KR20010039016A KR1019990047223A KR19990047223A KR20010039016A KR 20010039016 A KR20010039016 A KR 20010039016A KR 1019990047223 A KR1019990047223 A KR 1019990047223A KR 19990047223 A KR19990047223 A KR 19990047223A KR 20010039016 A KR20010039016 A KR 20010039016A
Authority
KR
South Korea
Prior art keywords
tank
raw material
pump
service
way valve
Prior art date
Application number
KR1019990047223A
Other languages
Korean (ko)
Other versions
KR100334878B1 (en
Inventor
백기동
Original Assignee
정주호
대우자동차 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정주호, 대우자동차 주식회사 filed Critical 정주호
Priority to KR1019990047223A priority Critical patent/KR100334878B1/en
Publication of KR20010039016A publication Critical patent/KR20010039016A/en
Application granted granted Critical
Publication of KR100334878B1 publication Critical patent/KR100334878B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C44/00Shaping by internal pressure generated in the material, e.g. swelling or foaming ; Producing porous or cellular expanded plastics articles
    • B29C44/34Auxiliary operations
    • B29C44/36Feeding the material to be shaped
    • B29C44/38Feeding the material to be shaped into a closed space, i.e. to make articles of definite length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C44/00Shaping by internal pressure generated in the material, e.g. swelling or foaming ; Producing porous or cellular expanded plastics articles
    • B29C44/34Auxiliary operations
    • B29C44/60Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/30Vehicles, e.g. ships or aircraft, or body parts thereof
    • B29L2031/3005Body finishings
    • B29L2031/3014Door linings

Landscapes

  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

PURPOSE: A material supply system improves efficiency of equipment and simplifies specification to reduce investment. CONSTITUTION: A material supply system comprises a pump(50), a service tank(60), a work tank(70), an electronic three way valve(80), a service tank material detecting sensor(90), a work tank material detecting sensor(100) and a manual three way valve(110). The service tank(60) and the work tank(70) are connected in parallel branching from a material supply pipeline(52) of the outlet side of the pump(50). The work tank(70) is connected to a foaming former(200) through a material supply pipeline(72) and a recovery pipeline(74). The electronic three way valve(80) is installed on a parallel diverging point on the material supply pipeline(52) to supply material discharged from the pump(50) to either of the service tank(60) or the work tank(70). The service tank material detecting sensor(90) detects the level of the material in the service tank(60) and drives the pump(50) and operates the electronic three way valve(80) to block the passage to the work tank(70) if the level is of the lowest limit and stop the pump(50) if the level is of the highest limit. The work tank material detecting sensor(100) detects the level of material in the work tank(70) and drives the pump(50) and operates the electronic three way valve(80) to block the passage to the service tank(60) if the level is of the lowest limit and stop the pump(50) if the level is of the highest limit.

Description

발포성형기의 원료공급시스템{RAW MATERIAL SUPPLY SYSTEM OF FOAMING MACHINE}Raw material supply system of foam molding machine {RAW MATERIAL SUPPLY SYSTEM OF FOAMING MACHINE}

본 발명은 예로, 차량의 도어 트림를 발포 제작시 사용되는 발포성형기에 관한 것으로, 특히 발포 성형기의 원료공급시스템을 개선하여 설비초기 투자비를 절감하고, 장비의 사용효율을 높이며, 에너지 절감을 꾀할 수 있도록 한 발포성형기의 원료공급시스템에 관한 것이다.The present invention, for example, relates to a foam molding machine used to foam the door trim of a vehicle, and in particular, to improve the raw material supply system of the foam molding machine to reduce the initial investment cost of the equipment, increase the use efficiency of the equipment, and save energy. A raw material supply system of a foam molding machine.

도 2는 종래의 발포성형기의 원료공급시스템의 구성도로서, 발포성형을 위해 폴리우레탄(Polyurethan) 공급부(2)와, 이소시아나이트(Isocyanate) 공급부(3)의 장치구성은 동일하며, 따라서 일측 폴레우레탄 공급부(2)의 장치구성을 설명하면, 폴리우레탄이 저장된 서비스탱크(10)와 작업탱크(14)의 사이에 원료공급을 위한 제1펌프(12)가 연결되어 있고, 작업탱크(14)와 서비스탱크(10)의 사이에는 저장원료를 작업탱크(14)로 공급하기 위한 제2펌프(16)가 연결되어 있고, 상기 작업탱크 (14)에는 발포성형기(4)가 연결되어 있고, 상기 서비스탱크(10)와 작업탱크(14)에는 각각에 대응하는 제1펌프(12)와 제2펌프(16)의 구동제어를 위한 센서(S1,S2)들이 배치되어 있다.2 is a configuration diagram of a raw material supply system of a conventional foam molding machine, wherein the apparatus configuration of a polyurethane supply part 2 and an isocyanate supply part 3 is the same for foam molding, and thus one side Referring to the configuration of the polyurethane supply unit 2, the first pump 12 for supplying raw materials is connected between the service tank 10 and the work tank 14, the polyurethane is stored, the work tank 14 The second pump 16 for supplying the storage raw material to the working tank 14 is connected between the and the service tank 10, the working tank 14 is connected to the foam molding machine (4), Sensors S1 and S2 for driving control of the first pump 12 and the second pump 16 are disposed in the service tank 10 and the working tank 14, respectively.

따라서 제1펌프(12)는 서비스탱크(10)내의 저장된 원료높이에 따라 작동하여 원료를 작업탱크(14)로 공급하고, 제2펌프(16)는 작업탱크(14)내의 저장된 원료높이에 따라 서비스탱크(10)내의 원료를 작업탱크(14)로 공급하게 되어 있다.Accordingly, the first pump 12 operates according to the stored raw material height in the service tank 10 to supply raw materials to the working tank 14, and the second pump 16 according to the stored raw material height in the working tank 14. The raw material in the service tank 10 is supplied to the working tank 14.

이와 같이 종래의 발포성형기의 원료공급시스템에서는 작업탱크(14)로 원료를 공급하기 위해 2대의 펌프(12,16)를 가동시키는 방법인 바, 에너지의 효율성이 떨어지고, 배관이 복잡해지며, 설비의 투자비가 증가되었다.As described above, in the raw material supply system of the conventional foam molding machine, a method of operating two pumps 12 and 16 to supply raw materials to the working tank 14 is reduced in energy efficiency, complicated pipes, and Investment costs have increased.

본 발명은 상기와 같은 사정을 감안하여 창안된 것으로, 발포 성형기의 원료공급시스템을 개선하여 설비초기 투자비를 절감하고, 장비의 사용효율을 높이며, 에너지 절감을 꾀할 수 있도록 한 발포성형기의 원료공급시스템을 제공함에 그 목적이 있다.The present invention was devised in view of the above circumstances, and improved raw material supply system of the foam molding machine to reduce the initial investment cost of the equipment, increase the use efficiency of the equipment, and to save energy, the raw material supply system of the foam molding machine The purpose is to provide.

상기의 목적을 달성하기 위한 본 발명의 구체적인 수단은,Specific means of the present invention for achieving the above object,

원료를 발포성형기(200)에 공급하기 위한 원료공급장치에 있어서,In the raw material supply device for supplying the raw material to the foam molding machine 200,

원료를 펌핑하기 위한 펌프(50)와;A pump 50 for pumping raw materials;

상기 펌프(50)의 토출구측 원료공급관로(52)상에 분기되어 각각 병열 연결된 서비스탱크(60) 및 작업탱크(70)를 구비하되, 상기 작업탱크(70)를 원료공급관로 (72)와 회수관로(74)를 통해 상기 발포성형기(200)에 연결하고;A service tank 60 and a work tank 70 branched on the discharge port side raw material supply pipe 52 of the pump 50 and connected in parallel with each other, and the working tank 70 is connected to the raw material supply pipe 72. Connecting to the foam molding machine 200 through a recovery line 74;

상기 원료공급관로(52)상의 병열 분기점에 설치되어 펌프(50)에서 토출된 원료를 서비스탱크(60) 또는 작업탱크(70)중 어느 하나에 택일적으로 공급하기 위한 전자식 3방밸브(80)와;Electronic three-way valve 80 for supplying the raw material discharged from the pump 50 to the one of the service tank 60 or the working tank (70) is installed at the parallel branch point on the raw material supply pipe (52) Wow;

상기 서비스탱크(60)내의 원료수위를 검출하여 하한 수위일 때 상기 펌프 (50)를 구동시킴과 동시에 상기 전자식 3방밸브(80)를 동작시켜 작업탱크(70)로의 유로를 차단하고, 상한 수위일 때 펌프(50)의 작동을 정지시키는 서비스탱크 원료감지센서(90); 및By detecting the raw water level in the service tank 60 and driving the pump 50 when the water level is at the lower limit, the electronic three-way valve 80 is operated to block the flow path to the working tank 70 and the upper water level Service tank raw material detection sensor 90 for stopping the operation of the pump 50 when; And

상기 작업탱크(70)내의 원료수위를 검출하여 하한 수위일 때 상기 펌프(50)를 구동시킴과 동시에 상기 전자식 3방밸브(80)를 동작시켜 서비스탱크(60)로의 유로를 차단하고, 상한 수위일 때 펌프(50)의 작동을 정지시키는 작업탱크 원료감지센서(100)와;By detecting the raw water level in the working tank 70 and driving the pump 50 at the lower limit level, the electronic three-way valve 80 is operated to block the flow path to the service tank 60, and the upper limit water level. Working tank raw material sensor 100 for stopping the operation of the pump 50 when;

상기 펌프(50)의 흡입구측에는 상기 서비스탱크(60)와 서비스관로(112)로 연결되어 상기 작업탱크(70)내의 원료량이 하한 수준일 경우 서비스탱크(60)내의 원료를 펌프(50)의 흡입구측에 공급하기 위한 수동식 3방밸브(110)를 포함한 것을 특징으로 한다.The suction port side of the pump 50 is connected to the service tank 60 and the service pipe 112 so that the raw material in the service tank 60 when the amount of raw material in the working tank 70 is the lower limit level, the suction port of the pump 50. It characterized in that it comprises a manual three-way valve 110 for supplying to the side.

도 1은 본 발명의 실시예에 따른 발포성형기의 원료공급장치의 구성도이고,1 is a block diagram of a raw material supply device of a foam molding machine according to an embodiment of the present invention,

도 2는 종래 발포성형기의 원료공급장치의 구성도이다.2 is a block diagram of a raw material supply device of a conventional foam molding machine.

<도면의 주요 부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>

50 : 펌프 52 : 원료공급관로50: pump 52: raw material supply line

60 : 서비스탱크 70 : 작업탱크60: service tank 70: working tank

72 : 원료공급관로 74 : 회수관로72: raw material supply pipeline 74: recovery pipeline

80 : 전자식 3방밸브 90 : 서비스탱크 원료감지센서80: Electronic 3-way valve 90: Service tank raw material sensor

100 : 작업탱크 원료감지센서 110 : 수동식 3방밸브100: working tank raw material sensor 110: manual 3-way valve

이하, 첨부된 도면을 참조하여 본 발명의 실시예를 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment of the present invention;

도 1은 본 발명의 실시예에 따른 발포성형기의 원료공급장치의 구성도로서, 폴리우레탄 공급장치를 설명하고 있고, 2점쇄선으로 도시한 부분은 이소시아나이트 공급장치로서 폴리우레탄 공급장치와 동일하다.1 is a configuration diagram of a raw material supply device of a foam molding machine according to an embodiment of the present invention, illustrating a polyurethane supply device, the part shown by a dashed line is the same as the polyurethane supply device as an isocyanate supply device Do.

따라서 본 발명의 실시예에서는 폴리우레탄(이하 "원료"라 한다)공급장치에 대하여 구성 및 작용을 설명한다.Therefore, in the embodiment of the present invention, the configuration and operation of the polyurethane (hereinafter referred to as "raw material") supply device will be described.

도시된 바와 같이 원료통(40)으로부터 원료를 펌핑하기 위한 펌프(50)가 구비되어 있고, 상기 펌프(50)의 토출구측 원료공급관로(52)상에는 서비스탱크(60) 및 작업탱크(70)가 각각 병렬로 연결되어 있고, 상기 작업탱크(70)와 발포성형기 (200)는 원료공급관로(72)와 회수관로(74)를 통해 연결되어 있다.A pump 50 for pumping the raw material from the raw material container 40 is provided as shown, and the service tank 60 and the working tank 70 on the discharge port side raw material supply pipe 52 of the pump 50. Are respectively connected in parallel, the working tank 70 and the foam molding machine 200 is connected through the raw material supply pipe 72 and the recovery pipe (74).

상기 원료공급관로(52)상의 병렬 분기점에는 펌프(50)에서 토출된 원료를 서비스탱크(60) 또는 작업탱크(70)중 어느 하나에 택일적으로 공급하기 위한 전자식 3방밸브(80)가 설치되어 있다.At the parallel branch point on the raw material supply pipe 52, an electronic three-way valve 80 for supplying raw materials discharged from the pump 50 to either the service tank 60 or the working tank 70 is installed. It is.

상기 서비스탱크(60)내에는 서비스탱크(60)내의 원료수위를 검출하여 하한 수위일 때 상기 펌프(50)를 구동시킴과 동시에 상기 전자식 3방밸브(80)를 동작시켜 작업탱크(70)로의 유로를 차단하고, 상한 수위일 때 펌프(50)의 작동을 정지시키는 서비스탱크 원료감지센서(90)가 설치되어 있다.The service tank 60 detects the raw water level in the service tank 60, drives the pump 50 when the water level is at the lower limit, and operates the electronic three-way valve 80 to the working tank 70. The service tank raw material detection sensor 90 is provided to block the flow path and stop the operation of the pump 50 at the upper limit level.

또, 상기 작업탱크(70)에는 상기 작업탱크(70)내의 원료수위를 검출하여 하한 수위일 때 상기 펌프(50)를 구동시킴과 동시에 상기 전자식 3방밸브(80)를 동작시켜 서비스탱크(60)로의 유로를 차단하고, 상한 수위일 때 펌프(50)의 작동을 정지시키는 작업탱크 원료감지센서(100)가 구비되어 있다.In addition, the working tank 70 detects the raw water level in the working tank 70 and drives the pump 50 when the water level is at the lower limit, and simultaneously operates the electronic three-way valve 80 to service the tank 60. It is provided with a working tank raw material detection sensor 100 for blocking the flow path to the (), and stops the operation of the pump 50 when the upper limit water level.

상기 펌프(50)의 흡입구측에는 상기 서비스탱크(60)와 서비스관로(112)로 연결되어 상기 작업탱크(70)내의 원료량이 하한 수준일 경우 서비스탱크(60)내의 원료를 펌프(50)의 흡입구측에 공급하기 위한 수동식 3방밸브(110)가 설치되어 있다.The suction port side of the pump 50 is connected to the service tank 60 and the service pipe 112 so that the raw material in the service tank 60 when the amount of raw material in the working tank 70 is the lower limit level, the suction port of the pump 50. Manual three-way valve 110 for supplying to the side is provided.

미설명 부호 55는 열교환기이다.Reference numeral 55 is a heat exchanger.

이와 같이 구성된 작동상태를 서비스탱크(60) 및 작업탱크(70)내의 원료수위의 정도 감지에 따라 나누어 설명한다.The operating state configured as described above will be described by dividing according to the degree of detection of the raw material level in the service tank 60 and the working tank 70.

(가) 서비스탱크(60)와 작업탱크(70)가 모두 비어있을 경우(A) When both service tank 60 and work tank 70 are empty

즉, 서비스탱크 원료감지센서(90)와 작업탱크 원료감지센서(100)에서 원료의 하한수준을 감지했을 경우이다. 이는 최초로 서비스탱크(60)와 작업탱크(70)에 원료를 충전할 경우이다.That is, when the service tank raw material detection sensor 90 and the working tank raw material detection sensor 100 detects the lower limit level of the raw material. This is the case when the raw material is filled in the service tank 60 and the working tank 70 for the first time.

이때 수동식 3방밸브(110)는 서비스관로(112)를 차단하게 조작되어 있고, 전자식 3방밸브(110)는 서비스탱크(60)측 관로를 차단한다.At this time, the manual three-way valve 110 is operated to block the service line 112, the electronic three-way valve 110 blocks the service tank 60 side pipe.

따라서 펌프(50)가 구동되면, 원료통(40)내의 원료가 펌핑되어 작업탱크(70)내로 공급된다. 작업탱크(70)내로 원료가 채워져 상한 수준에 도달하면 전자식 3방밸브(80)가 작업탱크(70)측 유로를 차단하고 서비스탱크(60)측 유로를 개방한다.Therefore, when the pump 50 is driven, the raw material in the raw material container 40 is pumped and supplied into the working tank 70. When the raw material is filled into the working tank 70 to reach the upper limit level, the electronic three-way valve 80 blocks the working tank 70 side flow path and opens the service tank 60 side flow path.

전자식 3방밸브(80)의 절환동작으로 펌프(50)에서 토출되는 원료가 서비스탱크(60)내로 채워진다. 서비스탱크(60)내의 원료 수위가 높아져 상한 수위에 도달되면 펌프(50)의 구동은 정지한다.The raw material discharged from the pump 50 is filled into the service tank 60 by the switching operation of the electronic three-way valve 80. When the raw material level in the service tank 60 is raised to reach the upper limit level, the driving of the pump 50 is stopped.

이렇게 하여 서비스탱크(60) 및 작업탱크(70)내의 연료가 모두 채워지면 수동식 3방밸브(110)를 조작시켜 서비스관로(112)가 펌프(50)와 연결된다.When the fuel in the service tank 60 and the working tank 70 is filled in this way, the service pipe 112 is connected to the pump 50 by operating the manual three-way valve 110.

(나) 서비스탱크(60)는 풀상태이고 작업탱크(70)만 비어있을 경우(B) If the service tank 60 is full and only the working tank 70 is empty

즉, 작업탱크(70)내의 원료가 하한 수위에 도달되면 전자식 3방밸브(80)가 절환되어 서비스탱크(60)측 유로가 차단되고, 펌프(50)가 구동된다.That is, when the raw material in the working tank 70 reaches the lower limit level, the electronic three-way valve 80 is switched to block the service tank 60 side flow path, and the pump 50 is driven.

따라서 서비스탱크(60)에 저장된 원료가 서비스관로(112)를 경유하여 펌프 (50)에 흡인되어 관로(52)를 거쳐 작업탱크(70)로 투입된다.Therefore, the raw material stored in the service tank 60 is sucked by the pump 50 via the service pipeline 112 and is introduced into the working tank 70 via the pipeline 52.

이렇게 하여 작업탱크(70)내의 원료 수위가 높아져 상한 수위에 도달되면, 펌프(50)는 작동을 멈춘다.In this way, when the raw material level in the working tank 70 becomes high and an upper level is reached, the pump 50 will stop operation | movement.

이후에는 작업탱크(70)내의 원료가 발포 작업시마다 발포성형기(200)를 통해 취출되어져 사용된다.Thereafter, the raw material in the working tank 70 is taken out and used through the foam molding machine 200 every time the foaming operation.

이와 같이 본 실시예에서는 서비스탱크(60)와 작업탱크(70)에 원료를 채워넣은 후 먼저, 작업탱크(70)내의 원료를 소진한 후 서비스탱크(60)내의 원료를 작업탱크(70)로 공급시켜 사용하게 된다.Thus, in the present embodiment, after filling the raw material in the service tank 60 and the working tank 70, the raw material in the working tank 70 is exhausted, and then the raw material in the service tank 60 to the working tank 70 It is supplied and used.

이와 같이 구성되고 작용하는 본 발명은 1개의 펌프(50)에 의해 원료통(40)으로부터 서비스탱크(60)로, 서비스탱크(60)에서 작업탱크(70)로의 원료공급이 가능토록 함으로써 종래의 2 펌프 사용에 비해 전기에너지의 절감효과가 있고, 효율적인 장비사용이 가능하다.The present invention constructed and acting as described above enables the supply of raw materials from the raw material container 40 to the service tank 60 and the service tank 60 to the working tank 70 by one pump 50. Compared with the use of 2 pumps, it saves electrical energy and enables efficient equipment use.

또, 설비의 사양이 단순화되어 투자비를 절감할 수 있고, 원재료 사용량이 적은 시스템일수록 유리하다.In addition, it is possible to reduce the investment cost by simplifying the specifications of the equipment, it is advantageous for a system that uses less raw materials.

상술한 바와 같이 본 발명에 의하면 원료통내의 원료를 펌핑하기 위한 펌프, 펌프의 토출구측 관로에 연결된 전자식 3방밸브, 전자식 3방밸브에 각각 서비스탱크와 작업탱크를 연결하고, 펌프와 서비스탱크와는 서비스관로로 연결하여, 1개의 펌프에 의해 서비스탱크와 작업탱크로의 원료투입이 가능하여 장비의 사용효율이 증대되고, 사양의 단순화로 투자비를 절감할 수 있고, 원재료 사용량이 적은 시스템에 유리한 이점을 갖는다.As described above, according to the present invention, a pump for pumping raw materials in a raw material container, an electronic three-way valve connected to an outlet port side of the pump, and an electronic three-way valve are connected to a service tank and a working tank, respectively, Is connected to the service pipe, and the feed tank can be fed into the service tank and the working tank by one pump, increasing the use efficiency of the equipment, reducing the investment cost by simplifying the specifications, and advantageous for the system using less raw materials. Has an advantage.

Claims (1)

원료를 발포성형기(200)에 공급하기 위한 원료공급장치에 있어서,In the raw material supply device for supplying the raw material to the foam molding machine 200, 원료를 펌핑하기 위한 펌프(50)와;A pump 50 for pumping raw materials; 상기 펌프(50)의 토출구측 원료공급관로(52)상에 분기되어 각각 병열 연결된 서비스탱크(60) 및 작업탱크(70)를 구비하되, 상기 작업탱크(70)를 원료공급관로 (72)와 회수관로(74)를 통해 상기 발포성형기(200)에 연결하고;A service tank 60 and a work tank 70 branched on the discharge port side raw material supply pipe 52 of the pump 50 and connected in parallel with each other, and the working tank 70 is connected to the raw material supply pipe 72. Connecting to the foam molding machine 200 through a recovery line 74; 상기 원료공급관로(52)상의 병열 분기점에 설치되어 펌프(50)에서 토출된 원료를 서비스탱크(60) 또는 작업탱크(70)중 어느 하나에 택일적으로 공급하기 위한 전자식 3방밸브(80)와;Electronic three-way valve 80 for supplying the raw material discharged from the pump 50 to the one of the service tank 60 or the working tank (70) is installed at the parallel branch point on the raw material supply pipe (52) Wow; 상기 서비스탱크(60)내의 원료수위를 검출하여 하한 수위일 때 상기 펌프 (50)를 구동시킴과 동시에 상기 전자식 3방밸브(80)를 동작시켜 작업탱크(70)로의 유로를 차단하고, 상한 수위일 때 펌프(50)의 작동을 정지시키는 서비스탱크 원료감지센서(90); 및By detecting the raw water level in the service tank 60 and driving the pump 50 when the water level is at the lower limit, the electronic three-way valve 80 is operated to block the flow path to the working tank 70 and the upper water level Service tank raw material detection sensor 90 for stopping the operation of the pump 50 when; And 상기 작업탱크(70)내의 원료수위를 검출하여 하한 수위일 때 상기 펌프(50)를 구동시킴과 동시에 상기 전자식 3방밸브(80)를 동작시켜 서비스탱크(60)로의 유로를 차단하고, 상한 수위일 때 펌프(50)의 작동을 정지시키는 작업탱크 원료감지센서(100)와;By detecting the raw water level in the working tank 70 and driving the pump 50 at the lower limit level, the electronic three-way valve 80 is operated to block the flow path to the service tank 60, and the upper limit water level. Working tank raw material sensor 100 for stopping the operation of the pump 50 when; 상기 펌프(50)의 흡입구측에는 상기 서비스탱크(60)와 서비스관로(112)로 연결되어 상기 작업탱크(70)내의 원료량이 하한 수준일 경우 서비스탱크(60)내의 원료를 펌프(50)의 흡입구측에 공급하기 위한 수동식 3방밸브(110)를 포함한 것을 특징으로 하는 발포성형기의 원료공급시스템.The suction port side of the pump 50 is connected to the service tank 60 and the service pipe 112 so that the raw material in the service tank 60 when the amount of raw material in the working tank 70 is the lower limit level, the suction port of the pump 50. Raw material supply system of the foam molding machine comprising a manual three-way valve 110 for supplying to the side.
KR1019990047223A 1999-10-28 1999-10-28 Raw material supply system of foaming machine KR100334878B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990047223A KR100334878B1 (en) 1999-10-28 1999-10-28 Raw material supply system of foaming machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990047223A KR100334878B1 (en) 1999-10-28 1999-10-28 Raw material supply system of foaming machine

Publications (2)

Publication Number Publication Date
KR20010039016A true KR20010039016A (en) 2001-05-15
KR100334878B1 KR100334878B1 (en) 2002-05-02

Family

ID=19617435

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990047223A KR100334878B1 (en) 1999-10-28 1999-10-28 Raw material supply system of foaming machine

Country Status (1)

Country Link
KR (1) KR100334878B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101786309A (en) * 2010-03-11 2010-07-28 云南省玉溪市太标太阳能设备有限公司 Foaming production line for water tank heat-insulation layers
KR20190028960A (en) * 2017-09-11 2019-03-20 삼성중공업 주식회사 Apparatus for supplying fixed quantity of material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101786309A (en) * 2010-03-11 2010-07-28 云南省玉溪市太标太阳能设备有限公司 Foaming production line for water tank heat-insulation layers
CN101786309B (en) * 2010-03-11 2013-01-02 云南省玉溪市太标太阳能设备有限公司 Foaming production line for water tank heat-insulation layers
KR20190028960A (en) * 2017-09-11 2019-03-20 삼성중공업 주식회사 Apparatus for supplying fixed quantity of material

Also Published As

Publication number Publication date
KR100334878B1 (en) 2002-05-02

Similar Documents

Publication Publication Date Title
KR100606203B1 (en) A concrete-mortar transfer system of concrete pump car
WO2000055507A1 (en) Automatic pneumatic pump
CN107339272B (en) A kind of steering engine hydraulic control system
CN1109229C (en) Refrigerant overcirculating vapour compression refrigerator system
CN204458342U (en) Electric pump station device
CN201363546Y (en) Hydraulic pressure type compressed natural gas adding device
CN101839391A (en) Hydraulic compressed natural gas filling device and gas filling control method
KR100334878B1 (en) Raw material supply system of foaming machine
CN211258919U (en) Double-cylinder piston mud pump
CN114215154A (en) Single-phase flow and double-phase flow random switching type negative pressure well and liquid discharge system
KR102498854B1 (en) Resource saving water piping system using ejector effect
JPH0726619A (en) Vacuum sewage-collecting system
KR100472567B1 (en) Dual Vaccum Sewer Collection System
CN214474534U (en) Drainage control system
JP3901337B2 (en) Sewage pump
US6047721A (en) Air introduction device for a hydro-pneumatic reservoir
KR970010508B1 (en) Pressing water supply pump device
CN217584053U (en) Air source filling module and air source filling system
CN215790836U (en) Concrete additive filling system
KR200371175Y1 (en) Dual Vaccum Sewer Collection System
CN213235480U (en) Press-in type water pump and suction type water pump combined starting device
CN221193542U (en) Double-passage water supplementing pump station
CN220704648U (en) Constant pressure water supply system
CN213952378U (en) Automatic water injection and supply system for car washing tank
RU2065093C1 (en) Hydraulic system interlocking device

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130618

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20140415

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160322

Year of fee payment: 15

LAPS Lapse due to unpaid annual fee