KR200268366Y1 - Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert - Google Patents

Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert Download PDF

Info

Publication number
KR200268366Y1
KR200268366Y1 KR2020010037338U KR20010037338U KR200268366Y1 KR 200268366 Y1 KR200268366 Y1 KR 200268366Y1 KR 2020010037338 U KR2020010037338 U KR 2020010037338U KR 20010037338 U KR20010037338 U KR 20010037338U KR 200268366 Y1 KR200268366 Y1 KR 200268366Y1
Authority
KR
South Korea
Prior art keywords
steel wire
culvert
prefabricated
wedge
fixing device
Prior art date
Application number
KR2020010037338U
Other languages
Korean (ko)
Inventor
이석태
이호석
차재규
Original Assignee
주식회사 토암산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 토암산업 filed Critical 주식회사 토암산업
Priority to KR2020010037338U priority Critical patent/KR200268366Y1/en
Application granted granted Critical
Publication of KR200268366Y1 publication Critical patent/KR200268366Y1/en

Links

Landscapes

  • Sewage (AREA)

Abstract

본 고안은 조립식 프리캐스트 콘크리트 박스 암거의 조립시, 암거에 프리스트레스트 힘을 가하기 위하여 강선을 긴장한 후 정착할 때 단방향이 아니라 양방향으로 강선을 정착할 수 있는 구조를 가진 양방향 프리스트레스트 강선 정착장치를 이용하여 긴장된 강선이 정착되어 조립되는 조립식 프리캐스트 콘크리트 박스 암거와, 상기 조립식 프리캐스트 콘크리트 박스 암거의 조립구조에 관한 것이다.The present invention uses a bidirectional prestressed steel wire fixing device having a structure that can fix the steel wires in both directions instead of one direction when the steel wire is tensioned and settled in order to apply prestressing force to the culvert when assembling the prefabricated concrete box culvert. It relates to a prefabricated concrete box culvert prefabricated by the tensioned steel wire is settled, and the assembled structure of the prefabricated concrete box culvert.

본 고안에서는 중공의 커플링부재, 상기 커플링부재의 양단에 분리가능하게 결합되며 중앙에 콘 형상의 웨지홀이 형성되어 있는 한 쌍의 웨지콘부재, 및 강선의 단부를 물어 상기 웨지콘부재의 웨지홀 각각에 삽입되므로써 강선을 정착하는 웨지를 구비하여, 상기 강선이 양방향으로 정착되면서도 상기 커플링부재에 의하여 서로 연결되는 양방향 강선 정착장치를 접합면에 설치하여 긴장된 강선을 정착하므로써 조립되는 구조의 조립식 프리캐스트 콘크리트 박스 암거가 제공된다.In the present invention, a hollow coupling member, a pair of wedge cone members detachably coupled to both ends of the coupling member and having a cone-shaped wedge hole formed at the center thereof, and an end of a steel wire, Wedges are inserted into each of the wedge holes and provided with wedges to fix the steel wires, while the steel wires are fixed in both directions. A prefabricated precast concrete box culvert is provided.

또한, 본 고안에서는, 이러한 양방향 강선 정착장치를 조립식 프리캐스트 콘크리트 박스 암거의 접합부 단면에 설치하여 양측으로 긴장된 강선을 정착하므로써 박스 암거를 연속적으로 조립하는 조립식 프리캐스트 콘크리트 박스 암거의 조립구조가 제공된다.In addition, the present invention provides an assembly structure of a prefabricated precast concrete box culvert that continuously assembles the box culvert by installing the bidirectional steel wire fixing device at the joint section of the prefabricated precast concrete box culvert and fixing tension wires on both sides. .

이러한 본 고안에 의하면, 종래의 일방향 강선 정착장치를 이용하여 조립되는 박스 암거가 가지는 문제점인 강선의 정착시 슬립에 의하여 발생하는 프리스트레스 힘의 손실을 최소화할 수 있으며, 조립식 프리캐스트 콘크리트 박스 암거의조립시에 박스 암거가 강한 결속력을 가지며 신뢰성 있게 결합되며, 강선 재료의 낭비를 최소화하고 암거의 파손을 방지할 수 있게 된다.According to the present invention, it is possible to minimize the loss of prestress force caused by slip when the steel wire is fixed, which is a problem of the box culvert assembled using a conventional one-way steel wire fixing device, the assembly of prefabricated concrete box culvert At the same time, the box culvert has a strong binding force and is reliably coupled, minimizing waste of wire material and preventing breakage of the culvert.

Description

양방향 프리스트레스트 강선 정착장치를 이용한 강선 정착구조를 가진 조립식 프리캐스트 콘크리트 박스 암거, 그 조립구조 {Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert}Dual Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert}

본 고안은 양방향 프리스트레스트 강선 정착장치를 이용한 강선 정착구조를 가진 조립식 프리캐스트 콘크리트 박스 암거, 이를 이용한 조립식 프리캐스트 콘크리트 박스 암거의 조립구조에 관한 것으로서, 구체적으로는 조립식 프리캐스트 콘크리트 박스 암거에 프리스트레스트 힘을 가하기 위하여 강선을 긴장한 후 정착할 때, 단방향이 아니라 양방향으로 강선을 정착할 수 있는 구조를 가진 양방향 프리스트레스트 강선 정착장치를 이용하여 강선을 정착하는 구조를 가진 조립식 프리캐스트 콘크리트 박스 암거와, 이를 이용하여 조립식 프리캐스트 콘크리트 박스 암거를 연속하여 조립하는 조립구조에 관한 것이다.The present invention relates to an assembly structure of a prefabricated concrete box culvert having a steel wire fixing structure using a bidirectional prestressed steel wire fixing device, and an assembly structure of a prefabricated concrete box culvert using the same. Prefabricated concrete box culvert with prefabricated concrete box culvert having structure to fix steel wire by using bi-directional prestressed steel wire fixing device having structure to fix steel wire in tension instead of unidirectional direction. It relates to an assembly structure for continuously assembling the prefabricated concrete box culvert using the same.

상하수도, 전력구, 통신구, 공동구 등의 시설물로 사용되는 프리캐스트 콘크리트 박스 암거(Precast Concrete Box Culvert)(이하, "PC암거"라고 한다)의 시공에 있어서, PC암거에 프리스트레스 힘(Prestress Force)을 도입하기 위해서는 강선(tendon)을 소정 길이로 긴장한 후 정착장치에 의하여 강선을 긴장된 상태로 PC암거에 정착시킨다.In the construction of precast concrete box culverts (hereinafter referred to as "PC culverts"), which are used as facilities for water and sewage, electric power, communication, and common areas, prestress force is applied to PC culverts. In order to introduce the tension to the steel wire (tendon) to a predetermined length and then fixed to the PC culvert in a tensioned state by the fixing device.

이러한 조립식 PC암거의 구체적인 구성은 등록실용신안 제223229호, 등록실용신안 제157899호, 등록실용신안 제157898호에 상세히 개시되어 있다.The specific configuration of such a prefabricated PC culvert is disclosed in detail in Utility Model No. 223229, Registration Utility Model No. 157899, and Registration Utility Model No. 157898.

일반적으로 조립식 PC암거는 암거 상호 간의 연결강도가 매우 약하기 때문에, 지반이 연약하여 부등침하가 발생되는 경우 콘크리트 박스 암거들 사이의 연결부위가 벌어져 수밀성이 저하되는 문제가 있었다. 상기와 같은 문제점을 해결하기위하여, 종래의 조립식 PC암거에서는 도 5a 및 도 5b에 도시된 바와 같은 프리스트레스 강선을 이용한 정착구조가 채용되었다.In general, the prefabricated PC culverts have very weak connection strengths between the culverts, so that when the ground is soft and unequal settlement occurs, the connection areas between the concrete box culverts are opened and watertightness is deteriorated. In order to solve the above problems, in the conventional prefabricated PC culvert, a fixing structure using prestressed steel wires as shown in FIGS. 5A and 5B is employed.

도 5a의 정착구조에 의하면, PC암거(500)의 내측 네 개의 모서리 부분에 형성된 헌치부에는 강선통과공(512)이 형성되며, 강선통과공(512)에는 강선(50)이 삽입된다. PC암거(500)의 길이 방향으로 내측 중간부에는 강선(50)을 정착하기 위하여 블럭아웃되어 상기 강선통과공(512)이 노출되도록 형성된 강선정착구(510)가 형성되어 있다. 강선통과공(512)으로 삽입된 강선(50)은 후술하는 종래의 일방향 강선 정착장치(600)에 의하여 상기 강선정착구(510)에 정착된다.According to the fixing structure of FIG. 5A, the wire passing hole 512 is formed in the haunting portion formed at the inner four corners of the PC culvert 500, and the steel wire 50 is inserted into the wire passing hole 512. A steel wire anchoring hole 510 is formed at the inner middle portion of the PC culvert 500 in the lengthwise direction to block out the steel wire 50 so as to expose the steel wire passing hole 512. The steel wire 50 inserted into the steel wire passing hole 512 is fixed to the steel wire anchoring hole 510 by a conventional one-way steel wire fixing device 600 which will be described later.

한편, 도 5a에 도시된 정착구조의 변형된 구조가 도 5b에 도시되어 있는데, PC암거(501)의 양측벽 하부에 융기부(520)를 돌출 형성하고, 이 융기부(520)에 강선통과공을 두어 상기 강선통과공에 강선(50)을 삽입하는 구조이다. 이러한 구조에서도 PC암거(501)의 길이 방향으로 융기부(520)의 중간부에는 강선(50)을 정착하기 위하여 블럭아웃되어 상기 강선통과공이 노출되도록 형성된 강선정착구(510)가 형성되어 있다. 도 5a의 정착구조에서와 마찬가지로, 강선통과공으로 삽입된 강선(50)은 후술하는 일방향 강선 정착장치(600)에 의하여 상기 강선정착구(510)에 정착된다.Meanwhile, a modified structure of the fixing structure shown in FIG. 5A is illustrated in FIG. 5B, in which protrusions 520 are formed to protrude from lower portions of both side walls of the PC culvert 501, and the wires pass through the ridges 520. Putting a ball is a structure for inserting the steel wire 50 in the wire passing hole. Even in such a structure, a steel wire anchoring hole 510 is formed in the middle portion of the ridge 520 in the longitudinal direction of the PC culvert 501 to block the steel wire 50 to fix the steel wire 50 so as to expose the steel wire passing hole. As in the fixing structure of FIG. 5A, the steel wire 50 inserted into the steel wire passing hole is fixed to the steel wire fixing hole 510 by a one-way steel wire fixing device 600 which will be described later.

도 6a 및 도 6b에는 이러한 종래의 PC암거에서 사용되는 일방향 강선 정착장치(600)의 분해사시도와 강선 정착상태의 단면도가 각각 도시되어 있는데, 종래의 일방향 강선 정착장치(600)는, 중앙에 콘(cone)형상의 웨지홀(wedge hole)(604)이 형성된 원통형의 웨지콘부재(wedge cone member)(602)를 구비하고 있다. 강선(50)은 프리스트레스 힘에 의하여 긴장된 상태로 상기 웨지콘부재(602)의 웨지홀(604)을 통하여 삽입되는데, 상기 웨지콘부재(602)의 웨지홀(604)에 대응되는 콘 형상을 가진 웨지(603)가 상기 긴장된 강선(50)의 단부를 물게 되고, 강선(50)의 긴장력에 의하여 강선(50)이 당겨져 상기 웨지(603)가 강선(50)의 단부를 물고 있는 상태에서 상기 웨지홀(604)로 삽입된다. 상기 웨지(603)와 웨지홀(604)의 콘 형상에 의하여 강선(50)의 단부가 더 이상 당겨지지 아니하고 견고하게 정착된다.6A and 6B show an exploded perspective view and a cross-sectional view of a wire fixing state, respectively, of the one-way steel wire fixing device 600 used in such a conventional PC culvert, and the conventional one-way steel wire fixing device 600 has a cone at the center thereof. A cylindrical wedge cone member 602 is formed, which has a cone shaped wedge hole 604. The steel wire 50 is inserted through the wedge hole 604 of the wedge cone member 602 in a tensioned state by the prestress force, and has a cone shape corresponding to the wedge hole 604 of the wedge cone member 602. Wedge 603 bites the end of the tensioned steel wire 50, the steel wire 50 is pulled by the tension of the steel wire 50, the wedge 603 is biting the end of the steel wire 50 in the state It is inserted into the hole 604. Due to the cone shape of the wedge 603 and the wedge hole 604, the end of the steel wire 50 is no longer pulled and is firmly fixed.

도 7a 내지 도 7c에는 위와 같은 일방향 강선 정착장치(600)를 이용하여 PC암거를 연속하여 조립하는 과정이 단계에 따라 개략적으로 도시되어 있는데, 우선, 도 7a에 도시된 바와 같이, 평탄한 지면상에 2개 이상의 PC암거(502, 503, 504)들을 위치시킨다. 이때는 통상적으로, 시공성을 고려하여 강선정착구(510)가 형성되어 있는 PC암거(502, 504)와, 강선정착구가 형성되어 있지 않은 PC암거(503)를 교대로 위치시킨다. PC암거(502, 503)들을 위치시킨 다음, 강선통과공(512)을 통하여 강선(50)을 삽입하고, 외측 PC암거(502)(도면에서 좌측의 암거)의 중간에 형성된 강선정착구(510)로 강선(50)의 단부를 노출시켜 그 노출된 단부에 일방향 강선 정착장치(600)를 설치하여 강선(50)의 단부를 상기 외측 PC암거(502)의 중간에 형성된 강선정착구(510)에 정착한다. 반대방향의 외측 PC암거(504)(도면에서 우측의 암거)에 형성된 강선정착구(510)에는 일방향 강선 정착장치(600)를 설치하고 강선(50)의 단부가 상기 일방향 강선 정착장치(600)를 관통한 상태로 외측 PC암거(504)의 외부로 돌출되도록 한다(도 7a). 돌출된 강선(50)의 단부를 유압식 긴장장치(400)로 긴장하여(도 7b) 강선(50)에 프리스트레스 힘을 도입한 후 긴장장치(400)의 긴장상태를 해제하면, 우측의 PC암거(504)의 강선정착구(510)에 설치되어 있던 일방향 강선 정착장치(600)의 웨지가 강선(50)을 물고 있는 상태에서 웨지홀로 밀려들어가므로써 강선(50)이 정착된다. 강선(50)의 정착이 완료되면 상기 우측 PC암거(504)의 강선정착구(510)에서 강선(50)을 절단한다(도 7c). 위와 같은 과정을 반복하여 다수개의 PC암거를 연결시킨다. 강선(50)의 정착작업이 완료되면 상기 강선정착구(510)에는 몰탈 또는 콘크리트를 채워 마감한다.7A to 7C schematically illustrate the process of assembling the PC culvert continuously using the one-way steel wire fixing device 600 according to the steps. First, as shown in FIG. Place two or more PC culverts 502, 503, 504. In this case, in general, in consideration of workability, PC culverts 502 and 504 in which the steel wire fixing holes 510 are formed and PC culverts 503 in which the steel wire fixing holes are not formed are alternately positioned. After placing the PC culverts 502 and 503, the steel wire 50 is inserted through the wire passage hole 512, and the steel wire anchoring hole 510 formed in the middle of the outer PC culvert 502 (the culvert on the left side in the drawing). The end of the furnace steel wire 50 is exposed and the one-way steel wire fixing device 600 is installed at the exposed end to fix the end of the steel wire 50 to the steel wire fixing port 510 formed in the middle of the outer PC culvert 502. do. The one-way steel wire fixing device 600 is installed in the steel wire fixing hole 510 formed in the outer PC culvert 504 (the right-hand culvert in the opposite direction) in the opposite direction, and the end of the steel wire 50 is connected to the one-way steel wire fixing device 600. It is made to protrude out of the outer PC culvert 504 in a penetrating state (FIG. 7A). When the end of the protruding steel wire 50 is tensioned by the hydraulic tension device 400 (FIG. 7B) and the prestressing force is released to the steel wire 50, then the tension device 400 is released. The steel wire 50 is fixed by being pushed into the wedge hole while the wedge of the one-way steel wire fixing device 600 installed in the steel wire fixing port 510 of the 504 is biting the steel wire 50. When the fixing of the steel wire 50 is completed, the steel wire 50 is cut at the steel wire fixing port 510 of the right PC culverter 504 (FIG. 7C). Repeat the above steps to connect multiple PC culverts. When the fixing operation of the steel wire 50 is completed, the steel wire fixing opening 510 is filled with mortar or concrete to finish.

그러나, 상기와 같은 일방향 강선 정착장치를 이용한 종래의 강선 정착구조에서는 다음과 같은 여러 가지 문제점이 발생된다.However, in the conventional steel wire fixing structure using the one-way steel wire fixing apparatus as described above, the following various problems occur.

일반 교량 거더에서 정착장치를 사용하여 강선을 정착시킬 때는, 통상 유압식 긴장장치를 정착장치에 직접 설치함으로써 인장시 반력에 의해 정착장치의 웨지가 웨지콘부재의 웨지홀로 밀려들어가기 때문에, 유압 긴장기의 유압을 제거하더라도 정착장치에서 강선의 슬립(slip) 현상을 최대한 억제할 수 있다.When fixing a steel wire using a fixing device in a general bridge girder, a hydraulic tension device is normally installed directly in the fixing device, so that the wedge of the fixing device is pushed into the wedge hole of the wedge cone member by reaction force when tensioning. Even if the hydraulic pressure is removed, the slipping of the steel wire in the fixing apparatus can be suppressed as much as possible.

그러나, 종래의 PC암거는 일련의 PC암거를 연속해서 반복 설치하여야 하는 구조물이기 때문에, 위와 같은 종래의 정착장치를 사용할 경우, 강선정착구의 위치를 PC암거의 양쪽 끝단이 아닌 중간 부분에 형성할 수밖에 없는데, 강선을 인장하기 위해서는 유압식 긴장장치를 PC암거의 단부면에 대고 PC암거 벽체의 반력에 의해 강선을 긴장하기 때문에, 앞서의 교량 거더의 긴장방법에서와는 달리 유압식 긴장장치의 유압을 제거하면 PC암거의 중간에 형성된 강선정착구에 설치된 강선 정착장치에서의 강선 슬립 현상이 크게 발생되어, 강선의 프리스트레스 힘의 손실이 매우 크다.However, since the conventional PC culvert is a structure that must be repeatedly installed a series of PC culverts, when using the conventional fixing device as described above, the position of the steel wire anchorage can only be formed in the middle portion of the PC culvert, not both ends In order to tension the steel wire, the hydraulic tension device is applied to the end face of the PC culvert and the steel tension is tensioned by the reaction force of the PC culvert wall. Therefore, unlike the tension method of the bridge girder, when the hydraulic tension of the hydraulic tension device is removed, The steel wire slip phenomenon occurs in the steel wire fixing device installed in the steel wire fixing device formed in the middle of the wire, and the loss of the prestress force of the steel wire is very large.

예를 들면, PC암거의 연결에 있어서는, 시공성을 감안할 때 사용되는 강선의 길이는 대략 2∼4m에 불과하고 강선의 긴장을 위한 인장력은 통상 약 5∼10톤(ton) 정도이다.For example, in the connection of PC culvert, the length of the steel wire used in consideration of workability is only about 2 to 4 m, and the tensile force for tension of the steel wire is usually about 5 to 10 tons (ton).

앞서 설명한 바와 같이, 일방향 강선 정착장치를 이용한 종래의 PC암거 조립구조에서는, PC암거의 강선정착구 내에서 강선이 정착될 때 강선 정착장치에서 5∼10㎜ 정도의 강선 슬립현상이 발생되는데, 일반적으로 정착간격이 3m 정도 되는 구조에서 약 5톤 정도의 인장력으로 강선을 긴장하게 되면 강선의 늘어나는 길이가 약 7.5mm 라는 점을 감안하면, 강선에 가해진 프리스트레스 힘은 정착시의 강선 슬립현상에 의해 대부분 상실된다.As described above, in the conventional PC culvert assembly structure using the one-way steel wire fixing device, when the steel wire is fixed in the steel wire anchorage of the PC culvert, the steel wire slipping phenomenon of about 5 to 10 mm occurs in the steel wire fixing device. Considering that when the steel wire is tensioned with a tensile force of about 5 tons in a structure with a settling interval of about 3 m, the extension length of the steel wire is about 7.5 mm, most of the prestress force applied to the steel wire is lost due to the slippage of the steel wire during settlement. do.

요컨대, 일방향 강선 정착장치를 이용한 종래의 PC암거의 조립구조에서는 정착시 강선의 슬립현상에 의하여 프리스트레스 힘이 대부분 손실되고, 그 결과로 PC암거 상호간의 결속력이 저하되어 도 8에 도시된 바와 같은 PC암거의 부등침하 현상을 방지하기 어렵게 된다.In other words, in the assembly structure of a conventional PC culvert using a one-way steel wire fixing device, prestressing forces are mostly lost due to slipping of the steel wire during fixing, and as a result, the binding force between the PC culverts decreases, resulting in a PC as shown in FIG. 8. It would be difficult to prevent culverts from inequality.

또한, 일방향 강선 정착장치를 이용한 종래의 PC암거의 연결구조에서는, 강선통과공과 연통되도록 강선정착구가 형성되어야 하므로 구조적으로 취약한 PC암거 내측의 헌치부를 블럭아웃하거나 또는 PC암거의 외측에 별도의 융기부에 형성할 수밖에 없다. 그러나, 이와 같이 강선정착구가 형성된 헌치부 또는 융기부는 구조적으로 매우 취약한 부분이기 때문에, PC암거의 부등침하 발생시, PC암거 상호간의 접합부에서 강선에 의한 상향력 또는 하향력이 발생하여 상기 헌치부 또는 융기부가 쉽게 파손되는 문제가 있다.In addition, in the connection structure of a conventional PC culvert using a one-way steel wire fixing device, since the steel wire anchoring hole must be formed so as to communicate with the steel wire through-holes, block out the hunt inside the structurally vulnerable PC culvert or separate the fusion outside the PC culvert There is no choice but to form at the base. However, since the haunting portion or the raised portion in which the wire anchorage is formed is a very fragile structural portion, when an uneven settlement of the PC culvert occurs, an upward force or a downward force is generated at the junction between the PC culverts, resulting in the hunt or ridge. There is a problem that the part is easily broken.

또한, 일방향 강선 정착장치를 이용한 종래의 PC암거의 연결구조에서는, 강선이 강선정착구 위치에서 절단되므로 강선 재료의 손실량이 과다하다.In addition, in the connection structure of the conventional PC culvert using the one-way steel wire fixing device, since the steel wire is cut at the steel wire anchoring position, the loss amount of the steel wire material is excessive.

그 뿐만 아니라, 강선의 정착 후에 강선정착구를 몰탈 또는 콘크리트로 메우게 되는데, 메워진 몰탈 또는 콘크리트에 균열이 발생되거나, 기존 콘크리트 와 새로 메워진 몰탈 또는 콘크리트 접합면에 수축으로 인한 틈새가 발생할 경우 PC암거 내부로 유입되는 하수 또는 외부로부터 유입되는 오염된 지하수로 인하여 강선이 부식될 가능성이 크다는 문제점이 있다.In addition, after fixing the steel wires, the steel anchorages are filled with mortar or concrete.In case of cracks in the filled mortar or concrete, or gaps due to shrinkage between the existing concrete and the newly filled mortar or concrete joint surface, the interior of the PC culvert There is a problem that the steel wire is likely to be corroded due to the sewage flowing into or contaminated ground water flowing from the outside.

본 고안은 상기와 같은 문제점을 해결하기 위하여 개발된 것으로서, 본 고안의 목적은, 일방향 강선 정착장치가 가지는 문제점인 정착시 슬립에 의하여 발생하는 프리스트레스 힘의 손실을 최소화할 수 있는 새로운 정착장치를 이용하여 강한 결속력을 가지며 강선 재료의 낭비를 최소화하고 구조물의 파손을 방지할 수 있는 견고하고 신뢰성 있는 조립식 PC암거를 조립할 수 있도록 하는 강선 정착구조를 가진 조립식 PC암거, 그 조립구조를 제공하는 것을 목적으로 한다.The present invention was developed to solve the above problems, and the object of the present invention is to use a new fixing device that can minimize the loss of prestress force caused by slip during fixing, which is a problem of the one-way steel wire fixing device. The purpose of the present invention is to provide a prefabricated PC culvert with a steel wire anchoring structure, which has a strong binding force, minimizes waste of steel wire material and assembles a solid and reliable prefabricated PC culvert that can prevent damage to the structure. do.

도 1a는 본 고안의 양방향 강선 정착장치에 따른 일실시예의 분해 사시도.Figure 1a is an exploded perspective view of one embodiment according to the bidirectional steel wire fixing device of the present invention.

도 1b는 본 고안의 양방향 강선 정착장치에 따른 일실시예가 강선과 결합된 상태의 단면도.Figure 1b is a cross-sectional view of an embodiment according to the bidirectional steel wire fixing device of the present invention combined with the steel wire.

도 2a는 본 고안에 따른 양방향 강선 정착장치를 이용하여 조립식 프리캐스트 콘크리트 박스 암거가 조립되는 형상을 도시한 사시도.Figure 2a is a perspective view showing the shape of the prefabricated concrete box culvert assembled using a bidirectional steel wire fixing device according to the present invention.

도 2b 내지 도 2e는 본 고안에 따른 양방향 강선 정착장치를 이용한 조립식 프리캐스트 콘크리트 박스 암거의 조립 단계를 설명하기 위한 측면도.Figure 2b to 2e is a side view for explaining the assembly step of the prefabricated concrete box culvert using a bidirectional steel wire fixing device according to the present invention.

도 3은 본 고안에 따른 양방향 강선 정착장치가 조립식 프리캐스트 콘크리트 박스 암거의 전단홈에 설치되어 있는 형상을 도시한 단면도.Figure 3 is a cross-sectional view showing a shape in which the bidirectional steel wire fixing device according to the present invention is installed in the shear groove of the prefabricated concrete box culvert.

도 4는 조립식 프리캐스트 콘크리트 박스 암거의 다수 위치에 강선이 설치되는 형상을 보여주는 개략도.Figure 4 is a schematic view showing the shape of the steel wire is installed in multiple locations of the prefabricated concrete box culvert prefabricated.

도 5a는 종래의 조립식 프리캐스트 콘크리트 박스 암거에서의 강선 정착구조의 일례를 보여주기 위하여 일부를 절개한 상태로 도시한 사시도.Figure 5a is a perspective view showing a part in a cut state to show an example of the steel wire anchoring structure in a conventional prefabricated precast concrete box culvert.

도 5b는 종래의 조립식 프리캐스트 콘크리트 박스 암거에서의 강선 정착구조의 또다른 예를 보여주기 위하여 일부를 절개한 상태로 도시한 사시도.Figure 5b is a perspective view showing a part cut away to show another example of the steel wire anchoring structure in a conventional prefabricated precast concrete box culvert.

도 6a는 종래의 일방향 강선 정착장치를 도시한 분해 사시도.Figure 6a is an exploded perspective view showing a conventional one-way steel wire fixing device.

도 6b는 도 6a의 강선 정착장치에서 강선의 정착상태를 도시한 단면도.Figure 6b is a cross-sectional view showing the fixing state of the steel wire in the steel wire fixing device of Figure 6a.

도 7a 내지 도 7c는 종래의 일방향 강선 정착장치를 이용하여 조립식 프리캐스트 콘크리트 박스 암거를 조립하는 과정을 설명하기 위하여 각 단계를 순차적으로 도시한 측면도.Figure 7a to 7c is a side view showing each step sequentially to explain the process of assembling the prefabricated concrete box culvert using a conventional one-way steel wire fixing device.

도 8은 종래의 일방향 강선 정착장치를 이용하여 조립한 조립식 프리캐스트 콘크리트 박스 암거에서의 지반 부등침하에 의한 변위형상을 보여주는 개략도.Figure 8 is a schematic diagram showing the displacement shape by the ground inequality in the prefabricated concrete box culvert assembled by using a conventional one-way steel wire fixing device.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10, 10' 강선 100 양방향 강선 정착장치10, 10 'steel wire 100 bidirectional steel wire fixing device

101 커플링부재 102, 102' 웨지콘부재101 Coupling Member 102, 102 'Wedge Cone Member

103, 103' 웨지 104, 104' 웨지홀103, 103 'Wedge 104, 104' Wedge Hole

107, 107' 강선삽입 안내면107, 107 'steel wire guide

201, 202, 203, 204 조립식 프리캐스트 콘크리트 박스 암거201, 202, 203, 204 prefabricated precast concrete box culvert

110 오목부 112 강선통과공110 recess 112 steel wire through hole

11, 11' 강선 400 유압식 긴장장치11, 11 'liner 400 hydraulic tensioner

상기와 같은 본 고안의 목적은, 중공의 커플링부재, 상기 커플링부재의 양단에 분리가능하게 결합되며 중앙에 콘 형상의 웨지홀이 형성되어 있는 한 쌍의 웨지콘부재, 및 강선의 단부를 물어 상기 웨지콘부재의 웨지홀 각각에 삽입되므로써 강선을 정착하는 웨지를 구비하여, 상기 강선이 양방향으로 정착되면서도 상기 커플링부재에 의하여 서로 연결되는 것을 특징으로 하는 본 고안의 양방향 강선 정착장치를 이용하여 달성될 수 있다.An object of the present invention as described above, the hollow coupling member, a pair of wedge cone member detachably coupled to both ends of the coupling member and the cone-shaped wedge hole is formed in the center, and the end of the steel wire It is provided with a wedge for fixing the steel wire by being inserted into each of the wedge holes of the wedge cone member, using the bidirectional steel wire fixing device of the present invention, characterized in that the wire is connected to each other by the coupling member while being fixed in both directions Can be achieved.

상기한 본 고안의 양방향 강선 정착장치는 그 구체적인 실시예로서 상기 웨지콘부재의 웨지홀 삽입구 주위에 경사면으로 이루어져 있어 강선의 삽입을 안내하는 강선삽입 안내면이 형성될 수도 있으며, 상기 웨지콘부재는 상기 커플링부재와 나사 결합될 수도 있다.The bidirectional steel wire fixing device according to the present invention has a slanted surface around the wedge hole insertion hole of the wedge cone member as a specific embodiment, so that a steel wire insertion guide surface for guiding the insertion of the steel wire may be formed. It may be screwed with the coupling member.

또한, 본 고안에서는, 상기한 목적을 달성하기 위하여, 강선통과공이 형성되어 있으며, 상기한 본 고안의 양방향 강선 정착장치에 의하여 상기 강선통과공으로 삽입되어 긴장된 강선이 정착되므로써 프리스트레스가 도입되는 구조를 가진 조립식 PC암거가 제공된다.In addition, in the present invention, in order to achieve the above object, a steel wire through hole is formed, the tension wire is inserted into the steel wire through hole by the bi-directional steel wire fixing device of the present invention has a structure in which the pre-stress is introduced by fixing A prefabricated PC culvert is provided.

구체적으로, 본 고안에서는, 박스형 몸체로 구성되어 있으며, 긴장된 강선이 통과하는 강선통과공이 형성되어 있어, 다수개가 연속하여 설치될 때 상기 강선통과공으로 삽입된 강선이 접합부 단면에서 정착되므로써 프리스트레스 힘이 가해지도록 하는 조립식 PC암거로서; 이웃하는 조립식 PC암거와 접합되는 접합부 단면에는 상기한 양방향 강선 정착장치가 설치되는 오목부가 형성되어 있으며; 상기 강선통과공은 상기 오목부의 중앙에 형성되어 있고; 상기 오목부에는 상기한 양방향 강선 정착장치가 장착되어 일측 방향으로 진입하는 강선이 상기 양방향 강선 정착장치의 일측에 정착되고 이웃하는 조립식 PC암거로부터 진입하는 또다른 강선도 상기 강선 정착장치의 타측에 정착되어 양측의 강선이 하나로 연결된 상태로 이웃하는조립식 PC암거와 조립될 수 있는 구조를 가진 것을 특징으로 하는 조립식 PC암거가 제공된다.Specifically, in the present invention, it is composed of a box-shaped body, a steel wire through hole through which the tensioned wire passes is formed, when a plurality of consecutively installed steel wire inserted into the wire through hole is settled at the joint section end prestressing force As a prefabricated PC culvert to be built; A concave portion in which the bidirectional steel wire fixing device is installed is formed in a joint portion end surface joined to a neighboring prefabricated PC culvert; The steel wire passing hole is formed at the center of the recess; The concave portion is equipped with the bidirectional steel wire fixing device, and the steel wire entering in one direction is settled on one side of the bidirectional steel wire fixing device, and another steel wire entering from a neighboring prefabricated PC culvert is also fixed to the other side of the steel wire fixing device. It is provided with a prefabricated PC culvert characterized in that it has a structure that can be assembled with the neighboring prefabricated PC culvert in a state where both wires are connected to one.

본 고안에 있어서, 상기한 조립식 PC암거는 그 접합부 단면에는 몰탈이 주입되어 채워지는 몰탈홈이 형성되어 있고, 상기 몰탈홈에는 소정 간격 이격되어 있는 복수개의 전단홈이 형성되어 있으며, 상기 오목부는 상기 몰탈홈 또는 상기 전단홈 내에 형성될 수 있다.In the present invention, the prefabricated PC culvert is formed with a mortar groove which is filled with mortar is injected into the joint end surface, the mortar groove is formed with a plurality of shear grooves spaced at a predetermined interval, the concave portion is It may be formed in the mortar groove or the shear groove.

또한, 본 고안에서는 상기한 조립식 PC암거의 조립구조로서, 동시에 긴장하고자 하는 개수로 순차적으로 설치되며 시점 PC암거의 일면에 강선의 일단을 정착되어 있는 다수개의 조립식 PC암거의 접합부 단면에는 상기 양방향 강선 정착장치가 설치되는 오목부가 형성되어 있어, 외측 조립식 PC암거의 접합부 단면으로 노출된 강선이 상기 양방향 강선 정착장치의 일측 웨지콘부재와 웨지에 의하여 정착되고; 상기 강선이 정착된 일측 웨지콘부재와 커플링부재와 타측 웨지콘부재가 결합된 상태에서, 후속하여 연속 설치된 다수개의 조립식 PC암거 중 상기 강선이 정착된 조립식 PC암거의 접합부 단면과 마주하는 접합부 단면을 가진 조립식 PC암거의 접합부 단면을 통하여 외부로 노출된 강선이 상기 강선 정착장치의 타측 웨지콘부재에 삽입되어 그 내부에 위치하던 웨지에 물려 긴장되므로써 정착되어, 프리스트레스가 도입되는 강선이 서로 하나로 연결되면서도 이웃하는 조립식 PC암거가 일체로 조립되는 것을 특징으로 하는 조립식 PC암거의 조립구조가 제공된다.In addition, in the present invention, as the assembly structure of the prefabricated PC culvert, the bidirectional steel wire is formed on the cross section of the joints of the plurality of prefabricated PC culverts, which are sequentially installed in a number to be simultaneously tensioned and one end of the steel wire is fixed to one surface of the starting point PC culvert. A concave portion in which the fixing device is installed is formed, and the steel wire exposed to the joint end surface of the outer prefabricated PC culvert is fixed by one side wedge cone member and the wedge of the bidirectional steel wire fixing device; One side wedge cone member in which the steel wire is fixed, the coupling member and the other wedge cone member are coupled, the joint section end face facing the joint section end of the prefabricated PC culvert in which the steel wire is fixed among the plurality of prefabricated PC culverts that are continuously installed The steel wires exposed to the outside through the cross-section of the prefabricated PC culvert having the same is inserted into the wedge cone member of the other side of the wire fixing device and fixed by being bitten by a wedge which is located therein. While providing a prefabricated structure of the prefabricated PC culvert, the neighboring prefabricated PC culvert is integrally assembled.

이하, 첨부된 도면을 참조하여 본 고안의 바람직한 실시예를 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the present invention.

우선, 본 고안에서 사용하고 있는 양방향 강선 정착장치에 대하여 설명한다. 도 1a에는 본 고안에 따른 양방향 강선 정착장치(100)의 일실시예가 분해 사시도로 도시되어 있으며, 도 1b에는 본 고안에 따른 양방향 강선 정착장치(100)의 일실시예가 강선(10, 10')과 결합된 상태의 단면도가 도시되어 있다.First, the bidirectional steel wire fixing apparatus used in the present invention will be described. 1A is an exploded perspective view of an embodiment of a bidirectional steel wire fixing device 100 according to the present invention, and FIG. 1B is an embodiment of a bidirectional steel wire fixing device 100 according to the present invention. A cross-sectional view of the state combined with is shown.

조립식 PC암거를 조립하여 전체 암거 구조물을 구축하는 경우, PC암거에 프리스트레스 힘을 도입하기 위하여 강선이 사용되는데, 본 고안의 양방향 강선 정착장치(100)는 이러한 강선이 양방향으로 정착되면서도 강선이 실질적으로 연결되어 전체 구조물이 마치 하나의 강선으로 연결된 것과 같은 효과를 가질 수 있도록 하는 구조로 이루어져 있다.When assembling the prefabricated PC culvert to build the entire culvert structure, the steel wire is used to introduce the prestressing force to the PC culvert, the bidirectional steel wire fixing device 100 of the present invention, while the steel wire is settled in both directions, the steel wire is substantially It is composed of a structure that allows the entire structure to have an effect as if connected by a single steel wire.

이를 위하여 본 고안에 따른 양방향 강선 정착장치(100)는 중공의 커플링부재(101)와, 상기 커플링부재(101)의 양단부에 각각 분리가능하게 결합되며 중앙에 콘(cone) 형상의 웨지홀(104, 104')이 형성되어 있는 한 쌍의 웨지콘부재(102, 102')와, 강선(10, 10')의 단부를 물어 상기 웨지홀(104, 104')에 끼워져 고정되는 한 쌍의 웨지(103, 103')를 포함한다.To this end, the bidirectional steel wire fixing device 100 according to the present invention is a hollow coupling member 101 and a wedge hole having a cone shape in the center and detachably coupled to both ends of the coupling member 101, respectively. A pair of wedge-con members 102 and 102 'having 104 and 104' formed thereon, and a pair that is fitted into and fixed to the wedge holes 104 and 104 'by biting end portions of the steel wires 10 and 10'. Of wedges 103 and 103 '.

도 1a 및 도 1b에 도시된 실시예에서, 상기 한 쌍의 웨지콘부재(102, 102')가 상기 커플링부재(101)에 분리가능하게 체결될 수 있도록 상기 커플링부재(101)의 양단부 내측에는 나사부(106)가 형성되어 있으며, 상기 커플링부재(101)의 양단부에 결합되는 한 쌍의 웨지콘부재(102, 102') 외면에는 상기 커플링부재(101)의 나사부(106)에 대응되는 나사부(105, 105')가 형성되어 있어, 상기웨지콘부재(102, 102')는 상기 커플링부재(101)의 양단부에 분리가능하게 나사 결합된다.In the embodiment shown in FIGS. 1A and 1B, both ends of the coupling member 101 can be detachably fastened to the coupling member 101 by the pair of wedge cone members 102 and 102 ′. A threaded portion 106 is formed at an inner side thereof, and a pair of wedge cone members 102 and 102 ′ coupled to both ends of the coupling member 101 are provided on the threaded portion 106 of the coupling member 101. Corresponding threaded portions 105 and 105 'are formed, and the wedgecon members 102 and 102' are detachably screwed to both ends of the coupling member 101.

상기 원통형 웨지콘부재(102, 102')의 중앙에는 콘 형상의 웨지홀(104, 104')이 형성되어 있으며, 상기 웨지홀(104, 104')에는 대응되는 콘 형상을 가지며 강선(10, 10')을 물 수 있는 구조를 가진 웨지(103, 103')가 삽입된다.Cone-shaped wedge holes 104 and 104 'are formed at the center of the cylindrical wedge cone members 102 and 102', and the wedge holes 104 and 104 'have a corresponding cone shape and steel wires 10 and Wedges 103 and 103 'having a structure capable of biting 10' are inserted.

도 1b에 도시된 바와 같이, 강선(10')을 물지 않은 상태의 웨지(103')가 상기 웨지홀(104')에 내에 위치하고 있고 웨지콘부재(102')가 커플링부재(101)에 결합되어 있는 상태에서 일측의 웨지콘부재(102')의 중앙을 통하여 웨지홀(104')로 삽입될 수 있다. 그런데, 경우에 따라서는 강선(10')이 정확하게 웨지콘부재(102')의 중앙으로 진출하지 아니할 경우가 있다. 이러한 경우에도 강선(10')이 웨지홀(104')로 용이하게 삽입될 수 있도록, 상기 웨지콘부재(102')의 외부면에는 중앙의 웨지홀(104') 삽입구 주위로 경사면으로 이루어진 강선삽입 안내면(107')을 형성하는 것이 바람직하다. 이러한 강선삽입 안내면(107')이 형성되어 있으면, 강선(10')이 상기 웨지콘부재(102')의 웨지홀(104')로 진입할 때 정확히 중앙으로 진입하지 못하더라도 상기 강선삽입 안내면(107')의 경사를 따라 자연스럽게 중앙 위치의 웨지홀(104')로 용이하게 삽입될 수 있다.As shown in FIG. 1B, the wedge 103 ′ without biting the steel wire 10 ′ is located in the wedge hole 104 ′ and the wedge cone member 102 ′ is coupled to the coupling member 101. It may be inserted into the wedge hole 104 'through the center of one side of the wedge cone member 102' in a coupled state. By the way, in some cases, the steel wire 10 'may not correctly advance to the center of the wedge cone member 102'. Even in this case, the steel wire 10 'is formed of an inclined surface around the insertion hole of the center of the wedge hole 104' so that the steel wire 10 'can be easily inserted into the wedge hole 104'. It is preferable to form the insertion guide surface 107 '. If the wire insertion guide surface 107 'is formed, even when the steel wire 10' does not enter the center when entering the wedge hole 104 'of the wedge cone member 102', the wire insertion guide surface ( Along the inclination of 107 ', it can be easily inserted into the wedge hole 104' in its natural position.

다음에서는 도 1a 및 도 1b에 도시된 실시예에서 강선(10, 10')이 정착되는 과정을 살펴본다.Next, the process of fixing the steel wires 10 and 10 'in the embodiment shown in FIGS. 1A and 1B will be described.

좌측으로부터 진출한 강선(10)은 좌측 웨지콘부재(102) 중앙에 형성된 웨지홀(104)로 삽입되는데, 좌측 웨지콘부재(102)의 웨지홀(104)로 삽입되어 외부로 돌출된 강선(10)에 웨지(103)가 물려지게 된다. 후술하는 바와 같이 강선(10)은 유압식 긴장장치에 의하여 당겨지므로써 긴장되는데, 유압식 긴장장치가 강선(10)을 당길 때의 반력이 상기 웨지(103)에 작용하게 되어 웨지(103)가 강선(10)을 물은 채로 좌측 웨지콘부재(102)의 웨지홀(104)로 밀려들어가게 된다. 유압식 긴장장치에 의하여 강선(10)이 소정의 긴장력으로 긴장되면 유압식 긴장장치를 해제하게 되는데, 강선(10)이 긴장되어 있으므로 강선(10)은 도면에서 우측으로 당겨지게 된다. 이러한 강선(10)의 당겨지는 힘에 의하여 강선(10)을 물고 있는 웨지(103)가 더욱 웨지홀(104)에 끼워지게 되어 강선(10)이 좌측 웨지콘부재(102)에 완전히 정착하게 된다. 정착된 강선(10)의 단부를 절단하고, 좌측 웨지콘부재(102)에 커플링부재(101)를 결합한다. 상기 커플링부재(101)의 양단부 내측에 나사부(106)가 형성되어 있고, 웨지콘부재(102)의 외면에도 대응되는 나사부(105)가 형성되어 있으므로, 웨지콘부재(102)와 커플링부재(101)를 용이하게 나사 결합하여 일체화시킬 수 있게 된다.The steel wire 10 extending from the left side is inserted into the wedge hole 104 formed at the center of the left wedge cone member 102, and is inserted into the wedge hole 104 of the left wedge cone member 102 and protrudes to the outside. The wedge 103 is bite. As will be described later, the steel wire 10 is tensioned by being pulled by the hydraulic tensioning device, and the reaction force when the hydraulic tensioning device pulls the steel wire 10 acts on the wedge 103 so that the wedge 103 is a steel wire ( 10 is pushed into the wedge hole 104 of the left wedge member 102 while biting. When the steel wire 10 is tensioned by a predetermined tension force by the hydraulic tension device, the hydraulic tension device is released. Since the steel wire 10 is tensioned, the steel wire 10 is pulled to the right in the drawing. The wedge 103 holding the steel wire 10 is further inserted into the wedge hole 104 by the pulling force of the steel wire 10 so that the steel wire 10 is completely fixed to the left wedge cone member 102. . The end of the fixed steel wire 10 is cut, and the coupling member 101 is coupled to the left wedge cone member 102. Since the threaded portion 106 is formed inside both ends of the coupling member 101, and the threaded portion 105 corresponding to the outer surface of the wedge cone member 102 is formed, the wedgecon member 102 and the coupling member are formed. 101 can be easily screwed and integrated.

후속하여 우측으로 진입하는 강선(10')을 우측 웨지콘부재(102')에 정착하게 되는데, 강선(10')을 우측 웨지콘부재(102')에 정착하는 방법은 여러 가지 형태로 수행할 수 있다. 우선 우측 웨지(103')를 강선(10')을 물지 않은 상태로 우측 웨지콘부재(102')의 웨지홀(104')에 넣고 상기 우측 웨지콘부재(102')를 커플링부재(101)와 결합한다. 앞서 좌측의 강선(10)이 이미 정착된 좌측 웨지콘부재(102)에 커플링부재(101)를 결합하기 전에 이미 우측 웨지(103')를 우측 웨지콘부재(102')에 삽입하여 우측 웨지콘부재(102')를 커플링부재(101)에 결합해 놓은상태에서 상기 좌측 웨지콘부재(102)와 커플링부재(101)를 결합하여도 무방하다.Subsequently, the steel wire 10 'entering the right side is fixed to the right wedge-con member 102'. The method of fixing the steel wire 10 'to the right wedge-con member 102' may be performed in various forms. Can be. First, the right wedge 103 'is inserted into the wedge hole 104' of the right wedge cone member 102 'without biting the steel wire 10' and the right wedge cone member 102 'is coupled to the coupling member 101. ) Before the coupling of the coupling member 101 to the left wedge cone member 102 in which the left steel wire 10 is already fixed, the right wedge 103 'is inserted into the right wedge cone member 102' and the right wedge is inserted. The left wedge-con member 102 and the coupling member 101 may be coupled in a state in which the cone member 102 'is coupled to the coupling member 101.

우측으로 진입하는 강선(10')은 우측 웨지콘부재(102')의 웨지홀(104')로 삽입되어, 웨지홀(104') 내부에 끼워져 있던 웨지(103')에 물려진다. 상기 우측 웨지콘부재(102')의 외부면에 중앙의 웨지홀(104') 삽입구 주위로 경사면으로 이루어진 강선삽입 안내면(107')을 형성하게 되면 강선(10')이 웨지홀(104')로 삽입될 때 상기 강선삽입 안내면(107')을 따라 용이하게 삽입될 수 있게 된다. 우측으로 진입한 강선(10')이 우측으로 당겨져 긴장되면 그와 동시에 강선(10')을 물고 있던 웨지(103')가 우측 웨지콘부재(102')의 웨지홀(104')에 완전하게 정착된다.The steel wire 10 'entering the right side is inserted into the wedge hole 104' of the right wedge cone member 102 'and is bitten by the wedge 103' inserted in the wedge hole 104 '. When the steel wire insertion guide surface 107 'is formed on the outer surface of the right wedge cone member 102' around the center of the insertion hole of the wedge hole 104 ', the steel wire 10' becomes the wedge hole 104 '. When inserted into the wire insertion guide surface 107 ′ can be easily inserted along. When the steel wire 10 'entering the right side is pulled to the right and tensioned, the wedge 103' holding the steel wire 10 'at the same time is completely in the wedge hole 104' of the right wedge cone member 102 '. Settles down.

이와 같이, 본 고안에 따른 양방향 강선 정착장치(100)는 좌측으로 진입하는 강선(10)과 우측으로 진입하는 강선(10')이 모두 하나의 장치 내부에서 양방향으로 각각 정착되며 결국 양쪽의 강선(10, 10')은 양방향 강선 정착장치(100)의 커플링부재(101)에 의하여 하나로 연결되는 것이다.As such, in the bidirectional steel wire fixing device 100 according to the present invention, the steel wire 10 entering the left side and the steel wire 10 'entering the right side are all fixed in both directions within one device, and both wires ( 10, 10 ′ are connected to each other by the coupling member 101 of the bidirectional steel wire fixing device 100.

따라서, 조립식 PC암거의 조립시 강선을 긴장할 경우, 본 고안에 따른 양방향 강선 정착장치(100)를 이용하면 강선이 연속적으로 이어질 수 있으므로, 조립식 PC암거가 조립된 상태에서 완전히 연속된 하나의 일체 구조물을 이룰 수 있게 된다.Therefore, when the steel wire is tensioned when assembling the prefabricated PC culvert, using the bidirectional steel wire fixing device 100 according to the present invention, the steel wire can be continuously connected, one integral structure that is completely continuous in the assembled PC culvert assembly state Can be achieved.

다음에서는 위와 같은 본 고안에 따른 양방향 강선 정착장치를 이용하여 조립되는 구조를 가진 조립식 PC암거의 실시예에 대하여 설명한다.Next will be described an embodiment of a prefabricated PC culvert having a structure that is assembled using a bidirectional steel wire fixing device according to the present invention as described above.

도 2a에는 본 고안에 따른 양방향 강선 정착장치를 이용하여 PC암거가 조립되는 형상의 사시도가 도시되어 있으며, 도 2b 내지 도 2e에는 PC암거의 조립 단계를 설명하기 위한 측면도가 도시되어 있다. 도면에 도시된 PC암거(201)의 단부면에는 PC암거를 마주 붙였을 때 몰탈을 주입할 수 있는 공간이 형성되도록 전단키 모양의 오목한 몰탈홈(211)이 형성되어 있으며, 상기 몰탈홈(211)의 소정 위치에는 더 오목하게 형성되어 있는 오목한 전단홈(212)이 형성되어 있다. 상기 몰탈홈(211)과 전단홈(212)에 의하여 생기는 공간에는 몰탈이 채워져 양측의 PC암거가 접합된다. 이와 같이 몰탈홈(211), 전단홈(212)이 형성된 단면을 가진 PC암거는 본 고안이 적용되는 일실시예일 뿐이며, 본 고안은 이에 한정되지 아니하고, 단순한 평면을 가진 PC암거, 암수단면을 가진 PC암거 등 다양한 단면을 가지는 PC암거 및 콘크리트 구조물에 적용할 수 있다.Figure 2a is a perspective view of the shape of the PC culvert is assembled using a bidirectional steel wire fixing apparatus according to the present invention, Figure 2b to 2e is a side view for explaining the assembly step of the PC culvert. An end surface of the PC culvert 201 shown in the drawing is formed with a concave mortar groove 211 of the shear key shape so that a space for injecting mortar is formed when the PC culvert facing each other, the mortar groove 211 of the At a predetermined position, a concave shear groove 212 is formed that is more concave. The mortar is filled in the space formed by the mortar groove 211 and the shear groove 212 is joined to the PC culverts on both sides. The mortar groove 211, PC culvert having a cross-section formed with a shear groove 212 is just one embodiment to which the present invention is applied, the present invention is not limited to this, PC culvert having a simple plane, having a female means surface It can be applied to PC culverts and concrete structures with various cross sections such as PC culverts.

PC암거(201)의 단부면 모서리에는 상기한 양방향 강선 정착장치가 위치할 수 있는 오목부(110)가 형성되며, 상기 오목부(110)에는 강선(11)이 통과할 수 있는 강선통과공(112)이 형성되어 있다.An end surface edge of the PC culvert 201 is formed with a concave portion 110 in which the bidirectional steel wire fixing apparatus can be located, and the concave portion 110 has a steel wire passing hole through which the steel wire 11 can pass ( 112 is formed.

본 고안에서는 종래 기술과 달리 상기 강선통과공(112)이 반드시 PC암거의 헌치부에 설치될 필요가 없다. 앞서 살펴본 바와 같이, 종래 기술에서는 강선의 정착을 위해서 PC암거의 중간을 블럭아웃하여 강선정착구를 형성하여야 하고 강선통과공이 상기 강선정착구와 연통되어야 하므로, 결국 강선통과공이 강선정착구의 블럭아웃이 가능한 헌치부에 형성되어야 하나, 본 고안에서는 이러한 강선정착구의 블럭아웃이 전혀 필요하지 아니하므로, 상기 강선통과공을 헌치부에 설치할 필요가 없다.In the present invention, unlike the prior art, the wire passing hole 112 does not necessarily need to be installed at the haunting portion of the PC culvert. As described above, in the prior art, in order to settle the steel wire, the middle of the PC culvert should be blocked out to form a steel wire anchoring hole, and the steel wire through hole should communicate with the steel wire anchoring hole, so that the steel wire through hole can block out the steel wire anchoring hole. Although it should be formed in the tooth, in the present invention, since the blockout of the wire anchorage is not necessary at all, it is not necessary to install the steel wire passing hole in the haunting portion.

일반적으로 PC암거에는 이중 철근이 배근되는데, 상기 이중 철근의 사이에강선이 위치하도록 상기 강선통과공이 형성되도록 하는 것이 바람직하다. 이 경우 앞서 종래 기술의 문제점으로 지적하였던 PC암거의 부등침하에 의하여 강선에 상향력 또는 하향력이 발생하더라도 강선이 이중철근 사이에 놓이게 되어 철근에 의하여 상향력 또는 하향력이 지지되기 때문에 종래 기술에서와 같은 헌치부의 파괴 등이 발생하지 않게 된다.In general, double rebar is reinforced in the PC culvert, it is preferable that the steel wire through-hole is formed so that the steel wire is located between the double rebar. In this case, even if an upward or downward force occurs in the steel wire due to the inequality of the PC culvert, which has been pointed out as a problem of the prior art, the steel wire is placed between the double rebars, so that the upward or downward force is supported by the rebar. Destruction of the haunting part, such as will not occur.

도 2a에 도시된 바와 같이, 평탄한 지면상에 2개 이상의 PC암거(201, 202, 203)들을 위치시킨다. 이때는 통상적으로, 시공성을 고려하여 강선정착용 오목부(110)가 형성되어 있는 PC암거(201, 203)와, 오목부(110)가 형성되어 있지 않은 PC암거(202)를 교대로 위치시킨다. PC암거(201, 202, 203)들을 위치시킨 다음, 강선통과공(112)을 통하여 강선(11)을 삽입한다. 도 2a 내지 도 2e에서 설명의 편의상 좌측에서부터 각각 순차적으로 제1 PC암거(201), 제2 PC암거(202)...라고 칭한다.As shown in FIG. 2A, two or more PC culverts 201, 202, 203 are placed on a flat surface. In this case, in general, the PC culverts 201 and 203 in which the steel wire fixing recesses 110 are formed and the PC culverts 202 in which the recesses 110 are not formed are alternately positioned in consideration of workability. The PC culverters 201, 202 and 203 are positioned, and then the steel wire 11 is inserted through the steel wire passing hole 112. For convenience of explanation in FIGS. 2A to 2E, the first PC culvert 201 and the second PC culvert 202 ... are sequentially called from the left side, respectively.

강선(11)의 좌측단은 시작위치에 있는 제1 PC암거(201)의 좌측면에 정착되는데, 이 경우에는 종래의 일방향 강선 정착장치(600)를 사용하여 강선(11)을 정착시켜도 무방하다. 즉, 제1 PC암거(201)의 단면에 형성된 오목부(110)에 일방향 강선 정착장치(600)의 웨지콘부재(602)를 위치하고 강선(11)의 단부에 웨지(603)를 물려 강선(11)을 당기므로써 웨지(603)가 강선(11)을 물은 채로 웨지콘부재(602)의 웨지홀(604)로 삽입되어 강선(11)이 정착되도록 한다.The left end of the steel wire 11 is fixed to the left side of the first PC culvert 201 in the starting position, in this case, the steel wire 11 may be fixed using the conventional one-way steel wire fixing device 600. . That is, the wedge-con member 602 of the one-way steel wire fixing device 600 is placed in the recess 110 formed in the cross section of the first PC culvert 201 and the wedge 603 is bitten at the end of the steel wire 11. By pulling 11), the wedge 603 is inserted into the wedge hole 604 of the wedge cone member 602 while biting the steel wire 11 so that the steel wire 11 is fixed.

강선(11)의 타단부는 다수개의 PC암거에 형성된 강선통과공(112)을 관통하여 우측의 제3 PC암거(203) 외부로 노출된다. 제3 PC암거(203)의 노출단면에 형성된오목부(110)에는 본 고안에 따른 양방향 강선 정착장치(100)가 설치되는데, 구체적으로 제3 PC암거(203) 외부로 노출되는 강선(11)은 양방향 강선 정착장치(100)의 좌측 웨지콘부재(102)에 형성된 웨지홀(104)로 삽입된다. 웨지홀(104)로 삽입된 단부에 웨지(103)를 물리고, 유압식 긴장장치(400)로 강선(11)을 긴장하여 강선(11)을 물고 있는 웨지(103)가 웨지콘부재(102)의 웨지홀(104)에 삽입되어 강선(11)이 정착되도록 한다. 즉, 유압식 긴장장치(400)가 강선(11)을 긴장할 때, 강선 긴장력에 대한 반력으로 웨지(103)가 강선(11)을 물을 채로 웨지콘부재(102)의 웨지홀(104)로 밀려들어가는데, 강선(11)이 소정 긴장력으로 긴장된 후 유압식 긴장장치(400)를 해제하면 긴장력에 의하여 강선(11)이 수축하면서 좌측으로 당겨지는데, 좌측의 웨지(103)가 강선(11)을 물은 채로 함께 좌측으로 더욱 당겨져서 웨지홀(104)에 완전히 삽입되므로써 강선(11)이 정착된다(도 2b).The other end of the steel wire 11 passes through the steel wire through hole 112 formed in the plurality of PC culverts and is exposed to the outside of the third PC culvert 203 on the right side. The concave portion 110 formed on the exposed end of the third PC culvert 203 is provided with a bidirectional steel wire fixing device 100 according to the present invention, specifically, the steel wire 11 exposed to the outside of the third PC culvert 203. Is inserted into the wedge hole 104 formed in the left wedge cone member 102 of the bidirectional steel wire fixing device (100). The wedge 103 is clamped at the end inserted into the wedge hole 104, and the steel wire 11 is tensioned by the hydraulic tension device 400 to bite the steel wire 11 to the wedge cone member 102. It is inserted into the wedge hole 104 so that the steel wire 11 is fixed. That is, when the hydraulic tension device 400 tensions the steel wire 11, the wedge 103 is pushed into the wedge hole 104 of the wedge cone member 102 with water to the steel wire 11 in response to the steel wire tension force When the steel wire 11 is tensioned with a predetermined tension force and the hydraulic tension device 400 is released, the steel wire 11 is pulled to the left while the steel wire 11 is contracted by the tension force, and the wedge 103 on the left side bites the steel wire 11. The steel wire 11 is fixed by being further pulled to the left together and fully inserted into the wedge hole 104 (FIG. 2B).

종래의 일방향 강선 정착장치를 이용하는 경우에는, 비록 강선을 PC암거의 단면에서 긴장하나 실제 강선이 정착되는 강선 정착장치는 PC암거의 내측 중간에 위치한 곳에 설치되어 있어, 강선 긴장시에 유압 긴장장치의 반력이 강선 정착장치의 웨지에 작용할 수 없으며, 결국 유압 긴장장치의 유압을 제거하면 강선 정착장치(600)에서의 강선 슬립 현상이 크게 발생되어 상당한 프리스트레스 힘의 손실이 발생한다.In the case of using a conventional one-way steel wire fixing device, although the steel wire is tensioned at the cross section of the PC culvert, the steel wire fixing device in which the actual steel wire is fixed is installed in the middle of the inside of the PC culvert. The reaction force cannot act on the wedge of the wire fixing device, and eventually removing the hydraulic pressure of the hydraulic tensioning device causes a large amount of wire slipping in the steel fixing device 600, resulting in a significant loss of prestress force.

그러나, 본 고안의 양방향 강선 정착장치(100)를 이용하게 되면, PC암거(203)의 단면에서 강선(11)을 긴장하게 되므로, 유압식 긴장장치(400)가 강선(11)을 긴장할 때 생기는 반력이 웨지에 작용하게 되어 강선(11)을 물고 있는 웨지(103)가 웨지콘부재(102)의 웨지홀(104)로 밀려들어가게 되고, 그에 따라 유압 긴장기의 유압을 제거하더라도 정착장치에서 강선의 슬립(slip) 현상을 최대한 억제할 수 있으며, 슬립에 의한 프리스트레스 힘의 손실도 억제할 수 있다.However, when the bidirectional steel wire fixing device 100 of the present invention is used, the steel wire 11 is tensioned in the cross section of the PC culvert 203, so that the reaction force generated when the hydraulic tension device 400 tensions the steel wire 11. The wedge 103 acting on the wedge is pushed into the wedge hole 104 of the wedge cone member 102, so that even if the hydraulic tension of the hydraulic tensioner is removed, The slip phenomenon can be suppressed as much as possible, and the loss of prestress force due to slip can also be suppressed.

강선(11)이 제3 PC암거(203)의 접합면에 정착되면 강선(11)을 절단하고, 강선(11)이 정착되어 있는 웨지콘부재(102)의 외부로 커플링부재(101)를 결합한다(도 2c). 상기 커플링부재(101)의 양단부 내측에 나사부(106)가 형성되어 있고, 웨지콘부재(102)의 외면에도 대응되는 나사부(105)가 형성되어 있으므로, 웨지콘부재(102)와 커플링부재(101)를 용이하게 나사 결합하여 일체화시킬 수 있게 된다.When the steel wire 11 is fixed to the joint surface of the third PC culvert 203, the steel wire 11 is cut and the coupling member 101 is moved out of the wedge cone member 102 where the steel wire 11 is fixed. To bind (FIG. 2C). Since the threaded portion 106 is formed inside both ends of the coupling member 101, and the threaded portion 105 corresponding to the outer surface of the wedge cone member 102 is formed, the wedgecon member 102 and the coupling member are formed. 101 can be easily screwed and integrated.

강선(11)을 양방향 강선 정착장치(100)의 좌측 웨지콘부재(102)에 정착한 다음, 양방향 강선 정착장치(100)의 커플링부재(101)에 우측 웨지콘부재(102')를 결합한다. 즉, 우측 웨지(103')를 강선(11')을 물지 않은 상태로 우측 웨지콘부재(102')의 웨지홀(104')에 넣고 상기 우측 웨지콘부재(104')를 커플링부재(101)와 결합한다.After the steel wire 11 is fixed to the left wedge cone member 102 of the bidirectional steel wire fixing device 100, the right wedge cone member 102 ′ is coupled to the coupling member 101 of the bidirectional steel wire fixing device 100. do. That is, the right wedge 103 'is inserted into the wedge hole 104' of the right wedge cone member 102 'without biting the steel wire 11' and the right wedge cone member 104 'is coupled to the coupling member ( 101).

연속될 제4, 제5 및 제6 PC암거(204, 205, 206)들을 제3 PC암거(203)에 후속하여 위치시키고, 상기 제4, 제5 및 제6 PC암거들(204, 205, 206)의 강선통과공(112')을 통하여 강선(11')을 삽입한다. 제3 PC암거(203)의 접합면에 마주하여 놓여지는 제4 PC암거(204)의 접합면에도 상기 이미 설치된 양방향 강선 정착장치(100)가 삽입되어 놓이도록 오목부(110')가 형성되어 있는데, 상기 제4 PC암거(204)에 형성되는 오목부(110')는 제3 PC암거(203)의 오목부(110) 보다 더 큰크기를 갖는 것이 바람직하다. 즉, 후속하여 PC암거를 설치할 때 이미 설치된 PC암거에 정착되어 있는 양방향 강선 정착장치가 어긋남 없이 용이하게 후속 PC암거의 오목부에 놓여지도록 하기 위하여 후속하는 PC암거의 오목부를 기설치된 PC암거의 오목부보다 크게 하는 것이 바람직한 것이다.The fourth, fifth and sixth PC culverts 204, 205, and 206 to be continuous are positioned after the third PC culvert 203, and the fourth, fifth and sixth PC culverts 204, 205, The steel wire 11 'is inserted through the steel wire passing hole 112'. A concave portion 110 ′ is formed on the joining surface of the fourth PC culvert 204 facing the joining surface of the third PC culvert 203 so that the already installed bidirectional steel wire fixing device 100 is inserted therein. However, the recess 110 'formed in the fourth PC culvert 204 preferably has a larger size than the recess 110 of the third PC culvert 203. That is, when the PC culvert is subsequently installed, the concave portion of the PC culvert which is installed in the recess of the subsequent PC culvert in order to easily be placed in the concave portion of the subsequent PC culvert without shifting the bidirectional steel wire fixing device fixed in the PC culvert already installed. It is preferable to make it larger than wealth.

강선통과공으로 삽입되어 제4 PC암거(204)의 좌측 접합면 외부로 나오는 강선(11')은, 제3 PC암거(203)에 이미 설치되어 있는 양방향 강선 정착장치(100)의 상기 우측 웨지콘부재(102')의 웨지홀(104')로 삽입되어, 웨지홀(104') 내부에 끼워져 있던 웨지(103')에 물려진다. 상기 우측 웨지콘부재(102')의 외부면에 중앙의 웨지홀(104') 삽입구 주위로 경사면으로 이루어진 강선삽입 안내면(107')을 형성하게 되면 강선(11')이 웨지홀(104')로 삽입될 때 상기 강선삽입 안내면(107')을 따라 용이하게 삽입될 수 있게 된다.The steel wire 11 ′ inserted into the steel wire passing hole and exiting from the left bonding surface of the fourth PC culvert 204 is the right wedge cone of the bidirectional steel wire fixing device 100 that is already installed in the third PC culvert 203. It is inserted into the wedge hole 104 'of the member 102' and is bitten by the wedge 103 'which was fitted inside the wedge hole 104'. When the steel wire insertion guide surface 107 'is formed on the outer surface of the right wedge cone member 102' around the center of the insertion hole of the wedge hole 104 ', the steel wire 11' becomes the wedge hole 104 '. When inserted into the wire insertion guide surface 107 ′ can be easily inserted along.

새로이 삽입된 강선(11')의 타단부, 즉 제6 PC암거(206)의 접합면 외부로 나오는 강선(11')을 앞서 설명한 바와 같이, 유압식 긴장장치(400)로 긴장하게 되면 강선(11')이 우측으로 당겨지면서 제4 PC암거(204)의 좌측 접합면에 설치되어 있는 우측 웨지콘부재(102')에 강선(11')이 정착된다. 즉, 우측 웨지콘부재(102')의 웨지홀(104')에 끼워져 있던 웨지(103')가 강선(11')을 물은 채로 우측으로 당겨져 웨지홀(104')에 완전히 삽입되므로써 강선(11')이 우측 웨지콘부재(102')에 정착된다(도 2e). 제4 PC암거(204)의 좌측면에서 상기한 바와 같이 강선(11')이 정착되면, 제6 PC암거(206)의 우측면에서는 앞서 설명한 제3 PC암거(203)에서의 강선 정착작업과 동일한 작업을 반복하여 제6 PC암거(206)의 우측면에 강선(11')을 정착한다. 이와 같은 반복 작업을 통하여 PC암거를 연속적으로 연결한다.As described above, the other end of the newly inserted steel wire 11 ', that is, the steel wire 11' coming out of the joint surface of the sixth PC culvert 206, is tensioned by the hydraulic tension device 400, and thus the steel wire 11 ') Is pulled to the right, and the steel wire 11' is fixed to the right wedge-con member 102 'provided on the left joining surface of the fourth PC culvert 204. That is, the wedge 103 'inserted in the wedge hole 104' of the right wedge cone member 102 'is pulled to the right while biting the steel wire 11' and completely inserted into the wedge hole 104 '. 11 ') is fixed to the right wedge-con member 102' (FIG. 2E). When the steel wire 11 'is settled on the left side of the fourth PC culvert 204 as described above, the right side of the sixth PC culvert 206 is the same as the steel wire fixing work in the third PC culvert 203 described above. The operation is repeated to fix the steel wire 11 'on the right side surface of the sixth PC culvert 206. Through this repetitive work, PC culverts are connected continuously.

양방향 강선 정착장치가 PC암거의 몰탈홈(211) 또는 후술하는 바와 같이 전단홈(212)에 설치되는 경우, 몰탈홈(211)과 전단홈(212)에 몰탈이 채워지게 되면 그 몰탈 속에 강선 정착장치(100)도 묻히게 되어 외기와의 접촉이 차단되므로써 부식의 염려도 없게 된다.When the bidirectional steel wire fixing device is installed in the mortar groove 211 of the PC culvert or the shear groove 212 as described below, when the mortar is filled in the mortar groove 211 and the shear groove 212, the steel wire is fixed in the mortar The device 100 is also buried so that contact with the outside air is blocked, so that there is no fear of corrosion.

도 3에는 제3 PC암거의 전단홈(212)과 제4 PC암거의 전단홈(212')에 양방향 강선 정착장치(100)가 설치되고 강선(11, 11')이 양방향으로 정착되어 있는 형상이 단면도로 도시되어 있다. 도 3에서 부재번호 213은 백업재이다.3 is a shape in which the bidirectional steel wire fixing device 100 is installed in the shear groove 212 of the third PC culvert and the shear groove 212 'of the fourth PC culvert, and the steel wires 11 and 11' are fixed in both directions. This is shown in cross section. In Fig. 3, reference numeral 213 is a backup material.

본 고안의 조립식 PC암거에서는, 도 4에 도시된 바와 같이, 양방향 강선 정착장치를 박스 몸체의 모서리 이외에도 박스의 상하벽체에 다수개 설치할 수도 있다.In the assembled PC culvert according to the present invention, as shown in FIG. 4, a plurality of bidirectional steel wire fixing devices may be installed on upper and lower walls of the box in addition to the corners of the box body.

한편, 이상의 실시예에서는 상기 양방향 강선 정착장치(100)가 양측의 조립식 PC암거(203, 204)에 걸쳐져 장착되도록 양측 조립식 PC암거(203, 204) 각각에 오목부(110, 110')가 형성되어 있으나, 경우에 따라서는 일측의 조립식 PC암거 중 어느 한 쪽의 조립식 PC암거의 접합부 단면에 상기 양방향 강선 정착장치(100)가 전부 삽입될 수 있을 정도의 깊이를 가진 오목부를 형성하고 그에 마주하는 조립식 PC암거의 접합부 단면에는 오목부를 형성하지 아니하도록 구성하는 것도 가능하다.Meanwhile, in the above embodiment, recesses 110 and 110 ′ are formed in each of the prefabricated PC culverts 203 and 204 so that the bidirectional steel wire fixing device 100 is mounted on both sides of the assembled PC culverts 203 and 204. However, in some cases, a concave portion having a depth enough to insert the bidirectional steel wire fixing device 100 can be formed on the end surface of one of the prefabricated PC culverts on either side of the prefabricated PC culvert. It is also possible to comprise so that a recessed part may not be formed in the cross section of the junction part of a prefabricated PC culvert.

이상에서 살펴본 바와 같이, 본 고안에 따른 양방향 강선 정착장치는, 강선이 양측으로 각각 정착되면서도 실질적으로는 서로 연결될 수 있도록 하여 조립식 PC암거가 조립될 때 프리스트레스를 가하기 위한 강선이 전체 암거에 걸쳐 하나로 이어져 연결될 수 있게 되며, 그에 따라 조립식 PC암거 상호간의 결속력이 강화된다.As described above, in the bidirectional steel wire fixing device according to the present invention, the steel wires can be connected to each other while the steel wires are respectively fixed to both sides so that the steel wires for prestressing when the prefabricated PC culverts are assembled are connected to one over the entire culverts. It can be connected, thereby strengthening the bond between the prefabricated PC culverts.

또한, 본 고안에 따른 양방향 강선 정착장치를 이용하여 강선이 정착되고 조립되는 조립식 PC암거에 의하면, 강선이 PC암거의 접합부 단면에서 정착되므로 정착시에 발생하는 프리스트레스 힘의 손실을 최소화할 수 있어 조립식 PC암거에 적절한 프리스트레스 힘을 충분히 도입할 수 있으며, 그에 따라 조립식 PC암거의 결합이 더욱 견고하게 된다.In addition, according to the prefabricated PC culvert in which the steel wire is fixed and assembled using the bidirectional steel wire fixing device according to the present invention, since the steel wire is fixed at the cross section of the PC culvert, the loss of prestress force generated during the fixing can be minimized. Adequate prestressing force can be introduced into the PC culvert, thereby making the coupling of the assembled PC culvert more robust.

특히, 종래에는 강선의 정착을 위하여 PC암거의 내측 중간을 블럭아웃하여 강선정착구를 형성하여야 했으나, 본 고안에 따르면 강선이 PC암거의 접합부 단면에서 정착되므로, PC암거의 중간을 블럭아웃할 필요가 없으므로, 종래의 기술에서 문제점으로 지적되어 왔던, PC암거의 부등침하에 따른 강선정착구에서의 파손을 방지할 수 있게 된다.Particularly, in the related art, in order to fix the steel wire, the inner middle of the PC culvert should be blocked to form a steel wire anchoring hole. However, according to the present invention, since the steel wire is fixed at the cross section of the PC culvert, it is necessary to block out the middle of the PC culvert. Therefore, it is possible to prevent breakage at the steel wire anchoring hole due to the uneven settlement of the PC culvert, which has been pointed out as a problem in the prior art.

그 뿐만 아니라, 종래의 기술에서는 블럭아웃이 필요하므로 조립식 PC암거에 있어서는 강선통과공이 헌치부 또는 외부에 형성된 별도의 융기부에 형성될 수밖에 없었으며 그로 인하여 PC암거의 부등침하 발생시에 강선에 의하여 헌치부 또는 융기부가 파괴되는 현상이 있었으나, 본 고안에서는 블럭아웃이 필요 없으므로, 강선통과공을 헌치부나 융기부에 설치하지 않고 PC암거의 이중 철근 사이 등 충분한 강도를 가지는 부분에 임의로 강선통과공을 형성할 수 있으므로, 위와 같은 종래 기술에서의 문제점이 발생하지 않게 된다.In addition, in the conventional technology, block-out is required, and thus, in the assembled PC culvert, the steel wire passing hole was inevitably formed in the haunch portion or a separate ridge formed on the outside. Although there was a phenomenon that the teeth or ridges were destroyed, in this design, no block-out is required, so the wire-through holes are arbitrarily applied to the portions having sufficient strength, such as between double rebars of PC culverts, without installing the wire-through holes in the hunt or ridges. Since it can be formed, the above problems in the prior art do not occur.

또한, 종래 기술에서는 블럭아웃된 강선정착구가 다시 몰탈 등에 의하여 메워지기는 하지만, 신·구 콘크리트의 불완전한 접합으로 인하여 우수 등이 침투하게 되고 그에 따라 강선이 부식되는 현상이 발생하게 되나, 본 고안에서는 이러한 블럭아웃이 필요하지 아니하므로 그에 따른 강선의 부식 현상도 원천적으로 방지할 수 있게 된다.In addition, in the prior art, although the block-out steel wire anchoring hole is filled by mortar or the like again, rainwater may penetrate due to incomplete bonding of new and old concrete, resulting in corrosion of the steel wire. Since this blockout is not required, the corrosion of the steel wire can be prevented at the source.

나아가, 종래의 기술에서는 강선정착구가 PC암거의 중간에 형성되어 있으므로, 강선의 정착 후에 그 정착부로부터 단부까지 길이의 강선이 버려지게 되나, 본 고안에서는 강선이 PC암거의 접합부 단면에 정착되므로, 종래 기술에서와 같은 버려지는 강선부분이 발생하지 않게 되므로 사용되는 강선의 양을 줄일 수 있어 시공비 절감효과를 가져올 수 있다.Furthermore, in the prior art, since the steel wire anchoring hole is formed in the middle of the PC culvert, the steel wire of the length from the fixing part to the end is discarded after the steel wire is fixed, but in the present invention, the steel wire is fixed to the joint end face of the PC culvert, Since the discarded steel wire portion does not occur as in the prior art, the amount of steel wire used can be reduced, resulting in a construction cost reduction effect.

Claims (3)

박스형 몸체로 구성되어 있으며, 긴장된 강선(11, 11')이 통과하는 강선통과공(112, 112')이 형성되어 있어, 다수개가 연속하여 설치될 때 상기 강선통과공(112, 112')으로 삽입된 강선(11, 11')이 접합부 단면에서 정착되므로써 프리스트레스 힘이 가해지도록 하는 조립식 PC암거로서,It is composed of a box-shaped body, and the steel wire through holes 112 and 112 'through which the tensioned steel wires 11 and 11' pass, and when the plurality of steel wires are continuously installed, the steel wire through holes 112 and 112 '. As a prefabricated PC culvert in which pre-stress forces are applied by inserting the steel wires 11 and 11 'at the joint section end, 이웃하는 조립식 PC암거와 접합되는 접합부 단면에는 웨지홀(104,104')이 형성되어 있는 웨지콘부재(102,102') 및 강선(10,10')을 정착하는 웨지(103,103')를 포함하여 이루어진 양방향 강선 정착장치(100)가 설치되는 오목부(110)가 형성되어 있으며,Bidirectional steel wire including wedge cone members 102 and 102 'having wedge holes 104 and 104' formed therein and wedges 103 and 103 'for fixing steel wires 10 and 10' at a junction section joined to a neighboring prefabricated PC culvert. Concave portion 110 is installed is installed fixing unit 100, 상기 강선통과공(112, 112')는 상기 오목부(110)의 중앙에 형성되어 있고,The steel wire passing holes 112 and 112 'are formed in the center of the recess 110, 상기 오목부(110)에는 상기 양방향 강선 정착장치(100)가 장착되어 일측 방향으로 진입하는 강선(11)이 상기 양방향 강선 정착장치(100)의 일측에 정착되고 이웃하는 조립식 PC암거로부터 진입하는 또다른 강선(11')도 상기 강선 정착장치(100)의 타측에 정착되어 양측의 강선(11, 11')이 하나로 연결된 상태로 이웃하는 조립식 PC암거와 조립될 수 있는 구조를 가진 것을 특징으로 하는 조립식 PC암거.The concave portion 110 is equipped with the bidirectional steel wire fixing device 100 and the steel wire 11 entering in one direction is fixed to one side of the bidirectional steel wire fixing device 100 and enters from a neighboring prefabricated PC culvert. The other steel wire 11 'is also fixed to the other side of the steel wire fixing device 100 is characterized in that it has a structure that can be assembled with the neighboring prefabricated PC culvert in a state in which both wires (11, 11') are connected as one Prefabricated PC Culvert. 제 1 항에 있어서,The method of claim 1, 상기 조립식 PC암거의 접합부 단면에는 몰탈이 주입되어 채워지는 몰탈홈(211)이 형성되어 있고,Mortar groove 211 is formed in the end surface of the junction portion of the prefabricated PC culvert is filled with mortar is injected, 상기 몰탈홈(211)에는 소정 간격 이격되어 있는 복수개의 전단홈(212)이 형성되어 있으며,The mortar groove 211 is formed with a plurality of shear grooves 212 spaced at a predetermined interval, 상기 오목부(110)는 상기 몰탈홈(211) 또는 상기 전단홈(212) 내에 형성되는 것을 특징으로 하는 조립식 PC암거.The recess 110 is a prefabricated PC culvert, characterized in that formed in the mortar groove (211) or the shear groove (212). 박스형 몸체로 구성되어 있으며, 긴장된 강선(11, 11')이 통과하는 강선통과공(112, 112')이 형성되어 있어, 다수개가 연속하여 설치될 때 상기 강선통과공(112, 112')으로 삽입된 강선(11, 11')이 접합부 단면에서 정착되므로써 프리스트레스 힘이 가해지도록 하는 조립식 PC암거의 조립구조로서,It is composed of a box-shaped body, and the steel wire through holes 112 and 112 'through which the tensioned steel wires 11 and 11' pass, and when the plurality of steel wires are continuously installed, the steel wire through holes 112 and 112 '. As the assembly structure of the prefabricated PC culvert in which the pre-stress force is applied by inserting the steel wires 11 and 11 'at the joint section end, 동시에 긴장하고자 하는 개수로 순차적으로 설치되며 시점 PC암거의 일면에 강선(11)의 일단을 정착되어 있는 다수개의 조립식 PC암거(201, 202, 203)의 접합부 단면에는 웨지홀(104,104')이 형성되어 있는 웨지콘부재(102,102') 및 강선(10,10')을 정착하는 웨지(103,103')를 포함하여 이루어진 양방향 강선 정착장치(100)가 설치되는 오목부(110)가 형성되어 있어, 외측 조립식 PC암거(203)의 접합부 단면으로 노출된 강선(11)이 상기 양방향 강선 정착장치(100)의 일측 웨지콘부재(102)와 웨지(103)에 의하여 정착되고,At the same time, wedge holes 104 and 104 'are formed in the cross-sections of the plurality of prefabricated PC culverts 201, 202, and 203, which are sequentially installed in a number desired to be tensioned and one end of the steel wire 11 is fixed to one surface of the point-in-time PC culvert. A concave portion 110 is formed on which a bidirectional steel wire fixing device 100 is formed, which includes wedge members 102 and 102 'and wedges 103 and 103' for fixing the steel wires 10 and 10 '. The steel wire 11 exposed to the cross section of the prefabricated PC culvert 203 is fixed by one side of the wedge cone member 102 and the wedge 103 of the bidirectional steel wire fixing device 100, 상기 강선(11)이 정착된 일측 웨지콘부재(102)와 커플링부재(101)와 타측 웨지콘부재(102')가 결합된 상태에서, 후속하여 연속 설치된 다수개의 조립식 PC암거(204, 205, 206) 중 상기 강선(11)이 정착된 조립식 PC암거(203)의 접합부 단면과 마주하는 접합부 단면을 가진 조립식 PC암거(204)의 접합부 단면을 통하여 외부로 노출된 강선(11')이 상기 양방향 강선 정착장치(100)의 타측 웨지콘부재(102')에 삽입되어 그 내부에 위치하던 웨지(103')에 물려 긴장되므로써 정착되어, 프리스트레스가 도입되는 강선(11, 11')이 서로 하나로 연결되면서도 이웃하는 조립식 PC암거(203, 204)가 일체로 조립되는 것을 특징으로 하는 조립식 PC암거의 조립구조.A plurality of prefabricated PC culverts 204 and 205 subsequently installed in a state in which the one side wedge-con member 102 and the coupling member 101 and the other side wedge-con member 102 'where the steel wire 11 is fixed are coupled. , 206 of the steel wire 11 'exposed to the outside through the joint end surface of the prefabricated PC culvert 204 having a joint end surface facing the joint end surface of the assembled PC culvert 203 is The steel wires 11 and 11 ', which are inserted into the other wedge cone member 102' of the bidirectional steel wire fixing device 100 and are bitten by being bitten by the wedge 103 'which is located therein, are introduced with prestresses into one another. The assembly structure of the prefabricated PC culvert, characterized in that the neighboring prefabricated PC culvert (203, 204) is integrally assembled.
KR2020010037338U 2001-12-04 2001-12-04 Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert KR200268366Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010037338U KR200268366Y1 (en) 2001-12-04 2001-12-04 Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010037338U KR200268366Y1 (en) 2001-12-04 2001-12-04 Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0071465A Division KR100458951B1 (en) 2001-11-16 2001-11-16 Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert

Publications (1)

Publication Number Publication Date
KR200268366Y1 true KR200268366Y1 (en) 2002-03-16

Family

ID=73113564

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010037338U KR200268366Y1 (en) 2001-12-04 2001-12-04 Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert

Country Status (1)

Country Link
KR (1) KR200268366Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200452669Y1 (en) * 2008-11-06 2011-03-16 주식회사 케이씨산업개발 Assembling Structure of Precast Concrete Culvert

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200452669Y1 (en) * 2008-11-06 2011-03-16 주식회사 케이씨산업개발 Assembling Structure of Precast Concrete Culvert

Similar Documents

Publication Publication Date Title
KR100458951B1 (en) Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
US6151850A (en) Intermediate anchorage system utilizing splice chuck
US6176051B1 (en) Splice chuck for use in a post-tension anchor system
KR100692913B1 (en) Tendon anchoring apparatus
KR100732554B1 (en) Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same
KR100934608B1 (en) A steel wire anchoring device and precast box, the method of assembling precast box using the same
KR100872197B1 (en) Prefabricated precast concrete box culvert
KR20100073448A (en) Continuation structure of prestressed concrete girder bridge
KR200268365Y1 (en) Dual Directional Prestressed Tendon Anchoring Apparatus
KR200268366Y1 (en) Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert
KR20080111686A (en) Bridge using phc girder and slab-phc complex girder
KR100418826B1 (en) Adhesive Strength Increasing Method of Precast Concrete Culvert by Continuing Prestressing Steel Wire
KR200268501Y1 (en) Dual Directional Prestressed Tendon Anchoring Apparatus
JP2896988B2 (en) Construction method of prestressed masonry structure
KR200279918Y1 (en) beam-column connection detail of long-span pre-cast system
KR200184684Y1 (en) Apparatus to prevent the negative moment of a bridge
KR100829150B1 (en) Precast concrete box culvert, structure and method of constructing the same
JP2005325518A (en) Prestress introducing unit and prestress introducing method
US20070251169A1 (en) Grouted rebar dowel splice
JP2003138517A (en) Structure of girder part formed by split construction of prestressed concrete multiple span continuous girder structure, and method of constructing the structure
JP2017193899A (en) Widening structure of existing PC floor slab
JPH0642039A (en) Joining method of end of precast concrete beam to precast concrete girder, and joining construction thereof
JP2913461B2 (en) Concrete member connection structure
KR200203628Y1 (en) Iron bar connecting device
JPH07292857A (en) Pc member with irregular-shaped steel pipe for joint, and connecting method thereof

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
O032 Opposition [utility model]: request for opposition
T701 Written decision to grant on technology evaluation
O131 Decision on opposition [utility model]
O072 Maintenance of registration after opposition [utility model]: final registration of opposition
LAPS Lapse due to unpaid annual fee