KR20060002211A - Pipe end sealing apparauts for grouting and grouting method using the apparatus - Google Patents

Pipe end sealing apparauts for grouting and grouting method using the apparatus Download PDF

Info

Publication number
KR20060002211A
KR20060002211A KR1020040051153A KR20040051153A KR20060002211A KR 20060002211 A KR20060002211 A KR 20060002211A KR 1020040051153 A KR1020040051153 A KR 1020040051153A KR 20040051153 A KR20040051153 A KR 20040051153A KR 20060002211 A KR20060002211 A KR 20060002211A
Authority
KR
South Korea
Prior art keywords
grouting
pipe
ground
sealing device
tip
Prior art date
Application number
KR1020040051153A
Other languages
Korean (ko)
Inventor
한광모
Original Assignee
계림하이텍 주식회사
한광모
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 계림하이텍 주식회사, 한광모 filed Critical 계림하이텍 주식회사
Priority to KR1020040051153A priority Critical patent/KR20060002211A/en
Publication of KR20060002211A publication Critical patent/KR20060002211A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

본 발명은 구조물이 설치되는 지반에 그라우팅액을 주입하여 지반을 고형화하여 지반 또는 지중에 설치되는 구조물이 안정성을 확보할 수 있도록 그라우팅을 실시하기 위하여, 지반의 소정의 위치에 그라우팅 파이프를 삽입하기 위하여 지반을 천공하거나 천공수를 동시에 주입하면서 지반을 천공할 때와 천공이 완료된 지반내에 삽입된 그라우팅 파이프를 이용하여 지반내에 그라우팅액을 주입할 때,         The present invention is to inject a grouting solution into the ground where the structure is installed to solidify the ground to grout to ensure the stability of the structure installed on the ground or ground, in order to insert the grouting pipe at a predetermined position of the ground When drilling the ground while drilling the ground or injecting the drilling water at the same time and when grouting liquid is injected into the ground using the grouting pipe inserted in the ground where the drilling is completed,

지반내에 일정한 간격을 두고 설치된 다수개의 그라우팅을 위한 천공부내에 주입되는 천공수가 인접하여 천공되는 또 다른 천공구멍에 삽입된 파이프내로 천공수가 역류되거나, 또는 천공된 구멍내에 삽입된 그라우팅 파이프를 이용하여 그라우팅을 실시하기 위하여 그라우팅액을 주입할 때 그라우팅을 실시하는 곳에서 주입되는 그라우팅액이 인접하여 그라우팅이 종료된 그라우팅 파이프내로 또는 아직 그라우팅이 실시 되지않은 파이프내로 그라우팅액이 역류되는 현상을 방지하기 위하여 그라우팅용 파이프 선단밀봉장치를 파이프의 선단에 삽입밀봉하여 지반을 천공하거나 그라우팅을 실시하는 그라우팅 시공방법에 대한 것이다.        Perforated water flows back into a pipe inserted into another drilled hole, which is drilled into a plurality of drilled holes for grouting, which are installed at regular intervals in the ground, or grouted using a grouting pipe inserted into the drilled hole. When the grouting liquid is injected, the grouting liquid injected from the grouting site is adjacent to the grouting pipe to prevent the grouting liquid from flowing back into the grouting pipe where the grouting is finished or into the pipe that has not yet been grouted. It is about a grouting construction method for inserting and sealing a pipe end sealing device for the pipe into the end of a pipe to perform grounding or grouting.

Description

그라우팅용 파이프 선단 밀봉장치 및 이를 이용한 그라우팅 시공방법{Pipe end sealing apparauts for grouting and grouting method using the apparatus}        Pipe end sealing apparauts for grouting and grouting method using the apparatus}             

도 1은 종래의 그라우팅 방법을 이용하여 터널에 그라우팅을 실시한 것을 보여주는 도면.       1 is a view showing grouting in a tunnel using a conventional grouting method.

도 2는 도 1의 단면 A-A를 보여주는 도면.         FIG. 2 shows a cross section A-A of FIG. 1. FIG.

도 3은 도 2의 "A"부분을 상세히 보여주는 도면.         3 is a view showing detail "A" of FIG. 2 in detail;

도 4는 종래의 방법으로 천공 및 그라우팅을 실시할 때 그라우팅 액 또는 천공수가 역류되는 현상을 보여주는 도면.         4 is a view showing a phenomenon in which the grouting liquid or the perforated water flows backward when the drilling and grouting is performed by a conventional method.

도 5는 본 발명의 그라우팅용 파이프 선단밀봉장치를 이용하여 그라우팅을 시공하는 과정을 보여주는 도면.        5 is a view showing a process of constructing the grouting using the grouting pipe tip sealing device of the present invention.

도 6(a)(b)(c)(d)(e)(f)(g)는 본 발명의 그라우팅용 파이프 선단 밀봉장치를 보여주는 도면.        6 (a) (b) (c) (d) (e) (f) (g) show a grouting pipe tip sealing device of the present invention.

<도면의 주요부분에 대한 부호의 설명>        <Description of the symbols for the main parts of the drawings>

10 : 그라우팅 부 11 : 토사        10: grouting part 11: earth and sand

12 : 터널 13 : 지반        12 tunnel 13 ground

14 : 그라우팅 파이프 15 : 그라우팅 범위        14: grouting pipe 15: grouting range

16 : 선단부 17 : 그라우팅액 또는 천공수        16: tip 17: grouting liquid or punching water

30 : 선단밀봉장치 31 : 몸체부        30: tip sealing device 31: body

32 : 삽입부 33 : 접착부        32: insertion part 33: adhesive part

34 : 홈부 35 : 밀폐재        34: groove 35: sealing material

36 : 발포재 37 : 섬유        36: foam material 37: fiber

38 : 후면지지부 39 : 전면 삽입부        38: rear support part 39: front insertion part

40 : 돌출부 41 : 돌출턱        40: protrusion 41: protrusion jaw

42 : 내측절개부 43 : 장홈부        42: medial incision 43: intestinal groove

44 : 삽입몸체 45 : 삽입부        44: insertion body 45: insertion unit

46 : 지지턱 47 : 선단지지부        46: support jaw 47: tip support

48 : 섬유뭉치        48: bundle of fibers

본 발명은 터널 또는 연약지반 상에 설치되는 지반에 그라우팅액을 주입하여 지반을 고형화하여 터널 또는 연약지반 상부 및 지중에 설치되는 구조물의 안정성을 확보할 수 있도록 그라우팅을 실시할 때,         The present invention injects grouting liquid into the ground installed on the tunnel or the soft ground to solidify the ground to perform the grouting to ensure the stability of the structure installed in the tunnel or the soft ground and the ground,

지반의 소정의 위치에 그라우팅 파이프를 삽입하기 위하여 지반을 천공할 때와 천공수를 동시에 주입하면서 지반을 천공하거나 또는 천공이 완료된 지반내에 삽입된 그라우팅 파이프를 이용하여 지반내에 그라우팅액을 주입할 때 지반내에 일정한 간격을 두고 설치된 다수개의 그라우팅을 위한 천공부내에 주입되는 천공수가 인접하여 천공되는 또 다른 천공구멍에 삽입된 파이프내로 천공수가 역류되거나 또는 다수개 인접하여 천공된 구멍내에 삽입된 그라우팅 파이프를 이용하여 그라우팅을 실시하기 위하여 그라우팅액을 주입할 때 그라우팅을 실시하는 곳에서 주입되는 그라우팅액이 인접하여 그라우팅이 종료 또는 그라우팅이 실시 되지 않은 그라우팅 파이프내로 그라우팅액이 역류되므로서, 소정의 압력을 유지하면서 지반을 굴삭하거나 또는 그라우팅을 실시하여야 하나 이들에 도입된 일정한 압력이 인접한 파이프내로 역류되어 빠져나가므로 압력이 저하되거나 또는 상기 파이프의 선단부에 지반이 굴삭수 또는 그라우팅액에 의하여 교란되어 인접한 파이프로 천공수 또는 그라우팅액과 함께 역류되면서 여굴이 형성되어 지반에 동공부가 형성되는 취약부가 발생되는 문제점을 해소하기 위하여 단계적으로 굴삭 또는 그라우팅이 완료되는 모든 파이프의 선단부에 선단밀봉장치를 삽입하여 밀봉을 한 후에 인접한 지역에 지반을 천공하거나 또는 그라우팅을 실시하도록 하여 효과적으로 지반을 천공하거나 지반내에 그라우팅 작업을 하여 지반을 계획된 강도로 고형화할 수 있도록 하는 그라우팅용 파이프 선단밀봉장치를 이용한 그라우팅 시공방법인 것이다.         In order to insert the grouting pipe at a predetermined position of the ground, when the ground is drilled and the ground water is injected simultaneously, or when grouting liquid is injected into the ground using the grouting pipe inserted in the ground where the drilling is completed. Using a grouting pipe inserted in a plurality of adjacently drilled holes or having a backflow into the pipe inserted into another drilled hole adjacently drilled into the drilled hole for a plurality of groutings installed at regular intervals therein. When the grouting liquid is injected to grout the grouting liquid, the grouting liquid injected from the grouting place is adjacent to the grouting liquid, and the grouting liquid flows back into the grouting pipe where the grouting is not performed. Excavating the ground or The grouting should be carried out, but since the constant pressure introduced to them is flowed back into the adjacent pipes and exits, the pressure is lowered or the ground at the tip of the pipes is disturbed by the digging water or the grouting fluid, so that the perforated water or the grouting fluid is fed to the adjacent pipes. In order to solve the problem that the weak part is formed due to backflow as the backflow is formed and the pupil part is formed on the ground, the end sealing device is inserted into the end of all pipes which are excavated or grouted step by step, and then sealed to the adjacent area. It is a grouting construction method using a pipe end sealing device for grouting so that the ground can be solidified to a predetermined strength by drilling the ground or grouting the ground effectively.

종래에는 지반에 그라우팅을 실시하기 위하여 천공수를 이용하여 천공비트에 의하여 천공을 하거나, 천공이 완료된 그라우팅 구멍내에 삽입된 파이프내에 그 라우팅액을 주입할 때, 인접하여 설치된 그라우팅 파이프의 선단부를 밀봉하지 않고 그라우팅을 실시하므로서 인접하여 설치된 그라우팅 파이프에서 천공 또는 그라우팅 작업이 종료된 그라우팅 파이프내로 천공수 또는 그라우팅액이 역류되므로서 천공수 또는 그라우팅액이 소정의 압력을 유지하지 못하므로서, 천공수를 이용하여 천공을 할때 발생되는 슬라임등을 원활히 배출시키지 못하거나 또는 그라우팅 액에 도입된 소정의 압력이 저하되어 설계된 범위의 지역에 그라우팅을 실시하지 못하여 결과적으로 지반에 설치된 구조물에 치명적인 구조적 위해를 주는 요인으로 작용하는 문제점이 있어 왔으며, 현재에는 이러한 문제점을 치유하기 위하여 그라우팅액의 겔타임을 조정하여 조기에 경화되도록 하고 있으나 지반내에 일정한 시간내에 침투된 후에 경화되어야 하나 겔타임이 빠르게 조정되어 지반에 완전히 침투되기 전에 경화되어 그라우팅이 도중에 중지되는 문제점이 또한 상존하는 것도 종래의 기술에 의하여 발생되는 문제점이다.         Conventionally, in order to grout the ground, when the perforation is performed using a punching bit or when the routing liquid is injected into the pipe inserted into the grouting hole where the drilling is completed, the tip of the adjacent grouting pipe is not sealed. Since the perforated water or grouting liquid is flowed back from the adjacent grouting pipes by the grouting and the grouting operation is completed, the perforated water or grouting fluid does not maintain a predetermined pressure, It is not able to smoothly discharge the slime generated when drilling, or the predetermined pressure introduced to the grouting liquid is lowered, so that grouting cannot be performed in the designed area, and as a result, it causes fatal structural damage to the structure installed on the ground. Problem In order to cure this problem, the gel time of grouting liquid is adjusted to be cured early, but it should be cured after penetrating into the ground within a certain time, but before the gel time is quickly adjusted and completely penetrated into the ground. It is also a problem caused by the prior art that the problem that the grouting is stopped in the middle also remains.

따라서, 본 발명은 상기의 문제점을 개선하기 위하여 제안된 기술로서, 지반 위 또는 지반 내에 설치되는 구조물의 안전성을 확보하기 위하여 지반에 대한 그라우팅을 통하여 지반을 고형화하므로서 지반을 안정화하여 지반에 설치되는 구조물의 안전도를 향상시키기 위하여 실시하는 그라우팅 작업을 위한 지반의 천공 및 상기 천공된 구멍내에 그라우팅을 실시할 때 인접하여 설치된 천공 또는 그라우팅 작업이 완료된 구멍내에 삽입된 파이프를 통하여 천공수 또는 그라우팅액이 역 류되는 현상을 방지하기 위하여 상기 파이프의 선단부에 선단 밀봉장치를 삽입한 후에 인접하여 설치된 파이프를 통하여 그라우팅을 실시하거나 천공을 하도록 하여 그라우팅 작업 또는 천공시 천공수 및 그라우팅액이 소정의 압력을 유지하도록 하여 설계된 작업을 원활히 수행할 수 있도록 하여 구조물의 안정성을 확보하면서 작업을 능률과 공사비를 절감할 수 있도록 하는 그라우팅 시공방법을 제공하는 데 있다.
Accordingly, the present invention is a technique proposed to improve the above problems, the structure is installed on the ground by stabilizing the ground by solidifying the ground through the grouting on the ground to ensure the safety of the structure installed on the ground or in the ground Perforated water or grouting liquid flows back through a pipe inserted into a hole in which the perforation or grouting is installed adjacently when the perforation of the ground for grouting work is performed to improve the safety of the grouting and grouting in the perforated hole. In order to prevent this phenomenon, the tip sealing device is inserted into the tip of the pipe, and then grouting or drilling is performed through adjacently installed pipes so that the punched water and grouting fluid maintain a predetermined pressure during grouting or drilling. Designed work The work while ensuring the stability of the structure to perform hwalhi to provide a grouting construction method that enables efficiency and cost savings.

본 발명은 그라우팅을 위하여 지반(13)을 천공할 때 사용되는 천공수가 인접한 또 다른 천공구멍에 삽입된 파이프(14)내로 천공수가 역류되거나 또는 상기 천공된 천공구멍에 삽입된 파이프(14)를 이용하여 그라우팅을 실시할 때 인접하여 설치된 그라우팅이 완료된 파이프(14)내로 그라우팅액이 역류되는 것을 방지하기 위하여 단계적으로 천공 또는 그라우팅이 완료되는 모든 파이프(14)의 선단부(16)에 선단밀봉장치(30)를 선단부(16)내에 삽입하여 밀봉을 한 후에 인접한 지역에 지반을 천공하거나 또는 그라우팅을 단계적으로 실시하도록 하는 그라우팅용 파이프 선단밀봉장치를 이용한 그라우팅 시공방법인 것에 특징이 있다.        The present invention utilizes the pipe 14 inserted into the drilled hole or the counter-water flows back into the pipe 14 inserted into another adjacent hole, which is used when drilling the ground 13 for grouting. In order to prevent the grouting liquid from flowing back into the adjacently installed grouting pipe 14 when grouting, the tip sealing device 30 is provided at the tip 16 of all the pipes 14, which are perforated or grouted in stages. ) Is a grouting construction method using a grouting pipe tip sealing device for inserting into the tip portion 16 to seal and then perforating the ground in a neighboring area or performing grouting step by step.

이하, 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.        Hereinafter, the configuration and operation of the present invention will be described in detail by the accompanying drawings.

도 1은 종래의 그라우팅 방법을 이용하여 터널에 그라우팅을 실시한 것을 보여주는 도면으로서, 터널(12)을 설치하기 위하여 지반(13)을 굴착하고, 상기 굴착된 터널(12)의 형상을 유지하기 위하여 터널(12)의 상부지반에 대한 그라우팅 작업을 실시하여 그라우팅부(10)가 형성된 것을 보여주는 것이다.        FIG. 1 is a view showing grouting in a tunnel using a conventional grouting method. In order to install the tunnel 12, the ground 13 is excavated, and the tunnel 12 is maintained to maintain the shape of the excavated tunnel 12. FIG. The grouting operation for the upper ground of (12) shows that the grouting portion 10 is formed.

상기 그라우팅 작업시 일정한 간격을 두고 그라우팅을 위한 지반을 천공하기 위하여 천공비트를 이용하여 지반(13)을 천공할 때 천공수를 이용하여 천공비트와 함께 지반을 천공하도록 한 후에, 상기 천공수와 굴착시 발생된 지반의 토사가 함께 외부로 유출되도록 하는데 이때 천공시 주입되는 천공수가 일정한 압력을 유지하도록 하고 있어 천공시 인접한 또 다른 천공구멍에 삽입된 파이프(14)내로 유출되는 현상이 발생되어 천공수에 도입된 압력이 저하되어 천공수의 소기의 효과를 기대할 수 없는 현상이 발생되는 점과, 또한 상기 천공된 천공구멍내에 삽입된 파이프(14)를 통하여 그라우팅을 실시할 때 상기 그라우팅 액에 일정한 압력이 작용하도록 하여 그라우팅액이 천공구멍의 주위에 일정한 범위를 형성하면서 그라우팅부(10)를 형성하도록 하는데, 상기 그라우팅 범위(15)를 형성하기 위하여 상기 그라우팅 파이프(14)를 통하여 주입되는 그라우팅 액이 일정한 압력을 유지하도록 하고 있어 인접한 천공구멍에 그라우팅 작업이 완료되어 형성된 그라우팅 범위(15)와 일정부분 겹치거나 또는 상기 그라우팅범위(15) 사이의 토사(11)를 통과하여 쉽게 인접하여 그라우팅 작업이 완료되지 않은 그라우팅 파이프(14)를 통하여 그라우팅 액이 역류되는 현상이 발생되므로서 지반이 구조역학적으로 취약부를 형성하게 되어 구조물의 안정성을 해치는 요인으로 작용하는 것이다.        In the grouting operation, when the ground 13 is drilled by using the drill bit to drill the ground for grouting at a predetermined interval, the ground is drilled together with the drill bit, and then drilled with the drill water. Soil of the ground generated at the time of flow out to the outside together at this time, the puncture water is injected into the hole to maintain a constant pressure during the puncturing occurs in the pipe 14 is inserted into another adjacent hole, the puncture water When the pressure introduced into the hole is lowered, a phenomenon in which the desired effect of the drilled water is not expected to occur, and a constant pressure is applied to the grouting liquid when grouting through the pipe 14 inserted into the drilled hole. This action allows the grouting liquid to form the grouting portion 10 while forming a predetermined range around the perforation hole. In order to form the grouting range 15, the grouting liquid injected through the grouting pipe 14 maintains a constant pressure, and thus, the grouting range 15 and a predetermined portion formed by the grouting operation are completed in adjacent drilling holes. The ground is structurally weak due to the phenomenon that the grouting liquid flows backward through the grouting pipe 14 which is not easily overlapped by passing through the soil 11 between the grouting ranges 15 or overlapping. To form a will act as a factor that damages the stability of the structure.

본 도에서는 터널에 대한 것을 예로 들어 설명하였으나 터널이외에 모든 형태의 지반에 대한 지반 천공시 및 그라우팅 작업을 실시할 때에도 상기와 같은 동일한 문제점이 발생된다는 점을 아울러 밝혀둔다.         In this figure, the tunnel has been described as an example, but it should be noted that the same problem occurs when the ground drilling and grouting work is performed on all types of grounds other than the tunnel.

도 2는 도 1의 단면 A-A를 보여주는 도면이고, 도 3은 도 2의 "A" 분분을 상세히 보여주는 도면으로서, 종래의 기술인 상기 도1의 천공 및 그라우팅 작업을 실시하는 과정을 보여주기 위한 것으로서, 터널의 지반(13)에 대한 천공을 실시하면서 천공수를 동시에 일정한 압력을 유지하면서 주입하도록 하는 작업을 통하여 지반을 천공하고, 상기 천공된 지반에 파이프(14)를 삽입한 후에 삽입된 파이프의 그라우팅 장치를 통하여 그라우팅액에 일정한 압력을 유지하면서 압력 주입하여 상기 그라우팅 파이프(14)의 주위에 일정한 범위에 걸쳐 형성되는 그라우팅 범위(15)가 다수개 형성되는 그라우팅 부(10)를 형성하여 지반토사에 대한 그라우팅 작업이 완료되도록 한 것이다.        Figure 2 is a view showing a cross-sectional AA of Figure 1, Figure 3 is a view showing the "A" portion of Figure 2 in detail, to show the process of performing the drilling and grouting operation of the prior art of Figure 1, Perforating the ground through the operation of injecting the drilling water while maintaining a constant pressure while simultaneously drilling the ground 13 of the tunnel, and grouting the inserted pipe after inserting the pipe 14 in the perforated ground. While maintaining a constant pressure in the grouting liquid through the device to form a grouting portion 10 is formed a plurality of grouting range 15 is formed over a certain range around the grouting pipe 14 to the ground soil The grouting work is done.

도 4는 종래의 방법으로 천공 및 그라우팅을 실시할 때 그라우팅 액 또는 천공수가 역류되는 현상을 보여주는 도면으로서, 상기 도2와 같은 방법을 통하여 그라우팅을 위한 지반 천공시 및 그라우팅 작업시 인접하여 설치된 또 다른 천공 구멍내의 파이프(14)를 통하여 천공수 및 그라우팅액(17)이 유출되는 현상이 발생되어 상기 삽입된 파이프(14)의 선단부 주위에 상기 천공수 또는 그라우팅액(17)이 역류될때 선단부(16)의 토사가 상기 천공수 및 그라우팅액(17)과 함께 섞여 지반의 토사(11)가 교란되어 상기 천공수 및 그라우팅액과 토사(11)가 함께 인접한 파이프(14)의 선단부(16)를 통하여 외부로 유출되는 현상이 발생되는 것이다.       4 is a view illustrating a phenomenon in which a grouting liquid or a perforated water flows backward when a perforation and grouting is performed by a conventional method, and another adjacently installed during ground drilling and grouting operations for grouting through the method as shown in FIG. 2. A phenomenon in which the puncture water and the grouting liquid 17 flows out through the pipe 14 in the boring hole occurs and the tip portion 16 when the perforated water or the grouting liquid 17 flows back around the inserted end of the pipe 14. ) Is mixed with the perforated water and grouting liquid (17), the soil soil (11) is disturbed by the perforated water and the grouting liquid and the earth and sand (11) through the front end portion 16 of the pipe (14) adjacent together The phenomenon of outflow occurs.

이렇게 발생되는 유출 천공수 및 그라우팅 액(17)으로 인하여 천공수 및 그라우팅액에 도입되는 일정한 압력이 저하되어 소기의 천공 및 그라우팅을 실시하지 못하게 되어 설계된 지반의 강도를 발현하지 못하거나 또는 선단부의 주위에 토사의 교란으로 인하여 토사와 함께 천공수 또는 그라우팅 액이 유출되므로서 선단부에 여굴이 형성되어 결과적으로 구조물에 악영향을 미치는 요인으로 작용하게되는 것이다.         Due to the outflow perforated water and grouting liquid 17 generated, the constant pressure introduced into the perforated water and grouting liquid is lowered to prevent the desired perforation and grouting, and thus, it is impossible to express the strength of the designed ground or the periphery of the tip. Due to the disturbance of the soil soil, perforated water or grouting liquid flows out along with the soil soil, and the overhang is formed at the distal end, resulting in a bad influence on the structure.

도 5는 본 발명의 그라우팅용 파이프 선단밀봉장치를 이용하여 그라우팅을 시공하는 과정을 보여주는 도면으로서, 종래의 기술인 상기 도 1에서 보여주는 터널에 대한 예를 들어 본 발명에서 사용하고자 하는 선단밀봉장치를 이용한 천공 및 그라우팅 시공방법을 설명하고자 한다.         5 is a view illustrating a process of constructing grouting using the grouting pipe tip sealing device of the present invention, using the tip sealing device to be used in the present invention for the tunnel shown in FIG. To explain the drilling and grouting construction method.

그러나 터널을 예로 들어 설명하였다고 하여 본 발명이 터널에 국한되어 적용되는 것이 아니고 모든 지반 및 모든 형태의 구조물이 설치되는 지반에 대하여 적용되는 것임을 아울러 밝혀둔다.       However, it will be apparent that the present invention is not limited to the tunnel but is applied to the ground on which all ground and all types of structures are installed.

상기 도 1에서 설명한 바와 같은 방법으로 터널에 대하여 그라우팅 작업을 도 2에서보여주는 방법인 지반에 대한 천공을 실시하면서 천공수를 동시에 일정한 압력을 유지하면서 주입하도록 하는 작업을 통하여 지반을 천공하고, 상기 천공된 지반에 파이프(14)를 삽입한 후에 삽입된 파이프의 그라우팅 장치를 통하여 그라우팅액에 일정한 압력을 유지하면서 압력 주입하여 상기 그라우팅 파이프(14)의 주위에 일정한 범위에 걸쳐 형성되는 그라우팅 범위(15)와 이러한 다수개의 그라우팅 범위(15)가 그라우팅 부(10)를 형성하도록 하는 것이 도 2의 그라우팅 방법인 것인데 비하여,        Drilling the ground through the operation to inject while maintaining a constant pressure at the same time while performing the drilling on the ground, which is a method showing the grouting work for the tunnel in the method as described in FIG. The grouting range 15 is formed over a predetermined range around the grouting pipe 14 by pressure injection while maintaining a constant pressure in the grouting liquid through the grouting device of the inserted pipe after inserting the pipe 14 into the ground. And such that the plurality of grouting ranges 15 form the grouting portion 10 is the grouting method of FIG.

본 도에서는 상기 도 2의 방법으로 천공 및 그라우팅을 실시하면서 상기 천공된 구멍내에 삽입된 파이프(14)의 선단부(16)에 본 발명의 선단 밀봉장치(30)를 삽입하여 밀봉토록한 다음 인접한 천공구멍에 대한 천공을 하고 본 도에서 도시하고 있는 점선의 선단밀봉장치(30)를 파이프(14)의 선단부(16)에 삽입밀봉되도록 하는 작업을 단계적으로 실시하도록 하면서, 상기 천공된 천공구멍내에 삽입된 파이프(14)를 통하여 그라우팅을 실시하는 과정을 반복적으로 하여 인접하여 수행되는 천공 및 그라우팅 작업시 주입되는 천공수 및 그라우팅 액(17)이 역류되는 현상을 방지하면서 단계적으로 지반(13)에 대한 천공 및 그라우팅을 완료토록하는 것이다.        In FIG. 2, the tip sealing device 30 of the present invention is inserted into the tip end portion 16 of the pipe 14 inserted into the drilled hole while the drilling and grouting is performed by the method of FIG. Drilling into the hole and inserting the sealed tip sealing device 30 shown in this figure into the end portion 16 of the pipe 14 in a stepwise manner while inserting it into the drilled hole, Repeating the grouting process through the pipe 14 to prevent the backflow of the grouting water and the grouting liquid 17 injected during the drilling and grouting operations performed adjacent to the ground 13 step by step for the ground 13 It is to complete the drilling and grouting.

도 6(a)(b)(c)(d)(e)(f)(g)는 본 발명의 그라우팅용 파이프 선단 밀봉장치를 상세히 보여주는 도면으로서,         6 (a) (b) (c) (d) (e) (f) (g) is a view showing in detail the pipe end sealing device for grouting of the present invention,

(a)는 일정한 길이의 원통형 파이프인 몸체부(31)와 상기 몸체부(31)의 일측단에 상기 몸체부의 파이프의 내측 직경에 맞는 일정한 길이의 봉형상의 삽입부(32)를 형성하면서 상기 삽입부(32)의 일측단을 상기 파이프의 내측에 삽입시키면서 상기 몸체부(31)와 삽입부(32)가 서로 밀착되는 부분은 접착재로 접착되는 접착부(33)가 형성되도록 한 것이다. 상기 삽입부(32)의 타측부 즉, 파이프인 몸체부(31)내로 삽입되지 않은 부분을 본 발명의 도 2에서 설명하는 천공 및 그라우팅 파이프(14)의 선단부(16)내로 삽입되도록 하는 것이다.        (a) is inserted into the body portion 31, which is a cylindrical pipe of a constant length and a rod-shaped insertion portion 32 of a constant length corresponding to the inner diameter of the pipe of the body portion at one end of the body portion 31, the insertion The body portion 31 and the insertion portion 32 are in close contact with each other while inserting one end of the portion 32 into the inside of the pipe so that the adhesive portion 33 is bonded to the adhesive material. The other side of the insertion portion 32, that is, the portion that is not inserted into the body portion 31, which is a pipe, is inserted into the tip portion 16 of the perforation and grouting pipe 14 described in FIG.

(b)는 상기 (a) 도에서 설명한 것과 동일하되 상기 삽입부(32)의 타측 즉 천공구멍내에 삽입된 파이프(14) 또는 그라우팅 파이프(14)의 선단부(16)에 삽입되는 부분에 일정한 폭과 깊이의 홈부(34)를 상기 삽입부(32)의 외주연에 형성하고, 상기 홈부(34)내에 밀폐재(35)를 충전시키도록 한다. 상기 밀폐재는 섬유 또는 실타래에 발포재가 함침되도록 한 것을 사용하거나 또는 고무재의 고무링 또는 팽창성수지 링등을 끼워서 사용하도록 한다.        (b) is the same as described in the above (a), but the other side of the insertion portion 32, that is, a constant width in the portion inserted into the pipe 14 or the end portion 16 of the grouting pipe 14 inserted into the drilling hole 14 An overly deep groove 34 is formed on the outer periphery of the insertion portion 32 to fill the seal 34 with the groove 34. The sealant is to be used to impregnate the foam material in the fiber or thread, or to use a rubber ring or expandable resin ring of the rubber material.

상기 밀폐재인 발포재가 홈부에 삽입될때 접착재의 역할을 하여 홈부내에 삽입된 밀폐재가 이탈되는 것을 방지하도록 한다.        When the sealing material is inserted into the groove portion serves as an adhesive to prevent the sealing material inserted in the groove from being separated.

상기 밀폐재(35)는 상기 천공구멍내에 삽입된 파이프 및 그라우팅 파이프의 선단부내에 상기 삽입부(32)가 삽입되어 보다 확실한 밀폐가 되도록 하기 위함이다.        The sealing material 35 is for inserting the insertion portion 32 into the end portion of the pipe and the grouting pipe inserted into the drilling hole to ensure a more secure seal.

(c)는 상기 도 (b)에서 언급한 홈부(34)를 1개 또는 복수개 이상 설치한 것을 보여주는 것이며 상기 홈부(34)내에 삽입되는 밀폐재(35)도 상기 도 (b)에서 언급한 것을 사용한다.        (c) shows that one or more grooves 34 mentioned in FIG. (b) are installed, and that the sealing material 35 inserted in the grooves 34 is also mentioned in FIG. use.

복수개 이상의 홈부를 형성한 것은 보다 확실한 밀폐를 하기 위함이며, 이렇게 보다 확실한 밀폐를 위하여 홈부를 한 개이상 형성하는 것은 천공수 및 그라우팅 액을 주입할 때 다양한 크기의 압력에 의하여 주입되므로 밀폐의 상태도 주입되는 압력의 크기에따라 대응할 수 있도록 하기 위하여 한개 이상의 홈부를 형성하도록 한 것이다.        The formation of a plurality of grooves is for a more secure seal, and the formation of at least one groove for a more secure seal is injected by pressure of various sizes when injecting perforated water and grouting liquid. One or more grooves are formed in order to be able to cope with the size of the injected pressure.

(d)는 섬유 또는 실타래로 이루어진 섬유뭉치(48)에 발포재를 함침시켜 이를 상기 천공 및 그라우팅을 위한 파이프의 선단부내에 삽입되도록 한 것이다.         (d) impregnates the foam material in the bundle of fibers 48 made of fibers or thread so that it is inserted into the distal end of the pipe for drilling and grouting.

이때 발포재가 상기 파이프의 선단부내에 삽입되면 파이프의 내경면과 상기 섬유뭉치에 함침된 발포재와 접착되어 쉽게 상기 선단밀봉장치가 이탈되는 것을 방지지하도록 한다.        In this case, when the foam member is inserted into the tip portion of the pipe, the foam member is adhered to the foam member impregnated with the inner diameter surface of the pipe and the fiber bundle so as to prevent the tip sealing device from being easily detached.

(e)는 콘 형상으로 하되 후면 지지부(38)의 단면직경이 전면 삽입부(39)의 단면 직경보다 크도록 하여 마치 코르크 마개로 병의 입구를 막는것과 같이 파이프(14)의 선단부(16)에 상기 전면 십입부(39)의 일정길이가 삽입되도록 하는 것이다.         (e) has a cone shape, but the cross-sectional diameter of the rear support portion 38 is larger than the cross-sectional diameter of the front inserting portion 39 so as to block the entrance of the bottle with a cork stopper 16 of the pipe 14 The predetermined length of the front recess 39 is to be inserted into.

상기 선단밀봉장치(30)의 재질은 연질의 프라스틱제품이거나 또는 섬유재질을 이용하거나 그 재질에 있어서는 다양한 재질을 사용할 수 있다.        The tip sealing device 30 may be made of a soft plastic product, a fiber material, or a variety of materials.

(f)는 상기 도 (e)에서 언급한 선단밀봉장치(30)의 몸체의 원주에 한개이상의 나선형의 돌출부(40)를 형성하여 상기 선단밀봉장치(30)가 파이프(14)의 선단부(16)내로 삽입될때 완전한 밀폐가 이루어지도록 하기 위함이다.        (f) forms one or more helical protrusions 40 on the circumference of the body of the tip sealing device 30 mentioned in FIG. (e) so that the tip sealing device 30 has a tip 16 of the pipe 14. This is to ensure a complete seal when inserted into the shell.

(g)는 화살형상으로 하되, 선단지지부(47)는 화살촉과 같은 형상을 하고 상기 선단지지부에서 일정한 길이가 연장되어 형성된 삽입몸체(44)인 삽입부(45)가 형성되도록 하고, 상기 선단지지부(47)에서 삽입몸체(44)로 연장되는 부분에 지지턱(46)을 형성할 수 있도록 선단지지부(47)의 후측의 단면이 축소되도록 하여 상기 삽입부(45)인 삽입몸체(44)가 파이프(14)의 선단부(16)내로 삽입될때 상기 지지턱(46)에 상기 파이프(14) 선단부(16)의 내측면이 접촉되도록 하기 위함이다.       (g) is in the shape of an arrow, the tip support portion 47 is shaped like an arrowhead and the insertion portion 45, which is an insertion body 44 formed by extending a predetermined length from the tip support portion to be formed, Insertion body which is the insertion part 45 so that the cross section of the rear side of the front support part 47 may be reduced so that the support jaw 46 may be formed in the part which extends from the front support part 47 to the insertion body 44. This is to allow the inner surface of the tip portion 16 of the pipe 14 to contact the support jaw 46 when the 44 is inserted into the tip portion 16 of the pipe 14.

또한, 상기 삽입몸체(44)의 후측부 즉 선단 파이프(16)내로 삽입될때 처음 삽입되는 부분에 일정한 높이의 돌출턱(41)을 설치하면서 상기 돌출턱(41)의 내측에서 상기 지지턱(46)까지 일정한 깊이의 장홈부(43)를 형성하도록 하고, 상기 삽입몸체(44)에 걸쳐 일정한 규격의 내측 절개부(42)를 형성하여 상기 삽입몸체(44) 가 파이프(14)의 내측으로 삽입될때 용이하게 삽입되도록 함과 동시에 상기 절개부(42)가 스프링 역할을 하여 파이프(14)의 내측에 삽입된 후에 탄성으로 파이프(14)의 내측면에 밀착되도록 하기 위하여 내측 절개부(42)를 설치하고, 또 다른 이유는 천공 및 그라우팅 파이프(14)의 내경이 다양한 관계로 상기 파이프(14)의 내측에 삽입되는 선단밀봉장치(30)의 규격도 또한 상기 파이프(14)의 내경에따라 선택되어야 하는 번거로움이 있어 이를 해소하기 위하여 어느 정도의 내경의 차이는 상기 내측 절개부(42)의 신축작용에 의하여 용이하게 상기 천공 및 그라우팅 파이프(14)의 선단부(16) 내경에 삽입되도록 하기 위함이면서, 동시에 상기 파이프(14)의 선단부(16)내에 삽입될때 돌출턱(41)에 의하여 파이프(14)의 내부면에 확실히 밀착지지가 되도록 하면서 또한 내측 절개부(42)에 의하여 탄성지지되도록 하기 위함이다.         In addition, the support jaw 46 inside the protruding jaw 41 while providing a protruding jaw 41 of a constant height in the rear portion of the insertion body 44, that is, the first insertion when inserted into the tip pipe 16. To form a long groove portion 43 of a constant depth up to), and to form an inner cut portion 42 of a predetermined size over the insertion body 44 to insert the insertion body 44 into the inside of the pipe 14 When the inner cut portion 42 is inserted into the inner portion of the pipe 14 while being inserted into the inside of the pipe 14 by the spring portion 42 to facilitate the insertion easily and at the same time, the inner cut portion 42 Another reason is that the size of the tip sealing device 30 inserted into the inside of the pipe 14 is also selected according to the inner diameter of the pipe 14, since the inner diameter of the perforated and grouting pipe 14 is various. There is a hassle that has to be solved The difference in the inner diameter to some extent is intended to be easily inserted into the inner diameter of the tip portion 16 of the perforation and grouting pipe 14 by the stretching action of the inner incision 42, and at the same time This is to ensure a close contact with the inner surface of the pipe 14 by the protruding jaw 41 when inserted into the tip portion 16 and to be elastically supported by the inner cutout 42.

상기 선단밀봉장치(30)의 재질은 본 발명의 설명에서 언급한 이외의 모든재질에 대하여도 적용하여 사용할 수 있음과 몸체부와 삽입부를 접착하지 않고 일체형으로 제작할 수도 있다.        The material of the tip sealing device 30 may be applied to all materials other than those mentioned in the description of the present invention, and may be manufactured integrally without bonding the body part and the insert part.

상기의 선단밀봉장치를 이용하여 그라우팅 작업을 수행하는 방법은 다음과 같다.        The grouting operation using the tip sealing device is as follows.

지반 상 또는 내에 설치되는 구조물의 안정성을 확보하기 위하여 지반(13)을 고형화하기 위하여 그라우팅 장치를 이용하여 그라우팅을 시공하는 방법에 있어서,        In the method of constructing grouting using a grouting device to solidify the ground 13 to ensure the stability of the structure installed on or in the ground,

a) 계획된 지반 상에 지반(13)을 천공하면서 천공을 위한 천공수를 동시에 주입하면서 지반을 천공하는 단계;a) drilling the ground while simultaneously injecting the drilling water for drilling while drilling the ground 13 on the planned ground;

b) 상기의 천공을 순차적으로 하면서 천공된 구멍내에 파이프(14)를 삽입하는 단계;     b) inserting the pipe (14) into the drilled hole while performing the above drilling sequentially;

c) 순차적으로 천공된 구멍내에 파이프(14)를 삽입하고, 상기 파이프의 선단부(16)에 선단밀봉장치(30)를 삽입하는 단계;     c) inserting the pipe (14) into sequentially drilled holes and inserting the tip sealing device (30) into the tip (16) of the pipe;

d) 상기 선단부(16)의 파이프에 선단밀봉장치(30)를 삽입한 후 인근의 장소에서 천공을 실시하고 천공이 완료되면 상기 c) 단계의 파이프 선단부(16)에 대한 밀봉(30)작업을 수행하면서 지반의 천공을 반복적으로 수행하여 완료하는 단계;  d) Insert the tip sealing device 30 into the pipe of the tip portion 16 and then perform the drilling at a nearby place, and when the drilling is completed, the sealing 30 operation on the pipe tip 16 of step c) is performed. Repeatedly performing perforation of the ground while performing;

e) 상기 천공이 완료된 천공구멍내에 삽입된 파이프(14)를 이용하여 그라우팅 작업을 수행하는 단계;e) performing a grouting operation by using the pipe 14 inserted into the drilling hole in which the drilling is completed;

f) 상기 삽입완료된 파이프의 선단부(16)에 선단 밀봉장치(30)를 삽입하여 밀봉을 하는 단계; f) sealing by inserting a tip seal device 30 into the tip end portion 16 of the inserted pipe;

g) 상기 밀봉된 파이프(14)의 인근의 장소에서 또 다른 그라우팅 작업을 수행완료한 다음 상기 f) 단계의 파이프 선단부(16)를 선단 밀봉장치(30)를 이용하여 밀봉하는 작업을 반복적으로 수행하면서 그라우팅 작업을 완료하는 것이다.     g) performing another grouting operation at a place adjacent to the sealed pipe 14, and then repeatedly sealing the pipe end portion 16 of the step f using the tip sealing device 30; The grouting work is completed.

본 발명은 지반 위 또는 지반 내에 설치되는 구조물의 안전성을 확보하기 위하여 지반에 대한 그라우팅을 통하여 지반을 고형화하므로서 지반을 안정화하여 지반에 설치되는 구조물의 안전도를 향상시키기 위하여 실시하는 그라우팅 작업을 위하여 지반에 천공 및 상기 천공된 구멍내에 그라우팅을 실시할 때 인접하여 설치된 천공작업이 완료된 천공 또는 그라우팅 작업이 완료된 구멍내에 삽입된 파이프를 통하여 천공수 또는 그라우팅액이 역류되는 현상을 방지하기 위하여 상기 파이프의 선단부에 선단 밀봉장치를 삽입한 후에 인접하여 설치된 파이프를 통하여 그라우팅을 실시하거나 천공을 하도록 하여 그라우팅 작업 또는 천공시 천공수 및 그라우팅액이 소정의 압력을 유지하도록 하여 설계된 작업을 원활히 수행할 수 있도록 하여 구조물의 안정성을 확보하면서 작업을 능률과 공사비를 절감할 수 있도록 하는 안정성을 확보할 수 있는 능률적이면서 경제성을 동시에 겸비한 그라우팅 시공방법인 것이다.         The present invention stabilizes the ground by grouting the ground to ensure the safety of the structure installed on the ground or in the ground by stabilizing the ground to improve the safety of the structure installed on the ground for grouting work carried out on the ground When the grouting is performed in the drilled hole and the drilled hole, the front end of the pipe is prevented from flowing back through the pipe inserted into the drilled hole or the hole in which the grouting is completed. After inserting the tip sealing device, grouting or drilling is performed through adjacently installed pipes so that the drilled water and grouting fluid can maintain a predetermined pressure during grouting or drilling to smoothly perform the designed work. It is an efficient and economical grouting construction method that ensures stability while ensuring stability while reducing work costs and construction costs.

Claims (10)

지반 상 또는 내에 설치되는 구조물의 안정성을 확보하기 위하여 지반을 고형화하기 위한 그라우팅 장치에 있어서,        In the grouting apparatus for solidifying the ground in order to ensure the stability of the structure installed on or in the ground, 상기 지반 상에 또는 내에 그라우팅 작업을 순차적으로 수행하기 위하여 천공을 하고 천공된 구멍 내에 삽입된 그라우팅 파이프를 통하여 그라우팅 작업을 순차적으로 실시할 때, 상기 천공된 구멍내에 삽입된 파이프를 통하여 그라우팅 작업을 수행하기 전에 선행의 천공 및 팡니프 삽입작업이 완료된 파이프의 선단부에 선단 밀봉장치를 삽입한 후에 그라우팅을 실시하고, 후행되어 수행되는 동종의 천공 및 그라우팅 작업을 상기 방법과 같이 수행하도록 하여 천공시 주입되는 천공수와 그라우팅 시 압력주입되는 그라우팅 액이 인접되어 삽입설치된 파이프내로 유출되지 않도록 하는 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        When the grouting operation is sequentially performed through a grouting pipe inserted in the drilled hole and drilled to sequentially perform the grouting operation on or in the ground, the grouting operation is performed through the pipe inserted into the drilled hole. Before inserting the tip sealing device to the tip of the pipe where the preceding drilling and pannipe inserting operation is completed, grouting is performed, and subsequent drilling and grouting operations of the same type to be performed are carried out as described above. A grouting pipe tip sealing device characterized in that the grouting liquid injected under pressure during grouting and perforated water does not flow into adjacently inserted pipes. 제 1항에 있어서,        The method of claim 1, 상기 선단밀봉장치는 일정한 길이의 원통형 파이프인 몸체부와 상기 몸체부의 일측단에 상기 파이프의 내측 직경에 맞는 일정한 길이의 봉형상의 삽입부를 형성하면서 상기 삽입부의 일측단을 상기 파이프의 내측에 삽입시키면서 상기 몸체부와 삽입부가 서로 밀착되는 부분은 접착재로 접착되는 접착부가 형성되도록 한 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        The tip sealing device is formed by inserting one end of the insertion portion into the inside of the pipe while forming a rod-shaped insertion portion having a constant length corresponding to the inner diameter of the pipe at one end of the body portion and a cylindrical pipe of a constant length. Grouting pipe end sealing device characterized in that the portion in which the body portion and the insert is in close contact with each other to form an adhesive portion bonded with an adhesive material. 제 1항에 있어서,        The method of claim 1, 상기 선단밀봉장치는 일정한 길이의 원통형 파이프인 몸체부와 상기 몸체부의 일측단에 상기 파이프의 내측 직경에 맞는 일정한 길이의 봉형상의 삽입부를 일체로 형성하는 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        The tip sealing device is a grouting pipe tip sealing device, characterized in that the body portion which is a cylindrical pipe of a certain length and a rod-shaped insertion portion of a constant length that matches the inner diameter of the pipe is integrally formed on one side end of the body portion. 제 2항 또는 제 3항에 있어서,        The method of claim 2 or 3, 상기 삽입부에 일정한 폭과 깊이의 홈부를 한개이상 설치하고 상기 삽입부의 홈부내에 섬유 또는 실타래에 발포재가 함침되도록 한 것이거나 고무재의 고무링이거나 팽창성수지재의 링중에서 어느 한 가지의 밀폐재를 삽입한 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        One or more grooves having a predetermined width and depth are installed in the insertion part, and the sealing material is embedded in the groove part of the insertion part so that the foam material is impregnated into the fiber or the thread, or the rubber ring of the rubber material or the ring of the expandable resin material is inserted. Grouting pipe end sealing device characterized by one. 제 1항에 있어서,        The method of claim 1, 상기 선단밀봉장치는 섬유 또는 실타래로 이루어진 섬유뭉치에 발포재를 함침시킨 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        The tip sealing device is a grouting pipe tip sealing device characterized in that the foam material is impregnated into a bundle of fibers made of fiber or thread. 제 1항에 있어서,        The method of claim 1, 상기 선단밀봉장치는 콘 형상으로 하되 후면 지지부의 단면직경이 전면 삽입부의 단면 직경보다 크도록 한 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        The tip sealing device has a conical shape, but the end face of the grouting pipe end sealing device, characterized in that the cross-sectional diameter of the rear support portion is larger than the cross-sectional diameter of the front insertion portion. 제 6항에 있어서,         The method of claim 6, 상기 콘 형상의 몸체에 나선형의 돌출부가 한개이상 형성된 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        Grouting pipe end sealing device characterized in that at least one spiral protrusion formed in the cone-shaped body. 제 1항에 있어서,        The method of claim 1, 상기 선단밀봉장치는 화살형상으로 하되, 선단지지부는 화살촉과 같은 형상을 하고 상기 선단지지부에서 일정한 길이가 연장되어 형성된 삽입몸체인 삽입부가 형성되도록 하고, 상기 선단지지부에서 삽입몸체로 연장되는 부분에 지지턱을 형성할 수 있도록 선단지지부의 후측의 단면이 축소되도록 하면서 상기 삽입몸체의 후측부 즉 선단 파이프내로 삽입될때 처음 삽입되는 부분에 일정한 높이의 돌출턱을 설치하되 상기 돌출턱의 내측에서 상기 지지턱까지 일정한 깊이의 장홈부가 상기 삽입몸체에 형성되도록 하고, 상기 삽입몸체의 전체길이에 걸쳐 내측 절개부를 형성하도록 한 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치.        The tip sealing device is in the shape of an arrow, the tip support portion has the same shape as the arrowhead and the insertion body is formed to be an insertion body formed by extending a predetermined length from the tip support portion to extend from the tip support portion to the insertion body While the end of the rear end of the front end support is to be reduced so that the support jaw can be formed in the part, a protruding jaw of a certain height is installed in the rear part of the insertion body, that is, the first insertion when inserted into the end pipe, but the inner side of the protruding jaw. Grouting pipe end sealing device characterized in that the long groove portion of a predetermined depth to the support jaw to be formed in the insertion body, and to form an inner cutout over the entire length of the insertion body. 지반 상 또는 내에 설치되는 구조물의 안정성을 확보하기 위하여 지반을 고형화하기 위하여 그라우팅 장치를 이용하여 그라우팅을 시공하는 방법에 있어서,    In the method of constructing grouting using a grouting device to solidify the ground in order to secure the stability of the structure installed on or in the ground, a) 계획된 지반 상에 지반을 천공하면서 천공을 위한 천공수를 동시에 주입하면서 지반을 천공하는 단계;     a) drilling the ground while simultaneously injecting the drilling water for drilling while drilling the ground on the planned ground; b) 상기의 천공을 순차적으로 하면서 천공된 구멍내에 파이프를 삽입하는 단계;      b) inserting a pipe into the perforated hole while performing the above perforation sequentially; c) 순차적으로 천공된 구멍내에 파이프를 삽입하고 상기 파이프의 선단부에 선단밀봉장치를 삽입하는 단계;      c) inserting the pipe into the sequentially drilled hole and inserting the tip sealing device at the tip of the pipe; d) 상기 선단부의 파이프에 선단밀봉장치를 삽입한 인근의 장소에서 천공을 실시하고 천공이 완료되면 상기 c) 단계의 파이프 선단부 밀봉작업을 반복적으로 수행하면서 지반의 천공을 완료하는 단계;      d) performing perforation at a nearby place where the tip sealing device is inserted into the pipe of the tip and completing the drilling of the ground while repeatedly performing the sealing of the pipe tip in step c) when the drilling is completed; e) 상기 천공이 완료된 천공구멍내에 삽입된 파이프를 이용하여 그라우팅 장치를 이용하여 그라우팅 작업을 수행하는 단계;      e) performing a grouting operation using a grouting apparatus using a pipe inserted into the punched hole having completed the drilling; f) 상기 그라우팅 작업의 수행이 완료된 파이프의 선단부에 선단 밀봉장치를 삽입하여 밀봉을 하는 단계;      f) sealing by inserting a tip sealing device at the tip of the pipe where the grouting operation is completed; g) 상기 밀봉된 파이프의 인근의 장소에서 또 다른 그라우팅 작업을 수행완료한 다음 상기 f) 단계의 파이프 선단부를 선단 밀봉장치를 이용하여 밀봉하는 작업을 반복적으로 수행하면서 그라우팅을 완료하는 단계로 이루어진 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치를 이용한 그라우팅 시공방법.      g) completing another grouting operation at a place adjacent to the sealed pipe, and then repeating the sealing of the pipe end of step f) by using a tip sealing device. Grouting construction method using a grouting pipe tip sealing device. 제 9항에 있어서,        The method of claim 9, 상기 선단밀봉장치는 상기 청구항 2항내지 청구항 7항 중 어느 한항의 선단밀봉장치인 것에 특징이 있는 그라우팅용 파이프 선단 밀봉장치를 이용한 그라우팅 시공방법.       The tip sealing device is a grouting construction method using a pipe tip sealing device for grouting, characterized in that the tip sealing device of any one of claims 2 to 7.
KR1020040051153A 2004-07-01 2004-07-01 Pipe end sealing apparauts for grouting and grouting method using the apparatus KR20060002211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040051153A KR20060002211A (en) 2004-07-01 2004-07-01 Pipe end sealing apparauts for grouting and grouting method using the apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040051153A KR20060002211A (en) 2004-07-01 2004-07-01 Pipe end sealing apparauts for grouting and grouting method using the apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0018694U Division KR200363708Y1 (en) 2004-07-01 2004-07-01 Pipe end sealing apparauts for grouting

Publications (1)

Publication Number Publication Date
KR20060002211A true KR20060002211A (en) 2006-01-09

Family

ID=37105190

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040051153A KR20060002211A (en) 2004-07-01 2004-07-01 Pipe end sealing apparauts for grouting and grouting method using the apparatus

Country Status (1)

Country Link
KR (1) KR20060002211A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741948A (en) * 2013-11-29 2014-04-23 中交第四航务工程局有限公司 Grouting method of chamfering of embedded part
CN104727463A (en) * 2015-03-25 2015-06-24 中国建筑第八工程局有限公司 Grouting connecting structure of prefabricated part and construction method thereof
KR101648814B1 (en) * 2016-05-11 2016-08-17 김동수 Separated steel pipe structure for preventing backward flow and, the grouting mathod using the same
CN113622667A (en) * 2021-06-16 2021-11-09 中交第四公路工程局有限公司 Grouting non-return and grout-supplementing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741948A (en) * 2013-11-29 2014-04-23 中交第四航务工程局有限公司 Grouting method of chamfering of embedded part
CN103741948B (en) * 2013-11-29 2016-03-30 中交第四航务工程局有限公司 The grouting method of built-in fitting chamfering
CN104727463A (en) * 2015-03-25 2015-06-24 中国建筑第八工程局有限公司 Grouting connecting structure of prefabricated part and construction method thereof
KR101648814B1 (en) * 2016-05-11 2016-08-17 김동수 Separated steel pipe structure for preventing backward flow and, the grouting mathod using the same
CN113622667A (en) * 2021-06-16 2021-11-09 中交第四公路工程局有限公司 Grouting non-return and grout-supplementing device

Similar Documents

Publication Publication Date Title
KR100776304B1 (en) Direct punching simultaneous poruing equipment and grouting construction method
KR200424432Y1 (en) Direct punching simultaneous poruing equipment
KR101070072B1 (en) A multistaged equipment of pipe grouting by double packer system and its construction
KR100978006B1 (en) Soil nailing method
KR101125082B1 (en) Tublar member, chemical injection apparatus and chemical injection method using the same
KR20220053956A (en) Constructing method of grouting steel pipe having cocking packer module and grouting steel pipe having cocking packer module
KR20070114961A (en) Pressurized grouting packer with waterproof function
JP2001040980A (en) Multistage grouting device and method therefor
KR101580961B1 (en) Reinforced direct boring attached imbedded bit at head steelpipe and one shot grouting in tunneling method
KR100842925B1 (en) Grouting apparatus and grouting method
KR102012708B1 (en) Tunnel construction method by advanced simultaneous injection
KR100795202B1 (en) Pressurized grouting packer with waterproof function
KR200352267Y1 (en) Slope-reinforcing structure for soil nailing having function of drainage
KR102079076B1 (en) Reinforced steel pipe one shot grouting and drilling
KR20170067531A (en) Apparatus to upgrade friction capacity of imbeded hollow type pile and construction method using thereby
JP4603652B2 (en) The consolidation method of natural ground
KR20060002211A (en) Pipe end sealing apparauts for grouting and grouting method using the apparatus
KR100576789B1 (en) Multistage grouting apparatus and method using casing and packer
KR100859871B1 (en) Disposible bit of attach and remove-type and the anchor constructing method thereof
KR102076246B1 (en) Anchor hole boring method to emit the crushed slime and the injected water by forming the negative pressure on the slope of the cone-shaped bit
KR100588606B1 (en) Multi in-situ packer set for deep depth grouting hole and grouting method
KR200363708Y1 (en) Pipe end sealing apparauts for grouting
JP2005314938A (en) Chemical grouting device and ground reinforcing method
KR101808267B1 (en) Soil nailing apparatus and soil nailing method using that
KR101442822B1 (en) Apparatus for inserting steel pipe and simultaneous horizontal high pressure jet-grouting in a tunnel supporting, and Method for inserting steel pipe and high pressure jet grouting with it

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
NORF Unpaid initial registration fee