KR102679042B1 - PC half-slab construction method for quick construction of precast concrete apartment house - Google Patents

PC half-slab construction method for quick construction of precast concrete apartment house Download PDF

Info

Publication number
KR102679042B1
KR102679042B1 KR1020220005921A KR20220005921A KR102679042B1 KR 102679042 B1 KR102679042 B1 KR 102679042B1 KR 1020220005921 A KR1020220005921 A KR 1020220005921A KR 20220005921 A KR20220005921 A KR 20220005921A KR 102679042 B1 KR102679042 B1 KR 102679042B1
Authority
KR
South Korea
Prior art keywords
wall
lower layer
slab
layer
concrete
Prior art date
Application number
KR1020220005921A
Other languages
Korean (ko)
Other versions
KR20230109982A (en
Inventor
이준성
장예은
Original Assignee
이화여자대학교 산학협력단
Filing date
Publication date
Application filed by 이화여자대학교 산학협력단 filed Critical 이화여자대학교 산학협력단
Priority to KR1020220005921A priority Critical patent/KR102679042B1/en
Publication of KR20230109982A publication Critical patent/KR20230109982A/en
Application granted granted Critical
Publication of KR102679042B1 publication Critical patent/KR102679042B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors

Abstract

본 발명은 하부층 콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 하프슬래브 및 PC 벽체를 설치할 수 있도록 하여 공기 단축이 가능하도록 한 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법을 제공한다.
본 발명의 적절한 일 실시 형태에 따르면, (a) 하부층 PC 하프슬래브를 설치하는 단계와; (b) 하부층 PC 벽체를 양중하여 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 하부층 PC 하프슬래브에 자립시켜 놓는 단계와; (c) 해당 층의 바로 위층에 상부층 PC 하프슬래브를 양중하여 하부층 PC 벽체의 상단에 거치되도록 설치하는 단계와; (d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층 토핑콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 벽체를 양중하여 하부층 PC 벽체의 상부에 위치시킨 후, 벽체자립수단을 통해 상부층 PC 벽체를 상부층 PC 하프슬래브에 자립시켜 놓는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지는 것을 특징으로 한다.
The present invention provides a PC half-slab construction method for the rapid construction of a PC apartment complex that allows the installation of the upper floor PC half-slab and PC wall while the curing of the lower floor concrete is not completed, thereby shortening the construction period.
According to one preferred embodiment of the present invention, (a) installing a lower layer PC half slab; (b) lifting the lower layer PC wall and placing it on both ends of the lower layer PC half-slab, and then making the lower layer PC wall stand on its own on the lower layer PC half-slab through fixing means; (c) lifting the upper layer PC half slab on the upper floor of the corresponding floor and installing it so that it is mounted on the top of the lower floor PC wall; (d) After pouring the lower layer topping concrete on the pre-installed lower layer PC half slab, lifting the upper layer PC wall while the curing of the lower layer topping concrete is not completed and placing it on top of the lower layer PC wall, then using wall self-supporting means The step of placing the upper floor PC wall on its own on the upper floor PC half slab is characterized in that construction is carried out by sequentially repeating the steps up to the number of floors designed for the upper floor.

Description

PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법{PC half-slab construction method for quick construction of precast concrete apartment house}PC half-slab construction method for rapid construction of PC apartment house {PC half-slab construction method for quick construction of precast concrete apartment house}

본 발명은 PC 공동주택을 위한 PC 하프슬래브의 시공 방법에 관한 것으로, 특히 하부층 콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 하프슬래브 및 PC 벽체를 설치할 수 있도록 하여 공기 단축이 가능하도록 한 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법에 관한 것이다.The present invention relates to a construction method of a PC half-slab for a PC apartment complex, and in particular, a PC apartment complex that allows the installation of the upper floor PC half-slab and PC wall while the curing of the lower floor concrete is not completed, thereby reducing the construction period. This is about the construction method of PC half slab for rapid construction.

기존 현장 중심의 건설생산 방식이 공업화 생산방식(Off-Site Construction, OSC)으로 변환되고 있으며, 공동주택 건설에 있어서도 PC(Precast Concrete)공법을 활용하여 공사비 절감, 공기단축 및 품질제고를 위한 시도가 증대되고 있다.The existing site-centered construction production method is being converted to an industrialized production method (Off-Site Construction, OSC), and attempts are being made to reduce construction costs, shorten the construction period, and improve quality by utilizing the PC (Precast Concrete) method in the construction of apartment complexes. It is increasing.

국내 공동주택은 주로 벽식(패널식)구조를 가지며, 이러한 구조체를 PC 구조로 형성하기 위해, 공장에서 제작, 운송된 PC 부재를 현장에서는 조립, 설치한 후 이를 구조적으로 일체화하는 과정이 필요하다.Domestic apartment houses mainly have a wall-type (panel-type) structure, and in order to form this structure into a PC structure, it is necessary to assemble and install PC members manufactured and transported in the factory at the site and then structurally integrate them.

따라서 PC 공동주택 벽식구조의 1개 층을 기준으로 한 시공 순서는 크게 ① PC 하프슬래브(Half-Slab) 설치, ② 배관 작업, ③ 토핑콘크리트(Topping Concrete) 타설 및 양생, ④ PC 벽체 설치의 4가지 공정으로 구성된다. Therefore, the construction sequence based on one floor of the PC apartment wall structure is largely divided into four stages: ① PC half-slab installation, ② piping work, ③ topping concrete pouring and curing, and ④ PC wall installation. It consists of two processes.

여기서, 토핑콘크리트가 상층부 수직부재를 지지하기 위해서는 설계강도의 약 70% 이상의 강도가 필요하며, 이로 인해 위 시공 순서의 ③ 토핑 타설 및 양생 시 소요되는 기간은 약 4-5일이 요구된다. PC 하프슬래브(Half-Slab)를 적용한 공동주택 벽식구조 시공의 기준층 사이클은 상기 ③번 공정의 공기지연 요소 등으로 인하여, 순수 작업일 기준 16일에 이르고 있다. 이는 동일한 형태의 현장타설 RC 공동주택 기준층 사이클과 비교할 때 약 두 배 이상의 기간이 소요됨으로써 공기가 길어짐은 물론이고 공사비가 증가하게 되는 문제가 발생된다. 따라서 PC 공동주택 벽식구조 시공의 기준 1개층 사이클을 단축하기 위한 시공 방안이 요구된다.Here, in order for the topping concrete to support the vertical members of the upper layer, a strength of about 70% or more of the design strength is required, and for this reason, the time required for pouring and curing the topping in ③ of the above construction sequence is about 4-5 days. The standard floor cycle for apartment wall structure construction using PC half-slab reaches 16 pure working days due to air delay factors in process ③ above. Compared to the standard floor cycle of the same type of cast-in-place RC apartment complex, this takes approximately twice as long, which causes the problem of not only lengthening the construction period but also increasing construction costs. Therefore, a construction plan is required to shorten the standard one-story cycle for PC apartment wall structure construction.

본 발명의 배경이 되는 기술로는 한국 등록특허 등록번호 제10-1193895호(특허문헌 1)로서, '프리캐스트 콘크리트 부재와 현장타설 콘크리트가 결합된 합벽 구조물 및 상기 합벽 구조물의 시공방법'가 제안되어 있다. 이는 토핑콘크리트를 타설하지 않고도 벽체의 구조적 안정성을 확보할 수 있는 합벽구조물의 시공방법을 개시하고 있다. 그러나 이 배경기술은 벽체 시공시 현장콘크리트를 타설 양생한 후 일정 이상의 강도가 발현되어야 슬래브가 시공되는 방법임으로 한 층의 공기가 길어질 뿐만 아니라 PC 공동주택의 조립식 벽식구조에 적용하기가 어렵다.The technology behind the present invention is Korean Patent Registration No. 10-1193895 (Patent Document 1), which proposes 'a composite wall structure combining precast concrete members and cast-in-place concrete and a construction method of the composite wall structure'. It is done. This discloses a construction method for a composite wall structure that can ensure the structural stability of the wall without pouring topping concrete. However, this background technology is a method in which the slab is constructed only when a certain level of strength is achieved after pouring and curing the in-situ concrete during wall construction, so not only does the construction period for one floor become longer, but it is also difficult to apply to the prefabricated wall structure of PC apartment complexes.

본 발명의 다른 배경기술로는 한국 공개특허 공개번호 제10-2020-0037677호(특허문헌 2)로서, 'PC벽체 시공중 자립을 위한 구조물 및 이의 시공 방법'이 제안되어 있다. 이는 수직철근에 결합되는 베이스부재, 가이드부재, 쐐기부재 등과, 지지브라켓부가 PC벽체의 내측에 위치하게 됨으로써, PC벽체 외측의 공간활용성을 높이고, 앙카의 설치시 바닥면 내부에 설치된 철근들과의 간섭에 의한 작업의 어려움을 해결한다. 그러나 이 배경기술은 슬래브의 시공 후 이루어지는 PC벽체의 조립 과정으로 공기 단축의 목적으로 한 PC 공동주택의 조립식 벽식구조에 적용하기가 어렵다.Another background technology of the present invention is Korean Patent Publication No. 10-2020-0037677 (Patent Document 2), which proposes 'a structure for self-reliance during PC wall construction and its construction method'. This increases the space utilization on the outside of the PC wall by positioning the base member, guide member, wedge member, etc. connected to the vertical reinforcing bar, and the support bracket part inside the PC wall, and when installing the anchor, the reinforcing bars installed inside the floor and Solve work difficulties caused by interference. However, this background technology is difficult to apply to the prefabricated wall structure of PC apartment complexes for the purpose of shortening the construction period due to the PC wall assembly process that occurs after the construction of the slab.

본 발명의 또 다른 배경기술로는 한국 등록특허 등록번호 제10-1270075호(특허문헌 3)로서, '시공 조립성이 우수한 외벽용 피씨 월'이 제안되어 있다. 이는 층고가 높은 구조물에 대한 벽체 시공시 작업이 간편하고 조립성이 우수함은 물론 각 피씨 월 간의 접합부, 바닥부(기초 콘크리트) 및 천정부(상판 슬래브)와의 접합부, 피씨 기둥과 피씨 월 간의 접합부 등 물류 창고의 전체적인 접합부 구조 일체성이 크게 향상되도록 한 것이다. 그러나 이 배경기술은 슬래브가 소요 강도를 발휘해야 다음 층의 벽체 및 슬래브를 시공할 수 있기 때문에 전체적으로 공기가 길어져 PC 공동주택의 조립식 벽식구조에 적용하기가 어렵다.Another background technology of the present invention is Korean Patent Registration No. 10-1270075 (Patent Document 3), which proposes a 'PC wall for exterior walls with excellent construction and assembly properties'. This not only simplifies work and has excellent assemblage when constructing walls for structures with high floor heights, but also provides logistics such as the joints between each PC wall, the joints with the floor (foundation concrete) and ceiling (top slab), and the joints between PC columns and PC walls. The overall structural integrity of the warehouse was greatly improved. However, this background technology is difficult to apply to the prefabricated wall structure of PC apartment complexes because the overall construction period is long because the slab must demonstrate the required strength before the next floor wall and slab can be constructed.

한국 등록특허 등록번호 제10-1193895호Korean Patent Registration No. 10-1193895 한국 공개특허 공개번호 제10-2020-0037677호Korean Patent Publication No. 10-2020-0037677 한국 등록특허 등록번호 제10-1270075호Korean Patent Registration No. 10-1270075

본 발명은 하부층 콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 하프슬래브 및 PC 벽체를 설치할 수 있도록 하여 공기 단축이 가능하도록 한 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법을 제공함에 그 목적이 있다.The purpose of the present invention is to provide a construction method of a PC half-slab for rapid construction of a PC apartment complex, which allows the installation of the upper-floor PC half-slab and PC wall while the curing of the lower-floor concrete is not completed, thereby shortening the construction period. There is.

본 발명의 적절한 일 실시 형태에 따르면, (a) 하부층 PC 하프슬래브를 설치하는 단계와; (b) 하부층 PC 벽체를 양중하여 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 하부층 PC 하프슬래브에 자립시켜 놓는 단계와; (c) 해당 층의 바로 위층에 상부층 PC 하프슬래브를 양중하여 하부층 PC 벽체의 상단에 거치되도록 설치하는 단계와; (d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층 토핑콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 벽체를 양중하여 하부층 PC 벽체의 상부에 위치시킨 후, 벽체자립수단을 통해 상부층 PC 벽체를 상부층 PC 하프슬래브에 자립시켜 놓는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지는 것을 특징으로 한다.According to one preferred embodiment of the present invention, (a) installing a lower layer PC half slab; (b) lifting the lower layer PC wall and placing it on both ends of the lower layer PC half-slab, and then making the lower layer PC wall stand on its own on the lower layer PC half-slab through fixing means; (c) lifting the upper layer PC half slab on the upper floor of the corresponding floor and installing it so that it is mounted on the top of the lower floor PC wall; (d) After pouring the lower layer topping concrete on the pre-installed lower layer PC half slab, lifting the upper layer PC wall while the curing of the lower layer topping concrete is not completed and placing it on top of the lower layer PC wall, then using wall self-supporting means The step of placing the upper floor PC wall on its own on the upper floor PC half slab is characterized in that construction is carried out by sequentially repeating the steps up to the number of floors designed for the upper floor.

본 발명의 적절한 다른 실시 형태에 따르면, (a) 하부층 PC 하프슬래브를 설치하는 단계와; (b) 하부층 PC 벽체를 양중하여 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 하부층 PC 하프슬래브에 자립시켜 놓는 단계와; (c) 해당 층의 바로 위층에 일부 영역만큼만 상부층 PC 하프슬래브를 양중하여 하부층 PC 벽체의 상단에 거치되도록 설치한 후, 상부층 PC 벽체를 양중하여 하부층 PC 벽체의 상부에 결합시킨 후, 벽체자립수단을 통해 상부층 PC 벽체를 상부층 PC 하프슬래브에 자립시켜 놓는 단계와; (d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층에서 벽체자립수단을 제거하는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지는 것을 특징으로 한다.According to another suitable embodiment of the present invention, (a) installing a lower layer PC half slab; (b) lifting the lower layer PC wall and placing it on both ends of the lower layer PC half-slab, and then making the lower layer PC wall stand on its own on the lower layer PC half-slab through fixing means; (c) After lifting the upper layer PC half slab only to a certain area on the upper floor of the relevant floor and installing it to be mounted on the top of the lower floor PC wall, lifting the upper floor PC wall and joining it to the upper part of the lower floor PC wall, then wall self-supporting means A step of making the upper layer PC wall stand on its own on the upper layer PC half slab through; (d) After pouring the lower layer topping concrete on the pre-installed lower layer PC half slab, removing the wall self-supporting means from the lower layer; is characterized in that construction is carried out by sequentially repeating the steps up to the number of floors designed for the upper layer.

여기서, 하부층 및 상부층 PC 하프슬래브는 동일 구조를 갖되, 길이방향의 양쪽 단부쪽 상면에 벽체지지용 콘크리트 돌출부가 상호 일정 간격을 가지고 복수개 이상으로 상향 돌출되어 있고, 벽체지지용 콘크리트 돌출부에는 복수의 앵커볼트 또는 벽체 서포트 하부연결판가 매립되어 돌출 설치되고, 전단력 저항과 토핑콘크리트와의 일체를 이루기 위해 하부층 및 상부층 PC 하프슬래브에는 트러스 철근의 양단부가 콘크리트 돌출부에 매립되어 설치된 것을 특징으로 한다.Here, the lower layer and the upper layer PC half slab have the same structure, but on the upper surfaces of both ends in the longitudinal direction, a plurality of concrete protrusions for wall support protrude upward at regular intervals, and the concrete protrusions for wall support have a plurality of anchors. The bolt or wall support lower connection plate is embedded and installed protruding, and both ends of the truss reinforcement bars are installed in the lower and upper floor PC half slabs by being embedded in the concrete protrusion to achieve shear force resistance and unity with the topping concrete.

또한, 하부층 및 상부층 PC 벽체에는 벽체 서포트의 상단을 연결하기 위한 벽체 서포트 상부연결판이 매립되어 설치된 것을 특징으로 한다.In addition, the lower and upper floor PC walls are characterized by an embedded wall support upper connection plate for connecting the top of the wall support.

또한, 벽체자립수단은 L형 접합철물 또는 긴 막대 형태의 벽체 서포트 중 어느 하나를 사용하는 것을 특징으로 한다.In addition, the wall self-supporting means is characterized by using either L-shaped joint hardware or a long bar-shaped wall support.

또한, 하부층 및 상부층 PC 벽체는 동일한 구조를 갖되, 각기 그 상단에 일정 두께를 갖고 상향 돌출된 결합돌부가 형성되고, 그 하단에 타측의 결합돌부가 끼움 결합될 수 있도록 일정 깊이로 함몰되어 있는 결합요홈이 형성되어 있는 것을 특징으로 한다.In addition, the lower layer and upper layer PC walls have the same structure, but each has a connecting protrusion with a certain thickness and protruding upward at the top thereof, and a joint protrusion that is recessed at a certain depth so that the connecting protrusion on the other side can be fitted and coupled to the bottom of the bonding protrusion. It is characterized by a groove being formed.

또한, 하부층 및 상부층 PC 벽체는 동일한 구조를 갖되, 각기 하단부에는 토핑콘크리트와 접합되도록 철근 또는 관통볼트 형태의 벽체접합용 연결재가 매립되어 양쪽 측면에서 일정량 돌출되어 설치된 것을 특징으로 한다.In addition, the lower layer and upper layer PC walls have the same structure, but each lower layer is characterized by a wall joining connecting material in the form of a reinforcing bar or through bolt being embedded to be connected to the topping concrete and protruding a certain amount from both sides.

또한, 상기 (d) 단계에서, 상부층 PC 하프슬래브는 일부만 설치된 상태에서 하부층 토핑콘크리트의 타설이 진행되는 것을 특징으로 한다.In addition, in step (d), the lower layer topping concrete is poured while the upper layer PC half slab is only partially installed.

또한, 하부층 토핑콘크리트의 양생이 완료되면, 하부층에서 벽체자립수단인 L형 접합철물 또는 긴 막대 형태의 벽체 서포트를 제거하는 단계;가 더 포함된 것을 특징으로 한다.In addition, when the curing of the topping concrete of the lower layer is completed, the step of removing the L-shaped joint hardware or long bar-shaped wall support, which is a wall self-supporting means, from the lower layer is characterized in that it is further included.

본 발명의 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법에 따르면, 하부층 토핑콘크리트의 양생이 완료되지 않은 상태에서 상부층의 PC 하프슬래브 및 벽체를 설치해가면서 시공이 이루어져 공사기간을 획기적으로 단축시킬 수 있다.According to the construction method of the PC half-slab for rapid construction of the PC apartment complex of the present invention, construction is performed by installing the PC half-slab and wall of the upper floor while the curing of the topping concrete of the lower floor is not completed, thereby dramatically shortening the construction period. You can do it.

또한, 토핑콘크리트의 타설 및 양생 작업을 여러 층에서 동시에 진행할 경우, 시공의 효율성을 더욱 극대화할 수 있다. 향후 고층 PC 공동주택에 적용 시 이러한 기대효과가 더욱 극대화될 수 있다.In addition, when pouring and curing of topping concrete is carried out simultaneously on multiple floors, construction efficiency can be further maximized. These expected effects can be further maximized when applied to high-rise PC apartment complexes in the future.

또한, 시공 중 PC 벽체 및 상층부 PC 하프슬래브의 하중을 분산시키는 벽체 서포트 또는 접합앵글의 설치로 구조적으로 취약한 토핑콘크리트의 의존도를 감소시킬 수 있고, 이로 인해 시공 안전성을 제고할 수 있다.In addition, the dependence on structurally weak topping concrete can be reduced by installing wall supports or joint angles that distribute the load of the PC wall and upper PC half-slab during construction, thereby improving construction safety.

또한, PC 하프슬래브의 설치 이후에 공동주택의 외벽을 이루게 되는 PC 벽체 설치 시점이 단축되어 토핑콘크리트에 선행하여 시공됨으로써 작업 시 추락 등의 안전사고 우려 없이 근로자가 안전하게 타설작업을 수행할 수 있다.In addition, after the installation of the PC half-slab, the installation time for the PC wall, which forms the exterior wall of the apartment building, is shortened and is constructed before the topping concrete, allowing workers to safely perform pouring work without fear of safety accidents such as falls during work.

또한, 벽체자립수단으로 사용된 접합철물 또는 벽체 서포트는 콘크리트 피복 위에 설치되어 토핑콘크리트의 양생이 완료된 이후에는 해체되므로 콘크리트 내부에 매몰되지 않아 여러번 사용 가능한 장점을 갖는다.In addition, the bonded hardware or wall support used as a means of wall independence is installed on the concrete covering and is dismantled after curing of the topping concrete is completed, so it has the advantage of being able to be used multiple times because it is not buried inside the concrete.

또한, PC 벽체의 상하단부에는 결합구조를 갖고 자립에 유리하며 외벽 시공이 용이한 이점을 갖는다.In addition, the upper and lower ends of the PC wall have a joint structure, which is advantageous for independence and makes it easy to construct an exterior wall.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1a는 본 공법에 따라 PC 하프슬래브에 PC벽체가 L형 접합철물을 통해 자립되어져 있는 상태이고,
도 1b는 도 1a의 평면 상태를 나타낸 것이고,
도 1c는 도 1b의 A-A선 단면도이고,
도 2는 도 1a에 적용된 하부층 및 상부측 PC 하프슬래브의 일 형태를 나타낸 것이고,
도 3은 도 2의 PC 하프슬래브에 설치되는 트러스철근의 사시도이고,
도 4는 도 1a에 도시된 'k'부의 확대도이고,
도 5는 본 공법에 따라 PC 하프슬래브에 PC벽체가 벽체 서포트를 통해 자립되어있는 상태이고,
도 6a 내지 도 6d는 본 공법의 일 실시 예에 따른 시공순서도이고,
도 7a 내지 도 7d는 본 공법의 다른 실시 예에 따른 시공순서도이다.
The following drawings attached to this specification illustrate preferred embodiments of the present invention, and serve to further understand the technical idea of the present invention along with the detailed description of the invention. Therefore, the present invention is limited to the matters described in the attached drawings. It should not be interpreted as limited.
Figure 1a shows a PC wall standing on a PC half-slab through L-shaped joint steel according to this method,
Figure 1b shows the planar state of Figure 1a,
Figure 1c is a cross-sectional view taken along line AA of Figure 1b;
Figure 2 shows one form of the lower layer and upper PC half slab applied in Figure 1a,
Figure 3 is a perspective view of the truss reinforcement installed in the PC half slab of Figure 2,
Figure 4 is an enlarged view of portion 'k' shown in Figure 1a,
Figure 5 shows a PC wall standing on a PC half-slab through wall support according to this method,
Figures 6a to 6d are construction flowcharts according to an embodiment of the present method,
Figures 7a to 7d are construction flow charts according to another embodiment of the present method.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.Below, the present invention will be described in detail with reference to embodiments shown in the attached drawings, but the presented embodiments are illustrative for a clear understanding of the present invention, and the present invention is not limited thereto.

본 공법에 적용되는 하부층 및 상부측 PC 하프슬래브(11,12)는 상대적인 설치 위치에 따라 용어를 달리한 것으로 상호 동일한 구조를 갖는다. 따라서 하부층 PC 하프슬래브(11)의 구조로 상부측 PC 하프슬래브(12)의 구조도 알 수 있다. 또한 하부층 및 상부층 PC벽체(21,22)도 상대적인 설치 위치에 따라 용어를 달리한 것으로 상호 동일한 구조를 갖는다. 도 1a는 본 공법에 따라 PC 하프슬래브(11,12)에 PC벽체(21,22)가 벽체자립수단인 L형 접합철물(42)을 통해 자립되어져 있는 상태를 나타낸 것이고, 도 1b는 도 1a의 평면 상태를 나타내고 있고, 도 1c는 도 1b의 A-A선 단면도로서 트러스철근(115)의 배치상태와 토핑콘크리트(13)의 타설 높이를 알 수 있도록 도시한 것이다. 도 2는 도 1a에 적용된 하부층 및 상부측 PC 하프슬래브(11,12)의 일 형태를 나타낸 것이고, 도 3은 PC 하프슬래브(11,12)에 설치되는 트러스철근(115)을 입체적으로 나타낸 것이고, 도 4는 도 1a에 도시된 'k'부의 확대도를 타나내고, 도 5는 PC 하프슬래브(11,12)에 PC벽체(21,22)가 벽체자립수단인 벽체 서포트(44)를 통해 자립되어져 있는 상태를 나타낸 것이다.The lower layer and upper PC half slabs (11, 12) applied to this method have the same structure, with different terms depending on the relative installation positions. Therefore, the structure of the upper PC half-slab 12 can be known from the structure of the lower PC half-slab 11. In addition, the lower and upper layer PC walls 21 and 22 also have the same structure, with different terminology depending on the relative installation positions. Figure 1a shows a state in which the PC walls (21, 22) are independent on the PC half-slabs (11, 12) through the L-shaped joint hardware 42, which is a wall self-supporting means, according to the present method, and Figure 1b shows Figure 1a. It shows the planar state, and Figure 1c is a cross-sectional view taken along line A-A of Figure 1b, showing the arrangement state of the truss reinforcement 115 and the pouring height of the topping concrete 13. Figure 2 shows one form of the lower layer and upper PC half-slabs (11, 12) applied to Figure 1a, and Figure 3 shows the truss reinforcement bars (115) installed on the PC half-slabs (11, 12) in three dimensions. , Figure 4 shows an enlarged view of the 'k' portion shown in Figure 1a, and Figure 5 shows the PC walls (21, 22) on the PC half-slabs (11, 12) through the wall support (44), which is a wall self-supporting means. It represents the state of being independent.

본 공법은 도 1a와 같이 하부층 및 상부층 PC 하프슬래브(11,12), 하부측 및 상부측 PC 벽체(21,22), 벽체자립수단인 L형 접합철물(42) 또는 벽체 서포트(44)를 이용하여 PC 공동주택의 공기를 획기적으로 단축시킬 수 있는 특징을 갖는다.This method uses lower and upper layer PC half slabs (11, 12), lower and upper PC walls (21, 22), L-type joint hardware (42) or wall support (44) as a wall self-supporting means, as shown in Figure 1a. It has the feature of being able to dramatically shorten the construction period of a PC apartment complex.

<하부층 PC 하프슬래브(11)의 설치> <Installation of lower floor PC half slab (11)>

먼저, 도 6a과 같이 해당 층의 하부에 하부층 PC 하프슬래브(11)가 설치된다.First, the lower layer PC half slab 11 is installed at the bottom of the corresponding layer, as shown in Figure 6a.

도 2와 같이 하부층 PC 하프슬래브(11)에는 길이방향의 양쪽 단부쪽 상면에 벽체지지용 콘크리트 돌출부(112)가 상호 일정 간격을 가지고 복수개 이상으로 상향 돌출되어 있다. 벽체지지용 콘크리트 돌출부(112)의 높이(h)는 토핑콘크리트(31)의 타설 높이와 동일하도록 함이 바람직하다. 이는 토핑콘크리트(31)의 타설 후 벽체지지용 콘크리트 돌출부(112)가 해당 층 슬래브의 바닥에서 돌출되는 부분이 없도록 하기 위함이다.As shown in FIG. 2, the lower layer PC half slab 11 has a plurality of concrete protrusions 112 for wall support projecting upward at regular intervals from each other on the upper surface of both ends in the longitudinal direction. It is desirable that the height (h) of the concrete protrusion 112 for wall support is the same as the pouring height of the topping concrete 31. This is to ensure that the concrete protrusion 112 for wall support does not protrude from the bottom of the slab of the corresponding floor after the topping concrete 31 is poured.

벽체지지용 콘크리트 돌출부(112)에는 벽체자립수단의 형태에 따라 복수의 앵커볼트(114) 또는 도 5의 벽체 서포트 하부연결판(118)이 매립되어 돌출 설치될 수 있다. 앵커볼트(114)는 L형 접합철물(42)의 설치를 위한 것이고, 벽체 서포트 하부연결판(118)은 벽체 서포트(44)의 하단부 연결을 위한 것이다.A plurality of anchor bolts 114 or the wall support lower connection plate 118 of FIG. 5 may be embedded and protruded into the concrete protrusion 112 for wall support, depending on the type of wall self-supporting means. The anchor bolt 114 is for installing the L-shaped joint hardware 42, and the wall support lower connection plate 118 is for connecting the lower end of the wall support 44.

또한, 도 2 및 도 3과 같이 하부층 PC 하프슬래브(11)에는 전단력 저항과 토핑콘크리트(31)와의 일체를 이루기 위해 트러스 철근(115)의 양단부가 콘크리트 돌출부(112)에 매립되어 설치됨이 바람직하다. 이때 도 1c와 같이 트러스 철근(115)은 하연근(1152)이 매립되고 상연근(1151)과 래티스근(1153)의 일부는 노출되도록 설치된다.In addition, as shown in Figures 2 and 3, it is preferable that both ends of the truss reinforcement bars 115 are installed in the lower layer PC half slab 11 by being embedded in the concrete protrusion 112 to achieve shear force resistance and unity with the topping concrete 31. . At this time, as shown in Figure 1c, the truss reinforcement bar 115 is installed so that the lower edge bar 1152 is embedded and a part of the upper edge bar 1151 and the lattice bar 1153 are exposed.

<하부층 PC 벽체(21)의 설치> <Installation of the lower floor PC wall (21)>

그 다음, 도 6b와 같이 하부층 PC 벽체(21)를 양중하여 하부층 PC 하프슬래브(11)의 양단부에 세워 위치시킨 후, 벽체자립수단을 통해 하부층 PC 벽체(21)를 하부층 PC 하프슬래브(11)에 자립시켜 놓는다. 벽체자립수단은 예시된 L형 접합철물(42) 또는 긴 막대 형태의 벽체 서포트(44) 중 어느 한 형태가 사용될 수 있다.Next, as shown in Figure 6b, the lower layer PC wall 21 is lifted and positioned at both ends of the lower layer PC half slab 11, and then the lower layer PC wall 21 is connected to the lower layer PC half slab 11 through the wall self-supporting means. Make it independent. As the wall self-supporting means, either the L-shaped joint hardware 42 or the long rod-shaped wall support 44 may be used.

벽체 서포트(44)를 적용하는 경우, 하부층 PC 벽체(21)에는 도 5와 같이 벽체 서포트(44)의 상단을 연결하기 위한 벽체 서포트 상부연결판(218)이 매립되어 설치됨이 바람직하다. 이때 벽체 서포트(44)의 양단은 힌지(45)를 통해 연결된다. 힌지(45)는 볼트 또는 연결핀 형태가 될 수 있다. 물론 볼트가 힌지(45)로 사용되는 경우 너트가 힌지(45)에 체결된다.When applying the wall support 44, it is preferable that a wall support upper connection plate 218 for connecting the upper end of the wall support 44 is embedded and installed in the lower layer PC wall 21, as shown in FIG. At this time, both ends of the wall support 44 are connected through a hinge 45. The hinge 45 may be in the form of a bolt or connecting pin. Of course, when a bolt is used as the hinge 45, a nut is fastened to the hinge 45.

하부층 PC 벽체(21)는 그 상단에 일정 두께를 갖고 상향 돌출된 결합돌부(212)가 형성되고, 그 하단에 타측의 결합돌부(212)가 끼움 결합될 수 있도록 일정 깊이로 함몰되어 있는 결합요홈(214)이 형성됨이 바람직하다. 따라서 도 6c 및 도 6d와 같이 하부층 및 상부층 PC 벽체(21,22)는 상호간의 결합돌부(212)와 결합요홈(214)이 끼움 결합되어져 조립 설치가 용이하게 이루어질 수 있다.The lower layer PC wall 21 is formed with a coupling protrusion 212 that has a certain thickness and protrudes upward at its upper end, and has a coupling groove recessed at a certain depth so that the coupling protrusion 212 on the other side can be fitted and coupled to the bottom thereof. (214) is preferably formed. Therefore, as shown in FIGS. 6C and 6D, the lower layer and upper layer PC walls 21 and 22 can be easily assembled and installed because the coupling protrusions 212 and coupling grooves 214 are fitted with each other.

또한, 도 4와 같이 하부층 PC 벽체(21)와 상부층 PC 벽체(22)는 그 하단부에 토핑콘크리트(31)와 접합되도록 철근 또는 관통볼트 형태의 벽체접합용 연결재(216)가 매립되어 양쪽 측면에서 일정량 돌출되어 설치될 수 있다. 따라서 벽체접합용 연결재(216)는 토핑콘크리트(31)와 합성되어 하부층 PC 벽체(21)의 일체성 및 자립성을 강화시켜 준다.In addition, as shown in Figure 4, the lower layer PC wall 21 and the upper layer PC wall 22 are embedded with wall joining connectors 216 in the form of reinforcing bars or through bolts at their lower ends to be connected to the topping concrete 31 on both sides. It can be installed with a certain amount of protrusion. Therefore, the connecting material for wall joining (216) is composited with the topping concrete (31) to strengthen the integrity and independence of the lower layer PC wall (21).

<상부층 PC 하프슬래브(12)의 설치> <Installation of upper floor PC half slab (12)>

그 다음, 도 6d와 같이 해당 층의 바로 위가 되는 상부층에 상부층 PC 하프슬래브(12)를 양중하여 하부층 PC 벽체(21)의 상단에 거치되도록 설치한다.Next, as shown in FIG. 6d, the upper layer PC half slab 12 is lifted to the upper floor immediately above the corresponding floor and installed so that it is mounted on the top of the lower layer PC wall 21.

<하부층 토핑콘크리트(31)의 타설 및 상부층 PC 벽체(22)의 설치> <Pouring of lower layer topping concrete (31) and installation of upper layer PC wall (22)>

그 다음, 도 6d와 같이 선 설치된 하부층 PC 하프슬래브(11)에 하부층 토핑콘크리트(31)를 타설한다. 여기서 하부층 토핑콘크리트(31)의 타설은 상부층 PC 하프슬래브(12)가 일부만 설치된 상태에서 진행될 수 있다.Next, the lower layer topping concrete (31) is poured into the pre-installed lower layer PC half slab (11) as shown in Figure 6d. Here, the pouring of the lower layer topping concrete 31 can be carried out with the upper layer PC half slab 12 only partially installed.

이후, 하부층 토핑콘크리트(31)의 양생이 완료되지 않은 상태(소요 강도가 발현되기 이전)에서 상부층 PC 벽체(22)를 양중하여 하부층 PC 벽체(21)의 상부에 위치시킨 후, 벽체자립수단 예로 L형 접합철물(42)을 통해 상부층 PC 벽체(22)를 상부층 PC 하프슬래브(12)에 자립시켜 놓는다.Thereafter, in a state where the curing of the lower layer topping concrete 31 is not completed (before the required strength is developed), the upper layer PC wall 22 is lifted and placed on the upper part of the lower layer PC wall 21, and then used as an example of wall self-supporting means. The upper layer PC wall (22) is made to stand on the upper layer PC half slab (12) through the L-shaped joint hardware (42).

이때 상부층 PC 벽체(22)의 하단측 결합요홈(214)이 하부층 PC 벽체(21)의 상단측 결합돌부(212)에 끼움 결합된다.At this time, the lower coupling groove 214 of the upper layer PC wall 22 is fitted into the upper upper coupling protrusion 212 of the lower layer PC wall 21.

<벽체자립수단의 제거> <Removal of wall independence means>

그 다음, 하부층 토핑콘크리트(31)의 양생이 완료되면, 하부층에서 벽체자립수단인 L형 접합철물(42) 또는 긴 막대 형태의 벽체 서포트(44)를 제거한다. 제거된 L형 접합철물(42) 또는 긴 막대 형태의 벽체 서포트(44)는 재사용할 수 있는 장점을 갖게 된다.Next, when the curing of the lower layer topping concrete 31 is completed, the L-shaped joint hardware 42 or the long bar-shaped wall support 44, which is a wall self-supporting means, is removed from the lower layer. The removed L-shaped joint hardware 42 or the long bar-shaped wall support 44 has the advantage of being reusable.

이후, 상층으로 설계된 층수까지 위 단계를 반복하여 각 층에 PC 하프슬래브(11,12)와 PC 벽체(21,22)의 시공이 이루어진다.Afterwards, the above steps are repeated up to the number of floors designed for the upper floor, and the PC half slabs (11, 12) and PC walls (21, 22) are constructed on each floor.

이와 같이 본 공법은 해당층에서 토핑콘크리트의 타설 후 강도 발현을 위해 소요되는 양생기간을 거치지 않고, 상부층에서 상부층 PC 하프슬래브(12)의 설치와 상부층 PC 벽체(22)의 설치가 이루어짐으로 공기를 획기적으로 단축시킬 수 있고, 이로 인한 공사비 절감을 꾀할 수 있다.In this way, this method saves air by installing the upper PC half slab (12) and the upper PC wall (22) on the upper floor without going through the curing period required to develop strength after pouring the topping concrete on the corresponding floor. It can be dramatically shortened, thereby reducing construction costs.

상기 실시예에서는 상부층 PC 하프슬래브(12)의 설치 후, 하부층 토핑콘크리트(31)의 타설 및 상부층 PC 벽체(22)의 설치가 순차적으로 이루어졌으나, 도 7a와 같이 하부층 PC 슬래브(11) 및 하부층 PC 벽체(21)를 순차적으로 설치하고, 도 7b와 같이 상부층 PC 슬래브(12) 및 상부층 PC 벽체(22)를 순차적으로 설치하고, 도 7c와 같이 하부층 토핑콘크리트(31)를 타설한 후, 도 7d와 같이 하부 층 벽체자립수단을 철거하는 순서로 이루어질 수도 있다.In the above embodiment, after installing the upper layer PC half slab 12, the pouring of the lower layer topping concrete 31 and the installation of the upper layer PC wall 22 were performed sequentially, but as shown in Figure 7a, the lower layer PC slab 11 and the lower layer After installing the PC wall 21 sequentially, installing the upper layer PC slab 12 and the upper layer PC wall 22 sequentially as shown in Figure 7b, and pouring the lower layer topping concrete 31 as shown in Figure 7c, As shown in 7d, it may be done in the order of demolishing the lower floor wall self-supporting means.

결국, 본 공법은 하부층 PC 벽체(21)가 하부층 PC 하프슬래브(11)에 자립적으로 지지/고정되어 있어, 상부층 PC 하프슬래브(12)와 상부층 PC 벽체(22)를 시공할 수 있을 뿐만 아니라 하부층 토핑콘크리트(31)를 타설한 후 양생이 완료되지 않아도 상부층 PC 하프슬래브(12)와 상부층 PC 벽체(22)를 시공할 수 있어 공기를 획기적으로 단축시킬 있는 것이다.Ultimately, in this method, the lower layer PC wall 21 is independently supported/fixed to the lower layer PC half slab 11, so that not only the upper layer PC half slab 12 and the upper layer PC wall 22 can be constructed, but also the lower layer PC wall 21. Even if curing is not completed after pouring the topping concrete (31), the upper layer PC half slab (12) and upper layer PC wall (22) can be constructed, drastically shortening the construction period.

지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. So far, the present invention has been described in detail with reference to the presented embodiments, but those skilled in the art can make various variations and modifications without departing from the technical spirit of the present invention with reference to the presented embodiments. will be. The present invention is not limited by such variations and modifications, but is limited by the claims appended below.

11: 하부층 PC 하프슬래브
112: 벽체지지용 콘크리트 돌출부
114: 앵커볼트
115: 트러스 철근
118: 벽체 서포트 하부연결판
12: 상부층 PC 하프슬래브
21: 하부층 PC 벽체
212: 결합돌부
214: 결합요홈
216: 벽체접합용 연결재
218: 벽체 서포트 상부연결판
22: 상부층 PC 벽체
31: 하부층 토핑콘크리트
42: L형 접합철물
44: 벽체 서포트
11: Lower layer PC half slab
112: Concrete protrusion for wall support
114: anchor bolt
115: Truss rebar
118: Wall support lower connection plate
12: Upper layer PC half slab
21: Lower floor PC wall
212: Combined protrusion
214: Combined groove
216: Connecting material for wall joining
218: Wall support upper connection plate
22: Upper floor PC wall
31: Lower layer topping concrete
42: L-type joint hardware
44: Wall support

Claims (9)

(a) 하부층 PC 하프슬래브를 설치하는 단계와;
(b) 하부층 PC 벽체를 양중하여 상기 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 상기 하부층 PC 하프슬래브에 자립시켜 놓는 단계와;
(c) 하부층의 바로 위층에 상부층 PC 하프슬래브를 양중하여 상기 하부층 PC 벽체의 상단에 거치되도록 설치하는 단계와;
(d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층 토핑콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 벽체를 양중하여 상기 하부층 PC 벽체의 상부에 위치시킨 후, 벽체자립수단을 통해 상기 상부층 PC 벽체를 상부층 PC 하프슬래브에 자립시켜 놓는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지며,
상기 하부층 및 상부층 PC 하프슬래브는 동일 구조를 갖되, 길이방향의 양쪽 단부쪽 상면에 벽체지지용 콘크리트 돌출부가 상호 일정 간격을 가지고 복수개 이상으로 상향 돌출되어 있고, 상기 벽체지지용 콘크리트 돌출부에는 복수의 앵커볼트 또는 벽체 서포트 하부연결판이 매립되어 돌출 설치되고, 전단력 저항과 토핑콘크리트와의 일체를 이루기 위해 상기 하부층 및 상부층 PC 하프슬래브에는 트러스 철근의 양단부가 콘크리트 돌출부에 매립되어 설치된 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
(a) installing the lower layer PC half slab;
(b) lifting the lower layer PC wall and placing it on both ends of the lower layer PC half-slab, and then allowing the lower layer PC wall to stand on the lower layer PC half-slab through fixing means;
(c) lifting the upper layer PC half slab to the upper layer of the lower layer and installing it so that it is mounted on the top of the lower layer PC wall;
(d) After pouring the lower layer topping concrete on the pre-installed lower layer PC half slab, lifting the upper layer PC wall while the curing of the lower layer topping concrete is not completed and placing it on the upper part of the lower layer PC wall, then installing wall self-supporting means Construction is carried out by sequentially repeating the step of placing the upper layer PC wall on the upper layer PC half slab through
The lower layer and the upper layer PC half slab have the same structure, but on the upper surfaces of both ends in the longitudinal direction, a plurality of concrete protrusions for wall support protrude upward at regular intervals, and the concrete protrusions for wall support have a plurality of anchors. A PC apartment complex in which bolts or wall support lower connection plates are embedded and installed protruding, and both ends of truss reinforcement bars are installed in the lower and upper floor PC half-slabs by being embedded in the concrete protrusions to achieve shear force resistance and unity with the topping concrete. Construction method of PC half slab for rapid construction.
(a) 하부층 PC 하프슬래브를 설치하는 단계와;
(b) 하부층 PC 벽체를 양중하여 상기 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 상기 하부층 PC 하프슬래브에 자립시켜 놓는 단계와;
(c) 하부층의 바로 위층에 일부 영역만큼만 상부층 PC 하프슬래브를 양중하여 상기 하부층 PC 벽체의 상단에 거치되도록 설치한 후, 상부층 PC 벽체를 양중하여 하부층 PC 벽체의 상부에 결합시킨 후, 벽체자립수단을 통해 상부층 PC 벽체를 상기 상부층 PC 하프슬래브에 자립시켜 놓는 단계와;
(d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층에서 벽체자립수단을 제거하는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지며,
상기 하부층 및 상부층 PC 하프슬래브는 동일 구조를 갖되, 길이방향의 양쪽 단부쪽 상면에 벽체지지용 콘크리트 돌출부가 상호 일정 간격을 가지고 복수개 이상으로 상향 돌출되어 있고, 상기 벽체지지용 콘크리트 돌출부에는 복수의 앵커볼트 또는 벽체 서포트 하부연결판이 매립되어 돌출 설치되고, 전단력 저항과 토핑콘크리트와의 일체를 이루기 위해 상기 하부층 및 상부층 PC 하프슬래브에는 트러스 철근의 양단부가 콘크리트 돌출부에 매립되어 설치된 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
(a) installing the lower layer PC half slab;
(b) lifting the lower layer PC wall and placing it on both ends of the lower layer PC half-slab, and then allowing the lower layer PC wall to stand on the lower layer PC half-slab through fixing means;
(c) Lifting the upper layer PC half slab only to a certain area on the upper floor of the lower layer and installing it to be mounted on the top of the lower layer PC wall, then lifting the upper layer PC wall and joining it to the upper part of the lower layer PC wall, then wall self-supporting means placing the upper layer PC wall on its own on the upper layer PC half slab through;
(d) After pouring the lower layer topping concrete on the pre-installed lower layer PC half slab, removing the wall self-supporting means from the lower layer; construction is carried out by sequentially repeating the steps up to the number of floors designed for the upper layer,
The lower layer and the upper layer PC half slab have the same structure, but on the upper surfaces of both ends in the longitudinal direction, a plurality of concrete protrusions for wall support protrude upward at regular intervals, and the concrete protrusions for wall support have a plurality of anchors. A PC apartment complex wherein the bolt or wall support lower connection plate is embedded and protruding, and both ends of the truss reinforcement are installed in the lower and upper floor PC half-slabs by being embedded in the concrete protrusion to achieve shear force resistance and unity with the topping concrete. Construction method of PC half slab for rapid construction.
삭제delete 제 1항 또는 제 2항에 있어서,
하부층 및 상부층 PC 벽체에는 벽체 서포트의 상단을 연결하기 위한 벽체 서포트 상부연결판이 매립되어 설치된 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
According to claim 1 or 2,
A PC half-slab construction method for rapid construction of a PC apartment complex, characterized in that the upper connection plate of the wall support for connecting the top of the wall support is embedded and installed in the lower and upper floor PC walls.
제 1항 또는 제 2항에 있어서,
상기 벽체자립수단은 L형 접합철물 또는 긴 막대 형태의 벽체 서포트 중 어느 하나를 사용하는 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
According to claim 1 or 2,
A method of constructing a PC half-slab for rapid construction of a PC apartment complex, characterized in that the wall self-supporting means uses either L-shaped joint hardware or a long bar-shaped wall support.
제 1항 또는 제 2항에 있어서,
상기 하부층 및 상부층 PC 벽체는 동일한 구조를 갖되, 각기 그 상단에 일정 두께를 갖고 상향 돌출된 결합돌부가 형성되고, 그 하단에 타측의 결합돌부가 끼움 결합될 수 있도록 일정 깊이로 함몰되어 있는 결합요홈이 형성되어 있는 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
According to claim 1 or 2,
The lower layer and upper layer PC walls have the same structure, but each has a coupling protrusion with a certain thickness and an upwardly protruding upper portion formed, and a coupling groove that is recessed at a certain depth so that the coupling protrusion on the other side can be fitted and coupled to the bottom of the coupling protrusion. A construction method of a PC half slab for rapid construction of a PC apartment complex, characterized in that it is formed.
제 1항 또는 제 2항에 있어서,
상기 하부층 및 상부층 PC 벽체는 동일한 구조를 갖되, 각기 하단부에는 토핑콘크리트와 접합되도록 철근 또는 관통볼트 형태의 벽체접합용 연결재가 매립되어 양쪽 측면에서 일정량 돌출되어 설치된 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
According to claim 1 or 2,
The PC walls of the lower and upper floors have the same structure, but at the lower ends of each, wall joining materials in the form of reinforcing bars or through bolts are embedded and installed to protrude a certain amount from both sides to be connected to the topping concrete. Rapid construction of a PC apartment complex. Construction method of PC half slab for.
제 1항 또는 제 2항에 있어서,
상기 (d) 단계에서, 상부층 PC 하프슬래브는 일부만 설치된 상태에서 하부층 토핑콘크리트의 타설이 진행되는 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
According to claim 1 or 2,
In step (d), the PC half-slab construction method for rapid construction of a PC apartment complex is characterized in that the lower layer topping concrete is poured while the upper layer PC half-slab is only partially installed.
제 1항 또는 제 2항에 있어서,
하부층 토핑콘크리트의 양생이 완료되면, 하부층에서 벽체자립수단인 L형 접합철물 또는 긴 막대 형태의 벽체 서포트를 제거하는 단계;가 더 포함된 것을 특징으로 하는 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법.
According to claim 1 or 2,
When the curing of the topping concrete of the lower layer is completed, a PC half slab for rapid construction of a PC apartment complex further includes the step of removing the L-shaped joint hardware or long bar-shaped wall support, which is a wall self-supporting means, from the lower layer. Construction method.
KR1020220005921A 2022-01-14 PC half-slab construction method for quick construction of precast concrete apartment house KR102679042B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220005921A KR102679042B1 (en) 2022-01-14 PC half-slab construction method for quick construction of precast concrete apartment house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220005921A KR102679042B1 (en) 2022-01-14 PC half-slab construction method for quick construction of precast concrete apartment house

Publications (2)

Publication Number Publication Date
KR20230109982A KR20230109982A (en) 2023-07-21
KR102679042B1 true KR102679042B1 (en) 2024-06-26

Family

ID=

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100377134B1 (en) * 1999-10-25 2003-03-26 삼성물산 주식회사 Corridor and balcony of ultra higher stories apartment half slab construction method
KR102282995B1 (en) * 2020-12-28 2021-07-28 (주)지산개발 Elvation module for column structure and construction method of building using it

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100377134B1 (en) * 1999-10-25 2003-03-26 삼성물산 주식회사 Corridor and balcony of ultra higher stories apartment half slab construction method
KR102282995B1 (en) * 2020-12-28 2021-07-28 (주)지산개발 Elvation module for column structure and construction method of building using it

Similar Documents

Publication Publication Date Title
CN107165272B (en) Prestressed assembled concrete frame node connecting structure and construction method thereof
US9388561B2 (en) Modular construction mold apparatus and method for constructing concrete buildings and structures
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN111576619B (en) Production method of high-strength concrete post-cast assembled frame system
CN103982041A (en) Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
KR20210038684A (en) Precast building construction system
KR100712354B1 (en) PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein
CN110656716A (en) Building structure with prefabricated wall boards connected in dense ribs and construction method of building structure
KR101036177B1 (en) Method for constructing building using PRC integrating method
KR102679042B1 (en) PC half-slab construction method for quick construction of precast concrete apartment house
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
CN113374171B (en) Recycled block concrete prefabricated assembled ring beam structure and construction method thereof
CN212926451U (en) Column base connecting assembly, prefabricated column and prefabricated column connecting structure
CN105926820B (en) Construction method for precast beam steel support plate resistance mesh combined floor
CN210529929U (en) Beam column connecting node with replaceable energy-consuming steel bars
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
CN210976062U (en) Assembled frame construction combination system
CN210049379U (en) Steel concrete combined frame column assembly type structure system
CN211200814U (en) Assembled light vertical bar plate type bearing wall structure
CN210049380U (en) Steel concrete combined frame column and reinforced concrete frame column combined assembly type structure system
KR20010090294A (en) Precast concrete structure for variable plan of apartment house
JP2001262586A (en) Foundation structure of dwelling house
CN112064824A (en) Combined-connection prefabricated shear wall system
KR20230109982A (en) PC half-slab construction method for quick construction of precast concrete apartment house
CN215630727U (en) Prefabricated caisson and connecting structure thereof