KR102342035B1 - Compressor unit - Google Patents

Compressor unit Download PDF

Info

Publication number
KR102342035B1
KR102342035B1 KR1020210047023A KR20210047023A KR102342035B1 KR 102342035 B1 KR102342035 B1 KR 102342035B1 KR 1020210047023 A KR1020210047023 A KR 1020210047023A KR 20210047023 A KR20210047023 A KR 20210047023A KR 102342035 B1 KR102342035 B1 KR 102342035B1
Authority
KR
South Korea
Prior art keywords
pressure
target gas
flow path
reciprocating compressor
valve
Prior art date
Application number
KR1020210047023A
Other languages
Korean (ko)
Inventor
사토시 데즈카
가츠히로 세야마
Original Assignee
가부시키가이샤 고베 세이코쇼
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가부시키가이샤 고베 세이코쇼 filed Critical 가부시키가이샤 고베 세이코쇼
Application granted granted Critical
Publication of KR102342035B1 publication Critical patent/KR102342035B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B41/00Pumping installations or systems specially adapted for elastic fluids
    • F04B41/06Combinations of two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • F17C9/02Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/007Installations or systems with two or more pumps or pump cylinders, wherein the flow-path through the stages can be changed, e.g. from series to parallel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/38Apparatus or methods specially adapted for use on marine vessels, for handling power plant or unit liquids, e.g. lubricants, coolants, fuels or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M21/00Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form
    • F02M21/02Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels
    • F02M21/0203Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels characterised by the type of gaseous fuel
    • F02M21/0215Mixtures of gaseous fuels; Natural gas; Biogas; Mine gas; Landfill gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M21/00Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form
    • F02M21/02Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels
    • F02M21/0218Details on the gaseous fuel supply system, e.g. tanks, valves, pipes, pumps, rails, injectors or mixers
    • F02M21/0245High pressure fuel supply systems; Rails; Pumps; Arrangement of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B37/00Pumps having pertinent characteristics not provided for in, or of interest apart from, groups F04B25/00 - F04B35/00
    • F04B37/10Pumps having pertinent characteristics not provided for in, or of interest apart from, groups F04B25/00 - F04B35/00 for special use
    • F04B37/18Pumps having pertinent characteristics not provided for in, or of interest apart from, groups F04B25/00 - F04B35/00 for special use for specific elastic fluids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/02Stopping, starting, unloading or idling control
    • F04B49/022Stopping, starting, unloading or idling control by means of pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/06Control using electricity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/08Regulating by delivery pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/22Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00 by means of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2210/00Working fluid
    • F05B2210/10Kind or type
    • F05B2210/12Kind or type gaseous, i.e. compressible
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0171Arrangement
    • F17C2227/0185Arrangement comprising several pumps or compressors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/30Use of alternative fuels, e.g. biofuels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Ocean & Marine Engineering (AREA)
  • Control Of Positive-Displacement Pumps (AREA)
  • Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Pipeline Systems (AREA)
  • Control Of Positive-Displacement Air Blowers (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The present application discloses a compressor unit having a plurality of reciprocating compressors connected in parallel. All of these reciprocating compressors have flow paths for guiding a target gas to a demand destination, and branch flow paths branching from the flow paths. The branch flow paths are provided with check valves.

Description

압축기 유닛{COMPRESSOR UNIT}Compressor unit {COMPRESSOR UNIT}

본 발명은, 선박의 LNG 저류조로부터 보일 오프 가스인 대상 가스를 수요처에 공급하는 압축기 유닛에 관한 것이다.The present invention relates to a compressor unit that supplies a target gas, which is an off-gas to boil, from an LNG storage tank of a ship to a consumer.

증발 가스를 승압하여 엔진 등에 공급하는 증발 가스 압축부가 개발되어 있다(일본 특허 공개 제2018-534206호 공보를 참조). 일본 특허 공개 제2018-534206호 공보의 증발 가스 압축부는, 주압축부 및 주압축부와 병렬로 설치된 예비 압축부를 갖고 있다. 주압축부는, 5개의 압축기를 갖고 있다. 예비 압축부는, 주압축부의 압축기와 동수의 압축기 또는 주압축부의 압축기보다도 많은 압축기에 의해 구성되어 있다. 주압축부 및 예비 압축부에 의해 압축된 증발 가스는, ME-GI 엔진에 공급된다. 주압축부 및 예비 압축부가 직렬로 연결되어 있는 경우, 주압축부의 복수의 압축기 중 일부만을 거친 증발 가스의 일부와, 예비 압축부의 복수의 압축기 중 일부만을 거친 증발 가스의 일부를, 각각 분기시켜 DFGE(이하, 「부수요처」라 칭함)로 보낼 수 있다.A boil-off gas compression unit that boosts the pressure of boil-off gas and supplies it to an engine or the like has been developed (refer to Japanese Patent Laid-Open No. 2018-534206). The boil-off gas compression unit of Japanese Patent Laid-Open No. 2018-534206 has a main compression unit and a preliminary compression unit installed in parallel with the main compression unit. The main compression unit has five compressors. The preliminary compression unit is constituted by the same number of compressors as the compressors in the main compression unit or more compressors than the compressors in the main compression unit. The boil-off gas compressed by the main compression unit and the preliminary compression unit is supplied to the ME-GI engine. When the main compression unit and the preliminary compression unit are connected in series, a part of the boil-off gas that has passed through only some of the plurality of compressors of the main compression unit and a part of the boil-off gas that has passed through only a part of the plurality of compressors of the preliminary compression unit are respectively branched to DFGE (hereinafter referred to as “secondary demand”).

그런데, 부수요처에 공급되는 상술한 가스는, 부수요처에서 실제로 요구되는 가스의 압력보다도 높은 상태에서 가스 도출로 상을 흘러, 부수요처에 유입되기 직전에 감압된다. 이 때문에, 왕복동 압축기로부터 부수요처에 이르기까지의 배관이나 계장품을 고압 사양으로 할 필요가 발생하여, 배관이나 계장품의 비용이 증대되어 버린다. 복수의 왕복동 압축기를 사용하여 부수요처에 가스가 공급되는 경우에는, 배관이나 계장품의 비용이 더 증대되어 버린다.By the way, the above-described gas supplied to the secondary demand destination flows through the gas derivation path in a state higher than the pressure of the gas actually required by the secondary demand destination, and is decompressed immediately before flowing into the secondary demand destination. For this reason, it will be necessary to make the piping and instrumentation from a reciprocating compressor to a sub-customer high-pressure specification, and the cost of piping and instrumentation will increase. When gas is supplied to an auxiliary demand using a plurality of reciprocating compressors, the cost of piping and instrumentation will further increase.

본 발명은, 복수의 왕복동 압축기로부터 수요처에 이르기까지의 가스 도출로에 있어서, 대상 가스가 고압화되어 버리는 것을 방지하는 것을 목적으로 한다.An object of the present invention is to prevent a target gas from becoming high-pressure in a gas derivation path from a plurality of reciprocating compressors to a customer.

본 발명의 일 국면에 관한 압축기 유닛은, 선박 내에 설치되며, 상기 선박의 LNG 저류조로부터 흡입한 보일 오프 가스인 대상 가스를 압축하도록 구성되어 있다. 압축기 유닛은, 복수의 압축 스테이지를 갖고, 대상 가스를 압축하여 하나의 수요처에 공급하는 제1 왕복동 압축기와, 복수의 압축 스테이지를 갖고, 대상 가스를 압축하여 상기 하나의 수요처에 공급하도록 상기 제1 왕복동 압축기와 병렬로 접속된 제2 왕복동 압축기와, 제어부를 구비하고 있다. 상기 제1 왕복동 압축기는, 1개의 압축 스테이지와 그 다음 압축 스테이지를 접속하는 스테이지 접속 유로로부터 분기하여 다른 수요처로 대상 가스를 유도하는 가스 도출로에 접속되는 제1 분기 유로와, 상기 가스 도출로로부터 상기 스테이지 접속 유로로의 대상 가스의 역류를 방지하도록 상기 제1 분기 유로에 마련된 제1 역지 밸브와, 상기 가스 도출로에 공급되는 대상 가스의 압력을 상기 제1 역지 밸브의 상류측에서 조정하도록 상기 제1 분기 유로에 마련된 제1 압력 조정 밸브와, 상기 1개의 압축 스테이지의 토출측의 대상 가스의 압력을 검출하는 제1 토출압 검출부와, 상기 제1 압력 조정 밸브의 하류측의 대상 가스의 압력을 검출하는 제1 공급압 검출부를 포함하고 있다. 상기 제2 왕복동 압축기는, 1개의 압축 스테이지와 그 다음 압축 스테이지를 접속하는 스테이지 접속 유로로부터 분기하여 상기 가스 도출로에 접속되는 제2 분기 유로와, 상기 가스 도출로로부터 상기 제2 왕복동 압축기의 상기 스테이지 접속 유로로의 대상 가스의 역류를 방지하도록 상기 제2 분기 유로에 마련된 제2 역지 밸브와, 상기 가스 도출로에 공급되는 대상 가스의 압력을 상기 제2 역지 밸브의 상류측에서 조정하도록 상기 제2 분기 유로에 마련된 제2 압력 조정 밸브와, 상기 제2 왕복동 압축기의 상기 1개의 압축 스테이지의 토출측의 대상 가스의 압력을 검출하는 제2 토출압 검출부와, 상기 제2 압력 조정 밸브의 하류측의 대상 가스의 압력을 검출하는 제2 공급압 검출부를 포함하고 있다. 상기 제어부는, 상기 제1 토출압 검출부 및 상기 제2 토출압 검출부의 검출 압력이 소정의 범위에 드는지 여부를 판정하고, 상기 검출 압력이 상기 소정의 범위에 드는 경우에는, 상기 제1 공급압 검출부 및 상기 제2 공급압 검출부의 검출 압력이, 상기 다른 수요처가 요구하는 압력값에 가까워지도록 상기 제1 압력 조정 밸브 및 상기 제2 압력 조정 밸브의 개방도를 조정한다.A compressor unit according to an aspect of the present invention is installed in a ship and is configured to compress a target gas that is a boil-off gas sucked from an LNG storage tank of the ship. The compressor unit has a plurality of compression stages, a first reciprocating compressor for compressing a target gas and supplying it to one consumer; a plurality of compression stages; A second reciprocating compressor connected in parallel with the reciprocating compressor, and a control unit are provided. The first reciprocating compressor includes a first branch flow path connected to a gas derivation path that branches from a stage connection path connecting one compression stage and the next compression stage and guides the target gas to another demand destination; a first check valve provided in the first branch flow path to prevent a reverse flow of the target gas to the stage connection flow path, and adjust the pressure of the target gas supplied to the gas outlet path at an upstream side of the first check valve A first pressure regulating valve provided in the first branch flow path, a first discharge pressure detection unit for detecting the pressure of the target gas on the discharge side of the one compression stage, and the pressure of the target gas on the downstream side of the first pressure regulating valve It includes a first supply pressure detection unit to detect. The second reciprocating compressor includes: a second branch flow path that branches from a stage connection flow path connecting one compression stage and the next compression stage and is connected to the gas lead-out path; a second check valve provided in the second branch flow path to prevent a reverse flow of the target gas to the stage connection flow path, and the second check valve to adjust the pressure of the target gas supplied to the gas outlet path at an upstream side of the second check valve a second pressure regulating valve provided in the second branch flow path; a second discharge pressure detecting unit for detecting a pressure of a target gas on a discharge side of the one compression stage of the second reciprocating compressor; and a second supply pressure detection unit for detecting the pressure of the target gas. The control unit determines whether pressures detected by the first discharge pressure detection unit and the second discharge pressure detection unit fall within a predetermined range, and when the detected pressure falls within the predetermined range, the first supply pressure detection unit and the opening degree of the first pressure regulating valve and the second pressure regulating valve is adjusted so that the detected pressure of the second supply pressure detecting unit approaches a pressure value required by the other demander.

상술한 압축기 유닛은, 복수의 왕복동 압축기로부터 수요처에 이르기까지의 유로에 있어서, 대상 가스가 고압화되어 버리는 것을 방지할 수 있다.The above-mentioned compressor unit can prevent the target gas from becoming high pressure in the flow path from a some reciprocating compressor to a demand destination.

본 발명의 목적, 특징 및 이점은, 이하의 상세한 설명과 첨부 도면에 의해, 보다 명백해진다.The objective, characteristic, and advantage of this invention become clearer with the following detailed description and accompanying drawing.

도 1은 압축기 유닛의 개략도.
도 2는 압축기 유닛의 일부의 개략도.
도 3은 압축기 유닛의 일부의 개략도.
도 4는 압축기 유닛의 제1 왕복동 압축기로부터 부수요처로의 대상 가스를 공급하기 위한 제어를 나타내는 개략적인 흐름도.
도 5는 부수요처로의 대상 가스의 공급을 정지하는 공급 정지 제어를 나타내는 개략적인 흐름도.
1 is a schematic view of a compressor unit;
2 is a schematic view of a part of a compressor unit;
3 is a schematic view of a part of a compressor unit;
Fig. 4 is a schematic flowchart showing control for supplying a target gas from a first reciprocating compressor of a compressor unit to a sub-customer;
Fig. 5 is a schematic flowchart showing supply stop control for stopping supply of target gas to an auxiliary demand destination;

도 1은 압축기 유닛(100)의 개략도이다. 도 2 및 도 3은, 압축기 유닛(100)의 일부의 개략도이다. 도 1 내지 도 3을 참조하여, 압축기 유닛(100)이 설명된다.1 is a schematic diagram of a compressor unit 100 . 2 and 3 are schematic views of a part of the compressor unit 100 . 1 to 3 , the compressor unit 100 is described.

압축기 유닛(100)은, LNG(Liquefied Natural Gas: 액화 천연가스)가 저류된 LNG 저류조(101)를 갖고 있는 선박(도시하지 않음) 내에 설치되어 있다. 압축기 유닛(100)은, LNG 저류조(101) 내에서 발생한 보일 오프 가스인 대상 가스를 흡입하고, 흡입된 대상 가스를 압축하도록 구성되어 있다. 또한, 압축기 유닛(100)은, 압축된 대상 가스를 주수요처(501)(예를 들어, 엔진) 및 부수요처(502)(예를 들어, 발전기나 엔진)에 공급하도록 구성되어 있다. 이하의 설명에 있어서, 대상 가스의 흐름 방향을 기준으로, 「상류」 및 「하류」라는 용어가 사용된다.The compressor unit 100 is installed in a ship (not shown) having an LNG storage tank 101 in which LNG (Liquefied Natural Gas) is stored. The compressor unit 100 is configured to suck a target gas that is a boil-off gas generated in the LNG storage tank 101 and compress the sucked target gas. Moreover, the compressor unit 100 is comprised so that the compressed target gas may be supplied to the main consumer 501 (for example, an engine) and the sub-customer 502 (for example, a generator or an engine). In the following description, the terms "upstream" and "downstream" are used based on the flow direction of the target gas.

압축기 유닛(100)은, 제1 왕복동 압축기(300)와, 제1 왕복동 압축기(300)에 병렬로 접속된 제2 왕복동 압축기(400)와, 제1 왕복동 압축기(300) 및 제2 왕복동 압축기(400)를 제어하는 제어부(420)를 갖고 있다. 제1 왕복동 압축기(300)와 제2 왕복동 압축기(400)는 마찬가지의 구조이다.The compressor unit 100 includes a first reciprocating compressor 300 , a second reciprocating compressor 400 connected in parallel to the first reciprocating compressor 300 , a first reciprocating compressor 300 and a second reciprocating compressor ( It has a control unit 420 that controls 400). The first reciprocating compressor 300 and the second reciprocating compressor 400 have the same structure.

제1 왕복동 압축기(300)는, 대상 가스가 주수요처(501)를 향하여 흐르는 유로(110)와, 대상 가스를 순차적으로 승압하는 제1 압축 스테이지(201) 내지 제6 압축 스테이지(206)와, 복수의 쿨러(281 내지 285)와, 구동부(도시 생략)를 구비하고 있다. 구동부는, 구동원(모터나 엔진 등)과, 구동원의 동력을 제1 압축 스테이지(201) 내지 제6 압축 스테이지(206)에 전달하는 크랭크 기구를 구비하고 있다.The first reciprocating compressor 300 includes a flow path 110 through which a target gas flows toward a main demand destination 501, and a first compression stage 201 to a sixth compression stage 206 for sequentially increasing the pressure of the target gas; A plurality of coolers 281-285 and a driving unit (not shown) are provided. The drive unit includes a drive source (a motor, an engine, etc.) and a crank mechanism that transmits the motive power of the drive source to the first compression stages 201 to 206 .

제1 압축 스테이지(201)는, 유로(110) 상에 있어서 2개 마련되고, 제2 압축 스테이지(202) 내지 제6 압축 스테이지(206)는, 유로(110) 상에 있어서 각각 1개씩 마련되어 있다.Two first compression stages 201 are provided on the flow passage 110 , and one second compression stage 202 to the sixth compression stage 206 are provided on the flow passage 110 , respectively. .

유로(110)는, LNG 저류조(101) 내에서 발생한 보일 오프 가스를 주수요처(501)에 공급할 수 있도록, LNG 저류조(101)와 주수요처(501)를 접속하고 있다. 유로(110)는, 저류조 접속 유로 유로(11)와, 복수의 스테이지 접속 유로(115 내지 119)와, 수요처 공급 유로(114)를 포함하고 있다.The flow path 110 connects the LNG storage tank 101 and the main consumer 501 so that the boil-off gas generated in the LNG storage tank 101 can be supplied to the main consumer 501 . The flow path 110 includes a storage tank connection flow path 11 , a plurality of stage connection flow paths 115 to 119 , and a demand supply flow path 114 .

저류조 접속 유로(111)는, 그 상류단이 LNG 저류조(101)에 접속되고, 하류단이 압축기 유닛(100)의 제1 압축 스테이지(201)에 접속되어 있다. 상세하게는, 저류조 접속 유로(111)는, LNG 저류조(101)의 상부로부터 연장 설치된 주 관(121)과, 주 관(121)의 하류단에 있어서 두갈래로 나누어져, 2개의 제1 압축 스테이지(201)에 접속된 분기관(122, 123)을 갖고 있다. 즉, 2개의 제1 압축 스테이지(201)는, 서로 병렬이 되도록 저류조 접속 유로(111)에 접속되어 있다.The storage tank connection flow path 111 has an upstream end connected to the LNG storage tank 101 , and a downstream end connected to the first compression stage 201 of the compressor unit 100 . In detail, the storage tank connection flow path 111 is divided into two at the downstream end of the main pipe 121 extended from the upper part of the LNG storage tank 101 and the main pipe 121, and two first compression It has branch pipes 122 and 123 connected to the stage 201 . That is, the two first compression stages 201 are connected to the storage tank connection passage 111 so as to be parallel to each other.

스테이지 접속 유로(115 내지 119)는, 1개의 압축 스테이지로부터 다음 단의 압축 스테이지로 대상 가스를 흘리도록 각각 배관되어 있다. 스테이지 접속 유로(115)는, 2개의 제1 압축 스테이지(201)로부터 제2 압축 스테이지(202)로 대상 가스를 흘리도록 구성되어 있다. 즉, 스테이지 접속 유로(115)는, 제2 압축 스테이지(202)로부터 제1 압축 스테이지(201)를 향하여 연장 마련된 주 관(124)과, 주 관(124)의 상류단에서 두갈래로 나누어져, 2개의 제1 압축 스테이지(201)에 접속된 분기관(125, 126)을 포함하고 있다. 스테이지 접속 유로(116)는, 제2 압축 스테이지(202)와 제3 압축 스테이지(203)를 접속하고 있다. 스테이지 접속 유로(117)는, 제3 압축 스테이지(203)와 제4 압축 스테이지(204)를 접속하고 있다. 스테이지 접속 유로(118)는, 제4 압축 스테이지(204)와 제5 압축 스테이지(205)를 접속하고 있다. 스테이지 접속 유로(119)는, 제5 압축 스테이지(205)와 제6 압축 스테이지(206)를 접속하고 있다.The stage connection flow paths 115 to 119 are respectively piped so as to flow the target gas from one compression stage to the compression stage of the next stage. The stage connection flow path 115 is configured to flow the target gas from the two first compression stages 201 to the second compression stage 202 . That is, the stage connection flow path 115 is divided into a main pipe 124 extending from the second compression stage 202 toward the first compression stage 201 , and an upstream end of the main pipe 124 , , comprising branch pipes 125 , 126 connected to the two first compression stages 201 . The stage connection flow path 116 connects the second compression stage 202 and the third compression stage 203 . The stage connection flow path 117 connects the third compression stage 203 and the fourth compression stage 204 . The stage connection flow path 118 connects the fourth compression stage 204 and the fifth compression stage 205 . The stage connection flow path 119 connects the fifth compression stage 205 and the sixth compression stage 206 .

수요처 공급 유로(114)는, 제6 압축 스테이지(206)를 주수요처(501)에 접속하는 유로이다.The customer supply flow path 114 is a flow path connecting the sixth compression stage 206 to the main customer 501 .

쿨러(281 내지 285)는, 대상 가스를 대상 가스보다도 저온의 냉각수와 열교환하도록 구성되어 있다. 쿨러(281)는, 제2 압축 스테이지(202)로부터 토출된 대상 가스를 냉각하도록 스테이지 접속 유로(116)에 마련되어 있다. 쿨러(282)는, 제3 압축 스테이지(203)로부터 토출된 대상 가스를 냉각하도록 스테이지 접속 유로(117)에 마련되어 있다. 쿨러(283)는, 제4 압축 스테이지(204)로부터 토출된 대상 가스를 냉각하도록 스테이지 접속 유로(118)에 마련되어 있다. 쿨러(284)는, 제5 압축 스테이지(205)로부터 토출된 대상 가스를 냉각하도록 스테이지 접속 유로(119)에 마련되어 있다. 쿨러(285)는, 제6 압축 스테이지(206)로부터 토출된 대상 가스를 냉각하도록 수요처 공급 유로(114)에 마련되어 있다.The coolers 281 to 285 are configured to heat exchange the target gas with cooling water that is lower in temperature than the target gas. The cooler 281 is provided in the stage connection flow path 116 so as to cool the target gas discharged from the second compression stage 202 . The cooler 282 is provided in the stage connection flow path 117 so that the target gas discharged from the 3rd compression stage 203 may be cooled. The cooler 283 is provided in the stage connection passage 118 so as to cool the target gas discharged from the fourth compression stage 204 . The cooler 284 is provided in the stage connection flow path 119 so that the target gas discharged from the 5th compression stage 205 may be cooled. The cooler 285 is provided in the customer supply flow path 114 so as to cool the target gas discharged from the sixth compression stage 206 .

압축기 유닛(100)은, 유로(110) 내의 대상 가스의 압력을 조정하기 위해 바이패스 유로(411 내지 414)를 갖고 있다. 바이패스 유로(411 내지 413)는, 스테이지 접속 유로(116, 117, 119) 상의 분기부(311 내지 313)로부터 대상 가스를 상류측으로 되돌리도록 구성되어 있다. 분기부(311 내지 313)는, 쿨러(281, 282, 284)의 하류에 위치하고 있다.The compressor unit 100 has bypass flow passages 411 to 414 for adjusting the pressure of the target gas in the flow passage 110 . The bypass flow passages 411 to 413 are configured to return the target gas upstream from the branch portions 311 to 313 on the stage connection flow passages 116 , 117 , and 119 . The branch portions 311 to 313 are located downstream of the coolers 281 , 282 , 284 .

바이패스 유로(411)는, 제1 압축 스테이지(201) 및 제2 압축 스테이지(202)를 바이패스하면서, 저류조 접속 유로(111)의 주 관(121)에 접속되어 있다. 바이패스 유로(412)는, 제3 압축 스테이지(203)를 바이패스하면서, 분기부(311)의 하류측 또한 제3 압축 스테이지(203)의 상류측의 접속부(315)에서 스테이지 접속 유로(116)에 접속되어 있다. 바이패스 유로(413)는, 제4 압축 스테이지(204) 및 제5 압축 스테이지(205)를 바이패스하면서, 분기부(312)의 하류측 또한 제4 압축 스테이지(204)의 상류측에서 스테이지 접속 유로(117)에 접속되어 있다. 바이패스 유로(414)는, 쿨러(285)의 하류측에 있어서 수요처 공급 유로(114)에 마련된 분기부(314)로부터 대상 가스를 상류측으로 되돌리도록 구성되어 있다. 바이패스 유로(414)는, 제6 압축 스테이지(206)를 바이패스하면서, 분기부(313)의 하류측 또한 제6 압축 스테이지(206)의 상류측에서 스테이지 접속 유로(119)에 접속되어 있다.The bypass flow path 411 is connected to the main pipe 121 of the storage tank connection flow path 111 while bypassing the first compression stage 201 and the second compression stage 202 . The bypass flow path 412 bypasses the third compression stage 203 , while the stage connection flow path 116 is connected at a connection part 315 on the downstream side of the branching part 311 and on the upstream side of the third compression stage 203 . ) is connected to The bypass flow path 413 bypasses the fourth compression stage 204 and the fifth compression stage 205 , while connecting the stages downstream of the branch 312 and upstream of the fourth compression stage 204 . It is connected to the flow path 117 . The bypass flow path 414 is configured to return the target gas to the upstream side from the branch portion 314 provided in the demand source supply flow path 114 on the downstream side of the cooler 285 . The bypass flow path 414 is connected to the stage connection flow path 119 on the downstream side of the branching part 313 and upstream of the sixth compression stage 206 while bypassing the sixth compression stage 206 . .

바이패스 유로(411 내지 414)에는, 바이패스 밸브(421 내지 424)가 각각 설치되어 있다.Bypass valves 421 to 424 are provided in the bypass flow passages 411 to 414, respectively.

바이패스 유로(411 내지 414)에 대응하여, 압력 센서(431 내지 434)가 유로(110)에 배치되어 있다. 압력 센서(431)는, 제2 압축 스테이지(202)로부터의 토출압을 검출하도록, 쿨러(281)의 하류측 또한 분기부(311)의 상류측에 있어서 스테이지 접속 유로(116)에 설치되어 있다. 압력 센서(432)는, 제3 압축 스테이지(203)로부터의 토출압을 검출하도록, 쿨러(282)의 하류측 또한 분기부(312)의 상류측에 있어서 스테이지 접속 유로(117)에 설치되어 있다. 압력 센서(433)는, 제5 압축 스테이지(205)로부터의 토출압을 검출하도록, 쿨러(284)의 하류측 또한 분기부(313)의 상류측에 있어서 스테이지 접속 유로(119)에 설치되어 있다. 압력 센서(434)는, 제6 압축 스테이지(206)로부터의 토출압을 검출하도록, 쿨러(285)의 하류측 또한 분기부(314)의 상류측에 있어서 수요처 공급 유로(114)에 설치되어 있다.Corresponding to the bypass flow passages 411 to 414 , pressure sensors 431 to 434 are disposed in the flow passage 110 . The pressure sensor 431 is provided in the stage connection flow path 116 on the downstream side of the cooler 281 and on the upstream side of the branch part 311 so as to detect the discharge pressure from the second compression stage 202 . . The pressure sensor 432 is provided in the stage connection flow path 117 on the downstream side of the cooler 282 and on the upstream side of the branch part 312 so as to detect the discharge pressure from the third compression stage 203 . . The pressure sensor 433 is provided in the stage connection flow path 119 on the downstream side of the cooler 284 and on the upstream side of the branching part 313 so as to detect the discharge pressure from the fifth compression stage 205 . . The pressure sensor 434 is provided in the customer supply flow path 114 on the downstream side of the cooler 285 and on the upstream side of the branch part 314 so as to detect the discharge pressure from the sixth compression stage 206 . .

제1 왕복동 압축기(300)는, 도 2에 도시된 바와 같이, 부수요처(502)(예를 들어, 발전기, 엔진, 가스 연소 설비)에 대상 가스를 공급하기 위한 제1 분기 유로(320)를 갖고 있다. 제1 분기 유로(320)는, 제2 압축 스테이지(202)와 제3 압축 스테이지(203)를 접속하는 스테이지 접속 유로(116)로부터 분기한다. 보다 상세하게는, 제1 분기 유로(320)는, 스테이지 접속 유로(116)로부터의 바이패스 유로(411)의 분기부(311)와 스테이지 접속 유로(116)에 대한 바이패스 유로(412)의 접속부(315) 사이에 있어서 스테이지 접속 유로(116)로부터 분기되어 있다.The first reciprocating compressor 300, as shown in FIG. 2, a first branch flow path 320 for supplying the target gas to the secondary demand 502 (eg, a generator, an engine, a gas combustion facility) have it The first branch flow path 320 branches from the stage connection flow path 116 that connects the second compression stage 202 and the third compression stage 203 . In more detail, the first branch flow path 320 includes a branch 311 of the bypass flow path 411 from the stage connection flow path 116 and the bypass flow path 412 to the stage connection flow path 116 . It branches from the stage connection flow path 116 between the connection parts 315 .

제1 분기 유로(320)의 하류단은, 부수요처(502)로부터 연장된 가스 도출로(102)에 접속되어 있다. 제1 왕복동 압축기(300)에서는, 부수요처(502)가 요구하는 압력에 가장 가깝고, 또한, 당해 요구 압력보다도 큰 토출압이 되는 제2 압축 스테이지(202)의 토출 가스가 부수요처(502)에 공급된다.The downstream end of the first branch flow path 320 is connected to the gas derivation path 102 extending from the sub-customer 502 . In the first reciprocating compressor 300 , the discharge gas of the second compression stage 202 , which is the closest to the pressure requested by the sub-customer 502 and greater than the required pressure, is delivered to the sub-customer 502 . is supplied

제1 분기 유로(320)에는, 가스 도출로(102)를 향하여 제1 개폐 밸브(321), 제1 압력 조정 밸브(322), 압력 센서(324) 및 제1 역지 밸브(323)가 차례로 마련되어 있다. 제1 역지 밸브(323)는, 가스 도출로(102)로부터의 대상 가스의 역류를 방지한다. 제1 압력 조정 밸브(322)는, 제1 역지 밸브(323)의 상류측에 있어서 가스 도출로(102)에 공급되는 대상 가스의 압력을 조정한다. 압력 센서(324)는, 제1 압력 조정 밸브(322)의 하류측의 대상 가스의 압력(보다 상세하게는, 제1 압력 조정 밸브(322)와 제1 역지 밸브(323) 사이의 압력)을 검출한다.A first opening/closing valve 321 , a first pressure regulating valve 322 , a pressure sensor 324 , and a first check valve 323 are sequentially provided in the first branch flow path 320 toward the gas outlet path 102 . have. The first check valve 323 prevents a reverse flow of the target gas from the gas outlet passage 102 . The first pressure regulating valve 322 adjusts the pressure of the target gas supplied to the gas outlet passage 102 on the upstream side of the first check valve 323 . The pressure sensor 324 detects the pressure of the target gas downstream of the first pressure regulating valve 322 (more specifically, the pressure between the first pressure regulating valve 322 and the first check valve 323 ). detect

제2 왕복동 압축기(400)의 유로(110)의 상류단은, 제1 왕복동 압축기(300)의 저류조 접속 유로(111)의 주 관(121)에 접속되어 있다. 제2 왕복동 압축기(400)의 유로(110)의 하류단은, 제1 왕복동 압축기(300)의 수요처 공급 유로(114)에 접속되어 있다.The upstream end of the flow path 110 of the second reciprocating compressor 400 is connected to the main pipe 121 of the storage tank connection flow path 111 of the first reciprocating compressor 300 . The downstream end of the flow path 110 of the second reciprocating compressor 400 is connected to the demand destination supply flow path 114 of the first reciprocating compressor 300 .

제2 왕복동 압축기(400)는, 도 3에 도시된 바와 같이, 제1 왕복동 압축기(300)와 함께 부수요처(502)에 대상 가스를 공급하도록 구성되어 있다. 제2 왕복동 압축기(400)에는, 제1 왕복동 압축기(300)의 제1 분기 유로(320), 제1 개폐 밸브(321), 제1 압력 조정 밸브(322), 압력 센서(324) 및 제1 역지 밸브(323)와 마찬가지의 제2 분기 유로(330), 제2 개폐 밸브(331), 제2 압력 조정 밸브(332), 압력 센서(334) 및 제2 역지 밸브(333)가 마련되어 있다. 제2 분기 유로(330)에서는, 가스 도출로(102)를 향하여 제2 개폐 밸브(331), 제2 압력 조정 밸브(332), 압력 센서(334) 및 제2 역지 밸브(333)가 차례로 마련되어 있다. 또한, 제2 왕복동 압축기(400)의 다른 구성에 대해서도, 제1 왕복동 압축기(300)와 마찬가지이다. 압축기 유닛(100)에서는, 제1 왕복동 압축기(300) 및 제2 왕복동 압축기(400)가 동일한 구조로 되기 때문에, 각각에 사용되는 부품의 공통화를 도모할 수 있다.As shown in FIG. 3 , the second reciprocating compressor 400 is configured to supply the target gas to the sub-customer 502 together with the first reciprocating compressor 300 . The second reciprocating compressor 400 includes a first branch flow path 320 of the first reciprocating compressor 300 , a first on/off valve 321 , a first pressure control valve 322 , a pressure sensor 324 , and a first A second branch flow path 330 similar to the check valve 323 , a second on/off valve 331 , a second pressure regulating valve 332 , a pressure sensor 334 , and a second check valve 333 are provided. In the second branch flow path 330 , a second on/off valve 331 , a second pressure regulating valve 332 , a pressure sensor 334 , and a second check valve 333 are sequentially provided toward the gas outlet passage 102 . have. In addition, also about the other structure of the 2nd reciprocating compressor 400, it is the same as that of the 1st reciprocating compressor 300. As shown in FIG. In the compressor unit 100, since the 1st reciprocating compressor 300 and the 2nd reciprocating compressor 400 become the same structure, commonization of the components used for each can be aimed at.

도 1에 도시한 제어부(420)는, 제1 왕복동 압축기(300) 및 제2 왕복동 압축기(400)의 압력 센서(431 내지 434, 324, 334)의 검출 압력을 나타내는 정보를 취득한다. 도 1에서는 도시를 생략하고 있지만, 실제로는 제어부(420)와 이들 압력 센서(431 내지 434, 324, 334)가 전기적으로 접속되어 있다. 또한, 제어부(420)는, 바이패스 밸브(421 내지 424), 제1 개폐 밸브(321), 제2 개폐 밸브(331), 제1 압력 조정 밸브(322) 및 제2 압력 조정 밸브(332)에 전기적으로 접속되어 있다.The control unit 420 illustrated in FIG. 1 acquires information indicating pressures detected by the pressure sensors 431 to 434 , 324 , 334 of the first reciprocating compressor 300 and the second reciprocating compressor 400 . Although not shown in FIG. 1, in reality, the control part 420 and these pressure sensors 431-434, 324, 334 are electrically connected. In addition, the control unit 420 includes the bypass valves 421 to 424 , the first on-off valve 321 , the second on-off valve 331 , the first pressure regulating valve 322 , and the second pressure regulating valve 332 . is electrically connected to

제어부(420)는, 제1 왕복동 압축기(300)에 있어서의 저류조 접속 유로(111), 복수의 스테이지 접속 유로(115 내지 119), 및 수요처 공급 유로(114)의 압력 밸런스를 일정하게 유지하기 위해, 압력 센서(431 내지 434)의 검출 압력에 기초하여, 바이패스 밸브(421 내지 424)의 개방도를 조정하도록 구성되어 있다. 또한, 제어부(420)는, 제1 왕복동 압축기(300)로부터 부수요처(502)에 일정 압력의 가스를 공급하기 위해, 압력 센서(431) 및 압력 센서(324)의 검출 압력에 기초하여, 제1 개폐 밸브(321) 및 제1 압력 조정 밸브(322)를 제어하도록 구성되어 있다. 이하의 설명에서는, 제1 왕복동 압축기(300)의 압력 센서(431)를 「제1 토출압 검출부(431A)」라 칭한다. 제1 왕복동 압축기(300)의 압력 센서(324)를 「제1 공급압 검출부(324)」라 칭한다.The control unit 420 is configured to constantly maintain the pressure balance of the storage tank connection flow path 111 , the plurality of stage connection flow paths 115 to 119 , and the customer supply flow path 114 in the first reciprocating compressor 300 . , based on the pressure detected by the pressure sensors 431 to 434, and to adjust the opening degree of the bypass valves 421 to 424. In addition, the control unit 420 is configured to supply gas of a predetermined pressure from the first reciprocating compressor 300 to the sub-customer 502 , based on the pressure detected by the pressure sensor 431 and the pressure sensor 324 , the second It is comprised so that the 1 on-off valve 321 and the 1st pressure regulating valve 322 may be controlled. In the following description, the pressure sensor 431 of the first reciprocating compressor 300 will be referred to as a “first discharge pressure detecting unit 431A”. The pressure sensor 324 of the first reciprocating compressor 300 is referred to as a “first supply pressure detection unit 324”.

마찬가지로, 제어부(420)는, 제2 왕복동 압축기(400)에 있어서의 각 유로(111, 115 내지 119, 114)의 압력 밸런스를 일정하게 유지하기 위해, 압력 센서(431 내지 434)에 기초하여 바이패스 밸브(421 내지 424)의 개방도를 조정한다. 또한, 제어부(420)는, 부수요처(502)에 일정 압력의 가스를 공급하기 위해, 압력 센서(431, 324)의 검출 압력에 기초하여, 제2 개폐 밸브(331) 및 제2 압력 조정 밸브(332)를 제어하도록 구성되어 있다. 이하의 설명에서는, 제2 왕복동 압축기(400)의 압력 센서(431)를 「제2 토출압 검출부(431B)」라 칭한다. 제2 왕복동 압축기(400)의 압력 센서(334)를 「제2 공급압 검출부(334)」라 칭한다.Similarly, in order to keep the pressure balance of each flow path 111, 115 to 119, 114 in the 2nd reciprocating compressor 400 constant, the control part 420 is based on the pressure sensors 431 to 434. The degree of opening of the pass valves 421 to 424 is adjusted. In addition, the control unit 420 is configured to supply the gas of a predetermined pressure to the sub-customer 502 , based on the pressure detected by the pressure sensors 431 and 324 , the second on/off valve 331 and the second pressure regulating valve (332) is configured to control. In the following description, the pressure sensor 431 of the second reciprocating compressor 400 is referred to as a "second discharge pressure detection unit 431B". The pressure sensor 334 of the second reciprocating compressor 400 is referred to as a “second supply pressure detection unit 334”.

다음에, 제1 왕복동 압축기(300)의 동작에 대하여 설명한다. 제1 왕복동 압축기(300)가 구동되면, 대상 가스는, 제1 압축 스테이지(201) 내지 제6 압축 스테이지(206)에 의해 순차적으로 압축된다. 제2 압축 스테이지(202) 내지 제6 압축 스테이지(206)로부터 토출된 대상 가스는, 쿨러(281 내지 285)를 통과함으로써 냉각된다. 제6 압축 스테이지(206)로부터 토출된 고압의 대상 가스는, 수요처 공급 유로(114)를 통해 주수요처(501)에 공급된다.Next, the operation of the first reciprocating compressor 300 will be described. When the first reciprocating compressor 300 is driven, the target gas is sequentially compressed by the first compression stage 201 to the sixth compression stage 206 . The target gas discharged from the second compression stage 202 to the sixth compression stage 206 is cooled by passing through the coolers 281 to 285 . The high-pressure target gas discharged from the sixth compression stage 206 is supplied to the main customer 501 through the customer supply flow path 114 .

제1 왕복동 압축기(300)의 구동 중, 유로(110) 내의 각 처의 대상 가스의 압력은, 제1 토출압 검출부(431A) 및 다른 압력 센서(432 내지 434)에 의해 취득되고 있다. 제1 토출압 검출부(431A) 및 다른 압력 센서(432 내지 434)의 압력 검출값이 소정의 정상 범위 내인 경우에는, 바이패스 밸브(421 내지 424)는 폐쇄되어 있다. 제1 토출압 검출부(431A) 및 다른 압력 센서(432 내지 434)의 압력 검출값이 정상 범위로부터 벗어난 경우에는, 제1 토출압 검출부(431A) 및 다른 압력 센서(432 내지 434)의 압력 검출값을 정상 범위로 되돌리도록, 바이패스 밸브(421 내지 424)의 개방도가 제어부(420)에 의해 조정된다. 이상의 동작은, 제2 왕복동 압축기(400)에 대해서도 마찬가지이다.While the first reciprocating compressor 300 is being driven, the pressure of the target gas at each location in the flow path 110 is acquired by the first discharge pressure detection unit 431A and the other pressure sensors 432 to 434 . When the pressure detection values of the first discharge pressure detection unit 431A and the other pressure sensors 432 to 434 are within a predetermined normal range, the bypass valves 421 to 424 are closed. When the pressure detection values of the first discharge pressure detection unit 431A and the other pressure sensors 432 to 434 are out of the normal range, the pressure detection values of the first discharge pressure detection unit 431A and the other pressure sensors 432 to 434 are The opening degree of the bypass valves 421 to 424 is adjusted by the control unit 420 to return to the normal range. The above operation is also the same for the second reciprocating compressor 400 .

그런데, 제1 왕복동 압축기(300)에서는, 주수요처(501)에 대상 가스를 공급하고 있는 동안, 부수요처(502)에도 대상 가스를 공급하고 있다. 도 4는 제1 왕복동 압축기(300)로부터 부수요처(502)로의 대상 가스를 공급하는 흐름을 나타내는 도면이다. 단, 주수요처(501)에 대상 가스가 공급되고 있는 동안, 부수요처(502)에 대상 가스가 항상 공급될 필요는 없다.By the way, in the 1st reciprocating compressor 300, while the target gas is being supplied to the main demand destination 501, the target gas is also supplied to the secondary demand destination 502. 4 is a diagram illustrating a flow of supplying a target gas from the first reciprocating compressor 300 to the sub-customer 502 . However, while the target gas is being supplied to the main consumer 501 , the target gas is not always supplied to the secondary demand 502 .

제1 왕복동 압축기(300)의 기동 시에는, 제어부(420)는, 제1 개폐 밸브(321)를 폐쇄하고 있다(스텝 S110). 제어부(420)는, 제1 압력 조정 밸브(322)의 상류측(이하, 1차측이라 하는 경우가 있음)의 대상 가스의 압력을 확인하기 위해, 제1 토출압 검출부(431A)의 검출 압력(이하, 1차측의 검출 압력이라 하는 경우가 있음)을 참조한다. 제어부(420)는, 1차측의 검출 압력이 미리 설정된 소정의 범위에 드는지 여부를 판정하고(스텝 S120), 1차측의 검출 압력이 소정의 범위에 들지 않으면, 제1 개폐 밸브(321)가 폐쇄된 상태가 유지된다(스텝 S120: "아니오"). 1차측의 검출 압력이 소정의 범위에 들면, 제어부(420)는, 제1 개폐 밸브(321)를 개방한다(스텝 S130).When the first reciprocating compressor 300 is started, the control unit 420 is closing the first on-off valve 321 (step S110). The control unit 420 is configured to check the pressure of the target gas on the upstream side (hereinafter, sometimes referred to as the primary side) of the first pressure control valve 322, the pressure detected by the first discharge pressure detection unit 431A ( Hereinafter, it may be referred to as the detection pressure of the primary side). The control unit 420 determines whether or not the detected pressure on the primary side falls within a predetermined range (step S120), and if the detected pressure on the primary side does not fall within the predetermined range, the first on-off valve 321 is closed. The current state is maintained (step S120: "No"). When the detected pressure on the primary side falls within a predetermined range, the control unit 420 opens the first on-off valve 321 (step S130).

제1 개폐 밸브(321)가 개방된 후, 제어부(420)는, 제1 압력 조정 밸브(322)의 하류측(이하, 2차측이라 하는 경우가 있음)에 위치하는 제1 공급압 검출부(324)의 검출 압력(이하, 2차측의 검출 압력이라 하는 경우가 있음)을 취득한다. 그리고, 제어부(420)는, 2차측의 검출 압력에 기초하여, 대상 가스의 압력이 부수요처(502)의 요구 압력이 되도록, 제1 압력 조정 밸브(322)의 개방도를 조정한다(스텝 S140).After the first on-off valve 321 is opened, the control unit 420 includes a first supply pressure detecting unit 324 located on the downstream side (hereinafter, sometimes referred to as a secondary side) of the first pressure regulating valve 322 . ) of the detection pressure (hereinafter referred to as secondary side detection pressure in some cases) is acquired. Then, based on the pressure detected on the secondary side, the control unit 420 adjusts the opening degree of the first pressure regulating valve 322 so that the pressure of the target gas becomes the required pressure of the sub-customer 502 (step S140 ). ).

제어부(420)는, 1차측의 검출 압력이 소정의 범위로부터 벗어난 경우, 제1 개폐 밸브(321)를 폐쇄하는 제어를 실행한다(스텝 S110). 부수요처(502)로의 대상 가스의 공급을 중단함으로써, 제1 왕복동 압축기(300)의 각 유로(111, 115 내지 119, 114)의 압력 밸런스의 안정화를 도모할 수 있다. 또한, 이 동안, 제2 왕복동 압축기(400)로부터 부수요처(502)로의 대상 가스의 공급은 계속되어도 된다. 그 후, 1차측의 검출 압력이 계속적으로 취득되어(스텝 S120), 검출 압력이 다시 소정의 범위에 들면, 제1 왕복동 압축기(300)로부터 부수요처(502)로의 대상 가스의 공급이 재개된다(스텝 S130, S140).The control unit 420 executes control to close the first on-off valve 321 when the detected pressure on the primary side deviates from the predetermined range (step S110). By stopping the supply of the target gas to the sub-customer 502 , it is possible to stabilize the pressure balance of the flow paths 111 , 115 to 119 , 114 of the first reciprocating compressor 300 . In addition, supply of the target gas from the 2nd reciprocating compressor 400 to the sub-customer 502 may be continued during this time. After that, the primary side detected pressure is continuously acquired (step S120), and when the detected pressure is again within the predetermined range, supply of the target gas from the first reciprocating compressor 300 to the sub-customer 502 is resumed ( Steps S130, S140).

제1 왕복동 압축기(300)에서는, 정지 신호가 제어부(420)에 입력되면(스텝 S210), 제어부(420)는, 제1 압력 조정 밸브(322)의 개방도를 낮추는 제어를 실행한다(스텝 S220). 이 결과, 제1 압력 조정 밸브(322)의 2차측 검출 압력이 점차 저하된다. 2차측의 검출 압력이 소정의 역치를 하회하면(스텝 S230), 제어부(420)는, 제1 개폐 밸브(321)를 폐쇄한다(스텝 S240). 제1 왕복동 압축기(300)에서는, 제1 압력 조정 밸브(322)의 개방도가 낮춰져 2차측으로의 가스의 흐름이 억제된 후에, 제1 개폐 밸브(321)가 폐쇄되기 때문에, 1차측의 압력의 급격한 변화가 방지된다.In the first reciprocating compressor 300 , when a stop signal is input to the control unit 420 (step S210 ), the control unit 420 executes control to lower the opening degree of the first pressure control valve 322 (step S220 ). ). As a result, the secondary side detection pressure of the 1st pressure regulation valve 322 falls gradually. When the detected pressure on the secondary side is less than the predetermined threshold (step S230), the control unit 420 closes the first on-off valve 321 (step S240). In the first reciprocating compressor 300 , since the first opening/closing valve 321 is closed after the opening degree of the first pressure regulating valve 322 is lowered to suppress the flow of gas to the secondary side, the primary side Abrupt changes in pressure are avoided.

제2 왕복동 압축기(400)에 대해서도, 도 4와 마찬가지의 스텝에 의해 부수요처(502)에 대상 가스가 공급된다. 즉, 제2 왕복동 압축기(400)의 기동 시에는, 제어부(420)는 제2 토출압 검출부(431B)와 제2 압력 조정 밸브(332) 사이의 제2 개폐 밸브(331)를 폐쇄하고 있다(스텝 S110). 제어부(420)는, 제2 토출압 검출부(431B)의 검출 압력에 기초하여, 제2 압력 조정 밸브(332)의 1차측(상류측)의 압력이 미리 설정된 소정의 범위에 드는지 여부를 판정한다(스텝 S120). 1차측의 검출 압력이 소정의 범위에 들면, 제어부(420)는, 제2 개폐 밸브(331)를 개방한다(스텝 S130).Also about the 2nd reciprocating compressor 400, the target gas is supplied to the sub-customer 502 by the step similar to FIG. That is, when the second reciprocating compressor 400 is started, the control unit 420 closes the second opening/closing valve 331 between the second discharge pressure detecting unit 431B and the second pressure adjusting valve 332 ( step S110). The control unit 420 determines whether or not the pressure on the primary side (upstream side) of the second pressure regulating valve 332 falls within a preset predetermined range based on the pressure detected by the second discharge pressure detection unit 431B. (Step S120). When the detected pressure on the primary side falls within the predetermined range, the control unit 420 opens the second on-off valve 331 (step S130).

제2 개폐 밸브(331)가 개방된 후, 제어부(420)는, 제2 공급압 검출부(334)의 검출 압력에 기초하여, 제2 압력 조정 밸브(332)의 2차측 대상 가스의 압력이 부수요처(502)의 요구 압력이 되도록, 제2 압력 조정 밸브(332)의 개방도를 조정한다(스텝 S140).After the second on-off valve 331 is opened, the control unit 420 determines that the secondary-side target gas pressure of the second pressure control valve 332 is negative based on the pressure detected by the second supply pressure detection unit 334 . The opening degree of the 2nd pressure regulating valve 332 is adjusted so that it may become the requested|required pressure of the demand destination 502 (step S140).

제2 왕복동 압축기(400)에서는, 제2 압력 조정 밸브(332)의 1차측의 검출 압력이 소정의 범위로부터 벗어난 경우, 제1 왕복동 압축기(300)와 마찬가지로, 제어부(420)가 제2 개폐 밸브(331)를 폐쇄하는 제어를 실행한다(스텝 S110). 이에 의해, 제2 왕복동 압축기(400)로부터 부수요처(502)로의 대상 가스의 공급이 중단된다. 또한, 이 동안, 제1 왕복동 압축기(300)로부터 부수요처(502)로의 대상 가스의 공급은 계속되어도 된다. 그 후, 1차측의 검출 압력이 다시 소정의 범위에 들면, 제2 왕복동 압축기(400)로부터 부수요처(502)로의 대상 가스의 공급이 재개된다(스텝 S120, S130, S140).In the second reciprocating compressor 400 , when the detected pressure on the primary side of the second pressure regulating valve 332 deviates from a predetermined range, as in the first reciprocating compressor 300 , the control unit 420 controls the second on-off valve Control to close 331 is executed (step S110). As a result, the supply of the target gas from the second reciprocating compressor 400 to the sub-customer 502 is stopped. In addition, supply of the target gas from the 1st reciprocating compressor 300 to the sub-customer 502 may be continued during this time. After that, when the detected pressure on the primary side again falls within the predetermined range, supply of the target gas from the second reciprocating compressor 400 to the sub-customer 502 is restarted (steps S120 , S130 , S140 ).

제2 왕복동 압축기(400)에서는, 정지 신호가 제어부(420)에 입력되면(스텝 S210), 제어부(420)는, 제2 압력 조정 밸브(332)의 개방도를 낮추는 제어를 실행한다(스텝 S220). 2차측의 검출 압력이 소정의 역치를 하회하면(스텝 S230), 제2 개폐 밸브(331)가 폐쇄된다(스텝 S240). 제2 왕복동 압축기(400)에서는, 제2 압력 조정 밸브(332)의 개방도가 낮춰진 후에 제2 개폐 밸브(331)가 폐쇄되기 때문에, 1차측의 압력의 급격한 변화가 방지된다.In the second reciprocating compressor 400 , when a stop signal is input to the control unit 420 (step S210 ), the control unit 420 executes control to lower the opening degree of the second pressure regulating valve 332 (step S220 ). ). When the detected pressure on the secondary side is less than a predetermined threshold (step S230), the second on-off valve 331 is closed (step S240). In the second reciprocating compressor 400 , since the second on-off valve 331 is closed after the opening degree of the second pressure regulating valve 332 is lowered, an abrupt change in the pressure on the primary side is prevented.

이상, 본 발명의 실시 형태에 대하여 설명하였지만, 제1 압력 조정 밸브(322) 및 제2 압력 조정 밸브(332)보다도 하류측의 유로에서는 대상 가스의 압력이 낮아지기 때문에, 가스 도출로(102)를 구성하는 배관이나 가스 도출로(102)에 설치되는 계장품에 고압 사양의 것을 사용하는 것이 불필요해진다. 그 결과, 당해 배관이나 계장품의 비용을 억제하는 것이 가능해진다. 또한, 제1, 제2 압력 조정 밸브(322, 332)와 제1, 제2 역지 밸브(323, 333) 사이의 배관은 고압 사양으로 되어도 된다.As mentioned above, although embodiment of this invention was described, since the pressure of the target gas becomes low in the flow path downstream from the 1st pressure regulating valve 322 and the 2nd pressure regulating valve 332, the gas derivation path 102 It becomes unnecessary to use the thing of a high pressure specification for the piping which comprises and the instrumentation provided in the gas derivation path 102. As shown in FIG. As a result, it becomes possible to suppress the cost of the said piping and instrumentation. In addition, the piping between the 1st, 2nd pressure regulating valves 322, 332 and the 1st, 2nd check valves 323, 333 may be made into a high pressure specification.

제1 왕복동 압축기(300)에서는, 제1 역지 밸브(323)가 마련됨으로써, 만일, 제1 역지 밸브(323)의 하류측의 압력이 비정상적으로 상승하였다고 해도, 상류측으로의 영향을 방지할 수 있다. 제1 압력 조정 밸브(322)의 1차측의 검출 압력이 소정의 범위로부터 벗어난 경우, 제1 개폐 밸브(321)가 폐쇄되므로, 제1 압력 조정 밸브(322)의 상류측에서의 가스의 압력이 안정화되어 있지 않은 상태에서의 부수요처(502)로의 대상 가스의 유출을 방지할 수 있다. 제2 왕복동 압축기(400)에 대해서도 마찬가지이다.In the first reciprocating compressor 300, by providing the first check valve 323, even if the pressure on the downstream side of the first check valve 323 rises abnormally, the influence on the upstream side can be prevented. . When the detected pressure on the primary side of the first pressure regulating valve 322 is out of the predetermined range, the first on-off valve 321 is closed, so that the gas pressure on the upstream side of the first pressure regulating valve 322 is stabilized. It is possible to prevent the outflow of the target gas to the sub-customer 502 in a non-existent state. The same applies to the second reciprocating compressor 400 .

제1 왕복동 압축기(300)에서는, 부수요처(502)의 요구 압력보다도 큰 토출 압력이 되는 제2 내지 제6 압축 스테이지(202 내지 206) 중, 가장 토출 압력이 작은 제2 압축 스테이지(202)의 하류측에 제1 분기 유로(320)가 마련된다. 이에 의해, 제1 압력 조정 밸브(322)의 1차측의 압력이 불필요하게 커지는 것이 방지되어, 2차측의 압력 조정을 용이하게 행하는 것이 가능해진다. 제2 왕복동 압축기(400)에 대해서도 마찬가지이다.In the first reciprocating compressor 300 , the second compression stage 202 having the smallest discharge pressure among the second to sixth compression stages 202 to 206 having a discharge pressure greater than the required pressure of the sub-customer 502 . A first branch flow path 320 is provided on the downstream side. Thereby, it is prevented that the pressure on the primary side of the 1st pressure control valve 322 becomes large unnecessarily, and it becomes possible to perform pressure adjustment on the secondary side easily. The same applies to the second reciprocating compressor 400 .

금회 개시된 실시 형태는, 모든 점에서 예시이며, 제한적인 것은 아니라고 이해되어야 한다. 본 발명의 범위는, 상기한 설명이 아니라 특허 청구 범위에 의해 나타내어지고, 특허 청구 범위와 균등의 의미 및 범위 내에서의 모든 변경이 포함되는 것이 의도된다.It should be understood that embodiment disclosed this time is an illustration in every point, and is not restrictive. The scope of the present invention is indicated by the claims rather than the above description, and it is intended that all changes within the meaning and scope of the claims and equivalents are included.

상술한 실시 형태에 관하여, 제1 왕복동 압축기(300)는, 1개의 제1 압축 스테이지(201)를 갖고 있어도 된다. 제1 왕복동 압축기(300)는, 5단 미만의 압축 스테이지로 각각 구성되어도 된다. 제2 왕복동 압축기(400)에 대해서도 마찬가지이다.Regarding the above-described embodiment, the first reciprocating compressor 300 may have one first compression stage 201 . Each of the first reciprocating compressors 300 may be constituted by a compression stage of less than five stages. The same applies to the second reciprocating compressor 400 .

상술한 다양한 실시 형태에 관련하여 설명된 압축기 유닛은, 이하의 특징을 주로 구비하고 있다.The compressor unit described in relation to the various embodiments described above mainly has the following features.

상술한 실시 형태의 일 국면에 관한 압축기 유닛은, 선박 내에 설치되며, 상기 선박의 LNG 저류조로부터 흡입한 보일 오프 가스인 대상 가스를 압축하도록 구성되어 있다. 압축기 유닛은, 복수의 압축 스테이지를 갖고, 대상 가스를 압축하여 하나의 수요처에 공급하는 제1 왕복동 압축기와, 복수의 압축 스테이지를 갖고, 대상 가스를 압축하여 상기 하나의 수요처에 공급하도록 상기 제1 왕복동 압축기와 병렬로 접속된 제2 왕복동 압축기와, 제어부를 구비하고 있다. 상기 제1 왕복동 압축기는, 1개의 압축 스테이지와 그 다음 압축 스테이지를 접속하는 스테이지 접속 유로로부터 분기하여 다른 수요처로 대상 가스를 유도하는 가스 도출로에 접속되는 제1 분기 유로와, 상기 가스 도출로로부터 상기 스테이지 접속 유로로의 대상 가스의 역류를 방지하도록 상기 제1 분기 유로에 마련된 제1 역지 밸브와, 상기 가스 도출로에 공급되는 대상 가스의 압력을 상기 제1 역지 밸브의 상류측에서 조정하도록 상기 제1 분기 유로에 마련된 제1 압력 조정 밸브와, 상기 1개의 압축 스테이지의 토출측의 대상 가스의 압력을 검출하는 제1 토출압 검출부와, 상기 제1 압력 조정 밸브의 하류측의 대상 가스의 압력을 검출하는 제1 공급압 검출부를 포함하고 있다. 상기 제2 왕복동 압축기는, 1개의 압축 스테이지와 그 다음 압축 스테이지를 접속하는 스테이지 접속 유로로부터 분기하여 상기 가스 도출로에 접속되는 제2 분기 유로와, 상기 가스 도출로로부터 상기 제2 왕복동 압축기의 상기 스테이지 접속 유로로의 대상 가스의 역류를 방지하도록 상기 제2 분기 유로에 마련된 제2 역지 밸브와, 상기 가스 도출로에 공급되는 대상 가스의 압력을 상기 제2 역지 밸브의 상류측에서 조정하도록 상기 제2 분기 유로에 마련된 제2 압력 조정 밸브와, 상기 제2 왕복동 압축기의 상기 1개의 압축 스테이지의 토출측의 대상 가스의 압력을 검출하는 제2 토출압 검출부와, 상기 제2 압력 조정 밸브의 하류측의 대상 가스의 압력을 검출하는 제2 공급압 검출부를 포함하고 있다. 상기 제어부는, 상기 제1 토출압 검출부 및 상기 제2 토출압 검출부의 검출 압력이 소정의 범위에 드는지 여부를 판정하고, 상기 검출 압력이 상기 소정의 범위에 드는 경우에는, 상기 제1 공급압 검출부 및 상기 제2 공급압 검출부의 검출 압력이, 상기 다른 수요처가 요구하는 압력값에 가까워지도록 상기 제1 압력 조정 밸브 및 상기 제2 압력 조정 밸브의 개방도를 조정한다.The compressor unit according to one aspect of the above-described embodiment is installed in a ship and is configured to compress a target gas that is a boil-off gas sucked in from an LNG storage tank of the ship. The compressor unit has a plurality of compression stages, a first reciprocating compressor for compressing a target gas and supplying it to one consumer; a plurality of compression stages; A second reciprocating compressor connected in parallel with the reciprocating compressor, and a control unit are provided. The first reciprocating compressor includes a first branch flow path connected to a gas derivation path that branches from a stage connection path connecting one compression stage and the next compression stage and guides the target gas to another demand destination; a first check valve provided in the first branch flow path to prevent a reverse flow of the target gas to the stage connection flow path, and adjust the pressure of the target gas supplied to the gas outlet path at an upstream side of the first check valve A first pressure regulating valve provided in the first branch flow path, a first discharge pressure detection unit for detecting the pressure of the target gas on the discharge side of the one compression stage, and the pressure of the target gas on the downstream side of the first pressure regulating valve It includes a first supply pressure detection unit to detect. The second reciprocating compressor includes: a second branch flow path that branches from a stage connection flow path connecting one compression stage and the next compression stage and is connected to the gas lead-out path; a second check valve provided in the second branch flow path to prevent a reverse flow of the target gas to the stage connection flow path, and the second check valve to adjust the pressure of the target gas supplied to the gas outlet path at an upstream side of the second check valve a second pressure regulating valve provided in the second branch flow path; a second discharge pressure detecting unit for detecting a pressure of a target gas on a discharge side of the one compression stage of the second reciprocating compressor; and a second supply pressure detection unit for detecting the pressure of the target gas. The control unit determines whether pressures detected by the first discharge pressure detection unit and the second discharge pressure detection unit fall within a predetermined range, and when the detected pressure falls within the predetermined range, the first supply pressure detection unit and the opening degree of the first pressure regulating valve and the second pressure regulating valve is adjusted so that the detected pressure of the second supply pressure detecting unit approaches a pressure value required by the other demander.

상기 구성에 의하면, 제1 압력 조정 밸브 및 제2 압력 조정 밸브의 하류측의 대상 가스의 압력이 낮아지기 때문에, 가스를 다른 수요처로 흘리기 위한 유로를 구성하는 배관이나 당해 유로에 설치되는 계장품에 고압 사양의 것을 사용하는 것이 불필요해진다. 그 결과, 당해 배관이나 계장품의 비용을 억제하는 것이 가능해진다.According to the above configuration, since the pressure of the target gas on the downstream side of the first pressure regulating valve and the second pressure regulating valve is lowered, a high pressure is applied to the piping constituting the flow path for flowing the gas to another customer or to the instrumentation installed in the flow path. It becomes unnecessary to use the thing of the specification. As a result, it becomes possible to suppress the cost of the said piping and instrumentation.

상기 구성에 관하여, 상기 제1 왕복동 압축기는, 상기 제1 토출압 검출부와 상기 제1 압력 조정 밸브 사이에서 상기 제1 분기 유로를 개폐하는 제1 개폐 밸브를 포함하고 있어도 된다. 상기 제2 왕복동 압축기는, 상기 제2 토출압 검출부와 상기 제2 압력 조정 밸브 사이에서 상기 제2 분기 유로를 개폐하는 제2 개폐 밸브를 포함하고 있어도 된다. 상기 제어부는, 소정의 압력 범위가 된 경우에 상기 제1 개폐 밸브 및 상기 제2 개폐 밸브를 개방해도 된다.In the above configuration, the first reciprocating compressor may include a first opening/closing valve that opens and closes the first branch flow path between the first discharge pressure detection unit and the first pressure regulating valve. The said 2nd reciprocating compressor may include the 2nd on-off valve which opens and closes the said 2nd branch flow path between the said 2nd discharge pressure detection part and the said 2nd pressure regulating valve. The said control part may open the said 1st on-off valve and the said 2nd on-off valve when it becomes a predetermined pressure range.

상기 구성에 의하면, 제1 압력 조정 밸브 및 제2 압력 조정 밸브의 상류측에서의 압력이 소정의 압력 범위에 든 상태가 확인된 후에, 다른 수요처로 대상 가스가 공급된다.According to the above configuration, after it is confirmed that the pressure at the upstream side of the first pressure regulating valve and the second pressure regulating valve falls within a predetermined pressure range, the target gas is supplied to another demanding destination.

상기 구성에 관하여, 상기 제어부는, 상기 다른 수요처로의 공급을 정지하라는 지시에 따라서 상기 제1 압력 조정 밸브 및 상기 제2 압력 조정 밸브의 개방도를 낮춤과 함께, 상기 제1 공급압 검출부 및 상기 제2 공급압 검출부의 상기 검출 압력이 소정의 역치를 하회하면, 상기 제1 개폐 밸브 및 상기 제2 개폐 밸브를 폐쇄해도 된다.With respect to the above configuration, the control unit lowers the opening degrees of the first pressure regulating valve and the second pressure regulating valve according to the instruction to stop supply to the other demanding destinations, and the first supply pressure detecting unit and the When the detected pressure of a 2nd supply pressure detection part is less than a predetermined threshold, you may close the said 1st on-off valve and the said 2nd on-off valve.

상기 구성에 의하면, 제1 개폐 밸브 및 제2 개폐 밸브를 폐쇄하기 전에, 제어부는, 제1 압력 조정 밸브 및 제2 압력 조정 밸브의 개방도를 낮추기 때문에, 제1 왕복동 압축기 및 제2 왕복동 압축기의 스테이지 접속 유로의 급격한 압력 상승을 방지할 수 있다.According to the above configuration, before closing the first on-off valve and the second on-off valve, the control unit lowers the opening degrees of the first pressure regulating valve and the second pressure regulating valve, so that the first reciprocating compressor and the second reciprocating compressor It is possible to prevent a sudden pressure rise in the stage connection passage.

상기 구성에 관하여, 상기 스테이지 접속 유로는, 상기 복수의 압축 스테이지 중에서 상기 다른 수요처가 요구하는 상기 압력값에 가장 가깝고 또한 상기 압력값보다도 큰 압력의 대상 가스를 토출하는 압축 스테이지의 토출측에 마련되어 있어도 된다.With respect to the above configuration, the stage connection flow path may be provided on the discharge side of the compression stage for discharging the target gas at a pressure closest to the pressure value required by the other demander and greater than the pressure value among the plurality of compression stages. .

상기 구성에 의하면, 제1 압력 조정 밸브 및 제2 압력 조정 밸브의 1차측의 압력을 낮게 억제할 수 있어, 압력 제어를 용이하게 행할 수 있다.According to the said structure, the pressure of the primary side of a 1st pressure regulating valve and a 2nd pressure regulating valve can be suppressed low, and pressure control can be performed easily.

상기 구성에 관하여, 상기 제1 왕복동 압축기 및 상기 제2 왕복동 압축기는, 동수의 압축 스테이지를 갖고 있어도 된다.Regarding the said structure, the said 1st reciprocating compressor and the said 2nd reciprocating compressor may have the same number of compression stages.

상술한 실시 형태의 기술은, 선박에 탑재된 압축기 유닛에 적합하게 이용된다.The technique of the above-described embodiment is suitably used for a compressor unit mounted on a ship.

Claims (5)

선박 내에 설치되며, 상기 선박의 LNG 저류조로부터 흡입한 보일 오프 가스인 대상 가스를 압축하는 압축기 유닛이며,
복수의 압축 스테이지를 갖고, 대상 가스를 압축하여 하나의 수요처에 공급하는 제1 왕복동 압축기와,
복수의 압축 스테이지를 갖고, 대상 가스를 압축하여 상기 하나의 수요처에 공급하도록 상기 제1 왕복동 압축기와 병렬로 접속된 제2 왕복동 압축기와,
제어부를 구비하고,
상기 제1 왕복동 압축기는,
1개의 압축 스테이지와 그 다음 압축 스테이지를 접속하는 스테이지 접속 유로로부터 분기하여 다른 수요처로 대상 가스를 유도하는 가스 도출로에 접속되는 제1 분기 유로와,
상기 가스 도출로로부터 상기 스테이지 접속 유로로의 대상 가스의 역류를 방지하도록 상기 제1 분기 유로에 마련된 제1 역지 밸브와,
상기 가스 도출로에 공급되는 대상 가스의 압력을 상기 제1 역지 밸브의 상류측에서 조정하도록 상기 제1 분기 유로에 마련된 제1 압력 조정 밸브와,
상기 1개의 압축 스테이지의 토출측의 대상 가스의 압력을 검출하는 제1 토출압 검출부와,
상기 제1 압력 조정 밸브의 하류측의 대상 가스의 압력을 검출하는 제1 공급압 검출부를 포함하고,
상기 제2 왕복동 압축기는,
1개의 압축 스테이지와 그 다음 압축 스테이지를 접속하는 스테이지 접속 유로로부터 분기하여 상기 가스 도출로에 접속되는 제2 분기 유로와,
상기 가스 도출로로부터 상기 제2 왕복동 압축기의 상기 스테이지 접속 유로로의 대상 가스의 역류를 방지하도록 상기 제2 분기 유로에 마련된 제2 역지 밸브와,
상기 가스 도출로에 공급되는 대상 가스의 압력을 상기 제2 역지 밸브의 상류측에서 조정하도록 상기 제2 분기 유로에 마련된 제2 압력 조정 밸브와,
상기 제2 왕복동 압축기의 상기 1개의 압축 스테이지의 토출측의 대상 가스의 압력을 검출하는 제2 토출압 검출부와,
상기 제2 압력 조정 밸브의 하류측의 대상 가스의 압력을 검출하는 제2 공급압 검출부를 포함하고,
상기 제어부는, 상기 제1 토출압 검출부 및 상기 제2 토출압 검출부의 검출 압력이 소정의 범위에 드는지 여부를 판정하고, 상기 검출 압력이 상기 소정의 범위에 드는 경우에는, 상기 제1 공급압 검출부 및 상기 제2 공급압 검출부의 검출 압력이, 상기 다른 수요처가 요구하는 압력값에 가까워지도록 상기 제1 압력 조정 밸브 및 상기 제2 압력 조정 밸브의 개방도를 조정하는 압축기 유닛.
It is a compressor unit that is installed in a ship and compresses a target gas that is a boil-off gas sucked from the LNG storage tank of the ship,
A first reciprocating compressor having a plurality of compression stages, compressing the target gas and supplying it to one consumer;
a second reciprocating compressor having a plurality of compression stages and connected in parallel with the first reciprocating compressor so as to compress a target gas and supply it to the one consumer;
having a control unit,
The first reciprocating compressor,
a first branch flow path that branches from a stage connection flow path connecting one compression stage and the next compression stage and is connected to a gas derivation path that guides the target gas to another demand destination;
a first check valve provided in the first branch passage to prevent a reverse flow of the target gas from the gas outlet passage to the stage connection passage;
a first pressure regulating valve provided in the first branch flow path to adjust the pressure of the target gas supplied to the gas outlet path at an upstream side of the first check valve;
a first discharge pressure detection unit for detecting the pressure of the target gas on the discharge side of the one compression stage;
a first supply pressure detection unit configured to detect a pressure of a target gas downstream of the first pressure control valve;
The second reciprocating compressor,
a second branch flow path branching from a stage connection flow path connecting one compression stage and the next compression stage and connected to the gas outlet;
a second check valve provided in the second branch passage to prevent a reverse flow of the target gas from the gas outlet passage to the stage connection passage of the second reciprocating compressor;
a second pressure regulating valve provided in the second branch flow path to adjust the pressure of the target gas supplied to the gas outlet path at an upstream side of the second check valve;
a second discharge pressure detection unit configured to detect a pressure of a target gas on a discharge side of the one compression stage of the second reciprocating compressor;
a second supply pressure detection unit configured to detect the pressure of the target gas downstream of the second pressure control valve;
The control unit determines whether pressures detected by the first discharge pressure detection unit and the second discharge pressure detection unit fall within a predetermined range, and when the detected pressure falls within the predetermined range, the first supply pressure detection unit and a compressor unit that adjusts the opening degrees of the first pressure regulating valve and the second pressure regulating valve so that the detected pressure of the second supply pressure detecting unit approaches a pressure value required by the other demanding destination.
제1항에 있어서,
상기 제1 왕복동 압축기는, 상기 제1 토출압 검출부와 상기 제1 압력 조정 밸브 사이에서 상기 제1 분기 유로를 개폐하는 제1 개폐 밸브를 포함하고,
상기 제2 왕복동 압축기는, 상기 제2 토출압 검출부와 상기 제2 압력 조정 밸브 사이에서 상기 제2 분기 유로를 개폐하는 제2 개폐 밸브를 포함하고,
상기 제어부는, 소정의 압력 범위가 된 경우에 상기 제1 개폐 밸브 및 상기 제2 개폐 밸브를 개방하는 압축기 유닛.
According to claim 1,
The first reciprocating compressor includes a first on/off valve configured to open and close the first branch flow path between the first discharge pressure detection unit and the first pressure control valve,
The second reciprocating compressor includes a second on-off valve configured to open and close the second branch flow path between the second discharge pressure detection unit and the second pressure control valve,
The control unit is a compressor unit that opens the first on-off valve and the second on-off valve when a predetermined pressure range is reached.
제2항에 있어서,
상기 제어부는, 상기 다른 수요처로의 공급을 정지하는 지시에 따라서 상기 제1 압력 조정 밸브 및 상기 제2 압력 조정 밸브의 개방도를 낮춤과 함께, 상기 제1 공급압 검출부 및 상기 제2 공급압 검출부의 상기 검출 압력이 소정의 역치를 하회하면, 상기 제1 개폐 밸브 및 상기 제2 개폐 밸브를 폐쇄하는 압축기 유닛.
3. The method of claim 2,
The control unit lowers the opening degrees of the first pressure regulating valve and the second pressure regulating valve in response to an instruction to stop supply to the other demanding destinations, and the first supply pressure detection unit and the second supply pressure detection unit A compressor unit that closes the first on-off valve and the second on-off valve when the detected pressure of is lower than a predetermined threshold.
제1항 내지 제3항 중 어느 한 항에 있어서,
상기 스테이지 접속 유로는, 상기 복수의 압축 스테이지 중에서 상기 다른 수요처가 요구하는 상기 압력값에 가장 가깝고 또한 상기 압력값보다도 큰 압력의 대상 가스를 토출하는 압축 스테이지의 토출측에 마련되어 있는 압축기 유닛.
4. The method according to any one of claims 1 to 3,
The stage connection flow path is provided on a discharge side of a compression stage for discharging a target gas having a pressure that is closest to the pressure value required by the other customer among the plurality of compression stages and is larger than the pressure value.
제4항에 있어서,
상기 제1 왕복동 압축기 및 상기 제2 왕복동 압축기는, 동수의 압축 스테이지를 갖고 있는 압축기 유닛.
5. The method of claim 4,
The first reciprocating compressor and the second reciprocating compressor have the same number of compression stages.
KR1020210047023A 2020-06-29 2021-04-12 Compressor unit KR102342035B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020111390A JP6759482B1 (en) 2020-06-29 2020-06-29 Compressor unit
JPJP-P-2020-111390 2020-06-29

Publications (1)

Publication Number Publication Date
KR102342035B1 true KR102342035B1 (en) 2021-12-22

Family

ID=72517967

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210047023A KR102342035B1 (en) 2020-06-29 2021-04-12 Compressor unit

Country Status (5)

Country Link
JP (1) JP6759482B1 (en)
KR (1) KR102342035B1 (en)
CN (1) CN112983789A (en)
GR (1) GR1010122B (en)
NO (1) NO20210744A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6850403B1 (en) * 2021-01-06 2021-03-31 株式会社神戸製鋼所 Compressor unit and compressor unit control program
JP7022245B1 (en) * 2021-08-05 2022-02-17 株式会社神戸製鋼所 Compressor unit and control method of compressor unit

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057883A (en) * 2007-08-31 2009-03-19 Mitsubishi Heavy Ind Ltd Gas turbine fuel gas supply device
KR20190139723A (en) * 2018-06-08 2019-12-18 대우조선해양 주식회사 BOG Reliquefaction System for Vessels and Method of Discharging Lubrication Oil in the Same

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013209000A (en) * 2012-03-30 2013-10-10 Mitsubishi Heavy Ind Ltd Vessel, liquefied fuel gas transfer device and liquefied fuel gas transfer method
KR20140052378A (en) * 2012-10-24 2014-05-07 현대중공업 주식회사 Equipment for supporting liquified gas storing tank and vessel having the same
KR102189792B1 (en) * 2014-12-02 2020-12-14 삼성중공업 주식회사 Reliquefaction system of liquified fuel propulsion ship
KR101751854B1 (en) * 2015-11-12 2017-06-28 대우조선해양 주식회사 Vessel
JP2017110797A (en) * 2015-12-18 2017-06-22 川崎重工業株式会社 Marine vessel
JP6722074B2 (en) * 2016-09-23 2020-07-15 川崎重工業株式会社 Ship
JP2018103954A (en) * 2016-12-28 2018-07-05 川崎重工業株式会社 Ship
KR102241817B1 (en) * 2017-09-08 2021-04-16 한국조선해양 주식회사 Gas Treatment System and Vessel having the same
KR20190105841A (en) * 2018-03-06 2019-09-18 대우조선해양 주식회사 Liquefied Petroleum Gas Fueled Ship and Fuel Supply Method of LPG Fueled Ship

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057883A (en) * 2007-08-31 2009-03-19 Mitsubishi Heavy Ind Ltd Gas turbine fuel gas supply device
KR20190139723A (en) * 2018-06-08 2019-12-18 대우조선해양 주식회사 BOG Reliquefaction System for Vessels and Method of Discharging Lubrication Oil in the Same

Also Published As

Publication number Publication date
JP6759482B1 (en) 2020-09-23
CN112983789A (en) 2021-06-18
JP2022010692A (en) 2022-01-17
GR1010122B (en) 2021-11-09
NO20210744A1 (en) 2021-12-30

Similar Documents

Publication Publication Date Title
KR102342035B1 (en) Compressor unit
US11300355B2 (en) Boil-off gas supply device
US11168700B2 (en) Method for controlling the outlet pressure of a compressor
CN111637358B (en) Control method of compressor unit, compressor unit and plurality of compression sections
KR102268315B1 (en) Stopping control method of compressor unit and compressor unit
US9989017B2 (en) System and method for operating a cryogenic fuel system
KR102476604B1 (en) Compressor unit
US10907542B2 (en) Compressed air energy storage power generation device
JP4009426B2 (en) Operation control method at startup of BOG compressor
KR102419942B1 (en) Compressor unit and control method of compressor unit
KR102355150B1 (en) Compressor unit and program for controlling compressor unit
JP2006316687A (en) Pressure feed method of fluid, pressure feed device, fuel gas supply device and relay station of gas transportation line
JP2017172690A (en) Low-temperature liquefied gas storage facility
JPH0942598A (en) Processing system and processing method for vaporized gas of liquefied gas

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right