KR20160049232A - Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project - Google Patents

Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project Download PDF

Info

Publication number
KR20160049232A
KR20160049232A KR1020140145754A KR20140145754A KR20160049232A KR 20160049232 A KR20160049232 A KR 20160049232A KR 1020140145754 A KR1020140145754 A KR 1020140145754A KR 20140145754 A KR20140145754 A KR 20140145754A KR 20160049232 A KR20160049232 A KR 20160049232A
Authority
KR
South Korea
Prior art keywords
hse
management
safety
health
plant construction
Prior art date
Application number
KR1020140145754A
Other languages
Korean (ko)
Inventor
손혜진
문병석
제갈홍
Original Assignee
한국수력원자력 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국수력원자력 주식회사 filed Critical 한국수력원자력 주식회사
Priority to KR1020140145754A priority Critical patent/KR20160049232A/en
Publication of KR20160049232A publication Critical patent/KR20160049232A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Computer Security & Cryptography (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The present invention relates to a method for constructing health, safety and environment management processes modeling on a nuclear power plant construction project. The method comprises the steps of: planning health, safety and environment (HSE) such that systematic and efficient businesses can be performed throughout HSE fields on the nuclear power plant construction project; performing and operating the HSE plan; checking the HSE plan; and managing the performance of the HSE plan. By using a process system for managing HSE on the nuclear power plant construction project and a system related thereto, the HSE plan can be integrally and efficiently managed.

Description

원전 건설 안전보건환경관리 프로세스 모델링 구축 방법{Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project}Technical Field [0001] The present invention relates to a nuclear power plant,

본 발명은 원자력 발전소 건설 안전보건환경 분야에 걸쳐 체계적이며 효율적인 업무가 가능하도록 HSE(Health, Safety, Environment)를 기획하는 단계와, HSE 이행 및 운영을 수행하는 단계와, HSE를 점검하는 단계와, HSE 성과를 관리하는 단계로 크게 4 개로 분류된 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법에 관한 것이다.The present invention relates to the steps of planning HSE (Health, Safety, Environment) so that systematic and efficient work can be done in the field of nuclear power plant construction safety and health environment, performing HSE implementation and operation, checking HSE, HSE performance management is classified into 4 stages, which are classified into 4 stages.

원자력 발전소 건설현장의 안전보건환경관리 업무는 건설공사 현장의 산업재해와 종사자의 건강장해를 예방하고 안전사고 후속조치에 대한 업무에 대하여 처리하고 있다. The safety and health environment management work at the construction site of the nuclear power plant prevents the industrial disasters at the construction site and the health hazards of the workers and handles the work on safety accidents follow-up measures.

안전보건관리와 관련한 업무는 교육, 안전보건활동(안전관리비, 작업통보), 비상시 대비 및 대응, 모니터링, 안전사고 보고 및 조사에 대해서 일부 활동에만 국한하여 업무를 처리하고 있어 건설소 안전보건 전체 활동에 관한 내용을 충분히 반영할 필요가 있다.The work related to safety and health management is limited to some activities only for education, safety and health activities (safety management fee, job notification), emergency preparedness and response, monitoring, safety accident report and investigation. It is necessary to fully reflect the contents of

대한민국 공개특허공보 제10-2014-0054037호에 참여자가 수집된 데이터 및 샘플에 대한 조기 액세스에 의해 장려되는 조사를 수행하는 방법 및 조사 데이터를 분배하는 방법이 제공되어 있으나, 본 발명에서의 HSE를 기획하는 제1 단계는 보다 상세하게 HSE 목표 및 기본계획을 운영하는 단계와, HSE 법규 및 준수를 평가하는 단계와, HSE 관리계획 수립 및 운영하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 제공하는 것과는 기술적 구성 및 효과에서 차이가 있다. Korean Patent Laid-Open Publication No. 10-2014-0054037 discloses a method of performing an investigation and a method of distributing survey data encouraged by participants with early access to collected data and samples, The first stage of planning is to construct the nuclear construction safety and health environment management process modeling including the steps of operating the HSE objectives and basic plan, evaluating HSE regulations and compliance, and establishing and operating an HSE management plan. There is a difference in technical structure and effect from providing a method.

대한민국 공개특허공보 제특2002-0023312호에 대상시설 기기의 이상 상태가 발생하면 이를 종합제어실(10)이 판단하고 제어하며, 경보변수정보는 대상자에게 즉시 전송되는 동시에 전송받은 대상자는 상기 종합제어실로 피드백 전송하고, 사용자가 자신의 조직 및 기기의 경영환경, IT환경, 경보변수, 업무정보 등 전송정보를 입력하면 이 입력결과는 타스크 스케줄러(20)에서 새로운 사례로 취급되어 사례가 사례기반추론 프로세서(30)에 전달되고, 상기 사례기반추론 프로세서(30)는 새로운 사례의 속성들 중에서 독특한 속성을 골라 인덱스를 부여하고, 그 인덱스 속성값과 가장 유사한 사례들을 과거 경보정보 위험요인 분석사례 데이터 베이스에서 검색하여 유사도를 계산하는 구성이 제공되어 있으나, 본 발명에서의 HSE를 기획하는 제1 단계는 보다 상세하게 HSE 목표 및 기본계획을 운영하는 단계와, HSE 법규 및 준수를 평가하는 단계와, HSE 관리계획 수립 및 운영하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 제공하는 것과는 기술적 구성 및 효과에서 차이가 있다. Korean Patent Application Publication No. 2002-0023312 discloses that when an abnormal state of a target facility device is detected and controlled by the general control room 10, the alarm variable information is immediately transmitted to the target person, and at the same time, And inputs the transmission information such as the management environment, the IT environment, the alarm parameters, and the job information of the user's own organization and device, the input result is treated as a new case in the task scheduler 20, 30, and the case-based reasoning processor 30 assigns an index to a unique attribute among the attributes of the new case and searches for cases most similar to the index attribute value in the past alert information risk factor analysis case database The degree of similarity is calculated. However, in the first step of planning the HSE in the present invention, Providing a method for establishing nuclear plant construction safety and health management process modeling, including the stages of operating HSE objectives and basic plans, evaluating HSE regulations and compliance, and establishing and operating an HSE management plan, There is a difference in effectiveness.

본 발명이 해결하려는 과제로 HSE를 기획하는 제1 단계는 보다 상세하게 HSE 목표 및 기본계획을 운영하는 단계와, HSE 법규 및 준수를 평가하는 단계와, HSE 관리계획 수립 및 운영하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 제공하는데 있다. The first step in planning the HSE is to operate the HSE objectives and basic plan in more detail, to evaluate HSE regulations and compliance, and to establish and operate an HSE management plan. And to provide a method for constructing nuclear plant construction safety and health environment management process modeling.

본 발명이 해결하려는 또 다른 과제는 안전보건환경관리시스템 구축 방법을 통해 안전보건환경프로세스의 기획, 이행 및 운영, 점검, 성과를 관리에 이르기까지 일련의 업무흐름을 체계적으로 명시하여 관리할 수 있는 방법을 제공함에 있다. Another task to be solved by the present invention is to provide a method for systematically specifying and managing a series of workflows from the planning, implementation, operation, inspection, and management of safety and health environmental processes through the establishment of the safety and health environment management system Method.

본 발명의 과제 해결 수단은 원자력 발전소 건설 안전보건환경 분야에 걸쳐 체계적이며 효율적인 업무가 가능하도록 HSE(Health, Safety, Environment)를 기획하는 단계와, HSE 이행 및 운영을 수행하는 단계와, HSE를 점검하는 단계와, HSE 성과를 관리하는 단계로 크게 4 개로 분류된 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 제공하는데 있다. The task of the present invention is to plan the HSE (Health, Safety, Environment) to plan and operate HSE, to carry out HSE implementation and operation, and to check HSE And HSE performance management, which are classified into 4 stages.

본 발명의 또 다른 과제 해결 수단으로, HSE를 기획하는 제1 단계는 보다 상세하게 HSE 목표 및 기본계획을 운영하는 단계와, HSE 법규 및 준수를 평가하는 단계와, HSE 관리계획 수립 및 운영하는 단계를 포함하며, HSE 이행 및 운영을 수행하는 제2 단계는 계약자 HSE 평가 및 관리하는 단계와, 안전관리비 운영 계획 및 관리를 수행하는 단계와, 건설소 안전보건 위험성을 평가하는 단계와, 건설소 환경 측면을 관리하는 단계와, 청결을 유지 관리하는 단계와, 공사허가 및 작업관리를 수행하는 단계와, 협의 및 의사소통을 수행하는 단계와, 건설소 비상사태 대비 및 대응을 수행하는 단계와, 폐기물 관리를 수행하는 단계와, 보호구 관리를 수행하는 단계와, HSE 교육 훈련 및 자격 부여를 수행하는 단계와, 근로자 건강검진 절차를 수행하는 단계를 포함하고, HSE 점검을 수행하는 제3 단계는 HSE 사고보고 및 관리를 수행하는 단계와, HSE 순시 및 점검을 수행하는 단계와, 시정조치 및 예방조치를 수행하는 단계와, HSE 순시 및 점검을 수행하는 단계와, 시정조치 및 예방조치를 수행하는 단계와, HSE 내부 심사를 수행하는 단계를 포함하며, HSE 성과를 관리하는 제4 단계는 HSE 성과측정 및 개선을 수행하는 단계와, 건설소 HSE 경영검토를 수행하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 제공하는데 있다. As a further solution to the problem of the present invention, the first step in planning the HSE is to operate the HSE objectives and basic plan in more detail, to evaluate the HSE regulations and compliance, to establish and operate the HSE management plan The second stage of performing the HSE implementation and operation includes evaluating and managing the HSE of the contractor, performing the safety management expense operation plan and management, evaluating the safety hazard of the construction site, A step of maintaining the cleanliness, a step of performing a construction permit and a work management, a step of conducting consultation and communication, a step of performing preparation and countermeasure for a construction site, Performing HSE training and qualification, and performing a health checkup procedure for a worker, wherein the HSE < RTI ID = 0.0 > The third step of performing the checking includes performing HSE incident reporting and management, performing HSE instantaneous and checking, performing corrective actions and preventive measures, performing HSE instantaneous and checking, Including the steps of performing corrective and preventive actions and performing HSE internal audits, and the fourth step of managing HSE performance is to perform HSE performance measurement and improvement and to perform the HSE management review of the construction site And to provide a method for constructing a nuclear plant construction safety and health environment management process modeling step.

본 발명은 상기와 같은 본 발명을 활용할 경우, 원전 건설 안전보건환경관리를 위한 프로세스 체계 및 관련 시스템을 활용할 수 있게 되어 통합적으로 효율적으로 관리할 수 있는 유리한 효과가 있다. The present invention has the advantageous effect that the process system and the related system for the nuclear power plant construction safety and health environment management can be utilized when the present invention as described above is utilized and can be integrally and efficiently managed.

보다 구체적으로, 안전보건환경 절차에 따른 업무수행을 함에 있어서 기획, 이행 및 운영, 점검, 성과관리 단계별 해당 업무를 파악할 수 있으며, 관련 시스템 활용 시에도 안전 점검 유형별, 단계별 현황 파악을 가능하게끔 데이터베이스화된 자료를 바탕으로 사용자가 일원화된 정보를 파악 관리할 수 있는 유리한 효과가 있다. More specifically, it is possible to grasp the tasks related to the planning, implementation, operation, inspection, and performance management stages in performing the work according to the safety and health environmental procedures. There is an advantageous effect that the user can grasp and manage the unified information based on the data.

도 1은 본 발명의 적용대상인 원전 건설 안전보건환경 프로세스 업무 흐름도 이다.
도 2는 안전보건환경 프로세스를 기반으로 시스템 목록에 관한 내용을 나타낸 것이다.
도 3은 현장 안전점검을 시행을 위한 안전 점검 단계별 항목을 도출하여 기준정보를 관리할 수 있도록 데이터베이스화한 것이다.
도 4는 점검단계, 항목에 관하여 점검 결과를 작성하는 화면을 나타낸 것으로 점검단계, 항목에 관한 데이터베이스를 활용하여 관련 해당 사항을 사용자가 직접 선택할 수 있는 화면이다.
FIG. 1 is a flowchart of a nuclear power plant construction safety and health environment process process to which the present invention is applied.
Fig. 2 shows the system list based on the safety and health environment process.
FIG. 3 is a database in which standard information can be managed by deriving items for safety inspection steps for conducting a site safety inspection.
FIG. 4 shows a screen for creating an inspection result regarding an inspection step and an item. It is a screen for the user to directly select relevant items using a database relating to an inspection step and an item.

본 발명의 실시를 위한 구체적인 내용에 대하여 살펴본다.Hereinafter, the present invention will be described in detail.

본 발명은 원자력 발전소 건설 안전보건환경 분야에 걸쳐 체계적이며 효율적인 업무가 가능하도록 안전보건과 환경 분야의 절차 관계를 기획, 이행 및 운영, 점검, 성과관리로 1단계로 분류하고, 분류된 대분류 4개에 대하여 상세 절차에 대하여 21개로 분류하여 상호 연계 되도록 구축하여서 원전 안전보건환경관리 체계에 대한 구축 방법을 제공하는데 있다.The present invention classifies the process relationship between safety and health and the environment into one stage by planning, implementing, operating, inspecting, and managing performance so that systematic and efficient work can be done in the field of nuclear power plant construction safety and health environment. And to provide a method for constructing a nuclear safety and health environment management system by constructing 21 types of detailed procedures.

또한, 본 발명은 안전보건환경관리시스템 구축 방법을 통해 안전보건환경프로세스의 기획, 이행 및 운영, 점검, 성과관리에 이르기까지 일련의 업무흐름을 체계적으로 명시하여 관리할 수 있는 방법을 제공함에 있다. In addition, the present invention provides a method for systematically specifying and managing a series of workflows from planning, implementation, operation, inspection, and performance management of a safety and health environmental process through a method for establishing a safety and health environment management system .

본 발명의 구성 및 전반적인 동작원리에 대하여 보다 구체적으로 설명한다.The configuration and overall operation principle of the present invention will be described in more detail.

도 1은 본 발명의 적용대상인 원전 건설 안전보건환경 프로세스 업무 흐름도 이다. 기획 단계의 세부 프로세스, 이행 및 운영단계에서 수행되어야 하는 세부 프로세스, 안전보건환경측면의 점검단계에서 수행해야 하는 업무 프로세스, 안전보건환경의 성과를 측정하기 위한 성과관리 측면의 업무프레스가 상세히 분류되어 있다. FIG. 1 is a flowchart of a nuclear power plant construction safety and health environment process process to which the present invention is applied. The detailed processes of the planning stage, the detailed processes to be carried out at the implementation and operation stages, the work processes to be carried out at the safety and health environment side, and the performance management side to measure the performance of the safety and health environment are classified in detail have.

또한, 이러한 단계별 프로세스들이 연계되도록 프로세스를 구성하여 사용자로 하여금 해당 안전보건환경 프로세스와 업무의 흐름을 한눈에 알아보기 쉽도록 표현하였다.Also, the process is structured so that these step-by-step processes are linked so that the user can easily understand the process and work flow of the relevant safety and health environment at a glance.

본 발명은 본 발명에 따라 설계 제작된 프로그램이 탑재된 컴퓨터 및/또는 서버에서 수행된다. The present invention is implemented in a computer and / or a server equipped with a program designed and manufactured according to the present invention.

보다 구체적으로, 도 1에 기초하여 살펴본다. More specifically, it will be described with reference to Fig.

HSE를 기획하는 제1 단계와, HSE를 이행 및 운영하는 제2 단계와, HSE를 점검하는 제3 단계와, HSE 성과를 관리하는 제4 단계를 포함한다. The first phase of planning HSE, the second phase of implementing and operating HSE, the third phase of checking HSE, and the fourth phase of managing HSE performance.

HSE를 기획하는 제1 단계는 보다 상세하게 HSE 목표 및 기본계획을 운영하는 단계와, HSE 법규 및 준수를 평가하는 단계와, HSE 관리계획 수립 및 운영하는 단계를 포함한다. The first phase of HSE planning involves the steps of operating HSE goals and plans in greater detail, assessing HSE regulations and compliance, and establishing and operating an HSE management plan.

HSE 이행 및 운영을 수행하는 제2 단계는 계약자 HSE 평가 및 관리하는 단계와, 안전관리비 운영 계획 및 관리를 수행하는 단계와, 건설소 안전보건 위험성을 평가하는 단계와, 건설소 환경 측면을 관리하는 단계와, 청결을 유지 관리하는 단계와, 공사허가 및 작업관리를 수행하는 단계와, 협의 및 의사소통을 수행하는 단계와, 건설소 비상사태 대비 및 대응을 수행하는 단계와, 폐기물 관리를 수행하는 단계와, 보호구 관리를 수행하는 단계와, HSE 교육 훈련 및 자격 부여를 수행하는 단계와, 근로자 건강검진 절차를 수행하는 단계를 포함한다. The second phase of HSE implementation and operation includes the steps of evaluating and managing the HSE of the contractor, performing the operation and management plan of the safety management expenses, evaluating the safety and health risks of the construction site, Performing maintenance and clean-up operations, performing construction permits and work management, conducting consultation and communication, performing construction contingency and response, and performing waste management Performing the HSE training and qualification, and performing the health checkup procedure for the workers.

HSE 점검을 수행하는 제3 단계는 HSE 사고보고 및 관리를 수행하는 단계와, HSE 순시 및 점검을 수행하는 단계와, 시정조치 및 예방조치를 수행하는 단계와, HSE 순시 및 점검을 수행하는 단계와, 시정조치 및 예방조치를 수행하는 단계와, HSE 내부 심사를 수행하는 단계를 포함한다. The third step of performing the HSE check includes performing the HSE incident reporting and management, performing the HSE instantaneous check and checking, performing the corrective action and the preventive measure, performing the HSE instantaneous check and checking, , Performing corrective actions and preventive measures, and performing HSE internal audits.

HSE 성과를 관리하는 제4 단계는 HSE 성과측정 및 개선을 수행하는 단계와, 건설소 HSE 경영검토를 수행하는 단계를 포함한다. The fourth step in managing HSE performance involves performing HSE performance measurement and improvement and performing the HSE management review of the construction site.

표 1은 상기 HSE를 기획하는 제1 단계와, HSE를 이행 및 운영하는 제2 단계와, HSE를 점검하는 제3 단계와, HSE 성과를 관리하는 제4 단계를 수행함에 있어서 각 프로세스 운영 목적 및 주요 사항에 대하여 관련 주요 내용을 요약한 것이다.Table 1 shows the first step of planning the HSE, the second step of implementing and operating the HSE, the third step of checking the HSE, and the fourth step of managing the HSE performance. It summarizes the main contents related to the main points.

Figure pat00001
Figure pat00001

HSE 목표 및 실적관리를 수행함에 있어, 각 프로젝트 별 HSE 목표를 체계적으로 수립하고, 정기적 모니터링 및 실적 관리를 통한 무사고 및 친환경 관련 목표를 달성하도록 한다.In carrying out HSE goals and performance management, systematically establish HSE goals for each project, and achieve non-compliance and environment-related goals through regular monitoring and performance management.

또한, HSE 법규 및 준수를 평가함에 있어, 국가 지자체의 HSE 법규 및 그 밖의 요구사항을 명확하게 파악하고 이를 준수하는지 점검하도록 한다.Also, in assessing HSE regulations and compliance, you should clearly identify and comply with HSE regulations and other requirements of the national municipality.

또한, 계약자(협력업체) HSE 평가 및 관리를 수행함에 있어, 계약자의 HSE 관리체계, 안전환경 관리계획, 운영실적을 평가하여 적격한 업체 선정 및 유지, 계약자 자율 HSE 활동을 유지하는지 점검하도록 한다.Also, in conducting the HSE evaluation and management of the contractor (partner company), the contractor's HSE management system, safety environment management plan, and operational performance should be evaluated to select and maintain qualified companies and to maintain contractor voluntary HSE activities.

산업 안전 보건 관리비의 운영 계획 및 관리를 수행함에 있어, 산업 안전 보건 관리비의 실행예산 편성 및 효율적인 집행을 위한 사용 기준을 제시하고 현장 안전 보건 관리 전반에 소요되는 비용을 수주하는 단계부터 반영하여 적정 안전관리 활동 수행 및 집행을 관리하도록 한다. In carrying out the operation planning and management of occupational safety and health management expenses, it is necessary to set the budget for the implementation of occupational safety and health management expense and to provide the usage standard for effective enforcement. Manage management activities and enforcement.

각각에 대한 주요 구성 내용은 표 1에 기재된 바와 같다. The main constituent contents for each are as shown in Table 1.

도 2는 안전보건환경 프로세스를 기반으로 시스템 목록에 관한 내용을 나타낸 것이다. Fig. 2 shows the system list based on the safety and health environment process.

즉, 도 2는 HSE를 기획하는 제1 단계와, HSE를 이행 및 운영하는 제2 단계와, HSE를 점검하는 제3 단계와, HSE 성과를 관리하는 제4 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 수행하기 위한 프로그램이 탑재된 컴퓨터와 연결된 모니터에 표시된 각각의 항목을 나타낸다. That is, FIG. 2 shows a nuclear plant construction safety and health environment including a first step of planning an HSE, a second step of implementing and operating the HSE, a third step of checking the HSE, and a fourth step of managing the HSE performance It represents each item displayed on the monitor connected to the computer equipped with the program for performing the management process modeling construction method.

도 3은 현장 안전점검을 시행을 위한 안전 점검 단계별 항목을 도출하여 기준정보를 관리할 수 있도록 데이터베이스화한 것이다. FIG. 3 is a database in which standard information can be managed by deriving items for safety inspection steps for conducting a site safety inspection.

점검유형 기준정보, 점검단계 기준정보, 점검 항목 기준정보에 관하여 단계별 분류표를 나타낸 것이다. The inspection type reference information, the inspection level reference information, and the inspection item reference information.

도 4는 안전점검을 실시함에 있어서, 점검단계, 항목에 관하여 점검 결과를 작성하는 화면을 나타낸 것으로 점검단계 및 항목에 관한 데이터베이스를 활용하여 관련 해당 사항을 사용자가 직접 선택할 수 있는 화면이다. FIG. 4 shows a screen for creating a check result regarding an inspection step and an item in performing a safety check, and a user can directly select relevant items using a database regarding the inspection step and items.

본 발명은 원자력 발전소 건설 안전보건환경 분야에 걸쳐 체계적이며 효율적인 업무가 가능하도록 HSE(Health, Safety, Environment)를 기획하는 단계와, HSE 이행 및 운영을 수행하는 단계와, HSE를 점검하는 단계와, HSE 성과를 관리하는 단계로 크게 4 개로 분류된 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법을 제공하여 통합적으로 효율적으로 관리할 수 있으므로 산업상 이용가능성이 매우 높다.The present invention relates to the steps of planning HSE (Health, Safety, Environment) so that systematic and efficient work can be done in the field of nuclear power plant construction safety and health environment, performing HSE implementation and operation, checking HSE, HSE performance management system is classified into four categories, and it is possible to manage them efficiently and integrally by providing a method of constructing the process modeling of safety and health environment management process.

Claims (5)

원전 건설 안전보건환경관리 프로세스 모델링 구축 방법에 있어서,
안전보건환경(HSE)관리를 기획하는 단계;
HSE 이행 및 운영을 수행하는 단계;
HSE를 점검하는 단계; 및
HSE 성과를 관리하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법.
In the construction method of safety and health environmental management process model of nuclear power plant construction,
Planning the safety and health environment (HSE) management;
Performing HSE implementation and operation;
Checking the HSE; And
A method for constructing nuclear plant construction safety and health management process modeling including steps to manage HSE performance.
청구항 1에 있어서,
HSE 관리를 기획하는 제1 단계는
HSE 목표 및 기본계획을 운영하는 단계;
HSE 법규 및 준수를 평가하는 단계; 및
HSE 관리계획 수립 및 운영하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법.
The method according to claim 1,
The first step in planning HSE management
Operating an HSE Goal and Basic Plan;
Assessing HSE regulations and compliance; And
A method for establishing nuclear plant construction safety and health management process modeling including HSE management plan establishment and operation.
청구항 1에 있어서,
HSE 이행 및 운영을 수행하는 제2 단계는
계약자 HSE 평가 및 관리하는 단계;
안전관리비 운영 계획 및 관리를 수행하는 단계;
건설소 안전보건 위험성을 평가하는 단계;
건설소 환경 측면을 관리하는 단계와, 청결을 유지 관리하는 단계;
공사허가 및 작업관리를 수행하는 단계와, 협의 및 의사소통을 수행하는 단계;
건설소 비상사태 대비 및 대응을 수행하는 단계;
폐기물 관리를 수행하는 단계;
보호구 관리를 수행하는 단계;
HSE 교육 훈련 및 자격 부여를 수행하는 단계; 및
근로자 건강검진 절차를 수행하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법.
The method according to claim 1,
The second phase of HSE implementation and operation is
Contractor HSE evaluation and management phase;
Performing safety management cost operation planning and management;
Assessing the safety hazards of construction sites;
Managing the environmental aspects of the construction site, and maintaining cleanliness;
Performing construction permission and work management, and performing consultation and communication;
Performing construction site emergency preparedness and response;
Performing waste management;
Performing protective equipment management;
Performing HSE training and qualification; And
A method for constructing nuclear plant construction safety and health environment management process modeling including steps to perform worker health checkup procedures.
청구항 1에 있어서,
HSE를 점검하는 제3 단계는
HSE 사고보고 및 관리를 수행하는 단계;
HSE 순시 및 점검을 수행하는 단계;
시정조치 및 예방조치를 수행하는 단계;
HSE 순시 및 점검을 수행하는 단계;
시정조치 및 예방조치를 수행하는 단계; 및
HSE 내부 심사를 수행하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법.
The method according to claim 1,
The third step in checking HSE is
Performing HSE incident reporting and management;
Performing HSE instantaneous and check;
Performing corrective and preventative measures;
Performing HSE instantaneous and check;
Performing corrective and preventative measures; And
A method for constructing nuclear plant construction safety and health environmental management process modeling including the step of performing HSE internal audit.
청구항 1에 있어서,
HSE 성과를 관리하는 제4 단계는
HSE 성과측정 및 개선을 수행하는 단계; 및
건설소 HSE 경영검토를 수행하는 단계를 포함하는 원전 건설 안전보건환경관리 프로세스 모델링 구축 방법.
The method according to claim 1,
The fourth step in managing HSE performance is
Performing HSE performance measurement and improvement; And
A method for constructing nuclear plant construction safety and health environmental management process modeling including steps to carry out HSE management review of construction sites.
KR1020140145754A 2014-10-27 2014-10-27 Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project KR20160049232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140145754A KR20160049232A (en) 2014-10-27 2014-10-27 Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140145754A KR20160049232A (en) 2014-10-27 2014-10-27 Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project

Publications (1)

Publication Number Publication Date
KR20160049232A true KR20160049232A (en) 2016-05-09

Family

ID=56020288

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140145754A KR20160049232A (en) 2014-10-27 2014-10-27 Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project

Country Status (1)

Country Link
KR (1) KR20160049232A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190025290A (en) 2017-09-01 2019-03-11 월드버텍 주식회사 Internet-based environmental health information system and usage method
KR20190040848A (en) * 2017-10-11 2019-04-19 양경옥 Method and Apparatus for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project
CN113537831A (en) * 2021-08-11 2021-10-22 北京图安世纪科技股份有限公司 HSE system operation evaluation method based on computer operation risk identification model
KR102316815B1 (en) * 2020-12-23 2021-10-25 주식회사 영신 Smart construction safety monitering integrated control system for ordering organization

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190025290A (en) 2017-09-01 2019-03-11 월드버텍 주식회사 Internet-based environmental health information system and usage method
KR20190040848A (en) * 2017-10-11 2019-04-19 양경옥 Method and Apparatus for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project
KR102316815B1 (en) * 2020-12-23 2021-10-25 주식회사 영신 Smart construction safety monitering integrated control system for ordering organization
CN113537831A (en) * 2021-08-11 2021-10-22 北京图安世纪科技股份有限公司 HSE system operation evaluation method based on computer operation risk identification model

Similar Documents

Publication Publication Date Title
Nguyen et al. Predicting safety risk of working at heights using Bayesian networks
Raviv et al. AHP-based analysis of the risk potential of safety incidents: Case study of cranes in the construction industry
Xu et al. Collaborative information integration for construction safety monitoring
CN104871182B (en) Examination and maintenance factory or the system of other facilities
Aguilar et al. IT based system for construction safety management and monitoring: C-RTICS2
KR101370775B1 (en) Intelligence system for managing a safety in company oriented and drive method of the same
Shohet et al. Integrated communication, control, and command of construction safety and quality
Taderera Occupational health and safety management systems: Institutional and regulatory frameworks in Zimbabwe
Alves Tenório de Morais et al. Building maintenance management activities in a public institution
Bergh et al. Developing and testing an internal audit tool of the psychosocial work environment in the oil and gas industry
KR20160049232A (en) Modeling Method of Healthy, Safety and Environment Management Processes on Nuclear Power plant Construction Project
Willquist et al. Identifying and analysing hazards in manufacturing industry—a review of selected methods and development of a framework for method applicability
KR102481223B1 (en) A smart integrated safety management system that can support various safety management, including safety inspection and education, using digital technology
Hamid et al. Integration of safety, health, environment and quality (SHEQ) management system in construction: a review
Abbasianjahromi et al. Applying social network analysis to identify the most effective persons according to their potential in causing accidents in construction projects
Liao et al. Fusion model for hazard association network development: A case in elevator installation and maintenance
CN109325646A (en) A kind of turnaround of unit scene high-risk operations dynamic control method
Falahati et al. Multi-dimensional model for determining the leading performance indicators of safety management systems
KR20200009739A (en) Safety work system and method applying blockchain in a closed space
Kosmowski et al. Organizational culture as prerequisite of proactive safety and security management in critical infrastructure systems including hazardous plants and ports
JP2004355295A (en) Business risk countermeasure support system and method
Lefranc et al. Does the management of regulatory compliance and occupational risk have an impact on safety culture?
Menezes et al. Functional resonance analysis method and human performance factors identifying critical functions in chemical process safety
da Rosa et al. Risk management in occupational safety: A systematic mapping
Chhillar et al. Safety Management with Application of Internet of Things, Artificial Intelligence, and Machine Learning for Industry 4.0 Environment

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application