KR20020061952A - Smooth Blasting Tunnels - Google Patents

Smooth Blasting Tunnels Download PDF

Info

Publication number
KR20020061952A
KR20020061952A KR1020010003093A KR20010003093A KR20020061952A KR 20020061952 A KR20020061952 A KR 20020061952A KR 1020010003093 A KR1020010003093 A KR 1020010003093A KR 20010003093 A KR20010003093 A KR 20010003093A KR 20020061952 A KR20020061952 A KR 20020061952A
Authority
KR
South Korea
Prior art keywords
blasting
hole
holes
tunnel
gunpowder
Prior art date
Application number
KR1020010003093A
Other languages
Korean (ko)
Other versions
KR100395409B1 (en
Inventor
조용소
Original Assignee
주식회사 부암테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 부암테크 filed Critical 주식회사 부암테크
Priority to KR10-2001-0003093A priority Critical patent/KR100395409B1/en
Publication of KR20020061952A publication Critical patent/KR20020061952A/en
Application granted granted Critical
Publication of KR100395409B1 publication Critical patent/KR100395409B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

PURPOSE: A center cut aligning structure for a smooth blasting tunnels is provided to reduce the cost required for manufacturing a special hole perforating apparatus and to effectively excavate a tunnel by perforating a gunpowder non-charging hole formed in the center cut using a conventional jumbo drill. CONSTITUTION: A center cut(2) is formed at a center of a free surface of a tunnel. The first expansion hole, the second expansion hole, left and right sidewall holes, an apex hole, and a bottom hole are formed around the center cut(2). A plurality of gunpowder charging holes are formed in the above holes with a predetermined interval. Gunpowder non-charging holes and gunpowder charging holes are formed in the center cut(2). Three gunpowder non-charging holes(21a,21b,21c) are vertically formed at a center of the center cut(2). Two first-blasting gunpowder charging holes(22) are formed at both sides of the gunpowder non-charging hole(21b). Four second-blasting gunpowder charging holes(23) are aligned at both sides of the gunpowder non-charging holes(21a,21c).

Description

터널발파공법(에스.비.티)의 심발공 배치구조{Smooth Blasting Tunnels}Smooth Blasting Tunnels of Tunnel Blasting Method (S.B.T)

본 발명은 터널발파공법(S.B.T : Smooth Blasting Tunnels)에 있어 터널 자유면 중심에 형성되는 심발공의 암석발파가 잘 이루어지도록 함과 동시 발파진동과폭음 등의 발파공해를 저감시킬 수 있는 심발공의 배치구조에 관한 것이다.In the present invention, in the smooth blasting tunnels (SBT: Smooth Blasting Tunnels), the rock blasting of the heart blast hole formed in the center of the free surface of the tunnel is made well, and the blasting pore that can reduce the blast pollution such as blasting vibration and explosion at the same time It relates to a layout structure.

산악지역을 관통하는 도로 또는 철로를 건설하기 위해서는 터널을 뚫고 있으며, 산악지역은 통상 여러 종류의 암류로 구성된 연암층과 경암층의 지질구조를 가지고 있다.Tunnels are used to build roads or railroads through mountainous areas, and mountainous areas usually have geological structures of soft and hard rock layers composed of several types of rocks.

따라서 터널굴착공사는 주로 폭약을 폭발시키는 발파공법이 널리 사용되고 있다.Therefore, in the tunnel excavation work, the blasting method that explodes explosives is widely used.

일반적으로 암발파의 경우 발파로 인하여 발생하는 에너지 중에서 0.5∼20%가 탄성파로 변환되어 발파진동(Ground Shock)으로 소비되는 것으로 밝혀졌으며, 상기한 발파진동은 지반속으로 전파되면서 지면에서는 진폭과 주기를 갖는 진동으로 나타나 발파현장 주변의 건축물과 구조물에 피해를 주게 되며, 또한 인체 및 가축에도 피해를 주게 되므로 터널굴착공사에는 유익한 발파공법이 그 주변환경과 인체 등에는 심한 부작용으로 나타나고 있으므로 이의 개선이 시급히 요구되고 있는 실정이다.In general, in the case of rock blasting, it is found that 0.5 to 20% of the energy generated by blasting is converted into a seismic wave and consumed as a ground shock. The blasting vibration is propagated to the ground, and the amplitude and period in the ground It appears as a vibration having a damage to buildings and structures around the blasting site, and also damages to humans and livestock, and thus the beneficial blasting method is a serious side effect to the surrounding environment and the human body. It is urgently required.

이를 위해 종래 기술은 터널의 자유면에 발파공을 뚫어줌에 있어서 터널의 중심부에 천공되는 심발공을 도 3의 도시와 같이 배치하고 있는 바, 이는 심발공(100)의 중앙에 대략 350mm 내외의 대구경을 가지는 무장약공(101)을 뚫어준 다음 상기 무장약공(101)에 인접한 주위의 가장 가까운 위치에 정사각형 모양을 이루도록 4개의 1차발파 장약공(102)과, 상기 1차발파 장약공(102)보다는 멀리 떨어진 위치에 능형모양으로 4개의 2차발파 장약공(103)을 배치하고, 이어서 상기 2차발파 장약공(103)보다 더 먼 위치에 정사각형 모양으로 4개의 3차발파 장약공(104)을 배치한 다음 발파시에는 대구경의 무장약공(101)에 가장 가까운 위치에 형성된 4개의 1차발파 장약공(102)이 먼저 발파되고 이어서 4개의 2차발파 장약공(103)과 3차발파 장약공(104)이 일정한 시차를 가지고 차례로 발파되는 구조로 되어 있다.To this end, in the prior art, a blast hole is drilled on the free surface of the tunnel, and a core hole drilled in the center of the tunnel is arranged as shown in FIG. 3, which is about 350 mm in the center of the heart hole 100. Four primary blasting holes 102 and the first blasting hole 102 to form a square shape at the nearest position adjacent to the armed medicine hole 101 having a drilled through the armed medicine hole (101) Rather, the four secondary blasting holes 103 are arranged in a ridge shape in a distant position, and then the four third blasting holes 104 in a square shape at a position farther than the secondary blasting holes 103. After the blasting, at the time of blasting, the four primary blasting holes 102 formed at the position closest to the large-caliber armed holes 101 are first blasted, followed by four secondary blasting holes 103 and the third blasting charge. The ball 104 has a certain time difference The structure is blasted by.

상기와 같은 종래 기술은 심발공(100)의 중앙에 배치된 대구경의 무장약공(101)은 비어있는 상태이므로 4개의 1차발파 장약공(102)이 동시에 발파될 때 그 발파압력이 무장약공(101)으로 작용하게 되므로서 4개의 1차발파 장약공(102) 안쪽에 있는 암석이 비어있는 무장약공(101)을 향해 파괴가 순조롭게 진행될 수 있으며, 또한 상기 무장약공(101)이 1차발파 장약공(101)의 발파시 발생된 발파진동 및 발파소음의 진행을 차단 및 흡수하는 작용을 기대할 수 있는 장점이 있는 반면에 다음과 같은 문제점을 내포하고 있다.In the prior art as described above, the large diameter armed medicine hole 101 disposed at the center of the heart blasting hole 100 is in an empty state, so when the four primary blasting medicine holes 102 are blasted at the same time, the blasting pressure of the armed medicine ( 101), the rock inside the four primary blasting hole 102 can proceed smoothly toward the empty armed medicament 101, the armed medicament 101 is the first blasting charge While there is an advantage that can be expected to block and absorb the progress of the blasting vibration and the blasting noise generated during the blasting of the ball 101, it contains the following problems.

즉, 종래 기술의 무장약공(101)의 내경은350mm 내외로서 기존의 천공장비로서 가장 큰 구멍을 천공하는 점보드릴로 천공할 수 있는102mm 보다 훨씬 크기 때문에 무장약공(101)을 천공하기 위해서는 특수하게 제작된 고가의 천공장비를 사용하여야 하므로 이로 인하여 무장약공(101)을 천공하는 데 많은 비용이 소요되는 문제점이 있으며, 또한 발파작업시 무장약공(101) 주위에 가장 가까운 위치에 정사각형 모양으로 배치되어 있는 4개의 1차발파 장약공(102)이 동시에 발파될 때 그 발파압력이 무장약공(101) 사방에서 동시에 작용되기 때문에 무장약공(101) 주위의 암석이 큰 덩어리 상태로 파괴되지 않고 잘게 부서지는 현상이 나타나게 되는데, 이렇게 암석이 잘게 부서지게 될 경우에는 잘게 부서진 세립 암석은무장약공(101)을 메우게 되어 암반의 굴착효율을 떨어뜨리게 되고, 또 무장약공(101)을 메우게 되는 세립 암석에 의하여 발파진동과 발파소음을 차단 및 흡수하는 효과가 저하되는 문제점이 발생되며, 심한 경우 세립 암석이 무장약공(101) 내에서 소결되는 현상이 나타나는 문제점이 있다.That is, the inner diameter of the prior art armed holes 101 is It can be drilled with a dot board reel that drills the largest hole with a conventional drilling equipment within 350mm. Since it is much larger than 102mm, in order to drill the armed medicine 101, a specially manufactured expensive drilling equipment must be used. Therefore, there is a problem in that it costs a lot of money for drilling the armed medicine 101. When the four primary blasting charges 102, which are arranged in a square shape at the nearest position around the armed medicines 101, are blasted at the same time, the blasting pressure acts simultaneously in all directions of the armed medicines 101. 101) When the surrounding rock is not broken into large chunks, the crushing phenomenon occurs. If the rock is crushed finely, the finely divided fine-grained rock fills the armed medicine 101, thereby reducing the excavation efficiency of the rock. The effect of blocking and absorbing the blasting vibration and the blasting noise is reduced by the fine-grained rock which fills up and fills the armed medicine 101. The problem is caused, there is a severe problem has developed that fine rock is sintered in the armed yakgong 101 it may appear when.

본 발명은 상기와 같은 종래 기술에서 나타나는 제반 문제점을 해결하고자 창출한 것으로, 터널굴착공사시 암반의 자유면에 다수의 터널발파공을 설계에 맞추어 천공 배치함에 있어 심발공에 배치되는 무장약공을 기존의 천공장비인 점보드릴로서 천공할 수 있도록 하므로서 별도의 특수천공장비를 제작하는데 소요되는 비용을 절감시키면서 심발공의 천공작업을 수행할 수 있도록 하는 한편 발파시 무장약공이 소결되는 현상없이 효율적으로 굴착될 수 있도록 하는데 목적을 두고 발명한 것이다.The present invention was created in order to solve the problems described in the prior art as described above, in the drilling of the tunneling holes in the free surface of the rock in accordance with the design to arrange a number of tunnel blasting holes according to the existing armed medicinal holes to be disposed It is possible to drill as a dot board reel, which is a drilling equipment, and to reduce the cost of manufacturing a separate special drilling equipment, and to carry out the drilling work of deep drilling. It was invented for the purpose of making it possible.

본 발명은 상기와 같은 목적을 달성하기 위한 수단으로서,The present invention as a means for achieving the above object,

터널의 자유면 중심부분에는 중앙에 위치한 무장약공과 그 주위에 다수의 장약공을 배치시킨 심발공과, 상기 심발공의 주위에 일정간격으로 배치되는 다수의 장약공으로 형성되는 1차 및 2차 확대공과, 터널의 자유면 바닥부분에 일정간격으로 배치되는 다수의 장약공으로 형성되는 바닥공과, 상기 2차 확대공의 외주에 배치되며 터널의 자유면 양측 벽면과 천정에 일정간격으로 다수 천공되는 장약공으로 형성되는 벽면 및 천정 외곽공으로 터널발파공을 구성하는 터널발파공법에 있어서,In the central part of the free surface of the tunnel, primary and secondary enlargement holes formed of armed medicine balls located in the center and a plurality of medicine balls arranged around them, and a plurality of medicine balls arranged at regular intervals around the heart hair balls; , A hole formed by a plurality of charge holes arranged at a predetermined interval on the bottom of the free surface of the tunnel, and a hole formed on the outer circumference of the secondary expansion hole and drilled a plurality of holes at regular intervals on both sides of the free surface of the tunnel and on the ceiling. In the tunnel blasting method of constructing the tunnel blasting hole with the wall surface and the ceiling outside hole,

상기 심발공의 중앙에는 일정간격을 가지며 수직상으로 3개의 상,중,하부 무장약공을 배치하며; 상기 상,중,하부 무장약공들 중 중간부 무장약공 양측에 수평하게 2개의 1차발파 장약공을 배치하고; 상기 상,하부 무장약공 각각의 좌,우 양측에는 대각선 방향으로 4개의 2차발파 장약공을 배치하고, 상기 1차발파 및 2차발파 장약공 주위에는 정사각형을 이루도록 배치되는 8개의 3차발파 장약공과, 능형을 이루도록 배치되는 4개의 4차발파 장약공 및 정사각형을 이루도록 배치되는 4개의 5차발파 장약공들을 차례로 형성시킨 것을 특징으로 하는 것이다.At the center of the cardiac cavities are arranged three upper, middle, lower arm at a constant interval vertically; Arranging two primary blasting holes horizontally on both sides of the middle arming hole among the upper, middle, and lower arming holes; Four secondary blasting charges are disposed on the left and right sides of each of the upper and lower arming holes in a diagonal direction, and eight tertiary blasting charges are arranged to form a square around the primary and secondary blasting charges. Ball, four quaternary blasting balls arranged to form a ridge and four fifth blasting balls arranged to form a square are characterized in that formed in sequence.

도 1은 본 발명을 설명하기 위한 터널발파공법의 천공 배공도.1 is a perforation of the tunnel blasting method for explaining the present invention.

도 2는 본 발명의 요부인 심발공 배치구조의 상세도.Figure 2 is a detailed view of the cardiac cavity arrangement structure that is the main part of the present invention.

도 3은 종래 기술의 심발공 배치구조도.Figure 3 is a deep hole arrangement structure of the prior art.

※ 도면의 주요부분에 대한 부호의 설명※ Explanation of code for main part of drawing

1 : 터널 자유면 2 : 심발공1: tunnel free surface 2: heart hole

21a,21b,21c : 상,중,하부 무장약공21a, 21b, 21c: upper, middle and lower armed pharmacy

22 : 1차발파 장약공 23 : 2차발파 장약공22: first blasting charge 23: second blasting charge

24 : 3차발파 장약공 25 : 4차발파 장약공24: 3rd blasting charge 25: 4th blasting charge

26 : 5차발파 장약공 3 : 1차 확대공26: 5th blasting charge 3: 1st expansion work

4 : 2차 확대공 5 : 좌,우 양측 벽면 외곽공4: 2nd enlarged hole 5: Left and right side wall outside hole

6 : 천정 외곽공 7 : 바닥공6: ceiling outside hole 7: floor hole

본 발명의 실시예를 첨부한 도면에 의거하여 상세히 설명하면 다음과 같다.Exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명을 설명하기 위한 터널발파공법의 천공 배공도이며, 도 2는 본 발명의 요부인 심발공 배치구조의 상세도를 도시한 것으로,Figure 1 is a perforated view of the tunnel blasting method for explaining the present invention, Figure 2 shows a detailed view of the deep hole arrangement structure that is the main part of the present invention,

도면부호 1은 터널 자유면을 나타내는 것으로, 터널발파공법으로 터널굴착공사를 시공하고자 할 때에는 먼저 터널 자유면(1)의 중심부에 심발공(2)을 형성하는 천공작업을 한 다음 상기 심발공(2) 주위에는 설계에 맞추어 일정거리로 이격되며 터널굴착 단면형상에 맞추어 다수의 장약공들이 일정간격으로 천공되는 1차 확대공(3)과, 2차 확대공(4), 좌,우 양측 벽면 외곽공(5), 천정 외곽공(6) 및 바닥공(7)을 형성한다.Reference numeral 1 denotes a tunnel free surface. When a tunnel excavation construction is to be performed by the tunnel blasting method, first, a drilling operation is performed to form a deep hole 2 in the center of the free tunnel surface 1, and then the deep hole ( 2) The primary expansion hole (3), the secondary expansion hole (4), the left and right side walls, which are spaced at a certain distance according to the design, and a plurality of charge holes are drilled at regular intervals according to the tunnel excavation cross-sectional shape. Outside hole (5), the ceiling outside hole (6) and the bottom hole (7) is formed.

본 발명의 특징은 터널 자유면(1)의 중심부에 형성되는 심발공(2)에 무장약공과 장약공을 배치하는 구조에 있다.A feature of the present invention resides in the arrangement of the armed medicinal holes and the medicinal holes in the cardiac cavities 2 formed in the center of the tunnel free surface 1.

상기 심발공(2)은 면적은 대략 2m2를 기준하여 형성된다.The cardiac hole 2 has an area of approximately 2 m 2 .

상기 심발공(2)의 중앙에는 3개의 상,중,하부 무장약공(21a)(21b)(21c)을 수직상으로 배치하며, 상,중,하부 무장약공들 중 중간부 무장약공(21b)의 좌,우 양측 각각에 수평하게 2개의 1차발파 장약공(22)을 배치하는 한편, 상,하부 무장약공(21a)(21c)의 양측 각각에는 대각선방향으로 4개의 2차발파 장약공(23)을 배치시킨다.Three upper, middle, and lower arm holes 21a, 21b, and 21c are vertically disposed in the center of the heart pit 2, and the middle arm of the upper arm, middle and lower arm holes 21b. Two primary blasting holes 22 are horizontally arranged on each of the left and right sides of the upper and lower arming holes 21a, 21c, respectively. 23).

상기 1차발파 및 2차발파 장약공(22)(23)들은 상,중,하부 무장약공(21a,21b.21c)의 좌,우 양측에 거의 수직상으로 배치되는 구조로 형성되는데, 상기 1차 발파 장약공(22)이 중간부 무장약공(21b)의 양측에 가장 가까운 간격으로 배치되어 있다.The primary blasting and secondary blasting holes 22, 23 are formed in a structure that is disposed substantially perpendicular to both the left, right sides of the upper, middle, and lower arming holes (21a, 21b.21c), the 1 The secondary blasting holes 22 are arranged at intervals closest to both sides of the middle armed hole 21b.

상기 1차발파 및 2차발파 장약공(22)(23)의 사방 주위에는 8개의 3차발파 장약공(24)이 일정간격을 유지한 채 정사각형 모양으로 배치되어 있으며, 상기 3차발파 장약공(24)의 사방 주위에는 각각 4개씩으로 된 4차발파 및 5차발파 장약공(25)(26)이 배치되는데, 상기 4차발파 장약공(25)들은 능형 모양으로 배치되는 한편 상기 5차발파 장약공(26)들은 정사각형 모양으로 배치된다.Eight tertiary blasting charges 24 are arranged in a square shape around the four sides of the first blasting and the second blasting charges 22 and 23, and the third blasting charges are maintained. Four blasting and fifth blasting holes 25 and 26 are arranged around each of the four sides of the 24, and the fourth blasting holes 25 are arranged in the shape of a ridge while the fifth ordering. The blasting holes 26 are arranged in a square shape.

그리고 상기한 1차발파 내지 5차발파 장약공들 각각에는 정해진 량의 폭약이 충진된 상태에서 일정한 시차로 연속하여 발파되도록 구성되어 있다. 즉, 1차발파 장약공(22)이 발파가 개시되면 일정한 시차로 순차적으로 발파되도록 구성된 것이다.Each of the first to fifth blasting charge holes is configured to continuously blast at a predetermined time difference in a state where a predetermined amount of explosive is filled. That is, the first blasting charge hole 22 is configured to be sequentially blasted at a certain time difference when blasting is started.

한편, 상기한 심발공(2)의 각 장약공들이 순차적으로 발파가 진행된 후에는 1차 확대공(3), 2차 확대공(4), 좌,우 양측 벽면 외곽공(5), 천정 외곽공(6) 및 바닥공(7)들의 각 장약공들이 정해진 순서에 맞추어 일정한 시차로 연속하여 발파되도록 구성되어 있다.On the other hand, after each blasting of the above-described heart hole (2) is sequentially blasted proceeds the primary enlarged hole (3), secondary enlarged hole (4), left and right both side wall outside hole (5), ceiling outside Each of the balls 6 and the bottom hole 7 is configured to blast continuously with a predetermined time difference in a predetermined order.

이와 같이 구성된 본 발명으로 터널굴착공사를 시행함에 있어 심발공(2)의 작용을 설명하면 다음과 같다.Referring to the operation of the heart hole (2) in the tunnel excavation construction according to the present invention configured as described above are as follows.

심발공(2)의 중앙에 상,하로 일정간격이 유지된 채 수직상으로 형성된 상,중,하부 무장약공(21a)(21b)(21c)의 주위에 도 2의 도시와 같이 배치된 각 장약공들은 정해진 순서에 따라 연차적으로 발파되는 것으로, 먼저 첫번째로 발파되는 2개의 1차발파 장약공(22)의 발파압력이 사방으로 전달되는데 우선 가장 가까운 거리에 있는 중간부 무장약공(21b)의 양측으로 작용하게 되므로 중간부 무장약공(21b)양측의 암석은 크게 균열되면서 큰 덩어리 상태로 파괴되는 것이며, 또한 1차발파 장약공(22)의 발파압력이 상,하부 무장약공(21a)(21c)으로도 작용하게 되는데, 상기한 상,하부 무장약공은 중간부 무장약공보다 1차발파 장약공(22)에서 조금 더 먼 위치에 배치되어 있기 때문에 1차발파 장약공의 발파압력의 영향을 덜 받는 상태가 된다.Each charge arranged as shown in FIG. 2 around the upper, middle, and lower armless medicine holes 21a, 21b, 21c formed vertically while maintaining a predetermined interval up and down in the center of the heart hole 2. The balls are sequentially blasted in a predetermined order. First, the blasting pressures of the two first blasting charge holes 22 are firstly blasted in all directions. Since it acts on both sides, the rock on both sides of the middle armed hole 21b is largely cracked and destroyed in a large lump state, and the blasting pressure of the primary blasted hole 22 is upper and lower armed holes 21a and 21c. The upper and lower armed medicaments are disposed at a position farther away from the primary blasted hole 22 than the middle armed medicament, so they are less affected by the blasting pressure of the primary blasted medics. It becomes the receiving state.

따라서 상,하부 무장약공(21a)(21c) 주위의 암석은 1차발파 장약공(22)에서 가장 가까운 위치에 있는 중간부 무장약공(21b) 주위의 암석보다는 덜 군열 내지 파괴되는 상태가 되는데, 이때 1차발파 장약공(22)이 발파된 후 극히 짧은 시차를 두고 4개의 2차발파 장약공(23)이 발파되므로 앞서 1차발파 장약공(22)의 발파진동이 상,하부 무장약공 주위의 암석으로 진행되고 있는 상태에서 두번째로 발파되는 2차발파 장약공(23)의 발파압력이 상,하부 무장약공(21a)(21c)에 작용하게 되는 상태가 되므로서 상기 상,하부 무장약공(21a)(21c) 주위의 암석은 1차발파 장약공의 발파압력과 2차발파 장약공의 발파압력의 영향을 연쇄적으로 받게 되며, 이와 같이 연쇄적인 발파압력을 받는 상,하부 무장약공(21a)(21c) 주위의 암석은 무장약공의 빈 공간에 의하여 균열 내지 파괴가 잘 이루어지게 된다.Therefore, the rock around the upper and lower armed holes 21a and 21c is less clustered or destroyed than the rock around the middle armed hole 21b at the position closest to the primary blasting hole 22. At this time, after the first blasting charge 22 is blasted, four secondary blasting charges 23 are blasted with an extremely short time difference, so the blasting vibration of the first blasting charge 22 is around the upper and lower armed pharmacy. The blasting pressure of the second blasting medicament blasting second blasting in the state that is proceeding to the rock of the state is to act on the upper and lower armed medicinal holes (21a) (21c) while the upper and lower armed medicinal ( The rocks around 21a) (21c) are subjected to the effects of the blasting pressure of the primary blasting hole and the blasting pressure of the secondary blasting hole in a chain, and the upper and lower armed medicinal holes subjected to the chain blasting pressure in this way (21a) Rock around 21c is cracked or destroyed by the empty space It will be written.

상기와 같이 심발공(2)의 중앙에 수직상으로 배치된 3개의 상,중,하부 무장약공(21a)(21b)(21c)는 1차발파 장약공(22) 및 2차발파 장약공(23)이 연쇄적으로 발파될 때 그 발파압력에 의하여 암석이 밀려날 수 있는 공간을 제공해주는 작용으로 균열 및 파괴가 원활하게 진행되게 함과 동시 터널 자유면(1)의 전방을 향해 떨어져 나가게 하므로서 다음의 연쇄적인 발파작동 즉, 8개의 3차발파 장약공(24)과 4개의 4차발파 장약공(25) 및 4개의 5차발파 장약공(26)들이 연쇄적으로 발파됨에 따라 심발공(2)의 암석이 상,중,하부 무장약공(21a)(21b)(21c)이 형성된 중앙부분부터 균열과 파괴 및 굴착되면서 점차로 5차발파 장약공(26)이 배치된 암석으로 확장되므로서 심발공(2)의 암석굴착작업이 정확하게 이루어지게 되는 것이다.As described above, the three upper, middle, and lower armed holes 21a, 21b, and 21c disposed vertically in the center of the heart pit 2 have the primary blasting holes 22 and the secondary blasting holes ( When 23) is sequentially blasted, it provides a space for rock to be pushed out by the blasting pressure so that cracking and breaking can proceed smoothly, and at the same time, it falls off in front of the free surface of the tunnel (1). Chain blasting operation, that is, eight blasting holes 24, four fourth blasting holes 25 and four fifth blasting holes (26) as a series of blasting heart hole (2 ) Rock is expanded from the center of the upper, middle and lower armed weak holes (21a) (21b) (21c) formed into cracks, fractures, and excavations, gradually expanding into the rock where the 5th blast hole (26) is placed. Rock excavation work of (2) is to be done correctly.

상기와 같이 심발공(2)의 각 장약공이 순차적이고 연쇄적인 발파가 완료되면 이어서 상기 심발공(2) 주위에 배치된 1차 및 2차 확대공(3)(4), 좌,우 양측 벽면 외곽공(5), 천정 외곽공(6) 및 바닥공(7)들을 구성하는 다수의 장약공들이 정해진 순서에 따라 연쇄적으로 발파되면서 터널 자유면(1)을 일정한 깊이로 굴착 절개시키게 되는 것이다.As described above, when the sequential and serial blasting of each blast hole of the heart pit 2 is completed, the primary and secondary enlarged holes 3 and 4 disposed around the heart pit 2 and the left and right wall surfaces on both sides. A plurality of charge holes constituting the outer hole (5), the ceiling outer hole (6) and the bottom hole (7) are blasted serially in a predetermined order to excavate the tunnel free surface (1) to a certain depth .

한편, 상기와 같이 심발공(2)의 중앙에 수직상으로 배치된 상,중,하부 무장약공들은 속이 빈 상태이므로 2개의 1차발파 장약공(22)이 발파될 때 발생되는 발파진동과 발파소음을 차단 및 흡수하는 작용을 하게 되며, 또한 1차발파 장약공(22)의 발파시에는 중간부 무장약공(21b) 주위의 암석이 파괴되어 절개된 상태이므로 이어서 연쇄적으로 발파되는 2차발파 장약공(23)이 발파진동과 발파소음 역시 상,하부 무장약공(2a)(2c)의 빈 공간과 앞서 파괴된 절개공에 의하여 차단 및 흡수되는 상태가 되는 것이며, 이와 같이 1차발파 및 2차발파 장약공(22)(23)의 연쇄적인 발파로 인하여 파괴됨과 동시 절개되는 절개공간은 그 다음으로 연쇄적으로 발파되는 3차발파 내지 5차발파 장약공(24)(25)(26)의 발파진동과 발파소음을 차단 및 흡수하는 작용을 하게 되는 것이며, 또한 심발공(2)의 모든 장약공들이 연쇄적으로 발파가 완료된 후에는 심발공(2)의 암석 전체가 절개된 상태가 되므로 이후에 연쇄적으로 발파되는 1차 및 2차 확대공(3)(4), 좌,우 양측의 벽면 외곽공(5), 천정 외곽공(6) 및 바닥공(7)들의 발파진동과 발파소음도 앞서 진행된 발파에 의하여 점차로 확장되면서 형성되는 절개공간에 의하여 차단 및 흡수되므로서 터널굴착공사시 폭약의 발파진동과 발파소음을 저감시킬 수 있는 것이다.On the other hand, the upper, middle, and lower armed medicinal holes arranged vertically in the center of the heart blasting hole (2) is empty, so the blasting vibration and blasting generated when two primary blasting holes 22 are blasted It acts to block and absorb the noise, and also during the blasting of the first blasting hole 22, since the rock around the middle arming hole 21b is broken and cut off, the second blasting is sequentially blasted. The blasting vibration 23 and the blasting vibration and the blasting noise are also blocked and absorbed by the empty spaces of the upper and lower armed weakening holes 2a and 2c and the previously broken incisions. The incision space which is destroyed due to the chain blasting of the blasting holes 22, 23 and simultaneously incised is next to the third blasting to the fifth blasting hole (24) (25) (26). It will act to block and absorb blasting vibration and blasting noise of After all the blasters in one heart hole (2) have been sequentially blasted, the entire rock of the heart hole (2) is incised, so that the first and second enlarged holes (3) are subsequently blasted in series. (4), the blasting vibration and blasting noise of the wall outer hole (5), the ceiling outer hole (6) and the bottom hole (7) of the left and right sides are also blocked by the incision space formed by gradually expanding by the blasting proceeded earlier. By absorbing, it is possible to reduce the blasting vibration and the blasting noise of explosives during tunnel excavation construction.

상기와 같은 본 발명에 의하면 터널 자유면의 중심부에 형성되는 심발공의 중앙에 수직상으로 3개의 상,중,하부 무장약공을 배치하는 수단으로 심발공의 발파작업시 암석이 크게 균열되면서 파괴되도록 하므로서 무장약공이 소결되는 현상없이 균열 및 파괴되면서 터널 자유면에서 떨어져 나가도록 하여 터널발파공법의 효율성을 향상시키는 효과가 있을 뿐 아니라 발파진동 및 발파소음을 현저하게 저감시키는 효과를 가져다주어 터널굴착현장의 주변의 각종 건축물이나 구조물 또는 교량 그리고 가축 등에 피해를 입히지 않고 터널굴착공사를 발파공법으로 시공할 수 있게 하는 유용한 발명이다.According to the present invention as described above by means of arranging three upper, middle, lower armed medicinal holes vertically to the center of the heart hole formed in the center of the tunnel free surface so that the rock is broken while the blasting operation of the heart hole largely cracked As a result, it is effective to improve the efficiency of the tunnel blasting method by breaking away from the free surface of the tunnel while cracking and breaking the weapon without sintering, and also significantly reducing the blasting vibration and the blasting noise. It is a useful invention that can be constructed by the blasting method of tunnel excavation without damaging various buildings, structures or bridges and livestock.

Claims (1)

터널의 자유면 중심부분에는 중앙에 위치한 무장약공과 그 주위에 다수의 장약공을 배치시킨 심발공과, 상기 심발공의 주위에 일정간격으로 배치되는 다수의 장약공으로 형성되는 1차 및 2차 확대공과, 터널의 자유면 바닥부분에 일정간격으로 배치되는 다수의 장약공으로 형성되는 바닥공과, 상기 2차 확대공의 외주에 배치되며 터널의 자유면 양측 벽면과 천정에 일정간격으로 다수 천공되는 장약공으로 형성되는 벽면 및 천정 외곽공으로 터널발파공을 구성하는 터널발파공법에 있어서,In the central part of the free surface of the tunnel, primary and secondary enlargement holes formed of armed medicine balls located in the center and a plurality of medicine balls arranged around them, and a plurality of medicine balls arranged at regular intervals around the heart hair balls; , A hole formed by a plurality of charge holes arranged at a predetermined interval on the bottom of the free surface of the tunnel, and a hole formed on the outer circumference of the secondary expansion hole and drilled a plurality of holes at regular intervals on both sides of the free surface of the tunnel and on the ceiling. In the tunnel blasting method of constructing the tunnel blasting hole with the wall surface and the ceiling outside hole, 상기 심발공의 중앙에는 일정간격을 가지며 수직상으로 3개의 상,중,하부 무장약공을 배치하며; 상기 상,중,하부 무장약공들 중 중간부 무장약공 양측에 수평하게 2개의 1차발파 장약공을 배치하고; 상기 상,하부 무장약공 각각의 좌,우 양측에는 대각선 방향으로 4개의 2차발파 장약공을 배치하고, 상기 1차발파 및 2차발파 장약공 주위에는 정사각형을 이루도록 배치되는 8개의 3차발파 장약공과, 능형을 이루도록 배치되는 4개의 4차발파 장약공 및 정사각형을 이루도록 배치되는 4개의 5차발파 장약공들을 차례로 형성시킨 것을 특징으로 하는 터널발파공법의 심발공 배치구조.At the center of the cardiac cavities are arranged three upper, middle, lower arm at a constant interval vertically; Arranging two primary blasting holes horizontally on both sides of the middle arming hole among the upper, middle, and lower arming holes; Four secondary blasting charges are disposed on the left and right sides of each of the upper and lower arming holes in a diagonal direction, and eight tertiary blasting charges are arranged to form a square around the primary and secondary blasting charges. A ball blasting structure of a tunnel blasting method comprising a ball, four fourth blasting balls arranged to form a ridge, and four fifth blasting balls arranged to form a square.
KR10-2001-0003093A 2001-01-19 2001-01-19 Smooth Blasting Tunnels KR100395409B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0003093A KR100395409B1 (en) 2001-01-19 2001-01-19 Smooth Blasting Tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0003093A KR100395409B1 (en) 2001-01-19 2001-01-19 Smooth Blasting Tunnels

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020010001778U Division KR200229396Y1 (en) 2001-01-22 2001-01-22 Smooth Blasting Tunnels

Publications (2)

Publication Number Publication Date
KR20020061952A true KR20020061952A (en) 2002-07-25
KR100395409B1 KR100395409B1 (en) 2003-08-27

Family

ID=27692191

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0003093A KR100395409B1 (en) 2001-01-19 2001-01-19 Smooth Blasting Tunnels

Country Status (1)

Country Link
KR (1) KR100395409B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100852959B1 (en) * 2007-01-30 2008-08-19 선산토건주식회사 Method for Manufacturing Tunneling
KR100852960B1 (en) * 2007-01-30 2008-08-20 선산토건주식회사 method for blasting center-cut of tunnel
CN105021096A (en) * 2015-07-17 2015-11-04 中铁四局集团第四工程有限公司 Five-segment-type millisecond electric detonator secondary blasting construction method applied to blasting of high-gas large-section tunnel
CN106996724A (en) * 2017-04-19 2017-08-01 江西理工大学 A kind of smooth blasting method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101196700B1 (en) 2012-07-16 2012-11-07 (주)한화 Blasting method for tunnel
KR101704013B1 (en) 2016-07-19 2017-02-08 조용소 Single and complex free surface in phase expansion and a series of free surface blasting method using a differential delay

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100852959B1 (en) * 2007-01-30 2008-08-19 선산토건주식회사 Method for Manufacturing Tunneling
KR100852960B1 (en) * 2007-01-30 2008-08-20 선산토건주식회사 method for blasting center-cut of tunnel
CN105021096A (en) * 2015-07-17 2015-11-04 中铁四局集团第四工程有限公司 Five-segment-type millisecond electric detonator secondary blasting construction method applied to blasting of high-gas large-section tunnel
CN105021096B (en) * 2015-07-17 2017-03-01 中铁四局集团第四工程有限公司 A kind of five-part form millisecond electric detonator secondary blasting construction method applied in high methane large cross-section tunnel explosion
CN106996724A (en) * 2017-04-19 2017-08-01 江西理工大学 A kind of smooth blasting method

Also Published As

Publication number Publication date
KR100395409B1 (en) 2003-08-27

Similar Documents

Publication Publication Date Title
KR100676914B1 (en) Excavating method of tunnel with slight vibration
KR100358780B1 (en) Tunnel Blasting Method for using Air Tube
KR101212606B1 (en) Blast method for center hole of tunnel
KR101040787B1 (en) Blasting method in horizontal direction using deck charge
KR100710410B1 (en) Tunnel high speed excavation method
CN108915694B (en) Construction method for tunnel lower-layer step full-section protective-layer-free extrusion blasting and road repairing and access protection
KR102268422B1 (en) New line drilling method for reducing noise vibration at the site boundary and rock blasting method including this same
CN111102892B (en) Wedge-shaped cut blast hole arrangement method suitable for blasting excavation of deep-buried tunnel
KR100395409B1 (en) Smooth Blasting Tunnels
KR100196634B1 (en) Rock blasting system
CN106545344B (en) A kind of Karst area tunnel wall-hanging country rock face blast excavation method
KR101155780B1 (en) Arrangement of holes for cutting core part during tunnel construction in accordance with parallel hole cut method
KR101048072B1 (en) Method for Forming Long-Earth Heart Pattern by Using the Depilation Effect of Inclined and Parallel Holes
KR100852960B1 (en) method for blasting center-cut of tunnel
KR101350065B1 (en) Method for blasting core center-cut
KR100438028B1 (en) A tunnel blasting method favorable to the environment,which utilizes pre-splitting and an upper center cut
KR19990002665A (en) Rock cutting method using tensile fracture
KR100323401B1 (en) Progressive Burnout Cart Blasting Method
KR101318362B1 (en) Blasting method for tunnel
KR0146411B1 (en) Rock blasting method
KR200229396Y1 (en) Smooth Blasting Tunnels
KR100312349B1 (en) V-cut blasting method with stage advanced blasting
KR20020074766A (en) V- M-Cutomitted
CN114676604A (en) Method for optimizing positions of cut holes and empty holes to improve blasting driving footage
KR100443578B1 (en) blasting method relaxation before hand cut core hole for long hole blasting

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120808

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130808

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140808

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150810

Year of fee payment: 13

LAPS Lapse due to unpaid annual fee