명에 따른 외부 방향유도부가 구비된 장약홀더의 일 실시예이다. 도 2a 및 도 2b는 본 발명에 따른 장약홀더의 다른 도면이다.1 is an embodiment of a charge holder provided with an external direction guide according to the present invention. 2a and 2b are other views of the charge holder according to the present invention.

본 발명에 따른 외부 방향유도부가 구비된 장약홀더(10)는 내부 격벽부(100), 외부 방향유도부(200) 및 개구부(300)를 포함한다.The charge holder 10 provided with an external guiding unit according to the present invention includes an internal partition 100, an external guiding unit 200, and an opening 300.

구체적으로, 본 발명에 따른 장약홀더(10)는 판형 부재가 길이방향으로 구비된 내부 격벽부(100); 1개의 내각을 가지도록 구비된 각 절곡부(210)가 상기 내부 격벽부(100)의 양 측에서 상호 대향되도록 결합되는 외부 방향유도부(200); 및 상기 외부 방향유도부(200)의 각 절곡부(210)의 단부가 상호 이격되면서 형성된 개구부(300)를 포함한다.Specifically, the charge holder 10 according to the present invention includes an inner bulkhead portion 100 having a plate-shaped member in the longitudinal direction; an external guide portion 200 in which each bent portion 210 provided to have one interior angle is coupled to face each other on both sides of the inner partition wall portion 100; and an opening 300 formed while the ends of each bent part 210 of the external direction guide part 200 are spaced apart from each other.

본 발명에 따른 내부 격벽부(100)는 판형 부재가 길이방향으로 구비되는 형상으로 이루어진다. The internal bulkhead portion 100 according to the present invention is formed in a shape in which a plate-like member is provided in the longitudinal direction.

본 발명에 있어서, 내부 격벽부(100)는 판형 부재의 길이방향으로 이격 형성된 장약거치홈(110)이 구비될 수 있다.In the present invention, the internal bulkhead portion 100 may be provided with mounting grooves 110 spaced apart in the longitudinal direction of the plate-shaped member.

장약거치홈(110)의 양 방향으로는 개구부(300)가 구비된다. 따라서, 장약거치홈(110)에 거치된 화약(20)이 폭발하면, 폭발압은 장약거치홈(110)의 양방향으로 구비된 개구부로 배출되는 구조이다.Openings 300 are provided in both directions of the loading holder groove 110 . Therefore, when the gunpowder 20 mounted in the charge holder groove 110 explodes, the explosion pressure is discharged through openings provided in both directions of the charge holder groove 110.

도 3은 본 발명에 따른 장약홀더의 일 부분을 나타낸다. 도 4는 도 3의 장약홀더의 분해도이다.Figure 3 shows a part of the charge holder according to the present invention. Figure 4 is an exploded view of the charge holder of Figure 3;

본 발명에 따른 내부 격벽부(100)의 일측에는 장약거치 보조홈(120)이 더 구비될 수 있다(도 4 참조). 장약거치홈(110)에 거치되는 화약(20)을 더욱 안정적으로 고정하기 위하여, 장약거치 보조홈(120)이 활용될 수도 있다. 예를 들어, 화약(20)과 연결된 결합끈 등의 단부에 결합고리(미도시)가 형성되고, 결합고리가 장약거치 보조홈(120)에 걸리는 방식 등으로 활용될 수 있다.An auxiliary mounting groove 120 may be further provided on one side of the internal bulkhead part 100 according to the present invention (see FIG. 4). In order to more stably fix the gunpowder 20 mounted on the charge holder groove 110, the charge holder auxiliary groove 120 may be utilized. For example, a coupling ring (not shown) may be formed at the end of a coupling string connected to the gunpowder 20, and the coupling ring may be utilized in a manner that is caught in the auxiliary charging groove 120.

본 발명에 따른 외부 방향유도부(200)는 1개의 내각을 가지도록 구비된 각 절곡부(210a)(210b)가 상기 내부 격벽부(100)의 양 측에서 상호 대향되도록 결합된다.In the external direction guide part 200 according to the present invention, each of the bent parts 210a and 210b having one inner angle is coupled to face each other on both sides of the inner partition wall part 100 .

본 발명에 있어서, 외부 방향유도부(200)의 각 절곡부(210a)(201b)는 동일한 형상으로 구비되되, 각 내각이 마주보도록 상호 반대 방향으로 대향배치될 수 있다(도 3 및 도 4 참조).In the present invention, each of the bent parts 210a and 201b of the external guide part 200 is provided in the same shape, but may be disposed to face each other in opposite directions so that each inner angle faces each other (see FIGS. 3 and 4). .

도 5는 본 발명에 따른 장약홀더의 다른 각도의 실시예이다. 도 6은 본 발명에 따른 장약홀더의 장약거치홈에 거치된 장약이 폭발한때의 폭파유동을 나타낸다.5 is an embodiment of another angle of the charge holder according to the present invention. Figure 6 shows the blasting flow when the charge mounted in the charge holder groove according to the present invention explodes.

도 6에 도시된 바와 같이, 내부 격벽부(100)의 장약거치홈에 거치된 화약(20)이 폭발하면, 폭발압은 상하좌우 등 모든 방향으로 향하게 될 것이다. 이때, 양 쪽에 구비된 개구부(300)로 우선 배출될 수 있다. 또한, 각 절곡부(210a)(210b)의 내각 쪽으로 향하는 폭발압도 절곡부(210)의 경사에 의해 개구부(300)로 안내될 것이다. 따라서, 모든 폭발압은 개구부(300) 방향으로 배출되는 것이다.As shown in FIG. 6, when the gunpowder 20 mounted in the charge holder groove of the internal bulkhead part 100 explodes, the explosion pressure will be directed in all directions, such as up, down, left and right. At this time, it may first be discharged through the openings 300 provided on both sides. In addition, the explosion pressure directed toward the inner angle of each of the bent parts 210a and 210b will be guided to the opening 300 by the inclination of the bent part 210 . Therefore, all the explosion pressure is discharged in the direction of the opening 300.

도 7은 암반(30)에 형성된 천공부(310)에 본 발명에 따른 장약홀더가 삽입된 상태도이다. 도 8은 본 발명에 따른 장약홀더의 일 실시예를 나타낸다.7 is a state diagram in which the charge holder according to the present invention is inserted into the perforated part 310 formed in the bedrock 30. 8 shows an embodiment of a charge holder according to the present invention.

본 발명에 따른 일 실시예로서, 암반은 연암 내지 경암에 해당되고, 사용폭약은 에뮤라이트 32mm이고, 천공 깊이는 6.0m이고, 천공부의 간격은 0.8m이고, 장약홀더의 길이는 3.0m로 하여 각 장약홀더를 연결하여 실시할 수 있다(도 8 참조). 이때, 폭발압이 계획한 방향으로 작용하여 원하는 파단선을 형성할 수 있게 된다.As an embodiment according to the present invention, the bedrock corresponds to soft rock to hard rock, the explosive used is emulite 32mm, the drilling depth is 6.0m, the spacing between drilling parts is 0.8m, and the length of the charge holder is 3.0m. It can be carried out by connecting each charge holder (see FIG. 8). At this time, the detonation pressure acts in a planned direction to form a desired fracture line.

그런데, 일반적으로 암반의 상측보다는 하측의 강도가 더욱 강하다. 또한, 암반의 형상과 특성상 강도가 서로 상이한 부분이 발생될 수도 있을 것이다. However, in general, the strength of the lower side of a bedrock is stronger than that of the upper side. In addition, due to the shape and characteristics of the rock mass, parts with different strengths may occur.

기존의 기술은 이러한 암반의 강도 차이가 있음에도, 장약홀더의 개구부의 갭 간격 등이 동일하게 구비된 장약홀더를 사용하여 왔다. 따라서, 폭발압도 동일하게 개구부를 통해 배출되는 방식으로 수행되어 왔다.Conventional technologies have been using charge holders provided with the same gap intervals of openings of the charge holders, even though there is such a difference in strength of the rock mass. Therefore, the explosion pressure has been carried out in a manner that is discharged through the opening in the same way.

하지만, 전술한 암반의 특성을 고려하여, 강도가 강한 부분에 더욱 강한 폭발압이 배출되도록 하면, 더욱 더 정밀한 제어가 가능할 것이다.However, in consideration of the characteristics of the above-described rock mass, more precise control will be possible if a stronger explosive pressure is discharged to a portion with high strength.

도 9는 본 발명에 따른 장약홀더의 하측에 구비된 개구부의 갭 간격이, 상측에 구비된 개구부의 갭 간격보다 큰 실시예를 나타낸다. 9 shows an embodiment in which the gap interval between the openings provided on the lower side of the charge holder according to the present invention is greater than the gap interval between the openings provided on the upper side.

도 10 및 도 11은 장약홀더의 하측에 구비된 일 절곡부의 개구부의 갭 간격이 상측에 구비된 타 절곡부의 개구부의 갭 간격보다 큰 실시예를 나타낸다.10 and 11 show an embodiment in which the gap between the openings of one bent part provided on the lower side of the charge holder is larger than the gap between the openings of the other bent part provided on the upper side.

본 발명에 있어서, 도 10a 및 도 10b에 도시된 바와 같이, 장약홀더의 하측에 배치된 일 절곡부(210_2)의 내각(A2)이, 일 절곡부보다 상측에 배치된 타 절곡부(210_1)의 내각(A1)보다 크게 구비되고, 하측에 구비된 일 절곡부(210_2)의 개구부(300)의 갭 간격(gap2)이 상측에 구비된 타 절곡부(210_1)의 개구부(300)의 갭 간격(gap1)보다 크게 구비되는 실시예가 가능하다.In the present invention, as shown in FIGS. 10A and 10B, the inner angle A2 of one bent part 210_2 disposed on the lower side of the charge holder is disposed on the upper side than the other bent part 210_1 The gap gap 2 of the opening 300 of one bent part 210_2 provided on the lower side is greater than the interior angle A1 of the gap gap 2 of the opening 300 of the other bent part 210_1 provided on the upper side. An embodiment provided larger than (gap1) is possible.

본 발명에 있어서, 도 11a 및 도 11b에 도시된 바와 같이, 장약홀더의 하측에 배치된 일 절곡부(210_3)의 길이(L3)는 일 절곡부보다 상측에 배치된 타 절곡부(210_1)의 길이(L1)보다 짧게 구비되고, 하측에 구비된 일 절곡부(210_3)의 개구부(300)의 갭 간격(gap3)이 상측에 구비된 타 절곡부(210_1)의 개구부(300)의 갭 간격(gap1)보다 크게 구비되는 실시예가 가능하다.In the present invention, as shown in FIGS. 11A and 11B, the length L3 of one bent part 210_3 disposed on the lower side of the charge holder is the length L3 of the other bent part 210_1 disposed above the one bent part. The gap gap 3 of the opening 300 of one bent part 210_3 provided on the lower side and shorter than the length L1 is provided on the upper side of the gap gap 300 of the other bent part 210_1 ( An embodiment provided larger than gap 1) is possible.

도 10 및 도 11의 실시예와 같이, 만약 암반의 강도가 하측보다 상측이 강하다고 조사된 경우, 암반의 하측에 배치된 개구부로부터는 상측보다 더 많은 폭발압이 배출되도록 함으로써, 암반의 파쇄를 더욱 효과적이고, 정밀하게 제어할 수 있다.10 and 11, if it is investigated that the upper side of the rock mass is stronger than the lower side, more explosive pressure is discharged from the opening disposed on the lower side of the rock mass than the upper side, thereby crushing the rock mass. More effective and precise control.

본 발명에 있어서, 외부 방향유도부(200)의 절곡부(210)의 각 단부에는 외측으로 절곡된 제1 추가절곡부(220)가 연장형성될 수 있다(도 12 참조).In the present invention, each end of the bent part 210 of the external direction guide part 200 may be formed by extending the first additional bent part 220 bent outward (see FIG. 12 ).

본 발명에 있어서, 외부 방향유도부(200)의 절곡부(210)의 각 단부에는 내측으로 절곡된 제2 추가절곡부(230)가 연장형성될 수 있다(도 13 참조).In the present invention, each end of the bent portion 210 of the external direction guide portion 200 may be formed with a second additional bent portion 230 bent inwardly extending (see FIG. 13 ).

제1 추가절곡부(220) 및 제2 추가절곡부(230)는 함께 구비될 수도 있다.The first additional bent part 220 and the second additional bent part 230 may be provided together.

본 발명은 상기 제1 추가절곡부(220) 및 제2 추가절곡부(230)를 활용하여, 폭발압을 원하는 방향과 원하는 양으로 배출 제어할 수 있다.The present invention utilizes the first additional bent portion 220 and the second additional bent portion 230 to control the discharge pressure in a desired direction and in a desired amount.

한편, 본 발명은 본 발명에 따른 장약홀더를 이용한 발파공법으로 구현될 수 있다.On the other hand, the present invention can be implemented as a blasting method using the charge holder according to the present invention.

구체적으로, 본 발명에 따른 발파공법은 암반에 아래 방향으로 천공부를 형성하는 S1 단계; 상기 천공부에 청구항 1에 따른 장약홀더를 삽입하는 S2 단계; 및 상기 장약홀더에 장착된 화약에 의해 발파가 이루어지는 S3 단계를 포함하는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더를 이용한 발파공법으로 구현된다.Specifically, the blasting method according to the present invention includes the step S1 of forming a perforation in the rock mass in a downward direction; Step S2 of inserting the charge holder according to claim 1 into the hole; and a step S3 in which blasting is performed by the gunpowder mounted on the charge holder.

한편, 본 발명에 따른 장약홀더의 경우, 절리 발달 암반에서 절리군의 관찰 및 기록을 통하여 예정 파단선을 예상하고, 파단선을 사면 절취선 전방에 적용하고 대형 브레이커와 병행 시공함으로써, 사면보호 목적에 부합하면서 사면정리 공기를 단축 시킬 수 있다.On the other hand, in the case of the charge holder according to the present invention, the expected fracture line is predicted through observation and recording of the joint group in the rock mass with joint development, the fracture line is applied in front of the slope perforation line, and parallel construction with a large breaker meets the purpose of slope protection While doing so, the slope clearance period can be shortened.

보통암 및 경암에서 대형 브레이커가 적용된 정밀깎기 적용시 제한적인 일일 시공물량으로 공기지연 및 장비 과투입에 따른 공사원가 상승으로 공사비용이 증가하나, 본 발명에 따른 장약홀더를 이용한 발파공법 적용시 일일 시공물량 증가 및 공기 단축으로 공사원가를 줄일 수 있으므로 공사비용을 절감할 수 있다.When applying precision cutting with a large breaker applied to normal rock and hard rock, the construction cost increases due to the increase in construction cost due to air delay and excessive input of equipment due to the limited daily construction quantity, but when the blasting method using the charge holder according to the present invention is applied, the daily It is possible to reduce the construction cost because the construction cost can be reduced by increasing the construction quantity and shortening the period.

또한, 장시간 대형 브레이커 사용시 높은 소음에 따른 민원이 발생하여 2중, 3중의 방음시설을 설치하여야 하는 불필요한 공종 및 비용 발생, 관할 관공서의 제재 등으로 원할한 공사를 수행하지 못하는 경우가 빈번히 발생하므로 소음발생 시간을 최소화하여 민원발생을 억제하고 원할한 공사를 수행할 수 있다.In addition, when using a large breaker for a long time, civil complaints due to high noise occur, resulting in unnecessary work types and costs that require the installation of double or triple soundproofing facilities, and frequent cases where smooth construction cannot be performed due to sanctions by the competent government office. By minimizing the occurrence time, civil complaints can be suppressed and construction can be carried out smoothly.

본 명세서에서 설명되는 실시예와 첨부된 도면은 본 발명에 포함되는 기술적 사상의 일부를 예시적으로 설명하는 것에 불과하다. 따라서, 본 명세서에 개시된 실시예들은 본 발명의 기술적 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이므로, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아님은 자명하다. 본 발명의 명세서 및 도면에 포함된 기술적 사상의 범위 내에서 당업자가 용이하게 유추할 수 있는 변형 예와 구체적인 실시 예는 모두 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The embodiments described in this specification and the accompanying drawings merely illustrate some of the technical ideas included in the present invention by way of example. Therefore, since the embodiments disclosed in this specification are intended to explain rather than limit the technical spirit of the present invention, it is obvious that the scope of the technical spirit of the present invention is not limited by these embodiments. All modified examples and specific examples that can be easily inferred by those skilled in the art within the scope of the technical idea included in the specification and drawings of the present invention should be construed as being included in the scope of the present invention.

10 : 장약홀더 20 : 화약
30 : 암반 31 : 천공부
100 : 내부 격벽부 110 : 장약거치홈
120 : 장약거치 보조홈
200 : 외부 방향유도부 210 : 절곡부
220 : 제1 추가 절곡부 230 : 제2 추가 절곡부
300 : 개구부
10: charge holder 20: gunpowder
30: bedrock 31: perforation
100: internal bulkhead part 110: charge holder groove
120: charge holder auxiliary groove
200: external direction guidance unit 210: bending unit
220: first additional bending part 230: second additional bending part
300: opening

Claims (9)

판형 부재가 길이방향으로 구비된 내부 격벽부;
1개의 내각을 가지도록 구비된 각 절곡부가 상기 내부 격벽부의 양 측에서 상호 대향되도록 결합되는 외부 방향유도부; 및
상기 외부 방향유도부의 각 절곡부의 단부가 상호 이격되면서 형성된 개구부를 포함하는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.
an inner partition wall portion having a plate-shaped member in a longitudinal direction;
an external direction guide unit in which each bent portion having one interior angle is coupled to face each other at both sides of the inner partition wall portion; and
Charge holder with an external guide part, characterized in that it comprises an opening formed while the ends of each bent part of the external guide part are spaced apart from each other.
청구항 1에 있어서,
상기 내부 격벽부는 판형 부재의 길이방향으로 이격 형성된 장약거치홈이 구비되는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.
The method of claim 1,
The internal bulkhead portion is a charge holder provided with an external guide portion, characterized in that provided with a charge holder groove formed spaced apart in the longitudinal direction of the plate-shaped member.
청구항 2에 있어서, 상기 내부 격벽부의 일측에는 장약거치 보조홈이 더 구비되는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.[Claim 3] The charge holder with an external direction guide according to claim 2, characterized in that an auxiliary charge mounting groove is further provided on one side of the inner bulkhead. 청구항 1에 있어서,
상기 외부 방향유도부의 각 절곡부는 동일한 형상으로 구비되되, 각 내각이 마주보도록 상호 반대 방향으로 대향배치되는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.
The method of claim 1,
Charge holder equipped with an external guide, characterized in that each bent portion of the external guide is provided in the same shape, but is disposed to face each other in opposite directions so that each inner angle faces each other.
청구항 1에 있어서,
장약홀더의 하측에 배치된 일 절곡부의 내각이, 일 절곡부보다 상측에 배치된 타 절곡부의 내각보다 크게 구비되고,
하측에 구비된 일 절곡부의 개구부의 갭 간격이 상측에 구비된 타 절곡부의 개구부의 갭 간격보다 크게 구비되는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.
The method of claim 1,
The inner angle of one bent part disposed on the lower side of the charge holder is larger than the inner angle of the other bent part disposed above the one bent part,
A charge holder with an external direction guide, characterized in that the gap between the openings of one bent part provided at the lower side is larger than the gap between the openings of the other bent part provided at the upper side.
청구항 1에 있어서,
장약홀더의 하측에 배치된 일 절곡부의 길이는 일 절곡부보다 상측에 배치된 타 절곡부의 길이보다 짧게 구비되고,
하측에 구비된 일 절곡부의 개구부의 갭 간격이 상측에 구비된 타 절곡부의 개구부의 갭 간격보다 크게 구비되는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.
The method of claim 1,
The length of one bent part disposed on the lower side of the charge holder is shorter than the length of the other bent part disposed above the one bent part,
A charge holder with an external direction guide, characterized in that the gap between the openings of one bent part provided at the lower side is larger than the gap between the openings of the other bent part provided at the upper side.
상기 외부 방향유도부의 절곡부의 각 단부에는 외측으로 절곡된 제1 추가절곡부가 연장형성된 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.Charge holder provided with an external guide portion, characterized in that the first additional bent portion bent outwardly is formed at each end of the bent portion of the external guide portion. 청구항 1에 있어서,
상기 외부 방향유도부의 절곡부의 각 단부에는 내측으로 절곡된 제2 추가절곡부가 연장형성된 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더.
The method of claim 1,
Charge holder provided with an external direction guide, characterized in that the second additional bent portion bent inwardly extends at each end of the bent portion of the external direction guide.
암반에 아래 방향으로 천공부를 형성하는 S1 단계;
상기 천공부에 청구항 1에 따른 장약홀더를 삽입하는 S2 단계; 및
상기 장약홀더에 장착된 화약에 의해 발파가 이루어지는 S3 단계를 포함하는 것을 특징으로 하는 외부 방향유도부가 구비된 장약홀더를 이용한 발파공법.



S1 step of forming a perforation in the rock mass in a downward direction;
Step S2 of inserting the charge holder according to claim 1 into the hole; and
A blasting method using a charge holder equipped with an external direction guide, characterized in that it comprises a step S3 in which blasting is performed by the gunpowder mounted on the charge holder.



KR1020210099834A 2021-07-29 2021-07-29 Charge Holder having external directional induction element and Blasting method thereby KR102504139B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210099834A KR102504139B1 (en) 2021-07-29 2021-07-29 Charge Holder having external directional induction element and Blasting method thereby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210099834A KR102504139B1 (en) 2021-07-29 2021-07-29 Charge Holder having external directional induction element and Blasting method thereby

Publications (2)

Publication Number Publication Date
KR20230018089A true KR20230018089A (en) 2023-02-07
KR102504139B1 KR102504139B1 (en) 2023-02-27

Family

ID=85221600

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210099834A KR102504139B1 (en) 2021-07-29 2021-07-29 Charge Holder having external directional induction element and Blasting method thereby

Country Status (1)

Country Link
KR (1) KR102504139B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101296273B1 (en) 2013-05-24 2013-08-14 조금원 Charge holders for easy loading of explosives
JP2018021744A (en) * 2016-08-05 2018-02-08 株式会社Skテック Process for dispersion and powder charging of explosive
CN209945165U (en) * 2019-04-09 2020-01-14 山东科技大学 Novel deep hole blasting energy-gathering pipe
US20200149854A1 (en) * 2017-07-19 2020-05-14 Tbs Mining Solutions Pty Ltd. A method and apparatus for preventing rock fragments from entering or collapsing into a blast hole
CN213238642U (en) * 2020-09-03 2021-05-18 中铁二局集团有限公司 Charging and connecting device for presplitting blasting
CN113073978A (en) * 2021-04-08 2021-07-06 中国矿业大学(北京) Thick coal seam confined concrete pillar roof-cutting roadway coal-pillar-free mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101296273B1 (en) 2013-05-24 2013-08-14 조금원 Charge holders for easy loading of explosives
JP2018021744A (en) * 2016-08-05 2018-02-08 株式会社Skテック Process for dispersion and powder charging of explosive
US20200149854A1 (en) * 2017-07-19 2020-05-14 Tbs Mining Solutions Pty Ltd. A method and apparatus for preventing rock fragments from entering or collapsing into a blast hole
CN209945165U (en) * 2019-04-09 2020-01-14 山东科技大学 Novel deep hole blasting energy-gathering pipe
CN213238642U (en) * 2020-09-03 2021-05-18 中铁二局集团有限公司 Charging and connecting device for presplitting blasting
CN113073978A (en) * 2021-04-08 2021-07-06 中国矿业大学(北京) Thick coal seam confined concrete pillar roof-cutting roadway coal-pillar-free mining method

Also Published As

Publication number Publication date
KR102504139B1 (en) 2023-02-27

Similar Documents

Publication Publication Date Title
JP2611157B2 (en) Multi-stage blasting method for one free surface tunnel excavator
AP880A (en) Method and apparatus for controlled small-charge blasting of hard rock and concrete by explosive pressurisation of the bottom of a drill hole.
KR102162731B1 (en) Eco friendly explosive case and Dispersion explosive assembly including this same and Blasting method using this same
KR102243638B1 (en) Explosive tube for rock blasting
KR20080085523A (en) Blast construction working method for a tunnel
KR20010039453A (en) Tunnel Blasting Method for using Air Tube
CN101936690A (en) Compound wedge cut and repeated compound wedge cut construction process
KR101392158B1 (en) The direction controlling implement with the vibration cut off in the charge hole to obstruct propagation of blasting vibration, and the blasting method using that implement
KR102504139B1 (en) Charge Holder having external directional induction element and Blasting method thereby
CN111595214A (en) Small-hole reinforced cracking explosive column and single-face annular joint-cutting explosive column combined cutting method
KR102128932B1 (en) Deck charge blasting method with low vibration and low noise
CN108050902A (en) A kind of tunnel blasting excavation method
KR100362014B1 (en) Tunnel pre-splitting blasting method
CN110332861A (en) City underground complex environment controls blasting construction method
KR102199682B1 (en) Explosive assembly including explosive concentration and vibration noise reduction liner plug and blasting method using it
JP2000213900A (en) Blasting method
KR100373493B1 (en) A Digging Method of Tunnel
KR0182394B1 (en) Rock cutting method by tensile failure
JPH05247939A (en) Demolition method of obstruction in deep ground
KR100358522B1 (en) The setting method of shaped charges for the explosives demolition of a steel structure
CN115468464B (en) Deep metal mine full-section deep hole blasting method based on accurate time delay of electronic detonator
KR102621202B1 (en) Blasting Method With Paper Tube
KR102525652B1 (en) Protector for multi-stage charge protection for deck charge method for rock blasting and rock blasting method using the same
CN219387888U (en) Tunnel blasting shock-absorbing hole
CN110530220A (en) A kind of blasting technology for reservoir dam

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant