- KR20090108305A KR20090108305A KR1020080033663A KR20080033663A KR20090108305A KR 20090108305 A KR20090108305 A KR 20090108305A KR 1020080033663 A KR1020080033663 A KR 1020080033663A KR 20080033663 A KR20080033663 A KR 20080033663A KR 20090108305 A KR20090108305 A KR 20090108305A
- Authority
- KR
- South Korea
- Prior art keywords
- slab
- hollow
- abdominal
- members
- construction method
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (11)
- 하부구조물(10)의 상부에 가설되는 거푸집(A) 위에서 철근콘크리트로서 하부슬래브(21)를 선 성형하고 복부 및 상부슬래브(22)(23)는 후 성형하는 중에 발포성수지로 된 복수개의 중공부재(24)들을 매립시켜서, 상기 하부구조물(10) 상부에 중공부재(24)들이 단면내에 매립된 중공의 슬래브(20)를 시공하는 것에 있어서,상기 하부슬래브(21)의 성형 전에 배근되는 하부 및 복부슬래브용 철근(21a)(22a)으로 구획된 공간마다 중공부재(24)들을 각각 배치하여 가고정시키고, 상기 하부슬래브(21)를 선 성형할 때 그 상면에 복부슬래브(22)의 성형 위치마다 상기 중공부재(24)들의 둘레면 하단을 밀착 구속할 수 있도록 구속용 돌부(22b)를 일체로 형성한 후에, 상기 구속용 돌부(22b)의 상단으로부터 연이어지도록 복부 및 상부슬래브(22)(23)를 후 성형하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 중공부재(24)들을 하부 및 복부슬래브용 철근(21a)(22a)으로 구획된 공간에 배치할 때에, 상기 중공부재(24)들과 하부슬래브용 철근(21a) 사이에 별도의 간격유지부재(D)들을 배열 설치하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 중공부재(24)들은 상기 하부 및 복부슬래브용 철 근(21a)(22a)으로 구획된 공간들에 배치된 상태에서, 복부슬래브용 철근(22a)에 양단이 고정되는 별도의 고정부재(C)로 결박하여 간단히 가고정시킬 수 있도록 함을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 중공부재(24)들은 각각 둘레면의 하단에 보조 구속수단(24a)을 구비하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제4항에 있어서, 상기 보조 구속수단(24a)은 상기 중공부재(24)들의 둘레면 하단에 길이방향으로 적어도 1개이상 요입되는 요홈(241)으로 형성됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제4항에 있어서, 상기 보조 구속수단(24a)은 상기 중공부재(24)들의 둘레면 하단에 길이방향으로 적어도 1개이상 돌출되는 돌기(242)로 형성됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 구속용 돌부(22b)는 상기 하부 및 복부슬래브용 철근(21a)(22a) 중량의 합보다 상기 하부슬래브(21)와 구속용 돌부(22b)를 성형하기 위해 타설되는 콘크리트의 부력이 작게 작용되는 지점에 해당하는 높이(h)로서 하부슬래브(21)의 상면에 돌출 형성하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제7항에 있어서, 상기 구속용 돌부(22b)의 높이(h)는 하부슬래브(21)의 상면으로부터 3~20㎝로 돌출되게 함을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 상부슬래브용 철근(23a)과 중공부재(24) 사이에는 간격유지부재(D)들을 배열 설치하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 중공부재(24)의 전,후측 끝부분에는 그 좌,우면과 상면이 경사져서 단면적이 점차로 작게 형성되는 전,후측 모따기부(24b)(24c)를 더 포함하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
- 제1항에 있어서, 상기 하부 및 복부슬래브(21)(22)를 성형할 때에 복수개의 긴장재(25)들을 1개조로 하여 단면내에 매설되도록 하되, 1개조의 긴장재(25)들 중 일부는 일측단이 하부슬래브(21)의 일측 끝부분에서 인장정착단(25a)이 되고 타측단은 복부슬래브(22)의 타측 끝부분 근처에서 고정정착단(25b)이 되게 설치하며, 1개조의 긴장재(25)들 중 다른 일부는 일측단이 하부슬래브(21)의 타측 끝부분에서 인장정착단(25c)이 되고 타측단은 복부슬래브(22)의 일측 끝부분 근처에서 고정정착단(25d)이 되게 설치하여서 됨을 특징으로 하는 중공 슬래브교의 시공방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080033663A KR101024369B1 (ko) | 2008-04-11 | 2008-04-11 | 중공 슬래브교의 시공방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080033663A KR101024369B1 (ko) | 2008-04-11 | 2008-04-11 | 중공 슬래브교의 시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090108305A true KR20090108305A (ko) | 2009-10-15 |
KR101024369B1 KR101024369B1 (ko) | 2011-03-23 |
Family
ID=41551720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080033663A KR101024369B1 (ko) | 2008-04-11 | 2008-04-11 | 중공 슬래브교의 시공방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101024369B1 (ko) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101935983A (zh) * | 2010-08-27 | 2011-01-05 | 郑州大学 | 一种装配整体式空心板桥的建造方法 |
CN103993750A (zh) * | 2014-05-16 | 2014-08-20 | 河南省交通工程加固有限责任公司 | 一种工程用空心构件的加固方法 |
CN105088932A (zh) * | 2014-05-06 | 2015-11-25 | 郑州大学 | 一种新型预制空心板及用其建造空心板桥的方法 |
CN108547210A (zh) * | 2018-06-21 | 2018-09-18 | 烟台大学 | 一种利用旧板的高速公路空心板桥及施工方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862609A (zh) * | 2016-05-25 | 2016-08-17 | 郑州大学 | 一种空心板桥加固的钢带-螺栓连环套箍法及套箍体系 |
KR102275286B1 (ko) | 2021-03-08 | 2021-07-13 | 대한강관 주식회사 | 파형강관과 파형강판을 이용하는 중공슬래브 구조물 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07166556A (ja) * | 1993-12-17 | 1995-06-27 | Kurimoto Ltd | 中空基礎スラブの構築方法 |
JP2001107499A (ja) | 1999-08-03 | 2001-04-17 | Daiwa House Ind Co Ltd | 中空スラブ及びその構築方法 |
KR100508532B1 (ko) | 2002-10-23 | 2005-08-17 | 주식회사 용마엔지니어링 | 속빈 슬래브교의 구조 |
KR100681849B1 (ko) | 2005-01-11 | 2007-02-15 | 채성태 | 조립 후 분할타설 방식의 중공형 프리캐스트 콘크리트슬래브 구조물 |
-
2008
- 2008-04-11 KR KR1020080033663A patent/KR101024369B1/ko active IP Right Grant
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101935983A (zh) * | 2010-08-27 | 2011-01-05 | 郑州大学 | 一种装配整体式空心板桥的建造方法 |
CN105088932A (zh) * | 2014-05-06 | 2015-11-25 | 郑州大学 | 一种新型预制空心板及用其建造空心板桥的方法 |
CN103993750A (zh) * | 2014-05-16 | 2014-08-20 | 河南省交通工程加固有限责任公司 | 一种工程用空心构件的加固方法 |
CN103993750B (zh) * | 2014-05-16 | 2016-04-27 | 河南省交通工程加固有限责任公司 | 一种工程用空心构件的加固方法 |
CN108547210A (zh) * | 2018-06-21 | 2018-09-18 | 烟台大学 | 一种利用旧板的高速公路空心板桥及施工方法 |
CN108547210B (zh) * | 2018-06-21 | 2024-01-19 | 烟台大学 | 一种利用旧板的高速公路空心板桥及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
KR101024369B1 (ko) | 2011-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101024369B1 (ko) | 중공 슬래브교의 시공방법 | |
KR101275754B1 (ko) | 전단블록이 상면에 형성된 피에스씨 거더와 그 제작방법 및 전단블록이 상면에 형성된 피에스씨 거더를 이용한 교량시공방법 | |
KR100999660B1 (ko) | 시공성 향상 기능을 갖는 다경간 프리캐스트 부재 | |
KR20130102898A (ko) | 캡빔을 이용한 말뚝지지형 조립식 잔교시공방법 | |
KR101860512B1 (ko) | 일체형 거푸집 모듈을 이용한 지상 및 수중 구조물의 단면 증설 보강 공법 | |
KR20090050520A (ko) | 리브드 하프피씨 바닥판 및 그 제조방법 | |
KR101308792B1 (ko) | 가변형 단면 박스거더와 이의 제작방법, 그리고 이를 이용한 교량의 시공방법 | |
KR100876388B1 (ko) | 반단면 프리캐스트 바닥판을 갖는 교량구조 및 그 시공방법 | |
KR100984249B1 (ko) | 합성거푸집 패널과 상부플랜지 내부철근과 일체화된 전단연결부재를 이용한 십자형 피에스씨 거더교 시공방법 | |
KR101344219B1 (ko) | 횡방향 긴장력이 도입되어 종방향 압축강도가 증진된 프리스트레스트 콘크리트 거더 및 그 제작방법 | |
KR101067717B1 (ko) | 프리스트레스트 콘크리트 거더 구조체 및 그 제조방법 | |
KR20090080666A (ko) | 중공형 콘크리트 거더 제작방법 및 이를 이용하는교량시공방법 | |
KR101007012B1 (ko) | 터널 천단부 보강 구조물 및 이를 이용한 터널 천단부보강공법 | |
KR100984247B1 (ko) | 상부플랜지 내부철근과 일체화된 전단연결부재를 이용한 십자형 피에스씨 거더교 시공방법 | |
KR100989153B1 (ko) | 바닥판 주철근 대체가 용이하도록 횡방향 강성연결재를 구비한 십자형 피에스씨 거더 연결구조 및 십자형 피에스씨 거더를 이용한 교량시공방법 | |
KR100669860B1 (ko) | 교량용 좌,우 비대칭형 프리텐션 프리캐스트 빔 거더 | |
KR100279018B1 (ko) | 중공슬래브교의 시공방법 | |
KR100508532B1 (ko) | 속빈 슬래브교의 구조 | |
KR101389821B1 (ko) | 매립형 추가 긴장부가 부설된 프리스트레스트 콘크리트 거더 및 이의 제작 및 보수공법 | |
KR101064752B1 (ko) | 콘크리트 슬래브 타설용 데크 | |
KR20200004087A (ko) | 연결재를 다단으로 배치시킨 연속형 거더교의 시공법 | |
KR200254651Y1 (ko) | 프리스트레스트 합성빔 | |
KR200478204Y1 (ko) | 중공슬래브를 위한 중공부재의 부상방지장치 | |
KR101340871B1 (ko) | 콘크리트 새들을 이용한 psc 거더 제작방법 및 콘크리트 새들을 이용한 psc 거더 | |
KR20060056008A (ko) | 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140226 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150316 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160316 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20170316 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20180316 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190318 Year of fee payment: 9 |