KR102124402B1 - Construction Method of Balcony using Super Speed System Method - Google Patents

Construction Method of Balcony using Super Speed System Method Download PDF

Info

Publication number
KR102124402B1
KR102124402B1 KR1020200000182A KR20200000182A KR102124402B1 KR 102124402 B1 KR102124402 B1 KR 102124402B1 KR 1020200000182 A KR1020200000182 A KR 1020200000182A KR 20200000182 A KR20200000182 A KR 20200000182A KR 102124402 B1 KR102124402 B1 KR 102124402B1
Authority
KR
South Korea
Prior art keywords
girder
balcony
fixed
slab
installation step
Prior art date
Application number
KR1020200000182A
Other languages
Korean (ko)
Inventor
홍종규
이민범
홍은정
Original Assignee
(주)케이아이피씨엠
이민범
홍종규
홍은정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)케이아이피씨엠, 이민범, 홍종규, 홍은정 filed Critical (주)케이아이피씨엠
Priority to KR1020200000182A priority Critical patent/KR102124402B1/en
Application granted granted Critical
Publication of KR102124402B1 publication Critical patent/KR102124402B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention relates to a method of constructing a balcony using a super-speed PC system. Accordingly, a technical point of the present invention is to construct a balcony by a super speed system (SSS) method. More specifically, coupling plates provided on both sides of a PC girder are quickly fixed to a fastening plate of a PC column, and a PC beam orthogonally connected to the PC girder is quickly and accurately fixed to a fixing reinforcing bar and a fixing plate of the PC girder such that the work can be easy and simple. Particularly, since a balcony slab is mounted and coupled to an upper surface of the assembled PC girder and PC beam, the construction of the balcony can be done more than 30% faster compared to a prior art so that productivity and economic efficiency can be significantly improved. In addition, in the present invention, the balcony slab serves as a formwork due to a stepped protrusion, which allows on-site concrete to be poured and cured, thereby enabling the concrete to be cured without using a conventional formwork (plywood, aluminum foam, a significant amount of copper, etc.). In addition, the present invention enables super-speed construction as well as providing structural stability.

Description

초스피드 피씨 시스템을 이용한 발코니 시공방법{Construction Method of Balcony using Super Speed System Method}Construction method of balcony using super speed system method

본 발명은 발코니를 SSS공법(Super Speed System)으로 시공하는 것으로, 더욱 자세히 말하면 PC거더 양측에 구비되는 결합판이 PC기둥의 체결판과 신속한 고정을 도모하며, PC거더로부터 직교 방향으로 연결된 PC빔은 고정철근 및 PC거더의 고정판에 빠르고 정확한 고정이 가능한 이유로 작업이 쉽고 간편하고, 특히 조립된 PC거더 및 PC빔 상면에 발코니 슬래브가 안착 결합됨으로서 발코니 시공이 종전 대비 30% 이상 신속하게 작업할 수 있는 바, 이는 생산성과 경제성이 크게 개선되는 것을 특징으로 하는 초스피드 피씨 시스템을 이용한 발코니 시공방법에 관한 것이다.The present invention is to construct the balcony by SSS method (Super Speed System), in more detail, the coupling plate provided on both sides of the PC girder promotes fast fixing with the fastening plate of the PC pillar, and the PC beam connected in the orthogonal direction from the PC girder It is easy and convenient to work because of the fast and accurate fixing to the fixed bar of the fixed rebar and the PC girder. Especially, as the balcony slab is seated on the assembled PC girder and the PC beam, the balcony construction can be done more than 30% faster than before. Bar, this relates to a balcony construction method using a super-speed PC system characterized in that the productivity and economics are greatly improved.

또한, 본 발명의 발코니 슬래브는 단턱으로 인해 그 자체가 거푸집 역할을 하면서 현장 콘크리트가 타설 및 양생되도록 하는 바, 이는 종전 거푸집(합판, 알루미늄 폼, 상당히 많은 동바리 등)의 사용 없이 그 자체로 양생 되도록 하고, 구조적 안정성과 함께 초 스피드한 시공이 이루어지도록 하는 특징이 있다.In addition, the balcony slab of the present invention allows the on-site concrete to be poured and cured while acting as a formwork itself due to the stepped jaws, so that it can be cured on its own without the use of a conventional formwork (plywood, aluminum foam, quite a lot of copper, etc.) And, it has a feature that enables super-speed construction with structural stability.

일반적으로 지하주차장을 포함한 공동주택 등의 건축물을 시공하는 경우에는 많은 하중이 요구되므로, 특허출원 제10-2010-0084034호와 같이 피씨 부재를 제작하여 현장에서 맞춤 조립하도록 형성되고 있으며, 이러한 시공방법은 통상 하프 슬래브(Half PC Slab)를 이용한 PRC(Precast Reinforced Concrete Layer Construction Method) 복합화 공법 등이 실시되고 있다.In general, when constructing a building such as an apartment house including an underground parking lot, a large load is required. Thus, as in patent application No. 10-2010-0084034, a PC member is manufactured to be assembled in the field, and this construction method is used. In general, a PRC (Precast Reinforced Concrete Layer Construction Method) composite method using a half PC slab has been implemented.

즉, 이러한 PRC 복합화 공법은 철근 콘크리트 라멘(Rahmen) 구조의 건물을 PC(Precast Concrete)화하는 공법으로서, 공장에서 제작한 PC기둥, PC보, 하프 슬래브 등 PC부재를 현장으로 운송, 양중하여 조립한 후 부재 간 접합부와 하프 슬래브의 상부에 덧침 콘크리트를 현장에서 타설하여 구조체를 일체화시키도록 형성된다.In other words, this PRC composite construction method is a method of converting a reinforced concrete ramen structure building into a PC (Precast Concrete), and transporting and assembling PC components such as PC pillars, PC beams, and half slabs manufactured in the factory to the site. After that, it is formed to unify the structure by pouring overlaid concrete on the top of the joint and the half slab between the members.

한편, 주택이나 사무실형 공장 등 다양한 건축물에 시공되는 발코니는 하부를 지지하기 위해 많은 동바리를 필요로 하여, 공사 비용의 증가로 이어지는 것은 물론이고 작업시간이 길어지는 문제점이 있었다.On the other hand, balconies installed in various structures such as houses and office-type factories require a lot of copper to support the lower part, leading to an increase in construction cost and a long working time.

이에, 대한민국 등록실용신안공보 제20-0392074호(등록일: 2005.07.29)에는 지반위에 바로 설치되는 1층의 아파트 발코니를 설치하기 위하여 설치한 거푸집의 하부에 설치하는 트러스 동바리에 관한 것으로서, 철재로 삼각형을 연이어서 설치된 트러스형태의 단위 트러스동바리를 아파트 발코니를 설치하기 위한 거푸집의 하부에 일정한 간격을 두고 설치하고, 상기 일정한 간격을 두고 설치된 단위 트러스 동바리의 상현 지지대를 지지하기 위하여 상현 지지대의 양측단에 외측지지대를 설치하여 일체화하고, 상기 외측지지대와 상현 지지대가 서로 만나는 지점에 지반의 고저에 따라 높이를 조절할 수 있도록 제작된 수직지주를 지반위에 고정설치한 후에 아파트의 발코니를 설치하도록 하는 콘크리트구조물의 설치를 용이하게 하기 위하여 협소한작업공간에 설치되는 트러스동바리라는 명칭의 선행문헌이 게시되어 있다.Accordingly, in the Republic of Korea Registered Utility Model Publication No. 20-0392074 (Registration date: 2005.07.29), it is related to a truss cluster that is installed at the bottom of a formwork installed to install a balcony on the first floor that is installed directly on the ground. The truss unit of the truss type installed in succession of triangles is installed at regular intervals in the lower part of the formwork for installing the apartment balcony, and both ends of the support supports are installed at regular intervals to support the supporting supports of the unit truss blocks installed at regular intervals. The concrete structure to install the balcony on the apartment after fixing the vertical support on the ground by installing the external support to the unity and fixing the height according to the height of the ground at the point where the external support and the Sanghyeon support meet each other. In order to facilitate the installation of the prior document, the name of the truss dongbari installed in a narrow working space is posted.

하지만, 상기한 선행문헌의 콘크리트 구조물의 조립성이 좋지 못하여 빠른 시공이 어려운 것은 물론이고, 발코니 하부에 많은 동바리를 설치해야 하기 때문에 많은 비용이 소요되는 문제점을 여전히 해결하지 못하고 있다.However, the assembling property of the concrete structure of the above-mentioned prior art is not good, so it is difficult to quickly construct it, and it is still difficult to solve the problem of high cost because a large number of copper bars must be installed under the balcony.

1. 대한민국 등록실용신안공보 제20-0392074호(등록일: 2005.07.29)1. Republic of Korea Registered Utility Model Publication No. 20-0392074 (Registration Date: July 29, 2005)

본 발명은 상술한 문제를 해결하기 위한 것으로, 그 기술적 요지는 PC거더 양측에 구비된 결합판이 PC기둥의 체결판과 신속한 고정을 도모하며, PC거더로부터 직교 방향으로 연결된 PC빔은 고정철근 및 PC거더의 고정판에 빠르고 정확한 고정이 가능한 이유로 작업이 쉽고 간편하고, 특히 조립된 PC거더 및 PC빔 상면에 발코니 슬래브가 안착 결합됨으로서 발코니 시공이 종전 대비 30% 이상 신속하게 작업할 수 있는 바, 이는 생산성과 경제성이 크게 개선되는 것을 제공함에 그 목적이 있다.The present invention is to solve the above-mentioned problems, the technical point of which is that the coupling plate provided on both sides of the PC girder promotes fast fixation with the fastening plate of the PC pillar, and the PC beam connected in the orthogonal direction from the PC girder is a fixed rebar and a PC It is easy and simple to work because of the fast and accurate fixing on the fixing plate of the girder. Especially, as the balcony slab is seated and coupled to the assembled PC girder and PC beam, the balcony construction can work more than 30% faster than before, which is a productivity. The aim is to provide a major improvement in economic efficiency.

또한, 본 발명의 발코니 슬래브는 단턱으로 인해 그 자체가 거푸집 역할을 하면서 현장 콘크리트가 타설 및 양생되도록 하는 바, 이는 종전 거푸집(합판, 알루미늄 폼, 상당히 많은 동바리 등)의 사용 없이 그 자체로 양생 되도록 하고, 구조적 안정성과 함께 초 스피드한 시공이 이루어지도록 하는 것을 제공함에 그 목적이 있다.In addition, the balcony slab of the present invention allows the on-site concrete to be poured and cured while acting as a formwork itself due to the stepped jaws, so that it can be cured on its own without the use of a conventional formwork (plywood, aluminum foam, quite a lot of copper, etc.) The aim is to provide a construction that allows super-speed construction with structural stability.

상술한 목적을 달성하기 위해 본 발명은 기초로부터 기립한 PC기둥(100)의 주두 상측 일면에 한 쌍의 체결판(110)이 형성되는 기둥 설치단계(S100); 상기 PC기둥(100)의 체결판(110)에 결합될 수 있도록 PC거더(200)의 양단에 결합판(210)이 구비되는 거더몸체(220)가 형성되며, 상기 거더몸체(220) 길이방향의 수직되는 면상에는 다수의 고정판(230)이 형성되는 거더 설치단계(S200); 상기 PC거더(200)의 각 고정판(230)에 PC빔(300)을 설치하되, 상기 PC빔(300)의 결합측 단부에는 고정철근(310)이 형성되어 고정판과 대응되면서 조립되도록 형성되는 빔 설치단계(S300)와; 상기 PC거더(200) 및 PC빔(300)이 조립된 상면에 발코니 슬래브(400)를 안착하여 발코니 구조를 완성하도록 하는 슬래브 설치단계(S400)로; 이루어진다.In order to achieve the above object, the present invention is a pillar installation step (S100) in which a pair of fastening plates 110 are formed on one upper side of the head of the PC pillar 100 standing up from the foundation; The girder body 220 is provided with a coupling plate 210 at both ends of the PC girder 200 so that it can be coupled to the fastening plate 110 of the PC column 100, the girder body 220 longitudinal direction Girder installation step (S200) in which a plurality of fixing plates 230 are formed on the vertical plane of the; A beam is formed to install the PC beam 300 on each fixed plate 230 of the PC girder 200, but a fixed reinforcing bar 310 is formed at the coupling-side end of the PC beam 300 to correspond to the fixed plate. An installation step (S300); As the slab installation step (S400) to complete the balcony structure by mounting the balcony slab 400 on the upper surface where the PC girder 200 and the PC beam 300 are assembled; Is done.

이때, 상기 슬래브 설치단계(S400) 이후에 발코니 슬래브(400) 상에 현장 콘크리트 타설 및 트러스트 근(i)을 배근하는 현장 콘크리트 타설단계(S500)가; 더 시공된다.At this time, after the slab installation step (S400), on-site concrete pouring and on-site concrete pouring on the balcony slab 400 (T) (S500); It is constructed more.

또한, 상기 빔 설치단계(S300)는 발코니 슬래브(400) 하면 중 PC빔(300) 사이에는 H빔(B)이 구비되며, 상기 H빔(B)은 일측에 고정플레이트(P)가 구비되며, 상기 고정플레이트(P)는 면상에는 다수의 체결홀(P1)이 형성되어, 별도의 결합구(P2)에 의해 H빔(B)이 거더몸체(220)에 고정된다.In addition, the beam installation step (S300) is provided with an H beam (B) between the PC beam 300 among the lower surfaces of the balcony slab 400, and the H beam (B) is provided with a fixed plate (P) on one side. , The fixing plate (P) has a plurality of fastening holes (P1) are formed on the surface, the H beam (B) is fixed to the girder body 220 by a separate coupling hole (P2).

이와 같이, 본 발명은 발코니를 SSS공법(Super Speed System)으로 시공하는 것으로, 더욱 자세히 말하면 PC거더 양측에 구비되는 결합판이 PC기둥의 체결판과 신속한 고정을 도모하며, PC거더로부터 직교 방향으로 연결된 PC빔은 고정철근 및 PC거더의 고정판에 빠르고 정확한 고정이 가능한 이유로 작업이 쉽고 간편하고, 특히 조립된 PC거더 및 PC빔 상면에 발코니 슬래브가 안착 결합됨으로서 발코니 시공이 종전 대비 30% 이상 신속하게 작업할 수 있는 것은 물론이고, 상기 PC거더 일측에 형성된 고정판에 PC빔이 고정됨으로서 슬래브 시공 시 거더에 비틀림이 발생하는 것을 최소화할 수 있는 효과가 있다.As described above, the present invention is to construct a balcony by the SSS method (Super Speed System), more specifically, a coupling plate provided on both sides of the PC girder promotes fast fixing with the fastening plate of the PC pillar, and is connected in an orthogonal direction from the PC girder. The PC beam is easy and convenient to work because it can be fast and accurate fixed to the fixed plate of the fixed rebar and the PC girder. Especially, as the balcony slab is mounted on the assembled PC girder and the PC beam, the balcony construction works more than 30% faster than before. Of course, the PC beam is fixed to the fixing plate formed on one side of the PC girder, thereby minimizing distortion of the girder during slab construction.

도 1은 본 발명에 따른 SSS공법에 의한 발코니 시공방법의 시공 순서를 나타낸 블럭도,
도 2는 본 발명의 전체적인 모습을 도시한 예시도,
도 3은 본 발명의 PC거더에 PC빔이 고정된 것을 나타낸 예시도,
도 4는 본 발명에 PC슬래브가 형성된 예시도,
도 5는 본 발명에 따른 거더에 H빔이 형성된 것을 나타낸 예시도,
도 6은 본 발명의 측면을 도시한 예시도이다.
1 is a block diagram showing the construction procedure of the balcony construction method according to the SSS method according to the present invention,
Figure 2 is an exemplary view showing the overall appearance of the present invention,
Figure 3 is an exemplary view showing that the PC beam is fixed to the PC girder of the present invention,
Figure 4 is an exemplary view of a PC slab formed in the present invention,
5 is an exemplary view showing that the H beam is formed on the girder according to the present invention,
6 is an exemplary view showing an aspect of the present invention.

먼저, 본 발명은 도 1 내지 도 6에 도시된 바와 같이, PC기둥(100), PC거더(200), PC빔(300), PC슬래브(400) 및 기둥 설치단계(S100), 거더 설치단계(S200), 빔 설치단계(S300), 슬래브 설치단계(S400), 현장 콘크리트 타설단계(S500)로 구성되어 이루어져 있다.First, the present invention, as shown in Figures 1 to 6, PC pillar 100, PC girder 200, PC beam 300, PC slab 400 and pillar installation step (S100), girder installation step It consists of (S200), beam installation step (S300), slab installation step (S400), and on-site concrete pouring step (S500).

이에, 도 1 내지 도 3에 도시된 바와 같이, 상기 기둥 설치단계(S100)는 지면으로부터 돌출되되 일측에 한 쌍의 체결판(110)이 형성되는 PC기둥(100)을 설치한다.Thus, as shown in Figures 1 to 3, the pillar installation step (S100) is protruding from the ground to install a PC pillar 100, a pair of fastening plates 110 are formed on one side.

이때, 상기 체결판(110)은 일정거리 이격되되 면상에 다수의 체결공(111)이 형성된다.At this time, the fastening plate 110 is spaced a predetermined distance, but a plurality of fastening holes 111 are formed on the surface.

또한, 상기 거더 설치단계(S200)는 PC기둥(100)의 체결판(110)에 결합될 수 있도록 양단에 결합판(210)이 구비되는 거더몸체(220)가 형성되며, 상기 거더몸체(220) 길이방향의 수직되는 일측 면상에는 다수의 고정판(230)이 구비되고, 상기 거더몸체(220) 상면에 다수의 연결철근(240)이 형성되는 PC거더(200)가 형성된다.In addition, the girder installation step (S200) is formed with a girder body 220 having a coupling plate 210 at both ends so as to be coupled to the fastening plate 110 of the PC pillar 100, the girder body 220 ) A plurality of fixing plates 230 are provided on one side that is vertical in the longitudinal direction, and a PC girder 200 in which a plurality of connecting reinforcing bars 240 are formed on the upper surface of the girder body 220 is formed.

이에, 상기 체결판(110) 면상에 체결공(111)이 형성되며, 상기 결합판(210) 면상에는 체결공(111)과 대응되도록 결합공(211)이 형성되어 별도의 체결구(C)에 의해 상호 결합된다.Accordingly, a fastening hole 111 is formed on the surface of the fastening plate 110, and a bonding hole 211 is formed on the surface of the coupling plate 210 so as to correspond to the fastening hole 111, so that a separate fastener C is provided. Are mutually coupled by.

이때, 상기 체결구(C)는 일반적인 볼트와 같은 형상으로 이루어진다.At this time, the fastener (C) is made of a general bolt-like shape.

이에, 상기 거더몸체(220)의 단부는 주두 상에 얹혀진 상태로 고정되는 것이다.Thus, the end of the girder body 220 is fixed to the state mounted on the head.

또한, 상기 빔 설치단계(S300)는 PC거더(200)의 각 고정판(230)에 PC빔(300)을 설치하는 것이다.In addition, the beam installation step (S300) is to install the PC beam 300 to each fixed plate 230 of the PC girder 200.

이때, 상기 고정판(230)은 거더몸체(220)에 형성된 내입홈(221)에 내입된 형태로, 상기 내입홈(221)은 하부에 지지단턱(222)이 형성되어 PC빔(300)의 하부를 지지하는 것이다.At this time, the fixing plate 230 is in the form of being inserted into the indentation groove 221 formed in the girder body 220, the indentation groove 221 has a lower support step 222 is formed in the lower portion of the PC beam 300 It is to support.

이때, 상기 PC빔(300) 하측에 하나의 동바리 기둥(F)이 구비되어 지면을 지지한다.At this time, one copper column pillar F is provided under the PC beam 300 to support the ground.

이에, 상기 고정판(230)에는 PC빔(300) 일측에 돌출 형성된 고정철근(310)이 내입되어 상호 결합될 수 있도록 고정공(231)이 형성된다.Thus, a fixing hole 231 is formed on the fixing plate 230 so that the fixing reinforcing bars 310 protruding from one side of the PC beam 300 are introduced and coupled to each other.

이때, 상기 PC빔(300)의 고정철근(310)은 외주면에 나사산이 형성되되 고정철근이 거더몸체(220)를 관통하면, 고정철근 단부에 너트(N)가 체결되고, 상기 너트(N)가 풀리지 않도록 풀림방지용 태그용접 이후 몰탈되어 PC빔(300)이 거더몸체(220)에서 견고하게 고정되는 것이다.At this time, the fixed rebar 310 of the PC beam 300 is formed with a thread on the outer circumferential surface, but when the fixed rebar penetrates the girder body 220, a nut N is fastened to the end of the fixed rebar, and the nut N The PC beam 300 is firmly fixed in the girder body 220 by being mortarized after the tag welding for preventing the loosening from being loosened.

또한, 상기 PC빔 상면에는 연결철근과 동일한 형상의 철근이 구비되는 것이다.In addition, a reinforcing bar having the same shape as the connecting reinforcing bar is provided on the upper surface of the PC beam.

이때, 상기 PC빔(300) 하측의 동바리 기둥(F)은 PC빔(300) 자체가 PC슬래브(400)를 지지하는 동바리 역할을 하고, 동바리 기둥은 PC빔을 지지하는 역할을 하기 때문에 동바리에 소요되는 비용 및 시공시간을 현저하게 절감시킬 수 있다.At this time, the copper beam pillar (F) on the lower side of the PC beam 300 acts as a copper blade for the PC beam 300 itself to support the PC slab 400, and the copper beam pillar serves to support the PC beam. The required cost and construction time can be significantly reduced.

또한, 상기 슬래브 설치단계(S400)는 PC거더(200) 및 PC빔(300) 상에 발코니 슬래브(400)를 시공하는 것이다.In addition, the slab installation step (S400) is to construct the balcony slab 400 on the PC girder 200 and the PC beam 300.

이에, 상기 발코니 슬래브(400)는 일측이 상측으로 절곡되는 단턱(410)이 형성되어 현장 콘크리트 타설 시 거푸집(Mold) 역할을 한다.Thus, the balcony slab 400 is formed with a stepped 410, one side of which is bent upward, and serves as a mold when pouring concrete on site.

이때, 상기 슬래브 설치단계(S400) 이후에 발코니 슬래브(400) 상에 현장 콘크리트 타설 및 트러스트 근(i)을 배근하는 현장 콘크리트 타설단계(S500)가 더 시공된다.At this time, after the slab installation step (S400), the on-site concrete pouring step (S500) for reinforcing the on-site concrete pouring and the trust root (i) on the balcony slab 400 is further constructed.

또한, 상기 빔 설치단계(S300)는 발코니 슬래브(400) 하면 중 PC빔(300) 사이에 H빔(B)이 형성되고, H빔(B) 일측에 고정플레이트(P)가 구비된다.In addition, in the beam installation step (S300), an H beam (B) is formed between the PC beams 300 among the lower surfaces of the balcony slab 400, and a fixed plate (P) is provided on one side of the H beam (B).

이때, 상기 고정플레이트(P)는 면상에는 다수의 체결홀(P1)이 형성되어, 별도의 결합구(P2)에 의해 H빔(B)이 거더몸체(220)에 고정된다.At this time, the fixing plate (P) has a plurality of fastening holes (P1) is formed on the surface, the H beam (B) is fixed to the girder body 220 by a separate coupling hole (P2).

즉, 상기 PC빔(300) 한 쌍이 발코니 슬래브(400) 하부를 지지하던 것을 H빔(B)이 보강하여 지지하는 것이다.That is, the H beam (B) reinforces and supports the pair of the PC beams 300 supporting the lower part of the balcony slab 400.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다The present invention is not limited to the specific preferred embodiments described above, and various modifications can be implemented by anyone who has ordinary skill in the art to which the present invention pertains without departing from the gist of the present invention as claimed in the claims. Of course, such changes are within the scope of the claims.

100 ... PC기둥 110 ... 체결판
111 ... 체결공 200 ... PC거더
210 ... 결합판 211 ... 결합공
220 ... 거더몸체 221 ... 내입홈
222 ... 지지단턱 230 ... 고정판
231 ... 고정공 240 ... 연결철근
300 ... PC빔 310 ... 고정철근
400 ... PC슬래브
100 ... PC pillar 110 ... Fastening plate
111 ... Fastener 200 ... PC Girder
210 ... mating plate 211 ... mating hole
220 ... girder body 221 ... indentation groove
222 ... Supporting step 230 ... Fixing plate
231 ... Fixed hole 240 ... Reinforcing bar
300 ... PC beam 310 ... Fixed rebar
400 ... PC slab

Claims (3)

기초로부터 기립한 PC기둥(100)의 주두 상측 일면에 한 쌍의 체결판(110)이 형성되는 기둥 설치단계(S100)와; 상기 PC기둥(100)의 체결판(110)에 결합될 수 있도록 PC거더(200)의 양단에 결합판(210)이 구비되는 거더몸체(220)가 형성되며, 상기 거더몸체(220) 길이방향의 수직되는 면상에는 다수의 고정판(230)이 형성되는 거더 설치단계(S200)와; 상기 PC거더(200)의 각 고정판(230)에 PC빔(300)을 설치하되, 상기 PC빔(300)의 결합측 단부에는 고정철근(310)이 형성되어 고정판과 대응되면서 조립되도록 형성되는 빔 설치단계(S300)와; 상기 PC거더(200) 및 PC빔(300)이 조립된 상면에 발코니 슬래브(400)를 안착하여 발코니 구조를 완성하도록 하는 슬래브 설치단계(S400)로; 이루어지는 것이며,
상기 슬래브 설치단계(S400) 이후에는 발코니 슬래브(400) 상에 현장 콘크리트 타설 및 트러스트 근(i)을 배근하는 현장 콘크리트 타설단계(S500)가; 더 시공되는 것이고,
상기 빔 설치단계(S300)는 발코니 슬래브(400) 하면 중 PC빔(300) 사이에 H빔(B)이 형성되며, 상기 H빔(B)은 일측에 고정플레이트(P)가 구비되고, 상기 고정플레이트(P)는 면상에는 다수의 체결홀(P1)이 형성되어, 별도의 결합구(P2)에 의해 H빔(B)이 거더몸체(220)에 고정되도록 하는 것이며,
상기 고정판(230)은 거더몸체(220)에 형성된 내입홈(221)에 내입된 형태로, 상기 내입홈(221)은 하부에 지지단턱(222)이 형성되어 PC빔(300)의 하부를 지지하는 것이며,
상기 PC빔(300)의 고정철근(310)은 외주면에 나사산이 형성되되 고정철근이 거더몸체(220)를 관통하면, 고정철근 단부에 너트(N)가 체결되고, 상기 너트(N)가 풀리지 않도록 풀림방지용 태그용접 이후 몰탈되어 PC빔(300)이 거더몸체(220)에서 고정되는 것을 특징으로 하는 초스피드 피씨 시스템을 이용한 발코니 시공방법.
A pillar installation step (S100) in which a pair of fastening plates 110 are formed on one upper side of the head of the PC pillar 100 standing up from the foundation; The girder body 220 is provided with a coupling plate 210 at both ends of the PC girder 200 so that it can be coupled to the fastening plate 110 of the PC column 100, the girder body 220 longitudinal direction A girder installation step (S200) in which a plurality of fixing plates 230 are formed on a vertical surface of the; A beam is formed to install the PC beam 300 on each fixed plate 230 of the PC girder 200, but a fixed reinforcing bar 310 is formed at the coupling-side end of the PC beam 300 to correspond to the fixed plate. An installation step (S300); As a slab installation step (S400) to complete the balcony structure by mounting the balcony slab 400 on the upper surface where the PC girder 200 and the PC beam 300 are assembled; Is done,
After the slab installation step (S400), there is an on-site concrete pouring step (S500) for reinforcing the on-site concrete placing and the trust root (i) on the balcony slab 400; It is being constructed more,
In the beam installation step (S300), an H beam (B) is formed between the PC beams 300 among the lower surfaces of the balcony slab 400, and the H beam (B) is provided with a fixed plate (P) on one side. The fixing plate (P) is a plurality of fastening holes (P1) is formed on the surface, so that the H beam (B) is fixed to the girder body 220 by a separate coupling hole (P2),
The fixing plate 230 is formed in the indentation groove 221 formed in the girder body 220, and the indentation groove 221 is formed with a support step 222 at the bottom to support the lower portion of the PC beam 300. And
The fixed reinforcing bar 310 of the PC beam 300 is formed with a thread on the outer circumferential surface, but when the fixed reinforcing bar penetrates the girder body 220, a nut N is fastened to the end of the fixed reinforcing bar, and the nut N is not released. The construction method of the balcony using the super speed PC system, characterized in that the PC beam 300 is fixed at the girder body 220 after being tampered with the tag welding for preventing the loosening.
삭제delete 삭제delete
KR1020200000182A 2020-01-02 2020-01-02 Construction Method of Balcony using Super Speed System Method KR102124402B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200000182A KR102124402B1 (en) 2020-01-02 2020-01-02 Construction Method of Balcony using Super Speed System Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200000182A KR102124402B1 (en) 2020-01-02 2020-01-02 Construction Method of Balcony using Super Speed System Method

Publications (1)

Publication Number Publication Date
KR102124402B1 true KR102124402B1 (en) 2020-06-19

Family

ID=71137074

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200000182A KR102124402B1 (en) 2020-01-02 2020-01-02 Construction Method of Balcony using Super Speed System Method

Country Status (1)

Country Link
KR (1) KR102124402B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541567A (en) * 2022-03-04 2022-05-27 中建八局第二建设有限公司 Construction method for irregular conjoined steel corridor in narrow and small site
KR102482995B1 (en) * 2022-09-20 2022-12-29 페이코코리아 주식회사 a reinforced concrete structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200392074Y1 (en) 2005-05-27 2005-08-09 주식회사 종합건축사사무소근정 Trussed supporting post for easily constructing concrete structures
KR100763254B1 (en) * 2007-06-18 2007-10-04 창조개발 주식회사 Construction with precast concrete balcony of apartment house
KR20160137777A (en) * 2015-05-21 2016-12-01 서울시립대학교 산학협력단 PC composite beam system
KR101840763B1 (en) * 2017-05-02 2018-03-21 주식회사 신원알피씨 Cantilever bridge with t-type fixinf support bracket construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200392074Y1 (en) 2005-05-27 2005-08-09 주식회사 종합건축사사무소근정 Trussed supporting post for easily constructing concrete structures
KR100763254B1 (en) * 2007-06-18 2007-10-04 창조개발 주식회사 Construction with precast concrete balcony of apartment house
KR20160137777A (en) * 2015-05-21 2016-12-01 서울시립대학교 산학협력단 PC composite beam system
KR101840763B1 (en) * 2017-05-02 2018-03-21 주식회사 신원알피씨 Cantilever bridge with t-type fixinf support bracket construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541567A (en) * 2022-03-04 2022-05-27 中建八局第二建设有限公司 Construction method for irregular conjoined steel corridor in narrow and small site
KR102482995B1 (en) * 2022-09-20 2022-12-29 페이코코리아 주식회사 a reinforced concrete structure

Similar Documents

Publication Publication Date Title
KR101432260B1 (en) Steel-exposed type steel framed reinforced concrete pillar
KR101937680B1 (en) Prefabricated Precast Structure and Construction Method Thereof
KR101663132B1 (en) Self-supporting type column structure
KR102124402B1 (en) Construction Method of Balcony using Super Speed System Method
KR20020011706A (en) Fabricated pier and Fabricated pier construction method
JP2018520285A (en) Prefabricated column and beam type construction
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
KR100712354B1 (en) PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein
CN112681511B (en) Reinforced concrete structure construction method using section steel to replace part of reinforcing steel bars
KR100865133B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR101036177B1 (en) Method for constructing building using PRC integrating method
KR101463106B1 (en) The precast concrete pillar and girder connecting structure for a building
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
CN112681616B (en) Stiffening structure for assembling reinforced concrete structure by using section steel to replace part of reinforcing steel bars
KR20090007085A (en) Form with reinforced bar, manufacturing method thereof and construction method using the same
CN207727981U (en) A kind of precast prestressed joint cores plank sheathing
KR20210136795A (en) the device fixing bar in detachable form and the detachable form structure using the same
JP4439938B2 (en) Wall type reinforced concrete structure and its construction method
KR101576224B1 (en) Prefabricated precast concrete girder for building construction
CN212336729U (en) Formwork supporting system
JPH0352803Y2 (en)
TWI769610B (en) Reinforced structure of reinforced concrete structure by replacing part of steel bars with section steel
KR102372473B1 (en) Constuction Structure for Joint of PC-Colunm and PC-Girder Using Temporay Bracket
KR102679042B1 (en) PC half-slab construction method for quick construction of precast concrete apartment house
TWI755188B (en) Construction method of reinforced concrete structure by replacing part of steel bars with section steel

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant