KR20220112083A - Risk index system and risk index management method for safeey management - Google Patents

Risk index system and risk index management method for safeey management Download PDF

Info

Publication number
KR20220112083A
KR20220112083A KR1020210015618A KR20210015618A KR20220112083A KR 20220112083 A KR20220112083 A KR 20220112083A KR 1020210015618 A KR1020210015618 A KR 1020210015618A KR 20210015618 A KR20210015618 A KR 20210015618A KR 20220112083 A KR20220112083 A KR 20220112083A
Authority
KR
South Korea
Prior art keywords
index
risk
risk index
work
reflecting
Prior art date
Application number
KR1020210015618A
Other languages
Korean (ko)
Inventor
송주신
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020210015618A priority Critical patent/KR20220112083A/en
Publication of KR20220112083A publication Critical patent/KR20220112083A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

According to the present invention, a risk index system for safety management comprises: a risk basis information collection unit that collects risk basis information necessary to calculate a risk index for an entrusted task in an electric power field; a risk index calculation unit for calculating a risk index for the entrusted task at a specific time point from the risk basis information; a risk index output unit for visually outputting the risk index to a manager for the entrusted task; and a control unit for recording and managing the risk basis information and the risk index.

Description

안전 경영을 위한 위험성 지수 시스템 및 위험성 지수 관리 방법{RISK INDEX SYSTEM AND RISK INDEX MANAGEMENT METHOD FOR SAFEEY MANAGEMENT} RISK INDEX SYSTEM AND RISK INDEX MANAGEMENT METHOD FOR SAFEEY MANAGEMENT

본 발명은 인적 위험성을 도출하여 관리할 수 있는 위험성 지수 시스템에 관한 것으로, 특히, 송변전, 배전, 기타공사 공사등 관련으로 안전경영 실현을 위한 인적 위험성 지수를 개발하여 구축된 안전 경영을 위한 위험성 지수 시스템에 관한 것이다.The present invention relates to a risk index system that can derive and manage human risks. In particular, risks for safety management built by developing a human risk index for realizing safety management in relation to transmission and transformation, distribution, and other construction works It is about the index system.

우리나라의 산업 재해 발생률은 OECD 국가들과 비교했을 때 매우 높은 수치를 보이고 있으며, 특히 산업재해 사망률은 1위에 이름을 올려 '근로자의 무덤'이라는 불명예가 있다. 사망재해 1건 발생시 발생하는 직·간접 손실비용은 약 20억 원에 이를 정도로 손실이 크다. 그러나 현재 산업 현장에서 사용하는 안전 관리 방법은 현장 안전 관리 조직 및 근로자가 직접 관리하는 방식으로 이루어지고 있다.The incidence of industrial accidents in Korea is very high compared to OECD countries, and in particular, the death rate from occupational accidents ranks first, and has the infamous 'worker's grave'. The cost of direct and indirect losses incurred in the occurrence of one fatal accident is large enough to reach about 2 billion won. However, the safety management method currently used in industrial sites is being managed directly by the on-site safety management organization and workers.

한편, 단순 노무직의 외주화로 산업현장에서는 위탁업체의 영역에 속한 업무의 상당 부분을 협력업체에게 위임하고 있는데, 협력업체의 소속 인원이 업무를 위임한 위탁업체의 사이트에서 작업을 수행하는 경우, 산업재해에 대한 관리가 소홀지기 쉬어, 실제 사고가 빈번하게 발생하고 있으며, 사고 발생시에도 관리 책임의 소재가 불분명해진다.On the other hand, with the outsourcing of simple labor jobs, in industrial sites, a significant part of the work that belongs to the consigned company is delegated to the subcontractor. Disaster management is easily neglected, and actual accidents occur frequently, and even when accidents occur, the location of management responsibility becomes unclear.

전력 산업 분야에서도, 안전 중심으로 전력사업 패러다임이 전환되고 있는 바, 안전중요도 증대로 종래 관리 방법으로는 관련 비용 및 제약이 증가한다. 또한, 산업안전 보건법 개정등 발주자 책임강화에 따른 안전정책 전환 요구는 강화되고 있어, 안전관리시스템 고도화 및 전문회사, 감독자 공사환경 개선을 위한 위험성 인식 상시·일상화가 필요하다. In the electric power industry, the paradigm of the electric power business is shifting towards safety. As the importance of safety increases, related costs and restrictions increase with the conventional management method. In addition, as the demand for safety policy change is being strengthened due to the strengthening of the responsibility of the client, such as the revision of the Occupational Safety and Health Act, there is a need to upgrade the safety management system and to recognize risks at all times and routinely for the improvement of the construction environment of specialized companies and supervisors.

그렇지만, 송변전·배전공사등 관련 안전, 위험성 인지관련 명확한 수치화, 데이터, 객관화 지표가 부재하여, 마땅한 안전 관리, 특히 인적 안전 관리 방안이 존재하지 않았다.However, due to the absence of clear numerical, data, and objective indicators related to safety and risk perception related to transmission and substation/distribution construction, there was no adequate safety management, especially human safety management plan.

현대중공업 아르곤 가스 질식 사망사고, 태안화력발전소 압사사고, 물류창고 건설현장 화재사고와 같은 산업재해로 인한 사망사고와 함께 가습기 살균제 사건 및 4ㆍ16 세월호 사건과 같은 시민재해로 인한 사망사고 발생 등이 사회적 문제로 지적되어 온 바, 특히, 경제적으로 약자인 협력업체에 의한 산업재해를 방지하고자 하는 국민적 관심은 중대재해법의 제정에까지 이르고 있다. Deaths due to industrial accidents such as argon gas suffocation of Hyundai Heavy Industries, the crushing accident at the Taean thermal power plant, and fire at the construction site of a distribution warehouse, as well as deaths due to civil disasters such as the humidifier disinfectant incident and the April 16 Sewol ferry incident, etc. This has been pointed out as a social problem, and in particular, the public interest in preventing industrial accidents caused by economically weak partner companies has led to the enactment of the Severe Accidents Act.

즉, 「중대재해처벌 등에 관한 법률」로 제정되어, 사업주, 법인 또는 기관 등이 운영하는 사업장 등에서 발생한 중대산업재해와 공중이용시설 또는 공중교통수단을 운영하거나 위험한 원료 및 제조물을 취급하면서 안전ㆍ보건 조치의무를 위반하여 인명사고가 발생한 중대시민재해의 경우, 사업주와 경영책임자 및 법인 등을 처벌함으로써 근로자를 포함한 종사자와 일반 시민의 안전권을 확보하고, 기업의 조직문화 또는 안전관리 시스템 미비로 인해 일어나는 중대재해사고를 사전에 방지하고자 한다.In other words, as enacted by the 「Act on Punishment of Serious Accidents, etc.」, serious industrial accidents that occurred at workplaces operated by business owners, corporations or institutions, etc. In the case of a serious civil accident in which a human accident occurs due to a violation of the duty to take action, the right to safety of workers, including workers, and general citizens is secured by punishing the business owner, the person in charge of the management, and the corporation. We want to prevent serious accidents from occurring in advance.

구체적으로, 사업주 및 경영책임자는 실질적으로 지배관리하는 사업장 종사자(용역, 도급, 위탁 포함) 및 제조물공중이용시설 이용자에 대한 안전보건 확보 의무 부담을 강화하고 있다.Specifically, business owners and business managers are strengthening their obligations to secure safety and health for workers at workplaces (including services, subcontracts, and consignment) and users of public product use facilities.

현재에는 경영자 처벌 조항에 대하여 논란 및 관심이 되고 있지만, 위탁업체에 대한 책임 소재도 조만간 문제될 것으로 예상된다. Currently, there is controversy and interest in the provision of punishment for managers, but it is expected that the position of responsibility for the consigned company will soon become a problem.

이러한 상황에서, 위탁업체가 특정 작업을 협력업체에게 위탁하고자 하는 경우 협력업체의 작업자를 직접 지정/관리하는 것은, 비정규직 보호법에 의해 직접 고용으로 간주될 수 있다. In such a situation, when a subcontractor wants to entrust a specific job to a subcontractor, direct designation/management of the subcontractor's workers may be considered direct employment under the Contingent Workers Protection Act.

따라서, 현재 상황에서 위탁업체가 특정 작업을 협력업체에게 위탁시키는 경우, 협력업체의 파견 인원의 부주의나 미숙으로 인한 사고를 방지하거나 및/또는 사고의 책임을 벗어날 마땅한 방안이 존재하지 않는다.Therefore, in the current situation, when a subcontractor entrusts a specific work to a subcontractor, there is no proper way to prevent accidents and/or escape responsibility for accidents caused by the negligence or negligence of personnel dispatched by subcontractors.

공공기관의 경우에도, 공공기관 안전등급제를 시행하는 상황에서, 위탁 작업에 대한 안전등급을 입증할 수단이 명확하지 않았다.Even in the case of public institutions, in the context of implementing the public institution safety rating system, it was not clear how to prove the safety rating for entrusted work.

대한민국 등록공보 10-0685704호Republic of Korea Registration No. 10-0685704

본 발명은 전력 분야에서 위탁 업무에 대한 안전을 관리할 수 있는 안전 경영을 위한 위험성 지수 시스템 및 관리 방법을 제공하고자 한다.An object of the present invention is to provide a risk index system and management method for safety management capable of managing the safety of entrusted work in the electric power field.

본 발명은 전력 분야에서 직접 고용 관계가 없는 협력업체의 직원에 의한 인적 위험성을 낮출 수 있는 안전 경영을 위한 위험성 지수 시스템 및 관리 방법을 제공하고자 한다.An object of the present invention is to provide a risk index system and management method for safety management that can reduce human risks caused by employees of partner companies without direct employment relationship in the electric power field.

본 발명의 일 측면에 따른 안전 경영을 위한 위험성 지수 시스템은, 전력 분야의 위탁 업무에 대한 위험성 지수를 산출하는데 필요한 위험성 근거 정보들을 수집하는 위험성 근거 정보 수집부; 상기 위험성 근거 정보들로부터 특정 시점의 위탁 업무에 대한 위험성 지수를 산출하는 위험성 지수 산출부; 상기 위험성 지수를 상기 위탁 업무에 대한 관리자에게 시각적으로 출력하는 위험성 지수 출력부; 및 상기 위험성 근거 정보들 및 상기 위험성 지수를 기록 및 관리하는 제어부를 포함할 수 있다.A risk index system for safety management according to an aspect of the present invention includes: a risk-based information collection unit for collecting risk-based information necessary to calculate a risk index for entrusted work in the electric power field; a risk index calculation unit for calculating a risk index for entrusted work at a specific time from the risk-based information; a risk index output unit for visually outputting the risk index to a manager for the consignment work; and a control unit for recording and managing the risk basis information and the risk index.

여기서, 상기 위험성 지수는 위탁 업무에 대한 수임업체의 작업자에 기인한 인적 위험성 지수를 포함하며,Here, the risk index includes a human risk index due to the worker of the entrusted company for the consignment work,

상기 인적 위험성 지수는, 상기 작업자의 경력 정보 및 상기 위탁 업무에 대한 상기 작업자의 실적 정보에 따라 산출될 수 있다.The human risk index may be calculated according to the worker's career information and the worker's performance information for the entrusted task.

여기서, 상기 위험성 지수는, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 더 포함할 수 있다.Here, the risk index may further include an environmental risk index, a work risk index, and a statistical risk index.

여기서, 도시한 위험성 지수 산출부는, 각 항목별 위험성 파라미터들에 가중치를 반영하여 합산하는 방식으로, 위험성 지수를 구성하는 인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 각각 산출하고, 산출된 각 항목별 위험성 지수를 합산하여 종합적인 위험성 지수를 산출할 수 있다.Here, the illustrated risk index calculation unit calculates the human risk index, the environmental risk index, the work risk index, and the statistical risk index that constitute the risk index, respectively, in a way that reflects and sums the weights of the risk parameters for each item, , a comprehensive risk index can be calculated by adding up the calculated risk index for each item.

여기서, 도시한 위험성 지수 산출부는, 위험성 지수에 대한 가중 지수 및 경감 지수를 상기 종합적인 위험성 지수 또는 각 항목별 위험성 지수에 반영하여 최종적인 위험성 지수를 산출할 수 있다.Here, the illustrated risk index calculation unit may calculate the final risk index by reflecting the weighted index and reduction index for the risk index in the overall risk index or the risk index for each item.

여기서, 상기 위험성 지수 출력부는, 상기 위탁 업무 수행전에, 상기 종합적인 위험성 지수에 가중 지수만 반영한 최종적인 위험성 지수를 디스플레이하고, 상기 위탁 업무 수행후에, 상기 종합적인 위험성 지수에 상기 가중 지수 및 상기 경감 지수를 반영한 최종적인 위험성 지수를 디스플레이할 수 있다.Here, the risk index output unit, before performing the consignment task, displays the final risk index reflecting only the weighted index in the overall risk index, and after performing the consignment task, the weighted index and the reduction in the overall risk index The final risk index reflecting the index can be displayed.

여기서, 상기 위험성 지수 출력부는, 감전, 떨어짐, 넘어짐, 맞음, 끼임 등 유형별로 안전사고 분석 보고서를 작성하고 제공할 수 있다.Here, the risk index output unit may prepare and provide a safety accident analysis report for each type, such as electric shock, fall, fall, hit, and jam.

여기서, 상기 위험성 근거 정보 수집부는, 위탁업체의 공사를 지원 및 관리하는 부서의 서버에서 위탁 업무에 대한 관련 정보들을 수집하고, 상기 위탁업체의 협력업체 및 외부 작업자를 관리하는 부서의 서버에서 협력업체 및 외부 작업자에 대한 정보를 수집할 수 있다.Here, the risk basis information collection unit collects information related to the consignment work from the server of the department that supports and manages the construction of the consigned company, and collects the information related to the consignment work from the server of the subcontractor of the consigned company and the department that manages the external worker and information about external workers.

여기서, 상기 제어부는, 위험성 근거 정보들 및 상기 위험성 지수를 저장하기 위한 저장부를 포함할 수 있다.Here, the control unit may include a storage unit for storing the risk basis information and the risk index.

본 발명의 다른 측면에 따른 안전 경영을 위한 위험성 지수 관리 방법은, 전력 분야의 위탁 업무에 대한 위험성 지수를 산출하는데 필요한 위험성 근거 정보들을 수집하는 단계; 상기 위험성 근거 정보들을 위험성 파라미터들로 정리하는 단계; 상기 위험성 파라미터들로부터 특정 시점의 위탁 업무에 대한 최종적인 위험성 지수를 산출하는 단계; 및 상기 위험성 지수를 상기 위탁 업무에 대한 관리자에게 시각적으로 출력하는 단계를 포함할 수 있다.A risk index management method for safety management according to another aspect of the present invention includes: collecting risk-based information necessary to calculate a risk index for entrusted work in the electric power field; arranging the risk basis information into risk parameters; calculating a final risk index for the entrusted task at a specific time from the risk parameters; And it may include the step of visually outputting the risk index to the manager for the consignment task.

여기서, 상기 위험성 파라미터들로 정리하는 단계 이후, 상기 최종적인 위험성 지수를 산출하는 단계 이전에, 위험성 지수에 대하여 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계를 더 포함할 수 있다.Here, after the step of arranging the risk parameters, before the step of calculating the final risk index, the step of reflecting at least one of a weighting index and a reduction index with respect to the risk index may be further included.

여기서, 상기 위험성 파라미터들로 정리하는 단계에서는, 외부 서버 등으로부터 수집한 정보/데이터들을 위험성 지수 산출을 위한 포맷에 맞추어 스케일링하고, 각 정보/데이터의 시간적 유효성을 확인하거나 각 정보/데이터의 생성 시각을 동기화할 수 있다.Here, in the step of arranging the risk parameters, the information/data collected from an external server, etc. are scaled according to the format for calculating the risk index, and the temporal validity of each information/data is checked or the generation time of each information/data can be synchronized.

여기서, 상기 최종적인 위험성 지수를 산출하는 단계에서는, 위험성 파라미터들로 정리하는 단계에서 얻어진 각 위험성 파라미터들에 각 가중치를 반영하여 합산하는 방식의 계산을 수행할 수 있다.Here, in the step of calculating the final risk index, it is possible to perform a calculation of a method of summing each risk parameter obtained in the step of arranging the risk parameters by reflecting each weight.

여기서, 상기 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계에서는, 각 항목별 위험성 파라미터들에 가중치를 반영하여 합산하는 방식으로, 위험성 지수를 구성하는 인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 각각 산출하고, 산출된 각 항목별 위험성 지수를 합산하여 산출된 종합적인 위험성 지수에 대하여, 상기 가중 지수 및 상기 경감 지수 중 적어도 하나를 상기 종합적인 위험성 지수 또는 각 항목별 위험성 지수에 반영할 수 있다.Here, in the step of reflecting at least one of the weighting index and the reduction index, the human risk index, the environmental risk index, the work risk index, And with respect to the overall risk index calculated by calculating the statistical risk index, and summing the calculated risk index for each item, at least one of the weighting index and the reduction index is the overall risk index or the risk index for each item can be reflected in

여기서, 상기 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계는, 상기 가중 지수와 상기 경감 지수를 설정하는 단계; 상기 종합적인 위험성 지수에 상기 가중 지수를 반영하는 단계; 및 상기 가중 지수가 반영된 종합적인 위험성 지수에 상기 경감 지수를 반영하는 단계를 포함할 수 있다.Here, the step of reflecting at least one of the weighting index and the reduction index may include: setting the weighting index and the reduction index; reflecting the weighted index in the overall risk index; And it may include the step of reflecting the reduction index to the overall risk index reflected the weighting index.

여기서, 상기 가중 지수를 반영하는 단계에서는, 작업 안전을 위협하는 일상적이지 않은 상황이 발생하면, 해당 위탁 업무의 위험성 지수에 대하여 가중 지수를 반영할 수 있다.Here, in the step of reflecting the weighted index, when an unusual situation threatening work safety occurs, the weighted index may be reflected for the risk index of the consigned work.

여기서, 상기 경감 지수를 반영하는 단계에서는, 상기 경감 지수를 예외적으로 발생된 가중 상황에 대하여 관련 인원들이 대응하는 활동에 대한 평가로서 반영할 수 있다.Here, in the step of reflecting the mitigation index, the mitigation index may be reflected as an evaluation of the activities corresponding to the aggravating situation that has occurred exceptionally.

여기서, 상기 경감 지수를 반영하는 단계에서는, 상기 관련 인원들이 대응하는 활동에 대하여 확인하는 단계를 수행할 수 있다.Here, in the step of reflecting the mitigation index, the step of confirming the activity corresponding to the relevant personnel may be performed.

상술한 구성의 본 발명의 사상에 따른 안전 경영을 위한 위험성 지수 시스템 및/또는 관리 방법을 실시하면, 전력 분야에서 위탁 업무에 대한 안전을 효과적으로 관리할 수 있는 이점이 있다.If the risk index system and / or management method for safety management according to the spirit of the present invention having the above configuration is implemented, there is an advantage that can effectively manage the safety of entrusted work in the electric power field.

본 발명의 안전 경영을 위한 위험성 지수 시스템 및/또는 관리 방법은, 공사감독자, 전문회사 작업자가 이미지, 수치화로 체감하는 위험성 인지효과 극대화하는 이점이 있다.The risk index system and/or management method for safety management of the present invention has the advantage of maximizing the risk perception effect experienced by the construction supervisor and the professional company worker through images and digitization.

본 발명의 안전 경영을 위한 위험성 지수 시스템 및/또는 관리 방법은, 산업재해 및 안전사고 예방에 대한 안전관리 일환으로 책임경영 강화에 기여하는 이점이 있다. The risk index system and/or management method for safety management of the present invention has the advantage of contributing to the reinforcement of responsible management as part of safety management for the prevention of industrial accidents and safety accidents.

본 발명의 안전 경영을 위한 위험성 지수 시스템 및/또는 관리 방법은, 적절하게 개발된 위험성 지수에 따라 공사관련자 안전의식 상시화로 공사현장 안전관리 효율화를 높이는 이점이 있다.The risk index system and/or management method for safety management of the present invention has the advantage of increasing the efficiency of construction site safety management by making construction-related safety awareness constant according to an appropriately developed risk index.

본 발명의 안전 경영을 위한 위험성 지수 시스템 및/또는 관리 방법은, 산업안전법 개정 등 발주자 책임강화에 따른 본사, 본부, 사업소 안정정책 실현에 기여하는 이점이 있다.The risk index system and/or management method for safety management of the present invention has the advantage of contributing to the realization of the head office, headquarters, and business establishment stabilization policy according to the reinforcement of the responsibility of the owner, such as the revision of the Industrial Safety Act.

본 발명의 안전 경영을 위한 위험성 지수 시스템 및/또는 관리 방법은, 공공기관에 적용하는 경우, 위탁 작업에 대한 유효한 안전 프로세스를 입증하여, 공공기관 안전등급제를 시행하는 상황에서, 높은 안전등급을 획득할 수 있는 이점이 있다. The risk index system and / or management method for safety management of the present invention, when applied to public institutions, proves an effective safety process for entrusted work, and obtains a high safety rating in a situation where the public institution safety rating system is implemented There are advantages to being able to

도 1은 본 발명의 사상에 따른 위험성 지수 시스템의 일 실시예를 도시한 블록도.
도 2는 본 발명의 사상에 따른 안전 경영을 위한 위험성 지수 관리 방법의 일 실시예를 도시한 흐름도.
도 3은 전력 회사 전체 위험성 지수를 표시하기 위한 본부, 사업소별 막대그래프 이미지.
도 4는 각 사업소 별로 위험성 지수를 시각적으로 표현한 이미지.
도 5는 도 2의 가중 지수 및 경감 지수를 반영하는 과정을 상세히 나타낸 흐름도.
도 6a는 경감 조치 증명 수단으로서 협력업체 임원 점검을 촬영한 사진.
도 6b는 경감 조치 증명 수단으로서 보호장구 착용 사진.
도 6c는 경감 조치 증명 수단으로서 추락 위험발생개소의 안전조치 사진.
1 is a block diagram illustrating an embodiment of a risk index system according to the spirit of the present invention.
2 is a flowchart illustrating an embodiment of a risk index management method for safety management according to the spirit of the present invention.
3 is a bar graph image for each headquarters and business office for displaying the overall risk index of the electric power company.
4 is an image visually expressing the risk index for each business office.
5 is a flowchart illustrating in detail a process of reflecting the weighting index and the relief index of FIG. 2 .
Figure 6a is a photograph taken as a means of proof of mitigation measures taken by an executive inspection of the partner company.
Figure 6b is a photo of wearing protective equipment as a means of proof of mitigation measures.
Figure 6c is a safety measure photo of the fall risk occurrence as a means of proof of mitigation measures.

본 발명을 설명함에 있어서 제 1, 제 2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 구성요소들은 용어들에 의해 한정되지 않을 수 있다. 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 된다. 예를 들어, 본 발명의 권리 범위를 벗어나지 않으면서 제 1 구성요소는 제 2 구성요소로 명명될 수 있고, 유사하게 제 2 구성요소도 제 1 구성요소로 명명될 수 있다. In describing the present invention, terms such as first, second, etc. may be used to describe various components, but the components may not be limited by the terms. The terms are only for the purpose of distinguishing one component from another. For example, without departing from the scope of the present invention, a first component may be referred to as a second component, and similarly, a second component may also be referred to as a first component.

어떤 구성요소가 다른 구성요소에 연결되어 있다거나 접속되어 있다고 언급되는 경우는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해될 수 있다.When a component is referred to as being connected or connected to another component, it may be directly connected or connected to the other component, but it can be understood that other components may exist in between. .

본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함할 수 있다. The terms used herein are used only to describe specific embodiments, and are not intended to limit the present invention. The singular expression may include the plural expression unless the context clearly dictates otherwise.

본 명세서에서, 포함하다 또는 구비하다 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것으로서, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해될 수 있다. In this specification, the terms include or include are intended to designate that a feature, number, step, operation, component, part, or combination thereof described in the specification exists, and includes one or more other features or numbers, It may be understood that the existence or addition of steps, operations, components, parts or combinations thereof is not precluded in advance.

또한, 도면에서의 요소들의 형상 및 크기 등은 보다 명확한 설명을 위해 과장될 수 있다.In addition, shapes and sizes of elements in the drawings may be exaggerated for clearer description.

본 발명의 구체적인 실시예들을 설명하기에 앞서, 본 발명에서 제시하는 위험성 지수에 대하여 정의하고 살펴보겠다. Before describing specific embodiments of the present invention, we will define and look at the risk index presented in the present invention.

위험성 지수는 항목별 위험성 지수들로 이루어지고, 각 항목별 위험성 지수는 인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수가 있다. 이중 특히, 인적 위험성 지수는 전력 분야에서 직접 고용 관계가 없는 협력업체의 직원에 의한 인적 위험성을 낮출 수 있도록 고안된 것이다.The risk index consists of risk indices for each item, and the risk index for each item includes a human risk index, an environmental risk index, a work risk index, and a statistical risk index. In particular, the human risk index is designed to reduce the human risk caused by employees of subcontractors who are not directly employed in the power sector.

각 항목별 위험성 지수는 수집된 각 항목별 위험성 파라미터들에 대한 분석 및 계산에 의해 구해지는데, 예컨대, 인적 위험성 지수를 얻기 위해 복수의 인적 위험성 파라미터들을 획득하고 이를 합산 등으로 취합하여, 인적 위험성 지수를 산출할 수 있다. 이때, 합산 전에 각 인적 위험성 파라미터에 대하여 특유의 가중치를 부여할 수 있다. 여기서, 가중치는 해당 파라미터의 비중을 높이는 가중치 뿐만 아니라 낮추는 가중치를 포함하는 개념이다. The risk index for each item is obtained by analysis and calculation of the collected risk parameters for each item. For example, a plurality of human risk parameters are acquired to obtain a human risk index, and these are combined by summing the human risk index. can be calculated. In this case, a specific weight may be assigned to each human risk parameter before the summation. Here, the weight is a concept including a weight that increases the weight of the corresponding parameter as well as a weight that decreases the weight.

상술한 과정으로 구해진 각 항목별 위험성 지수들을 합산 등으로 취합하여, 종합적인 위험성 지수를 얻을 수 있다. 즉, 종합적인 위험성 지수는 항목별 위험성 지수들(인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수)로 이루어진다.By summing up the risk indices for each item obtained by the above-described process, it is possible to obtain a comprehensive risk index. That is, the comprehensive risk index consists of item-specific risk indices (human risk index, environmental risk index, work risk index, and statistical risk index).

또한, 본 발명에서는 위험성 관리의 효율성 및 유연성을 부여하기 위해, 가중 지수 및 경감 지수를 추가적으로 제안한다. 가중 지수(높이는 지수만을 의미) 및/또는 경감 지수(낮추는 지수만을 의미)는 각 항목별 위험성 지수 또는 종합적인 위험성 지수에 반영할 수 있다.In addition, in the present invention, in order to provide efficiency and flexibility of risk management, a weighting index and a mitigation index are additionally proposed. The weighting index (meaning only the increasing index) and/or the mitigation index (meaning only the decreasing index) can be reflected in the risk index for each item or the overall risk index.

예컨대, 상기 가중 지수는 관리자가 사안에 따라(case by case) 설정하도록 하여, 인적 위험성 관리에 대한 책임 및 권한을 할당하면서 예외적인 경우를 반영하도록 하며, 상기 경감 지수는 상기 가중 지수를 적용시키는 상황에 대한 관련인들의 대처에 따라 부여하여 개별 사안에 대한 위험성 컨트롤 활동의 유효성을 확인/평가하며, 대외적으로 위험성 컨트롤 활동을 입증할 수 있다.For example, the weighting index is set by the manager on a case-by-case basis to reflect exceptional cases while allocating responsibility and authority for human risk management, and the mitigation index is a situation in which the weighting index is applied By granting it according to the responses of the people concerned, it is possible to confirm/evaluate the effectiveness of risk control activities for individual cases, and to demonstrate risk control activities externally.

종합적인 위험성 지수 또는 항목별 위험성 지수들에 상기 가중/경감 지수를 반영하여 최종적인 위험성 지수를 산출한다.The final risk index is calculated by reflecting the weighting/reducing index in the overall risk index or the risk index for each item.

도 1은 본 발명의 사상에 따른 위험성 지수 시스템의 일 실시예를 도시한 블록도이다.1 is a block diagram illustrating an embodiment of a risk index system according to the spirit of the present invention.

도시한 위험성 지수 시스템은, 전력 분야의 위탁 업무에 대한 위험성 지수를 산출하는데 필요한 위험성 근거 정보들을 수집하는 위험성 근거 정보 수집부(110); 상기 위험성 근거 정보들로부터 특정 시점의 위탁 업무에 대한 위험성 지수를 산출하는 위험성 지수 산출부(140); 상기 위험성 지수를 상기 위탁 업무에 대한 관리자에게 시각적으로 출력하는 위험성 지수 출력부(160); 및 상기 위험성 근거 정보들 및 상기 위험성 지수를 기록 및 관리하는 제어부(180)를 포함할 수 있다.The illustrated risk index system includes: a risk-based information collection unit 110 for collecting risk-based information necessary to calculate a risk index for consigned work in the power field; a risk index calculation unit 140 for calculating a risk index for entrusted work at a specific time from the risk basis information; a risk index output unit 160 for visually outputting the risk index to a manager for the consignment work; and a controller 180 for recording and managing the risk basis information and the risk index.

도시한 바와 같이 상기 제어부(180)는 그 내부 또는 외부에 상기 위험성 근거 정보들 및 상기 위험성 지수를 저장하기 위한 저장부(190)를 구비할 수 있다.As shown, the control unit 180 may include a storage unit 190 for storing the risk basis information and the risk index inside or outside thereof.

구현에 따라, 상기 제어부(180)는 상기 위험성 근거 정보 수집부(110)에서 수집된 위험성 정보를 처리하는 위험성 정보 처리부를 더 구비할 수 있다.According to implementation, the control unit 180 may further include a risk information processing unit for processing the risk information collected by the risk basis information collection unit 110 .

여기서, 상기 위험성 지수는 위탁 업무에 대한 외부 수임업체로서 협력업체(전문회사)의 작업자(외부 작업자라 약칭함)에 기인한 인적 위험성 지수를 포함하며, 이와 함께, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 더 포함할 수 있다.Here, the risk index includes the human risk index caused by the worker (abbreviated as an external worker) of the partner company (specialized company) as an external commissioning company for the consigned work, along with the environmental risk index, the work risk index, and a statistical risk index.

상기 인적 위험성 지수는, 상기 외부 작업자의 경력 정보 및 상기 위탁 업무에 대한 상기 외부 작업자의 실적 정보에 따라 산출되는 위험성 지수이다. 예컨대, 상기 외부 작업자가 위탁업체의 동종의 다른 작업(공사)에 대한 수행 회수가 많을수록 인적 위험성 지수가 낮아지며, 상기 외부 작업자가 상기 작업(공사) 분야에서 경력이 짧을수록 인적 위험성 지수가 높아질 수 있다. 여기서, 상기 외부 작업자의 경력은 등록된 작업(공사)에 관련된 자격증 취득일이나, 상기 협력업체에서 상기 위탁업체에 대하여 제출한 인력(변경) 신고서에 기재된 내용이나, 기능 인력 관리용 시스템에 입력한 내용 등으로부터 추정할 수 있다.The human risk index is a risk index calculated according to career information of the external worker and performance information of the external worker for the entrusted work. For example, the more the number of times the external worker performs other work (construction) of the same type of the consigned company, the lower the human risk index, and the shorter the experience of the external worker in the work (construction) field, the higher the human risk index. . Here, the experience of the external worker is the date of acquisition of a certificate related to the registered work (construction), the contents described in the manpower (change) report submitted by the partner company to the consigned company, or the contents entered into the system for managing skilled personnel It can be estimated from etc.

2인 이상으로 규정된 작업(공사)의 경우에는, 작업(공사) 특성에 따라, 다수 외부 작업자들의 실적/경력의 분포를 반영할 수 있다. 해당 작업(공사)이 1인의 주도와 다른 이들의 협조로 수행되는 특징을 가진 경우에는, 다수 외부 작업자들의 실적/경력들 중 가장 높은 것에 의해 인적 위험성 지수가 크게 좌우될 수 있다.In the case of a job (construction) defined by two or more people, the distribution of the performance/career of multiple external workers may be reflected according to the characteristics of the work (construction). If the work (construction) has the characteristics of being carried out under the initiative of one person and with the cooperation of others, the human risk index may be greatly influenced by the highest one among the performance/career of many external workers.

반면, 해당 작업(공사)이 소정 수의 인원들의 주도로 수행되는 특징을 가진 경우에는, 다수 외부 작업자들의 실적/경력들 중 상기 소정 수의 상위 인원들의 실적/경력들에 의해 인적 위험성 지수가 결정될 수 있다.On the other hand, if the corresponding work (construction) has a characteristic that is performed under the initiative of a predetermined number of personnel, the human risk index may be determined by the performance/s can

보다 외부 작업자에 대한 정보를 세밀히 관리하는 구현의 경우, 협력업체에 대한 인적 파라미터로서, 일별 공사건수, 외부 작업자의 연속 작업일수를 추가적으로 반영할 수 있다. 가장 세밀히 관리하는 구현의 경우, 협력업체(전문회사)의 요일별 누적 피곤도, 작업자의 컨디션도 반영할 수 있다. 상기 세밀한 파라미터들은 예컨대 외부 작업자의 입력 수단으로서 PMIS Self Test 적용하여 입력된 값을 독출하여 확보할 수 있다. In the case of an implementation in which information on external workers is managed in detail, the number of construction cases per day and the number of consecutive working days of external workers may be additionally reflected as human parameters for the subcontractor. In the case of the most closely managed implementation, the accumulated fatigue by day of the week of the partner company (specialized company) and the condition of the worker can also be reflected. The detailed parameters can be secured by, for example, reading an input value by applying PMIS Self Test as an input means of an external operator.

상기 환경 위험성 지수는, 날씨, 온도, 미세먼지, 습도 등 환경 파라미터가 해당 작업(공사)의 안전도에 영향을 미치는 경우 이를 반영하기 위한 것이다.The environmental risk index is intended to reflect when environmental parameters such as weather, temperature, fine dust, and humidity affect the safety of the corresponding work (construction).

예컨대, 송전탑이나 전주 등 야외에서 물리적인 추락의 위험이 존재하는 작업(공사)의 경우, 날씨 및/또는 온도를 환경 위험성 지수로 반영할 수 있다.For example, in the case of work (construction) in which a risk of physical fall exists outdoors, such as a power transmission tower or electric pole, weather and/or temperature may be reflected as an environmental risk index.

예컨대, 작업(공사) 대상 설비로부터 감전의 위험이 존재하는 경우, 미세먼지가 많거나 습도가 높은 것은 전기 방전 경로의 형성이 용이해지는 바, 이를 환경 위험성 지수로 반영할 수 있다.For example, when there is a risk of electric shock from a work (construction) target facility, a large amount of fine dust or high humidity facilitates the formation of an electric discharge path, which can be reflected as an environmental risk index.

상기 업무 위험성 지수는, 작업(공사) 자체의 특성에 의해 안전도가 달라지는 경우, 이를 반영하기 위한 것이다. 예컨대, 활선 : 간접·직접·복합, 비활선 등 작업(공사) 자체의 특성에 따른 작업난이도별로 가중치를 부여할 수 있다. 예컨대, 활선 공사가 비활선 공사 보다, 직접 활선 공사가 간접 활선 공사 보다 업무 위험성 지수가 높게 적용하고, 작업 자체가 생소한 간접 활선 공사의 경우, 외부 작업자의 실적을 다른 공사보다 큰 비율로 반영할 수 있다.The work risk index is to reflect this when the degree of safety is changed by the characteristics of the work (construction) itself. For example, live wire: weight can be assigned to each work difficulty according to the characteristics of the work (construction) itself, such as indirect/direct/composite, non-live wire. For example, the work risk index is higher for live wire construction than for non-live construction work, and for direct live construction work than for indirect live line construction. have.

상기 통계적 위험성 지수는, 과거에 수회 수행된 작업(공사)에 대한 결과들로부터, 사고가 많은 작업(공사)에 대하여 높은 위험성 지수를 반영하기 위한 것이다. 이를 위해 사고 파라미터로서, 최근 5개년 직원·일반인·도급자 월별, 일별 산업재해 현황을 수집하고, 이를 통계적 처리하여, 사고 발생 확률이 높은 작업(공사)에 대하여 높은 통계적 위험성 지수를 반영할 수 있다.The statistical risk index is to reflect a high risk index for work (construction) with many accidents from the results for work (construction) performed several times in the past. For this purpose, as an accident parameter, it is possible to collect the monthly and daily industrial accident status of employees, general public, and contractors for the past 5 years, and statistically process it to reflect a high statistical risk index for work (construction) with a high probability of occurrence of an accident. .

구현에 따라, 상기 통계적 위험성 지수는, 각 협력업체별로 산출된 사고 발생 확률에 대하여 통계적 위험성 지수를 반영할 수도 있다.According to implementation, the statistical risk index may reflect the statistical risk index for the accident occurrence probability calculated for each partner company.

상술한 바와 같이 위험성 지수를 구성하는 파라미터들이 많을수록 지수의 정확도는 증가되는 바, 고도화된 산출 방식을 가지도록 시스템을 구축하되, 관리자에 대한 위험성 지수 출력에 있어서는 가급적 심플 표현으로 가능하도록 하는 것이 유리하다.As described above, as the number of parameters constituting the risk index increases, the accuracy of the index increases, so it is advantageous to build a system to have an advanced calculation method, but to output the risk index to the manager as simple as possible. .

이를 위해 상기 위험성 근거 정보 수집부(110)는 위탁업체(주로 전력회사될 것임)의 업무(공사)를 지원/관리하는 부서의 서버에서 위탁 업무에 대한 관련 정보들을 수집하고, 상기 위탁업체의 협력업체 및 외부 작업자를 관리하는 부서의 서버에서 협력업체 및 외부 작업자에 대한 정보를 수집할 수 있다.To this end, the risk-based information collection unit 110 collects information related to the consignment work from the server of the department that supports / manages the work (construction) of the consigned company (which will be mainly a power company), and cooperates with the consigned company. Information about subcontractors and external workers can be collected from the server of the department that manages companies and external workers.

도시한 위험성 지수 산출부(140)는, 상술한 바와 같이, 각 항목별 위험성 파라미터들에 가중치를 반영하여 합산하는 방식으로, 위험성 지수를 구성하는 인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 각각 산출하고, 산출된 각 항목별 위험성 지수를 합산하여 종합적인 위험성 지수를 산출할 수 있다. 이때, 본 발명에서 제안하는 가중 지수 및 경감 지수를 사안에 따라 종합적인 위험성 지수 또는 각 항목별 위험성 지수에 반영하여 최종적인 위험성 지수를 산출할 수 있다.The illustrated risk index calculation unit 140, as described above, reflects and sums the weights in the risk parameters for each item, and the human risk index constituting the risk index, the environmental risk index, the work risk index, and A comprehensive risk index can be calculated by calculating each statistical risk index and adding the calculated risk index for each item. At this time, the final risk index can be calculated by reflecting the weighting index and the reduction index proposed in the present invention in the overall risk index or the risk index for each item depending on the case.

도시한 위험성 지수 산출부(140)는, 상기 종합적인 위험성 지수에 본 발명의 사상에 따라 가중 지수 및/또는 경감 지수를 반영하여, 최종적인 위험성 지수를 산출할 수 있다.The illustrated risk index calculation unit 140 may calculate the final risk index by reflecting the weighted index and/or the reduction index according to the spirit of the present invention in the comprehensive risk index.

상기 가중 지수 및 경감 지수의 상세 적용에 대해서는 후술하겠다.Detailed application of the weighting index and the reduction index will be described later.

상기 제어부(180)는 위험성 지수 시스템을 구성하는 서버의 중앙연산장치일 수 있으며, 이 경우, 상기 위험성 지수 산출부(140) 및 위험성 지수 출력부(160), 위험성 근거 정보 수집부(110)는 상기 서버의 메인 메모리에 로딩되어 실행되는 소프트웨어 모듈을 포함할 수 있다.The control unit 180 may be a central computing device of a server constituting the risk index system. In this case, the risk index calculation unit 140, the risk index output unit 160, and the risk basis information collection unit 110 are It may include a software module that is loaded into the main memory of the server and executed.

상기 위험성 지수 출력부(160)는, 예컨대, 상기 서버의 사용자로서 관리자를 위한 인터페이스를 포함할 수 있다. The risk index output unit 160 may include, for example, an interface for an administrator as a user of the server.

상기 위험성 지수 출력부(160)는, 상기 관리자가 바로 수행되는 또는 직전에 수행된 개별 작업(공사)에 대하여 필요한 조치를 판단할 수 있도록 즉각적으로 최종적인 위험성 지수를 제공할 뿐만 아니라, 감전, 떨어짐, 넘어짐, 맞음, 끼임 등 유형별로 안전사고 분석 보고서를 작성하고 제공할 수 있으며, 위험성 지수 App 개발을 통한 팝업 형태로 관련인들에게 전달하여, 위험성 지수에 대한 접근성을 확대할 수 있다.The risk index output unit 160 not only provides a final risk index immediately so that the manager can determine the necessary action for the individual work (construction) performed immediately or just before, as well as electric shock, falling It is possible to prepare and provide a safety accident analysis report by type, such as , falling, hit, and jamming, and to expand access to the risk index by delivering it to the relevant people in the form of a pop-up through the development of the risk index app.

도 2는 본 발명의 사상에 따른 안전 경영을 위한 위험성 지수 관리 방법의 일 실시예를 도시한 흐름도이다.2 is a flowchart illustrating an embodiment of a risk index management method for safety management according to the spirit of the present invention.

도시한 안전 경영을 위한 위험성 지수 관리 방법은, 전력 분야의 위탁 업무에 대한 위험성 지수를 산출하는데 필요한 위험성 근거 정보들을 수집하는 단계; 상기 위험성 근거 정보들을 위험성 파라미터들로 정리하는 단계(S100); 상기 위험성 파라미터들로부터 특정 시점의 위탁 업무에 대한 최종적인 위험성 지수를 산출하는 단계(S400); 및 상기 위험성 지수를 상기 위탁 업무에 대한 관리자에게 시각적으로 출력하는 단계(S600)를 포함할 수 있다.The illustrated risk index management method for safety management includes: collecting risk-based information necessary to calculate a risk index for entrusted work in the electric power field; arranging the risk basis information into risk parameters (S100); Calculating the final risk index for the entrusted task at a specific time from the risk parameters (S400); and visually outputting the risk index to the manager for the entrusted task (S600).

도시한 바와 같이, 상기 위험성 파라미터들로 정리하는 단계(S100) 이후, 상기 최종적인 위험성 지수를 산출하는 단계(S400) 이전에, 위험성 지수에 대하여 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계(S200)를 더 포함할 수 있다.As shown, after the step (S100) of arranging the risk parameters, before the step (S400) of calculating the final risk index, the step of reflecting at least one of a weighting index and a reduction index with respect to the risk index ( S200) may be further included.

구현에 따라, 상기 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계(S200)에서는, 상기 위험성 파라미터들 각각에 가중치를 부여하는 과정도 함께 수행할 수 있다.Depending on the implementation, in the step of reflecting at least one of the weighting index and the mitigation index (S200), the process of assigning a weight to each of the risk parameters may also be performed.

상기 위험성 근거 정보들을 수집하는 단계에서는, 예컨대, 위탁업체(주로 전력회사될 것임)의 업무(공사)를 지원/관리하는 부서의 서버에서 위탁 업무에 대한 관련 정보들을 수집하고, 상기 위탁업체의 협력업체 및 외부 작업자를 관리하는 부서의 서버에서 협력업체 및 외부 작업자에 대한 정보를 수집할 수 있다.In the step of collecting the risk-based information, for example, information related to the consigned work is collected from the server of the department supporting/managing the work (construction) of the consigned company (which will be mainly a power company), and the consignment company's cooperation Information about subcontractors and external workers can be collected from the server of the department that manages companies and external workers.

상기 위험성 파라미터들로 정리하는 단계(S100)에서는, 외부 서버 등으로부터 수집한(전송받은) 정보/데이터들을 위험성 지수 산출을 위한 포맷에 맞추어 스케일링하고, 각 정보/데이터의 시간적 유효성을 확인하거나 각 정보/데이터의 생성 시각을 동기화할 수 있다. In the step (S100) of arranging the risk parameters, the information / data collected (transmitted) from an external server, etc. are scaled according to the format for calculating the risk index, and the temporal validity of each information / data is checked or each information /Data creation time can be synchronized.

예컨대, 외부 작업자 입력 정보의 입력 시점이 규정된 소정 기간 이내에 있는지 확인할 수 있다. For example, it may be confirmed whether the input time of the external operator input information is within a prescribed predetermined period.

예컨대, 예보된 기온이 작업 시간에 존재하지 않은 경우, 작업 시간 전후의 예보된 기온을 이용하여 보정(interpolation)할 수 있다.For example, when the predicted temperature does not exist during the working time, it may be interpolated using the predicted temperature before and after the working time.

상기 위험성 지수에 대하여 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계(S200)에 대해서는 후술하겠다.The step (S200) of reflecting at least one of a weighting index and a reduction index with respect to the risk index will be described later.

상기 최종적인 위험성 지수를 산출하는 단계(S400)는, 앞서 설명한 본 발명에서 제시하는 위험성 지수의 각 개념들에 의해 정의되는 최종적인 위험성 지수를 산출한다. The step of calculating the final risk index (S400) calculates the final risk index defined by each concept of the risk index presented in the present invention described above.

예컨대, 상기 S200 단계가 존재하는 경우, 상기 S200 단계에서 산출된 값들을 합산하는 비교적 단순한 계산을 수행할 수 있다. 반면, 상기 S200 단계가 생략된 경우에는 상기 S100 단계에서 얻어진 각 위험성 파라미터들에 각 가중치를 반영하여 합산하는 방식의 계산을 수행할 수 있다.For example, when the step S200 exists, a relatively simple calculation of summing the values calculated in the step S200 may be performed. On the other hand, when the step S200 is omitted, it is possible to perform a calculation in a way that each weight is reflected and added to each risk parameter obtained in the step S100.

상기 위험성 지수를 시각적으로 출력하는 단계(S600)에서는, 관리자에게 담당하는 지역(지사)의 모든 작업(공사)들에 대하여 본 발명의 사상에 따른 위험성 지수로 정리된 리포트를 제공할 수 있다.In the step (S600) of visually outputting the risk index, it is possible to provide a report organized by the risk index according to the spirit of the present invention for all operations (construction) in the area (branch) responsible for the manager.

또한, 상기 위험성 지수를 시각적으로 출력하는 단계(S600)에서는, 감전, 떨어짐, 넘어짐, 맞음, 끼임 등 유형별 안전사고 분석 보고서를 적용할 수 있다.In addition, in the step (S600) of visually outputting the risk index, a safety accident analysis report for each type such as electric shock, fall, fall, hit, and jam can be applied.

상기 경감 지수를 해당 작업(공사)에서 가중 지수의 상황에 대처하여 수행한 것에 대한 사후 판정으로 이용하는 구현의 경우, 상기 위험성 지수를 시각적으로 출력하는 단계(S600)에서는, 종합적인 위험성 지수에 가중 지수만 반영한 최종적인 위험성 지수를 디스플레이하고, 종합적인 위험성 지수에 가중 지수 및 경감 지수를 반영한 최종적인 위험성 지수를 디스플레이하는 방식으로, 2회 출력을 수행할 수 있다.In the case of an implementation using the mitigation index as a post-judgment for what was performed in response to the situation of the weighted index in the corresponding work (construction), in the step (S600) of visually outputting the risk index, the weighted index to the overall risk index By displaying the final risk index reflecting only

예컨대, 해당 작업(공사)의 당일날 작업(공사)가 수행되기 전인 아침에는 종합적인 위험성 지수에 가중 지수만을 부여한 최종적인 위험성 지수를 관리자에게 제공(디스플레이)하고, 작업(공사)가 수행된 오후에는 종합적인 위험성 지수에 가중 지수 및 경감 지수를 부여한 최종적인 위험성 지수를 관리자에게 제공(디스플레이)할 수 있다. For example, on the day of the work (construction), in the morning before the work (construction) is performed, the final risk index in which only the weighted index is given to the overall risk index is provided (displayed) to the manager, and the work (construction) is performed in the afternoon can provide (display) the final risk index to which the weighted index and mitigation index are assigned to the overall risk index.

그래서, 상기 관리자가 위험성 경감 지수를 반영한 위험성 지수 수치와 반영되지 않은 위험성 지수 수치의 차이를 통해서, 각 지사(또는 협력업체)에서 얼마나 위험성을 인지하고 대응했는지를 수치화하여 인식할 수 있다.So, through the difference between the risk index value that reflects the risk reduction index and the risk index value that is not reflected by the manager, it is possible to quantify and recognize how much risk has been recognized and responded to by each branch (or partner company).

구현에 따라, 상기 위험성 지수를 시각적으로 출력하는 단계(S600)에서는, 인적 위험도 지수에 따라 관리자의 대응 지침을 마련하여 제시할 수 있다. 예컨대, 특정 위탁 업무에 대한 인적 위험도 지수가 50이하이면 해당 일 또는 해당 작업의 금지, 50 이상 60 이하이면 감독자 참여 필수, 60 이상 70 이하이면 사전 및 사후 감독자 점검 필수, 70 이상인 경우 수탁 업체 자율에 따라 작업 가능 등으로 구분할 수 있다. 이는 특히 상술한 작업(공사)가 수행되기 전에 종합적인 위험성 지수에 가중 지수만을 부여한 최종적인 위험성 지수를 관리자에게 제공(디스플레이)하는 경우에 적용하는 것이 유리하다.Depending on the implementation, in the step of visually outputting the risk index ( S600 ), the manager's response guideline may be prepared and presented according to the human risk index. For example, if the human risk index for a specific consignment job is 50 or less, the job or the work is prohibited. If it is 50 or more and 60 or less, supervisor participation is required. If it is 60 or more and 70 or less, pre- and post supervisor inspection is required. It can be classified according to workability, etc. This is particularly advantageous in the case of providing (displaying) the final risk index in which only the weighted index is given to the overall risk index before the above-mentioned work (construction) is performed.

구현에 따라, 상기 위험성 지수를 시각적으로 출력하는 단계(S600)에서는, 하기 표 1과 같은 위험성 지수 수치 및 위험성 지수 단계별 대응 매뉴얼을 상기 위험성 지수 리포트와 함께 출력(디스플레이)할 수 있다.According to the implementation, in the step of visually outputting the risk index (S600), the risk index numerical value and the risk index step-by-step response manual as shown in Table 1 below may be output (displayed) together with the risk index report.

[표 1][Table 1]

Figure pat00001
Figure pat00001

구현에 따라, 상기 위험성 지수를 시각적으로 출력하는 단계(S600)에서는, 전력회사의 본부나 사업소별로 정리된 리포트를 상위 관리자에게 제공할 수 있다. 예컨대, 도 3에 도시한 바와 같은 전력 회사 전체 위험성 지수를 표시하기 위한 본부, 사업소별 막대그래프 이미지를 디스플레이할 수 있다. 도 3에서는 관심(파란), 주의(노란), 경계(주황), 심각(빨간)으로 위험성 단계에 맞는 막대그래프(색)·수치로 표시하고 있다. 도 3에서 본부별 막대그래프 클릭시 사업소 위험성지수 상세표시가 디스플레이되도록(사업소 평균값으로 도 3과 유사하게 막대그래프(색), 수치표시) 구현할 수 있다.Depending on the implementation, in the step of visually outputting the risk index ( S600 ), a report organized by headquarters or business office of a power company may be provided to a senior manager. For example, it is possible to display a bar graph image for each headquarters and business office for displaying the overall risk index of the electric power company as shown in FIG. In FIG. 3, interest (blue), caution (yellow), alert (orange), and serious (red) are indicated by bar graphs (color) and numerical values corresponding to risk levels. 3, it can be implemented so that the detailed display of the business risk index is displayed when the bar graph for each headquarters is clicked (bar graph (color), numerical display similar to FIG. 3 as the average value of the business office).

도 4는 각 사업소 별로 위험성 지수를 시각적으로 표현한 이미지이다. 도 4의 이미지는 사업소나, 본부별, 또는 협력업체별로 제공될 수 있으며, 도 3에서 각 막대그래프를 클릭시 디스플레이되도록 구현할 수도 있다.4 is an image visually expressing the risk index for each business office. The image of FIG. 4 may be provided for each business office, headquarters, or partner company, and may be implemented to be displayed when each bar graph in FIG. 3 is clicked.

도 5는 가중 지수 및 경감 지수를 반영하는 과정을 상세히 나타낸 흐름도이다.5 is a flowchart illustrating in detail a process of reflecting a weighting index and a reducing index.

도시한 흐름도에 따른 위험성 지수 관리 방법에서, 도 2의 상기 위험성 지수를 산출하는 단계(S400)는, 위험성 지수에 반영할 가중 지수와 경감 지수를 설정하는 단계; 종합적인 위험성 지수에 가중 지수를 반영하는 단계(S220); 및 상기 가중 지수가 반영된 종합적인 위험성 지수에 경감 지수를 반영하는 단계(S260)를 포함할 수 있다.In the risk index management method according to the illustrated flowchart, the step of calculating the risk index of FIG. 2 (S400) includes the steps of setting a weighting index and a reduction index to be reflected in the risk index; Reflecting the weighted index to the comprehensive risk index (S220); And it may include a step (S260) of reflecting the reduction index to the comprehensive risk index reflected the weighting index.

구현에 따라, 상기 가중 지수와 경감 지수를 설정하는 단계(S210)는, 위험성 지수 시스템의 구축 과정에서 미리 수행되고, 개별 작업(공사)에 대한 위험성 지수 관리 방법에서는 생략될 수도 있다.Depending on the implementation, the step of setting the weighting index and the reduction index (S210) is performed in advance in the process of building the risk index system, and may be omitted in the risk index management method for individual tasks (construction).

상기 가중 지수와 경감 지수를 설정하는 단계(S210)에서는, 예상되는 안정성 악화 예외 상황들에 대하여 부여할 가중 지수 값을 설정하고, 관리자의 주관적 판단에 따라 가중 지수 값에 반영가능한 범위를 설정할 수 있다.In the step (S210) of setting the weighting index and the reduction index, the weighted index value to be given to the expected stability deterioration exception situations is set, and a range that can be reflected in the weighted index value can be set according to the subjective judgment of the manager. .

또한, 경감 지수에 대하여는, 관련 인원들이 예상되는 안정성 악화 예외 상황들에 대하여 취할 수 있는 조치들을 나열하고, 각 조치들에 대하여 부여할 경감 지수 값을 설정할 수 있다.In addition, for the mitigation index, it is possible to list the measures that the relevant personnel can take for the expected stability deterioration exception situations, and set the mitigation index value to be given for each measure.

상기 가중 지수를 반영하는 단계(S220)에서는 작업 안전을 위협하는 일상적이지 않은 상황이 발생하면, 해당 작업(공사)에 대하여 위험성 지수에 대한 가중 지수를 반영한다. In the step of reflecting the weighted index (S220), if an unusual situation threatening work safety occurs, the weighted index for the risk index is reflected for the corresponding work (construction).

예컨대, 가중 지수로서, 인적인 변화에 따라서 갑작스런 편조인원 대한 변화(기존 회사소속 인력아님)가 생기거나, 해당 인원(들)이 평소 할수 있는 공사 건수를 초과하거나, 공사 유형중에 간접 활선, 무정전 작업등이 하루 과다하거나, 날씨 파라미터(온도, 바람, 태풍등)가 평상시 기준 기간(봄/여름/가을/겨울) 평균치를 초과하거나 낮거나 하는 등의 상황 발생시, 이를 반영할 수 있다.For example, as a weighting index, a sudden change in the number of braided workers (not the existing company personnel) occurs according to a personal change, the number of works that the person(s) can usually do exceeds, or indirect live wire, uninterrupted work, etc. This may be reflected when a situation such as excessive one day or a weather parameter (temperature, wind, typhoon, etc.) exceeding or lowering the average value of the normal reference period (spring/summer/autumn/winter) occurs.

상기 가중 지수를 반영하는 단계(S220)에서 필요한 정보들은, 날씨 파라미터 등 전산적으로 자동입력이 가능한 변수의 경우, 시스템에서 해당 조건이 만족되면 자동으로 수행하고, 작업자의 컨디션 등 인간의 판단이 필요한 변수의 경우, 관리자가 이를 입력하도록 구현할 수 있다.In the case of variables that can be automatically entered computationally, such as weather parameters, the information necessary in the step (S220) of reflecting the weighting index is automatically performed when the corresponding conditions are satisfied in the system, and human judgment such as the condition of the operator is required. For variables, it can be implemented to be entered by the administrator.

상기 가중 지수를 반영하는 단계(S220)에서는 전혀 예정되지 않은 상황이 발생된 경우, 관리자가 소정의 가중 지수값을 입력하도록 구현할 수도 있다.In the step of reflecting the weighted index ( S220 ), when an unexpected situation occurs, an administrator may input a predetermined weighted index value.

상기 경감 지수를 반영하는 단계(S260)에서는 상기 경감 지수를 예외적으로 발생된 가중 상황에 대하여 관련 인원들이 대응하는 활동에 대한 평가로서 반영할 수 있다. In the step of reflecting the mitigation index ( S260 ), the mitigation index may be reflected as an evaluation of the activity corresponding to the activities of the relevant personnel in the exceptionally generated aggravating situation.

예컨대, 상기 가중 상황에 대한 반작용으로 각 지사(또는 협력업체)에서 지사장, 차부장, 직원들이 조를 편성해서 순시를 실시하고, 해당 협력업체(전문회사) 사장에게 문자 통보 등 대응조치 활동을 경감 지수로 수치화하여 반영할 수 있다.For example, as a reaction to the above aggravated situation, the branch manager, deputy manager, and employees at each branch (or subcontractor) form a group and conduct a patrol, and reduce countermeasure activities such as text message notification to the president of the subcontractor (specialized company). can be quantified and reflected.

예컨대, 해당 작업(공사)에 대하여, 협력업체가 아닌 제3의 감리업체에서 감리가 진행된 경우, 이를 경감 지수로 수치화하여 반영할 수 있다.For example, in the case where supervision of the work (construction) is performed by a third-party supervisory company rather than a partner company, this can be quantified as a reduction index and reflected.

구현에 따라, 상기 경감 지수를 반영하는 단계(S260)에서는 상기 관련 인원들이 대응하는 활동에 대하여 확인하는 단계를 수행할 수 있다. 이는 위험성 지수에 대한 경감 지수의 증거(근거)를 명확화하기 위함이다. 예컨대, 전문회사(협력업체)도 사장등 임원이 순시를 시행하였음을 근거로 경감 지수가 제시된 경우, 순시 사진을 등록하게 하고, 등록된 순시 사진에 파일속성에 현장 사진 시간, 위치기록이 실제 공사현장인지 일치 여부를 확인할 수 있다. 이는 사진을 촬영한 스마트폰의 위치태그 설정 사진 등록 기능을 이용하여 구현할 수 있다. 예컨대, 전문회사(하청 업체)도 사장등 임원이 순시를 시행하였음을 근거로 경감 지수가 제시된 경우, 순시 사진을 등록하게 하고, 등록된 순시 사진에 파일속성에 현장 사진 시간, 위치기록이 실제 공사현장인지 일치 여부를 확인할 수 있다.Depending on the implementation, in the step of reflecting the mitigation index ( S260 ), the step of confirming the activity corresponding to the relevant personnel may be performed. This is to clarify the evidence (evidence) of the mitigation index for the risk index. For example, if a reduction index is presented on the basis that an executive such as the president of a specialized company (partner company) conducted a patrol, it is required to register an instantaneous photo, and in the registered instantaneous photo, the on-site photo time and location record are the actual construction work. You can check whether it is on-site or not. This can be implemented using the location tag setting photo registration function of the smartphone that took the photo. For example, a specialized company (subcontractor) is also required to register an instantaneous photo when a reduction index is presented based on the fact that an executive such as the president conducted an inspection. You can check whether it is on-site or not.

상술한 바와 같이 종합적인 위험성 지수에 가중/경감 지수를 적용하는 경우, 최종적인 위험성 지수를 산출하는 수학식을 예시하면 하기 수학식 1과 같다.As described above, when the weighting/reducing index is applied to the overall risk index, an example of an equation for calculating the final risk index is as shown in Equation 1 below.

[수학식 1][Equation 1]

최종적인 위험성 지수 = 종합적인 위험성 지수 + 가중 지수 - 경감 지수Final Risk Index = Comprehensive Risk Index + Weighted Index - Mitigation Index

하기 표 2는 상기 수학식 1에 따른 위험성 지수의 산출 방식을 예시하여 나타낸 것이며, DB등에도 이와 유사한 형태로 저장될 수 있다.Table 2 below exemplifies the calculation method of the risk index according to Equation 1, and may be stored in a DB or the like in a similar form.

[표 2][Table 2]

Figure pat00002
Figure pat00002

도 6a는 경감 조치 증명 수단으로서 협력업체 임원 점검을 촬영한 사진이고, 도 6b는 경감 조치 증명 수단으로서 보호장구 착용 사진이며, 도 6c는 경감 조치 증명 수단으로서 추락 위험발생개소의 안전조치 사진이다.Figure 6a is a photograph taken of the inspection of an executive of a partner company as a means of proof of mitigation measures, Figure 6b is a photograph of wearing protective gear as means of proof of reduction measures, Figure 6c is a photograph of safety measures at the point of risk of falling as means of proof of reduction measures.

상기 표 2에서 1번 작업의 경우 경감지수 획득을 위한 활동의 입증으로서 도 6a와 같은 사진을 제시할 수 있고, 2번 작업의 경우 경감지수 획득을 위한 활동의 입증으로서 도 6b와 같은 사진을 제시할 수 있다. 한편, 표 2의 3번 작업의 경우에는 감리회사가 별도로 입력하는 정보나 보고서 파일을 근거로 확인할 수 있다.In Table 2, in the case of task 1, a photo as shown in Figure 6a can be presented as proof of the activity for obtaining the relief index, and in the case of task 2, the photo as shown in Figure 6b is presented as proof of the activity for obtaining the relief index can do. On the other hand, in the case of task 3 in Table 2, it can be confirmed based on information or report files separately input by the supervisory company.

상술한 바와 같은 본 발명의 사상에 따른 안전 경영을 위한 위험성 지수 시스템/방법은, 이용되는 개별 위험성 파라미터들을 전력회사 내/외에서 활용하고 있는 각종 예측 시스템에서 이용하는 파라미터들을 추가하는 방식으로 벤치마킹 및 응용·추가 업그레이드가 가능하다.The risk index system / method for safety management according to the spirit of the present invention as described above is benchmarking and applying / Additional upgrades are possible.

또한, 본 발명의 사상에 따라 산출되는 위험성 지수는 전력수급 비상 단계별 조치 매뉴얼이나, 공사현장 실시간모니터링 시스템 등에 제공되어 안전경영 실현에 이용될 수 있다. In addition, the risk index calculated according to the spirit of the present invention can be provided to a power supply and demand emergency step-by-step action manual or a real-time monitoring system for construction sites and used to realize safety management.

본 발명이 속하는 기술 분야의 당업자는 본 발명이 그 기술적 사상이나 필수적 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있으므로, 이상에서 기술한 실시 예들은 모든 면에서 예시적인 것이며 한정적인 것이 아닌 것으로서 이해해야만 한다. 본 발명의 범위는 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 등가개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.Those skilled in the art to which the present invention pertains should understand that the present invention may be embodied in other specific forms without changing the technical spirit or essential characteristics thereof, so the embodiments described above are illustrative in all respects and not restrictive. only do The scope of the present invention is indicated by the following claims rather than the detailed description, and all changes or modifications derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention. .

110 : 위험성 근거 정보 수집부
140 : 위험성 지수 산출부
160 : 위험성 지수 출력부
180 : 제어부
190 : 저장부
110: risk basis information collection unit
140: risk index calculation unit
160: risk index output unit
180: control unit
190: storage

Claims (18)

전력 분야의 위탁 업무에 대한 위험성 지수를 산출하는데 필요한 위험성 근거 정보들을 수집하는 위험성 근거 정보 수집부;
상기 위험성 근거 정보들로부터 특정 시점의 위탁 업무에 대한 위험성 지수를 산출하는 위험성 지수 산출부;
상기 위험성 지수를 상기 위탁 업무에 대한 관리자에게 시각적으로 출력하는 위험성 지수 출력부; 및
상기 위험성 근거 정보들 및 상기 위험성 지수를 기록 및 관리하는 제어부
를 포함하는 안전 경영을 위한 위험성 지수 시스템.
a risk-based information collection unit that collects risk-based information necessary to calculate a risk index for entrusted work in the power sector;
a risk index calculation unit for calculating a risk index for entrusted work at a specific time from the risk-based information;
a risk index output unit for visually outputting the risk index to a manager for the consignment work; and
A control unit that records and manages the risk basis information and the risk index
A risk index system for safety management, including
제1항에 있어서,
상기 위험성 지수는 위탁 업무에 대한 수임업체의 작업자에 기인한 인적 위험성 지수를 포함하며,
상기 인적 위험성 지수는,
상기 작업자의 경력 정보 및 상기 위탁 업무에 대한 상기 작업자의 실적 정보에 따라 산출되는 안전 경영을 위한 위험성 지수 시스템.
According to claim 1,
The risk index includes a human risk index due to the worker of the contracting company for the consignment work,
The human risk index is
A risk index system for safety management calculated according to the worker's career information and the worker's performance information for the consigned work.
제2항에 있어서,
상기 위험성 지수는,
환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수
를 더 포함하는 안전 경영을 위한 위험성 지수 시스템.
3. The method of claim 2,
The risk index is
Environmental Risk Index, Occupational Risk Index, and Statistical Risk Index
Risk index system for safety management further comprising.
제3항에 있어서,
도시한 위험성 지수 산출부는,
각 항목별 위험성 파라미터들에 가중치를 반영하여 합산하는 방식으로, 위험성 지수를 구성하는 인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 각각 산출하고,
산출된 각 항목별 위험성 지수를 합산하여 종합적인 위험성 지수를 산출하는 안전 경영을 위한 위험성 지수 시스템.
4. The method of claim 3,
The illustrated risk index calculation unit,
The human risk index, the environmental risk index, the work risk index, and the statistical risk index that constitute the risk index are calculated in a way that reflects and sums the risk parameters for each item, respectively,
A risk index system for safety management that calculates a comprehensive risk index by adding up the calculated risk index for each item.
제4항에 있어서,
도시한 위험성 지수 산출부는,
위험성 지수에 대한 가중 지수 및 경감 지수를 상기 종합적인 위험성 지수 또는 각 항목별 위험성 지수에 반영하여 최종적인 위험성 지수를 산출하는 안전 경영을 위한 위험성 지수 시스템.
5. The method of claim 4,
The illustrated risk index calculation unit,
A risk index system for safety management that calculates the final risk index by reflecting the weighted index and mitigation index for the risk index in the overall risk index or the risk index for each item.
제5항에 있어서,
상기 위험성 지수 출력부는,
상기 위탁 업무 수행전에, 상기 종합적인 위험성 지수에 가중 지수만 반영한 최종적인 위험성 지수를 디스플레이하고,
상기 위탁 업무 수행후에, 상기 종합적인 위험성 지수에 상기 가중 지수 및 상기 경감 지수를 반영한 최종적인 위험성 지수를 디스플레이하는 안전 경영을 위한 위험성 지수 시스템.
6. The method of claim 5,
The risk index output unit,
Before performing the consignment work, display the final risk index reflecting only the weighted index in the overall risk index,
After performing the consignment work, a risk index system for safety management that displays the final risk index reflecting the weighting index and the mitigation index in the overall risk index.
제1항에 있어서,
상기 위험성 지수 출력부는,
감전, 떨어짐, 넘어짐, 맞음, 끼임 등 유형별로 안전사고 분석 보고서를 작성하고 제공하는 안전 경영을 위한 위험성 지수 시스템.
According to claim 1,
The risk index output unit,
A risk index system for safety management that prepares and provides safety accident analysis reports by type such as electric shock, fall, fall, hit, and jamming.
제1항에 있어서,
상기 위험성 근거 정보 수집부는,
위탁업체의 공사를 지원 및 관리하는 부서의 서버에서 위탁 업무에 대한 관련 정보들을 수집하고, 상기 위탁업체의 협력업체 및 외부 작업자를 관리하는 부서의 서버에서 협력업체 및 외부 작업자에 대한 정보를 수집하는 안전 경영을 위한 위험성 지수 시스템.
According to claim 1,
The risk-based information collection unit,
It collects information about consigned work from the server of the department that supports and manages the construction of the consigned company, and collects information about the subcontractor and external workers from the server of the department that manages the subcontractor and external workers of the consigned company. Risk index system for safe management.
제1항에 있어서,
상기 제어부는,
위험성 근거 정보들 및 상기 위험성 지수를 저장하기 위한 저장부
를 포함하는 안전 경영을 위한 위험성 지수 시스템.
According to claim 1,
The control unit is
Storage unit for storing risk basis information and the risk index
A risk index system for safety management, including
전력 분야의 위탁 업무에 대한 위험성 지수를 산출하는데 필요한 위험성 근거 정보들을 수집하는 단계;
상기 위험성 근거 정보들을 위험성 파라미터들로 정리하는 단계;
상기 위험성 파라미터들로부터 특정 시점의 위탁 업무에 대한 최종적인 위험성 지수를 산출하는 단계; 및
상기 위험성 지수를 상기 위탁 업무에 대한 관리자에게 시각적으로 출력하는 단계
를 포함하는 안전 경영을 위한 위험성 지수 관리 방법.
collecting risk-based information necessary to calculate a risk index for entrusted work in the power sector;
arranging the risk basis information into risk parameters;
calculating a final risk index for the entrusted task at a specific time from the risk parameters; and
Visually outputting the risk index to a manager for the entrusted task
A risk index management method for safety management, including
제10항에 있어서,
상기 위험성 파라미터들로 정리하는 단계 이후, 상기 최종적인 위험성 지수를 산출하는 단계 이전에,
위험성 지수에 대하여 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계
를 더 포함하는 안전 경영을 위한 위험성 지수 관리 방법.
11. The method of claim 10,
After the step of arranging the risk parameters, before the step of calculating the final risk index,
reflecting at least one of a weighted index and a mitigation index for the risk index
Risk index management method for safety management further comprising.
제10항에 있어서,
상기 위험성 파라미터들로 정리하는 단계에서는,
외부 서버 등으로부터 수집한 정보/데이터들을 위험성 지수 산출을 위한 포맷에 맞추어 스케일링하고, 각 정보/데이터의 시간적 유효성을 확인하거나 각 정보/데이터의 생성 시각을 동기화하는 안전 경영을 위한 위험성 지수 관리 방법.
11. The method of claim 10,
In the step of organizing the risk parameters,
A risk index management method for safety management that scales information/data collected from external servers according to the format for calculating the risk index, checks the temporal validity of each information/data, or synchronizes the creation time of each information/data.
제10항에 있어서,
상기 최종적인 위험성 지수를 산출하는 단계에서는,
위험성 파라미터들로 정리하는 단계에서 얻어진 각 위험성 파라미터들에 각 가중치를 반영하여 합산하는 방식의 계산을 수행하는 안전 경영을 위한 위험성 지수 관리 방법.
11. The method of claim 10,
In the step of calculating the final risk index,
A risk index management method for safety management that calculates each risk parameter obtained in the step of arranging the risk parameters by reflecting each weight and adding them up.
제11항에 있어서,
상기 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계에서는,
각 항목별 위험성 파라미터들에 가중치를 반영하여 합산하는 방식으로, 위험성 지수를 구성하는 인적 위험성 지수, 환경 위험성 지수, 업무 위험성 지수, 및 통계적 위험성 지수를 각각 산출하고, 산출된 각 항목별 위험성 지수를 합산하여 산출된 종합적인 위험성 지수에 대하여,
상기 가중 지수 및 상기 경감 지수 중 적어도 하나를 상기 종합적인 위험성 지수 또는 각 항목별 위험성 지수에 반영하는 안전 경영을 위한 위험성 지수 관리 방법.
12. The method of claim 11,
In the step of reflecting at least one of the weighting index and the relief index,
The human risk index, environmental risk index, work risk index, and statistical risk index, which constitute the risk index, are calculated in a way that reflects and sums the risk parameters for each item, and calculates the risk index for each item. For the overall risk index calculated by summing,
A risk index management method for safety management in which at least one of the weighting index and the reduction index is reflected in the overall risk index or the risk index for each item.
제14항에 있어서,
상기 가중 지수 및 경감 지수 중 적어도 하나를 반영하는 단계는,
상기 가중 지수와 상기 경감 지수를 설정하는 단계;
상기 종합적인 위험성 지수에 상기 가중 지수를 반영하는 단계; 및
상기 가중 지수가 반영된 종합적인 위험성 지수에 상기 경감 지수를 반영하는 단계
를 포함하는 안전 경영을 위한 위험성 지수 관리 방법.
15. The method of claim 14,
The step of reflecting at least one of the weighting index and the alleviation index comprises:
setting the weighting index and the relief index;
reflecting the weighted index in the overall risk index; and
Reflecting the mitigation index in the comprehensive risk index reflecting the weighting index
A risk index management method for safety management, including
제15항에 있어서,
상기 가중 지수를 반영하는 단계에서는,
작업 안전을 위협하는 일상적이지 않은 상황이 발생하면, 해당 위탁 업무의 위험성 지수에 대하여 가중 지수를 반영하는 안전 경영을 위한 위험성 지수 관리 방법.
16. The method of claim 15,
In the step of reflecting the weighting index,
A risk index management method for safety management that reflects a weighted index for the risk index of the entrusted work when an unusual situation that threatens work safety occurs.
제16항에 있어서,
상기 경감 지수를 반영하는 단계에서는,
상기 경감 지수를 예외적으로 발생된 가중 상황에 대하여 관련 인원들이 대응하는 활동에 대한 평가로서 반영하는 안전 경영을 위한 위험성 지수 관리 방법.
17. The method of claim 16,
In the step of reflecting the reduction index,
A risk index management method for safety management in which the mitigation index is reflected as an evaluation of the activities of the relevant personnel in response to an aggravated situation that occurs exceptionally.
제17항에 있어서,
상기 경감 지수를 반영하는 단계에서는,
상기 관련 인원들이 대응하는 활동에 대하여 확인하는 단계를 수행하는 안전 경영을 위한 위험성 지수 관리 방법.
18. The method of claim 17,
In the step of reflecting the reduction index,
A risk index management method for safety management in which the relevant personnel perform a step of confirming the corresponding activities.
KR1020210015618A 2021-02-03 2021-02-03 Risk index system and risk index management method for safeey management KR20220112083A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210015618A KR20220112083A (en) 2021-02-03 2021-02-03 Risk index system and risk index management method for safeey management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210015618A KR20220112083A (en) 2021-02-03 2021-02-03 Risk index system and risk index management method for safeey management

Publications (1)

Publication Number Publication Date
KR20220112083A true KR20220112083A (en) 2022-08-10

Family

ID=82846743

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210015618A KR20220112083A (en) 2021-02-03 2021-02-03 Risk index system and risk index management method for safeey management

Country Status (1)

Country Link
KR (1) KR20220112083A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100685704B1 (en) 2005-01-22 2007-02-23 (주)케이디티 A method for calculating power parameters using fuzzy algorithm technology for information visualization of power-receiving/switching boards

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100685704B1 (en) 2005-01-22 2007-02-23 (주)케이디티 A method for calculating power parameters using fuzzy algorithm technology for information visualization of power-receiving/switching boards

Similar Documents

Publication Publication Date Title
Raviv et al. AHP-based analysis of the risk potential of safety incidents: Case study of cranes in the construction industry
Van Der Molen et al. Interventions to prevent injuries in construction workers
Zhou et al. Tower crane safety on construction sites: A complex sociotechnical system perspective
Cambraia et al. Identification, analysis and dissemination of information on near misses: A case study in the construction industry
Teo et al. The indirect effect of safety investment on safety performance for building projects
Li et al. Ranking the risks from multiple hazards in a small community
Mohandes et al. Occupational Health and Safety in Modular Integrated Construction projects: The case of crane operations
Marhani et al. OHSAS 18001: A pilot study of towards sustainable construction in Malaysia
Zekri Construction safety and health performance in Dubai
US11818801B2 (en) System to monitor and process risk relationship sensor data
JP2004280444A (en) Disaster risk evaluation system and method for supporting evaluation of disaster risk
KR20160049232A (en) Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project
KR20220112083A (en) Risk index system and risk index management method for safeey management
Guidry et al. Business continuity and disaster management: Mitigating the socioeconomic impacts of facility downtime after a disaster
Tarigan et al. Operational risk analysis of network Operation Center Division pt. IO
Kozarević et al. RISK Management in telecommunications services in Bosnia and Herzegovina
Bottomley OHSMS Performance measures that add up
Assbeihat et al. Construction safety in Jordan–conditions and obstacles
Tchórzewska-Cieślak et al. Developing procedures for hazard identification
Reis et al. Case study of risk assessment in single family housing
Inoguchi et al. Clarifying the transition of workload for victims life reconstruction support programs in affected local governments using the victims master database—Comparison between the 2007 Chuetsu-oki earthquake and the 2016 Kumamoto Earthquake
Justyna Economic Aspects of Analysis of Occurrence of Incidential Events on the Scope of Security of Information in a Production Enterprise
Nowfal et al. Investigation of health and safety measures in construction sites in Lebanon and Northern Cyprus
McGinn et al. Integrated worker risk evaluation system
Al Shaaili et al. Near-miss accidents data analysis and knowledge dissemination in water construction projects in Oman