KR20170069098A - Gas boiler and emergency driving control method thereof - Google Patents
Gas boiler and emergency driving control method thereof Download PDFInfo
- Publication number
- KR20170069098A KR20170069098A KR1020150176352A KR20150176352A KR20170069098A KR 20170069098 A KR20170069098 A KR 20170069098A KR 1020150176352 A KR1020150176352 A KR 1020150176352A KR 20150176352 A KR20150176352 A KR 20150176352A KR 20170069098 A KR20170069098 A KR 20170069098A
- Authority
- KR
- South Korea
- Prior art keywords
- temperature
- heating
- hot water
- water
- emergency operation
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
- F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
- F24H1/22—Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
- F24H1/34—Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water chamber arranged adjacent to the combustion chamber or chambers, e.g. above or at side
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
- F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
- F24H9/2035—Arrangement or mounting of control or safety devices for water heaters using fluid fuel
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q9/00—Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The present invention relates to a gas boiler and its emergency operation control method, and more particularly, to a gas boiler and its emergency operation control method, which comprises a main body for supplying hot water and heating water by burning gaseous fuel and an operation command for controlling operation of the main body, And a remote controller for calculating and estimating a predicted gas ratio, wherein the main body includes a combustion unit for burning gaseous fuel to heat water, a sensing unit for sensing a temperature of outside air outside the room and a direct water supplied to the combustion unit, And a control unit for controlling the driving of the combustion unit so as to supply heating water and hot water by changing the heating and hot water set temperature on the basis of the outside temperature and the direct water temperature sensed by the sensing unit when a failure or communication abnormality occurs, If the remote controller malfunctions or communication abnormality occurs, the outside temperature and the direct temperature are detected and the detected outside temperature And an emergency operation in which the heating water and the hot water are supplied and the heating operation and the hot water set temperature are changed and set according to the direct water temperature.
Description
BACKGROUND OF THE
In general, boilers are used as a means for receiving heating and hot water, and these boilers are divided into various types depending on their usage and capacity.
The boiler includes a combustion unit for igniting and burning the supplied fuel, a heat exchange unit for transferring the heat generated in the combustion unit to the heating water and performing heat exchange in a high temperature state, and a heating water heat exchanged in a high temperature state, And a heating pipe circulated or supplied for supply. In addition, the boiler is divided into a gas boiler and an oil boiler depending on the fuel used in the combustion.
1 is a schematic view of a general domestic gas boiler.
1, a domestic gas boiler (hereinafter referred to as a "gas boiler") according to the related art is constructed by heating water supplied from a
When the hot water is used, the gas boiler (1) exchanges hot water via the three-way valve (5) through a hot water heat exchanger (4).
The gas boiler includes a main body for supplying hot water and heating water by burning gaseous fuel, and a remote controller for inputting an operation command for controlling operation of the main body and displaying an operation state transmitted from the main body.
The gas boiler constructed as described above is operated so as to provide heating or hot water at a temperature required through the control unit of the main body as the user adjusts the season by using the operation buttons of the remote controller or the like.
Meanwhile, in the case of a failure of the remote controller or a communication error with the remote controller during the operation using the remote controller, the emergency operation is performed by activating the emergency operation button connected to the controller of the main body.
In other words, all operations of the gas boiler are stopped when a remote controller malfunction occurs. On the other hand, an emergency operation button connected to the control unit is provided in the main body in order to minimize inconvenience caused by stopping the gas boiler during winter, When the button is operated, the gas boiler is not stopped and the emergency operation continues until the repair of the engineer is completed.
For example, the applicant of the present invention has filed a patent application for the technology of emergency operation of a gas boiler in many of the following
However, according to the emergency operation mode of the gas boiler according to the related art, since the emergency operation condition is set to the temperature of the winter season in which the air temperature is low, when the emergency operation is performed in accordance with the remote controller abnormality in the midst of winter or autumn, There is a problem that the hot water and the heating temperature of the gas boiler can not be appropriately adjusted by the control unit set as a reference.
In addition, the gas boiler according to the related art has a problem of consuming a large amount of fuel as it operates in a state where it is set to the coldest temperature in the emergency operation.
That is, the emergency operation method of the gas boiler according to the related art performs the emergency operation irrespective of the seasonally varying outdoor temperature and direct water temperature.
Therefore, it is necessary to develop a technology to control the emergency operation to the optimum operating temperature condition by automatically changing the heating and hot water set temperature during the emergency operation by using the seasonal outdoor temperature and direct water temperature, which can check the indoor temperature or the temperature of the external environment .
An object of the present invention is to provide a gas boiler and its emergency operation control method capable of emergency operation by changing heating and hot water set temperatures according to seasons by using outside temperature and direct water temperature .
Another object of the present invention is to provide a gas boiler and its emergency operation control method capable of emergency operation with optimal operating temperature conditions by subdividing heating and hot water set temperatures according to outdoor temperature and direct water temperature.
In order to achieve the above object, a gas boiler according to the present invention includes a main body for supplying hot water and heating water by burning gaseous fuel, an operation command for controlling the operation of the main body, And a remote controller for calculating and estimating a gas consumption amount and a predicted gas ratio of the fuel, wherein the main body comprises: a combustion section for heating the gas by burning the gaseous fuel; a sensing section for sensing the temperature of the outdoor air outside the room and the temperature of the direct water supplied to the combustion section And a control unit for controlling the driving of the combustion unit so as to supply heating water and hot water by changing the heating and hot water set temperature based on the outside temperature and the direct water temperature sensed by the sensing unit when a failure or communication error occurs in the remote control unit .
Wherein the sensing unit includes a first temperature sensor for sensing an outside temperature of the outdoor unit during an emergency operation and a second temperature sensor for sensing a temperature of the direct water supplied to the combustion unit, And a storage unit for storing the heating and hot water set temperatures for the respective temperature sections in correspondence with the heating set temperature and the hot water set temperature, respectively, for each temperature section.
The control unit includes a diagnosing unit for diagnosing whether or not an abnormality has occurred by using the sensing signals of the first and second temperature sensors during an emergency operation. In the emergency operation, the controller counts time using a timer provided therein , And performs emergency operation during a predetermined emergency operation time.
In order to achieve the above object, the present invention provides a method of controlling an emergency operation of a gas boiler, comprising the steps of: (a) checking a connection state of a remote controller with a controller provided in the main body when power is supplied; (C) when the remote controller is not connected to the remote controller, detecting a temperature of the outdoor air and a temperature of the direct water supplied to the combustion unit using the sensing unit; and (c) And supplying the heating water and the hot water.
(C1) diagnosing whether or not an abnormality has occurred in a first temperature sensor for sensing the outside temperature and a second temperature sensor for sensing the direct temperature, (c2) (C3) when the first temperature sensor is in a steady state and the outside temperature detected by the first temperature sensor is lower than the first temperature detected by the first temperature sensor, Supplying the heating water by fixing the heating set temperature to a second heating temperature set lower than the first heating temperature when the outdoor temperature is higher than a predetermined first temperature, Supplying the heating water by fixing the heating set temperature to a third heating temperature set to be equal to the first heating temperature, when the temperature exceeds the second temperature set lower than the first temperature, (c5) remind Supplying the heating water by fixing the heating set temperature to a fourth heating temperature set to be higher than the third heating temperature when the temperature is lower than the second temperature and higher than the third temperature set lower than the second temperature, and (c6) And supplying the heating water by fixing the heating set temperature to a fifth heating temperature set higher than the fourth heating temperature when the outside air temperature is lower than the third temperature.
Wherein the step c) includes the steps of: (c7) supplying the heating water by fixing the hot water set temperature to a first hot water temperature when the second temperature sensor is in an abnormal state, (c3) When the direct water temperature detected by the second temperature sensor exceeds a predetermined fourth temperature, the hot water set temperature is fixed to the second hot water temperature set lower than the first hot water temperature to supply hot water (C4) fixing the hot water set temperature to a third hot water temperature set to be higher than the second hot water temperature if the direct water temperature is lower than the fourth temperature and is set to be lower than the fourth temperature (C5) when the direct water temperature is lower than the fifth temperature and is higher than a sixth temperature set lower than the fifth temperature, the hot water set temperature is higher than the third hot water temperature and the first (C6) if the direct water temperature is equal to or lower than the sixth temperature, setting the hot water set temperature to a fifth hot water temperature set to be higher than the fourth hot water temperature So as to supply hot water.
The present invention further includes (d) counting the time in the process of performing the emergency operation, and stopping the driving of the main body when a predetermined emergency operation time has elapsed.
As described above, according to the gas boiler and the emergency operation control method thereof according to the present invention, when a failure or communication abnormality occurs in the remote control, the outdoor temperature and the direct water temperature are sensed and the heating and hot water set temperature It is possible to control to perform emergency operation in which heating water and hot water are supplied.
Thus, according to the present invention, the heating and hot water set temperatures can be subdivided according to the seasonally varying outdoor temperature and direct water temperature, so that the emergency operation can be performed under the optimum operating temperature condition.
1 is a schematic view of a gas boiler according to the prior art,
2 is a block diagram of a gas boiler according to a preferred embodiment of the present invention;
3 is a flow chart for explaining steps of controlling emergency operation of a gas boiler according to a preferred embodiment of the present invention.
Hereinafter, a gas boiler and its emergency operation control method according to a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.
First, the configuration of a gas boiler to which the present invention is applied will be described with reference to the configuration of a gas boiler according to the prior art shown in FIG.
That is, according to the present invention, the outside temperature and the direct-water temperature are detected in the gas boiler according to the prior art shown in FIG. 1, and the heating and hot water set temperatures are changed and changed according to the sensed temperatures, Is added.
2 is a block diagram of a gas boiler according to a preferred embodiment of the present invention.
2, a
The
The
Here, the heat exchanger may be a condensing heat exchanger including a sensible heat exchanger and a latent heat exchanger, or a heat exchanger for a common gas boiler including a heat exchanger.
The
The
The
To this end, the
The
The
The
For example, the
Accordingly, the
To this end, the
The
In addition, the
As described above, according to the present invention, when a remote controller malfunctions or a communication error occurs, the outside temperature and the direct water temperature are sensed, the seasons are determined using the sensed temperature, and the heating and the hot water set temperature are changed to set the emergency water Can be controlled.
Next, a method of controlling the emergency operation of the gas boiler according to the preferred embodiment of the present invention will be described in detail with reference to FIG.
3 is a flow chart for explaining steps of controlling emergency operation of a gas boiler according to a preferred embodiment of the present invention.
3, the
In step S12, the
When the
On the other hand, if it is determined in step S12 that the
The
At this time, the
In step S20, the
If it is determined in step S20 that the
If the sensed outdoor temperature exceeds the first temperature in step S24, the
If it is determined in step S24 that the sensed outdoor temperature is lower than the first temperature, the
If the sensed outdoor temperature exceeds the second temperature in step S28, the
If it is determined in step S28 that the sensed outdoor temperature is lower than the second temperature, the
If the sensed outdoor temperature exceeds the third temperature in step S32, the
On the other hand, if it is determined in step S32 that the detected outside air temperature is lower than the third temperature, the
Here, the first temperature to the third temperature are set to distinguish the summer season, the spring season, the autumn season, and the winter season, and may be set at about 25 ° C, 15 ° C, and 10 ° C, respectively, in this embodiment.
And the first to fifth heating temperatures are temperatures set for performing heating in an emergency operation in summer, spring, autumn, and winter, respectively.
Here, the first heating temperature may be set equal to the third heating temperature.
For example, the first and third heating temperatures are respectively set to about 55 to 60 DEG C, the second heating temperature is set to about 50 to 55 DEG C, the fourth heating temperature is set to about 60 to 70 DEG C, The fifth heating temperature may be set at about 70 to 80 캜.
In step S40, the
If it is determined in step S40 that the
If the sensed outdoor temperature exceeds the fourth temperature in step S44, the
If it is determined in step S44 that the sensed outdoor temperature is lower than the fourth temperature, the
If the sensed outdoor temperature exceeds the fifth temperature in step S48, the
If it is determined in step S48 that the sensed outdoor temperature is lower than the sixth temperature, the
If the sensed outdoor temperature exceeds the sixth temperature, the
On the other hand, if the sensed outdoor temperature is lower than the sixth temperature in step S52, the
Here, the fourth temperature to the sixth temperature are set to distinguish the summer season, the spring season, the autumn season, and the winter season, and they may be set at about 20 ° C, 10 ° C, and 5 ° C, respectively, in this embodiment.
And the first to fifth direct water temperatures are temperatures set for performing heating in emergency operation in summer, spring, autumn, and winter, respectively.
Here, the first direct water temperature may be set equal to the fourth direct water temperature.
For example, the first and fourth direct water temperatures are set to about 60 to 70 ° C respectively, the second direct water temperature is set to about 45 to 50 ° C, the third direct water temperature is set to about 50 to 60 ° C, The fifth set temperature may be set to about 70 to 80 캜.
As described above, according to the present invention, the outside temperature and the direct water temperature can be detected during the emergency operation, and the heating and hot water set temperatures can be changed and controlled to supply the heating water and the hot water according to the sensed outside temperature and direct water temperature.
In step S60, the
If the emergency operation time elapses as a result of the inspection in step S60, the
In the present invention, when the remote controller malfunctions or communication abnormality occurs, the present invention senses the outside temperature and the direct water temperature, changes the heating and hot water setting temperature according to the detected outside temperature and direct water temperature, It is possible to control to perform the emergency operation to be supplied.
Although the invention made by the present inventors has been described concretely with the above embodiments, the present invention is not limited to the above embodiments, and it goes without saying that various changes can be made without departing from the gist of the present invention.
In the present invention, when a failure or communication abnormality occurs in the remote control, the controller detects the outside temperature and the direct temperature, and changes the heating and hot water set temperature according to the sensed outside temperature and the direct water temperature to control the emergency operation to supply hot water and hot water And its emergency operation control method.
10: gas boiler 11: main body
12: remote controller 13: input part
14: display section 20:
30: sensing
40: control section 41: diagnosis section
42: timer 50: storage unit
Claims (7)
And a remote controller for inputting an operation command for controlling the operation of the main body and calculating and estimating a gas consumption amount and an estimated gas ratio of the gas fuel consumed in the main body,
The main body includes a combustion unit for burning gaseous fuel to heat water,
A sensing unit for sensing a temperature of outdoor air outside and a temperature of direct water supplied to the combustion unit;
And a control unit for controlling the driving of the combustion unit so as to supply heating water and hot water by changing the heating and hot water set temperature on the basis of the outside temperature and the direct water temperature sensed by the sensing unit when a failure or communication error occurs in the remote control Gas boiler.
The sensing unit may include a first temperature sensor that senses an outdoor temperature outside the room during an emergency operation,
And a second temperature sensor for sensing the temperature of the direct water supplied to the combustion unit,
The main body further includes a storage unit for storing the heating temperature and the hot water set temperature for each temperature zone by storing the outside temperature and the direct water temperature in a plurality of sections and associating the heating set temperature and the hot water set temperature for each temperature section, Wherein the gas boiler is a gas boiler.
Wherein the controller includes a diagnostic unit for diagnosing an abnormality using the sensing signals of the first and second temperature sensors during an emergency operation,
Wherein the controller is configured to count the time using a timer provided in the process of performing the emergency operation and to perform the emergency operation for a predetermined emergency operation time.
(b) when the remote control is not connected as a result of the connection state check, sensing the outside temperature of the outdoor and the temperature of the direct water supplied to the combustion unit using the sensing unit,
and (c) performing emergency operation so as to supply heating water and hot water by changing the heating and hot water set temperature on the basis of the outdoor temperature and the direct water temperature in the control unit.
(c1) diagnosing whether or not an abnormality has occurred in the first temperature sensor for sensing the outside temperature and the second temperature sensor for sensing the direct temperature,
(c2) supplying the heating water by fixing the heating set temperature to a first predetermined heating temperature when the first temperature detecting sensor is in an abnormal state,
(c3) when the first temperature sensor is in a normal state and the outdoor air temperature sensed by the first temperature sensor exceeds a predetermined first temperature, Supplying the heating water by fixing the heating water to the heating temperature,
(c4) heating the heating set temperature to a third heating temperature which is set equal to the first heating temperature when the outside air temperature is lower than the first temperature and is lower than the first temperature, Supplying water,
(c5) if the outside temperature exceeds the third temperature, which is lower than the second temperature and lower than the second temperature, fixing the heating set temperature to a fourth heating temperature set higher than the third heating temperature, And
(c6) supplying the heating water by fixing the heating set temperature to a fifth heating temperature set higher than the fourth heating temperature when the outside air temperature is lower than the third temperature Emergency operation control method.
(c7) supplying the heating water by fixing the hot water set temperature to a first hot water temperature set in advance when the second temperature sensor is in an abnormal state,
(c3) when the second temperature sensor is in a normal state and the direct-on temperature detected by the second temperature sensor exceeds a preset fourth temperature, Supplying the hot water by fixing the hot water to the hot water,
(c4) fixing the hot water set temperature to a third hot water temperature set to be higher than the second hot water temperature when the direct water temperature is lower than the fourth temperature and is set lower than the fourth temperature, Supplying step,
(c5) when the direct water temperature is lower than the fifth temperature and is higher than a sixth temperature set lower than the fifth temperature, the hot water set temperature is higher than the third hot water temperature and lower than the fourth hot water temperature Supplying the hot water by fixing the hot water to the hot water;
(c6) fixing the hot water set temperature to a fifth hot water temperature set higher than the fourth hot water temperature to supply hot water if the direct water temperature is lower than the sixth temperature Operation control method.
(d) counting the time in the process of performing the emergency operation, and stopping the operation of the main body when a predetermined emergency operation time has elapsed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150176352A KR20170069098A (en) | 2015-12-10 | 2015-12-10 | Gas boiler and emergency driving control method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150176352A KR20170069098A (en) | 2015-12-10 | 2015-12-10 | Gas boiler and emergency driving control method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20170069098A true KR20170069098A (en) | 2017-06-20 |
Family
ID=59281232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150176352A KR20170069098A (en) | 2015-12-10 | 2015-12-10 | Gas boiler and emergency driving control method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20170069098A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110411028A (en) * | 2019-07-11 | 2019-11-05 | 青岛海尔空调器有限总公司 | Control method for smart home system |
KR102070187B1 (en) * | 2018-11-27 | 2020-01-28 | 린나이코리아 주식회사 | Apparatus and method for confirming communication condition between boiler and room-controller |
CN114688600A (en) * | 2020-12-29 | 2022-07-01 | 庆东纳碧安株式会社 | Boiler system and method of operation |
-
2015
- 2015-12-10 KR KR1020150176352A patent/KR20170069098A/en not_active Application Discontinuation
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102070187B1 (en) * | 2018-11-27 | 2020-01-28 | 린나이코리아 주식회사 | Apparatus and method for confirming communication condition between boiler and room-controller |
CN110411028A (en) * | 2019-07-11 | 2019-11-05 | 青岛海尔空调器有限总公司 | Control method for smart home system |
CN110411028B (en) * | 2019-07-11 | 2022-06-10 | 重庆海尔空调器有限公司 | Control method for intelligent household system |
CN114688600A (en) * | 2020-12-29 | 2022-07-01 | 庆东纳碧安株式会社 | Boiler system and method of operation |
KR20220094778A (en) * | 2020-12-29 | 2022-07-06 | 주식회사 경동나비엔 | Boiler system and operating method |
CN114688600B (en) * | 2020-12-29 | 2023-10-20 | 庆东纳碧安株式会社 | Boiler system and method of operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2933576B1 (en) | Hot water-centered combined hot water and heating boiler | |
US7747358B2 (en) | Building equipment component control with automatic feature detection | |
KR101997043B1 (en) | Apparatus and method for heating temperature control of each control system using boiler return temperature | |
JP6236548B2 (en) | Gas boiler exhaust flue closure detection method | |
KR101393406B1 (en) | Automatic control method of boiler using outdoor air temperature sensor | |
KR20170069098A (en) | Gas boiler and emergency driving control method thereof | |
WO2009069892A2 (en) | Device for control each temperature of warm circulation water of each room control system | |
AU2014247379A1 (en) | Hot Water Supply System | |
JP2009150609A (en) | Heat pump type water heater | |
JP6303808B2 (en) | Hot water system | |
KR101429896B1 (en) | Method for monitoring poor combustion of boiler | |
KR101476645B1 (en) | Method for controlling heating temperature for each room in the heating system for each room | |
KR20130105255A (en) | A boiler apparatus with the heating function for domestic water using hot water | |
KR20120020621A (en) | Automatic valve position measuring apparatus by using education effect for each room in each heating system | |
KR20170069406A (en) | Gas boiler and gas sonsumption detect and display method thereof | |
KR100742942B1 (en) | Automatic Operation Test Control Method and System of Boiler | |
KR101549439B1 (en) | Combustion conversion method for preventiong incomplete combustion of boiler | |
KR102522032B1 (en) | Apparatus and Method for Fault Detect of Three-way Fixing of Boiler | |
KR20120073395A (en) | Heating apparatus and method | |
KR101835269B1 (en) | Hybrid boiler for low-carbon and Eco-friendly, and the control method thereof | |
KR101485961B1 (en) | Gas boiler and trial run method thereof | |
KR101106934B1 (en) | The correction method of clogging judgement in way of combustion apparatus | |
KR101938565B1 (en) | Piping misassembly detection method in cascade boiler system | |
KR101976649B1 (en) | Control method of heating operation in case of failure of temperature measuring device in cascade system | |
JP2011106735A (en) | Erroneous piping detection system in bathroom heating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |