KR100732554B1 - Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same - Google Patents

Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same Download PDF

Info

Publication number
KR100732554B1
KR100732554B1 KR1020060085920A KR20060085920A KR100732554B1 KR 100732554 B1 KR100732554 B1 KR 100732554B1 KR 1020060085920 A KR1020060085920 A KR 1020060085920A KR 20060085920 A KR20060085920 A KR 20060085920A KR 100732554 B1 KR100732554 B1 KR 100732554B1
Authority
KR
South Korea
Prior art keywords
culvert
steel wire
wedge
fixing device
wire fixing
Prior art date
Application number
KR1020060085920A
Other languages
Korean (ko)
Inventor
소창영
Original Assignee
(주) 이삼이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 이삼이엔지 filed Critical (주) 이삼이엔지
Priority to KR1020060085920A priority Critical patent/KR100732554B1/en
Application granted granted Critical
Publication of KR100732554B1 publication Critical patent/KR100732554B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Sewage (AREA)

Abstract

A tendon anchoring apparatus is provided to cut down on the cost by making a structure simple and reducing the number of components and to be assembled to a culvert more easily. The tendon anchoring apparatus(500) comprises a housing(505) formed in the hollow cylindrical shape and provided with a male thread(540) having a spiral on the outer circumferential surface and hanging projections(520) having coupling holes(527), a wedge cone member(700) composed of an insertion(710) inserted to a through hole(525) of the housing and provided with many hanging projections(715) and a support(720) coupled to one side of the insertion, formed in the shape of a disk having the larger diameter than the through hole formed by the hanging projection and the appointed thickness and provided with a wedge hole connected to the outside by the support, a wedge(620) inserted to the wedge hole to hold tendons, and a spring(630) attached to the rear of the wedge to push the wedge toward the wedge hole.

Description

강선정착장치 및 이를 이용한 암거의 연결구조와 그 연결방법 { Tendon Anchoring Apparatus, Connecting structure of culvert using the same and Connecting method of culvert using the same }Steel wire anchoring device and connecting structure of culvert using same and connecting method {Tendon Anchoring Apparatus, Connecting structure of culvert using the same and Connecting method of culvert using the same}

도 1a는 종래의 양방향 강선 정착장치의 분해 사시도,Figure 1a is an exploded perspective view of a conventional bidirectional steel wire fixing device,

도 1b는 종래의 양방향 강선 정착장치와 강선의 결합된 상태를 도시한 단면도,1B is a cross-sectional view showing a state in which a conventional bidirectional steel wire fixing device and a steel wire are combined;

도 2a는 종래의 양방향 강선 정착장치를 이용하여 조립식 프리캐스트 콘크리트 박스 암거가 조립되는 형상을 도시한 사시도,Figure 2a is a perspective view showing the shape of prefabricated concrete box culvert is assembled using a conventional bidirectional steel wire fixing device,

도 2b 내지 도 2e는 종래의 양방향 강선 정착장치를 이용한 조립식 프리캐스트 콘크리트 박스 암거의 조립단계를 설명하기 위한 측면도,Figure 2b to 2e is a side view for explaining the assembly step of the prefabricated concrete box culvert prefabricated using a conventional bidirectional steel wire fixing device,

도 3은 종래의 양방향 강선 정착장치가 조립식 프리캐스트 콘크리트 박스 암거의 전단홈에 설치되어 있는 형상을 도시한 단면도,3 is a cross-sectional view showing a shape in which a conventional bidirectional steel wire fixing device is installed in a shear groove of a prefabricated concrete box culvert;

도 4는 본 발명의 실시예에 따른 강선정착장치의 분해사시도,4 is an exploded perspective view of a steel wire fixing device according to an embodiment of the present invention,

도 5는 본 발명의 실시예에 따른 강선정착장치의 측단면도,Figure 5 is a side cross-sectional view of the steel wire fixing device according to an embodiment of the present invention,

도 6은 본 발명의 실시예에 따른 강선정착장치를 암거 사이에 배치한 연결구조도,Figure 6 is a connection structure arrangement disposed between the steel wire anchoring device according to an embodiment of the present invention,

도 7은 본 발명의 실시예에 따른 강선정착장치를 이용한 암거의 연결구조를 도시한 연결구조도,7 is a connection structure showing the connection structure of the culvert using the steel wire fixing apparatus according to an embodiment of the present invention,

도 8은 본 발명의 실시예에 따른 암거의 사시도,8 is a perspective view of a culvert according to an embodiment of the present invention,

도 9는 본 발명의 실시예에 따른 강선정착장치를 이용한 암거의 연결방법을 나타내는 순서도.Figure 9 is a flow chart illustrating a method of connecting a culvert using a steel wire fixing apparatus according to an embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

500 : 강선정착장치, 505 : 하우징,500: steel wire fixing device, 505: housing,

540 : 숫나사부, 620 : 웨지,540: male part, 620: wedge,

630 : 스프링, 700 : 웨지콘부재,630: spring, 700: wedge cone member,

740 : 웨지홀, 750 : 경사부,740: wedge hole, 750: inclined portion,

810 : 제1암거, 811, 821 : 제1돌출부, 810: first culvert, 811, 821: first protrusion,

811a, 821a : 제1삽입공, 812, 822 : 제2돌출부,811a, 821a: first insertion hole, 812, 822: second projection,

812a, 822a : 제2삽입공, 813, 823 : 암나사결합부재,812a, 822a: second insertion hole, 813, 823: female screw coupling member,

813a, 823a : 암나사부, 813b, 823b : 나사지지부,813a, 823a: female thread part, 813b, 823b: screw support part,

814, 824 : 강선, 815, 825 : 정착공,814, 824: steel wire, 815, 825: anchorage,

817a, 817b, 827a, 827b : 오목부, 817a, 817b, 827a, 827b: concave,

818,828 : 충진홈, 820 : 제2암거, 818,828: Filling groove, 820: 2 culvert,

910 : 결합지지봉, 921 : 제1긴장고정부재, 910: combined support rod, 921: first tension fixing member,

922 : 제2긴장고정부재, 930 : 와이어, 922: second tension fixing member, 930: wire,

940 : 유압식긴장장치, S10 : 결합단계, 940: hydraulic tension device, S10: coupling step,

S20 : 배치단계, S30 : 긴장단계, S20: batch phase, S30: tension phase,

S40 : 고정결합단계, S50 : 몰탈충진단계.S40: fixed bonding step, S50: mortar filling step.

본 발명은 강선정착장치 및 이를 이용한 암거의 연결구조와 그 연결방법에 관한 것으로서, 특히 콘크리트 박스 암거에 보다 쉽게 장착되는 강선정착장치와, 이를 이용하여 암거를 보다 쉽게 밀착시켜 조립할 수 있는 강선정착장치를 이용한 암거의 연결구조와 그 연결방법에 관한 것이다.The present invention relates to a steel wire fixing device and a connection structure of a culvert using the same and a method of connecting the same, in particular, a steel wire fixing device that is more easily mounted on a concrete box culvert, and a steel wire fixing device that can be easily assembled and assembled using the same. It relates to the connection structure of the culvert and the connection method using.

상하수도, 전력구, 통신구, 공동구 등의 시설물로 사용되는 프리캐스트 콘크리트 박스 암거(Precast Concrete Box Culvert)(이하, '암거'라고 한다)의 시공에 있어서, 암거에 프리스트레스 힘(Prestress Force)을 도입하기 위해서는 강선(tendon)을 소정 길이로 긴장한 후 정착장치에 의하여 강선을 긴장된 상태로 암거에 정착시킨다.In the construction of precast concrete box culverts (hereinafter referred to as `` culverts ''), which are used as facilities for water and sewage, electric power, communication, and common areas, a prestress force is introduced to the culverts. In order to do so, the wire is tensioned to a predetermined length and the wire is fixed to the culvert by the fixing device.

이러한 조립식 암거의 구체적인 구성은 등록실용신안 제223229호, 등록실 용신안 제157899호, 등록실용신안 제157898호에 상세히 개시되어 있다.The specific configuration of such a prefabricated culvert is disclosed in detail in Utility Model No. 223229, Registration No. 157899, and Registration Utility Model No. 157898.

일반적으로 조립식 암거는 암거 상호 간의 연결강도가 매우 약하기 때문에, 지반이 연약하여 부등침하가 발생되는 경우 콘크리트 박스 암거들 사이의 연결부위가 벌어져 수밀성이 저하되는 문제가 있었다.In general, prefabricated culverts have very weak connection strengths between the culverts, so that when the ground is soft and unequal settlement occurs, there is a problem that the connection between the concrete box culverts is opened and watertightness is deteriorated.

상기와 같은 문제점을 해결하기 위하여, 등록특허공보 등록번호10-458951호에서는 도 1a 및 도 1b에 도시된 바와 같은 강선 정착장치를 이용하여 도 2a 내지 도 3에 도시된 바와 같이 암거를 상호 밀접하게 조립하였다.In order to solve the above problems, Patent No. 10-458951 uses a steel wire fixing device as shown in Figure 1a and Figure 1b as shown in Figures 2a to 3 close to each other closely Assembled.

도 1a는 종래의 양방향 강선 정착장치의 분해 사시도이고, 도 1b는 종래의 양방향 강선 정착장치와 강선의 결합된 상태를 도시한 단면도이며, 도 2a는 종래의 양방향 강선 정착장치를 이용하여 조립식 프리캐스트 콘크리트 박스 암거가 조립되는 형상을 도시한 사시도이고, 도 2b 내지 도 2e는 종래의 양방향 강선 정착장치를 이용한 조립식 프리캐스트 콘크리트 박스 암거의 조립단계를 설명하기 위한 측면도이며, 도 3은 종래의 양방향 강선 정착장치가 조립식 프리캐스트 콘크리트 박스 암거의 전단홈에 설치되어 있는 형상을 도시한 단면도이다.Figure 1a is an exploded perspective view of a conventional bidirectional steel wire fixing device, Figure 1b is a cross-sectional view showing a combined state of the conventional bidirectional steel wire fixing device and the steel wire, Figure 2a is a prefabricated prefabricated using a conventional bidirectional steel wire fixing device 2B to 2E are side views for explaining an assembly step of the prefabricated concrete box culvert using a conventional bidirectional steel wire fixing device, and FIG. 3 is a conventional bidirectional steel wire It is sectional drawing which shows the shape in which the fixing device is installed in the front groove of the prefabricated concrete box culvert.

도 1a 및 도 1b에 도시된 바와 같이, 종래의 강선 정착장치(100)는 중공의 커플링부재(101)와, 상기 커플링부재(101)의 양단부에 각각 분리가능하게 결합되며 중앙에 콘(cone) 형상의 웨지홀(104, 104')이 형성되어 있는 한 쌍의 웨지콘부재(102, 102')와, 강선(10, 10')의 단부를 물어 상기 웨지홀(104, 104')에 끼워져 고정되는 한 쌍의 웨지(103, 103')를 포함한다.As shown in FIGS. 1A and 1B, the conventional steel wire fixing device 100 is detachably coupled to the hollow coupling member 101 and both ends of the coupling member 101 and has a cone at the center thereof. a pair of wedge cone members 102 and 102 'having the cone shaped wedge holes 104 and 104' and end portions of the steel wires 10 and 10 '. It includes a pair of wedges (103, 103 ') that is fitted in and fixed to.

상기 한 쌍의 웨지콘부재(102, 102')가 상기 커플링부재(101)에 분리가능하게 체결될 수 있도록 상기 커플링부재(101)의 양단부 내측에는 나사부(106)가 형성되어 있으며, 상기 커플링부재(101)의 양단부에 결합되는 한 쌍의 웨지콘부재(102, 102') 외면에는 상기 커플링부재(101)의 나사부(106)에 대응되는 나사부(105, 105')가 형성되어 있어, 상기 웨지콘부재(102, 102')는 상기 커플링부재(101)의 양단부에 분리가능하게 나사 결합된다.Threaded portions 106 are formed inside both ends of the coupling member 101 so that the pair of wedge cone members 102 and 102 'can be detachably fastened to the coupling member 101. On the outer surface of the pair of wedge cone members 102 and 102 'coupled to both ends of the coupling member 101, threaded portions 105 and 105' corresponding to the threaded portion 106 of the coupling member 101 are formed. Thus, the wedge cone members 102 and 102 'are detachably screwed to both ends of the coupling member 101.

상기 원통형 웨지콘부재(102, 102')의 중앙에는 콘 형상의 웨지홀(104, 104')이 형성되어 있으며, 상기 웨지홀(104,104')에는 대응되는 콘 형상을 가지며 강선(10, 10')을 물수 있는 구조를 가진 웨지(103, 103')가 삽입된다.Cone shaped wedge holes 104 and 104 'are formed at the center of the cylindrical wedge cone members 102 and 102', and the wedge holes 104 and 104 'have corresponding cone shapes and have steel wires 10 and 10'. Wedges (103, 103 ') having a structure capable of biting () are inserted.

도 1b에 도시된 바와 같이, 강선(10')을 물지 않은 상태의 웨지(103')가 상기 웨지홀(104')에 내에 위치하고 있고 웨지콘부재(102')가 커플링부재(101)에 결합되어 있는 상태에서 일측의 웨지콘부재(102')의 중앙을 통하여 웨지홀(104')로 삽입될 수 있다. As shown in FIG. 1B, the wedge 103 ′ without biting the steel wire 10 ′ is located in the wedge hole 104 ′ and the wedge cone member 102 ′ is coupled to the coupling member 101. It may be inserted into the wedge hole 104 'through the center of one side of the wedge cone member 102' in a coupled state.

상기 강선(10')이 웨지홀(104')로 용이하게 삽입될 수 있도록, 상기 웨지콘부재(102')의 외부면에는 중앙의 웨지홀(104') 삽입구 주위로 경사면으로 이루어진 강선삽입 안내면(107')이 형성되어 있다.A steel wire insertion guide surface formed with an inclined surface around a central wedge hole 104 'insertion hole on an outer surface of the wedge cone member 102' so that the steel wire 10 'can be easily inserted into the wedge hole 104'. 107 'is formed.

상기 강선 정착장치(100)를 이용하여 암거를 조립하는 방법은 도 2a 내지 도 2e에 도시된 바와 같다.A method of assembling the culvert using the steel wire fixing device 100 is as shown in FIGS. 2A to 2E.

도면에 도시된 암거(201)의 단부면에는 암거를 마주 붙였을 때 몰탈을 주입할 수 있는 공간이 형성되도록 전단키 모양의 오목한 몰탈홈(211)이 형성되어 있으며, 상기 몰탈홈(211)의 소정 위치에는 더 오목하게 형성되어 있는 오목한 전단홈(212)이 형성되어 있다. An end surface of the culvert 201 shown in the drawing is formed with a shear key-shaped concave mortar groove 211 so as to form a space for injecting mortar when facing the culvert, the predetermined position of the mortar groove 211 The concave shear groove 212 is formed in a more concave.

상기 몰탈홈(211)과 전단홈(212)에 의하여 생기는 공간에는 몰탈이 채워져 양측의 암거가 접합된다. The mortar is filled in the space formed by the mortar groove 211 and the shear groove 212 is bonded to the culverts on both sides.

암거(201)의 단부면 모서리에는 상기한 양방향 강선 정착장치가 위치할 수 있는 오목부(110)가 형성되며, 상기 오목부(110)에는 강선(11)이 통과할 수 있는 강선통과공(112)이 형성되어 있다.An end surface edge of the culvert 201 is formed with a concave portion 110 in which the bidirectional steel wire fixing device is located, and the concave portion 110 has a steel wire through hole 112 through which the steel wire 11 can pass. ) Is formed.

도 2a에 도시된 바와 같이, 평탄한 지면상에 2개 이상의 암거(201, 202, 203)들을 위치시킨다. As shown in FIG. 2A, two or more culverts 201, 202, 203 are placed on a flat surface.

이때는 통상적으로, 시공성을 고려하여 강선정착용 오목부(110)가 형성되어 있는 암거(201, 203)와, 오목부(110)가 형성되어 있지 않은 암거(202)를 교대로 위치시킨다. At this time, in general, the culverts 201 and 203 in which the steel wire fixing recesses 110 are formed and the culverts 202 in which the recesses 110 are not formed are alternately positioned in consideration of workability.

암거(201, 202, 203)들을 위치시킨 다음, 강선통과공(112)을 통하여 강선(11)을 삽입한다. The culverts 201, 202, and 203 are positioned, and then the steel wire 11 is inserted through the steel wire passing hole 112.

도 2a 내지 도 2e에서 설명의 편의상 좌측에서부터 각각 순차적으로 제1 암거(201), 제2 암거(202)...라고 칭한다.For convenience of explanation in FIGS. 2A to 2E, the first culvert 201 and the second culvert 202 ... are sequentially called from the left side, respectively.

강선(11)의 좌측단은 시작위치에 있는 제1 암거(201)의 좌측면에 정착되는데, 제1 암거(201)의 단면에 형성된 오목부(110)에 일방향 강선 정착장치(600)의 웨지콘부재(602)를 위치하고, 강선(11)의 단부에 웨지(603)를 물려 강선(11)을 당기므로써 웨지(603)가 강선(11)을 물은 채로 웨지콘부재(602)의 웨지홀(604)로 삽입되어 강선(11)이 정착되도록 한다.The left end of the steel wire 11 is fixed to the left side of the first culvert 201 in the start position, the wedge of the one-way steel wire fixing device 600 in the recess 110 formed in the cross section of the first culvert 201 Wedge hole of the wedge cone member 602 is positioned while the cone member 602 is positioned and the wedge 603 is pulled to the end of the steel wire 11 to pull the steel wire 11. 604 is inserted to allow the steel wire 11 to settle.

강선(11)의 타단부는 다수개의 암거에 형성된 강선통과공(112)을 관통하여 우측의 제3암거(203) 외부로 노출된다. The other end of the steel wire 11 passes through the steel wire through hole 112 formed in the plurality of culverts and is exposed to the outside of the third culvert 203 on the right side.

제3암거(203)의 노출단면에 형성된 오목부(110)에는 강선 정착장치(100)가 설치되는데, 구체적으로 제3암거(203) 외부로 노출되는 강선(11)은 양방향 강선 정착장치(100)의 좌측 웨지콘부재(102)에 형성된 웨지홀(104)로 삽입된다. The steel wire fixing device 100 is installed in the recess 110 formed at the exposed end of the third culvert 203. Specifically, the steel wire 11 exposed to the outside of the third culvert 203 is a bidirectional steel wire fixing device 100. It is inserted into the wedge hole 104 formed in the left wedge cone member (102).

웨지홀(104)로 삽입된 단부에 웨지(103)를 물리고, 유압식 긴장장치(400)로 강선(11)을 긴장하여 강선(11)을 물고 있는 웨지(103)가 웨지콘부재(102)의 웨지홀(104)에 삽입되어 강선(11)이 정착되도록 한다. The wedge 103 is clamped at the end inserted into the wedge hole 104, and the steel wire 11 is tensioned by the hydraulic tension device 400 to bite the steel wire 11 to the wedge cone member 102. It is inserted into the wedge hole 104 so that the steel wire 11 is fixed.

즉, 유압식 긴장장치(400)가 강선(11)을 긴장할 때, 강선 긴장력에 대한 반력으로 웨지(103)가 강선(11)을 물을 채로 웨지콘부재(102)의 웨지홀(104)로 밀려들어가는데, 강선(11)이 소정 긴장력으로 긴장된 후 유압식 긴장장치(400)를 해제하면 긴장력에 의하여 강선(11)이 수축하면서 좌측으로 당겨지는데, 좌측의 웨지(103)가 강선(11)을 물은 채로 함께 좌측으로 더욱 당겨져서 웨지홀(104)에 완전히 삽입되므로써 강선(11)이 정착된다(도 2b).That is, when the hydraulic tension device 400 tensions the steel wire 11, the wedge 103 is pushed into the wedge hole 104 of the wedge cone member 102 with water to the steel wire 11 in response to the steel wire tension force When the steel wire 11 is tensioned with a predetermined tension force and the hydraulic tension device 400 is released, the steel wire 11 is pulled to the left while the steel wire 11 is contracted by the tension force, and the wedge 103 on the left side bites the steel wire 11. The steel wire 11 is fixed by being further pulled to the left together and fully inserted into the wedge hole 104 (FIG. 2B).

강선(11)이 제3암거(203)의 접합면에 정착되면 강선(11)을 절단하고, 강선(11)이 정착되어 있는 웨지콘부재(102)의 외부로 커플링부재(101)를 결합한다(도 2c). When the steel wire 11 is fixed to the joint surface of the third culvert 203, the steel wire 11 is cut, and the coupling member 101 is coupled to the outside of the wedge cone member 102 where the steel wire 11 is fixed. (FIG. 2C).

상기 커플링부재(101)의 양단부 내측에 나사부(106)가 형성되어 있고, 웨지콘부재(102)의 외면에도 대응되는 나사부(105)가 형성되어 있으므로, 웨지콘부재(102)와 커플링부재(101)를 용이하게 나사 결합하여 일체화시킬 수 있게 된다.Since the threaded portion 106 is formed inside both ends of the coupling member 101, and the threaded portion 105 corresponding to the outer surface of the wedge cone member 102 is formed, the wedgecon member 102 and the coupling member are formed. 101 can be easily screwed and integrated.

강선(11)을 양방향 강선 정착장치(100)의 좌측 웨지콘부재(102)에 정착한 다음, 양방향 강선 정착장치(100)의 커플링부재(101)에 우측 웨지콘부재(102')를 결합한다.After the steel wire 11 is fixed to the left wedge cone member 102 of the bidirectional steel wire fixing device 100, the right wedge cone member 102 ′ is coupled to the coupling member 101 of the bidirectional steel wire fixing device 100. do.

연속될 제4, 제5 및 제6 암거(204, 205, 206)들을 제3암거(203)에 후속 하여 위치시키고, 상기 제4, 제5 및 제6 암거들(204, 205, 206)의 강선통과공(112')을 통하여 강선(11')을 삽입한다. The fourth, fifth and sixth culverts 204, 205 and 206 to be continuous are positioned subsequent to the third culvert 203 and the fourth, fifth and sixth culverts 204, 205 and 206 The steel wire 11 'is inserted through the steel wire passing hole 112'.

제3 암거(203)의 접합면에 마주하여 놓여지는 제4 암거(204)의 접합면에도 상기 이미 설치된 양방향 강선 정착장치(100)가 삽입되어 놓이도록 오목부(110')가 형성되어 있는데, 상기 제4 암거(204)에 형성되는 오목부(110')는 제3 암거(203)의 오목부(110) 보다 더 큰 크기를 갖는 것이 바람직하다.The concave portion 110 ′ is formed on the joining surface of the fourth culvert 204 facing the joining surface of the third culvert 203 so that the already installed bidirectional steel wire fixing device 100 is inserted. The recess 110 ′ formed in the fourth culvert 204 preferably has a larger size than the recess 110 of the third culvert 203.

강선통과공으로 삽입되어 제4 암거(204)의 좌측 접합면 외부로 나오는 강선(11')은, 제3 암거(203)에 이미 설치되어 있는 양방향 강선 정착장치(100)의 상기 우측 웨지콘부재(102')의 웨지홀(104')로 삽입되어, 웨지홀(104') 내부에 끼워져 있던 웨지(103')에 물려진다. The steel wire 11 'inserted into the steel wire passing hole and coming out of the left joint surface of the fourth culvert 204 is the right wedge-con member of the bidirectional steel wire fixing device 100 already installed in the third culvert 203 ( 102 ') is inserted into the wedge hole 104' and is bitten by the wedge 103 'which is fitted inside the wedge hole 104'.

새로이 삽입된 강선(11')의 타단부, 즉 제6 암거(206)의 접합면 외부로 나오는 강선(11')을 앞서 설명한 바와 같이, 유압식 긴장장치(400)로 긴장하게 되면 강선(11')이 우측으로 당겨지면서 제4 암거(204)의 좌측 접합면에 설치되어 있는 우측 웨지콘부재(102')에 강선(11')이 정착된다. As described above, the other end of the newly inserted steel wire 11 ', that is, the steel wire 11' coming out of the joint surface of the sixth culvert 206, is tensioned by the hydraulic tension device 400, and thus the steel wire 11 ' ) Is pulled to the right, and the steel wire 11 'is fixed to the right wedge-con member 102' provided on the left joining surface of the fourth culvert 204.

즉, 우측 웨지콘부재(102')의 웨지홀(104')에 끼워져 있던 웨지(103')가 강선(11')을 물은 채로 우측으로 당겨져 웨지홀(104')에 완전히 삽입되므로써 강선(11')이 우측 웨지콘부재(102')에 정착된다(도 2e). That is, the wedge 103 'inserted in the wedge hole 104' of the right wedge cone member 102 'is pulled to the right while biting the steel wire 11' and completely inserted into the wedge hole 104 '. 11 ') is fixed to the right wedge-con member 102' (FIG. 2E).

제4 암거(204)의 좌측면에서 상기한 바와 같이 강선(11')이 정착되면, 제6 암거(206)의 우측면에서는 앞서 설명한 제3 암거(203)에서의 강선 정착작업과 동일한 작업을 반복하여 제6 암거(206)의 우측면에 강선(11')을 정착한다. When the steel wire 11 'is settled on the left side of the fourth culvert 204 as described above, on the right side of the sixth culvert 206, the same operation as the steel wire fixing work in the third culvert 203 described above is repeated. To fix the steel wire 11 ′ on the right side of the sixth culvert 206.

이와 같은 반복 작업을 통하여 암거를 연속적으로 연결한다.Through this repetitive work, culverts are connected continuously.

양방향 강선 정착장치가 암거의 몰탈홈(211) 또는 전단홈(212)에 설치되는 경우, 몰탈홈(211)과 전단홈(212)에 몰탈이 채워지게 되면 그 몰탈 속에 강선 정착장치(100)도 묻히게 되어 외부와의 접촉이 차단되므로써 부식의 염려도 없게 된다.When the bidirectional steel wire fixing device is installed in the mortar groove 211 or shear groove 212 of the culvert, when the mortar is filled in the mortar groove 211 and the shear groove 212, the wire wire fixing device 100 in the mortar It is buried so that contact with the outside is prevented, so there is no fear of corrosion.

도 3에는 제3 암거의 전단홈(212)과 제4 암거의 전단홈(212')에 양방향 강선 정착장치(100)가 설치되고 강선(11, 11')이 양방향으로 정착되어 있는 형상이 단면도로 도시되어 있다. 3 is a cross-sectional view in which a bidirectional steel wire fixing device 100 is installed in the shear groove 212 of the third culvert and the shear groove 212 'of the fourth culvert, and the steel wires 11 and 11' are fixed in both directions. Is shown.

도 3에서 부재번호 213은 백업재이다.In Fig. 3, reference numeral 213 is a backup material.

그러나, 위와 같은 종래의 강선 정착장치는, 커플링부재(101)의 양측에 2개의 웨지콘부재(102,102')와 2개의 웨지(103,103')를 결합하여야 하기 때문에 부품의 수가 많아져 비용이 많이 소모되고, 또한 초기에 상기 강선 정착장치를 암거에 결합시키기가 곤란하였다.However, the conventional steel wire fixing apparatus as described above requires two wedge-con members 102 and 102 'and two wedges 103 and 103' to be coupled to both sides of the coupling member 101, thereby increasing the number of parts and increasing the cost. It was exhausted and also difficult to initially attach the steel wire fixing device to the culvert.

또한, 암거에 강선을 삽입하기 위하여 강선통과공(112)을 형성하여야만 하였고, 강선을 강선통과공을 통해 삽입한 후에 강선 정착장치를 이용하여 상기 강선을 잡아주도록 하여야 하는바 그 작업공정이 많아지는 문제가 있었다.In addition, in order to insert the steel wire in the culvert should be formed through the steel wire through hole 112, after inserting the steel wire through the steel wire through hole to hold the steel wire using a steel wire fixing device to increase the work process There was a problem.

또한, 강선통과공(112)을 통과한 강선 중 불필요한 부분을 절단하여야 하는바, 재료의 낭비가 많고, 특히 수중에서는 상기 강선을 절단하기가 매우 힘들어 암거를 상호 연결하는데 힘든 문제점이 있었다.In addition, there is a lot of waste of materials, especially in the water bar, the unnecessary portion of the steel wire passing through the wire passing hole 112, it is very difficult to cut the steel wire, there was a difficult problem to interconnect the culvert.

본 발명은 전술한 문제점을 해결하기 위하여 안출된 것으로서, 구조를 간단하게 하고 부품의 수를 줄여 비용을 절감하고, 보다 쉽게 암거에 조립될 수 있는 강선정착장치와, 이를 이용하여 암거를 신속하고 쉽게 연결할 수 있으며 강선의 절 단이 필요없는 강선정착장치를 이용한 암거의 연결구조와 그 연결방법을 제공하는데 그 목적이 있다.SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, the structure is simple and the number of parts to reduce the cost, the steel wire fixing device that can be easily assembled to the culvert, using the culvert quickly and easily The purpose of the present invention is to provide a connection structure of a culvert using a steel wire fixing device that can be connected and does not require cutting of the wire.

상기 목적을 달성하기 위하여 본 발명의 강선정착장치는, 내부에 웨지홀이 형성되어 있고 상기 웨지홀에 웨지가 장착되어, 삽입되는 강선을 상기 웨지를 이용하여 잡는 강선정착장치에 있어서, 상기 강선정착장치의 일측에는 숫나사부가 형성되어 있고, 타측에는 상기 웨지홀이 외부와 연통되도록 형성된 것을 특징으로 한다.In order to achieve the above object, the steel wire fixing device of the present invention has a wedge hole formed therein and a wedge is mounted in the wedge hole, and the steel wire fixing device for catching the inserted steel wire using the wedge, wherein the steel wire fixing One side of the device is formed with a male thread, the other side is characterized in that the wedge hole is formed to communicate with the outside.

상기 강선정착장치는, 일측에 숫나사부가 형성되고, 타측이 개방된 중공의 하우징과; 상기 하우징의 타측에 결합되고, 내부에 웨지홀이 형성된 웨지콘부재와; 상기 웨지홀에 삽입되어 강선을 잡는 웨지로 이루어진다.The steel wire fixing device includes a hollow housing having a male screw portion formed at one side and an open side at the other side; A wedge cone member coupled to the other side of the housing and having a wedge hole formed therein; It is made of a wedge inserted into the wedge hole to catch a steel wire.

상기 웨지의 후방에는 스프링이 장착되도록 함이 바람직하다.It is preferable to have a spring mounted on the rear of the wedge.

그리고, 상기 목적을 달성하기 위하여 본 발명의 강선정착장치를 이용한 암거의 연결구조는, 두 개의 암거를 강선정착장치를 이용하여 연결하는 구조에 있어서, 상기 강선정착장치는, 내부에 웨지홀이 형성되어 있고, 상기 웨지홀에 웨지가 장착되며, 일측에는 숫나사부가 형성되어 있고, 타측에는 상기 웨지홀이 외부와 연통되도록 형성되며, 상기 암거는, 일측에 암나사결합부재가 매립되어 있고, 타측에는 강선이 매립되어 있어, 상기 강선정착장치의 숫나사부는 상기 암거 중 어느 하나의 암나사결합부재에 결합되고, 상기 강선정착장치의 웨지홀에는 상기 암거 중 다른 하나에 매립된 강선이 삽입되어 상기 웨지에 의해 잡혀져, 상기 강선정착장치 에 의해 두 개의 암거가 상호 연결되는 것을 특징으로 한다.And, in order to achieve the above object, the connecting structure of the culvert using the steel wire fixing device of the present invention, in the structure of connecting two culverts using the steel wire fixing device, the steel wire fixing device, the wedge hole is formed therein Wedge is mounted on the wedge hole, the male thread portion is formed on one side, the wedge hole is formed to communicate with the outside, the culvert, the female screw coupling member is embedded on one side, the steel wire on the other side The buried male part of the steel wire fixing device is coupled to any one of the female screw coupling members of the culvert, and the steel wire buried in the other of the culverts is inserted into the wedge hole of the steel wire fixing device and is caught by the wedge. , The two culverts are interconnected by the steel wire fixing device.

상기 암나사결합부재는, 상기 숫나사부에 대응되는 암나사부와; 상기 암나사부의 양측에 결합되고 끝단이 절곡된 나사지지부로 이루어진다.The female screw coupling member may include a female screw portion corresponding to the male screw portion; It is coupled to both sides of the female screw portion and consists of a screw support bent end.

또한, 두 개의 암거에는 마주보는 면에 상호 엇갈리게 돌출부가 형성되어 있되, 상기 돌출부에는 삽입공이 형성되어 있고, 상기 삽입공에는 결합지지봉이 삽입되어 두 개의 암거를 상호 결합 지지하도록 한다.In addition, the two culverts are provided with mutually opposite projections on the opposite surface, the insertion portion is formed in the projection, the insertion hole is inserted into the insertion hole to support the two culverts are mutually coupled.

또한, 상기 암거의 측벽에는 긴장장치가 장착되기 위한 정착공이 형성되어 있어, 상기 정착공에 긴장장치를 장착하고 두 개의 암거를 밀착되도록 잡아당겨 연결하도록 한다.In addition, the side wall of the culvert is formed with a fixing hole for mounting the tension device, the tension device is mounted to the fixing hole to pull the two culverts in close contact.

그리고, 상기 목적을 달성하기 위하여 본 발명의 강선정착장치를 이용한 암거의 연결방법은, 일측에 암나사결합부재가 매립되어 있고, 타측에 강선이 매립되어 있으며, 측벽에 정착공이 형성된 제1암거와 제2암거를, 일측에 숫나사부가 형성되고 타측에 웨지홀이 형성된 강선정착장치를 이용하여 상호 연결하는 방법에 있어서,And, in order to achieve the above object, the connecting method of the culvert using the steel wire fixing device of the present invention, the first screw and the first culvert is formed with a female screw coupling member is embedded on one side, the steel wire is embedded on the other side, the fixing hole is formed on the side wall In the method of connecting the two culverts using a steel wire fixing device having a male thread portion formed on one side and a wedge hole formed on the other side,

상기 제2암거의 일측에 매립된 암나사결합부재에 상기 강선정착장치의 숫나사부를 결합하는 강선정착장치 결합단계와;A steel wire fixing device coupling step of coupling the male screw portion of the steel wire fixing device to the female screw coupling member embedded in one side of the second culvert;

상기 제1암거의 타측을 상기 제2암거의 일측에 인접하게 배치하는 배치단계와;An arrangement step of disposing the other side of the first culvert adjacent to one side of the second culvert;

상기 정착공에 긴장장치를 장착하여 제1암거와 제2암거를 상호 밀착되는 방향으로 잡아당겨 제1암거의 타측에 매립된 강선이 상기 강선정착장치의 타측에 형 성된 웨지홀에 삽입되도록 하는 긴장단계로 이루어진 것을 특징으로 한다.The tension device is installed in the fixing hole to pull the first and second culverts in close contact with each other so that the steel wire embedded in the other side of the first culvert is inserted into the wedge hole formed at the other side of the wire anchorage device. Characterized in consisting of steps.

이때, 상기 제1암거와 제2암거의 마주보는 면에는 상호 엇갈리게 돌출부가 형성되어 있고, 상기 돌출부에는 삽입공이 형성되어, 상기 제1암거와 제2암거의 삽입공에 결합지지봉을 삽입하여 상기 제1암거와 제2암거를 상호 고정 결합시키는 고정결합단계를 더 포함하여 이루어진다.At this time, the first and second culverts face each other, the protrusions are formed alternately, the insertion portion is formed in the protrusions, the coupling rods are inserted into the insertion hole of the first culvert and the second culvert by inserting the first It further comprises a fixed coupling step of fixedly coupling the first culvert and the second culvert.

또한, 상기 제1암거와 제2암거를 밀착시킨 후 상기 제1암거와 제2암거의 테두리를 따라 형성된 충진홈에 몰탈을 충진하는 몰탈충진단계를 더 포함하여 이루어지도록 함이 바람직하다.In addition, it is preferable to further include a mortar filling step of filling the mortar in the filling groove formed along the edge of the first and second culvert after the first culvert and the second culvert in close contact.

이하에서는 첨부된 도면을 참조하여 본 발명의 바람직한 실시예에 대하여 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the present invention.

도 4는 본 발명의 실시예에 따른 강선정착장치의 분해사시도이고, 도 5는 본 발명의 실시예에 따른 강선정착장치의 측단면도이다.4 is an exploded perspective view of the steel wire fixing device according to an embodiment of the present invention, Figure 5 is a side cross-sectional view of the steel wire fixing device according to an embodiment of the present invention.

도 4 및 도 5에 도시된 바와 같이, 본 발명의 강선정착장치(500)는, 하우징(505)과, 웨지콘부재(700)와, 웨지(620)와, 스프링(630)으로 이루어진다.As shown in FIGS. 4 and 5, the steel wire fixing apparatus 500 of the present invention includes a housing 505, a wedge cone member 700, a wedge 620, and a spring 630.

상기 하우징(505)은 중공 원통형으로써, 상기 하우징(505)의 일측에는 외주면에 나사선이 형성된 숫나사부(540)가 형성되어 있고, 타측은 개방되어 있다. The housing 505 is a hollow cylindrical shape, one side of the housing 505 is formed with a male screw portion 540 is formed with a screw thread on the outer peripheral surface, the other side is open.

상기 숫나사부(540)의 지름은 상기 하우징(505)의 지름보다 작도록 함이 바람직하다.The diameter of the male screw portion 540 is preferably smaller than the diameter of the housing 505.

상기 하우징(505)의 타측에는 도 4 및 도 5에 도시된 바와 같이, 중심방향으 로 걸림턱(520)이 돌출형성되어 있고, 상기 걸림턱(520)에는 일정간격으로 결합공(527)이 형성되어 있다.As shown in FIGS. 4 and 5, the locking jaw 520 protrudes toward the center of the housing 505, and the coupling jaw 527 is formed at a predetermined interval in the locking jaw 520. Formed.

즉, 도 4에서 상기 걸림턱(520)은 상기 결합공(527)에 의해 일정간격으로 다수개로 형성된 것으로 보이는데, 도 4에서는 상기 결합공(527)과 걸림턱(520)이 각각 3개로 이루어져 있다.That is, in FIG. 4, the latching jaw 520 is shown to be formed in plural at regular intervals by the coupling hole 527, and in FIG. 4, the coupling hole 527 and the locking jaw 520 are each composed of three. .

상기 결합공(527)과 걸림턱(520)의 필요에 따라 그 수를 변경할 수 있음은 물론이다.Of course, the number of the coupling hole 527 and the locking step 520 can be changed as necessary.

상기 걸림턱(520)에 의해 형성되는 관통공(525)은 원형을 이루도록 한다.The through hole 525 formed by the locking jaw 520 has a circular shape.

즉, 상기 걸림턱(520)의 끝단은 곡선을 이루며 연결시 원형을 이루도록 한다.That is, the end of the locking step 520 is curved to form a circular shape when connected.

상기 웨지콘부재(700)는 상기 하우징(505)의 타측에 결합되는데, 삽입부(710)와, 지지부(720)로 이루어진다.The wedge cone member 700 is coupled to the other side of the housing 505, and includes an insertion part 710 and a support part 720.

상기 삽입부(710)는 상기 하우징(505)에 삽입되는 부분으로써, 자세하게는 상기 걸림턱(520)에 의해 형성되는 관통공(525)에 삽입되는 부분으로써, 외주면에는 상기 결합공(527)에 대응되는 다수의 걸림돌기(715)가 돌출 형성되어 있다.The insertion part 710 is a part inserted into the housing 505, and is a part inserted into the through hole 525 formed by the locking jaw 520 in detail, and has an outer circumferential surface with the coupling hole 527. A plurality of corresponding locking projections 715 are formed to protrude.

상기 지지부(720)는, 상기 삽입부(710)의 일측 즉 상기 하우징(505)으로부터 멀리 떨어진 부분에 일체로 결합되고, 상기 걸림턱(520)에 의해 형성되는 관통공(525)보다 더 큰 지름을 갖고 일정 두께를 가지는 원판형상으로 이루어진다.The support part 720 is integrally coupled to one side of the insertion part 710, that is, a part far from the housing 505, and has a larger diameter than the through hole 525 formed by the locking jaw 520. It has a disk shape having a predetermined thickness.

바람직하게는 상기 지지부(720)의 크기는 상기 하우징(505)의 지름과 동일하도록 한다.Preferably, the size of the support 720 is equal to the diameter of the housing 505.

또한, 상기 웨지콘부재(700)의 내부에는 도 5에 도시된 바와 같이 웨지홀(740)의 형성되어 있다.In addition, a wedge hole 740 is formed in the wedge cone member 700 as shown in FIG. 5.

상기 웨지홀(740)은 콘 형상으로써, 상기 지지부(720)를 통해 외부와 연통되도록 형성되어 있다.The wedge hole 740 has a cone shape and is formed to communicate with the outside through the support part 720.

이때, 상기 지지부(720)에는 상기 웨지홀(740)과 연통되는 부위에 경사부(750)를 형성함이 바람직하다.In this case, it is preferable that the inclined portion 750 is formed in the support portion 720 in a portion communicating with the wedge hole 740.

상기 웨지콘부재(700)는 상기 걸림돌기(715)가 상기 결합공(527)에 삽입된 후, 상기 웨지콘부재(700) 또는 하우징(505)을 회전함으로써 도 5에 도시된 바와 같이 상기 걸림돌기(715)가 상기 걸림턱(520)에 걸려 결합되도록 한다.The wedge-con member 700 is the locking protrusion as shown in FIG. 5 by rotating the wedge-con member 700 or the housing 505 after the locking protrusion 715 is inserted into the coupling hole 527. The machine 715 is hooked to the engaging jaw 520 to be coupled.

상기 웨지(620)는 상기 웨지홀(740)에 삽입되어 강선(814,824)(950)을 잡는 것으로써, 그에 대한 자세한 사항은 종래기술에서 언급한 것과 동일한 바, 그에 대한 자세한 설명은 생략한다.The wedge 620 is inserted into the wedge hole 740 to catch the steel wires 814, 824 and 950, and details thereof are the same as those mentioned in the related art, and a detailed description thereof will be omitted.

상기 웨지(620)의 후방에는 상기 스프링(630)이 장착되어, 상기 웨지(620)를 웨지홀(740) 방향으로 미는 역할을 수행한다.The spring 630 is mounted to the rear of the wedge 620 to push the wedge 620 toward the wedge hole 740.

이때, 상기 하우징(505)의 내부는, 상기 스프링(630)이 유동없이 배치되도록 하기 위해 상기 스프링(630)의 지름과 동일하거나 약간 큰 원통형상의 스프링삽입공(530)을 형성하도록 한다.At this time, the inside of the housing 505, so that the spring 630 is arranged without flow to form a cylindrical spring insertion hole 530 of the same or slightly larger than the diameter of the spring 630.

또한, 상기 하우징(505)의 타측 내부에는 도 5에 도시된 바와 같이, 상기 웨지콘부재(700)의 삽입부(710) 및 걸림돌기(715)가 삽입될 수 있도록 상기 스프링삽입공(530)보다 큰 지름을 갖고, 상기 삽입부(710) 및 걸림돌기(715)의 전체 지름보 다 약간 큰 안착부(510)를 형성하도록 함이 바람직하다.In addition, as shown in FIG. 5, the spring insertion hole 530 may be inserted into the insertion part 710 and the locking protrusion 715 of the wedge-con member 700 in the other side of the housing 505. It is preferable to form a seating portion 510 having a larger diameter and slightly larger than the overall diameter of the insertion portion 710 and the locking projection 715.

위와 같은 구조에 의해, 상기 강선정착장치(500)는 내부에 웨지(620)가 장착되는 웨지홀(740)이 형성되어있고, 일측에는 숫나사부(540)(540)가 형성되며, 타측에는 강선(814,824)이 웨지홀(740)에 삽입되어 상기 웨지(620)에 의해 잡혀지는 구조로 되어 있다.By the above structure, the steel wire fixing device 500 is formed with a wedge hole 740 in which the wedge 620 is mounted therein, and a male screw portion 540 and 540 is formed at one side and a steel wire at the other side. 814 and 824 are inserted into the wedge hole 740 to be held by the wedge 620.

본 발명의 강선정착장치(500)는 상술한 바와 같이, 하우징(505)과 웨지콘부재(700)가 별개로 제작되어 걸림턱(520)과 걸림돌기(715)에 의해 결합될 수도 있고, 도시하지는 않았지만, 상기 하우징(505)과 웨지콘부재(700)가 나사결합할 수도 있으며, 상기 하우징(505)과 웨지콘부재(700)가 일체로 형성될 수도 있다.Steel wire fixing apparatus 500 of the present invention, as described above, the housing 505 and the wedge-con member 700 may be manufactured separately and may be coupled by the locking jaw 520 and the locking protrusion 715, and shown in FIG. Although not shown, the housing 505 and the wedge cone member 700 may be screwed together, and the housing 505 and the wedge cone member 700 may be integrally formed.

본 발명의 강선정착장치(500)는 일측에 숫나사부(540)가 형성되어 있고, 타측에 강선(814,824)이 삽입되어 웨지(620)와 웨지홀(740)에 의해 잡혀지는 구조를 가지고 있으면 충분하다.The steel wire fixing apparatus 500 of the present invention has a structure in which a male screw portion 540 is formed at one side, and steel wires 814 and 824 are inserted at the other side to be held by the wedge 620 and the wedge hole 740. Do.

위와 같이, 하나의 웨지(620)와 웨지홀(740)을 형성함으로써, 부품의 수를 줄일 수 있다.As described above, by forming one wedge 620 and the wedge hole 740, the number of components can be reduced.

도 6은 본 발명의 실시예에 따른 강선정착장치(500)를 암거(810,820) 사이에 배치한 연결구조도이고, 도 7은 본 발명의 실시예에 따른 강선정착장치(500)를 이용한 암거(810,820)의 연결구조를 도시한 연결구조도이며, 도 8은 본 발명의 실시예에 따른 암거의 사시도이다.FIG. 6 is a connection structure diagram in which a steel wire fixing device 500 according to an embodiment of the present invention is disposed between culverts 810 and 820, and FIG. 7 is a culvert using the steel wire fixing device 500 according to an embodiment of the present invention. ) Is a connection structure showing a connection structure of Figure 8 is a perspective view of a culvert according to an embodiment of the present invention.

도 6 내지 도 8에 도시되어 있는 암거(810,820)는 종래의 암거와 같이 중공 사각형상을 취하고 있다.The culverts 810 and 820 shown in Figs. 6 to 8 have a hollow rectangular shape as in the conventional culverts.

상기 암거(810,820)의 일측에는 암나사결합부재(813,823)가 매립되어 있고, 타측에는 강선(814,824)이 매립되어 있다.Female screw coupling members 813 and 823 are embedded at one side of the culverts 810 and 820, and steel wires 814 and 824 are embedded at the other side.

이때, 상기 암나사결합부재(813,823)는, 상기 숫나사부(540)에 대응되게 내주면에 나사산이 형성된 암나사부(813a,823a)와, 상기 암나사부(813a,823a)의 양측에 결합되고 끝단이 절곡된 나사지지부(813b,823b)로 이루어진다.At this time, the female screw coupling members 813 and 823 are coupled to both sides of the female screw portions 813a and 823a having a thread formed on the inner circumferential surface of the female screw portion 540 and the female screw portions 813a and 823a and the ends are bent. Screw support portions 813b and 823b.

상기 나사지지부(813b,823b)는 끝단이 절곡되어 있어, 상기 암나사부(813a,823a)가 암거(810,820)로부터 쉽게 분리되는 것을 방지하는 역할을 한다.The end portions of the screw supports 813b and 823b are bent to prevent the female screw portions 813a and 823a from being easily separated from the culverts 810 and 820.

상기 강선(814,824)은 상기 암거(810,820)의 타측에 완전 매립되는 것이 아니라, 상기 강선정착장치(500)에 삽입되도록 하기 위하여 약간 돌출되도록 한다.The wires 814 and 824 are not completely embedded in the other side of the culverts 810 and 820, but slightly protrude to be inserted into the wire fixing device 500.

이때, 상기 강선(814,824)의 돌출 길이는 상기 강선정착장치(500)의 내부공간보다 작도록 함이 바람직하다.At this time, the protruding lengths of the wires 814 and 824 are preferably smaller than the inner space of the wire fixing device 500.

상기 암거(810,820)의 양측에는 상기 강선정착장치(500)가 안착될 수 있는 오목부(817a, 817b, 827a, 827b)가 형성되어 있고, 상기 오목부(817a, 817b, 827a, 827b)에 상기 암나사결합부재(813,823)와 강선(814,824)이 매립되어 있다.Concave portions 817a, 817b, 827a, and 827b on which both of the culverts 810 and 820 can be seated are formed, and the recesses 817a, 817b, 827a, and 827b have Female screw coupling members 813 and 823 and steel wires 814 and 824 are embedded.

또한, 도 8에 도시된 바와 같이, 상기 암거(810,820)의 양측에는 테두리를 따라 가로방향과 세로방향으로 연결되는 반원 형상의 충진홈(818,828)이 형성되어 있다.In addition, as illustrated in FIG. 8, semicircular filling grooves 818 and 828 are formed at both sides of the culverts 810 and 820 in the transverse direction and the longitudinal direction along the edge.

반원 형상의 상기 충진홈(818,828)은 도 8에 도시된 바와 같이, 제1암거(810)와 제2암거(820)가 상호 접하여 원형을 이루게 되고, 상기 충진홈(818,828)에는 고강도의 몰탈이 충진되어 제1암거(810)와 제2암거(820)를 보다 강하게 접착 시키도록 한다.As shown in FIG. 8, the filling grooves 818 and 828 having a semicircular shape have a circular shape where the first culvert 810 and the second culvert 820 are in contact with each other, and the filling grooves 818 and 828 have high strength mortars. The filling is made to bond the first culvert 810 and the second culvert 820 more strongly.

이때, 상기 충진홈(818,828)에 몰탈을 충진시키기 위해, 상기 충진홈(818,828)은 상기 암거(810,820)의 외부와 연통되어 있도록 한다.In this case, in order to fill mortar in the filling grooves 818 and 828, the filling grooves 818 and 828 are in communication with the outside of the culverts 810 and 820.

도 6에 도시된 바와 같이, 제1암거(810)의 타측과 제2암거(820)의 일측 사이에 상기 강선정착장치(500)를 배치한다.As shown in FIG. 6, the steel wire fixing device 500 is disposed between the other side of the first culvert 810 and one side of the second culvert 820.

이때, 상기 강선정착장치(500)의 숫나사부(540)는 상기 제2암거(820)의 일측에 매립된 암나사결합부재(823)에 결합되도록 하고, 상기 강선정착장치(500)의 웨지홀(740)에는 상기 제1암거(810)의 타측에 매립된 강선(814)이 삽입되어 웨지(620)에 의해 물려 잡여지도록 한다.At this time, the male screw portion 540 of the steel wire fixing device 500 is coupled to the female screw coupling member 823 embedded in one side of the second culvert 820, the wedge hole of the steel wire fixing device 500 The steel wire 814 embedded in the other side of the first culvert 810 is inserted into the 740 so as to be seized by the wedge 620.

또한, 상기 제1암거(810)와 제2암거(820)에는 마주보는 면에 상호 엇갈리게 돌출부(811,812,821,822)가 형성되어 있고, 상기 돌출부(811,812,821,822)에는 삽입공(811a,812a,821a,822a)이 형성되어 있으며, 상기 삽입공(811a,812a,821a,822a)에는 결합지지봉(910)이 삽입되어 두 개의 암거(810,820)를 상호 결합 지지하도록 한다.In addition, the first culvert 810 and the second culvert 820 is formed with the projections 811, 812, 821, 822 alternately on the surface facing each other, the projections 811, 812, 821, 822 insertion holes (811a, 812a, 821a, 822a) Is formed, and the coupling support rod 910 is inserted into the insertion holes (811a, 812a, 821a, 822a) to support the two culverts (810, 820) coupled to each other.

즉, 상기 제1암거(810)의 일측 중앙부에는 제1돌출부(811)가 형성되어 있고, 타측의 상부와 하부에는 각각 제2돌출부(812)가 형성되어 있으며, 제2암거(820)의 일측 중앙부에는 상기 제1암거(810)의 제2돌출부(812) 사이에 배치되는 제1돌출부(821)가 형성되어 있고, 타측에는 상기 제1암거(810)와 동일하게 상부와 하부에 각각 제2돌출부(822)가 형성되어 있다.That is, a first protrusion 811 is formed at one side central portion of the first culvert 810, and a second protrusion 812 is formed at upper and lower portions of the other side, and one side of the second culvert 820. A first protrusion 821 disposed between the second protrusions 812 of the first culvert 810 is formed at a central portion thereof, and a second protrusion is formed on the other side of the first culvert 810 in the upper and lower portions thereof, similarly to the first culvert 810. Protrusions 822 are formed.

또한, 상기 제1돌출부(811,821)에는 제1삽입공(811a,821a)이 상하로 관통형 성되어 있고, 상기 제2돌출부(812,822)에는 제2삽입공(812a,822a)이 상하로 관통형성되어 있다.In addition, first insertion holes 811a and 821a are vertically penetrated in the first protrusions 811 and 821, and second insertion holes 812a and 822a are penetrated up and down in the second protrusions 812 and 822. It is.

그리고, 상기 암거(810,820)의 측벽에는 도 6에 도시된 바와 같이, 긴장장치가 장착되기 위한 정착공(815,825)이 형성되어 있다.In addition, as illustrated in FIG. 6, fixing holes 815 and 825 for mounting the tension device are formed on sidewalls of the culverts 810 and 820.

상기 정착공(815,825)에는 도 7에 도시된 바와 같이, 긴장고정부재(921,922)를 삽입장착하고, 상기 긴장고정부재(921,922)를 와이어(930)로 연결한 후에 상기 와이어(930)를 유압식긴장장치(940)를 이용하여 잡아당김으로서, 제1암거(810)와 제2암거(820)가 밀착되도록 한다.As shown in FIG. 7, the fixing holes 815 and 825 are inserted into the fixing holes 815 and 825, and the wire 930 is hydraulically tensioned after connecting the tension fixing members 921 and 922 to the wires 930. By pulling using the apparatus 940, the first culvert 810 and the second culvert 820 are brought into close contact.

도 9는 본 발명의 실시예에 따른 강선정착장치(500)를 이용한 암거(810,820)의 연결방법을 나타내는 순서도이다.9 is a flowchart illustrating a method of connecting culverts 810 and 820 using the steel wire fixing apparatus 500 according to the embodiment of the present invention.

도 9에 도시된 바와 같이 본 발명의 강선정착장치(500)를 이용한 암거(810,820)의 연결방법은, 결합단계(S10)와, 배치단계(S20)와, 긴장단계(S30)와, 고정결합단계(S40)와, 몰탈충진단계(S50)으로 이루어진다.As shown in Figure 9, the connection method of the culverts 810, 820 using the steel wire fixing device 500 of the present invention, the coupling step (S10), the arrangement step (S20), the tension step (S30), fixed coupling Step S40, and the mortar filling step (S50).

상기 결합단계(S10)는, 상기 제1암거(810)의 일측에 매립된 암나사결합부재(813)에 상기 강선정착장치(500)의 숫나사부(540)를 회전시켜 나사 결합하는 단계이다.The coupling step S10 is a step of screwing the male screw portion 540 of the steel wire fixing device 500 to the female screw coupling member 813 embedded in one side of the first culvert 810.

상기 배치단계(S20)는, 상기 제1암거(810)의 타측을 상기 제2암거(820)의 일측에 인접하게 배치하는 단계이다.In the disposing step S20, the other side of the first culvert 810 is disposed adjacent to one side of the second culvert 820.

상기 긴장단계(S30)는, 상기 정착공(815,825)에 긴장장치 중 긴장고정부재(921,922)를 삽입 장착하고, 상기 긴장고정부재(921,922)를 와이어(930)로 연결 한 후에, 상기 와이어(930)를 유압식긴장장치(940)를 이용하여 잡아당기는 단계이다.The tension step (S30), the tension fixing member (921,922) of the tension device is inserted into the fixing holes (815,825), and after connecting the tension fixing members (921,922) with a wire 930, the wire 930 ) Is a step of pulling using the hydraulic tensioning device (940).

이때, 상이 긴장고정부재(921,922) 중 제1암거(810)의 정착공(815)에 삽입되는 제1긴장고정부재(921)는 와이어(930)에 고정 결합되도록 하고, 상기 제2암거(820)의 정착공(825)에 삽입되는 제2긴장고정부재(922)는 와이어(930)가 슬라이딩되도록 하며, 상기 유압식긴장장치(940)는 상기 제2긴장고정부재(922)에 접하여 와이어(930)를 잡아당기도록 한다.In this case, the first tension fixing member 921 inserted into the fixing hole 815 of the first culvert 810 of the tension fixing members 921 and 922 is fixed to the wire 930 and the second culvert 820. The second tension fixing member 922 is inserted into the fixing hole 825 of the) so that the wire 930 is sliding, the hydraulic tensioning device 940 is in contact with the second tension fixing member 922 wire (930). To pull).

따라서, 도 7에 도시된 바와 같이 상기 유압식긴장장치(940)를 이용하여 와이어(930)를 잡아당길 경우, 상기 제1암거(810)는 제1긴장고정부재(921) 및 와이어(930)와 함께 상기 제2암거(820) 방향으로 이동하게 되고, 상기 제2암거(820)는 와이어(930)가 제2긴장고정부재(922)를 슬라이딩하여 유압식긴장(940)장치에 의해 당겨지기 때문에 상기 제2긴장고정부재(922)와 함께 제1암거(810) 방향으로 이동하게 되어, 제1암거(810)와 제2암거(820)가 상호 밀착되도록 한다.Therefore, when pulling the wire 930 by using the hydraulic tensioning device 940 as shown in Figure 7, the first culvert 810 and the first tension fixing member 921 and the wire 930 and Move together in the direction of the second culvert 820, the second culvert 820 is because the wire 930 is pulled by the hydraulic tension 940 device by sliding the second tension fixing member 922 the The second tension fixing member 922 is moved in the direction of the first culvert 810, such that the first culvert 810 and the second culvert 820 are in close contact with each other.

상기 제1암거(810)와 제2암거(820)가 인접하게 배치되면서, 상기 제1암거(810)의 타측에 매립된 강선(814)은 강선정착장치(500)의 타측에 형성된 웨지홀(740)을 통하여 내부로 삽입되어 웨지(620)에 물리게 되고, 긴장장치에 의해 제1암거(810)와 제2암거(820)가 밀착되면서 상기 강선(814)은 강선정착장치(500)에 더욱 삽입되어, 제1암거(810)와 제2암거(820)는 더욱 밀착되게 된다.As the first culvert 810 and the second culvert 820 are disposed adjacent to each other, the steel wire 814 embedded in the other side of the first culvert 810 is a wedge hole formed on the other side of the steel wire fixing device 500 ( 740 is inserted into the inside of the wedge 620, and the first culvert 810 and the second culvert 820 is in close contact by the tension device as the steel wire 814 is more in line fixing device 500 Inserted, the first culvert 810 and the second culvert 820 is in close contact.

이때, 상기 강선정착장치(500)의 웨지콘부재(700)에는 웨지홀(740)과 연통되는 부위에 경사부(750)가 형성되어 있어, 강선(814)이 강선정착장치(500)의 내부에 보다 쉽게 삽입되도록 할 수 있다.At this time, the wedge cone member 700 of the wire fixing device 500 is formed with an inclined portion 750 in a portion communicating with the wedge hole 740, the steel wire 814 is inside the wire fixing device 500 This makes it easier to insert into.

상기 고정결합단계(S40)는, 상기 제1암거(810)의 타측에 형성된 제2삽입공(812a)과 제2암거(820)의 일측에 형성된 제1삽입공(821a)에 결합지지봉(910)을 삽입하여, 제1암거(810)와 제2암거(820)를 상호 고정 결합시키는 단계이다.The fixed coupling step (S40), the support rod 910 is coupled to the first insertion hole 821a formed on one side of the second insertion hole 812a and the second culvert 820 formed on the other side of the first culvert 810 ) To insert the first culvert 810 and the second culvert 820 is fixed to each other.

상기 몰탈충진단계(S50)는, 제1암거(810)에 형성된 충진홈(818)과 제2암거(820)에 형성된 충진홈(828)에 고강도 몰탈을 충진하여 상기 1암거(810)와 제2암거(820)를 보다 확고히 접착시키는 단계이다.The mortar filling step (S50), by filling the high-strength mortar in the filling groove 818 formed in the first culvert 810 and the filling groove 828 formed in the second culvert 820 the first culvert 810 and the first The second culvert 820 is more firmly bonded.

자세하게 살펴보면, 상기 제1암거(810)의 타측과 제2암거(820)의 일측이 밀착될 경우, 상기 제1암거(810)의 타측 테두리를 따라 형성된 반원 형태의 충진홈(818)과, 상기 제2암거(820)의 일측 테두리를 따라 형성된 반원 형태의 충진홈(828)이 상호 접하여 원통형을 이루게 되는데, 이러한 상기 충진홈(818,828)에 고강도 몰탈을 충진하여 제1암거(810)와 제2암거(820)를 보다 확고히 접착시키는 단계이다.In detail, when the other side of the first culvert 810 and one side of the second culvert 820 is in close contact, the semicircular filling groove 818 formed along the other edge of the first culvert 810 and the The semicircular filling grooves 828 formed along one side edge of the second culvert 820 come into contact with each other to form a cylindrical shape. The culvert 820 is more firmly bonded.

위와 같이, 암거(810,820)에 암나사결합부재(813,823)를 직접 매립함으로써, 강선정착장치(500)와 암거(810,820)의 결합을 보다 용이하게 하면서 강하게 결합되도록 할 수 있다.As described above, by directly embedding the female screw coupling members 813 and 823 in the culverts 810 and 820, it is possible to make the strong wire fixing device 500 and the culverts 810 and 820 more easily coupled.

또한 상기 암거(810,820)에 강선(814,824)을 직접 매립하여 이를 강선정착장치(500)에 삽입되도록 함으로써, 후에 강선(814,824)을 절단할 필요가 없게 되며, 암거(810,820)에 강선(814,824)을 삽입하기 위하여 종래의 강선통과공을 형성할 필요가 없다.In addition, by directly embedding the steel wires (814,824) in the culverts (810,820) to be inserted into the wire fixing device 500, there is no need to cut the steel wires (814,824) later, the wires (814,824) to the culverts (810,820) There is no need to form a conventional steel wire through hole for insertion.

특히, 강선(814,824)을 절단할 필요가 없어 작업공정을 줄일 수 있고, 수중에서도 작업이 가능하다.In particular, it is not necessary to cut the steel wires (814,824) can reduce the work process, it is possible to work in water.

또한, 강선정착장치(500)를 암거(810,820)에 나사결합한 후에, 긴장장치를 이용하여 제1암거(810)와 제2암거(820)를 잡아당기면 되기 때문에 간단한 작업공정을 통하여 암거를 쉽게 밀착시켜 조립할 수 있다.In addition, after screwing the steel wire fixing device 500 to the culverts 810 and 820, the first culvert 810 and the second culvert 820 can be pulled out using a tension device so that the culvert can be easily adhered through a simple work process. Can be assembled.

위와 같은 본 발명의 연결구조 및 연결방법은 두 개 이상의 암거를 상호 연결할 때에도 물론 활용될 수 있다.The connection structure and connection method of the present invention as described above can of course also be used when interconnecting two or more culverts.

본 발명인 강선 정착장치는 전술한 실시예에 국한하지 않고, 본 발명의 기술 사상이 허용되는 범위 내에서 다양하게 변형하여 실시할 수 있다.Steel wire fixing device of the present invention is not limited to the above-described embodiment, it can be carried out in a variety of modifications within the scope of the technical idea of the present invention.

이상에서 설명한 바와 같은 본 발명의 강선 정착장치에 따르면 다음과 같은 효과가 있다.According to the steel wire fixing device of the present invention as described above has the following effects.

첫째, 강선정착장치에 숫나사부를 형성함으로서, 암거에 강선정착장치를 보다 쉽게 결합할 수 있다.First, by forming a male screw portion in the steel wire fixing device, it is possible to more easily combine the steel wire fixing device to the culvert.

또한, 하나의 웨지와 웨지홀을 형성하면 되므로, 부품의 수를 줄일 수 있어 비용 절감의 효과가 있다.In addition, since only one wedge and a wedge hole may be formed, the number of parts may be reduced, thereby reducing the cost.

둘째, 암거에 암나사결합부재를 직접 매립함으로써, 강선정착장치와 암거의 결합을 보다 용이하게 하면서 강하게 결합되도록 할 수 있다.Secondly, by embedding the female screw coupling member directly to the culvert, it is possible to make the stronger combination while making the coupling of the steel wire fixing device and the culvert easier.

또한 상기 암거에 강선을 직접 매립하여 이를 강선정착장치에 삽입되도록 함으로써, 후에 강선을 절단할 필요가 없게 되며, 암거에 강선을 삽입하기 위하여 종 래의 강선통과공을 형성할 필요가 없다.In addition, by directly embedding the steel wire in the culvert so that it is inserted into the steel wire fixing device, there is no need to cut the steel wire later, it is not necessary to form a conventional steel wire through hole to insert the steel wire in the culvert.

특히, 강선을 절단할 필요가 없어 작업고정을 줄일 수 있고, 수중에서도 작업이 가능하다.In particular, there is no need to cut the steel wire can reduce the fixed work, it is possible to work in water.

셋째, 암거에 삽입공이 형성된 돌출부를 형성하고, 상호 엇갈리게 형성함으로써, 결합지지봉을 삽입하여 암거들을 강하게 고정 결합시킬 수 있다.Third, by forming a protrusion formed in the culvert insertion hole, and staggered mutually, by inserting the coupling support rod can be strongly fixed to the culvert.

넷째, 암거의 정착공을 형성함으로서, 상기 정착공에 긴장장치를 장착하여 제1암거와 제2암거를 잡아당기면 되기 때문에 간단한 작업공정을 통하여 암거를 쉽게 밀착시켜 조립할 수 있다.Fourth, by forming the culvert fixing hole, the tension device is mounted on the fixing hole to pull the first culvert and the second culvert, so that the culvert can be easily adhered and assembled through a simple work process.

Claims (9)

내부에 웨지홀이 형성되어 있고 상기 웨지홀에 웨지가 장착되어, 삽입되는 강선을 상기 웨지를 이용하여 잡는 강선정착장치에 있어서,In the steel wire fixing apparatus which has a wedge hole formed therein and a wedge is mounted in the wedge hole to catch the inserted steel wire using the wedge, 상기 강선정착장치의 일측에는 숫나사부가 형성되어 있고, 타측에는 상기 웨지홀이 외부와 연통되도록 형성된 것을 특징으로 하는 강선정착장치.A male screw portion is formed at one side of the steel wire fixing device, and the wedge hole is formed to communicate with the outside on the other side. 제 1항에 있어서,The method of claim 1, 상기 강선정착장치는,The steel wire fixing device, 일측에 숫나사부가 형성되고, 타측이 개방된 중공의 하우징과;A male housing formed at one side and a hollow housing having the other side opened; 상기 하우징의 타측에 결합되고, 내부에 웨지홀이 형성된 웨지콘부재와;A wedge cone member coupled to the other side of the housing and having a wedge hole formed therein; 상기 웨지홀에 삽입되어 강선을 잡는 웨지로 이루어진 것을 특징으로 하는 강선정착장치.The steel wire fixing device, characterized in that made of a wedge inserted into the wedge hole to hold the steel wire. 두 개의 암거를 강선정착장치를 이용하여 연결하는 구조에 있어서,In the structure of connecting two culverts using a steel wire fixing device, 상기 강선정착장치는,The steel wire fixing device, 내부에 웨지홀이 형성되어 있고, 상기 웨지홀에 웨지가 장착되며, 일측에는 숫나사부가 형성되어 있고, 타측에는 상기 웨지홀이 외부와 연통되도록 형성되며,A wedge hole is formed inside, a wedge is mounted on the wedge hole, a male screw part is formed on one side, and the wedge hole is formed to communicate with the outside on the other side. 상기 암거는,The culvert, 일측에 암나사결합부재가 매립되어 있고, 타측에는 강선이 매립되어 있어,Female screw coupling member is embedded on one side, and steel wire is embedded on the other side, 상기 강선정착장치의 숫나사부는 상기 암거 중 어느 하나의 암나사결합부재에 결합되고, 상기 강선정착장치의 웨지홀에는 상기 암거 중 다른 하나에 매립된 강선이 삽입되어 상기 웨지에 의해 잡혀져,The male thread portion of the steel wire fixing device is coupled to any one of the female screw coupling member of the culvert, the steel wire embedded in the other one of the culvert is inserted into the wedge hole of the steel wire fixing device is caught by the wedge, 상기 강선정착장치에 의해 두 개의 암거가 상호 연결되는 것을 특징으로 하는 강선정착장치를 이용한 암거의 연결구조.Culvert connection structure using a steel wire fixing device, characterized in that the two culverts are interconnected by the steel wire fixing device. 제 3항에 있어서,The method of claim 3, wherein 상기 암나사결합부재는,The female screw coupling member, 상기 숫나사부에 대응되는 암나사부와;A female thread part corresponding to the male thread part; 상기 암나사부의 양측에 결합되고 끝단이 절곡된 나사지지부로 이루어진 것을 특징으로 하는 강선정착장치를 이용한 암거의 연결구조.Connection structure of the culvert using a steel wire fixing device characterized in that the screw support is coupled to both sides of the female screw portion and the end is bent. 제 3항 또는 제 4항에 있어서,The method according to claim 3 or 4, 두 개의 암거에는 마주보는 면에 상호 엇갈리게 돌출부가 형성되어 있되,The two culverts have mutually alternate protrusions on opposite sides, 상기 돌출부에는 삽입공이 형성되어 있고,Insertion holes are formed in the protrusions, 상기 삽입공에는 결합지지봉이 삽입되어 두 개의 암거를 상호 결합 지지하는 것을 특징으로 하는 강선정착장치를 이용한 암거의 연결구조.The insertion hole is connected to the culvert using a steel wire fixing device, characterized in that the coupling support rod is inserted to support the two culverts mutually coupled. 제 3항 또는 제 4항에 있어서,The method according to claim 3 or 4, 상기 암거의 측벽에는 긴장장치가 장착되기 위한 정착공이 형성되어 있어,The side wall of the culvert is formed with a fixing hole for mounting the tension device, 상기 정착공에 긴장장치를 장착하고 두 개의 암거를 밀착되도록 잡아당겨 연결하는 것을 특징으로 하는 강선정착장치를 이용한 암거의 연결구조.Equipped with a tension device in the fixing hole and the connection structure of the culvert using a steel wire fixing device, characterized in that to pull the two culverts in close contact. 일측에 암나사결합부재가 매립되어 있고, 타측에 강선이 매립되어 있으며, 측벽에 정착공이 형성된 제1암거와 제2암거를, 일측에 숫나사부가 형성되고 타측에 웨지홀이 형성된 강선정착장치를 이용하여 상호 연결하는 방법에 있어서,The female screw coupling member is embedded at one side, and the steel wire is embedded at the other side, and the first and second culverts with fixing holes formed on the sidewalls, using a steel wire fixing device having male threads formed on one side and wedge holes formed on the other side. In the method of interconnecting, 상기 제2암거의 일측에 매립된 암나사결합부재에 상기 강선정착장치의 숫나사부를 결합하는 강선정착장치 결합단계와;A steel wire fixing device coupling step of coupling the male screw portion of the steel wire fixing device to the female screw coupling member embedded in one side of the second culvert; 상기 제1암거의 타측을 상기 제2암거의 일측에 인접하게 배치하는 배치단계와;An arrangement step of disposing the other side of the first culvert adjacent to one side of the second culvert; 상기 정착공에 긴장장치를 장착하여 제1암거와 제2암거를 상호 밀착되는 방향으로 잡아당겨 제1암거의 타측에 매립된 강선이 상기 강선정착장치의 타측에 형성된 웨지홀에 삽입되도록 하는 긴장단계로 이루어진 것을 특징으로 하는 강선정착장치를 이용한 암거의 연결방법.Tension step for mounting the tension device in the fixing hole to pull the first and second culvert in close contact with each other so that the steel wire embedded in the other side of the first culvert is inserted into the wedge hole formed on the other side of the wire anchorage device Culvert connection method using a steel wire fixing device, characterized in that consisting of. 제 7항에 있어서,The method of claim 7, wherein 상기 제1암거와 제2암거의 마주보는 면에는 상호 엇갈리게 돌출부가 형성되어 있고, 상기 돌출부에는 삽입공이 형성되어,Opposite sides of the first and second culverts are formed with mutually alternate protrusions, and the protrusions are formed with insertion holes, 상기 제1암거와 제2암거의 삽입공에 결합지지봉을 삽입하여 상기 제1암거와 제2암거를 상호 고정 결합시키는 고정결합단계를 더 포함하여 이루어진 것을 특징 으로 하는 강선정착장치를 이용한 암거의 연결방법.The culvert connection using a steel wire fixing device, characterized in that it further comprises a fixed coupling step of fixing the first culvert and the second culvert by inserting the coupling support rod in the insertion hole of the first culvert and the second culvert. Way. 제 7항 또는 제 8항에 있어서,The method according to claim 7 or 8, 상기 제1암거와 제2암거를 밀착시킨 후, 상기 제1암거와 제2암거의 테두리를 따라 형성된 충진홈에 몰탈을 충진하는 몰탈충진단계를 더 포함하여 이루어진 것을 특징으로 하는 강선정착장치를 이용한 암거의 연결방법.After the close contact with the first culvert and the second culvert, the mortar filling step of filling the mortar in the filling groove formed along the edge of the first culvert and the second culvert further comprises using How to connect culverts.
KR1020060085920A 2006-09-06 2006-09-06 Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same KR100732554B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060085920A KR100732554B1 (en) 2006-09-06 2006-09-06 Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060085920A KR100732554B1 (en) 2006-09-06 2006-09-06 Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same

Publications (1)

Publication Number Publication Date
KR100732554B1 true KR100732554B1 (en) 2007-06-28

Family

ID=38373489

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060085920A KR100732554B1 (en) 2006-09-06 2006-09-06 Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same

Country Status (1)

Country Link
KR (1) KR100732554B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100783009B1 (en) 2007-08-20 2007-12-07 삼호콘크리트(주) Precast culvert assembly for fastening insert
KR100801573B1 (en) 2007-05-07 2008-02-05 신종덕 Precast concrete culvert boxes and method for constructing the same boxes
KR100910055B1 (en) 2008-09-12 2009-07-30 장영미 Connecting apparatus and connecting method of precast concrete box units and precast concrete box unit comprising double connecting apparatus
KR100934608B1 (en) 2009-06-24 2009-12-31 김형중 A steel wire anchoring device and precast box, the method of assembling precast box using the same
KR101021186B1 (en) 2009-02-03 2011-03-15 이 상 철 Tendon Anchoring Apparatus for Precast Concrete Box Culvert
KR101045038B1 (en) 2009-03-06 2011-06-29 장영미 Connecting Apparatus and Connecting Method of Precast Concrete Elements and Precast Concrete Element comprising the Connecting Apparatus
KR101053688B1 (en) * 2009-02-06 2011-08-02 장영미 Connection device and connection construction method of prefabricated precast concrete member, and precast concrete member provided with connection device
KR200457831Y1 (en) * 2009-07-02 2012-01-05 양학래 anchorage device
KR200483082Y1 (en) * 2016-12-13 2017-03-31 유원경 Steel strand anchorage device for improving concreate placement quality
KR101907632B1 (en) * 2017-03-07 2018-10-12 서울대학교산학협력단 Tendon spacer for post-tensioning system and construction method of tendon using the same
CN109057163A (en) * 2018-09-29 2018-12-21 朱建玉 Ready-package prestressing force Special ground tackle

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980032237U (en) * 1998-05-30 1998-08-17 박병무 Culvert
KR20010020056A (en) * 1999-08-31 2001-03-15 박병무 Precasted culvert
JP2001254479A (en) * 2000-03-12 2001-09-21 Anderson Technology Kk Pc steel stranded wire connection structure, connection piece, and connection method therefor
JP2002227343A (en) * 2001-02-02 2002-08-14 Ps Corp Engaging device of prestressing bar, connecting device and anchoring deice therefor
KR100458951B1 (en) * 2001-11-16 2004-12-03 주식회사 토암산업 Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
KR200414850Y1 (en) * 2006-01-27 2006-04-25 (주)신명건설기술공사 Concretbox joint installation structure for using drainage, waterworks, road, causeway and landfill seepage water drain work
KR100692913B1 (en) * 2006-07-12 2007-03-12 (주) 이삼이엔지 Tendon anchoring apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980032237U (en) * 1998-05-30 1998-08-17 박병무 Culvert
KR20010020056A (en) * 1999-08-31 2001-03-15 박병무 Precasted culvert
JP2001254479A (en) * 2000-03-12 2001-09-21 Anderson Technology Kk Pc steel stranded wire connection structure, connection piece, and connection method therefor
JP2002227343A (en) * 2001-02-02 2002-08-14 Ps Corp Engaging device of prestressing bar, connecting device and anchoring deice therefor
KR100458951B1 (en) * 2001-11-16 2004-12-03 주식회사 토암산업 Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
KR200414850Y1 (en) * 2006-01-27 2006-04-25 (주)신명건설기술공사 Concretbox joint installation structure for using drainage, waterworks, road, causeway and landfill seepage water drain work
KR100692913B1 (en) * 2006-07-12 2007-03-12 (주) 이삼이엔지 Tendon anchoring apparatus

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100801573B1 (en) 2007-05-07 2008-02-05 신종덕 Precast concrete culvert boxes and method for constructing the same boxes
KR100783009B1 (en) 2007-08-20 2007-12-07 삼호콘크리트(주) Precast culvert assembly for fastening insert
KR100910055B1 (en) 2008-09-12 2009-07-30 장영미 Connecting apparatus and connecting method of precast concrete box units and precast concrete box unit comprising double connecting apparatus
KR101021186B1 (en) 2009-02-03 2011-03-15 이 상 철 Tendon Anchoring Apparatus for Precast Concrete Box Culvert
KR101053688B1 (en) * 2009-02-06 2011-08-02 장영미 Connection device and connection construction method of prefabricated precast concrete member, and precast concrete member provided with connection device
KR101045038B1 (en) 2009-03-06 2011-06-29 장영미 Connecting Apparatus and Connecting Method of Precast Concrete Elements and Precast Concrete Element comprising the Connecting Apparatus
KR100934608B1 (en) 2009-06-24 2009-12-31 김형중 A steel wire anchoring device and precast box, the method of assembling precast box using the same
KR200457831Y1 (en) * 2009-07-02 2012-01-05 양학래 anchorage device
KR200483082Y1 (en) * 2016-12-13 2017-03-31 유원경 Steel strand anchorage device for improving concreate placement quality
KR101907632B1 (en) * 2017-03-07 2018-10-12 서울대학교산학협력단 Tendon spacer for post-tensioning system and construction method of tendon using the same
CN109057163A (en) * 2018-09-29 2018-12-21 朱建玉 Ready-package prestressing force Special ground tackle

Similar Documents

Publication Publication Date Title
KR100732554B1 (en) Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same
KR100692913B1 (en) Tendon anchoring apparatus
KR101161357B1 (en) Steel connecting device
KR100458951B1 (en) Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
KR100934608B1 (en) A steel wire anchoring device and precast box, the method of assembling precast box using the same
JP2005518487A (en) High strength pipe coupler with grout injection
KR101713525B1 (en) Chiropractors permanent anchor friction
KR100872197B1 (en) Prefabricated precast concrete box culvert
KR200457831Y1 (en) anchorage device
KR100708601B1 (en) An electric terminal box of houses
KR102167075B1 (en) Rebar coupler having sequential insert assembling structure
JP2012057315A (en) Connection method and connection structure for pc members
CN202299134U (en) Steel strand anchoring system
KR20130004814U (en) Precast concrete box including steel wire anchoring device
KR101806326B1 (en) Prefabricated precast concrete culvert with integral anchor embedded
KR100829150B1 (en) Precast concrete box culvert, structure and method of constructing the same
KR20120052059A (en) Establishment method using embedded reinforcement strand and fixing apparatus with flange
US20140083031A1 (en) Void former and method of reinforcing
KR20190049514A (en) The apparatus and production method to fix the reinforcement ULBON to tension plate of prestressed concrete structure
KR200203628Y1 (en) Iron bar connecting device
KR20090006586A (en) Tendon anchoring apparatus, assemblying methd and precast concrete using thereof
JP2015045202A (en) Arch culvert and manufacturing method thereof
JP2005325518A (en) Prestress introducing unit and prestress introducing method
CN210177820U (en) Deviation reinforcing bar toper clamping piece quick connector
KR200420791Y1 (en) Removable ground anchor

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130620

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140617

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150610

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160620

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170620

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180619

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190617

Year of fee payment: 13