KR20110020401A - Excavation method for pre-nailed tunneling - Google Patents

Excavation method for pre-nailed tunneling Download PDF

Info

Publication number
KR20110020401A
KR20110020401A KR1020090078000A KR20090078000A KR20110020401A KR 20110020401 A KR20110020401 A KR 20110020401A KR 1020090078000 A KR1020090078000 A KR 1020090078000A KR 20090078000 A KR20090078000 A KR 20090078000A KR 20110020401 A KR20110020401 A KR 20110020401A
Authority
KR
South Korea
Prior art keywords
tunnel
hole
excavation
horizontal
nail
Prior art date
Application number
KR1020090078000A
Other languages
Korean (ko)
Other versions
KR101148331B1 (en
Inventor
서동현
Original Assignee
(주)현이앤씨
서동현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)현이앤씨, 서동현 filed Critical (주)현이앤씨
Priority to KR1020090078000A priority Critical patent/KR101148331B1/en
Publication of KR20110020401A publication Critical patent/KR20110020401A/en
Application granted granted Critical
Publication of KR101148331B1 publication Critical patent/KR101148331B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/02Driving inclined tunnels or galleries
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE: A digging method of a pre-stressing nail tunnel is provided to reduce boring amount and to excavate inner gang pre-stressing and inner gang pre-stressing nail tunnel at once blasting. CONSTITUTION: A digging method of a pre-stressing nail tunnel is composed like next. A pre-stressing nail is drilled on the face supposed to be drilled and a pre-support guide hole(30) at a pilot tunnel by additionally assembling a horizontal contour hole(40), a horizontal stopping hole(50), and a horizontal bottom hole. Those are blasted a pre-support empty hole, a horizontal outer hole, a horizontal magnifying hole, and a horizontal base ball.

Description

선지보네일 터널의 굴착방법{EXCAVATION METHOD FOR PRE-NAILED TUNNELING}Excavation METHOD FOR PRE-NAILED TUNNELING}

본 발명은 갱외선지보네일터널을 시공하거나 갱내선지보네일터널을 시공하는 공법인 대한민국 특허 제10-0740200호의 “선지보 터널 공법 및 이에 적합한 장치”에 추가로 기술개발을 하고자 하는 부분이다.The present invention is a part to develop the technology in addition to the "propagation tunnel construction method and the device suitable for it" of the Republic of Korea Patent No. 10-0740200, which is a construction method for constructing an outboard beam nail tunnel or a construction of a mine beam nail tunnel.

터널굴착시 갱내선지보네일 터널에서 선 굴착된 파일럿터널의 자유면을 최대한 이용하여 최소의 장약으로 최대의 굴착효과를 기대할 수 있고 갱외 및 갱내선지보네일 터널에서 1회 발파당 1회 굴진장을 최대로 굴착할 수 있도록 하며, 막장굴착을 다단분할 굴착할 경우 상하반단면 또는 전단면 굴착이 가능하므로 작업이 용이하면서도 안전하게 시공될 수 있는 선지보네일 터널의 굴착방법에 관한 것이다.During tunnel excavation, it is possible to expect the maximum excavation effect with minimum charge by utilizing the free surface of the pilot tunnel pre-excavated in the tunnel pre-excavation tunnel. It is possible to excavate to the maximum, and in the case of multi-segmental excavation of the membrane, it is possible to excavate the upper and lower cross-sections or the shear surface, so that the work can be easily and safely constructed, the method of excavating the bonbon tunnel.

종래 터널굴착을 위한 발파기술에 있어서 가장 중요한 요소는 막장면의 중심부에 일정규모의 구역을 정하여 먼저 발파하여 자유면을 형성하도록 하는 심발공의 발파이다. 이때 자유면의 크기와 형성되는 형태에 따라 터널굴착의 난이도가 결정된다고 해도 과언이 아니다.The most important element in the conventional blasting technology for tunnel excavation is the blasting of the deep hole to define the area of a certain size in the center of the membrane surface and to blast first to form a free surface. It is no exaggeration to say that the difficulty of tunneling is determined by the size and shape of the free surface.

종래의 발파 방법은 자유면을 형성하기 위한 심발공의 1차적인 발파가 필요하고 시간차를 두어 터널을 굴착하기 위한 2차 발파가 동시에 뇌관에 점화되어 이 루어진다.The conventional blasting method requires the primary blasting of the heart hole to form a free surface, and the second blasting to excavate the tunnel at a time difference is ignited at the primer at the same time.

종래의 터널 굴착공법은 터널 원지반의 조건에 따라 1회 굴진장과 막장 굴착방법은 다단 분할굴착부터 전단면 굴착 공법까지 다양하게 적용되나 대단면 터널에서는 대부분 다단분할 굴착이 적용된다.According to the conventional tunnel excavation method, the single excavation site and the membrane excavation method are variously applied from the multi-stage digging excavation to the shear surface digging method according to the conditions of the tunnel base, but the multi-stage dividing excavation is mostly applied in the large-sized tunnel.

따라서 본 발명은 상기와 같은 문제점을 해결하기 위한 것으로서 본 발명의 목적은 갱내선지보네일 터널에서는 대단면의 본선 터널을 굴착하기 전에 선굴착된 파일럿 터널을 이용한 자유면의 활용으로 종래 기술에서 중요한 요소인 심발공을 생략할 수 있도록 하고 대단면 본선 터널의 굴착면 외곽으로의 선지보네일을 시공하면서 생성된 선지보 빈공을 이용하여 발파함으로써 천공량을 감소시켜 경제적인 시공을 할 수 있도록 하고 갱내선지보 및 갱외선지보네일 터널에서 1발파당 1회 굴진장을 최대한 굴착할 수 있도록 하는 반면 굴진장 증가에 따른 늘어나는 여굴량을 최소화시키도록 한다.Therefore, an object of the present invention is to solve the above problems, and an object of the present invention is to use a free surface using a pre-excavated pilot tunnel before excavating a main tunnel of a large cross section in a tunnel shipborne nail tunnel. It is possible to omit the deep hole and blast by using the hollow beams created by constructing the hollow beams to the outside of the excavated surface of the main cross-section tunnel so that the drilling amount can be reduced and economical construction is possible. Excavation sites should be excavated as much as once per blast in beam and out-of-shore outboard nail tunnels, while minimizing the amount of excavation due to the increase in excavation sites.

선지보 네일만으로 굴착 후 갱내 추가 지보 없이 터널이 완벽하게 자립하여 추가지보에 따른 작업의 번거로움을 제거하고 굴착이 용이하도록 하고자 한다.After excavation with only the nail nails, the tunnel is completely self-supporting without additional support in the gang to remove the hassle of work according to the additional support and to facilitate the excavation.

또한 갱내선지보네일 터널에서 U자형 측정자를 사용하여 선지보 빈공의 정확한 위치파악으로 시공성을 향상시키도록 한다.In addition, the U-shaped measuring device is used in the mine tunnel nailnail tunnel to improve the constructability by pinpointing the position of the hollow beams.

상기와 같은 목적을 실현하기 위하여 본 발명에서는 다음과 같은 선지보 터 널의 굴착방법을 개발하였다.In order to realize the above object, the present invention has developed a method of drilling a shipboard tunnel as follows.

갱내선지보네일 터널 시공시 파일럿 터널에서 선지보네일을 시공하면서 생성된 천단부의 선지보 빈공(30)과 굴착이 예정된 막장면에 추가로 수평외곽공(40), 수평확대공(50) 및 수평바닥공(60)을 조합하여 천공한 후 장약하여 선지보 빈공-수평확대공-수평외곽공-수평바닥공의 순으로 발파하는 특징이 있다. 이때 굴진장이 늘어남에 따라 상기 선지보 빈공의 앞 열에 같은 방향으로 전열공(31)을 천공하여, 발파시 폭력의 조절이 가능한 특징이 있다.In addition to the horizontal borehole (30), horizontal enlargement hole (50), and horizontal borehole (30) in addition to the hollow borehole (30) at the top of the top end, which is created while constructing the propane nail in the pilot tunnel, Combination and drilling of the bottom hole 60 is characterized in that the blasting in the order of empty beam-horizontal expansion hole-horizontal outer hole-horizontal floor hole. At this time, as the excavation length increases, the heat-transfer hole 31 is drilled in the same direction in the front row of the hollow beam, so that the blasting can be controlled.

또한 갱외선지보네일터널 또는 갱내선지보네일터널 시공시 터널설계시 원지반이 연암 이상의 양호한 지반 조건에서는 선지보 네일 만을 설치하여 자립하도록 네일 간격과 길이를 조정하여 1회 발파당 굴진장과 막장굴착을 모델링하여 해석하는 단계; 터널 굴착전에 선지보네일을 시공하는 단계; 1회 발파당 굴진장을 선지보 네일만으로 완전 자립시키고 작업의 용이성에 따라 자유롭게 시공하는 단계로 이루어지는 연암 이상 원지반에 선지보네일만으로 선 자립을 확보한 후 굴착하는 것을 특징으로 하는 선지보네일터널의 굴착방법을 적용할 수 있다. Also, when designing tunnels when constructing out-of-ground beam nail tunnels or out-of-ground beam nail tunnels, if the ground is in good soil conditions over soft rock, only the nail nails are installed to adjust the spacing and length of the nails so that they become independent. Modeling and analyzing; Constructing an eye beam nail before the tunnel excavation; The excavation site of the Prophet Nail, characterized by the excavation after securing the self-independence only with the propagation bonil on the Yeonam abnormal base, which consists of the step of completely self-initiating the excavation site per blasting with only the propulsion nail and freely constructing it according to the ease of work. Excavation methods can be applied.

이때 1회 굴진시 상기 수평외곽공을 두 열로 천공하며 터널의 여굴 허용선까지 외측으로 제1외곽공(41)을 1회 굴착 천공장의 반까지 방사상으로 경사 천공하고, 내측으로 여굴의 폭만큼 평행이동하여 제2외곽공(42)을 1회 굴착 천공장까지 천공한 후 상기 수평외곽공을 장약할 때, 상기 제1외곽공은 천공홀 전체에 정밀폭약을 장약하고 상기 제2외곽공은 공심부로부터 천공장의 절반만 정밀폭약을 장약하는 특징이 있다.At this time, when drilling once, the horizontal perforation is drilled in two rows, and the first outer perforation 41 is radially inclined to half of the excavation fabric factory once to the permissible line of the tunnel, and parallel to the width of the perforation inward. When the second outer hole 42 is drilled once to the drilling factory, and the horizontal outer hole is charged, the first outer hole charges the precision explosives in the entire drilling hole and the second outer hole is filled with the ball. Only half of the mill plant from the core is charged with precision explosives.

또한 갱내선지보네일터널 굴착시 천단부의 선지보 빈공과 굴착이 예정된 막장면에 추가로 수평외곽공, 수평확대공을 천공할 때 U자형 측정자(130)의 한 쪽을 선지보 빈공에 삽입하고 타측을 막장면에 노출시켜 선지보 빈공의 위치를 육안으로 확인하고 발파공을 천공 가능하도록 하는 특징이 있다.In addition, when drilling the inner beam boil tunnel, one side of the U-shaped measuring instrument 130 is inserted into the empty beam hole when the horizontal outer hole and the horizontal enlarged hole are drilled in addition to the hollow hole in the top end of the ceiling and the scheduled membrane surface. It is characterized by exposing it to the curtain surface to visually check the position of the hollow beam and allow the blasting hole to be drilled.

상기와 같은 특징을 지닌 본 발명으로 얻게 되는 효과는 다음과 같다.Effects obtained by the present invention having the above characteristics are as follows.

갱내선지보네 일터널에서 대단면의 본선 터널을 굴착하기 전에 선굴착된 파일럿 터널의 자유면을 활용하기 때문에 자유면을 확보하기 위한 심발공의 발파를 생략할 수 있고 선천공된 선지보 빈공(30)을 이용하여 발파하는 만큼 필요한 발파공의 수가 줄어듦으로 천공량을 감소시킬 수 있다. 결과적으로 파일럿 터널을 자유면으로 이용한 장약량의 감소는 최소의 장약으로 최대의 굴착효과를 얻도록 하므로 경제적인 시공의 효과를 볼 수 있다.Since the free surface of the pre-excavated pilot tunnel is utilized before the excavation of the main tunnel of the large section in the mine tunnel tunnel, the blasting of the core hole to secure the free surface can be omitted. ) Can be used to reduce the amount of perforations as the number of blast holes required decreases. As a result, the reduction of the amount of loading using the pilot tunnel as a free surface allows to obtain the maximum digging effect with the minimum amount of loading, and thus the economical construction effect can be seen.

또한 갱외 및 갱내선지보네일 터널에 있어서 설계를 통해 선지보네일 만으로터널이 자립하도록 네일 간격을 조정하고 본선터널의 굴착면을 발파하기 전에 선지보네일를 먼저 시공하여 터널의 자립시간을 충분히 확보할 수 있기 때문에 종래의 1회 발파당 굴진장 보다 더 굴진장을 늘릴 수가 있고 대단면 터널에서 굴착시 안정을 위해 분할굴착 하던 것을 반단면 또는 전단면 굴착도 가능하게 되며 공사비와 공기 단축으로 종래보다 경제적이다. In addition, it is possible to secure enough independence time of tunnels by adjusting nail spacing so that tunnels can be made to stand alone by using propagation nails only by designing outboard and outboard tunnel nails tunnels before constructing the excavation surface of the main tunnel. Therefore, it is possible to increase the excavation length more than the conventional excavation site per one blasting, and it is also possible to excavate the dividing excavation for half section or shear plane for stability when excavating in large cross section tunnel. .

이때 종래의 발파방법을 이용할 경우 1회 굴진장이 늘면 그많큼 여굴량이 크게 발생할 수 있으나 본 발명과 같이 외곽공이 여굴선을 벗어나지 않도록 두 열로 경사지게 두배 만큼 길게 배치하여 여굴 영역 범위에서 발파되므로 1회 굴진량이 종래보다 늘어도 여굴량이 늘지 않게 된다.In this case, when using a conventional blasting method, the amount of excavation may increase as much as one excavation length is increased. However, once excavated in the excavation area range, the perforation is doubled to be inclined in two rows so that the outer hole does not escape the excavation line. Even if it increases more conventionally, the amount of overfiltration does not increase.

또한 갱내선지보네일 터널 굴착을 위한 발파공 천공시 터널 종방향으로 길이를 조정할 수 있는 U자형 측정자를 사용하여 터널 굴착면에 미리 표시함으로써 선지보 빈공과 발파공의 중첩을 피하여 천공 발파할 수 있다.In addition, when drilling the blast hole for drilling of the mine inner beam nail tunnel, it is possible to blast by avoiding the overlap between the hollow beam and the blast hole by using a U-shaped measuring device that can adjust the length in the longitudinal direction of the tunnel.

이하, 본 발명를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings the present invention will be described in detail.

도 1은 갱내선지보네일 터널에서 선지보 빈공을 발파공으로 이용하는 장약을 배치한 단면도이고, 도 2는 갱내선지보네일터널에서 선지보 빈공을 발파공으로 이용하지 않는 장약을 배치한 단면도이고, 도 3a와 3b는 갱내선지보 및 갱외선지보네일터널에서 1회 발파당 기존보다 늘어난 굴진장을 도시한 단면도이고, 도 4와 도 5는 각각 도1의 AA부분과 BB부분을 확대 도시한 단면도이고, 도 6은 갱내선지보네일터널에서 선지보 빈공과 전열공을 확대 도시한 단면도이고, 도 7a 내지 7e는 본 발명에 따른 발파공별 장약형태를 상세 도시한 단면도이고, 도 8은 굴착면에서 선지보 빈공의 위치를 표시하기 위한 U자형 측정자를 도시한 단면도이고, 도 9는 선지보네일 터널의 실시 예이며 도 10a 내지 10c는 선지보네일 터널의 개념도이며, 도 11a 및 11b는 갱내선지보네일 터널의 설계 수치해석에 대해 도시한 그림이다.FIG. 1 is a cross-sectional view of a charge using an empty beam as a blasting hole in a mine propagation tunnel tunnel, FIG. 2 is a cross-sectional view of a charge not using a hollow hole as a blasting hole in a mine propagation tunnel tunnel, FIG. 3A And 3b is a cross-sectional view showing the excavation site increased per conventional blasting in the mine interior bulletin board and mine outboard tunnel tunnel, Figure 4 and Figure 5 is an enlarged cross-sectional view of AA and BB portion of Figure 1, Figure 6 is an enlarged cross-sectional view showing the hollow beam hollow hole and the heat transfer hole in the mine interior beam nail tunnel, Figure 7a to 7e is a cross-sectional view showing the details of the blast hole according to the present invention, Figure 8 is a crossbeam in the excavation surface 9 is a cross-sectional view showing a U-shaped measuring instrument for indicating the position of the empty space, Figure 9 is an embodiment of the propagation nail tunnel, Figures 10a to 10c is a conceptual diagram of the propagation nail tunnel, Figures 11a and 11b is a mine propagation nail This figure shows the design numerical analysis of the tunnel.

즉, 도 11a는 갱내선지보네일 터널의 시공단계 수치해석을 위한 3D모델이고, 지반이 TYPE-4인 조건에서 갱내 선지보네일 시공후 1회 굴진장 6.0m로 5막장 30m를 선지보네일 외에 추가지보 없이 굴착한 경우의 모델링이고, 도 11b는 시공단계별 도 11a의 둘째 막장에서 천단기준점의 천단변위 그래프이다.In other words, Figure 11a is a 3D model for the numerical analysis of the construction stage of the mine shaft mine nail tunnel, and after the construction of mine mine shaft soil under the condition that the ground is TYPE-4, 6.0m at the excavation site of 5m 30m other than the shipboard nail This is modeling when excavation is performed without additional support, and FIG. 11B is a graph of top end displacement at the second end of FIG. 11A according to construction stages.

본 발명은 선지보 터널공법(특허 제10-0740200호)의 미 개발 부분인 발파 굴착에 관한 것이다.The present invention relates to blasting excavation that is an undeveloped part of the sunbo tunnel method (Patent No. 10-0740200).

선지보 터널 공법은 네일을 갱외의 상부 지표면에서 선시공후 굴착하는 방법(이하, 갱외선지보네 터널이라 칭함)과 계획된 대단면 터널내에 파일럿 터널을 관통하고 그 내부에서 선지보네일을 대단면 터널 단면을 향해 선시공 하는 방법(이하, 갱내선지보네일 터널이라 칭함)이 있다. 이 두가지 공법을 통칭하여 선지보네일터널공법(Pre-Nailed Tunnelling Method)이라 한다.The propagation tunnel method is to excavate the nail after starting the construction on the upper surface of the shaft (hereinafter referred to as the outboard propulsion tunnel) and through the pilot tunnel in the planned large cross section tunnel, and the cross section of the cross section tunnel inside the prop beam There is a method of pre-installation (hereinafter referred to as mine tunnel nail tunnel). These two methods are collectively called the Pre-Nailed Tunnelling Method.

이 공법은 갱내 또는 갱외에서 선지보네일 설치 후 본선터널까지 굴착 확공하고 설계에 따라 추가지보재인 숏크리트 락볼트등을 시공하며 라이닝을 선택적으로 추가하기도 한다. This method excavates and expands to the main tunnel after the installation of the pre-shipped nails inside or outside the pit, and additionally adds lining to the construction of shotcrete rock bolts.

상기의 대단면 터널은 도로 3차선 이상의 폭원을 갖는 터널을 통칭하며 일반적으로는 4차선 도로터널을 흔하게 대단면 터널이라고 한다. The large section tunnel is a tunnel having a width source of more than three lanes of roads, and a four lane road tunnel is generally referred to as a large section tunnel.

도 10a에서 도시한 바와 같이, 갱내선지보네일 터널에서 선지보 설치에 따른 선지보 빈공(30)을 이용하여, 터널 발파를 하는 방법에 대해 갱내선지보 4차로 도로터널을 예로 다음 표1과 같이 암반등급에 따라 TYPE별로 구분하고 기존 2차로 터널의 암반등급과 비교하여 설명한다.As shown in FIG. 10a, a method of performing tunnel blasting using a hollow beam 30 in accordance with the installation of a hollow beam in a tunnel hollow nail tunnel is shown below. Classify by type according to rock class and compare with rock class of existing 2nd tunnel.

표 1. 암반등급에 따른 터널의 지보타입 및 굴진장Table 1. Jib types and excavation sites for tunnels according to rock class

RMRRMR 100~81100-81 80~6180-61 60~4160-41 40~2140-21 20 이하20 or less 암반등급Bedrock grade I 암반상태Rock condition 매우 양호Very good 양호Good 보통usually 불량Bad 매우 불량Very bad 기존2차로 도로터널2nd Road Tunnel 지보 TYPEJibo TYPE 1One 22 33 44 55 굴진장Excavation site 3.5m이상More than 3.5m 3.5m3.5m 2.0m2.0m 1.5m/3.0m1.5m / 3.0m 1.2m/1.2m1.2m / 1.2m 선지보네일
4차로 도로터널

Propane nail
4 lane road tunnel

지보 TYPEJibo TYPE 1One 22 33 44 55
1회발파당 굴진장Drilling site per blast 6.0m이상6.0m or more 3.0m이상More than 3.0m 2.0m이상
/2.0m이상
2.0m or more
More than 2.0m
1.5m이상
/1.5m이상
1.5m or more
More than 1.5m
1.5m이상
/1.5m이상
1.5m or more
More than 1.5m
선지보네일
시공범위
Propane nail
Construction range
90°이하 90 ° or less 90°
~100°이하
90 °
~ 100 ° or less
90°
~100°이하
90 °
~ 100 ° or less
100°
~120°이하
100 °
~ 120 ° or less
120°
~180°이하
120 °
~ 180 ° or less

상기한 도 1에서 도시한 바와 같이, 갱내선지보네일터널을 시공함에 있어서, 파일럿터널에서 선지보네일를 시공하면서 생성된 천단부의 선지보 빈공(30)과 굴착이 예정된 막장면에 추가로 수평외곽공(40), 수평확대공(50) 및 수평바닥공(60)을 조합하여 천공한 후 상기 선지보 빈공과 수평외곽공, 수평확대공, 수평바닥공에 장약하여 발파한다.As shown in FIG. 1, in the construction of the mine tunnel nail tunnel, the horizontal hollow hole is additionally added to the hollow beam 30 of the top end portion that is generated while constructing the prop beam nail in the pilot tunnel and the scheduled membrane face. (40), and then drilled by combining the horizontal expansion hole 50 and the horizontal bottom hole (60), and then blasted by blowing into the above-mentioned hollow hole, horizontal outer hole, horizontal enlargement hole, horizontal ground hole.

파일럿터널에서 선지보네일을 시공하는 것은 천공후 네일의 설치, 그라우팅공정을 본선 터널의 굴착선 까지만 하고 선지보 빈공을 형성해야 하기 때문에 시공이 용이하지않고 공사비가 커지게 되므로 가능한 굴착단계에서 자립에 취약한 천단부를 선지보네일만으로 보강한 구조해석에 의해 터널의 자립이 확보되는 범위에서 선지보네일 시공을 최소로 하는 것이 유리하다.In the pilot tunnel, the construction of the pre-boned nails is necessary because the installation and grouting process of the nails after drilling is required only to the excavation line of the main ship tunnel, and the pre-engineered hollow holes are formed. It is advantageous to minimize the construction of the propane nails to the extent that the independence of the tunnel is secured by the structural analysis reinforcing the fragile ceiling only with the propane nail.

따라서 이때 발파를 위한 상기 선지보 빈공은 표1에서 보여주는 바와 같이 지반의 자립성에 따라 TYPE-1~5로 구분되어 90°이하 또는 90°내지 180° 범위의 선지보빈공 사이각(32)을 이루는 내에서 설치된다. 지반의 자립성은 RMR (Bieniawski) 분류에 따라 지반을 5등급으로 RMR 값을 100~81, 80~61, 60~41, 40~21, 20 이하로 분류한 것을 기준으로 한다. 상기 표1의 TYPE-5와 같이 지반이 불량한 경우는 상부 반단면의 180° 범위 내로 시공되고 TYPE-1과 같이 지반이 다 소 안정한 경우는 터널의 천단부의 정점을 중심으로 하여 천단부에서 90°이하 범위 내로 방사상의 부채살 형태로 시공한다.Therefore, at this time, the hollow bore hole for blasting is divided into TYPE-1-5 according to the independence of the ground as shown in Table 1 to form an angle between the hollow bore hole (32) of 90 ° or less or 90 ° to 180 ° range Is installed within. Soil independence is based on the classification of the soil into 5 grades according to the RMR (Bieniawski) classification, and the RMR values below 100 ~ 81, 80 ~ 61, 60 ~ 41, 40 ~ 21, 20. If the ground is bad as shown in TYPE-5 of Table 1, it is constructed within the range of 180 ° of the upper half section, and if the ground is somewhat stable as in TYPE-1, it is 90 ° from the top of the top of the tunnel end. It should be constructed in the form of radial fan meat within the following ranges.

가능한 굴진장이 길게 되도록 선지보네일터널의 장약은, 뇌관을 역기폭 되도록 공저부터 배열 설치하여 1발파당 굴진장이 정확히 시공되도록 한다. 순기폭시 발생하는 미굴착부의 발생을 최소화하고자 하는 의도이다. 또한 확대공을 먼저 기폭할 경우 선지보 빈공(30)과 전열공이 시간차와 뇌관의 위치에 따라 손상될 우려가 있으므로 상기 장약된 폭약을 선지보 빈공-수평확대공-수평외곽공-수평바닥공의 순으로 발파한다.In order to make the excavation length as long as possible, the charge of Seonjebonnail Tunnel is installed from the bottom to arrange the primer so that the excavation length per blast is correctly installed. The intention is to minimize the occurrence of unexcavated parts generated during net explosion. In addition, if the detonation hole is detonated first, the line bore hole 30 and the heat transfer hole may be damaged depending on the time difference and the position of the primer. Therefore, the above-mentioned explosive charge is made by the line bore hole-horizontal enlargement hole-horizontal outline hole-horizontal bottom hole. Blasting in order of.

상기 방법으로 발파함에 있어서, 상기한 도 6에서 도시한 바와 같이 1회발파당 굴진장을 종래보다 늘이면 일정하게 배열되어 있는 선지보 빈공의 종방향 간격이 파일럿 터널쪽 전색장보다 클 경우 선지보 빈공의 앞 열에 같은 방향으로 전열공(31)을 천공하여, 발파시 폭력을 조절할 수 있다.In the blasting by the above method, as shown in FIG. 6 above, when the excavation length per blast is increased than in the prior art, the propagation beam is longer than the pilot tunnel side full length. By drilling the heat-transfer hole 31 in the same direction in the front row of the vacant space, it is possible to control the violence during blasting.

상기 표1에서 예시한 바와 같이 선지보 4차로 도로터널에 있어서, TYPE-2의 굴진장은 3m이상이고 TYPE-3의 굴진장은 2m이상을 적용한다. TYPE-2와 3은 선지보 빈공을 이용한 발파방법을 적용하지만 화약의 폭력 조절 차원에서 선지보 빈공 앞에 전열공을 도 6에서 도시한 바와 같이 배치하여 장약 발파한다. 전열공을 추가함에 있어서, TYPE-2는 2열을 추가 천공하고 TYPE-3은 1열을 추가 천공한다.As exemplified in Table 1 above, in the tunnel road of Sunjibo 4 lanes, the excavation length of TYPE-2 is more than 3m and the excavation length of TYPE-3 is more than 2m. TYPE-2 and 3 apply the blasting method using the empty beam, but in order to control the violence of gunpowder, the thermal bomb is placed in front of the empty beam as shown in FIG. In the addition of heat transfer holes, TYPE-2 drills two additional rows and TYPE-3 drills one additional row.

이에 따른 효과는 발파된 암 버럭의 크기가 너무 커지는 것을 방지할 수 있고 보강된 터널 주변 지반에 작용하는 폭력의 크기를 줄일 수 있다.The effect can thus prevent the size of the blasted cancer block from growing too large and reduce the amount of violence acting on the ground around the reinforced tunnel.

상기 도 6과 도 7b에서 도시한 바와 같이, 폭약을 장약할 때 상기 선지보 빈 공(30)은 돌출된 상기 선지보네일를 보호하기 위한 보호재(120)를 네일 선단으로부터 채우고 그 바로 밑에 전색을 한다. 이 보호재와 전색의 합계 길이는 선지보 빈공이 선발파 되어도 수평외곽공(40)과 수평확대공(50)이 손상되지 않도록 상기 선지보 빈공의 본선터널 굴착선 위치로부터 수평외곽공의 최소저항선과 수평확대공의 최소저항선이 더해진 길이 만큼 이격시킨 길이로 하며 이지점부터 폭약을 장약하고 공 입구를 전색한다. 이때 전열공 역시 최소저항선 거리만큼 이격 되도록 천공및 장약을 하고 전색 한다. 장약량은 저항선과 공간거리를 고려하여 현장 지반 조건에 따른 장약량 추정 이론식과 경험식에 의해 산정하여 채운다.As shown in FIGS. 6 and 7B, when charging explosives, the prop bobbin ball 30 fills the protective material 120 for protecting the protruding prop nail from the nail tip and color it directly below. . The total length of the protective material and all colors is determined by the minimum resistance line of the horizontal outer hole from the position of the main tunnel digging line of the hollow hole so that the horizontal outer hole 40 and the horizontal enlargement hole 50 are not damaged even if the hollow hole emptying starts. The length is separated by the length of the horizontal resistance hole plus the minimum resistance line. Charge explosives from this point and color the entrance. In this case, the heating holes are also drilled and charged so as to be spaced apart by the minimum resistance line distance. The dose is calculated and filled by the theoretical and empirical formulas for estimating the dose according to site conditions considering the resistance line and the clearance.

상기 선지보 빈공과 같이 상향공에 대한 전색은 흘러 내리지 않도록 점토가 포함된 모래를 이용하여 하도록 한다. 보호재(120)로는 기 시공된 선지보 네일 및 그라우팅이 손상되지 않도록 네일 선단에 폴리에틸렌폼과 같은 완충재를 사용하도록 한다.Like the sunbo hollow hole, the color of the uphole is to be used by using sand containing clay so as not to flow down. As the protective member 120, a buffer material such as polyethylene foam is used at the tip of the nail so that the previously constructed nail nail and grouting are not damaged.

또 다른 실시 방법으로 갱내 선지보네일터널에서 상기와 같이 1회 굴진 길이 만큼 발파하기 위해서 화약을 장약할 때, 상기 선지보 빈공(30)에는 화약류나 폭약을 장약하지 않고 상기 굴진방향으로 천공된 발파공에만 화약류나 폭약을 장약할 수도 있다. 이때 선지보 빈공은 장약을 하지 않으므로 무장약공으로 활용되며 기폭순서에서 제외되므로 상기 장약된 화약류나 폭약을 수평확대공-수평외곽공-수평바닥공의 순으로 발파한다.In another embodiment, when the gunpowder is charged to blast as much as the length of the excavation as described above in the mine shaft bonn tunnel, the blast hole drilled in the excavation direction without the charge of explosives or explosives in the ship hollow hole 30. You can only charge gunpowder or explosives. At this time, the empty space is used as an armed drug because it does not charge, and the explosives or explosives are expelled in the order of horizontal expansion hole-horizontal outer hole-horizontal bottom hole.

상기한 도 3a 및 3b에 도시한 바와 같이, 선지보네일 터널(갱내선지보 또는 갱외선지보네일 터널)에서 종래보다 작업성을 용이하게 하고 1발파당 굴진장을 길 게 한다.As shown in Figs. 3A and 3B, in the propagation nail tunnel (inner beam propagation or outboard propagation tunnel tunnel), the workability is easier and the excavation length per blast is longer than before.

이와 같이 구성된 선지보네일터널에 있어서, 작업성을 용이하게 하고 1발파당 굴진장을 길게하며 막장굴착을 단순화 하기위해 터널설계시 원지반이 연암 이상의 양호한 지반 조건에서 선지보 네일 만을 설치하여 자립하도록 네일 간격과 길이를 조정하여 1회 발파당 굴진장과 추가 지보없이 1막장 이상의 굴착을 모델링하여 해석하는 단계; 본선터널 굴착전에 선지보네일을 시공하는 단계; 1회 발파당 굴진장을 선지보 네일만으로 완전 자립시키고 설계와 작업의 용이성에 따라 1막장 이상을 발파 굴착 시공하는 단계로 이루어지는 연암 이상 원지반에 선지보네일만으로 선 자립을 확보한 후 굴착하는 것을 특징으로 하는 선지보네일터널의 굴착방법을 적용한다. In the sunbeam nail tunnel constructed in this way, in order to facilitate the workability, lengthen the excavation length per blast, and simplify the membrane excavation, in the tunnel design, the base ground is installed by the sole nail nail only in good ground condition over soft rock. Modeling and analyzing excavation of one or more membranes without adjusting the spacing and blasting per blast by adjusting intervals and lengths; Constructing a sun nail before the main tunnel excavation; The excavation site per blasting is fully self-reliant with only the nail nails and the excavation is achieved after securing the independence with only the edge nails on the soft rock ore base consisting of blasting and constructing more than one curtain curtain according to the design and ease of work. The excavation method is to be applied.

종래에는 지보의 중요성을 먼저 고려하는 작업 방법을 적용했으나 본 발명은 선지보네일로 안전을 확보한 후 작업의 용이성을 고려하여 여러 막장에서의 터널 설계는 시공 단계 해석을 터널막장을 다단분활 굴착하여 숏크리트와 락볼트로 보강하고 주변지반의 변형이 수렴되면 다음단계의 분할면을 굴착하여 지보를 완료하는 식으로 여러단계로 굴착하여 한 막장을 굴착 완료하는 것이다. 다단분할 굴착은 대단면터널의 막장을 중벽분할, CD분할, 측벽도갱 등으로 굴착하는 것을 말하며 시공성은 상하반단면 터널이 가장 유리하나 종래에는 대단면 터널에서 자립성이 어려워 적용이 어려웠다.Conventionally, a work method that considers the importance of the support is applied first, but the present invention secures safety with an advance beam nail and considers the ease of operation. When it is reinforced with rock bolts and the deformation of the surrounding ground converges, the dividing surface of the next stage is excavated to complete the support. Multi-segment excavation refers to the excavation of the membrane of a large-sized tunnel by middle wall splitting, CD splitting, and side wall digging.

상기의 다단분할 굴착은 시공이 매우 번거롭고 터널의 안정이 불안전한 상태에서 작업이 진행된다. 숏크리트와 락볼트 그리고 종래 선지보터널에 사용된 조각 판, 철근으로 짜여진 트러스판을 분할굴착시 마다 설치하여 터널 원지반과 지보재의 추가보강으로 변형이 수렴된 후 즉, 구조적 안정 후 여러 단계를 반복하는 것이다.The multi-stage excavation excavation is very cumbersome in construction and work is performed in an unstable tunnel. Install the shotcrete, the rock bolt and the truss plate woven with reinforcement plate and reinforcing bar, which is used in the conventional sun tunnel tunnel every time dividing excavation, after the deformation is converged by additional reinforcement of the tunnel base and the supporting material, that is, repeating several steps after structural stability will be.

그러나 본 발명은 연암 이상의 양호한 지반에서 다단분할굴착을 하지않고 선지보네일만으로 막장굴착을 단순화하기 위해 상하반단면 또는 전단면굴착 방법으로 다수막장을 굴착한 후 추가 지보재를 설계하여 시공함으로써 종래에 다단분할 굴착시 단계마다 추가 보강을 해야하는 숏크리트 락볼트 공정을 생략하고 자유롭게 굴착을 할 수 있고 반단면굴착 완료시 또는 전단면 굴착완료시 한번에 추가 지보재를 시공하면 된다.However, the present invention is conventionally multi-stage by excavating multiple membranes by the upper and lower half-section or shear plane excavation method to simplify the membrane excavation only by the edge nail without the multi-stage digging excavation in the good ground over soft rock. When dividing excavation, the shotcrete rock bolt process, which requires additional reinforcement for each step, can be omitted, and the excavation can be done freely, and additional support materials can be constructed at the time of completion of half-section excavation or completion of shear excavation.

다만, 국부적으로 발생할 수 있는 낙석에 대해서는 고려되지않아 낙석의 우려가 있는 곳은 숏크리트를 1회 굴진장 별로 시공하여야 할 것이며 선지보네일 보강량이 일부 추가될 것이다.However, where rockfall may occur locally, shotcrete may need to be constructed for each excavation site, and the amount of reinforced bownail reinforcement will be added.

실시 예로 입증 설명하면 종래터널공법이 2차선 도로터널에서 1회 굴진장이 3.5M가 한계라면 본 발명은 4차선 대단면 도로터널에서 1회 굴진장 6.0M로 5막장을 추가 지보없이 30m까지 굴착 시공이 가능하다.When demonstrating an embodiment example, if the conventional tunnel method is limited to one excavation length 3.5M in the two-lane road tunnel, the present invention is excavated construction up to 30m without additional information to 5m with one excavation length 6.0M in the four-lane large cross-section road tunnel This is possible.

도 11a에서 도시한 바와 같이 4차선 대단면 도로터널에서 갱내선지보네일 터널에 대한 모델링을 실시하여 TYPE-4인 지반 조건(RMR Ⅳ등급)에서 갱내선지보네일 터널을 시공할 때 상부 반단면굴착으로 터널의 1회 굴진장을 6.0m로 5막장을 추가 지보 없이 30m까지 굴착할 경우로 모델링하여 설계할 때 둘째 막장 천단부를 기준으로 천단변위를 각각 시공단계별로 결과값을 그래프로 그려본 결과, 도 11b에서 도시한 바와 같이 변위 측정점으로부터 후방 3막장까지 굴착을 완료시 약 6.5mm에서 수렴하는 것을 볼 수 있다. 1회 모델링한 30m 전구간을 1회에 숏크리트와 측벽부 락볼트를 시공 완료하고 갱내선지보네일 터널의 시공이 완료된 후 터널 천단부의 최종 변위는 약 7.0mm에서 수렴하는 것을 볼 수 있다.As shown in FIG. 11A, the upper half-section excavation is performed when constructing the mine ground bonail tunnel under ground condition (RMR IV class) of TYPE-4 by modeling the mine ground tunnel nail tunnel in the four-lane large cross-section road tunnel. As a result of designing a tunnel with one tunnel excavation site of 6.0m and drilling up to 30m without additional support, the resultant values were plotted for each construction stage based on the second end of the tunnel. As shown in FIG. 11B, it can be seen that convergence is completed at about 6.5 mm when the excavation is completed from the displacement measuring point to the posterior 3 curtain. After completing the construction of shotcrete and side wall rock bolt at once, the final displacement of the top end of the tunnel converges at about 7.0mm.

종합적으로 볼 때 표1에서 보는 바와 같이 종래의 기존 2차로 터널에서 암반 등급(RMR)이 가장 좋은 TYPE-1에서 1회 굴진장이 3.5m 이나 본 공법은 TYPE-4 연암 지반 조건 4차로 도로터널에서 반단면 굴착 1회 굴진장이 6.0m로 5막장 까지 1회에 굴착 설계가 가능하며 그 이유는 선지보네일터널은 터널의 진행방향과 횡방향으로 네일이 선지보 된 상태에서 굴착하게 되므로 종래의 NATM 터널공법과 같이 1회 굴진장의 제약이 구조적으로 적게 되기 때문이다.Overall, as shown in Table 1, the excavation length is 3.5m once in TYPE-1, which has the best rock grade (RMR) in the existing existing two-way tunnel. Half-section excavation One excavation site is 6.0m and excavation design is possible up to 5 curtains. The reason is that the propagation bonile tunnel is excavated in the state of nail propagation in the direction of tunnel and transverse direction. This is because, as in the tunneling method, the limitation of one excavation site is structurally reduced.

또한 상기한 도 3에서 도시한 바와 같이, 선지보네일터널(갱내선지보 및 갱외선지보네일터널)에서 본선 터널의 굴착면(10)에 일정한 횡간격으로 수평외곽공을 2열로 천공함으로써 종래 터널의 1회 굴착장(70)보다 1회 굴진 길이를 늘이는 경우(80) 발생하는 여굴량을 감소시킬 수 있다.In addition, as shown in FIG. 3, the conventional tunnel by drilling horizontal outer perforations in two rows at a predetermined lateral interval in the excavation surface 10 of the main tunnel in the propagation nail tunnel (inner beam propagation and outboard propagation tunnel tunnel). Increasing the length of one excavation than the one excavation site 70 of 80 may reduce the amount of excavation that occurs.

수평외곽공의 천공경사각에 의해 발생하는 여굴을 감소시키기 위하여 터널 외측으로 제1외곽공(41)을 1회 굴착 천공장의 반까지 방사상으로 경사 천공하고, 내측으로 허용하는 여굴의 폭만큼 평행이동하여 제2외곽공(42)을 1회 굴착 천공장까지 천공한다. 이때 상기 두열의 외곽공을 발파시 서로 간섭하지 않도록 상기 제1외곽공은 천공홀 전체에 정밀폭약을 장약하고 상기 제2외곽공은 공심부로부터 천공장의 절반까지만 정밀폭약을 장약하여 1회 굴진에 따른 여굴량을 증가시키지 않고 굴진장을 늘일 수 있다.In order to reduce the overhang caused by the inclined perforation angle of the horizontal perforation, the first perforation 41 is radially inclined to one half of the excavation fabrication plant outside the tunnel, and is moved in parallel by the width of the perforation allowed inward. The second outer hole 42 is drilled once to the excavation cloth factory. At this time, the first outer hole charges the precision explosives in the whole drilling hole so that the two outer holes do not interfere with each other, and the second outer hole charges the precision explosives from the core core to only half of the fabric factory and drills once. It is possible to increase the excavation length without increasing the amount of overhang.

갱내선지보네일터널에 있어서, 도 8에서 도시한 바와 같이, 파일럿 터널에서 선지보네일을 시공하면서 생성된 천단부의 선지보 빈공과 굴착이 예정된 막장면에 추가로 수평외곽공, 수평확대공을 천공할 때 선시공된 선지보 네일과 중첩되지 않도록, 터널 종방향으로 길이를 조정할 수 있는 U자형 측정자(130)의 한쪽을 선지보 빈공에 삽입하고 타측을 막장면에 노출시켜 선지보 빈공의 위치를 육안으로 확인하고 발파공을 천공 가능하도록 한다. 상기 U자형 관은 L자형의 관 2개가 고정부와 측정부로 나뉘어 있어 이중으로 분리 또는 결합하여 사용하며, 결합시 두 L자형 관의 단부에 5~10cm 간격으로 구멍이 뚫려있고 상기 구멍 중 양쪽 끝에 고정핀을 꽂아 두 개의 L자형 관을 결합한다.As shown in FIG. 8, in the mine tunnel finger tunnel tunnel, the horizontal outer hole and the horizontal enlargement hole are drilled in addition to the hollow beam of the top end portion created while constructing the prophetic nail in the pilot tunnel and the closed face where the excavation is scheduled. When one of the U-shaped measuring instrument 130, the length of which can be adjusted in the longitudinal direction of the tunnel, is inserted into the hollow beam, and the other side is exposed to the closed surface, so that the position of the hollow beam is not visible. Check it and make it possible to drill the blast hole. The U-shaped tube is divided into two L-shaped tubes divided into a fixed part and a measuring part, and can be used by separating or combining two times. Plug the two pins together to join the two L-shaped tubes.

상기 U자형 측정자(130)를 사용함으로써 선지보 빈공과 발파공의 중첩을 피하여 발파효율을 증대시키고 선지보공의 정확한 위치파악으로 시공성이 향상된다.By using the U-shaped measuring device 130, avoiding the overlapping of the empty beam empty hole and the blast hole to increase the blasting efficiency and improve the workability by pinpointing the position of the empty hole.

도 9는 대단면 터널의 갱내 선지보 네일 터널의 발파 설계도면으로서 뇌관의 점화 순서가 파일럿 터널을 기준으로 선지보 빈공이 먼저 기폭 되고 본선터널 굴착라인 쪽으로 단계적으로 수평 확대공(50)이 기폭되며 다음으로 수평 외곽공이 기폭되고 수평 바닥공이 마지막으로 기폭 되어 상부반단면이 발파 굴착된다.9 is a blasting design drawing of the inner nail nail tunnel of the large section tunnel, the ignition order of the primer is detonated by the hollow hole first based on the pilot tunnel, and the horizontal expansion hole 50 is detonated stepwise toward the main tunnel drilling line. Next, the horizontal perforator is detonated and the horizontal bottom is detonated last, and the upper half section is blasted and excavated.

하부는 파일럿 터널을 중심으로 내측부터 외측으로 기폭되고 외곽공 바닥공 순서로 하부 반단면을 발파 굴착한다.The lower part is detonated from the inner side to the outer side of the pilot tunnel and blasts the lower half section in the order of the perforated hole.

도 1은 갱내선지보네일터널에서 선지보 빈공을 발파공으로 이용하는 발파의 실시 예를 도시한 단면도.1 is a cross-sectional view showing an embodiment of the blasting using a hollow beam as a blasting hole in the mine tunnel nail tunnel.

도 2는 갱내선지보네일터널에서 선지보 빈공을 발파공으로 이용하지 않는 발파의 실시 예를 도시한 단면도.Figure 2 is a cross-sectional view showing an embodiment of the blasting not using the hollow beam empty blast hole in the mine tunnel nail tunnel.

도 3a는 갱외선지보네일터널에서 1회 발파당 굴진장이 종래의 방법보다 두배로 길면서 여굴발생량이 동일 하도록 제1외곽공과 제2외곽공을 2열 천공한 것을 도시한 단면도.Figure 3a is a cross-sectional view showing that the first perforated hole and the second perforated two rows so that the excavation rate is equal to twice as long as the excavation site per blasting in the outboard tunnel nail tunnel.

도 3b는 갱내선지보네일터널에서 1회 발파당 굴진장이 종래의 방법보다 두배로 길면서 여굴발생량이 동일 하도록 제1외곽공과 제2외곽공을 2열 천공한 것을 도시한 단면도.Figure 3b is a cross-sectional view showing that the first perforation and the second perforation in two rows so that the excavation rate is equal to twice as long as the excavation site per blasting in the mine shaft tunnel nail tunnel conventional method.

도 4는 도 1에서 AA부분을 확대 도시한 단면도.Figure 4 is an enlarged cross-sectional view of the AA portion in FIG.

도 5는 도 1에서 BB부분을 확대 도시한 단면도.FIG. 5 is an enlarged cross-sectional view of a portion BB in FIG. 1; FIG.

도 6은 갱내선지보네일터널에서 선천공된 빈공과 전열공을 확대 도시한 단면도.Figure 6 is an enlarged cross-sectional view showing a hollow hole and a heat-transfer hole bored in the mine interior tunnel.

도 7a 내지 7e는 본 발명에 따른 발파공별 장약형태를 상세 도시한 단면도.Figure 7a to 7e is a cross-sectional view showing in detail the type of blast hole according to the invention.

도 8은 굴착면에서 선지보 빈공의 위치를 표시하기 위한 U자형 측정자를 도시한 단면도.8 is a cross-sectional view showing a U-shaped measuring instrument for indicating the position of the hollow beam hollow on the excavation surface.

도 9는 선지보네일터널의 실시 예.9 is an embodiment of a sun finger nail tunnel.

도 10a와 10b는 선지보네일터널의 개념도.10a and 10b is a conceptual diagram of the prophet nail tunnel.

도 10c는 갱외선지보네일 터널 개념도.Figure 10c is a schematic diagram of the outboard tunnel nail tunnel.

도 11a 및 11b는 갱내선지보네일 터널의 설계 수치해석에 대해 도시한 그림.Figures 11a and 11b is a view showing the numerical design analysis of the mine ground beam nail tunnel.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 본선터널 굴착면 20 : 파일럿 터널10: main tunnel excavation surface 20: pilot tunnel

30 : 선지보 빈공 31 : 전열공30: sun bore blank 31: electrician

32 : 선지보 빈공 사이각 33 : 선지보네일32: empty space between the empty beam 33: the empty beam nail

40 : 수평외곽공 41 : 제1외곽공40: horizontal outer ball 41: first outer ball

42 : 제2외곽공 50 : 수평확대공42: the second outer hole 50: horizontal magnifying hole

60 : 수평바닥공 65 : 상하반 굴착라인 경계60: horizontal bottom hole 65: upper and lower digging line boundary

70 : 종래 1회 굴진장 80 : 늘어난 1회 굴진장70: conventional one-time drilling yard 80: increased one-time drilling yard

90 : 선지보 빈공 장약 이격거리 100 : 장약장90: Seonjibo empty space charge distance: 100:

110 : 전색장 120 : 보호재110: full color 120: protective material

130 : U자형측정자 140 : 점폭약포130: U-shaped measuring instrument 140: point width medicine

150 : 락볼트 160 : 천단 변위 측정위치 150: lock bolt 160: end displacement measurement position

Claims (8)

갱내선지보네일 터널에 있어서,In the mine tunnel nailnail tunnel, 파일럿 터널에서 선지보네일을 시공하면서 생성된 천단부의 선지보 빈공과 굴착이 예정된 막장면에 추가로 수평외곽공, 수평확대공 및 수평바닥공을 조합하여 천공하는 단계;Drilling a combination of a horizontal periphery, a horizontal enlargement hole and a horizontal bottom hole in addition to a hollow beam and a hollow surface to be excavated at the top end portion of the top end portion generated while constructing the prophetic nail in the pilot tunnel; 상기 선지보 빈공과 수평외곽공, 수평확대공, 수평바닥공에 장약 후 발파하는 단계를 포함하는 것을 특징으로 하는 선지보네일 터널의 굴착방법.Excavating method of the bow nail tunnel, characterized in that it comprises the step of blasting after filling the hollow beam, horizontal outer hole, horizontal enlargement hole, horizontal bottom hole. 제1항에 있어서,The method of claim 1, 발파를 위한 상기 선지보 빈공은 지반의 자립성에 따라 터널 천단부의 정점을 중심으로 하여 횡방향으로 90° 내지 180° 범위의 내각을 이루는 방사상의 부채살 형태로 천공하는 것을 특징으로 하는 선지보네일 터널의 굴착방법.The hollow beam for blasting is drilled in the form of radial scallops forming an angle of 90 ° to 180 ° in the transverse direction around the apex of the tunnel end according to the independence of the ground. Excavation method. 제1항에 있어서,The method of claim 1, 상기 선지보 빈공과 수평외곽공, 수평확대공, 수평바닥공에 장약 후 선지보 빈공-수평확대공-수평외곽공-수평바닥공의 순으로 발파하는 단계를 포함하는 것을 특징으로 하는 선지보네일 터널의 굴착방법.Propagation bownail characterized in that it comprises the step of blasting the hollow beam, horizontal expansion hole, horizontal enlargement hole, horizontal bottom hole, and then in the order of the empty beam hollow-horizontal expansion hole-horizontal outer hole-horizontal ground hole Tunnel excavation method. 제1항 내지 제3항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 3, 상기 선지보 빈공의 종방향 간격이 파일럿 터널쪽 전색장 보다 클 경우 선지보 빈공의 앞 열에 같은 방향으로 전열공을 천공하여 발파시 폭력을 조절하는 단계를 더 포함하는 것을 특징으로 하는 선지보네일 터널의 굴착방법.If the longitudinal spacing of the hollow beam is greater than the color depth of the pilot tunnel side, the boron nail tunnel further comprises the step of controlling the violence when the blasting by drilling the heating hole in the same direction in the front row of the hollow beam Excavation method. 제1항에 있어서,The method of claim 1, 상기 선지보 빈공이 선발파되더라도 수평확대공과 수평외곽공 및 선지보네일이 손상되지 않도록 상기 선지보 빈공의 장약은 본선터널 굴착선 위치로부터 수평외곽공의 최소저항선과 수평확대공의 최소저항선이 더해진 길이 만큼 이격시킨 지점까지 전색하고 이지점부터 폭약을 장약하는 것을 특징으로 하는 선지보네일 터널의 굴착방법.In order to prevent damage to the horizontal expansion hole, the horizontal outer hole, and the edge nail, even if the hollow hole is selected, the loading of the hollow hole is performed by adding the minimum resistance line of the horizontal outer hole and the minimum resistance line of the horizontal expansion hole from the position of the main tunnel digging line. The excavation method of the prophet bone nail tunnel, which is characterized by coloring up to a point separated by a length and charging explosives from the point. 선지보네일터널에 있어서, In Seonjibonnail Tunnel, 작업성을 용이하게 하고 1발파당 굴진장을 길게하며 막장굴착을 단순화 하기위해 터널설계시 원지반이 연암 이상의 양호한 지반 조건에서 선지보 네일 만을 설치하여 자립하도록 네일 간격과 길이를 조정하여 1회 발파당 굴진장과 추가 지보없이 1막장 이상의 굴착을 모델링하여 해석하는 단계;In order to facilitate workability, lengthen excavation length per blast and simplify membrane excavation, in tunnel design, nail base and nail length are adjusted in a good ground condition over soft rock to adjust the nail spacing and length. Modeling and analyzing excavation of one or more membranes without excavation field and additional support; 본선터널 굴착전에 선지보네일을 시공하는 단계;Constructing a sun nail before the main tunnel excavation; 1회 발파당 굴진장을 선지보 네일만으로 완전 자립시키고 설계와 작업의 용이성에 따라 1막장 이상을 발파 굴착 시공하는 단계로 이루어지고;Completely excavating the excavation site per blasting with only the nail nails and blasting and excavating more than one curtain according to the design and ease of work; 연암 이상 원지반에 선지보네일만으로 선 자립을 확보한 후 굴착하는 것을 특징으로 하는 선지보네일 터널의 굴착방법.The excavation method of the prophet bone nail tunnel, characterized in that the excavation after securing the independence with only the prophetic nail on the base of soft rock. 제1항 내지 제6항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 6, 본선터널의 굴착면에 일정한 횡간격으로 설치되는 수평외곽공은 천공경사각에 의해 발생하는 여굴을 감소시키기 위하여 터널의 여굴 허용선까지 외측으로 제1외곽공을 1회 굴착 천공장의 반까지 방사상으로 경사 천공하고, 내측으로 여굴의 폭만큼 평행이동하여 제2외곽공을 1회 굴착 천공장까지 천공하는 단계;Horizontal perforations installed on the excavation surface of the main ship at regular lateral intervals are radially inclined radially to half of the excavation fabric factory once the first perforation outwards to the permissible line of the tunnel in order to reduce the overload caused by the drilling inclination angle. Drilling and drilling the second outer hole to the excavation fabrication plant by moving the inner side in parallel by the width of the mine; 상기 단계 이후 상기 수평외곽공을 장약할 때 상기 제1외곽공은 천공홀 전체에 정밀폭약을 장약하고 상기 제2외곽공은 공저로부터 천공장의 절반까지만 정밀폭약을 장약하는 단계를 더 포함하는 것을 특징으로 하는 선지보네일터널의 굴착방법.When the horizontal outer hole is charged after the step, the first outer hole further comprises the step of filling the precision explosives in the entire hole, and the second outer hole further comprises the step of filling the precision explosives only up to half of the mill factory from the bottom The excavation method of the sunbon nail tunnel characterized by. 갱내선지보네일 터널에 있어서,In the mine tunnel nailnail tunnel, 파일럿 터널에서 선지보네일을 시공하면서 생성된 천단부의 선지보 빈공과 굴착이 예정된 막장면에 추가로 수평외곽공, 수평확대공을 천공할 때 선시공된 선지보네일과 중첩되지 않도록, 터널 종방향으로 길이를 조정할 수 있는 U자형 측정자의 한쪽을 선지보 빈공에 삽입하고 타측을 막장면에 노출시켜 선지보 빈공의 위치를 U자형 측정자로 육안으로 확인하고 발파공을 천공 가능하도록 한 것을 특징으로 하는 선지보네일 터널의 굴착방법.In the pilot tunnel, the length of the hollow beams and the excavation of the top end portion created by constructing the propane nails in the pilot tunnel are extended to the longitudinal direction of the tunnel so that they do not overlap with the pre-built spun nails when the perforated horizontal holes and horizontal enlarged holes are drilled. One side of the U-shaped measuring instrument that can adjust the U-shaped measuring instrument is inserted into the hollow hole, and the other side is exposed to the curtain surface. Tunnel excavation method.
KR1020090078000A 2009-08-24 2009-08-24 Excavation method for pre-nailed tunneling KR101148331B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090078000A KR101148331B1 (en) 2009-08-24 2009-08-24 Excavation method for pre-nailed tunneling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090078000A KR101148331B1 (en) 2009-08-24 2009-08-24 Excavation method for pre-nailed tunneling

Publications (2)

Publication Number Publication Date
KR20110020401A true KR20110020401A (en) 2011-03-03
KR101148331B1 KR101148331B1 (en) 2012-05-21

Family

ID=43929644

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090078000A KR101148331B1 (en) 2009-08-24 2009-08-24 Excavation method for pre-nailed tunneling

Country Status (1)

Country Link
KR (1) KR101148331B1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015186969A1 (en) * 2014-06-03 2015-12-10 (주)현이앤씨 Method for constructing linear support member of large-section tunnel having small flattening
CN107218043A (en) * 2017-08-27 2017-09-29 中铁二十局集团第六工程有限公司 A kind of breaking surrounding rock cavern excavation method
CN109751063A (en) * 2019-02-26 2019-05-14 中铁第四勘察设计院集团有限公司 A kind of large section tunnel supporting construction and its construction method
CN112035937A (en) * 2020-09-07 2020-12-04 河南城建学院 Tunnel construction surrounding rock deformation analysis and informatization construction method
CN112964143A (en) * 2021-03-24 2021-06-15 山东科技大学 Three-time blasting method for hollow hole straight-hole cut
CN114166082A (en) * 2021-12-10 2022-03-11 中铁七局集团有限公司 Tunnel advanced drilling hole combination accurate control blasting structure and construction process
CN114183148A (en) * 2021-12-10 2022-03-15 中交路桥华南工程有限公司 Excavation construction method applied to high-ground-stress deep-buried tunnel broken belt
CN114483050A (en) * 2022-01-26 2022-05-13 京昆高速铁路西昆有限公司 Three-step full-process mechanized construction method for large-section tunnel
KR102572706B1 (en) * 2022-10-31 2023-08-30 주식회사 한울엔지니어링 Tunnel Excavation Method for Upper and Lower Parallel Construction

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101655072B1 (en) * 2014-10-22 2016-09-07 박재현 Cross-Section Tunnel Construction Method Using Rock Mass Quality Rating

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740200B1 (en) * 2004-11-29 2007-07-18 서동현 Tunnelling method using pre-support concept and an adjustable apparatus thereof
KR100676914B1 (en) 2006-06-13 2007-02-01 주식회사 무진네오테크 Excavating method of tunnel with slight vibration

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015186969A1 (en) * 2014-06-03 2015-12-10 (주)현이앤씨 Method for constructing linear support member of large-section tunnel having small flattening
CN107218043A (en) * 2017-08-27 2017-09-29 中铁二十局集团第六工程有限公司 A kind of breaking surrounding rock cavern excavation method
CN109751063A (en) * 2019-02-26 2019-05-14 中铁第四勘察设计院集团有限公司 A kind of large section tunnel supporting construction and its construction method
CN112035937B (en) * 2020-09-07 2023-12-22 河南城建学院 Tunnel construction surrounding rock deformation analysis and informatization construction method
CN112035937A (en) * 2020-09-07 2020-12-04 河南城建学院 Tunnel construction surrounding rock deformation analysis and informatization construction method
CN112964143A (en) * 2021-03-24 2021-06-15 山东科技大学 Three-time blasting method for hollow hole straight-hole cut
CN112964143B (en) * 2021-03-24 2021-09-21 山东科技大学 Three-time blasting method for hollow hole straight-hole cut
CN114166082A (en) * 2021-12-10 2022-03-11 中铁七局集团有限公司 Tunnel advanced drilling hole combination accurate control blasting structure and construction process
CN114166082B (en) * 2021-12-10 2023-09-15 中铁七局集团有限公司 Tunnel advanced drilling hole combination accurate control blasting structure and construction process
CN114183148B (en) * 2021-12-10 2023-10-20 中交路桥华南工程有限公司 Construction method applied to excavation of high-ground-stress deep-buried tunnel breaking zone
CN114183148A (en) * 2021-12-10 2022-03-15 中交路桥华南工程有限公司 Excavation construction method applied to high-ground-stress deep-buried tunnel broken belt
CN114483050A (en) * 2022-01-26 2022-05-13 京昆高速铁路西昆有限公司 Three-step full-process mechanized construction method for large-section tunnel
CN114483050B (en) * 2022-01-26 2024-04-23 中国国家铁路集团有限公司 Three-step full-procedure mechanized construction method for large-section tunnel
KR102572706B1 (en) * 2022-10-31 2023-08-30 주식회사 한울엔지니어링 Tunnel Excavation Method for Upper and Lower Parallel Construction

Also Published As

Publication number Publication date
KR101148331B1 (en) 2012-05-21

Similar Documents

Publication Publication Date Title
KR101148331B1 (en) Excavation method for pre-nailed tunneling
CN108286920A (en) A kind of implementation of Tunnel Blasting and excavation
CN106761745B (en) The outer sublevel open stope method of arteries and veins
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN101638989B (en) Milling and supporting construction method of fault crushed zone of subbottom tunnel
KR101551905B1 (en) Tunnel blasting pattern using large hole and small hole, and method for blasting of tunnel using this same
CN108590688B (en) A kind of TBM development machine and its tunneling construction method with hydraulic drill rig
CN109826628A (en) Presplitting arching without pillar mining method under the conditions of a kind of tight roof
KR20180105100A (en) Vibration-free rapid excavation method using pilot tunnel in large-scale tunnel
CN104806249A (en) Guiding and tunneling construction method of short silo
CN105649634B (en) A kind of high ferro Tunnel Engineering hydraulic drill ring mechanization photoface exploision drivage method
CN104457466B (en) A kind of blasting method of tunnel open excavation section
CN111023930B (en) Tunnel step excavation method
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
US4118071A (en) In situ oil shale retort with a horizontal sill pillar
CN109322683A (en) Underground Large chamber medium-length hole controls blasting construction method
CN109405688A (en) Close on the blasting construction method in existing operation tunnel
CN106522962A (en) Tunneling method
CN111457804B (en) Method for blasting IV-grade massive crushed rock with disordered development and wide fracture surface
CN115655037B (en) Tunnel near-connection expansion excavation blasting vibration reduction construction method
CN112964143B (en) Three-time blasting method for hollow hole straight-hole cut
CN112945035B (en) Construction method for pre-splitting blasting excavation of middle and lower layers of diversion tunnel
CN114791246A (en) Blasting construction method for existing small-clear-distance close-connection tunnel
CN209672960U (en) Close on the blasting arrangement in existing operation tunnel
CN109900175A (en) The low damage blasting method of underground mine tunnelling

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150508

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160509

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160516

Year of fee payment: 17