KR20140025646A - Structure and method for installing partition wall under ship deck - Google Patents

Structure and method for installing partition wall under ship deck Download PDF

Info

Publication number
KR20140025646A
KR20140025646A KR1020120091369A KR20120091369A KR20140025646A KR 20140025646 A KR20140025646 A KR 20140025646A KR 1020120091369 A KR1020120091369 A KR 1020120091369A KR 20120091369 A KR20120091369 A KR 20120091369A KR 20140025646 A KR20140025646 A KR 20140025646A
Authority
KR
South Korea
Prior art keywords
cover plate
wall
ship deck
installing
wall portion
Prior art date
Application number
KR1020120091369A
Other languages
Korean (ko)
Inventor
김훈우
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to KR1020120091369A priority Critical patent/KR20140025646A/en
Publication of KR20140025646A publication Critical patent/KR20140025646A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B29/00Accommodation for crew or passengers not otherwise provided for
    • B63B29/02Cabins or other living spaces; Construction or arrangement thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/56Bulkheads; Bulkhead reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/40Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
    • B63B73/43Welding, e.g. laser welding
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/72Non-load-bearing walls of elements of relatively thin form with respect to the thickness of the wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Optics & Photonics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a partition wall structure under a ship deck and a method for building the partition wall structure under the ship deck. The partition wall structure under a ship deck includes: a framework beam which forms a ship deck; a cover plate formed under the framework beam; and a wall portion prepared under the cover plate. Thereby, damages to the wall portion which compartments the space under the ship deck can be prevented, and time and costs spent for installing the wall portion can be reduced.

Description

선박 데크 하부의 벽체시공구조 및 벽체시공방법 {structure and method for installing partition wall under ship deck}Wall construction structure and wall construction method under the ship deck {structure and method for installing partition wall under ship deck}

본 발명은 선박 데크 하부의 벽체시공구조 및 벽체시공방법에 관한 것으로, 더욱 상세하게는 일정한 방화 구획 요건에 따라 선박 데크의 하부에 공간이 구획되도록 시공되는 벽체를 포함하는 선박 데크 하부의 벽체시공구조 및 벽체시공방법에 관한 것이다. The present invention relates to a wall construction structure and a wall construction method of the lower part of the ship deck, and more particularly, the wall construction structure of the lower part of the ship deck including a wall is constructed so that the space is partitioned in the lower part of the ship deck according to the requirements of a certain fire protection partition And it relates to a wall construction method.

선체의 갑판을 이루는 데크(deck)의 하부에는 구획된 공간이 존재한다.There is a partitioned space under the deck that forms the deck of the hull.

이러한 선박 데크 하부의 구획된 공간은 일정한 방화 구획 요건을 준수하도록 마련된 벽체들에 의해 구획된다. The partitioned space underneath this ship deck is partitioned by walls arranged to comply with certain fire compartment partition requirements.

선박 데크의 하부에서 벽체들에 의해 구획되는 공간의 일 예가 대한민국 등록특허번호 제10-1022986호(2011년03월10일자 등록, 이하 '특허문헌1'이라 함) 등에 개시되어 있다. An example of a space partitioned by walls at the bottom of a ship deck is disclosed in Korean Patent No. 10-1022986 (registered on March 10, 2011, hereinafter referred to as 'Patent Document 1').

한편, 도 1은 종래기술에 따른 선박 데크 하부의 벽체시공구조를 나타낸 사시도이다. On the other hand, Figure 1 is a perspective view showing the wall construction structure of the ship deck according to the prior art.

종래의 선박 데크 하부의 벽체시공구조(1)는, 도 1에 도시된 바와 같이, 벽체부(3)가 골조 빔(5)들의 하부에 시공될 때에 골조 빔(5)들이 벽체부(3)의 상부에 절개 형성된 빔 관통부(7)를 통과하도록 시공되는 구조이다. The wall construction structure 1 of the lower part of the conventional ship deck, as shown in Figure 1, when the wall portion 3 is constructed in the lower portion of the frame beams 5, the frame beams (5) wall portion (3) The structure is constructed so as to pass through the beam through portion 7 formed in the upper portion of the cut.

그러나, 종래의 선박 데크 하부의 벽체시공구조(1)에 의하면 벽체부(3)에 빔 관통부(7)가 형성되도록 상부 일부를 절개해야 하기 때문에 절개 과정에서 벽체부(3)가 손상될 수 있고, 절개 작업에 따른 작업시간과 비용이 증가 될 수 있다는 문제점이 있다. However, according to the wall construction structure 1 of the lower part of the ship deck, the wall portion 3 may be damaged during the cutting process because the upper portion of the wall construction structure 1 must be cut so that the beam through portion 7 is formed in the wall portion 3. And, there is a problem that the work time and cost can be increased according to the cutting operation.

또한, 골조 빔(5)들이 벽체부(3)의 빔 관통부(7)에 맞물려 설치되더라도 치수 오차 등으로 인한 빈틈이 발생 될 수 있기 때문에 일정한 방화 구획 요건을 만족시키지 못할 수 있다는 문제점이 있다. In addition, even when the frame beams 5 are installed in engagement with the beam penetrating portion 7 of the wall portion 3, there may be a problem that gaps may not be satisfied because of gaps due to dimensional errors and the like.

대한민국 등록특허번호 제10-1022986호(2011년03월10일자 등록)Republic of Korea Patent No. 10-1022986 (registered March 10, 2011)

본 발명의 목적은, 선박 데크 하부의 공간을 구획하는 벽체부의 손상을 방지할 수 있고, 벽체부 시공작업에 소요되는 시간과 비용을 절감할 수 있는 선박 데크 하부의 벽체시공구조 및 벽체시공방법을 제공하는 것이다. SUMMARY OF THE INVENTION An object of the present invention is to provide a wall construction structure and a wall construction method of a ship deck lower portion that can prevent damage to a wall portion partitioning a space in a lower portion of a ship deck, and to reduce the time and cost required for the wall portion construction work. To provide.

또한, 선박 데크의 하부에서 벽체부에 의해 구획된 공간이 일정한 방화 구획 요건을 충족시키도록 마련될 수 있는 선박 데크 하부의 벽체시공구조 및 벽체시공방법을 제공하는 것이다. In addition, it is to provide a wall construction structure and wall construction method of the lower part of the ship deck that can be provided so that the space partitioned by the wall portion in the lower part of the ship deck to meet a certain fire protection partition requirements.

상기 목적을 달성하기 위해 본 발명에 따른 선박 데크 하부의 벽체시공구조는, 선박의 데크를 형성하도록 구비된 골조 빔; 상기 골조 빔의 하부에 구비된 커버 플레이트; 및, 상기 커버 플레이트의 하부에 구비된 벽체부;를 포함하는 것을 특징으로 한다. In order to achieve the above object, the wall construction structure of the lower part of the ship deck according to the present invention, the frame beam provided to form a deck of the ship; A cover plate provided below the skeleton beam; And a wall part provided below the cover plate.

여기서, 상기 벽체부는 선체의 A급 방화 구획 요건에 적합한 불연성 재질로 마련된 것이 바람직하다. Here, the wall portion is preferably provided with a non-combustible material suitable for the class A fire protection partition requirements of the hull.

상기 커버 플레이트는 상기 골조 빔에 용접에 의해 결합되되 가접 용접방식으로 결합되고, 상기 골조 빔과 상기 커버 플레이트 사이에 용접되지 않은 부위는 밀봉재로 충진되어 기밀 처리된 것이 바람직하다. The cover plate is coupled to the frame beam by welding, but is joined by a temporary welding method, and the non-welded portion between the frame beam and the cover plate is filled with a sealing material and is hermetically treated.

본 발명에 따른 선박 데크 하부의 벽체시공구조는 상기 커버 플레이트 및 상기 벽체부 사이에 구비된 벽체부 설치 빔을 더 포함하는 것이 바람직하다. The wall construction structure of the lower part of the ship deck according to the invention preferably further comprises a wall portion mounting beam provided between the cover plate and the wall portion.

그리고, 상기 벽체부 설치 빔은 상기 커버 플레이트에 용접에 의해 결합되되 가접 용접방식으로 결합되고, 상기 커버 플레이트와 상기 벽체부 설치 빔 사이에 용접되지 않은 부위는 밀봉재로 충진되어 기밀 처리된 것이 바람직하다. In addition, the wall mounting beam is coupled to the cover plate by welding, but is joined in a temporary welding method, the non-welded portion between the cover plate and the wall mounting beam is preferably filled with a sealing material and hermetically treated. .

한편, 상기 목적을 달성하기 위해 본 발명에 따른 선박 데크 하부의 벽체시공방법은, 선박의 데크를 형성하도록 골조 빔을 설치하는 단계; 상기 골조 빔의 하부에 커버 플레이트를 설치하는 단계; 및, 상기 커버 플레이트의 하부에 벽체부를 설치하는 단계;를 포함하는 것을 특징으로 한다. On the other hand, the wall construction method of the lower part of the ship deck according to the present invention to achieve the above object, the step of installing a frame beam to form a deck of the ship; Installing a cover plate at the bottom of the frame beam; And installing a wall portion under the cover plate.

여기서, 상기 커버 플레이트를 설치하는 단계는, 상기 커버 플레이트를 상기 골조 빔의 하부에 가접 용접방식으로 결합하는 단계와, 상기 골조 빔과 상기 커버 플레이트 사이에서 용접되지 않은 부위를 밀봉재로 충진하여 기밀 처리하는 단계를 포함하는 것이 바람직하다. Here, the step of installing the cover plate, the step of joining the cover plate to the lower portion of the frame beam in a temporary welding method, and filling the non-welded portion between the frame beam and the cover plate with a sealing material airtight treatment It is preferable to include the step of.

본 발명에 따른 선박 데크 하부의 벽체시공방법은 상기 벽체부를 설치하는 단계 이전에 상기 커버 플레이트의 하부에 벽체부 설치 빔을 설치하는 단계를 더 포함하는 것이 바람직하다. The wall construction method of the lower part of the ship deck according to the present invention preferably further comprises the step of installing the wall portion mounting beam in the lower portion of the cover plate before the step of installing the wall portion.

그리고, 상기 벽체부 설치 빔을 설치하는 단계는, 상기 벽체부 설치 빔을 상기 커버 플레이트의 하부에 가접 용접방식으로 결합하는 단계와, 상기 커버 플레이트와 상기 벽체부 설치 빔 사이에서 용접되지 않은 부위를 밀봉재로 충진하여 기밀 처리하는 단계를 포함하는 것이 바람직하다. The installing of the wall mounting beam may include coupling the wall mounting beam to the lower portion of the cover plate by a temporary welding method, and attaching the non-welded portion between the cover plate and the wall mounting beam. It is preferred to include the step of filling with a sealing material and hermetic treatment.

본 발명에 따르면, 선박 데크 하부의 공간을 구획하는 벽체부의 손상을 방지할 수 있고, 벽체부 시공작업에 소요되는 시간과 비용을 절감할 수 있다. According to the present invention, it is possible to prevent damage to the wall portion partitioning the space under the ship deck, it is possible to reduce the time and cost required for the wall portion construction work.

또한, 선박 데크의 하부에서 벽체부에 의해 구획된 공간이 선급 규정에 따른 선체의 A급 방화 구획 요건을 충족시키도록 마련될 수 있다. In addition, the space partitioned by the wall part at the bottom of the ship deck may be arranged to meet the class A fire protection compartment requirements of the hull in accordance with the Rules.

도 1은 종래기술에 따른 선박 데크 하부의 벽체시공구조를 나타낸 사시도,
도 2는 본 발명에 따른 선박 데크 하부의 벽체시공구조를 나타낸 정면도 및 측면도,
도 3은 본 발명에 따른 선박 데크 하부의 벽체시공방법을 나타낸 시공 흐름도이다.
1 is a perspective view showing a wall construction structure of the lower part of the ship deck according to the prior art,
2 is a front view and a side view showing the wall construction structure of the lower part of the ship deck according to the present invention;
Figure 3 is a construction flowchart showing the wall construction method of the lower part of the ship deck according to the present invention.

이하에서는 첨부된 도면을 참조하여 본 발명에 대해 상세히 설명한다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 따른 선박 데크 하부의 벽체시공구조(10)는, 도 2에 도시된 바와 같이, 선박의 데크를 형성하도록 구비된 골조 빔(30)과, 골조 빔(30)의 하부에 구비된 커버 플레이트(40)와, 커버 플레이트(40)의 하부에 구비된 벽체부(50)를 포함한다. The wall construction structure 10 of the lower part of the ship deck according to the present invention, as shown in Figure 2, the frame provided to form the deck of the ship 30, the cover provided in the lower portion of the skeleton beam (30) The plate 40 and the wall part 50 provided in the lower part of the cover plate 40 are included.

이에 따라, 골조 빔(30)이 벽체부(50)를 가로질러 통과될 필요없이 골조 빔(30)의 하부에 구비되고 벽체부(50)의 상부에 구비된 커버 플레이트(40)에 의해 골조 빔(30)도 선박 데크의 하부 공간을 구획하는 일종의 벽체로서의 기능을 담당하도록 함으로써, 벽체부(50)의 손상을 방지할 수 있고, 벽체부(50)의 시공작업에 소요되는 시간과 비용을 절감할 수 있다. Accordingly, the skeleton beam 30 is provided by the cover plate 40 provided in the lower portion of the skeleton beam 30 and provided in the upper portion of the wall portion 50 without having to pass through the wall portion 50. Also, 30 may serve as a kind of wall partitioning the lower space of the ship deck, thereby preventing damage to the wall part 50 and reducing the time and cost required for the construction work of the wall part 50. can do.

선박의 데크(deck)는, 도 2에 도시된 바와 같이, 골조 빔(30)과, 골조 빔(30)의 상부에 설치되는 데크 플레이트(deck plate)(20)로 구성되어 진다. 이때, 골조 빔(30)의 가로방향으로는 가로 빔(31)이 구비될 수 있다. As shown in FIG. 2, the deck of the ship is composed of a frame beam 30 and a deck plate 20 provided on an upper portion of the frame beam 30. At this time, the horizontal beam 31 may be provided in the horizontal direction of the skeleton beam (30).

커버 플레이트(40)는 골조 빔(30)에 용접에 의해 결합되되 가접 용접방식으로 결합되고, 골조 빔(30)과 커버 플레이트(40) 사이에 용접되지 않은 부위는 실리콘 등과 같은 밀봉재로 충진되어 기밀 처리된다. The cover plate 40 is joined to the frame beam 30 by welding, but is joined by a temporary welding method, and the non-welded portion between the frame beam 30 and the cover plate 40 is filled with a sealing material such as silicon and sealed. Is processed.

즉, 도 2에 도시된 바와 같이, 골조 빔(30)과 커버 플레이트(40) 사이에는 골조 빔(30)의 길이방향을 따라 일정 간격을 두고 태크 웰드(tack weld) 처리된 곳과 태크 웰드 처리가 되지 않은 부위에서 매스틱 씨일(mastic seal) 처리된 곳으로 이루어진 용접 기밀부(70)가 마련된다. That is, as shown in FIG. 2, between the frame beam 30 and the cover plate 40, the tack welded place and the tack weld process at a predetermined interval along the longitudinal direction of the frame beam 30. The welding hermetic part 70 which consists of a place where the mastic seal process was performed in the part which is not provided is provided.

이에 따라, 골조 빔(30)에 커버 플레이트(40)가 용접 결합시 용접되지 않은 부위에서 생길 수 있는 틈새가 용접 기밀부(70)에 의해 완벽하게 기밀 처리됨으로써 골조 빔(30) 또한 벽체로서의 기능을 담당하도록 하여 선박 데크의 하부에서 벽체부(50)에 의해 구획된 공간이 선급 규정에 따른 선체의 A급 방화 구획 요건을 충족시키도록 할 수 있다. Accordingly, the gap that may occur in the unwelded portion when the cover plate 40 is welded to the skeleton beam 30 is completely hermetically treated by the welding hermetic portion 70, so that the skeleton beam 30 also functions as a wall. The space partitioned by the wall part 50 in the lower part of the ship deck may satisfy the class A fire protection partition requirements of the hull according to the classification requirements.

본 발명의 일실시예로서, 커버 플레이트(40)는 두께 6 mm 정도의 스틸(steel) 재질로 된 플레이트인 것이 바람직하다. In one embodiment of the present invention, the cover plate 40 is preferably a plate made of steel (steel) of about 6 mm thickness.

한편, 도 2에 도시된 바와 같이, 본 발명에 따른 선박 데크 하부의 벽체시공구조(10)는 커버 플레이트(40) 및 벽체부(50) 사이에 구비된 벽체부 설치 빔(60)을 더 포함하는 것이 바람직하다. On the other hand, as shown in Figure 2, the wall construction structure 10 of the lower portion of the ship deck according to the present invention further includes a wall portion mounting beam 60 provided between the cover plate 40 and the wall portion 50. It is desirable to.

벽체부 설치 빔(60)은 단면상으로 하부가 오목하게 함몰된 형상이 되도록 커버 플레이트(40)의 하부에 설치된다. The wall installation beam 60 is provided in the lower part of the cover plate 40 so that the lower part may be concave-shaped in cross section.

이에 따라, 커버 플레이트(40)의 하부에 벽체부 설치 빔(60)을 먼저 설치함으로써 벽체부(50)의 설치시 벽체부(50)의 상부가 벽체부 설치 빔(60)의 함몰된 공간으로 수용되게 하여 벽체부(50)를 커버 플레이트(40)의 하부에 용이하게 설치할 수 있다. Accordingly, the wall mounting beam 60 is first installed in the lower portion of the cover plate 40 so that the upper portion of the wall 50 is recessed in the wall mounting beam 60 when the wall 50 is installed. The wall part 50 can be easily installed in the lower part of the cover plate 40 by making it accommodated.

벽체부 설치 빔(60)은 커버 플레이트(40)에 용접에 의해 결합되되 가접 용접방식으로 결합되고, 커버 플레이트(40)와 벽체부 설치 빔(60) 사이에 용접되지 않은 부위는 실리콘 등과 같은 밀봉재로 충진되어 기밀 처리된다. The wall mounting beam 60 is joined to the cover plate 40 by welding, but is joined by a temporary welding method, and the non-welded portion between the cover plate 40 and the wall mounting beam 60 is a sealing material such as silicon. Filled and sealed.

즉, 도 2에 도시된 바와 같이, 커버 플레이트(40)와 벽체부 설치 빔(60) 사이에도 벽체부 설치 빔(60)의 길이방향을 따라 일정 간격을 두고 태크 웰드 처리된 곳과 태크 웰드 처리가 되지 않은 부위에서 매스틱 씨일 처리된 곳으로 이루어진 용접 기밀부(70)가 마련된다. That is, as shown in Figure 2, between the cover plate 40 and the wall portion mounting beam 60, the place where the tack weld treatment and the tack weld treatment at a predetermined interval along the longitudinal direction of the wall portion mounting beam 60. The welding hermetic part 70 which consists of a place where the mastic seal process was performed in the part which is not provided is provided.

이에 따라, 커버 플레이트(40)에 벽체부 설치 빔(60)이 용접 결합시 용접되지 않은 부위에서 생길 수 있는 틈새가 용접 기밀부(70)에 의해 완벽하게 기밀 처리됨으로써 커버 플레이트(40)와 벽체부 설치 빔(60) 또한 벽체로서의 기능을 담당하도록 하여 선박 데크의 하부에서 벽체부(50)에 의해 구획된 공간이 선급 규정에 따른 선체의 A급 방화 구획 요건을 충족시키도록 할 수 있다. Accordingly, the gap that may occur at the non-welded portion when the wall installation beam 60 is welded to the cover plate 40 is completely hermetically treated by the welding hermetic portion 70, thereby covering the cover plate 40 and the wall. The auxiliary installation beam 60 may also serve as a wall so that the space partitioned by the wall part 50 at the bottom of the ship deck may satisfy the class A fire protection partition requirements of the hull according to the classification requirements.

본 발명의 일실시예로서, 벽체부(50)는 선체의 A급 방화 구획 요건 중 후술할 A-60 요건에 적합한 두께 100 mm 정도의 스틸과 같은 불연성 재질로 마련된 격벽(partition wall)인 것이 바람직하다. As an embodiment of the present invention, the wall portion 50 is preferably a partition wall provided with a non-combustible material such as steel having a thickness of about 100 mm suitable for the A-60 requirement to be described later among the class A fireproof partition requirements of the hull. Do.

이에 따라, 선박 데크의 하부에서 벽체부(50)에 의해 구획된 공간이 선급 규정에 따른 선체의 A급 방화 구획 요건을 확실하게 충족시키도록 할 수 있다.
Thereby, the space partitioned by the wall part 50 in the lower part of the ship deck can be made to satisfy | fill the A-class fire-proof division requirements of a hull based on classification.

한편, 선급 규정에 따른 선체의 A급 방화 구획 요건은 대략 다음과 같다. On the other hand, the requirements of class A fire compartments are to be as follows.

a. 강(steel) 또는 이와 동등한 재질로 사용된 격벽, 갑판의 구조일 것a. The structure of bulkheads or decks made of steel or equivalent

b. 충분히 보강된 격벽, 갑판의 구조일 것b. Fullly reinforced bulkheads and deck construction

c. 60분의 표준화재 시험이 끝날 때까지 연기와 불꽃의 통과를 저지할 수 있는 격벽, 갑판의 구조일 것c. The structure of bulkheads and decks to prevent the passage of smoke and sparks until the end of the 60-minute standard test.

d. 다음 각급에 상당하는 시간 내에 불에 노출되지 아니하는 면의 평균 온도가 최초의 온도보다 140도를 넘어 상승하지 아니하고 또한 이음부를 포함한 어느 한 점에 있어서의 온도가 최초의 온도보다 180도를 넘어 상승하지 않도록 승인된 불연성 재료로서 방열되어 있는 격벽, 갑판의 구조일 것d. The average temperature of the surface that is not exposed to fire within the time equivalent to the following does not rise above 140 degrees above the initial temperature, and the temperature at any point including the seam rises above 180 degrees above the initial temperature. Non-combustible materials approved to be non-combustible and are to be structured in bulkheads and decks.

A급 방화 구획 요건Class A fire prevention compartment requirements 시간time A-60
A-30
A-15
A-0
A-60
A-30
A-15
A-0
60분
30분
15분
0분
60 minutes
30 minutes
15 minutes
0 min

이러한 구성에 의해, 본 발명에 따라 선박 데크의 하부에서 벽체부(50)가 시공되는 과정을 도 2 및 도 3을 참조하여 설명하면 다음과 같다. With this configuration, the process of constructing the wall portion 50 in the lower portion of the ship deck according to the present invention will be described with reference to FIGS. 2 and 3 as follows.

우선, 선박의 데크를 형성하도록 골조 빔(30)을 설치한다(S10). First, the frame beam 30 is installed to form a deck of the ship (S10).

다음에, 골조 빔(30)의 하부에 커버 플레이트(40)를 설치한다(S20). Next, the cover plate 40 is installed below the skeleton beam 30 (S20).

이때, 커버 플레이트(40)를 설치하는 단계(S20)는, 커버 플레이트(40)를 골조 빔(30)의 하부에 가접 용접방식으로 결합하는 단계와, 골조 빔(30)과 커버 플레이트(40) 사이에서 용접되지 않은 부위를 실리콘 등과 같은 밀봉재로 충진하여 기밀 처리하는 단계를 포함한다. At this time, the step of installing the cover plate 40 (S20), the step of coupling the cover plate 40 to the lower portion of the frame beam 30 by a welding method, the frame beam 30 and the cover plate 40 The non-welded portion is filled with a sealing material such as silicone, and airtightly treated.

그리고, 커버 플레이트(40)의 하부에 벽체부(50)를 설치한다. And the wall part 50 is provided in the lower part of the cover plate 40.

본 발명의 일실시예로서, 커버 플레이트(40)의 하부에 벽체부(50)를 설치하는 단계 이전에 커버 플레이트(40)의 하부에 벽체부 설치 빔(60)을 설치하는 단계(S30)를 더 포함하는 것이 바람직하다. In one embodiment of the present invention, prior to the step of installing the wall portion 50 in the lower portion of the cover plate 40, the step of installing the wall portion mounting beam 60 in the lower portion of the cover plate 40 (S30) It is preferable to further include.

이때, 벽체부 설치 빔(60)을 설치하는 단계(S30)는, 벽체부 설치 빔(60)을 커버 플레이트(40)의 하부에 가접 용접방식으로 결합하는 단계와, 커버 플레이트(40)와 벽체부 설치 빔(60) 사이에서 용접되지 않은 부위를 실리콘 등과 같은 밀봉재로 충진하여 기밀 처리하는 단계를 포함한다. At this time, the step of installing the wall portion mounting beam 60 (S30), the step of coupling the wall portion mounting beam 60 to the lower portion of the cover plate 40 by a temporary welding method, the cover plate 40 and the wall Filling the non-welded portions between the secondary installation beams 60 with a sealing material such as silicon and sealing them.

단계 30에서 커버 플레이트(40)의 하부에 벽체부 설치 빔(60)을 설치한 이후에 벽체부 설치 빔(60)의 하부에 벽체부(50)를 설치한다(S40). After installing the wall mounting beam 60 on the lower portion of the cover plate 40 in step 30, the wall 50 is installed on the lower portion of the wall mounting beam 60 (S40).

마지막으로, 골조 빔(30)의 상부에 데크 플레이트(20)를 설치하여 선박의 데크를 완성한다(S50).
Finally, the deck plate 20 is installed on the upper portion of the skeleton beam 30 to complete the deck of the ship (S50).

이에, 본 발명에 따르면, 벽체부(50)에 골조 빔(30)이 관통되는 빔 관통부를 별도로 절개 형성시킬 필요없이, 골조 빔(30)의 하부에 구비되고 벽체부(50)의 상부에 구비된 커버 플레이트(40)에 의해 골조 빔(30)도 선박 데크의 하부 공간을 구획하는 일종의 벽체로서의 기능을 담당하도록 함으로써, 벽체부(50)의 손상을 방지할 수 있고, 벽체부(50)의 시공작업에 소요되는 시간과 비용을 절감할 수 있다.
Thus, according to the present invention, the wall portion 50 is provided on the lower portion of the frame beam 30 and is provided on the upper portion of the wall portion 50, without the need to separately cut the beam through portion through which the frame beam 30 is penetrated. By the cover plate 40, the frame beam 30 also serves as a kind of wall partitioning the lower space of the ship deck, thereby preventing damage to the wall portion 50, The time and cost of construction work can be reduced.

이상 본 발명자에 의해서 이루어진 발명을 상기 실시 예에 따라 구체적으로 설명하였지만, 본 발명은 상기 실시 예에 한정되는 것은 아니고 그 요지를 이탈하지 않는 범위에서 여러 가지로 변경 가능한 것은 물론이다. Although the present invention has been described in detail with reference to the above embodiments, it is needless to say that the present invention is not limited to the above-described embodiments, and various modifications may be made without departing from the spirit of the present invention.

30 : 골조 빔 40 : 커버 플레이트
50 : 벽체부 60 : 벽체부 설치 빔
30: frame beam 40: cover plate
50: wall portion 60: wall portion mounting beam

Claims (9)

선박의 데크를 형성하도록 구비된 골조 빔(30);
상기 골조 빔(30)의 하부에 구비된 커버 플레이트(40); 및
상기 커버 플레이트(40)의 하부에 구비된 벽체부(50);
를 포함하는 것을 특징으로 하는 선박 데크 하부의 벽체시공구조.
Frame beam 30 provided to form a deck of the ship;
A cover plate 40 provided below the frame beam 30; And
A wall portion 50 provided below the cover plate 40;
Wall construction structure of the lower portion of the ship deck comprising a.
제1항에 있어서,
상기 벽체부(50)는 선체의 A급 방화 구획 요건에 적합한 불연성 재질로 마련된 것을 특징으로 하는 선박 데크 하부의 벽체시공구조.
The method of claim 1,
The wall portion 50 is a wall construction structure of the lower part of the ship deck, characterized in that provided with a non-combustible material suitable for the class A fire protection partition requirements of the hull.
제2항에 있어서,
상기 커버 플레이트(40)는 상기 골조 빔(30)에 용접에 의해 결합되되, 가접 용접방식으로 결합되고,
상기 골조 빔(30)과 상기 커버 플레이트(40) 사이에 용접되지 않은 부위는 밀봉재로 충진되어 기밀 처리된 것을 특징으로 하는 선박 데크 하부의 벽체시공구조.
3. The method of claim 2,
The cover plate 40 is coupled to the frame beam 30 by welding, it is coupled in a temporary welding method,
The non-welded portion between the frame beam 30 and the cover plate 40 is filled with a sealing material and the airtight wall construction structure, characterized in that the bottom of the ship deck.
제3항에 있어서,
상기 커버 플레이트(40) 및 상기 벽체부(50) 사이에 구비된 벽체부 설치 빔(60)을 더 포함하는 것을 특징으로 하는 선박 데크 하부의 벽체시공구조.
The method of claim 3,
The wall construction structure of the lower part of the ship deck, characterized in that it further comprises a wall portion mounting beam (60) provided between the cover plate (40) and the wall portion (50).
제4항에 있어서,
상기 벽체부 설치 빔(60)은 상기 커버 플레이트(40)에 용접에 의해 결합되되, 가접 용접방식으로 결합되고,
상기 커버 플레이트(40)와 상기 벽체부 설치 빔(60) 사이에 용접되지 않은 부위는 밀봉재로 충진되어 기밀 처리된 것을 특징으로 하는 선박 데크 하부의 벽체시공구조.
5. The method of claim 4,
The wall installation beam 60 is coupled to the cover plate 40 by welding, it is coupled in a temporary welding method,
The non-welded portion between the cover plate 40 and the wall installation beam 60 is filled with a sealing material, the wall construction structure of the lower part of the ship deck, characterized in that the airtight treatment.
선박의 데크를 형성하도록 골조 빔(30)을 설치하는 단계;
상기 골조 빔(30)의 하부에 커버 플레이트(40)를 설치하는 단계; 및
상기 커버 플레이트(40)의 하부에 벽체부(50)를 설치하는 단계;
를 포함하는 것을 특징으로 하는 선박 데크 하부의 벽체시공방법.
Installing a frame beam 30 to form a deck of the ship;
Installing a cover plate (40) at the bottom of the frame beam (30); And
Installing a wall portion (50) at a lower portion of the cover plate (40);
Wall construction method of the lower part of the ship deck comprising a.
제6항에 있어서,
상기 커버 플레이트(40)를 설치하는 단계는,
상기 커버 플레이트(40)를 상기 골조 빔(30)의 하부에 가접 용접방식으로 결합하는 단계와,
상기 골조 빔(30)과 상기 커버 플레이트(40) 사이에서 용접되지 않은 부위를 밀봉재로 충진하여 기밀 처리하는 단계를 포함하는 것을 특징으로 하는 선박 데크 하부의 벽체시공방법.
The method according to claim 6,
Installing the cover plate 40,
Coupling the cover plate 40 to a lower portion of the frame beam 30 in a temporary welding method;
Filling the non-welded portion between the frame beam (30) and the cover plate (40) with a sealing material to the airtight wall construction method comprising the step of sealing.
제7항에 있어서,
상기 벽체부(50)를 설치하는 단계 이전에 상기 커버 플레이트(40)의 하부에 벽체부 설치 빔(60)을 설치하는 단계를 더 포함하는 것을 특징으로 하는 선박 데크 하부의 벽체시공방법.
8. The method of claim 7,
Before installing the wall portion 50, the wall construction method of the bottom of the ship deck further comprises the step of installing the wall portion mounting beam (60) in the lower portion of the cover plate (40).
제8항에 있어서,
상기 벽체부 설치 빔(60)을 설치하는 단계는,
상기 벽체부 설치 빔(60)을 상기 커버 플레이트(40)의 하부에 가접 용접방식으로 결합하는 단계와,
상기 커버 플레이트(40)와 상기 벽체부 설치 빔(60) 사이에서 용접되지 않은 부위를 밀봉재로 충진하여 기밀 처리하는 단계를 포함하는 것을 특징으로 하는 선박 데크 하부의 벽체시공방법.
9. The method of claim 8,
Installing the wall portion mounting beam 60,
Coupling the wall mounting beam 60 to the lower portion of the cover plate 40 by a temporary welding method;
Filling the non-welded portion between the cover plate (40) and the wall portion mounting beam (60) with a sealing material to the airtight wall construction method comprising the step of sealing.
KR1020120091369A 2012-08-21 2012-08-21 Structure and method for installing partition wall under ship deck KR20140025646A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120091369A KR20140025646A (en) 2012-08-21 2012-08-21 Structure and method for installing partition wall under ship deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120091369A KR20140025646A (en) 2012-08-21 2012-08-21 Structure and method for installing partition wall under ship deck

Publications (1)

Publication Number Publication Date
KR20140025646A true KR20140025646A (en) 2014-03-05

Family

ID=50640594

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120091369A KR20140025646A (en) 2012-08-21 2012-08-21 Structure and method for installing partition wall under ship deck

Country Status (1)

Country Link
KR (1) KR20140025646A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105480383A (en) * 2015-12-29 2016-04-13 广船国际有限公司 Structure of partition wall of cabin room and ship

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105480383A (en) * 2015-12-29 2016-04-13 广船国际有限公司 Structure of partition wall of cabin room and ship

Similar Documents

Publication Publication Date Title
JP6179043B2 (en) Method for manufacturing liquefied natural gas carrier
KR20140013323A (en) Blast or firewall of marine structure
KR20140025646A (en) Structure and method for installing partition wall under ship deck
KR20140084696A (en) An installation structure for a barrier of an upper liquid dome
JP2015218505A (en) Foundation water drip member fitting structure and foundation water drip member
KR101086223B1 (en) Floating Panel for Floating Roof
KR20180031020A (en) Framework for molded element, wall element, and clean gas chamber
EP1213726A1 (en) End support system for a shipping container for nuclear fuel
JP6543036B2 (en) Explosion proof construction
JP5983425B2 (en) Seismic and tsunami reinforced structures for existing buildings
JP6371144B2 (en) Construction method of the exterior corridor of the unit type building
GB2615390A (en) Dry wall formations
JP5377986B2 (en) Construction method of unit type building
JP6946028B2 (en) building
JP2005163489A (en) Heat insulating foundation
KR20140039764A (en) Cable space sealing structure in plant
JP6585021B2 (en) Water stop structure
CN217953282U (en) Shelter bulletproof structure and special vehicle
JP6987738B2 (en) Floor structure
JP6735193B2 (en) Damping wall
CN109184042B (en) Steel-aluminum composite section bar and partition system based on steel-aluminum composite section bar
JP7082458B2 (en) Stair support structure
JP4772393B2 (en) Ship interior divider
US20210257117A1 (en) Lining method and lining
JP6672349B2 (en) Joint structure of outer wall panel and joint construction method