KR20060028234A - 철도교의 상부구조물 교체 시공방법 - Google Patents
철도교의 상부구조물 교체 시공방법 Download PDFInfo
- Publication number
- KR20060028234A KR20060028234A KR1020040077308A KR20040077308A KR20060028234A KR 20060028234 A KR20060028234 A KR 20060028234A KR 1020040077308 A KR1020040077308 A KR 1020040077308A KR 20040077308 A KR20040077308 A KR 20040077308A KR 20060028234 A KR20060028234 A KR 20060028234A
- Authority
- KR
- South Korea
- Prior art keywords
- upper structure
- bridge
- railway
- pier
- preparing
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
- 열차가 통행하는 철도교의 교각 상에 설치된 제 1상부구조물을 제 2상부구조물로 교체하기 위한 철도교의 상부구조물 교체 시공방법에 있어서,상기 철도교의 제원과 상기 제 2상부구조물에 요구되는 치수, 강도 등을 고려하여 상기 제 2상부구조물을 준비하는 단계;상기 제 2상부구조물을 철도를 따라 이동시킬 수 있는 철도크레인을 준비하는 단계;상기 제 2상부구조물을 상기 철도크레인에 실어서 상기 제 1상부구조물의 상부까지 이동시켜 상기 제 2상부구조물을 상기 제 1구조물 상에 위치시키는 단계;상기 제 1상부구조물을 상기 교각 상에서 제거하는 단계; 및상기 크레인에 실린 상기 제 2상부구조물을 하강시켜 상기 제 1상부구조물이 제거된 상기 교각 상에 상기 제 2상부구조물을 설치하는 단계를 포함하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 1항에 있어서, 상기 교각의 높이, 상기 제 2구조물의 높이와 무게 등을 고려하여 상기 교각 상에 설치되어 상기 제 2상부구조물을 받쳐줄 교좌장치를 준비하는 단계;상기 제 1상부구조물을 상기 열차의 통행을 허용하는 범위 내에서 인상하는 제 1상부구조물 인상단계; 및상기 제 1상부구조물 상으로 상기 열차의 통행을 허용하면서, 상기 교각 상에 구교좌장치가 있다면 이를 제거하고, 상기 준비한 교좌장치를 상기 교각 상에 설치하는 교좌장치 설치단계를 더 포함하고,상기 교각 상에 상기 제 2구조물을 설치하는 단계에는 상기 교각 상에 설치된 교좌장치 상에 설치하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 열차가 통행하는 철도교의 교각 상에 설치된 제 1상부구조물을 제 2상부구조물로 교체하기 위한 철도교의 상부구조물 교체 시공방법에 있어서,상기 철도교의 제원과 상기 제 2상부구조물에 요구되는 치수, 강도 등을 고려하여 상기 제 2상부구조물을 준비하는 단계;상기 제 2상부구조물을 들어올릴 수 있는 크레인을 준비하는 단계;상기 제 2상부구조물과 상기 크레인을 열차에 탑재하여 상기 제 1상부구조물의 교체가 필요한 철도교까지 이송하는 단계;상기 제 1상부구조물을 상기 교각 상에서 제거하는 단계; 및상기 크레인을 이용해 상기 제 2상부구조물을 상기 제 1상부구조물이 제거된 상기 교각 상에 상기 제 2상부구조물을 설치하는 단계를 포함하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 3항에 있어서, 상기 교각의 높이, 상기 제 2구조물의 높이와 무게 등을 고려하여 상기 교각 상에 설치되어 상기 제 2상부구조물을 받쳐줄 교좌장치를 준비 하는 단계;상기 제 1상부구조물을 상기 열차의 통행을 허용하는 범위 내에서 인상하는 제 1상부구조물 인상단계; 및상기 제 1상부구조물 상으로 상기 열차의 통행을 허용하면서, 상기 교각 상에 구교좌장치가 있다면 이를 제거하고, 상기 준비한 교좌장치를 상기 교각 상에 설치하는 교좌장치 설치단계를 더 포함하고,상기 교각 상에 상기 제 2구조물을 설치하는 단계에는 상기 교각 상에 설치된 교좌장치 상에 설치하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 1항 또는 제 2항에 있어서,상기 제 2상부구조물을 준비하는 단계에는 적어도 일측에는 상하 방향으로 구멍이 뚫린 제 2상부구조물을 준비하고,상기 철도크레인을 준비하는 단계에는 상기 제 2상부구조물에 뚫린 구멍을 통해 와이어를 통과시켜 상기 제 1상부구조물을 승강시키기 위한 제 1승강수단과 상기 제 2상부구조물의 승강을 위한 제 2승강수단을 구비하는 철도크레인을 준비하고,상기 제 1구조물을 상기 제 1교각 상에서 제거하는 단계는,상기 제 1승강수단의 와이어를 상기 구멍을 통해 통과시켜 상기 제 1상부구조물에 연결하여 상기 제 1승강수단이 상기 제 1상부구조물을 들고 있는 상태에서 상기 제 1상부구조물의 양단부위를 각각 절단하는 단계;상기 제 1승강수단을 이용해 상기 절단되어 상기 교각과 분리된 제 1상부구조물의 일부를 양측 교각 사이로 하강시키는 단계; 및상기 교각 상의 제 1상부구조물의 양측 잔여부분을 제거하는 단계를 구비하여서된 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 2항 또는 제 4항에 있어서,상기 제 1상부구조물 인상단계는 상기 교각 내부의 철근 배치상태를 탐사하는 단계, 상기 교각의 측면에 탐사된 철근을 피해서 복수의 홈을 형성하는 단계, 상기 홈에 쐐기부를 갖는 볼트의 일단을 삽입하는 단계, 상기 볼트의 쐐기부에 쐐기부재를 결합하는 단계, 상기 볼트의 타단에 마찰판을 갖는 잭받침대를 결합하는 단계, 상기 볼트의 타단에 너트를 결합하여 상기 마찰판이 상기 교각의 측면에 가압되도록 하는 단계, 상기 잭받침대 상에 잭을 설치하는 단계 및 상기 잭으로 상기 제 1상부구조물을 들어올리는 단계를 포함하여 구성된 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 1항 내지 제 4항 중 어느 한 항에 있어서, 상기 제 2상부구조물을 준비하는 단계에는 유도상화를 위해 자갈이 깔리거나 자갈을 깔 수 있는 슬라브형 상부구조물을 준비하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 1항 내지 제 4항 중 어느 한 항에 있어서, 상기 제 2상부구조물을 준비하 는 단계에는 유도상화를 위해 자갈이 깔리거나 자갈을 깔 수 있는 슬라브를 갖는 피씨빔형 상부구조물, 슬라브를 갖는 스틸플레이트형 상부구조물, 슬라브를 갖는 스틸박스형 상부구조물 중 어느 하나를 준비하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
- 제 1항 내지 제 4항 중 어느 한 항에 있어서,상기 제 2상부구조물을 준비하는 단계에는 에프알피(FRP) 복합재로 된 제 2상부구조물을 준비하는 것을 특징으로 하는 철도교 상부구조물 교체 시공방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040077308A KR100638578B1 (ko) | 2004-09-24 | 2004-09-24 | 철도교의 상부구조물 교체 시공방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040077308A KR100638578B1 (ko) | 2004-09-24 | 2004-09-24 | 철도교의 상부구조물 교체 시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060028234A true KR20060028234A (ko) | 2006-03-29 |
KR100638578B1 KR100638578B1 (ko) | 2006-10-26 |
Family
ID=37139041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040077308A KR100638578B1 (ko) | 2004-09-24 | 2004-09-24 | 철도교의 상부구조물 교체 시공방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100638578B1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100721667B1 (ko) * | 2006-05-25 | 2007-05-23 | 삼성물산 주식회사 | 교량의 거더 설치공법 및 이에 사용되는 거더 인양크레인,임시거더, 거더 운반용 차량, 거더 |
KR101237492B1 (ko) * | 2011-12-28 | 2013-02-26 | 한국철도기술연구원 | 오거 및 인양장비를 이용한 선로 하부구조물 시공 방법 |
FR3107907A1 (fr) * | 2020-03-06 | 2021-09-10 | Eiffage Genie Civil | Méthode d’entretien d’appareils d’appui |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101016152B1 (ko) | 2008-12-30 | 2011-02-17 | 서울대학교산학협력단 | 케이블 인양장치와 가설인양대와 수평이동부재를 이용한 교량 상부구조물의 급속교체시공방법 및 급속교체시공장치 |
KR101095449B1 (ko) | 2011-09-19 | 2011-12-16 | 주식회사성수프론티어 | 리프트 장치를 이용한 교량 해체장치 및 교량 해체 공법 |
KR102105230B1 (ko) | 2017-09-25 | 2020-04-27 | 주식회사 포스코건설 | 기존 철도선로와 철도운행을 유지하는 철도교량 시공방법 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003034911A (ja) | 2001-07-25 | 2003-02-07 | Taisei Corp | 橋桁の架替工法 |
KR100478702B1 (ko) | 2003-07-16 | 2005-03-25 | 김정현 | 교량 상부구조물의 순차적 교체 방법 |
-
2004
- 2004-09-24 KR KR1020040077308A patent/KR100638578B1/ko not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100721667B1 (ko) * | 2006-05-25 | 2007-05-23 | 삼성물산 주식회사 | 교량의 거더 설치공법 및 이에 사용되는 거더 인양크레인,임시거더, 거더 운반용 차량, 거더 |
KR101237492B1 (ko) * | 2011-12-28 | 2013-02-26 | 한국철도기술연구원 | 오거 및 인양장비를 이용한 선로 하부구조물 시공 방법 |
FR3107907A1 (fr) * | 2020-03-06 | 2021-09-10 | Eiffage Genie Civil | Méthode d’entretien d’appareils d’appui |
Also Published As
Publication number | Publication date |
---|---|
KR100638578B1 (ko) | 2006-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100692952B1 (ko) | 철도 크레인 및 이를 이용한 철도교의 상부구조물 교체 시공방법 | |
EP1700954A2 (en) | Prefabricated modular member, permanent railway for tramways and subways including said member, and process for laying the same | |
KR100891961B1 (ko) | 가설구조물을 이용하여 도로 또는 철도의 노후된 교량이나 무도상 교량을 유도상화 하기 위한 교량 교체공법 및 그 장치 | |
KR100603901B1 (ko) | 기존 거더의 일부를 활용한 판형교 유도상 구조 및 시공방법 | |
JP2008115645A (ja) | 立体交差構造及び該立体交差構造の構築方法 | |
KR102105230B1 (ko) | 기존 철도선로와 철도운행을 유지하는 철도교량 시공방법 | |
CN113957793A (zh) | 一种复杂市域环境预制箱梁支架施工方法 | |
KR100454405B1 (ko) | 철도교의 강교를 콘크리트교로 치환시켜 유도상화하는공법 | |
KR100556219B1 (ko) | 철도교량의 상부구조물 교체 및 이를 이용한 유도상화방법. | |
KR100454406B1 (ko) | 가벤트를 이용하여 철도교의 강교를 콘크리트교로치환하여 유도상화하는 공법 및 그 장치 | |
KR100638578B1 (ko) | 철도교의 상부구조물 교체 시공방법 | |
CN113931212A (zh) | 一种用于有轨电车的路桥过渡段结构及其施工方法 | |
KR100415768B1 (ko) | 철도교의 강교를 슬래브교로 치환하는 공법 및 그 가설구조 | |
KR101187282B1 (ko) | 2주식교대 구조를 이용한 철도 교량 시공방법 | |
CN110644380B (zh) | 一种大跨径跨线桥加宽工程狭窄空间梁板安装方法 | |
CN112211112A (zh) | 一种在既有桥梁上采用双导梁架桥机的钢箱梁安装方法 | |
KR100907141B1 (ko) | 이동크레인 설치구조 및 이를 이용한 철도교 상부구조물의교체시공방법 | |
KR20060082970A (ko) | 철도 교량의 거더 교체용 크레인 및 이를 이용한 거더교체방법 | |
CN211285076U (zh) | 一种铁路轨道架空加固结构 | |
KR100711086B1 (ko) | 철도 교량용 판형교의 거더 개량용 가설장비 및 개량 공법 | |
KR101258841B1 (ko) | 교량의 프리캐스트 바닥판 시공 방법 | |
KR20050116212A (ko) | 철도교의 상부구조물 교체방법 및 거기에 이용되는철도교용 에프알피 상부구조물 | |
CN111636256A (zh) | 跨座式单轨低置线路的路基结构及其施工方法 | |
JP7506236B1 (ja) | 単線直上高架化工法及び鉄道区間高架化工法 | |
KR100729842B1 (ko) | 철도교의 유도상화를 위한 보수공법 및 구조 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121015 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20130930 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20141002 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20151019 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20160912 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20170912 Year of fee payment: 12 |
|
LAPS | Lapse due to unpaid annual fee |