KR102443024B1 - Hot stove device and how to operate a hot stove - Google Patents

Hot stove device and how to operate a hot stove Download PDF

Info

Publication number
KR102443024B1
KR102443024B1 KR1020207020460A KR20207020460A KR102443024B1 KR 102443024 B1 KR102443024 B1 KR 102443024B1 KR 1020207020460 A KR1020207020460 A KR 1020207020460A KR 20207020460 A KR20207020460 A KR 20207020460A KR 102443024 B1 KR102443024 B1 KR 102443024B1
Authority
KR
South Korea
Prior art keywords
hot stove
combustion
pressure
blowing
hot
Prior art date
Application number
KR1020207020460A
Other languages
Korean (ko)
Other versions
KR20200096635A (en
Inventor
겐고 우스이
쇼지 후루다치
Original Assignee
닛테츠 엔지니어링 가부시키가이샤
닛테츠 푸란토 셋케에 가부시키가이샤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 닛테츠 엔지니어링 가부시키가이샤, 닛테츠 푸란토 셋케에 가부시키가이샤 filed Critical 닛테츠 엔지니어링 가부시키가이샤
Publication of KR20200096635A publication Critical patent/KR20200096635A/en
Application granted granted Critical
Publication of KR102443024B1 publication Critical patent/KR102443024B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/007Controlling or regulating of the top pressure
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/06Making pig-iron in the blast furnace using top gas in the blast furnace process
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B9/00Stoves for heating the blast in blast furnaces
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B9/00Stoves for heating the blast in blast furnaces
    • C21B9/02Brick hot-blast stoves
    • C21B9/04Brick hot-blast stoves with combustion shaft
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories, or equipment peculiar to furnaces of these types
    • F27B1/22Arrangements of heat-exchange apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/64Controlling the physical properties of the gas, e.g. pressure or temperature
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/66Heat exchange

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Environmental & Geological Engineering (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Air Supply (AREA)
  • Blast Furnaces (AREA)
  • Vending Machines For Individual Products (AREA)
  • Electric Stoves And Ranges (AREA)
  • Massaging Devices (AREA)

Abstract

열풍로 장치(1)는, 용광로(2)에 열풍을 송풍하는 송풍 운전 및 열풍로 내에서 연료 가스를 연소시키는 연소 운전을 행하는 열풍로(4)와, 용광로(2)로부터 얻어지는 BFG를 연료 가스로서 열풍로(4)에 공급하는 연료 가스 공급 라인(5)과, 연료 가스 공급 라인(5)에 설치되어 BFG를 승압하는 블로워(52)를 갖는다. 연료 가스 공급 라인(5)은, 용광로(2)의 노정(21)으로부터 BFG를 취출하는 노정 가스 회수 라인(3)의 노정압 회수 설비(35)보다도 하류측으로부터 BFG를 취출한다. 블로워(52)의 동력은, 연소 운전 시의 열풍로(4)의 배기 가스로부터 배압 및 배열을 회수하는 배기압 회수 설비(441)로부터 공급된다.The hot stove device 1 includes a hot stove 4 that performs a blowing operation of blowing hot air to the blast furnace 2 and a combustion operation of burning fuel gas in the hot stove, and BFG obtained from the blast furnace 2 is converted into fuel gas. It has a fuel gas supply line 5 supplied to the hot stove 4 as a furnace, and a blower 52 which is installed in the fuel gas supply line 5 and pressurizes BFG. The fuel gas supply line 5 takes out BFG from the downstream side of the furnace top pressure recovery facility 35 of the top gas recovery line 3 that takes out BFG from the furnace top 21 of the blast furnace 2 . The power of the blower 52 is supplied from an exhaust pressure recovery facility 441 that recovers back pressure and heat from the exhaust gas of the hot stove 4 during combustion operation.

Figure R1020207020460
Figure R1020207020460

Description

열풍로 장치 및 열풍로 운전 방법Hot stove device and how to operate a hot stove

본 발명은, 열풍로 장치 및 열풍로 운전 방법에 관한 것이다.The present invention relates to a hot stove device and a method for operating a hot stove.

제철용 용광로에 열풍을 공급하기 위해, 열풍로가 사용되고 있다(특허문헌 1 참조).In order to supply hot air to the furnace for iron making, a hot stove is used (refer patent document 1).

열풍로에 있어서는, 연소 운전과 송풍 운전이 반복된다.In the hot stove, the combustion operation and the blowing operation are repeated.

연소 운전 시에는, 외부로부터 연료 가스 및 공기가 공급되고, 이들을 내부에서 연소시킴으로써, 열풍로 내의 축열 벽돌이 고온까지 가열된다.At the time of combustion operation, fuel gas and air are supplied from the outside, and by burning these inside, the thermal-storage brick in a hot stove is heated to high temperature.

송풍 운전에는, 연소 시와는 역방향으로 공기가 공급되고, 공급된 공기는 축열 벽돌에 의해 가열되어, 고온이 되어 용광로로 공급된다.In the blowing operation, air is supplied in a direction opposite to that at the time of combustion, and the supplied air is heated by the thermal-storage brick and becomes high temperature and is supplied to the furnace.

열풍로는 복수 개가 병렬로 설치되어, 하나가 연소 운전하는 동안에도 다른 것이 송풍 운전을 계속함으로써 용광로에 대한 열풍의 공급이 중단되지 않도록 되어 있다.A plurality of hot stoves are installed in parallel so that the supply of hot air to the furnace is not interrupted by continuing the blowing operation of the other while one of the furnaces is performing a combustion operation.

통상, 연소 운전 시에는, 연료 가스로서 용광로의 노정 가스(BFG)가 이용된다. 연소 배기는 대기 개방되기 때문에, 열풍로 내 압력은 대기압보다 약간 높은 정도가 된다.Normally, at the time of combustion operation, furnace top gas (BFG) of a blast furnace is used as fuel gas. Since the combustion exhaust is released to the atmosphere, the pressure in the hot stove is slightly higher than the atmospheric pressure.

한편, 송풍 운전 시에는, 고압의 용광로 내부에 열풍을 불어 넣기 위해, 블로워 등에 의해 가압된 공기가 열풍로 내에 도입되어, 열풍로 내 압력은 용광로의 내부 압력 이상이 된다.On the other hand, during the blowing operation, in order to blow hot air into the high-pressure furnace, air pressurized by a blower or the like is introduced into the hot stove, and the pressure in the hot stove becomes equal to or higher than the internal pressure of the furnace.

열풍로의 운용에 있어서는, 연소 운전과 송풍 운전을 소정 시간마다 전환함과 함께, 전환 시에 각각의 열풍로 내 압력에 따른 압력 조정을 행하고 있었다.In operation of the hot stove, the combustion operation and the ventilation operation are switched every predetermined time, and the pressure is adjusted according to the pressure in each hot stove at the time of switching.

연소 운전으로부터 송풍 운전으로 전환할 때에는, 균압 운전을 행하여, 가압된 공기를 열풍로 내로 도입하여, 열풍로 내의 압력을 높이고 있었다.When switching from the combustion operation to the ventilation operation, the pressure equalization operation was performed to introduce pressurized air into the hot stove to increase the pressure in the hot stove.

송풍 운전으로부터 연소 운전으로 전환할 때에는, 배압 운전을 행하여, 열풍로 내로부터 점차 배기함으로써, 열풍로 내의 압력을 낮추고 있었다.When switching from the blowing operation to the combustion operation, the pressure in the hot stove was lowered by performing the back pressure operation and gradually evacuating from the inside of the hot stove.

그런데, 특허문헌 1의 열풍로 장치에서는, 연소 운전 시에 공급되는 연료 가스 및 공기의 압력을 높임으로써, 몇 가지의 개선이 도모되어 있다.By the way, in the hot stove apparatus of patent document 1, several improvement is aimed at by raising the pressure of the fuel gas and air supplied at the time of combustion operation.

즉, 연소 운전 시의 열풍로 내 압력을 종래의 대기압 정도보다도 높임으로써, 연소 가스의 체적을 삭감하여, 노체 및 설비의 소형화가 가능해진다. 또한, 연소 운전 시의 열풍로 내 압력을 송풍 운전 시의 열풍로 내 압력에 가깝게 함으로써, 각각의 사이의 압력차가 작아져, 종래의 균압 운전 및 배압 운전 시간을 단축할 수 있어, 에너지가 절약된다.That is, by raising the pressure in the hot stove at the time of the combustion operation above the conventional atmospheric pressure level, the volume of the combustion gas is reduced, and the furnace body and equipment can be downsized. In addition, by making the pressure in the hot stove during combustion operation close to the pressure in the stove during blowing operation, the pressure difference between them becomes small, and the conventional pressure equalization operation and back pressure operation time can be shortened, thereby saving energy. .

연소 운전 시의 열풍로 내 압력을 높이기 위한 구체적인 구성으로서, 특허문헌 1의 열풍로 장치에서는, 연소 운전에 사용하는 BFG를 용광로의 BFG 회수 라인으로부터 취출하는 위치를, 노정압 회수 터빈 발전 설비(TRT)보다도 상류측의 고압 부분으로 하고 있다.As a specific configuration for increasing the pressure in the hot stove during combustion operation, in the hot stove device of Patent Document 1, the position at which BFG used for combustion operation is taken out from the BFG recovery line of the blast furnace is a furnace top pressure recovery turbine power generation facility (TRT). ) as the high-pressure part on the upstream side.

일본 특허 공개 소59-143008호 공보Japanese Patent Laid-Open No. 59-143008

전술한 바와 같이, 특허문헌 1의 열풍로 장치에서는, 연소 운전에 사용하는 BFG를, 용광로의 BFG 회수 라인의 TRT보다도 상류측의 고압 부분으로부터 취출함으로써, 연소 운전 시의 열풍로 내 압력을 높이고 있다.As described above, in the hot stove device of Patent Document 1, the BFG used for combustion operation is taken out from the high-pressure part upstream from the TRT of the BFG recovery line of the blast furnace, thereby increasing the pressure in the hot stove during combustion operation. .

그러나 용광로의 BFG 회수 라인의 TRT보다도 상류측으로부터 취출한 BFG라도, 그 압력(예를 들어 280KPa)은, 연소 운전 시의 열풍로 내 압력을 송풍 운전 시의 열풍로 내 압력(예를 들어 500KPa)까지 높일 정도로 충분하지 않아, 균압 운전 및 배압 운전을 해소하기까지는 이르지 못하였다. 즉, 특허문헌 1에 있어서는, 균압 운전 및 배압 운전으로 조정하는 압력차를 작게 할 수 있었다고 해도, 각각의 작업 자체는 해소할 수 없어, 작업 효율의 삭감, 운전 효율의 향상으로 이어지지 않는다고 하는 문제가 있었다.However, even for BFG taken out from the upstream side of the TRT of the BFG recovery line of the blast furnace, the pressure (for example, 280 KPa) is the pressure in the hot stove during combustion operation and the pressure in the stove during blowing operation (for example, 500 KPa). It was not enough to increase the pressure to , so it was not possible to solve the equalization operation and the back pressure operation. That is, in Patent Document 1, even if the pressure difference adjusted by the equalization operation and the back pressure operation can be reduced, each operation itself cannot be solved, and there is a problem that it does not lead to a reduction in operation efficiency or improvement in operation efficiency. there was.

또한, 특허문헌 1과 같이, 용광로의 BFG 회수 라인의 TRT보다도 상류측으로부터 취출된 BFG에는, 다음과 같은 문제가 있다.Moreover, like patent document 1, BFG taken out from the upstream side rather than TRT of the BFG recovery line of a blast furnace has the following problems.

BFG 회수 라인의 용광로에 가까운 부분이므로, 용광로의 노정 압력의 변동의 영향을 받기 쉬워, BFG의 압력이 안정적이지 않기 때문에, 열풍로에 있어서의 연소 운전의 안정성이 저하된다.Since it is a part of the BFG recovery line close to the furnace, it is easily affected by fluctuations in the furnace top pressure. Since the pressure of the BFG is not stable, the stability of the combustion operation in the hot stove is lowered.

또한, 고압이라는 점에서 BFG 중에 포함되는 수분량이 많아, 열풍로에 도입되었을 때에 미스트가 되어 내화 벽돌을 열화시키는 원인이 된다.Moreover, from the point of high pressure, the moisture content contained in BFG is large, and when it introduce|transduces into a hot stove, it becomes mist and becomes a cause which deteriorates a firebrick.

본 발명의 목적은, 연소 운전 시의 열풍로 내 압력을 충분히 고압화할 수 있는 열풍로 장치 및 열풍로 운전 방법을 제공하는 데 있다.It is an object of the present invention to provide a hot stove device and a hot stove operating method capable of sufficiently increasing the pressure in the hot stove during combustion operation.

본 발명의 열풍로 장치는, 용광로에 열풍을 송풍하는 송풍 운전 및 열풍로 내에서 연료 가스를 연소시키는 연소 운전을 행하는 열풍로와, 상기 용광로의 노정 가스를 상기 연료 가스로서 상기 열풍로에 공급하는 연료 가스 공급 라인과, 상기 연료 가스 공급 라인에 설치되어 상기 연료 가스를 승압하는 승압기를 갖는 것을 특징으로 한다.The hot stove device of the present invention comprises a hot stove for performing a blowing operation for blowing hot air to a blast furnace and a combustion operation for burning fuel gas in the hot stove, and supplying the furnace top gas as the fuel gas to the hot stove. It is characterized in that it has a fuel gas supply line and a booster installed in the fuel gas supply line to boost the pressure of the fuel gas.

본 발명의 열풍로 운전 방법은, 용광로에 열풍을 송풍하는 송풍 운전 및 열풍로 내에서 연료 가스를 연소시키는 연소 운전을 행하는 열풍로의 운전 방법이며, 상기 용광로의 노정 가스를 상기 연료 가스로서 상기 열풍로에 공급함과 함께, 상기 열풍로에 공급되는 상기 연료 가스를 승압기에 의해 승압하는 것을 특징으로 한다.The hot stove operating method of the present invention is a method of operating a hot stove in which a blowing operation of blowing hot air to a blast furnace and a combustion operation of burning fuel gas in the blast furnace are performed, wherein the furnace top gas is used as the fuel gas. It is characterized in that the fuel gas supplied to the hot stove is pressurized by a booster while being supplied to the furnace.

본 발명에서는, 열풍로에 공급되는 연료 가스를, 승압기에 의해 승압함으로써 충분한 고압으로 할 수 있다.In the present invention, it is possible to increase the pressure of the fuel gas supplied to the hot stove with a booster to a sufficient high pressure.

이 때문에, 열풍로에 있어서는, 연소 운전 시의 열풍로 내 압력을 송풍 운전 시의 열풍로 내 압력까지 충분히 고압화할 수 있어, 연소 운전 시와 송풍 운전 시의 열풍로 내 압력의 차가 없어짐으로써, 균압 운전 및 배압 운전이 필요없게 되어, 각각의 작업을 해소할 수 있다.For this reason, in the hot stove, the pressure in the hot stove during combustion operation can be sufficiently increased to the pressure inside the hot stove during the blowing operation, and the pressure difference between the pressure in the hot stove during combustion operation and ventilation operation is eliminated, thereby equalizing pressure. Operation and back pressure operation are not required, and each operation can be eliminated.

열풍로의 운전에 있어서 균압 운전 및 배압 운전을 완전 해소할 수 있음으로써, 각각의 작업 공정을 삭감할 수 있어, 작업 효율 및 작업 비용을 저감할 수 있다. 또한, 열풍로의 운전에 있어서, 균압 운전 및 배압 운전이 차지하고 있던 기간을 해소할 수 있어, 운전 효율을 향상시킬 수 있다. 또한, 열풍로 기수의 삭감도 가능하다. 또한, 종래의 배압 운전 시에는, 열풍로 내에 잔류하고 있던 BFG로부터, 열풍로 내 압력의 저하에 수반하여 결로가 발생하였지만, 배압 운전의 해소에 의해, 이러한 열풍로 내의 결로도 방지할 수 있다.By being able to completely eliminate the pressure equalization operation and the back pressure operation in the operation of the hot stove, the respective operation steps can be reduced, and the operation efficiency and operation cost can be reduced. Further, in the operation of the hot stove, the period occupied by the pressure equalization operation and the back pressure operation can be eliminated, and the operation efficiency can be improved. In addition, it is possible to reduce the number of hot stove noses. Further, during the conventional back pressure operation, dew condensation occurred from the BFG remaining in the hot stove with a decrease in the pressure in the hot stove.

또한, 본 발명에서는, 열풍로에 도입되는 연료 가스를, 승압기에 의해 단열 압축함으로써 승온시킬 수 있다. 이에 의해, 종래의 연료 가스의 예열 장치나, 종래의 보조 연료 가스의 공급도 해소할 수 있어, 설비 및 운전 비용을 억제할 수 있다.Moreover, in this invention, the temperature can be raised by adiabatic compression of the fuel gas introduce|transduced into a hot stove with a pressurizer. Thereby, the conventional preheating apparatus of fuel gas and the conventional supply of auxiliary fuel gas can also be eliminated, and installation and operation cost can be suppressed.

본 발명에 있어서, 연소 운전 시의 열풍로 내 압력을 높임으로써, 연소 운전의 시간도 단축할 수 있다. 종래는, 일반적으로 송풍 운전에 대해 연소 운전의 시간이 길게 설정되며, 또한 전술한 균압 운전 및 배압 운전이 필요하였다. 그러나 본 발명에서는, 균압 운전 및 배압 운전을 해소할 수 있음과 함께, 연소 운전 시간을 단축하여 송풍 운전과 동일 정도의 시간으로 할 수도 있고, 연소 운전과 송풍 운전이 반복되는 간소한 운전 스케줄의 설정도 가능해진다.In the present invention, by increasing the pressure in the hot stove during the combustion operation, the time for the combustion operation can also be shortened. Conventionally, the time of the combustion operation is generally set long with respect to the blowing operation, and the above-mentioned equalizing operation and back pressure operation are required. However, in the present invention, the pressure equalization operation and the back pressure operation can be eliminated, and the combustion operation time can be shortened to the same time as the ventilation operation, and a simple operation schedule in which the combustion operation and the ventilation operation are repeated. also becomes possible

상술한 작용 효과 외에도, 본 발명에서는, 전술한 특허문헌 1에 있어서의 연료 가스의 고압화에 의한 작용 효과에 대해서도 얻을 수 있다.In addition to the above-described effects, in the present invention, the effects of the high-pressure fuel gas in Patent Document 1 described above can also be obtained.

즉, 송풍 운전 시의 열풍로 내 압력과 연소 운전 시의 열풍로 내 압력의 차가 감소하여, 균압 운전 및 배압 운전에 있어서의 압력 변동이 해소되므로, 열풍로 각 부의 수명을 연장할 수 있다. 예를 들어, 철피의 피로 파괴의 방지, 열풍로 내의 내화 벽돌의 균열이나, 벽돌 줄눈의 벌어짐을 방지할 수 있어, 줄눈으로부터의 열풍로 내 가스의 블로 바이와 같은 문제도 해소할 수 있다.That is, since the difference between the pressure in the hot stove during the blowing operation and the pressure in the hot stove during the combustion operation is reduced, pressure fluctuations in the pressure equalization operation and the back pressure operation are eliminated, the life of each part of the hot stove can be extended. For example, it is possible to prevent fatigue fracture of the steel shell, to prevent cracking of refractory bricks in the hot stove, and to prevent the opening of brick joints, and it is also possible to solve problems such as blow-by of gas in the hot stove from the joints.

또한, 연소 운전 시의 열풍로 내 압력의 고압화에 의해, 연료 가스의 체적을 억제할 수 있어, 열풍로 내 단면적을 억제할 수 있고, 연소 운전 시의 연소 효율도 향상시킬 수 있어, 노체 및 설비를 소형화할 수 있다.In addition, by increasing the pressure in the hot stove during combustion operation, the volume of fuel gas can be suppressed, the cross-sectional area of the hot stove can be suppressed, and combustion efficiency during combustion operation can be improved, so that the furnace body and Equipment can be downsized.

본 발명의 열풍로 장치에 있어서, 상기 연료 가스 공급 라인은, 상기 용광로의 노정으로부터 상기 노정 가스를 취출하는 노정 가스 회수 라인의 노정압 회수 설비보다도 하류측으로부터 상기 노정 가스를 취출하는 것이 바람직하다.In the hot stove device of the present invention, it is preferable that the fuel gas supply line takes out the furnace top gas from a downstream side of a furnace top pressure recovery facility of a top gas recovery line that takes out the top gas from the furnace top of the blast furnace.

본 발명의 열풍로 운전 방법에 있어서, 상기 연료 가스로서, 상기 용광로의 노정으로부터 취출되어 노정압 회수 설비에 의해 압력 회수된 상기 노정 가스를 사용하는 것이 바람직하다.In the hot stove operating method of the present invention, it is preferable to use the furnace top gas taken out from the furnace top of the blast furnace and pressure-recovered by a furnace top pressure recovery facility as the fuel gas.

본 발명에서는, 연료 가스로서 사용하는 노정 가스가, 노정압 회수 설비에 의해 압력 회수된 후이므로, 용광로의 노정 압력의 변동의 영향은 노정압 회수 설비에 의해 완화되어, 연료 가스에 있어서의 압력 변동을 안정화할 수 있다.In this invention, since the furnace top gas used as fuel gas is after pressure recovery by the furnace top pressure recovery facility, the influence of the fluctuation|variation of the furnace top pressure of a blast furnace is relieved by the furnace top pressure recovery facility, and the pressure fluctuation in fuel gas is relieved. can be stabilized.

본 발명에서는, 연료 가스로서 사용하는 노정 가스가, 노정압 회수 설비에 의해 압력 회수되어 저압의 상태이므로, 노정 가스 중의 수분량을 낮은 상태로 할 수 있어, 연료 가스로서 도입되었을 때에 열풍로 내의 미스트 발생에 의한 내화 벽돌의 열화 등을 방지할 수 있다.In the present invention, since the furnace top gas used as fuel gas is pressure-recovered by the furnace top pressure recovery facility and is in a low pressure state, the moisture content in the furnace top gas can be made low, and mist is generated in the hot stove when introduced as fuel gas. It is possible to prevent deterioration of the refractory brick by

본 발명에서는, 승압기에 의한 승압을 할 수 있으므로, 이러한 저압의 노정 가스를 사용해도, 열풍로에 도입되는 연료 가스를 충분한 고압으로 할 수 있다.In the present invention, since the pressure can be increased by the booster, even if such a low-pressure furnace top gas is used, the fuel gas introduced into the hot stove can be made high enough.

본 발명의 열풍로 장치에 있어서, 상기 연소 운전 시의 상기 열풍로의 배기 가스로부터 배압 및 배열을 회수하는 배열 회수 설비를 갖고, 상기 승압기는 상기 배열 회수 설비에 의해 회수한 배압 및 배열을 동력에 사용하는 것이 바람직하다.In the hot stove device of the present invention, a heat recovery facility for recovering back pressure and heat from the exhaust gas of the hot stove during the combustion operation is provided, wherein the booster applies the back pressure and heat recovered by the heat recovery facility to power. It is preferable to use

본 발명의 열풍로 운전 방법에 있어서, 상기 연소 운전 시의 상기 열풍로의 배기 가스로부터 배압 및 배열을 회수하고, 회수한 배압 및 배열을 상기 승압기의 동력에 사용하는 것이 바람직하다.In the hot stove operating method of the present invention, it is preferable to recover back pressure and heat from the exhaust gas of the hot stove during the combustion operation, and use the recovered back pressure and heat to power the booster.

본 발명에서는, 승압기의 동력을, 열풍로의 연소 운전 시의 배기 가스로부터 회수한 배압 및 배열에 의해 조달할 수 있어, 운전 비용을 억제할 수 있다. 본 발명에 있어서의 승압기의 효과는, 전술한 바와 같지만, 그 동력에 대해서도 열풍로의 연소 운전 시의 배기 에너지를 이용함으로써, 본 발명의 실시에 필요한 비용을 최소한으로 할 수 있다.In the present invention, the power of the booster can be supplied by the back pressure and exhaust heat recovered from the exhaust gas during the combustion operation of the hot stove, and the operating cost can be reduced. Although the effect of the booster in the present invention is as described above, the cost required for carrying out the present invention can be minimized by using the exhaust energy during the combustion operation of the hot stove also for its power.

본 발명의 열풍로 운전 방법에 있어서, 상기 송풍 운전과, 상기 열풍로를 상기 송풍 운전으로부터 상기 연소 운전으로 전환하는 연소 전환 작업과, 상기 연소 운전과, 상기 열풍로를 상기 연소 운전으로부터 상기 송풍 운전으로 전환하는 송풍 전환 작업을 반복함과 함께, 상기 연소 전환 작업, 상기 연소 운전 및 상기 송풍 전환 작업의 합계 시간을, 상기 송풍 운전을 행하는 시간 이하로 하는 것이 바람직하다.In the hot stove operating method of the present invention, the blowing operation, a combustion switching operation of switching the hot stove from the blowing operation to the combustion operation, the combustion operation, and the blowing operation of the hot stove from the combustion operation While repeating the ventilation switching operation for switching to

본 발명에서는, 예를 들어 열풍로 2개 운전을 행하는 경우, 2개의 열풍로를 교대로, 한쪽을 송풍 운전으로 하고, 그 동안에 다른 쪽에서 연소 전환 작업, 연소 운전 및 송풍 전환 작업을 실행할 수 있다.In the present invention, for example, when two hot stoves are operated, the two hot stoves are alternately used as one of the blowing operation, and in the meantime, the combustion switching operation, the combustion operation, and the blowing switching operation can be performed on the other side.

본 발명에서는, 연소 전환 작업 및 송풍 전환 작업에 압력 조정(균압 및 배압)을 포함하지 않으므로, 연소 전환 작업 및 송풍 전환 작업은 연소 가스 혹은 송풍용 공기의 전환만 하면 돼, 매우 단시간에 실행할 수 있다.In the present invention, since pressure adjustment (equalization and back pressure) is not included in the combustion switching operation and the blowing switching operation, the combustion switching operation and the blowing switching operation only need to be performed by switching the combustion gas or blowing air, and can be performed in a very short time. .

그리고 본 발명에서는, 연소 운전이 고압에서 행해지므로, 송풍 운전과 동일 정도의 시간에 충분한 축열이 얻어진다.And in the present invention, since the combustion operation is performed at a high pressure, sufficient heat storage is obtained in the same amount of time as the ventilation operation.

그 결과, 2개의 열풍로 중 한쪽이 송풍 운전하는 동안에, 다른 쪽을 전후에 연소 전환 작업 및 송풍 전환 작업을 수반하는 연소 운전으로 할 수 있어, 2개의 열풍로에 의해 종래의 3개 열풍로 운전과 동일 조건의 송풍 운전을 시킬 수 있다. 이때, 송풍 운전은, 2개의 열풍로에 의해 교대로 행해지므로, 용광로에 대한 송풍이 중단되는 일은 없다.As a result, while one of the two hot stoves is performing a blowing operation, the other can be set to a combustion operation involving a combustion switching operation and a blowing switching operation before and after the other, and the conventional three hot stoves are operated by the two hot stoves. Blowing operation under the same conditions as At this time, since the blowing operation is alternately performed by the two hot stoves, the blowing to the blast furnace is not interrupted.

또한, 짝수 개의 열풍로를 갖는 열풍로 장치라면, 2개씩의 열풍로에 대해 본 발명을 적용할 수 있다.In addition, if it is a hot stove device having an even number of hot stoves, the present invention can be applied to two hot stoves.

본 발명의 열풍로 운전 방법에 있어서, 상기 송풍 운전과, 상기 열풍로를 상기 송풍 운전으로부터 상기 연소 운전으로 전환하는 연소 전환 작업과, 상기 연소 운전과, 상기 열풍로를 상기 연소 운전으로부터 상기 송풍 운전으로 전환하는 송풍 전환 작업을 반복함과 함께, 상기 연소 전환 작업, 상기 연소 운전 및 상기 송풍 전환 작업의 합계 시간을, 상기 송풍 운전을 행하는 시간의 2배 이하로 하는 것이 바람직하다.In the hot stove operating method of the present invention, the blowing operation, a combustion switching operation of switching the hot stove from the blowing operation to the combustion operation, the combustion operation, and the blowing operation of the hot stove from the combustion operation While repeating the ventilation switching operation for switching to

본 발명에서는, 예를 들어 열풍로 3개 운전을 행하는 경우, 3개의 열풍로 중 하나를 송풍 운전으로 하고, 그 동안에 다른 2개로 연소 전환 작업, 연소 운전 및 송풍 전환 작업을 실행할 수 있다.In the present invention, for example, when three hot stoves are operated, one of the three hot stoves is used as the blowing operation, and in the meantime, the other two can perform the combustion switching operation, the combustion operation, and the blowing switching operation.

즉, 송풍 운전하고 있던 열풍로를 연소 운전으로 전환하여 2번째의 열풍로에 의해 송풍 운전을 행하고, 소정의 송풍 운전 시간이 경과하면 2번째의 열풍로를 송풍 운전으로부터 연소 운전으로 전환하여 3번째의 열풍로에 의해 송풍 운전을 행한다. 이때, 1번째의 열풍로는 연소 운전의 절반이 경과한 상태이며, 소정의 송풍 운전 시간이 경과하면 3번째의 열풍로를 송풍 운전으로부터 연소 운전으로 전환함과 함께, 1번째의 열풍로에 의해 송풍 운전을 행한다.That is, the hot stove that was in the blowing operation is switched to the combustion operation, the blowing operation is performed by the second hot stove, and when the predetermined blowing operation time has elapsed, the second hot stove is switched from the blowing operation to the combustion operation and the third Blowing operation is performed by the hot stove of At this time, the first hot stove is in a state where half of the combustion operation has elapsed, and when the predetermined blowing operation time has elapsed, the third hot stove is switched from the blowing operation to the combustion operation, and by the first hot stove Blow operation is performed.

그 결과, 3개의 열풍로 중 하나가 송풍 운전하는 동안에, 다른 2개를 전후에 연소 전환 작업 및 송풍 전환 작업을 수반하는 연소 운전으로 할 수 있어, 3개의 열풍로를 효율적으로 운전시킬 수 있다. 이때, 송풍 운전은, 3개의 열풍로 중 어느 것에 의해 교대로 행해지므로, 용광로에 대한 송풍이 중단되는 일은 없다.As a result, while one of the three hot stoves is performing the blowing operation, the other two can be set to a combustion operation involving the combustion switching operation and the blowing switching operation before and after, and the three hot stoves can be operated efficiently. At this time, since the blowing operation is alternately performed by any of the three hot stoves, the blowing to the blast furnace is not interrupted.

또한, 본 발명에서는, 송풍 운전에 대해 연소 운전이 거의 2배의 시간이 되기 때문에, 송풍 운전의 시간을 짧게 하여 축열 온도의 저하를 작게 할 수 있다. 또한, 연소가 행해지는 연소실의 사이즈를 작게 할 수도 있다.Further, in the present invention, since the combustion operation takes almost twice as long as the ventilation operation, the time for the ventilation operation can be shortened to reduce the decrease in the thermal storage temperature. Moreover, the size of the combustion chamber in which combustion is performed can also be made small.

또한, 3의 배수 개의 열풍로를 갖는 열풍로 장치라면, 3개씩의 열풍로에 대해 본 발명을 적용할 수 있다.In addition, if it is a hot stove device having multiple hot stoves of 3, the present invention can be applied to three hot stoves each.

또한, 열풍로 3개 운전의 경우에서, 1개로 연소 운전을 실행하는 동안에, 2개로 송풍 운전을 행하도록 해도 되고, 송풍 운전을 행하는 2개의 열풍로에 대해서는, 우선 1번째의 열풍로에 의해서만 송풍 운전을 행하고, 1번째의 송풍 운전이 절반 경과한 단계에서 2번째의 열풍로가 송풍 운전을 개시함으로써, 용광로에 대한 송풍 온도를 전술한 열풍로 2개 내지 짝수 개의 교대 운전에 비해 높게 할 수 있다.In addition, in the case of operation of three hot stoves, while one combustion operation is performed, two blowing operation may be performed, and, with respect to two hot stoves in which blowing operation is performed, firstly, only the first hot stove blows air. Operation is performed and the second hot stove starts the blowing operation at the stage where half of the first blowing operation has elapsed, so that the blowing temperature for the blast furnace can be made higher than the aforementioned alternating operation of two or an even number of hot stoves. .

본 발명에 따르면, 연소 운전 시의 열풍로 내 압력을 충분히 고압화할 수 있는 열풍로 장치 및 열풍로 운전 방법을 제공할 수 있다.According to the present invention, it is possible to provide a hot stove device and a hot stove operation method capable of sufficiently increasing the pressure in the hot stove during combustion operation.

도 1은 본 발명의 열풍로 장치의 일 실시 형태를 도시하는 모식도.
도 2는 상기 실시 형태에서의 송풍 운전 및 연소 운전을 나타내는 모식도.
도 3은 종래의 송풍 운전 및 연소 운전을 나타내는 모식도.
도 4는 상기 실시 형태에서의 다른 송풍 운전 및 연소 운전을 나타내는 모식도.
BRIEF DESCRIPTION OF THE DRAWINGS It is a schematic diagram which shows one Embodiment of the hot stove apparatus of this invention.
It is a schematic diagram which shows the ventilation operation and combustion operation in the said embodiment.
3 is a schematic diagram showing a conventional blowing operation and combustion operation.
Fig. 4 is a schematic diagram showing another ventilation operation and combustion operation in the above embodiment.

도 1에 있어서, 열풍로 장치(1)는, 용광로(2)에 열풍을 공급하는 것이다.In FIG. 1 , the hot stove device 1 supplies hot air to the furnace 2 .

용광로(2)에는, 노정(21)에 장입 장치(22)가 설치되고, 철광석 및 코크스를 주체로 하는 장입물이 삽입된다. 용광로(2)에는, 복수의 송풍구(23)가 노체의 둘레 방향으로 배열되고, 각각에는 환상 관(24)을 개재하여 열풍로 장치(1)가 접속되어 있다.In the furnace 2 , a charging device 22 is installed in the furnace top 21 , and a charging material mainly composed of iron ore and coke is inserted. In the furnace 2 , a plurality of air outlets 23 are arranged in the circumferential direction of the furnace body, and the hot stove device 1 is connected to each via an annular tube 24 .

열풍로 장치(1)로부터 열풍이 공급되면, 열풍은 환상 관(24)으로 분배되어 송풍구(23)로부터 열풍로 내로 균등하게 불어 넣어진다. 용광로 내에 불어 넣어진 열풍은, 장입물을 가열하여 철분의 환원 반응에 기여한 후, 노정 가스(BFG)로서 노정(21)으로부터 취출된다.When hot air is supplied from the hot stove device 1 , the hot air is distributed to the annular tube 24 and uniformly blown from the tuyeres 23 into the hot stove. The hot air blown into the furnace is blown out from the furnace top 21 as furnace top gas (BFG) after heating the charge and contributing to the reduction reaction of iron powder.

용광로(2)에는, 노정 가스를 회수하는 노정 가스 회수 라인(3)이 접속되어 있다.A furnace top gas recovery line 3 for recovering furnace top gas is connected to the furnace 2 .

노정 가스 회수 라인(3)은, 노정(21)에 접속된 노정 배관(31)에 의해 BFG를 취출하고, 더스트 캐쳐(32), 제1 벤투리 스크러버(33), 제2 벤투리 스크러버(34)를 순차 통과시킴으로써 BFG를 제진한다.The furnace top gas recovery line 3 takes out BFG through the furnace top pipe 31 connected to the furnace top 21, and the dust catcher 32, the 1st venturi scrubber 33, the 2nd venturi scrubber 34 ) is passed sequentially to remove the BFG.

제진된 BFG는, 노정압 회수 설비(35)(TRT)에 의해 압력 및 열 등의 잔류 에너지가 회수되고, 전력 등으로 변환되어 재이용된다.Residual energy such as pressure and heat is recovered from the dedusted BFG by the furnace top pressure recovery facility 35 (TRT), and is converted into electric power and reused.

에너지 회수된 BFG는, 가스 홀더(36)에 저장되어, 다른 설비의 연료 등에 이용된다.The energy-recovered BFG is stored in the gas holder 36 and used as fuel for other facilities.

열풍로 장치(1)는, 3개의 열풍로(4(4A 내지 4C))를 구비하고 있다. 열풍로(4A 내지 4C)는, 각각 축열실(41) 및 연소실(42)을 갖는 외연소식이다.The hot stove device 1 is provided with three hot stoves 4 (4A to 4C). The hot stoves 4A to 4C are external combustion types each having a heat storage chamber 41 and a combustion chamber 42 .

축열실(41)은, 내부에 축열용 체커 벽돌이 쌓여, 노정부가 연소실(42)과 연통됨과 함께, 노저부에 송풍 본관(43) 및 연도 본관(44)이 접속되어 있다.In the heat storage chamber 41, the checker bricks for heat storage are piled up inside, the furnace top communicates with the combustion chamber 42, and the ventilation main pipe 43 and the flue main pipe 44 are connected to the furnace bottom part.

연소실(42)은, 중간부에 환상 관(24)에 이르는 열풍 본관(45)이 접속되고, 노저의 버너 부분에 공기 공급관(46) 및 연료 가스 공급관(47)이 접속되어 있다.As for the combustion chamber 42, the hot air main pipe 45 which reaches the annular pipe 24 is connected to the intermediate part, and the air supply pipe 46 and the fuel gas supply pipe 47 are connected to the burner part of a furnace bottom.

열풍로(4A 내지 4C)는, 각각 송풍 본관(43), 연도 본관(44) 및 열풍 본관(45)과의 접속 부분에 도시하지 않은 개폐 밸브를 갖고, 동작 상태에 따라서 각각과의 접속이 단속된다.Each of the hot stoves 4A to 4C has an opening/closing valve (not shown) at the connection portion with the blowing main pipe 43, the flue main pipe 44, and the hot air main pipe 45, and the connection with each of them is interrupted depending on the operating state. do.

열풍로(4A 내지 4C)에 있어서는, 각각 용광로(2)에 열풍을 공급하는 송풍 운전과, 축열하기 위한 축열 운전이 교대로 행해진다.In the hot stoves 4A to 4C, the blowing operation for supplying hot air to the blast furnace 2 and the heat storage operation for accumulating heat are alternately performed, respectively.

송풍 운전 시에는, 송풍 본관(43)으로부터 공기가 도입되고, 축열실(41)을 통과하는 동안에 가열되어 열풍이 생성되고, 열풍이 연소실(42)로부터 열풍 본관(45)을 거쳐 환상 관(24)으로 공급된다.During the blowing operation, air is introduced from the blower main pipe 43 and heated while passing through the heat storage chamber 41 to generate hot air, and the hot air passes from the combustion chamber 42 through the hot air main pipe 45 to the annular pipe 24 ) is supplied.

연소 운전 시에는, 버너 부분에서 공기 공급관(46)으로부터의 공기 및 연료 가스 공급관(47)으로부터의 연료 가스에 의한 연소가 연소실(42) 내에서 행해지고, 고온의 연소 가스가 축열실(41)에 통과되어 체커 벽돌에 축열이 행해진다. 축열실(41)을 통과한 연소 가스는, 연도 본관(44)으로부터 배출된다.During the combustion operation, combustion by air from the air supply pipe 46 and fuel gas from the fuel gas supply pipe 47 at the burner part is performed in the combustion chamber 42 , and the high-temperature combustion gas enters the heat storage chamber 41 . Passed through, heat storage is performed on the checker bricks. The combustion gas that has passed through the heat storage chamber 41 is discharged from the flue main pipe 44 .

이들 송풍 운전 및 연소 운전에 관하여, 3개의 열풍로(4A 내지 4C)의 상호의 연계에 대해서는 이후에 상세하게 설명한다.Regarding these blowing operation and combustion operation, the mutual linkage of the three hot stoves 4A-4C is demonstrated in detail later.

송풍 본관(43)에는 송풍용 블로워(431)가 설치되어, 흡입한 공기를 소정 압력까지 승압하여 축열실(41) 내지 열풍 본관(45)으로 보낼 수 있다. 블로워(431)에 의해 송풍 운전 시의 축열실(41) 및 연소실(42)의 열풍로 내 압력이 소정의 고압으로 유지되어, 용광로(2)의 내부가 고압이라도 송풍구(23)로부터 열풍을 불어 넣을 수 있다.A blower 431 for blowing is installed in the air blowing main pipe 43 , and the sucked air can be pressurized to a predetermined pressure and sent to the heat storage chamber 41 or the hot air main pipe 45 . The blower 431 maintains the pressure in the hot blast furnace of the heat storage chamber 41 and the combustion chamber 42 during the blowing operation at a predetermined high pressure, and blows hot air from the blast port 23 even if the inside of the furnace 2 is high pressure. can be put

연도 본관(44)에는 터빈 발전기 등의 배기압 회수 설비(441)가 설치되어, 연도 본관(44)을 통해 배출되는 연소 가스의 압력 및 열 등의 잔류 에너지가 회수된다.An exhaust pressure recovery facility 441 such as a turbine generator is installed in the flue main pipe 44 , and residual energy such as pressure and heat of the combustion gas discharged through the flue main pipe 44 is recovered.

공기 공급관(46)에는 공기 공급용 블로워(461)가 설치되어, 연소 운전 시에 외기를 연소실(42)로 압송할 수 있다.A blower 461 for supplying air is installed in the air supply pipe 46 , so that external air can be pressurized to the combustion chamber 42 during combustion operation.

연료 가스 공급관(47)은, 연료 가스 공급 라인(5)을 개재하여 노정 가스 회수 라인(3)에 접속되어, 용광로(2)로부터 회수된 BFG를 연소실(42)의 연료 가스로서 사용할 수 있다.The fuel gas supply pipe 47 is connected to the furnace top gas recovery line 3 via the fuel gas supply line 5 , and the BFG recovered from the furnace 2 can be used as the fuel gas of the combustion chamber 42 .

연료 가스 공급 라인(5)은, 분기 배관(51)이 노정 가스 회수 라인(3)의 노정압 회수 설비(35)의 하류측에 접속되어, 당해 부분으로부터 취출된 BFG를 열풍로(4)에 공급할 수 있다.In the fuel gas supply line 5 , a branch pipe 51 is connected to the downstream side of the furnace top pressure recovery facility 35 of the furnace top gas recovery line 3 , and the BFG taken out from the portion is fed to the hot stove 4 . can supply

연료 가스 공급 라인(5)의 도중에는, 본 발명의 승압기로서의 블로워(52)가 설치되어 있다. 연료 가스 공급 라인(5)을 통해 연소실(42)로 보내지는 BFG는, 블로워(52)에 의해 소정 압력까지 승압되어, 연소 운전 시의 연소실(42) 및 축열실(41)의 열풍로 내 압력을 소정의 고압으로 유지할 수 있다.In the middle of the fuel gas supply line 5, a blower 52 as a booster of the present invention is provided. BFG sent to the combustion chamber 42 through the fuel gas supply line 5 is pressurized to a predetermined pressure by the blower 52, and the pressure in the hot stove of the combustion chamber 42 and the heat storage chamber 41 during combustion operation. can be maintained at a predetermined high pressure.

승압기로서의 블로워(52)는, 그 동력으로서, 연도 본관(44)에 설치된 배기압 회수 설비(441)에 의한 회수 에너지를 사용한다. 예를 들어, 열풍로(4A 내지 4C) 중 어느 것으로 연소 운전을 행할 때에는, 블로워(52)에 의해 연료 가스인 BFG를 승압하지만, 그 동력은 현재 연소 운전 중인 열풍로(4A 내지 4C) 중 어느 것으로부터의 회수 에너지로 할 수 있다.The blower 52 as a pressure booster uses, as its motive power, energy recovered by the exhaust pressure recovery facility 441 installed in the flue main pipe 44 . For example, when a combustion operation is performed with any of the hot stoves 4A to 4C, the blower 52 boosts the pressure of BFG, which is the fuel gas, but the power thereof is any of the hot stoves 4A to 4C currently in combustion operation. It can be done with the energy recovered from it.

블로워(52)에 의해 승압을 행하여, 연료 가스 공급관(47)으로부터 연소실(42)로 공급되는 연료 가스(BFG)의 압력을 높인 경우, 연소 균형을 이루기 위해, 공기 공급관(46)으로부터 연소실(42)에 공급되는 공기의 압력을 높일 필요가 있다. 그것을 위한 승압은, 블로워(461)에 의해 행할 수 있다. 또한, 블로워(461)의 동력도, 배기압 회수 설비(441)에 의한 회수 에너지로 할 수 있다. 또한, 공기 공급용 블로워(461)는, 송풍용 블로워(431)의 풍량에 여유가 있으면, 이것으로 대용해도 된다.When the pressure of the fuel gas BFG supplied from the fuel gas supply pipe 47 to the combustion chamber 42 is increased by increasing the pressure by the blower 52 , in order to achieve a combustion balance, the combustion chamber 42 from the air supply pipe 46 ), it is necessary to increase the pressure of the air supplied to the The pressure increase for it can be performed by the blower 461. As shown in FIG. In addition, the motive power of the blower 461 can also be set as the energy recovered by the exhaust pressure recovery facility 441 . In addition, as long as there is room in the air volume of the blower 431 for ventilation, the blower 461 for air supply may substitute for this.

본 실시 형태의 열풍로 장치(1)에 있어서는, 3개의 열풍로(4A 내지 4C) 중 2개를 사용하여, 각각에 송풍 운전 및 연소 운전을 교대로 실행시킨다.In the hot stove device 1 of the present embodiment, two of the three hot stoves 4A to 4C are used to alternately perform the ventilation operation and the combustion operation respectively.

도 2에 나타내는 바와 같이, 열풍로(4A, 4B) 2개를 사용하는 경우, 예를 들어 기준 시점 0분부터 45분 사이클로, 송풍 운전 및 연소 운전을 교대로 실행시킨다.As shown in FIG. 2 , when using two hot stoves 4A and 4B, for example, the ventilation operation and the combustion operation are alternately performed in a cycle of 45 minutes from the reference time 0 minute.

열풍로(4A)에서는, 기준 시점 0분부터, 송풍 운전을 45분 행하고, 0.5분 동안 송풍 운전으로부터 연소 운전으로의 전환(연소 전환 작업)을 행하고, 연소 운전을 44분 행하고, 0.5분 동안 연소 운전으로부터 송풍 운전으로의 전환(송풍 전환 작업)을 행하고, 이후 이들 4개의 공정을 반복한다.In the hot stove 4A, from the reference time 0 minutes, the blowing operation is performed for 45 minutes, the switching from the blowing operation to the combustion operation (combustion switching operation) is performed for 0.5 minutes, the combustion operation is performed for 44 minutes, and the combustion is performed for 0.5 minutes. Switching from the operation to the ventilation operation (air switching operation) is performed, and then these four steps are repeated.

송풍 운전은 45분이기 때문에, 1사이클분이 된다. 연소 운전 44분과 연소 및 송풍의 전환 작업 0.5분이 2회로 합계 45분이 되어, 1사이클분에 상당한다.Since the ventilation operation is 45 minutes, it is equivalent to one cycle. 44 minutes of combustion operation and 0.5 minutes of switching operation of combustion and ventilation become two times 45 minutes in total, and it is equivalent to one cycle.

열풍로(4A)의 열풍로 내 압력은, 송풍 운전 시에는, 송풍 본관(43)의 블로워(431)에 의해 송풍용 공기의 승압이 행해져, 소정의 열풍로 내 압력이 유지된다. 한편, 연소 운전 시에는, 연료 가스 공급 라인(5)의 블로워(52)에 의해 연료 가스인 BFG의 승압이 행해져, 송풍 운전 시와 동일한 열풍로 내 압력이 유지된다.As for the pressure in the hot stove of 4A of hot stoves, at the time of a ventilation operation, the pressure of the air for ventilation is performed by the blower 431 of the ventilation main pipe 43, and the predetermined|prescribed pressure in a hot stove is maintained. On the other hand, at the time of combustion operation, the pressure of BFG which is fuel gas is raised by the blower 52 of the fuel gas supply line 5, and the same pressure in a hot stove as in the case of a ventilation operation is maintained.

연소 전환 작업 및 송풍 전환 작업에서는, 공기의 유통 방향의 반전을 위해, 열풍로(4A 내지 4C)의 송풍 본관(43), 연도 본관(44) 및 열풍 본관(45)과의 접속 부분에 각각 설치되는 도시하지 않은 개폐 밸브를 구동시키기 위한 전환 시간이 발생한다.In the combustion switching operation and the ventilation switching operation, for reversing the flow direction of the air, each of the hot stoves 4A to 4C is installed in the connecting portion with the ventilation main tube 43 , the flue main tube 44 , and the hot air main tube 45 . A switching time for driving an on-off valve (not shown) occurs.

열풍로(4A)의 열풍로 내 온도는, 송풍 운전 시에, 송풍에 수반하여 저하되어 간다. 한편, 연소 운전 시에는, 연소실(42)에서의 연소에 의해, 점차 상승해 가서, 송풍 운전의 당초 필요한 온도가 확보된다.The temperature inside the hot stove of 4 A of hot stoves falls with ventilation at the time of a ventilation operation. On the other hand, at the time of combustion operation, it increases gradually by combustion in the combustion chamber 42, and the temperature initially required for a ventilation operation is ensured.

이러한 단시간의 연소 운전에 의해 충분한 축열을 행할 수 있는 것은, 승압기인 블로워(52)에 의해 연료 가스인 BFG를 승압하여, 연소실(42)에서의 연소 운전을 고압으로 행하는 것에 기인한다.The reason that sufficient heat can be stored by such a short-time combustion operation is due to the high-pressure combustion operation in the combustion chamber 42 by boosting the fuel gas BFG by the blower 52 serving as a pressure booster.

이상과 같은 열풍로(4A)에 대해, 열풍로(4B)에서는, 기준 시점 0분부터, 0.5분의 연소 전환 작업을 행하고, 연소 운전을 44분 행하고, 0.5분의 송풍 전환 작업을 행하고, 송풍 운전을 45분 행하고, 이후 이들 4개의 공정을 반복한다.With respect to the hot stove 4A as described above, in the hot stove 4B, from the reference time 0 minute, the combustion switching operation is performed for 0.5 minutes, the combustion operation is performed for 44 minutes, the ventilation switching operation is performed for 0.5 minutes, and ventilation is performed. The operation is carried out for 45 minutes, and then these four steps are repeated.

열풍로(4B)에 있어서도, 송풍 운전 45분이 1사이클분, 연소 운전 44분과 연소 전환 작업 0.5분 및 송풍 전환 작업 0.5분으로 합계 45분이 1사이클분이 된다.Also in the hot stove 4B, 45 minutes of ventilation operation is one cycle's worth, 44 minutes of combustion operation, 0.5 minutes of combustion switching operation|work, and 0.5 minutes of ventilation switching operation|work 0.5 minutes total 45 minutes become one cycle.

송풍 운전 시 및 연소 운전 시의 압력 및 온도의 변화는, 열풍로(4B)에 있어서도 열풍로(4A)에서 설명한 바와 같은 거동을 나타낸다.Changes in pressure and temperature during the blowing operation and the combustion operation exhibit the same behavior as those described for the hot stove 4A also in the hot stove 4B.

이와 같이, 본 실시 형태에서는, 도 2에 나타내는 바와 같이, 열풍로(4A, 4B)가 45분 사이클로 교대로 송풍 운전과 연소 운전을 행할 수 있다.Thus, in this embodiment, as shown in FIG. 2, the hot stove 4A, 4B can alternately perform a ventilation operation and a combustion operation in a 45-minute cycle.

열풍로(4A, 4B)에 있어서, 송풍 운전은 45분 사이클 전체에 걸치므로, 용광로(2)에 대한 송풍이 중단되는 일은 없다. 한편, 연소 운전은, 고압에서의 연소로 함으로써, 44분 동안 소정의 축열을 행할 수 있다. 이에 의해, 연소 전환 작업 및 송풍 전환 작업을 포함하여 연소 운전을 45분 사이클에 수용할 수 있어, 열풍로(4A, 4B) 2개에서의 45분 사이클에서의 송풍 및 연소의 교대 운전을 실현할 수 있다.In the hot stoves 4A and 4B, since the blowing operation spans the entire 45-minute cycle, the blowing to the furnace 2 is not interrupted. On the other hand, in the combustion operation, a predetermined heat storage can be performed for 44 minutes by performing combustion at a high pressure. Thereby, the combustion operation including the combustion switching operation and the blowing switching operation can be accommodated in a 45-minute cycle, and alternate operation of blowing and combustion in a 45-minute cycle in the two hot stoves 4A and 4B can be realized. have.

도 2의 운전을 행할 때에는, 열풍로(4A, 4B)의 조합이 아닌, 열풍로(4A, 4C)의 조합, 혹은 열풍로(4B, 4C)의 조합을 사용해도 된다.When performing the operation of FIG. 2 , not the combination of the hot stoves 4A and 4B, but the combination of the hot stoves 4A and 4C or the combination of the hot stoves 4B and 4C may be used.

본 실시 형태의 열풍로 장치(1)에 있어서는, 3개의 열풍로(4A 내지 4C) 3개를 사용함과 함께, 승압기인 블로워(52)를 사용하지 않고, 연소 운전을 상압에서 행함으로써, 종래와 같은 송풍 운전 및 연소 운전을 행할 수도 있다.In the hot stove device 1 of the present embodiment, by using three three hot stoves 4A to 4C and performing combustion operation at normal pressure without using the blower 52 which is a pressure booster, it is different from the prior art. The same blowing operation and combustion operation may be performed.

도 3에 나타내는 바와 같이, 열풍로(4A 내지 4C) 3개를 사용하여, 연소 운전을 상압에서 행하는 경우, 예를 들어 기준 시점 0분부터 45분 사이클로, 송풍 운전 및 연소 운전을 교대로 실행시킨다.As shown in FIG. 3 , when the combustion operation is performed at normal pressure using three hot stoves 4A to 4C, the blowing operation and the combustion operation are alternately performed, for example, in a cycle of 45 minutes from the reference time 0 minute. .

단, 송풍 운전은 45분의 1사이클이지만, 연소 운전은 승온에 시간이 걸리므로, 2사이클 90분을 사용한다. 또한, 2사이클 90분에 있어서는, 연소 운전 75분의 전후에는, 송풍 운전 시의 고압을 연소 운전 시의 상압까지 낮추는 배압 운전 7.5분과, 연소 운전 시의 상압을 송풍 운전 시의 고압까지 높이는 균압 운전 7.5분이 설정된다.However, although the ventilation operation is one cycle of 45 minutes, since the combustion operation takes time to increase the temperature, two cycles of 90 minutes are used. In addition, in 90 minutes of 2 cycles, before and after 75 minutes of combustion operation, a back pressure operation of 7.5 minutes for lowering the high pressure during the blowing operation to the atmospheric pressure during the combustion operation, and an equalization operation for increasing the atmospheric pressure during the combustion operation to the high pressure during the ventilation operation 7.5 minutes is set.

도 3에 있어서, 열풍로(4A 내지 4C) 각각에서는, 전술한 송풍 운전 45분(1사이클분)에 이어서, 배압 운전 7.5분, 연소 운전 75분 및 균압 운전 7.5분의 계 90분(2사이클분)이 실행되고, 이후 이들 공정이 반복된다.In Fig. 3 , in each of the hot stoves 4A to 4C, following the above-described blowing operation for 45 minutes (for one cycle), the back pressure operation for 7.5 minutes, the combustion operation for 75 minutes, and the equalization operation for 7.5 minutes total 90 minutes (2 cycles). minutes) is executed, and then these processes are repeated.

이때, 열풍로(4A 내지 4C) 각각에서는, 서로 1사이클분씩 공정이 밀리게 되어, 용광로(2)에 대한 열풍의 공급이 중단되는 일이 없다. 즉, 열풍로(4A)의 송풍 운전에 이어서 열풍로(4B)의 송풍 운전이 행해지고, 또한 열풍로(4C)의 송풍 운전이 계속되고, 다시 열풍로(4A)의 송풍 운전이 행해지고, 이러한 반복에 의해 항시 어느 열풍로(4A 내지 4C)가 송풍 운전을 행하고 있다.At this time, in each of the hot stoves 4A to 4C, the process is pushed back by one cycle from each other, and the supply of the hot air to the furnace 2 is not interrupted. That is, following the blowing operation of the hot stove 4A, the blowing operation of the hot stove 4B is performed, the blowing operation of the hot stove 4C is continued, and the blowing operation of the hot stove 4A is performed again, and this repetition is repeated. As a result, certain hot stoves 4A to 4C are always performing the blowing operation.

이와 같이, 도 3에 나타내는 종래와 같은 송풍 운전 및 연소 운전에서는, 열풍로(4A 내지 4C)가 상압에서의 연소 운전을 행하기 때문에, 소기의 축열을 확보하기 위해서는 연소 운전에 시간이 필요하며, 열풍로(4A 내지 4C)의 3개 운용이 필수가 된다. 또한, 연소 운전과 송풍 운전의 열풍로 내 압력의 차를 확보하기 위해 균압 운전 및 배압 운전이 필요해, 운전 작업의 번잡함을 피할 수 없다.As described above, in the conventional blowing operation and combustion operation shown in FIG. 3, since the hot stoves 4A to 4C perform combustion operation at normal pressure, the combustion operation takes time to secure the desired heat storage, Three operations of the hot stoves 4A to 4C are essential. In addition, in order to secure the pressure difference in the hot stove between the combustion operation and the blowing operation, an equalizing operation and a back pressure operation are required, and the complexity of operation cannot be avoided.

이상에 설명한 바와 같이, 본 실시 형태의 열풍로 장치(1)에 의하면, 특히 도 2와 같은 운전을 행함으로써, 이하의 효과를 얻을 수 있다.As described above, according to the hot stove device 1 of the present embodiment, the following effects can be obtained by particularly performing the operation as shown in FIG. 2 .

본 실시 형태에서는, 열풍로(4(4A 내지 4C))에 공급되는 연료 가스(BFG)를 승압기인 블로워(52)에 의해 승압함으로써, 충분한 고압으로 할 수 있다.In this embodiment, it can be set as sufficient high pressure by pressurizing fuel gas BFG supplied to the hot stove 4 (4A-4C) with the blower 52 which is a pressure booster.

이 때문에, 열풍로(4)에 있어서는, 연소 운전 시의 열풍로 내 압력을 송풍 운전 시의 열풍로 내 압력까지 충분히 고압화할 수 있어(도 2 참조), 연소 운전 시와 송풍 운전 시의 열풍로 내 압력의 차가 없어짐으로써, 균압 운전 및 배압 운전(도 3 참조)이 필요없게 되어, 각각의 작업을 해소할 수 있다.For this reason, in the hot stove 4, the pressure in the hot stove at the time of combustion operation can be sufficiently increased to the pressure inside the hot stove at the time of blowing operation (refer to Fig. 2), and the hot stove at the time of combustion operation and blowing operation By eliminating the difference in internal pressure, the equalization operation and the back pressure operation (refer to Fig. 3 ) are no longer necessary, and each operation can be eliminated.

본 실시 형태에서는, 열풍로(4)의 송풍 운전 및 연소 운전을 도 2와 같이 행함으로써, 도 3과 같은 균압 운전 및 배압 운전을 완전 해소할 수 있고, 각각의 작업 공정을 삭감할 수 있어, 작업 효율 및 작업 비용을 저감할 수 있다.In this embodiment, by performing the blowing operation and the combustion operation of the hot stove 4 as shown in Fig. 2, the equalizing operation and the back pressure operation as shown in Fig. 3 can be completely eliminated, and the respective working steps can be reduced. Working efficiency and working cost can be reduced.

또한, 도 2에 나타내는 열풍로(4)의 운전에 의하면, 도 3의 균압 운전 및 배압 운전이 차지하고 있던 기간을 해소할 수 있어, 운전 효율을 향상시킬 수 있다.Further, according to the operation of the hot stove 4 shown in FIG. 2 , the period occupied by the pressure equalization operation and the back pressure operation of FIG. 3 can be eliminated, and the operation efficiency can be improved.

또한, 도 2에 나타내는 열풍로(4)의 운전은, 열풍로(4A 내지 4C) 중 2개를 사용하면 되며, 1개를 휴지시키거나, 혹은 보수 점검을 할 수도 있다.In addition, for the operation of the hot stove 4 shown in FIG. 2 , two of the hot stoves 4A to 4C may be used, and one may be stopped, or maintenance and inspection may be performed.

도 2와 같은 운전만을 행한다면, 열풍로 장치(1)에 설치하는 열풍로(4)는 2개뿐이어도 되고, 기수의 삭감도 가능하다.If only the operation as shown in Fig. 2 is performed, there may be only two hot stoves 4 provided in the hot stove apparatus 1, and the number of noses can also be reduced.

도 3에 나타내는 종래와 같은 운전을 행하는 경우, 균압 운전 시에 열풍로(4)의 내부에 잔류하고 있던 BFG로부터, 열풍로 내 압력의 상승에 수반하여 결로가 발생하고 있었다. 그러나 도 2의 운전을 행한다면, 균압 운전의 해소에 의해, 이러한 열풍로 내의 결로도 방지할 수 있다.In the case of performing the operation as in the prior art shown in FIG. 3 , dew condensation was generated from the BFG remaining inside the hot stove 4 during the pressure equalization operation as the pressure in the hot stove increased. However, if the operation shown in FIG. 2 is performed, dew condensation in the hot stove can be prevented by eliminating the pressure equalization operation.

또한, 본 실시 형태에서는, 열풍로(4)에 도입되는 연료 가스를, 본 발명의 승압기인 블로워(52), 및 공기를 승압하는 공기 공급용 블로워(461)로부터, 각각 단열 압축함으로써 승온시킬 수 있다. 이에 의해, 종래의 열풍로 장치에서 사용되고 있던 연료 가스의 예열 장치나, 종래의 보조 연료 가스의 공급도 해소할 수 있어, 설비 및 운전 비용의 억제를 할 수 있다.In addition, in this embodiment, the fuel gas introduced into the hot stove 4 can be heated by adiabatic compression from the blower 52 which is the booster of the present invention and the blower 461 for air supply that pressurizes air, respectively. have. Thereby, the preheating apparatus of the fuel gas used with the conventional hot stove apparatus, and the conventional supply of auxiliary fuel gas can also be eliminated, and installation and operation cost can be suppressed.

본 실시 형태에 있어서는, 도 2의 설명에서 서술한 바와 같이, 연소 운전 시의 열풍로 내 압력을 높임으로써, 연소 운전의 시간도 단축할 수 있다. 종래는, 일반적으로 송풍 운전에 대해 연소 운전의 시간이 길게 설정되고, 또한 전술한 균압 운전 및 배압 운전이 필요하였다. 그러나 본 실시 형태에서는, 균압 운전 및 배압 운전을 해소할 수 있는 동시에, 연소 운전을 단축하여 송풍 운전과 동일 정도의 시간으로 할 수도 있고, 연소 운전과 송풍 운전이 반복되는 간소한 운전 스케줄의 설정도 가능해진다.In the present embodiment, as described in the description of FIG. 2 , the time of the combustion operation can also be shortened by increasing the pressure in the hot stove during the combustion operation. Conventionally, the time of the combustion operation is generally set long with respect to the blowing operation, and the above-described pressure equalization operation and back pressure operation are required. However, in the present embodiment, the pressure equalization operation and the back pressure operation can be eliminated, the combustion operation can be shortened and the time period equivalent to that of the ventilation operation, and a simple operation schedule in which the combustion operation and the ventilation operation are repeated. it becomes possible

또한, 본 실시 형태에 있어서는, 송풍 운전 시의 열풍로 내 압력과 연소 운전 시의 열풍로 내 압력의 차를 없앨 수 있어, 균압 운전 및 배압 운전에 있어서의 압력 변동(도 3 참조)이 해소되므로, 열풍로(4)의 각 부의 수명을 연장시킬 수 있다. 예를 들어, 철피의 피로 파괴의 방지, 열풍로 내의 내화 벽돌의 균열이나, 벽돌 줄눈의 벌어짐을 방지할 수 있어, 줄눈으로부터의 열풍로 내 가스의 블로 바이와 같은 문제도 해소할 수 있다.In addition, in the present embodiment, the difference between the pressure in the hot stove during the blowing operation and the pressure in the hot stove during the combustion operation can be eliminated, and the pressure fluctuations during the equalization operation and the back pressure operation (see Fig. 3 ) are eliminated. , it is possible to extend the life of each part of the hot stove 4 . For example, it is possible to prevent fatigue fracture of the steel shell, to prevent cracking of refractory bricks in the hot stove, and to prevent the opening of brick joints, and it is also possible to solve problems such as blow-by of gas in the hot stove from the joints.

또한, 연소 운전 시의 열풍로 내 압력의 고압화에 의해, 연료 가스의 체적을 억제할 수 있어, 열풍로 내 단면적을 억제할 수 있고, 연소 운전 시의 연소 효율도 향상시킬 수 있고, 노체 및 설비를 소형화할 수 있다.In addition, by increasing the pressure in the hot stove during combustion operation, the volume of fuel gas can be suppressed, the cross-sectional area of the hot stove can be suppressed, combustion efficiency during combustion operation can be improved, and the furnace body and Equipment can be downsized.

본 실시 형태에서는, 열풍로(4)에 연료 가스로서 노정 가스 회수 라인(3)에 회수된 용광로(2)의 노정(21)으로부터의 노정 가스(BFG)를 사용함과 함께, 연료 가스 공급 라인(5)은, 분기 배관(51)에 의해, 노정 가스 회수 라인(3)의 노정압 회수 설비(35)보다도 하류측으로부터 BFG를 취출하도록 하였다.In this embodiment, while using the furnace top gas BFG from the furnace top 21 of the blast furnace 2 recovered by the furnace top gas recovery line 3 as fuel gas for the hot stove 4, a fuel gas supply line ( In 5), BFG was taken out from the downstream side of the furnace top pressure recovery facility 35 of the furnace top gas recovery line 3 by the branch pipe 51 .

이 때문에, 연료 가스로서 사용하는 BFG가, 노정압 회수 설비(35)에 의해 압력 회수된 후의 것이 되어, 용광로(2)의 노정(21)의 압력의 변동의 영향은 노정압 회수 설비(35)에 의해 완화되어, 열풍로(4)의 버너 부분에 공급되는 BFG에 있어서의 압력 변동을 안정화시킬 수 있다.For this reason, BFG used as fuel gas becomes the thing after pressure recovery by the furnace top pressure recovery facility 35, and the influence of the fluctuation|variation in the pressure of the furnace top 21 of the blast furnace 2 is the furnace top pressure recovery facility 35. This can be alleviated by , and the pressure fluctuation in the BFG supplied to the burner portion of the hot stove 4 can be stabilized.

또한, 연료 가스로서 사용하는 BFG가, 노정압 회수 설비(35)에 의해 압력 회수되어 저압의 상태이므로, BFG 중의 수분량을 낮은 상태로 할 수 있어, 열풍로(4)의 버너 부분에 도입되었을 때, 열풍로(4)의 내부에서 미스트 발생에 의한 내화 벽돌의 열화 등을 방지할 수 있다.In addition, since the BFG used as fuel gas is pressure-recovered by the furnace top pressure recovery facility 35 and is in a low pressure state, the moisture content in the BFG can be made low, and when introduced into the burner portion of the hot stove 4 , it is possible to prevent deterioration of refractory bricks due to mist generation inside the hot stove 4 .

비교로서, 전술한 특허문헌 1과 같이, 노정 가스 회수 라인(3)의 노정압 회수 설비(35)보다도 상류측으로부터 BFG를 취출하는 경우(도 1의 분기 배관(51P) 참조), 열풍로(4)의 연소 운전에 공급되는 BFG에, 용광로(2)의 노정(21)의 압력 변동의 영향을 받을 가능성이 있는 동시에, 보다 고압이기 때문에 BFG 중의 수분량이 높아, 열풍로(4)의 버너 부분에 도입되었을 때, 열풍로(4)의 내부에 미스트를 발생시켜, 내화 벽돌의 열화 등을 초래할 가능성도 있다.As a comparison, as in Patent Document 1 described above, when BFG is taken out from the upstream side of the furnace top pressure recovery facility 35 of the furnace top gas recovery line 3 (refer to the branch pipe 51P in Fig. 1), a hot stove ( The BFG supplied to the combustion operation of 4) may be affected by the pressure fluctuation of the furnace top 21 of the blast furnace 2, and at the same time, the moisture content in the BFG is higher due to the higher pressure, and the burner portion of the hot stove 4 When introduced into the blast furnace 4, there is a possibility that mist is generated inside the hot stove 4, resulting in deterioration of the fire bricks and the like.

그러나 본 실시 형태에서는, 노정 가스 회수 라인(3)의 노정압 회수 설비(35)보다도 하류측으로부터 BFG를 취출하도록 하였으므로, 이들 문제를 해소할 수 있다.However, in this embodiment, since BFG is taken out from the downstream side of the furnace top pressure recovery facility 35 of the furnace top gas recovery line 3, these problems can be eliminated.

본 실시 형태에서는, 연료 가스 공급 라인(5)에 승압기로서 블로워(52)를 설치하여, 열풍로(4)에 공급되는 BFG를 승압할 수 있다.In this embodiment, the blower 52 is provided as a booster in the fuel gas supply line 5, and BFG supplied to the hot stove 4 can be boosted up.

이 때문에, 노정압 회수 설비(35)에 의해 압력 회수된 후의 저압의 BFG를 사용해도, 열풍로(4)에 도입되는 BFG를 충분한 고압으로 할 수 있다.For this reason, even if it uses the low pressure BFG after pressure recovery by the furnace top pressure recovery facility 35, BFG introduced into the hot stove 4 can be made high enough.

본 실시 형태에서는, 연도 본관(44)에 설치된 배기압 회수 설비(441)에 의해, 열풍로(4)의 배기 가스로부터 배압 및 배열을 회수하고, 회수한 배압 및 배열의 에너지를, 승압기인 블로워(52) 및 공기 공급관(46)의 블로워(461)의 동력에 사용하고 있다. 이 때문에, 열풍로(4)의 연소 운전 시의 블로워(52, 461)의 동력을, 열풍로(4)의 연소 운전 시의 배기 가스로부터의 회수 에너지로 조달할 수 있어, 운전 비용을 억제할 수 있다.In the present embodiment, the back pressure and heat are recovered from the exhaust gas of the hot stove 4 by the exhaust pressure recovery facility 441 installed in the flue main building 44, and the recovered back pressure and heat energy are used as a booster for the blower. It is used for the power of the blower 461 of the 52 and the air supply pipe 46 . For this reason, the motive power of the blowers 52 and 461 at the time of the combustion operation of the hot stove 4 can be procured with energy recovered from the exhaust gas during the combustion operation of the hot stove 4, and operation cost can be suppressed. can

따라서, 본 실시 형태에 있어서의 블로워(52)에 의해 실현되는 연소 운전 시의 승압의 효과는, 전술한 바와 같지만, 그 동력에 대해서도 열풍로(4)의 연소 운전 시의 배기 에너지를 이용할 수 있어, 운전에 필요한 비용을 최소한으로 할 수 있다.Therefore, the effect of the pressure increase during the combustion operation realized by the blower 52 in the present embodiment is as described above, but the exhaust energy during the combustion operation of the hot stove 4 can be used for the power as well. In other words, the cost of driving can be kept to a minimum.

전술한 도 2에서는, 본 실시 형태의 열풍로 장치(1)에 있어서, 2개의 열풍로(4)를 45분 사이클로 교체시키는 운전에 대해 설명하였다. 이에 비해, 동일한 열풍로 장치(1)에 있어서, 3개의 열풍로(4)를 30분 사이클로 운전해도 된다.In FIG. 2 mentioned above, in the hot stove apparatus 1 of this embodiment, the operation|movement which replaces the two hot stove 4 by a 45-minute cycle was demonstrated. On the other hand, in the same hot stove apparatus 1, you may drive the three hot stove 4 in a 30-minute cycle.

도 4에 있어서, 열풍로(4A 내지 4C) 3개는, 각각 기준 시점 0분부터 30분 사이클로, 송풍 운전 및 연소 운전을 교대로 실행시킨다.In Fig. 4 , the three hot stoves 4A to 4C alternately perform the ventilation operation and the combustion operation in a cycle of 30 minutes from the reference time point 0 minute, respectively.

열풍로(4A)에서는, 기준 시점 0분부터, 송풍 운전을 30분 행하고, 0.5분 동안 송풍 운전으로부터 연소 운전으로의 전환(연소 전환 작업)을 행하고, 연소 운전을 59분 행하고, 0.5분 동안 연소 운전으로부터 송풍 운전으로의 전환(송풍 전환 작업)을 행하고, 이후 이들 4개의 공정을 반복한다.In the hot stove 4A, from the reference time 0 minutes, the blowing operation is performed for 30 minutes, the switching from the blowing operation to the combustion operation (combustion switching operation) is performed for 0.5 minutes, the combustion operation is performed for 59 minutes, and the combustion is performed for 0.5 minutes. Switching from the operation to the ventilation operation (air switching operation) is performed, and then these four steps are repeated.

송풍 운전은 30분이 1사이클분이 된다. 연소 운전 59분과 연소 및 송풍의 전환 작업 0.5분이 2회로 합계 60분이 되어, 2사이클분에 상당한다.For the ventilation operation, 30 minutes is equivalent to one cycle. 59 minutes of combustion operation and 0.5 minutes of switching operation of combustion and ventilation become two times of 60 minutes in total, and it is equivalent to 2 cycles.

열풍로(4A)의 열풍로 내 압력에 대해서는, 전술한 도 2와 마찬가지이다.About the pressure in the hot stove of 4 A of hot stoves, it is the same as that of FIG. 2 mentioned above.

즉, 송풍 운전 시에는, 송풍 본관(43)의 블로워(431)에 의해 송풍용 공기의 승압이 행해져, 소정의 열풍로 내 압력이 유지된다. 한편, 연소 운전 시에는, 연료 가스 공급 라인(5)의 블로워(52)에 의해 연료 가스인 BFG의 승압이 행해져, 송풍 운전 시와 동일한 열풍로 내 압력이 유지된다.That is, at the time of a ventilation operation, the pressure of the air for ventilation is performed by the blower 431 of the ventilation main pipe 43, and the predetermined|prescribed pressure in a hot stove is maintained. On the other hand, at the time of combustion operation, the pressure of BFG which is fuel gas is raised by the blower 52 of the fuel gas supply line 5, and the same pressure in a hot stove as in the case of a ventilation operation is maintained.

연소 전환 작업 및 송풍 전환 작업에서는, 공기의 유통 방향의 반전을 위해, 열풍로(4A 내지 4C)의 송풍 본관(43), 연도 본관(44) 및 열풍 본관(45)과의 접속 부분에 각각 설치되는 도시하지 않은 개폐 밸브를 구동시키기 위한 전환 시간이 발생한다.In the combustion switching operation and the ventilation switching operation, for reversing the flow direction of the air, each of the hot stoves 4A to 4C is installed in the connecting portion with the ventilation main tube 43 , the flue main tube 44 , and the hot air main tube 45 . A switching time for driving an on-off valve (not shown) occurs.

열풍로(4A)의 열풍로 내 온도는, 송풍 운전 시에, 송풍에 수반하여 저하되어 간다. 단, 송풍 운전의 시간이 짧기 때문에, 송풍 운전의 종료 시의 온도는, 전술한 도 2의 송풍 운전보다도 높은 온도로 유지되어 있다.The temperature inside the hot stove of 4 A of hot stoves falls with ventilation at the time of a ventilation operation. However, since the time of the ventilation operation is short, the temperature at the end of the ventilation operation is maintained at a temperature higher than that of the ventilation operation of FIG. 2 described above.

한편, 연소 운전 시에는, 연소실(42)에서의 연소에 의해, 점차 상승해 가서, 송풍 운전의 당초 필요한 온도가 확보된다. 단, 전술한 송풍 운전 시의 온도 저하의 축소 외에도, 연소 운전의 시간으로서 거의 2사이클분의 시간(59분)이 확보되어 있으므로, 도 2의 연소 운전(29분)보다도 완만한 상승 특성으로 할 수 있어, 연소 온도가 낮은 연소 운전 또는 연료 가스의 소비가 적은 연소 운전으로 할 수 있다. 또한, 연소가 행해지는 연소실(42)의 사이즈를 작게 할 수 있다.On the other hand, in the case of a combustion operation, it increases gradually by combustion in the combustion chamber 42, and the temperature initially required for a ventilation operation is ensured. However, in addition to the reduction of the temperature drop during the blow operation described above, since the time (59 minutes) for almost 2 cycles is secured as the time of the combustion operation, it is possible to achieve a more gentle rising characteristic than the combustion operation (29 minutes) in Fig. 2 . Therefore, a combustion operation with a low combustion temperature or a combustion operation with a small consumption of fuel gas can be performed. Moreover, the size of the combustion chamber 42 in which combustion is performed can be made small.

이상과 같은 열풍로(4A)에 대해, 열풍로(4B)에서는, 기준 시점 0분부터, 연소 운전의 후반 및 0.5분의 송풍 전환 작업에 이어서, 송풍 운전 30분, 연소 전환 작업 0.5분, 연소 운전 59분, 송풍 전환 작업 0.5분의 반복이 행해진다.With respect to the hot stove 4A as described above, in the hot stove 4B, from the reference time 0 minute, the second half of the combustion operation and the ventilation switching operation for 0.5 minutes, followed by the ventilation operation for 30 minutes, the combustion switching operation for 0.5 minutes, combustion The repetition of 59 minutes of driving|operation and 0.5 minute of ventilation switching operation|work is performed.

또한, 열풍로(4C)에서는, 기준 시점 0분부터, 연소 전환 작업 0.5분, 연소 운전 59분, 송풍 전환 작업 0.5분, 송풍 운전 30분이 반복하여 행해진다.Moreover, in 4 C of hot stoves, from the reference time 0 minute, combustion switching operation|work 0.5 minutes, combustion operation 59 minutes, ventilation switching operation|work 0.5 minutes, and ventilation operation 30 minutes are performed repeatedly.

이와 같이, 도 4의 운전에서는, 열풍로(4A 내지 4C)가 30분 사이클로 순차, 송풍 운전과 연소 운전을 행할 수 있다. 그리고 열풍로(4A 내지 4C) 중 어느 것이 송풍 운전 30분을 교대로 행함으로써, 용광로(2)에 대한 열풍의 공급을 중단없이 행할 수 있다.As described above, in the operation of FIG. 4 , the hot stoves 4A to 4C can sequentially perform the blowing operation and the combustion operation in a cycle of 30 minutes. And supply of the hot air to the blast furnace 2 can be performed without interruption|interruption by any of the hot stoves 4A - 4C alternately performing the ventilation operation for 30 minutes.

또한, 균압 운전 및 배압 운전(도 3 참조)이 불필요하기 때문에, 각각의 작업을 해소할 수 있는 동시에, 전술한 균압 운전 및 배압 운전에 있어서의 압력 변동에 의한 기기의 영향, 결로의 발생 등의 문제를 해소할 수 있다. 또한, 2개에 의한 송풍 운전을 실시하면, 1개에 의한 송풍 운전에 비해 송풍 온도를 상승시킬 수 있다.In addition, since the pressure equalization operation and the back pressure operation (refer to Fig. 3) are unnecessary, each operation can be eliminated, and the influence of the equipment due to the pressure fluctuations in the above-described pressure equalization operation and the back pressure operation, generation of dew condensation, etc. can solve the problem. Moreover, when the ventilation operation by two is implemented, compared with the ventilation operation by one, the ventilation temperature can be raised.

또한, 본 발명은 전술한 실시 형태에 한정되는 것은 아니며, 본 발명의 목적을 달성할 수 있는 범위에서의 변형 등은 본 발명에 포함된다.In addition, this invention is not limited to the above-mentioned embodiment, The deformation|transformation etc. within the range which can achieve the objective of this invention are included in this invention.

예를 들어, 열풍로 장치(1)에 설치되는 열풍로(4)는 3개에 한정되지 않고, 2개(도 2의 운전이 가능), 4개 이상(도 2의 운전 또는 도 4의 운전이 가능)이어도 된다. 예를 들어, 열풍로(4)가 4개인 경우, 그 2개씩을 전술한 도 2의 운전으로 할 수 있는 것 외에, 1개를 휴지하고, 3개로 도 4의 운전을 행하도록 해도 된다. 혹은, 4개의 열풍로(4) 중, 2개를 휴지하고, 2개를 운전해도 된다.For example, the number of hot stoves 4 installed in the hot stove device 1 is not limited to three, and two (operation in FIG. 2 is possible), four or more (operation in FIG. 2 or operation in FIG. 4 ). this is possible). For example, when there are four hot stoves 4, two of them can be used for the operation of Fig. 2 described above, and one of them can be stopped and the operation of Fig. 4 can be performed with three units. Alternatively, two of the four hot stoves 4 may be stopped and two may be operated.

상기 실시 형태에서는, 도 2와 같은 45분 사이클에서의 운전, 혹은 도 4와 같은 30분 사이클의 운전에 대해 설명하였지만, 운전의 사이클 타임은 적절하게 설정하면 되며, 예를 들어 20분 사이클로 짧게 해도 되고, 혹은 60분 사이클로 길게 해도 된다. 단, 사이클 타임이 짧으면, 공정의 전환이 빈번해져 효율적이지 않은 경우도 있다. 한편, 사이클 타임을 길게 하기 위해서는, 열풍로(4)의 용량의 크기가 필요해지는 것 외에, 송풍 운전 및 연소 운전에서의 열풍로 내 온도의 변화 폭이 제한되는 경우도 있다. 따라서, 열풍로 장치(1)로서의 요구 조건에 따라서 사이클 타임을 적절하게 설정하는 것이 바람직하다.In the above embodiment, the operation in a 45-minute cycle as shown in FIG. 2 or operation in a 30-minute cycle as in FIG. 4 has been described. However, the cycle time of the operation may be appropriately set, for example, even if the cycle is shortened to 20 minutes. Alternatively, the cycle may be longer than 60 minutes. However, if the cycle time is short, the process may be switched frequently, which may not be efficient. On the other hand, in order to lengthen the cycle time, in addition to the size of the capacity of the hot stove 4, the range of changes in the temperature in the hot stove in the blowing operation and the combustion operation is limited in some cases. Therefore, it is preferable to appropriately set the cycle time according to the requirements as the hot stove device 1 .

상기 실시 형태에서는, 열풍로(4)는, 외연소식으로 하였지만, 내연소식 혹은 노정 연소식 등이어도 되며, 그 형식은 한정되지 않는다.In the said embodiment, although it was set as the external combustion type, the hot stove 4 may be an internal combustion type, a furnace top combustion type, etc., and the form is not limited.

또한, 승압기로서 블로워(52)를 사용하였지만, 연료 가스 공급 라인(5)을 통과하는 연료 가스를 승압할 수 있는 장치라면, 다른 구성의 승압기여도 된다.In addition, although the blower 52 is used as a pressure booster, if it is a device which can pressurize the fuel gas passing through the fuel gas supply line 5, the pressure booster of another structure may be sufficient.

또한, 각각의 열풍로(4)의 연도 본관(44)에 이르는 배기 가스 라인에, 유량계 및 유량 조정 장치를 마련하여, 연료 가스와 공기량에 적합한 배기 가스량이 되도록 유량 조정함으로써, 연소 운전과 송풍 운전의 전환 시의 밸브의 전환 동작을 필요로 하지 않게 해도 된다.In addition, a flow meter and a flow rate adjustment device are provided in the exhaust gas line leading to the flue main pipe 44 of each hot stove 4, and the flow rate is adjusted so that the exhaust gas amount is suitable for the fuel gas and air amount, whereby the combustion operation and the ventilation operation are performed. The switching operation of the valve at the time of switching of .

본 발명은 열풍로 장치 및 열풍로 운전 방법에 이용할 수 있다.INDUSTRIAL APPLICABILITY The present invention can be applied to a hot stove device and a method for operating a hot stove.

1: 열풍로 장치
2: 용광로
21: 노정
22: 장입 장치
23: 송풍구
24: 환상 관
3: 노정 가스 회수 라인
31: 노정 배관
32: 더스트 캐쳐
33: 제1 벤투리 스크러버
34: 제2 벤투리 스크러버
35: 노정압 회수 설비
36: 가스 홀더
4, 4A, 4B, 4C: 열풍로
41: 축열실
42: 연소실
43: 송풍 본관
431: 송풍용 블로워
44: 연도 본관
441: 배기압 회수 설비
45: 열풍 본관
46: 공기 공급관
461: 연소용 공기 가압용 블로워
47: 연료 가스 공급관
5: 연료 가스 공급 라인
51, 51P: 분기 배관
52: 승압기인 블로워
1: Hot stove device
2: furnace
21: itinerary
22: charging device
23: tuyere
24: Illusion tube
3: Top gas recovery line
31: top piping
32: dust catcher
33: first venturi scrubber
34: second venturi scrubber
35: furnace top pressure recovery facility
36: gas holder
4, 4A, 4B, 4C: hot stove
41: heat storage chamber
42: combustion chamber
43: Bongpung Main Building
431: blower for blowing
44: year main building
441: exhaust pressure recovery facility
45: Hot Air Main Building
46: air supply pipe
461: blower for pressurizing air for combustion
47: fuel gas supply pipe
5: Fuel gas supply line
51, 51P: branch piping
52: blower which is a booster

Claims (8)

용광로에 열풍을 송풍하는 송풍 운전 및 열풍로 내에서 연료 가스를 연소시키는 연소 운전을 행하는 열풍로와, 상기 용광로의 노정 가스를 상기 연료 가스로서 상기 열풍로에 공급하는 연료 가스 공급 라인과, 상기 연료 가스 공급 라인에 설치되어 상기 연료 가스를 승압하는 승압기를 갖고, 상기 승압기는 상기 연료 가스를 승압하여, 상기 열풍로의 상기 연소 운전시의 노내 압력을 상기 열풍로의 상기 송풍 운전시와 동일한 노내 압력으로 하는 것을 특징으로 하는 열풍로 장치.a hot stove for performing a blowing operation for blowing hot air to the furnace and a combustion operation for burning fuel gas in the furnace; a fuel gas supply line for supplying the furnace top gas as the fuel gas to the hot stove; and a pressure booster installed in a gas supply line for boosting the fuel gas, wherein the booster boosts the fuel gas so that the furnace pressure during the combustion operation of the hot stove is the same as that during the blowing operation of the hot stove. A hot stove device, characterized in that 제1항에 있어서,
상기 연료 가스 공급 라인은, 상기 용광로의 노정으로부터 상기 노정 가스를 취출하는 노정 가스 회수 라인의 노정압 회수 설비보다도 하류측으로부터 상기 노정 가스를 취출하는 것을 특징으로 하는 열풍로 장치.
According to claim 1,
The said fuel gas supply line takes out the said furnace top gas from the downstream side of the furnace top pressure recovery facility of the furnace top gas recovery line which takes out the said furnace top gas from the furnace top of the said blast furnace.
제1항 또는 제2항에 있어서,
상기 연소 운전 시의 상기 열풍로의 배기 가스로부터 배압 및 배열을 회수하는 배열 회수 설비를 갖고, 상기 승압기는 상기 배열 회수 설비에 의해 회수한 배압 및 배열을 동력에 사용하는 것을 특징으로 하는 열풍로 장치.
3. The method of claim 1 or 2,
and a heat recovery facility for recovering back pressure and heat from the exhaust gas of the hot stove during the combustion operation, wherein the booster uses the back pressure and heat recovered by the heat recovery facility for power. .
용광로에 열풍을 송풍하는 송풍 운전 및 열풍로 내에서 연료 가스를 연소시키는 연소 운전을 행하는 열풍로의 운전 방법이며,
상기 용광로의 노정 가스를 상기 연료 가스로서 상기 열풍로에 공급함과 함께, 상기 열풍로에 공급되는 상기 연료 가스를 승압기에 의해 승압하여, 상기 열풍로의 상기 연소 운전시의 노내 압력을 상기 열풍로의 상기 송풍 운전시와 동일한 노내 압력으로 하는 것을 특징으로 하는 열풍로 운전 방법.
A method of operating a hot stove in which a blowing operation of blowing hot air to the furnace and a combustion operation of burning fuel gas in the furnace are performed,
While supplying the furnace top gas of the blast furnace as the fuel gas to the hot stove, the fuel gas supplied to the hot stove is pressurized by a booster to increase the pressure in the furnace during the combustion operation of the hot stove. The hot stove operation method, characterized in that the same furnace pressure as that during the blowing operation.
제4항에 있어서,
상기 연료 가스로서, 상기 용광로의 노정으로부터 취출되어 노정압 회수 설비에 의해 압력 회수된 상기 노정 가스를 사용하는 것을 특징으로 하는 열풍로 운전 방법.
5. The method of claim 4,
The hot stove operation method according to claim 1, wherein the furnace top gas taken out from the furnace top of the blast furnace and pressure-recovered by a furnace top pressure recovery facility is used as the fuel gas.
제4항에 있어서,
상기 연소 운전 시의 상기 열풍로의 배기 가스로부터 배압 및 배열을 회수하고, 회수한 배압 및 배열을 상기 승압기의 동력에 사용하는 것을 특징으로 하는 열풍로 운전 방법.
5. The method of claim 4,
and recovering back pressure and heat from the exhaust gas of the hot stove during the combustion operation, and using the recovered back pressure and heat for power of the booster.
제4항 내지 제6항 중 어느 한 항에 있어서,
상기 송풍 운전과, 상기 열풍로를 상기 송풍 운전으로부터 상기 연소 운전으로 전환하는 연소 전환 작업과, 상기 연소 운전과, 상기 열풍로를 상기 연소 운전으로부터 상기 송풍 운전으로 전환하는 송풍 전환 작업을 반복함과 함께,
상기 연소 전환 작업, 상기 연소 운전 및 상기 송풍 전환 작업의 합계 시간을, 상기 송풍 운전을 행하는 시간 이하로 하는 것을 특징으로 하는 열풍로 운전 방법.
7. The method according to any one of claims 4 to 6,
repeating the blowing operation, a combustion switching operation of switching the hot stove from the blowing operation to the combustion operation, the combustion operation, and a blowing switching operation of switching the hot stove from the combustion operation to the blowing operation; together,
The hot stove operating method according to claim 1, wherein a total time of the combustion switching operation, the combustion operation, and the blowing switching operation is set to be equal to or less than a time for performing the blowing operation.
제4항 내지 제6항 중 어느 한 항에 있어서,
상기 송풍 운전과, 상기 열풍로를 상기 송풍 운전으로부터 상기 연소 운전으로 전환하는 연소 전환 작업과, 상기 연소 운전과, 상기 열풍로를 상기 연소 운전으로부터 상기 송풍 운전으로 전환하는 송풍 전환 작업을 반복함과 함께,
상기 연소 전환 작업, 상기 연소 운전 및 상기 송풍 전환 작업의 합계 시간을, 상기 송풍 운전을 행하는 시간의 2배 이하로 하는 것을 특징으로 하는 열풍로 운전 방법.
7. The method according to any one of claims 4 to 6,
repeating the blowing operation, a combustion switching operation of switching the hot stove from the blowing operation to the combustion operation, the combustion operation, and a blowing switching operation of switching the hot stove from the combustion operation to the blowing operation; together,
The hot stove operating method according to claim 1, wherein a total time of the combustion switching operation, the combustion operation, and the blowing switching operation is set to not more than twice the time for performing the blowing operation.
KR1020207020460A 2017-12-18 2018-08-31 Hot stove device and how to operate a hot stove KR102443024B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2017242038A JP6954824B2 (en) 2017-12-18 2017-12-18 Hot air furnace equipment and hot air furnace operation method
JPJP-P-2017-242038 2017-12-18
PCT/JP2018/032444 WO2019123727A1 (en) 2017-12-18 2018-08-31 Blast furnace stove device and method for operating blast furnace stove device

Publications (2)

Publication Number Publication Date
KR20200096635A KR20200096635A (en) 2020-08-12
KR102443024B1 true KR102443024B1 (en) 2022-09-13

Family

ID=66994010

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020207020460A KR102443024B1 (en) 2017-12-18 2018-08-31 Hot stove device and how to operate a hot stove

Country Status (7)

Country Link
EP (1) EP3730631B1 (en)
JP (1) JP6954824B2 (en)
KR (1) KR102443024B1 (en)
CN (1) CN111684083A (en)
BR (1) BR112020012112B1 (en)
RU (1) RU2769340C2 (en)
WO (1) WO2019123727A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113564294B (en) * 2021-07-29 2022-06-28 郑州豫兴热风炉科技有限公司 Efficient conversion device for non-fluctuation furnace change of hot blast stove and control method
CN114752721B (en) * 2022-03-23 2023-08-25 马鞍山钢铁股份有限公司 Single-seat blast furnace fan supply protection system and control method thereof
CN115287386B (en) * 2022-06-30 2023-09-01 山东省冶金设计院股份有限公司 Pressure equalizing system and method for full recovery of waste gas of hot blast stove

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1247417A (en) * 1969-05-22 1971-09-22 Armco Steel Corp Method of blast furnace reduction of iron ores
JPS54161505A (en) * 1978-06-12 1979-12-21 Kawasaki Steel Co Blast gas pressure rizing for hot blast furnace
JPS55122812A (en) * 1979-03-14 1980-09-20 Kawasaki Steel Corp High pressure operating method of hot stove
JPS57126906A (en) * 1981-01-28 1982-08-06 Kawasaki Steel Corp Method of raising pressure of blast furnace gas for hot blast stove
JPS59143008A (en) 1983-02-02 1984-08-16 Nippon Steel Corp Hot stove device performing high pressure combustion
JPS6089258U (en) * 1983-11-26 1985-06-19 新日本製鐵株式会社 Hot air generator for blast furnace
RU2277127C1 (en) * 2005-01-17 2006-05-27 Государственное образовательное учреждение высшего профессионального образования "Уральский государственный технический университет - УПИ" Method of injection of the hot reducing gases in the blast furnace
GB2513185A (en) * 2013-04-19 2014-10-22 Siemens Vai Metals Tech Gmbh Blast furnace plant
JP2016204728A (en) * 2015-04-28 2016-12-08 株式会社Ihi Dust removal mechanism and blast furnace

Also Published As

Publication number Publication date
EP3730631A1 (en) 2020-10-28
EP3730631A4 (en) 2021-09-29
EP3730631B1 (en) 2023-09-27
RU2769340C2 (en) 2022-03-30
BR112020012112B1 (en) 2023-10-31
KR20200096635A (en) 2020-08-12
RU2020119665A3 (en) 2022-01-20
JP6954824B2 (en) 2021-10-27
BR112020012112A2 (en) 2020-11-24
CN111684083A (en) 2020-09-18
JP2019108583A (en) 2019-07-04
RU2020119665A (en) 2022-01-20
WO2019123727A1 (en) 2019-06-27

Similar Documents

Publication Publication Date Title
KR102443024B1 (en) Hot stove device and how to operate a hot stove
JP6076977B2 (en) Waste heat recovery power plant for sintering equipment
KR101534589B1 (en) Method of operating regenerative heaters in blast furnace plant
JP2012031495A (en) Apparatus for generating hot blast
CN215668074U (en) Hot blast stove system with independent pressurizing device
JP2016510393A (en) Energy recovery from exhaust from melting furnace with gas turbine and heat exchanger
JP6953327B2 (en) How to operate the blast furnace shaft blowing device and the blast furnace shaft blowing device
CN106969638A (en) Rotary hearth furnace fume afterheat gradient utilization system and application method
CN101603109B (en) Process for treating top gas of reduction shaft furnace
CN104154762B (en) Mine heat furnace smelting flue-gas dust removal and purification processing method and mine heat furnace smelting system
CN104197725B (en) The method of comprehensive utilization of mine heat furnace smelting flue-gas dust removal and purification and sensible heat and latent heat
WO2014170086A1 (en) Blast furnace plant and operation method
JP2016510373A (en) Energy recovery from exhaust from melting furnaces using gas turbines and heat exchangers
CN204226020U (en) The air supply system of gas turbine
EP3839074B1 (en) Blast furnace plant and shutdown process
JP6604343B2 (en) Preheating gas blowing method, blast furnace operating method, and oxygen blast furnace operating method
JP6604344B2 (en) Preheating gas blowing device to blast furnace shaft, preheating gas blowing method and blast furnace operating method
JP5790045B2 (en) Hot air generator
CN104033250A (en) Integrated oxygen-enriched combustion power system
CN104359314B (en) The energy-saving heating furnace system of a kind of Mist heat recovering and flue gas waste heat recovery method
KR101644536B1 (en) Furnace
JP3161615B2 (en) Humidifying blast furnace air
CN105545487A (en) Combined cycle power plant
JP2012246568A (en) Heating apparatus
JPS5928510A (en) Method for charging or discharging air in or from hot blast stove

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant