KR200429236Y1 - Temporarily installed material capable of easy attachment and detachment - Google Patents

Temporarily installed material capable of easy attachment and detachment Download PDF

Info

Publication number
KR200429236Y1
KR200429236Y1 KR2020060016323U KR20060016323U KR200429236Y1 KR 200429236 Y1 KR200429236 Y1 KR 200429236Y1 KR 2020060016323 U KR2020060016323 U KR 2020060016323U KR 20060016323 U KR20060016323 U KR 20060016323U KR 200429236 Y1 KR200429236 Y1 KR 200429236Y1
Authority
KR
South Korea
Prior art keywords
support
support beam
connecting plate
hole
present
Prior art date
Application number
KR2020060016323U
Other languages
Korean (ko)
Inventor
권혁찬
Original Assignee
정우개발 (주)
권혁찬
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정우개발 (주), 권혁찬 filed Critical 정우개발 (주)
Priority to KR2020060016323U priority Critical patent/KR200429236Y1/en
Application granted granted Critical
Publication of KR200429236Y1 publication Critical patent/KR200429236Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 고안은 설치 및 분리가 용이한 가설자재에 관한 것으로, 더욱 상세하게는 흙막이 공사에 있어서, 흙벽 또는 암벽이 미치는 힘을 지지하기 위해 사용되는 부재에 미리 체결공을 형성한 다양한 가설자재에 관한 것이다. The present invention relates to a temporary material that is easy to install and remove, and more particularly, to a variety of temporary materials in which a fastening hole is formed in advance in a member used for supporting a force applied by an earth wall or a rock wall in a earthquake construction. .

본 고안은 흙막이 공사에 사용되는 H 빔에 있어서, 상기 H 빔의 플랜지 부분에 일정간격으로 2열의 플랜지공을 형성하고 웨지에는 2 내지 8개의 웨지공을 1열 또는 2열로 형성하여 미리 제작되거나 상기 H 빔의 양 말단에는 연결판공이 구성되어 있는 연결판과, 상기 연결판을 지지하기 위한 보강판이 더 구비된 빔이나 또는 흙막이 공사에 사용되는 빔에 있어서, 상기 빔은 지지빔, 버팀빔, 및 브릿지빔으로 일체로 구성되어 있고 상기 지지빔과 버팀빔은 수직으로 결합되고 브릿지빔은 상기 지지빔과 버팀빔을 연결하는 형태이며, 상기 지지빔에는 띠장의 체결공과 결합할 수 있는 다수의 지지빔공이 형성되고 상기 버팀빔의 말단에는 연결판공이 형성되어 있는 연결판이 부착되어 있고, 버팀빔의 말단의 플랜지 부위에는 다른 버팀보들과 결합이 용이하도록 버팀빔공이 형성되어 있는 것을 특징으로 하는 T형 빔을 제공한다. The present invention in the H-beam used for earthquake construction, forming two rows of flange holes at regular intervals in the flange portion of the H-beam and two to eight wedge holes formed in one row or two rows in the wedge in advance or In both ends of the H beam, a connecting plate formed of a connecting plate hole, and a beam further provided with a reinforcing plate for supporting the connecting plate, or a beam used in the construction of the earth barrier, the beam is a support beam, a prop beam, and It is composed of a bridge beam integrally and the support beam and the support beam is vertically coupled and the bridge beam is a form of connecting the support beam and the support beam, the support beam is a plurality of support beams that can be combined with a fastening hole of the band A ball is formed and a connecting plate having a connecting plate hole is attached to the end of the support beam, and the flange portion of the end of the support beam is easy to combine with other support beams Provided is a T-beam, characterized in that the lock brace beam hole is formed.

말뚝, 버팀보, 띠장, H빔, 흙막이 Pile, brace, belt, H beam, earthen board

Description

설치 및 분리가 용이한 가설자재{Temporarily installed material capable of easy attachment and detachment}Temporarily installed material capable of easy attachment and detachment

도 1은 본 고안의 일실시 예에 따른 다양한 H 빔의 사시도이며,1 is a perspective view of various H beams according to an embodiment of the present invention,

도 2는 본 고안의 체결공들의 구성을 보여주는 도면이고, 2 is a view showing the configuration of the fastening holes of the present invention,

도 3은 본 고안의 일실시 예에 따른 T형 빔의 사시도이며, 3 is a perspective view of a T-beam according to an embodiment of the present invention,

도 4는 본 고안의 일실시 예에 따른 스티프너의 사시도이고, 4 is a perspective view of a stiffener according to an embodiment of the present invention,

도 5는 본 고안의 가설자재가 적용된 일부 가설 상태도이다. 5 is a partial state of the hypothesis applied to the hypothesis material of the present invention.

*도면의 주요 부호에 대한 설명** Description of Major Symbols in Drawings *

100 : H 빔 110 : 플랜지100: H beam 110: flange

115 : 플랜지공 120 : 웨브115: flange hole 120: web

125 : 웨브공 130, 140, 220 : 연결판125: web ball 130, 140, 220: connecting plate

135, 145, 225 : 연결판공 150 : 보강판135, 145, 225: connection plate hole 150: reinforcement plate

200 : 귀잡이 빔 210 : 버팀빔200: deaf beam 210: prop beam

230, 240 : 브릿지빔 250 : 지지빔230, 240: bridge beam 250: support beam

300 : 스티프너 320 : 조정판300: stiffener 320: control panel

본 고안은 설치 및 분리가 용이한 가설자재에 관한 것으로, 더욱 상세하게는 흙막이 공사에 있어서, 흙벽 또는 암벽이 미치는 힘을 지지하기 위해 사용되는 부재에 미리 체결공을 형성한 다양한 가설자재에 관한 것이다. The present invention relates to a temporary material that is easy to install and remove, and more particularly, to a variety of temporary materials in which a fastening hole is formed in advance in a member used for supporting a force applied by an earth wall or a rock wall in a earthquake construction. .

건설현장에서 지하에 건물의 기초, 지하실 또는 콘크리트 벽체를 축조하기 위하여 해당 지반을 굴토한 후 굴토면이 토압에 의해 붕괴되는 것을 방지하기 위하여 통상 가설 흙막이 벽을 설치하고 있다. 이러한 흙막이는 소정 간격으로 지반에 설치되는 H 파일(엄지말뚝)을 박고 토류판 등을 적층하여 굴토면을 받치는 토류벽을 형성하고 H 파일의 일측면에 수평되게 띠장을 설치하며, 이를 지지하기 위한 버팀보를 띠장에 연결시킨다. 상기 띠장은 여러개의 H 빔을 연결하여 사용하게 되는데 이를 연결하기 위하여 두 개의 빔 사이에 철판을 대고 용접하거나 빔의 연결부위에 구멍을 뚫고 대는 철판에도 구멍을 뚫어 이를 볼팅하는 방식을 쓰고 있으나 작업현장에서 매우 위험하고 번거로우며, 공정을 느리게 하고 있다. 또한 이러한 경우 나중에 분리시에 이 부분을 다시 사용하지 못하고 절단하여 버리고 있는 실정이다. 또한, 상기 띠장을 지지하기 위한 버팀보가 사용되는데, 이러한 버팀보가 여러개 연결되거나 버팀보의 중간부분에 다른 버팀보가 연결되거나 하는 등의 일이 발생한다. 이러한 경우 다른 자재와 연결하기 위하여 버팀보에 구멍을 뚫는 작업을 현장에서 곧바로 시행하며 용접도 이루어지게 된다. 상기한 문제점들이 여전히 발생하게 되는 것이다. In the construction site, in order to build the foundation, basement, or concrete wall of the basement, the temporary ground wall is usually installed to prevent the ground surface from collapse by earth pressure after excavating the ground. These mudstones are piled with H piles (thumb piles) installed on the ground at predetermined intervals and stacked with earth plate to form earthen walls that support the oyster surface, and install girders horizontally on one side of the H piles. Connect to the strip. The band is used to connect a number of H beams in order to connect them by welding a steel plate between the two beams, or by drilling a hole in the iron plate to the hole of the connection portion of the beam is used to bolt it Is very dangerous and cumbersome and slows down the process. Also, in this case, this part is not used again at the time of separation and is cut off. In addition, a brace for supporting the band is used, such that braces are connected several times, or other braces are connected to the middle portion of the brace and the like occurs. In this case, a hole is drilled in the brace in order to connect with other materials, and the welding is performed. The above problems still occur.

한편 상기 띠장은 토류벽의 토압을 견디게 되는데, 횡방향으로 미치는 토압등을 지지하기 위하여 설치되는 버팀보와 띠장이 연접하는 부위나 또는 버팀보의 길이의 조절을 위해 잭이 필요한 경우 잭과 띠장이 연접하는 부위는 많은 힘을 받는다. 즉 띠장과 버팀보로 대개 H 빔을 사용함으로서 버팀보에 약축 방향으로 좌굴이 발생하므로 이를 해결하여야 하며 이를 보강하기 위해 수평 및 수직으로 보강재를 설치하기도 한다. 보강재로는 띠장으로 사용되는 H 빔의 플랜지 사이에 적당한 크기의 철판을 수직으로 대고 용접하거나, 해당 플랜지 부분에 철판을 수평으로 대고 용접하고 있으나 이러한 방법은 매우 복잡하고 시간이 많이 소요되며, 용접설치시 가스 발생을 유발하여 환경파괴 및 안정적이지 못한 곳에서의 가스 사용으로 인한 안전사고의 위험뿐만 아니라 분리가 힘들기 때문에 이 부분을 절단하여 사용하여야 하므로 자재의 낭비로 이어지는 문제가 있다. 또한, 리프트팩을 이용하거나 그 부위에 나무로 거푸집을 만들어 콘크리트를 내설하여 보강하는 방법도 쓰이고 있다. 그러나 이러한 것은 콘크리트의 건조시까지 걸리는 시간이 길며, 여전히 복잡하며, 재활용이 힘들다는 단점을 가지고 있다.On the other hand, the band is to endure the earth pressure of the earth wall, the area where the brace and the band is connected to support the earth pressure in the lateral direction, or if the jack is required for the adjustment of the length of the brace is connected to the jack and the band Receives a lot of power. In other words, buckling occurs in the weak axis of the brace by using H beams as the girdle and the brace, and the stiffeners should be solved horizontally and vertically. As a reinforcing material, a steel plate of a suitable size is welded vertically between the flanges of the H-beam used as a strip, or horizontally welded to the flange part. However, this method is very complicated and time-consuming. This is a problem that leads to waste of materials because it is necessary to cut this part because it is difficult to separate as well as the risk of safety accident due to environmental destruction and use of gas in unstable places by causing gas generation. In addition, it is also used to reinforce concrete by using a lift pack or by making wooden formwork at the site. However, this has the disadvantage that it takes a long time to dry the concrete, is still complicated, and difficult to recycle.

즉 흙막이 공사에 사용되는 가설자재는 시공상황에 맞게 현장에서 절단하여 사용함은 물론 가설자재에 체결공을 현장에서 뚫거나 현장에서 용접하거나 함으로 써 작업효율의 저하를 불러오고 안전사고의 위험이 상존하며 더욱이 상기한 절단 및 용접에 의한 시공의 결과 공사완료 후 가설 자재의 해체시 재활용이 곤란함은 더욱 큰 문제점으로 지적되어 왔다.In other words, temporary materials used for earthquake construction are not only cut and used at the site according to the construction situation, but also by drilling or fastening the fasteners on the temporary materials at the site or welding them at the site, resulting in a decrease in work efficiency and the danger of safety accidents. As a result of the construction by cutting and welding described above, it is pointed out that it is difficult to recycle when dismantling temporary materials after construction is completed.

따라서 본 고안은 이를 해결하기 위해, 흙막이 공사시에 사용되는 가설자재의 시공시에 작업이 효율적으로 이루어질 수 있고 안전성이 구비되며 그 해체 후에도 재활용이 가능한 가설자재를 제공함을 그 목적으로 한다.Therefore, in order to solve this problem, it is an object of the present invention to provide a temporary material that can be efficiently carried out at the time of construction of the temporary material used at the time of construction, safety is provided, and can be recycled after dismantling.

상기한 목적을 달성하기 위한 본 고안은 흙막이 공사에 사용되는 H 빔에 있어서, 상기 H 빔의 플랜지 부분에 일정간격으로 2열의 플랜지공을 형성하고 웨지에는 2 내지 8개의 웨지공을 1열 또는 2열로 형성하여 미리 제작되거나 상기 H 빔의 양 말단에는 연결판공이 구성되어 있는 연결판과, 상기 연결판을 지지하기 위한 보강판이 더 구비된 빔이나 또는 흙막이 공사에 사용되는 빔에 있어서, 상기 빔은 지지빔, 버팀빔, 및 지지빔으로 일체로 구성되어 있고 상기 지지빔과 버팀빔은 수직으로 결합되고 브릿지빔은 상기 지지빔과 버팀빈을 연결하는 형태이며, 상기 지지빔에는 띠장의 체결공과 결합할 수 있는 다수의 지지빔공이 형성되고 상기 버팀빔의 말단에는 연결판공이 형성되어 있는 연결판이 부착되어 있고, 버팀빔의 말단의 플랜지 부위에는 다른 버팀보들과 결합이 용이하도록 버팀빔공이 형성되어 있는 것 을 특징으로 하는 T형 빔을 제공한다. The present invention for achieving the above object is in the H-beam used for the construction of the earthquake, forming two rows of flange holes at regular intervals in the flange portion of the H beam and two to eight wedge holes in the wedge in one row or two In the beam formed in advance in the form of a column or a connecting plate which is formed at both ends of the H beam and a connecting plate hole, and a reinforcement plate for supporting the connecting plate or a beam used in the construction of the earth barrier, the beam is The support beam, the support beam, and the support beam is integrally formed, and the support beam and the support beam are vertically coupled, and the bridge beam connects the support beam and the support beam, and the support beam is coupled with a fastening hole of a band. A plurality of supporting beam holes are formed, and a connecting plate having a connecting plate hole is attached to the end of the support beam, and a flange portion at the end of the support beam is different. To facilitate the coupling and side beams provides a T-shaped beam, it characterized in that the brace beam is formed a ball.

이하 본 고안에 첨부된 도면을 참조하여 본 고안의 바람직한 일 실시예를 상세히 설명하기로 한다. 우선, 도면들 중, 동일한 구성요소 또는 부품들은 가능한 한 동일한 참조부호를 나타내고 있음에 유의하여야 한다. 본 고안을 설명함에 있어, 관련된 공지기능 혹은 구성에 대한 구체적인 설명은 본 고안의 요지를 모호하지 않게 하기 위하여 생략한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. First, it should be noted that in the drawings, the same components or parts denote the same reference numerals as much as possible. In describing the present invention, detailed descriptions of related well-known functions or configurations are omitted so as not to obscure the subject matter of the present invention.

도 1은 본 고안의 일실시 예에 따른 다양한 H 빔의 사시도이다. 본 고안은 종래의 H 빔에 체결공을 미리 형성하는 것에 특징이 있다. 작업현장에서 필요에 따라 체결공을 즉석에서 뚫는 일이 빈번하게 일어나고 있는데 미리 체결공이 형성됨으로써 작업현장에서의 효율과 안전을 고려한 것이다. 1 is a perspective view of various H beams according to an embodiment of the present invention. The present invention is characterized in that the fastening hole is formed in advance in the conventional H beam. As the need arises at the work site, the fastening hole is made on the fly, and the fastening hole is formed in advance, which considers the efficiency and safety at the work site.

a 도면은 H 빔(100)의 플랜지(110)와 웨브(120)에 체결공을 형성한 것이다. 양쪽의 플랜지(110)에 2열로 플랜지공(115)을 형성하고 또한 웨브에도 1열 또는 필요에 따라 2열로 몇개의 웨브공(125)을 형성한다. Figure a is a fastening hole formed in the flange 110 and the web 120 of the H beam 100. The flange holes 115 are formed in two rows in the flanges 110 on both sides, and the web holes 125 are formed in one row or two rows as necessary in the web.

b 도면은 H 빔(100)의 양 말단에 연결판(130, 140)이 형성되어 있으며 연결판에도 연결판공(135, 145)이 있고, 연결판을 지지하기 위한 보강판(150)이 구비되어 있다. 띠장으로 연결되거나 버팀보가 다수개 연결되는 경우 H 빔(100)의 말단부위를 바로 연결하기 어렵기 때문에 각각의 빔을 맞대고 철판을 대어서 용접하고 있으나 빔을 정확하게 맞붙이기 위해 조정하는 작업이 쉽지 않을 뿐더러 힘이 많이 받지 않게 된다. 따라서 본 고안과 같이 빔의 말단부에 미리 연결판을 형성하는 것이 바람직하다. 또한 각각의 빔을 맞대는 경우 연결판에 연결판공을 미리 형성하여 둠으로서 볼팅작업을 통해 보다 정교하게 서로 맞붙일 수 있고 맞댄 상황에서 플랜지에 미리 형성되어 있는 체결공과 정형화되어 이에 맞게 체결공이 형성되어 있는 철판을 용접작업없이 볼팅만으로 용이하게 고정할 수 있다. 볼팅만으로 충분한 이유는 상기 연결판을 형성함으로써 각 빔에 종방향으로 작용하는 힘이 일직선으로 이루어질 수 있기 때문이다. b is a connecting plate (130, 140) is formed at both ends of the H beam 100, the connecting plate has a connecting plate hole (135, 145), the reinforcing plate 150 is provided for supporting the connecting plate have. In case that it is connected by a band or multiple braces, it is difficult to directly connect the distal end portion of the H beam 100. However, each beam is welded to each other by welding, but it is not easy to adjust the beam to make it fit correctly. You won't get much power. Therefore, it is preferable to form the connecting plate in advance in the distal end of the beam as in the present invention. In addition, in the case of abutting each beam, the connecting plate hole is formed in advance in the connecting plate, so that it can be more precisely bonded to each other through bolting work, and the fastening hole is formed in accordance with the fastening hole formed in the flange in the opposite situation. Iron plate can be easily fixed by bolting without welding. Bolting alone is sufficient because the force acting in the longitudinal direction on each beam can be made in a straight line by forming the connecting plate.

도 2는 본 고안의 체결공들의 구성을 보여주는 도면이다. 상기한 개개의 체결공의 경우 동일간격을 유지함으로써 개개의 주 가설부재간에 상호 결합이 용이하도록 하는 것이 바람직하다. Figure 2 is a view showing the configuration of the fastening holes of the present invention. In the case of the individual fastening holes, it is preferable to maintain the same spacing to facilitate mutual coupling between the individual main temporary members.

A로 표시되는 H 빔(100)의 크기는 다양하게 1 내지 15 M로 할 수 있으며 체결공을 뚫은 점을 감안하여 1 내지 10 M가 바람직하다. 다양한 규격의 빔의 크기를 갖게 하는 것은 작업현장의 크기에 맞춰서 빔을 절단하거나 하는 등의 일을 하지 않음으로써 안전과 효율을 극대화하기 위함이다. 빔의 공칭치수는 일반적으로 200*200, 250*250, 300*300, 350*350, 400*400, 500*500(mm)이 가설용 자재로는 많이 쓰이며 일반적으로 B와 B'의 치수가 같게 되어 있으나 반드시 이에 한정되지는 않는다. 작업현장의 크기와 사용되는 용도에 따라 필요강도가 다르기 때문에 적절하게 선택한다. 상기 공칭치수에 따르는 바람직한 C 및 D의 간격은 각각, 150-100, 150-100, 150-100, 150-100, 200-100, 200-100으로 하여 작은 치수의 것은 어느정 도의 호환이 되게 하며 큰 것은 큰것끼리 어느 정도 호환이 될 수 있도록 함이 바람직하다. The size of the H beam 100 represented by A may be variously 1 to 15 M, and 1 to 10 M is preferable in view of the fact that the fastening hole is drilled. It is to maximize the safety and efficiency by not cutting the beam according to the size of the work site to have the size of the beam of various standards. The nominal dimensions of beams are generally 200 * 200, 250 * 250, 300 * 300, 350 * 350, 400 * 400, 500 * 500 (mm). They are the same, but are not necessarily limited thereto. Since the required strength varies depending on the size of the work site and the intended use, select appropriately. The preferred spacing of C and D according to the nominal dimensions is 150-100, 150-100, 150-100, 150-100, 200-100, 200-100, so that the small dimensions are compatible to some extent. It is desirable to make big things compatible with big things to some extent.

플렌지부분과 웨지부분의 간격을 일치시키는 것이 바람직한 것은 서로간의 호환성을 유지하기 위함이며 이렇게 함으로써 중간부재들이 삽입될 때 체결공을 서로 맞출 수 있게 된다. 또한 공칭치수가 큰 것의 플랜지에는 4열의 플랜지공을 형성하여 호환성을 더욱 높일 수도 있을 것이다. It is desirable to match the spacing between the flange portion and the wedge portion in order to maintain compatibility with each other so that the fastening holes can be aligned with each other when the intermediate members are inserted. In addition, four rows of flanged holes may be formed in the flange of a large nominal size to further increase compatibility.

웨지부분에 있는 웨지공은, 다른 부속부재가 빔의 말단부위 근처의 플랜지 사이에 삽입되거나 연결되는 경우가 대부분이기 때문에 전체적으로 웨지공을 형성할 필요는 없을 것이며 2 개 내지 8개의 웨지공을 1 열 또는 2열로 형성할 수 있을 것이다.The wedge hole in the wedge portion does not need to form a wedge hole as a whole because other accessory members are often inserted or connected between flanges near the distal end of the beam. Or in two rows.

상기한 것은 다양한 시공현장에 적용할 수 있도록 필요에 따라 그 부재의 총연장을 다양한 규격으로 구비할 수 있으며, 그 부재의 폭 및 깊이 또한, 다양한 규격으로 형성할 수 있다는 것을 보여주는 예시적인 것에 불과함은 물론이다.The above is just an example showing that the total extension of the member may be provided in various standards as necessary to be applied to various construction sites, and that the width and depth of the member may be formed in various standards. Of course.

도 3은 본 고안의 일실시 예에 따른 T형 빔의 사시도이다. 띠장에 수직으로 연결되는 부분의 압력을 띠장에 고루 분산시키기 위해서 본 도면에서와 같이 T형 빔을 형성할 수 있는데 이러한 것을 작업현장에서 만드는 경우 공정과 시간이 많이 소요되기 때문에 본 고안에서는 일체형의 T형 빔을 제시한다. 본 고안의 T 형 빔은 지지빔(250), 버팀빔(210), 브릿지빔(230, 240)으로 이루어져 있다. 지지빔에는 다수의 지지빔공(255)이 형성되어 있어서 띠장에 형성되어 있는 체결공들과 용이하게 볼팅결합을 할 수 있게 되어 있다. 또한 버팀빔의 말단부위에도 다른 버팀보와 결합할 수 있도록 버팀빔공(215)이 다수 형성되어 있으며 버팀빔의 끝부분에는 연결판(220)이 있으며 연결판(220)에는 연결판공(225)이 형성되어 있다. 본 고안의 T형 빔에 본 고안의 H 빔이 연결되는 경우 연결판끼리 서로 맞대어서 볼팅결합을 하고 플랜지 부분에 뚫려있는 체결공과 그 체결공의 크기에 맞게 정형화된 철판을 서로 맞대어 볼팅결합함으로써 매우 용이하게 연결할 수 있게 된다. 3 is a perspective view of a T-beam according to an embodiment of the present invention. In order to evenly distribute the pressure of the part connected vertically to the band, the T-shaped beam can be formed as shown in this drawing. Present the type beam. T-shaped beam of the present invention consists of a support beam 250, the support beam 210, bridge beams (230, 240). A plurality of support beam holes 255 are formed in the support beam so that the bolts can be easily bolted to the fastening holes formed in the strip. In addition, the end portion of the support beam is formed a plurality of support beam holes 215 to be combined with other support beams, the end of the support beam has a connecting plate 220 and the connecting plate 220 is formed in the connecting plate hole 225 have. When the H beam of the present invention is connected to the T-beam of the present invention, the connecting plates are bolted to each other, and the fastening holes drilled in the flange portion and the iron plates shaped to the size of the fastening holes are bolted to each other. It can be easily connected.

도 4는 본 고안의 일실시 예에 따른 스티프너의 사시도이다. 띠장과 버팀보가 연결되는 부위나 띠장과 연결잭이 맞닺는 부위는 많은 힘이 작용하기 때문에 좌굴이 발생할 수 있고 따라서 이 부분의 띠장부분에 본 여러가지 보강재를 넣는데 종래의 고안은 작업장소의 협소, 위험성, 재활용의 문제가 발생하지만 본 고안의 스티프너는 매우 간단하게 이를 설치 및 분리할 수 있다.본 고안의 스티프너(300)는 사각형 박스형으로 그 내부에 판형의 지지대(310)을 형성하여 보다 더 보강력을 가질 수 있고, 결합을 용이하게 하기 위하여 플랜지와 맞닿을 부분에 스티프너공(305)이 플랜지의 체결공에 맞게 형상되어 있다. 플랜지 사이의 공간과 상기 스티프너와의 사이가 차이가 나는 경우에는 조정판(320)을 더 구비하여 스티프너와 플랜지 사이에 삽입할 수 있으며 조정판(320)에는 스티프너공(305)와 같은 규격으로 조정판공(325)을 형성시킨다. 상기 체결공과 띠장에 형성되어 있는 체결공과 볼팅결합등을 통해 용이하게 연결시킴으로서 작업을 매우 쉽고 안전하게 진행시킬 수 있을 뿐만 아니라 쉽게 분리도 가능하고 재활용도 가능하게 된다. 4 is a perspective view of a stiffener according to an embodiment of the present invention. The buckling may occur due to the high force applied at the part where the girdle and the brace are connected or the part where the girder is connected with the jack, so that various stiffeners are put in the girdle of this part. The problem of recycling occurs, but the stiffener of the present invention can be installed and detached very simply. The stiffener 300 of the present invention is formed in a rectangular box shape to form a plate-shaped support 310 therein to provide more reinforcement. The stiffener hole 305 is shaped to fit the fastening hole of the flange in a portion which will be in contact with the flange to facilitate the coupling. If there is a difference between the space between the flange and the stiffener, the adjusting plate 320 is further provided to be inserted between the stiffener and the flange, and the adjusting plate 320 has the same adjustment plate hole as the stiffener hole 305 ( 325). By connecting easily through the fastening hole and the bolting coupling formed in the fastening hole and the strip, not only can the work proceed very easily and safely, but also can be easily separated and recycled.

도 5는 본 고안의 가설자재가 적용된 일부 가설 상태도로서 상기한 본 고안의 자재들이 사용되는 상태를 알 수 있다. 본 고안의 H 빔(100)의 연결판에 있는 연결판공과 띠장으로 사용되는 빔의 플랜지 상의 체결공을 서로 볼팅결합하여 사용할 수 있고 H 빔(100)의 플랜지 상에 형성되어 있는 플랜지공과 웨지상에 형성되어 있는 웨지공을 다른 부속자재의 체결공과 결합시킴과 현장에서 필요한 다양한 형태의 것을 만들 수 있다. 또한 본 고안에서와 같이 미리 T형 빔(200)을 만들고 T형 빔(200)에도 연결되는 부위에 체결공을 형성시켜 띠장 또는 다른 버팀보 등과 용이하게 결합할 수 있음을 알 수 있다. 본 고안의 T 형 빔의 지지빔은 띠장과 맞닿음으로써 띠장에 미치는 압력을 고루 분산해 주는 역할도 한다. 스티프너(300)는 띠장과 버팀보가 맞닿는 부위의 띠장의 플랜지 사이에 설치된다. FIG. 5 shows a state in which some of the materials of the present invention are used as the temporary state diagrams to which the temporary materials of the present invention are applied. The connecting plate hole in the connecting plate of the H-beam 100 of the present invention and the fastening hole on the flange of the beam used as the band can be used by bolting to each other and the flange hole and wedge shape formed on the flange of the H-beam 100 The wedge hole formed in the joint can be combined with the fastening hole of other subsidiary materials, and various forms required in the field can be made. In addition, as in the present invention, it can be seen that the T-beam 200 is made in advance, and a fastening hole is formed at a portion connected to the T-beam 200, so that the T-beam 200 can be easily coupled to a strip or other brace. The supporting beam of the T-beam of the present invention also plays a role of distributing the pressure on the band by contacting the band. The stiffener 300 is installed between the flange of the strip of the region where the strip and abutment.

상기한 개개의 부재들 간에는 각기 형성된 체결공 간에 볼트 체결이 용이함으로 그 시공의 용이성을 확보할 수 있음은 물론 공사완료 후 그 해체의 용이성을 확보할 수 있음은 물론 해체된 부재의 재활용 또한 가능하다.The bolts can be easily secured between the respective fastening holes formed between the individual members, thereby ensuring the ease of construction, as well as ensuring the ease of dismantling after the completion of construction. .

이상에서 설명한 본 고안은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 고안의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능함은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 있어서 명백할 것이다.The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and various substitutions, modifications, and changes are possible within the scope without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.

본 고안에 의할 경우 흙막이 공사에 있어 현장에서 2차적인 작업을 최소화하고 결합 및 해체를 용이하게 할 수 있어 작업효율을 향상시킴은 물론 안전사고의 감소를 도모할 수 있다. 다수의 체결공의 존재로 다른 연결되는 부재의 위치선택의 폭이 매우 넓고 시공현장에서의 별도의 천공작업 등이 필요없는 장점이 있다. 나아가 흙막이 공사의 완료 후에도 해체된 가설 버팀장치의 재활용이 가능하므로 시공 경비의 절감을 꾀할 수 있다 하겠다.According to the present invention, it is possible to minimize the secondary work on the site in the earthen construction and facilitate the coupling and dismantling, thereby improving work efficiency and reducing safety accidents. The presence of a plurality of fastening holes has a wide range of position selection of the other connecting member and there is an advantage that does not require a separate drilling work in the construction site. Furthermore, even after the completion of the construction of the clogs, the dismantled braces can be recycled, thereby reducing construction costs.

Claims (5)

흙막이 공사에 사용되는 H 빔에 있어서,In the H-beam used for earthquake construction, 상기 H 빔의 플랜지 부분에 일정간격으로 2열의 플랜지공을 형성하고 웨지에는 2 내지 8개의 웨지공을 1열 또는 2열로 형성하여 미리 제작되어지는 것을 특징으로 하는 H 빔.H-beams, characterized in that formed in two rows of flange holes at regular intervals in the flange portion of the H-beam, the wedge is formed in advance by forming two to eight wedge holes in one row or two rows. 제 1항에 있어서,The method of claim 1, 상기 H 빔의 양 말단에는 연결판공이 구성되어 있는 연결판과, 상기 연결판을 지지하기 위한 보강판을 구비하는 것을 특징으로 하는 H 빔.H-beams, characterized in that provided at both ends of the H beam is a connecting plate is formed with a connecting plate hole, and a reinforcing plate for supporting the connecting plate. 흙막이 공사에 사용되는 빔에 있어서,In the beam used for earthquake construction, 상기 빔은 지지빔, 버팀빔, 및 브릿지빔으로 일체로 구성되어 있고 상기 지지빔과 버팀빔은 수직으로 결합되고 브릿지빔은 상기 지지빔과 버팀빔을 연결하는 형태이며, 상기 지지빔에는 띠장의 체결공과 결합할 수 있는 다수의 지지빔공이 형성되고 상기 버팀빔의 말단에는 연결판공이 형성되어 있는 연결판이 부착되어 있고, 버팀빔의 말단의 플랜지 부위에는 다른 버팀보들과 결합이 용이하도록 버팀빔공이 형성되어 있는 것을 특징으로 하는 T형 빔.The beam is integrally composed of a support beam, a support beam, and a bridge beam, the support beam and the support beam are vertically coupled, and the bridge beam connects the support beam and the support beam. A plurality of support beam holes that can be combined with the fastening holes are formed, and a connection plate having a connection plate hole is attached to the end of the support beam, and the support beam hole is easily connected to other support beams at the flange portion of the end of the support beam. T-shaped beam, characterized in that formed. 삭제delete 삭제delete
KR2020060016323U 2006-06-16 2006-06-16 Temporarily installed material capable of easy attachment and detachment KR200429236Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060016323U KR200429236Y1 (en) 2006-06-16 2006-06-16 Temporarily installed material capable of easy attachment and detachment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060016323U KR200429236Y1 (en) 2006-06-16 2006-06-16 Temporarily installed material capable of easy attachment and detachment

Publications (1)

Publication Number Publication Date
KR200429236Y1 true KR200429236Y1 (en) 2006-10-19

Family

ID=41777629

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060016323U KR200429236Y1 (en) 2006-06-16 2006-06-16 Temporarily installed material capable of easy attachment and detachment

Country Status (1)

Country Link
KR (1) KR200429236Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101329440B1 (en) * 2013-04-22 2013-11-14 주식회사 포스코 Steel pipe strut having an enclosure connector
KR101824903B1 (en) * 2017-02-20 2018-02-02 임상수 Frame assembly and the installing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101329440B1 (en) * 2013-04-22 2013-11-14 주식회사 포스코 Steel pipe strut having an enclosure connector
KR101824903B1 (en) * 2017-02-20 2018-02-02 임상수 Frame assembly and the installing method thereof

Similar Documents

Publication Publication Date Title
US7883296B2 (en) Shoring beam extension and reinforcement assembly
US7128500B2 (en) Corner connection for temporary shoring
US20130008125A1 (en) Construction method for new underground structure
KR100855098B1 (en) Strut structure as temporary system using a vertical truss at the end and the method thereof
KR101474515B1 (en) Earth retaining wall using support and panel, method for constructing the same
CN106703045A (en) Assembled type crown beam, surrounding purlin and waist beam structure
US6984092B1 (en) Corner connection for temporary shoring
KR20050010616A (en) transverse truss strutting method for construction and structure thereof
US7690867B2 (en) Center beam connection assembly for temporary shoring
KR100584701B1 (en) A method of construction for temporary retaining wall
JP7103962B2 (en) Earth retaining structure and earth retaining method
KR101026583B1 (en) A wale system for supporting earth retaining wall
KR200429236Y1 (en) Temporarily installed material capable of easy attachment and detachment
JP6905387B2 (en) Construction method of earth retaining structure
JP2006299737A (en) Structural material, connecting structure and connecting method of structural material
KR100808977B1 (en) Connecting structure of corner supporting beam for temporary soil sheathing work
CN111270678A (en) Support system and construction method thereof
KR100797185B1 (en) Construction method and the apparatus of a ground retaining structures or walls
KR20130098579A (en) Soil protection against build system
KR100458821B1 (en) The length adjustable lagging and its using method of braced wall construction
KR200383309Y1 (en) Form system for construction of underground slab
KR101545330B1 (en) Prefab type land-side protection wall device
JP7219529B2 (en) Combination structure of steel materials, shoring structure and construction method
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
KR101218825B1 (en) Method of land-side protection wall using bracing

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20080129

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee