KR102105117B1 - Target unit for measuring the displacement in tunnel - Google Patents

Target unit for measuring the displacement in tunnel Download PDF

Info

Publication number
KR102105117B1
KR102105117B1 KR1020190110572A KR20190110572A KR102105117B1 KR 102105117 B1 KR102105117 B1 KR 102105117B1 KR 1020190110572 A KR1020190110572 A KR 1020190110572A KR 20190110572 A KR20190110572 A KR 20190110572A KR 102105117 B1 KR102105117 B1 KR 102105117B1
Authority
KR
South Korea
Prior art keywords
tunnel
casing member
casing
target
measuring
Prior art date
Application number
KR1020190110572A
Other languages
Korean (ko)
Inventor
한병원
남제현
이종한
Original Assignee
(주)에이티맥스
주식회사 동진디엔에스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)에이티맥스, 주식회사 동진디엔에스 filed Critical (주)에이티맥스
Priority to KR1020190110572A priority Critical patent/KR102105117B1/en
Application granted granted Critical
Publication of KR102105117B1 publication Critical patent/KR102105117B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points
    • G01C15/06Surveyors' staffs; Movable markers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/32Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0041Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining deflection or stress

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Disclosed is a target unit for measuring tunnel displacement. An object of the present invention is to provide the target unit for measuring the tunnel displacement, which can be continuously used in one installation regardless of the number or thickness of shotcrete. The target unit for measuring the tunnel displacement according to one embodiment of the present invention comprises: a target plate on which reflection for measuring the tunnel displacement is made; a casing to which the target plate is rotationally connected; a base member which is connected to the casing to be rotatable, and fixed to the primary shotcrete inside an excavation unit of a tunnel; and an elastic spring connecting the target plate and the base member and embedded in the casing.

Description

터널 변위 측정용 타겟 유니트{Target unit for measuring the displacement in tunnel}Target unit for measuring the displacement in tunnel}

본 발명은 터널 굴착부에 복수 회에 걸친 숏크리트(shortcrete)의 타설이 이루어지더라도 계속해서 사용할 수 있는 터널 변위 측정용 타겟 유니트에 관한 것이다.The present invention relates to a target unit for measuring tunnel displacement that can be continuously used even if a shortcrete is poured over the tunnel excavation multiple times.

일반적으로 터널 시공은 사전에 이루어진 지반 조사로부터 파악된 정보는 제한적으로 이용되고, 발생 응력이나 지반 강도는 굴착 공법과 지보(支保)의 시공방법에 의해서도 변하므로 시공에 따른 지반의 거동 특성을 명확하게 측정하는 방법이 필요하다.In general, in tunnel construction, the information obtained from the ground survey conducted beforehand is limitedly used, and the generated stress and ground strength are also changed by the excavation method and the construction method of the support, so the behavior characteristics of the ground according to the construction are clearly defined. Need a way to measure.

터널 굴착공사는 암반을 굴착하여 지보공(支保工)을 형성한 후 지보공 내부의 암반면에 형성된 균열의 진행을 방지하기 위하여 풍화암, 연암, 경암 등의 암(岩) 타입에 따라 구분하여 적절하게 숏크리트(shotcrete)를 수 회에 걸쳐 타설하는데, 이때 터널의 내공변위 및 천단변위를 계측하여 그 결과치를 시공에 반영함으로써 공사를 안전하게 진행할 수 있다.Tunnel excavation works are appropriately classified according to the type of weathering rock, soft rock, hard rock, etc. to prevent the progress of cracks formed on the rock surface inside the support hole after excavating the rock to form a support hole. (shotcrete) is poured several times. At this time, it is possible to safely carry out the construction by measuring the inner displacement and the celestial displacement of the tunnel and reflecting the result in the construction.

대표적인 방법이 터널 내공에 반사판을 가진 타겟을 터널에 부착하고, 레이저 광선을 발사하여 그 타겟에서 반사되는 광선의 속도를 측정하여 터널의 길이(거리)를 파악하고, 또 소정의 기준점과의 각도 변위량을 측정하여 터널 내부의 내공 변위량을 파악하는 방법이다.A typical method is to attach a target with a reflector to the tunnel inside the tunnel, fire a laser beam, measure the speed of the light reflected from the target, grasp the length (distance) of the tunnel, and also determine the amount of angular displacement from a predetermined reference point. It is a method to grasp the amount of displacement inside the tunnel by measuring.

이와 같은 기술과 관련하여 대한민국 등록특허 제10-1190549호에 터널의 내공변위 및 천단변위 측정용 핀이 개시되어 있으며, 그 구성은 터널의 내부 벽에 삽입되어 고정되는 앵커볼트, 광 반사가 일어나는 타겟판 및 상기 앵커볼트와 타겟판 사이에 위치하여 앵커볼트와 타겟판에 고정되는 탄성부를 포함하며, 탄성부의 길이를 숏크리트의 두께를 고려하여 결정할 수 있고, 탄성부에 이물질이 유입되는 것을 방지하기 위해 커버로 감싸는 것을 특징으로 하고 있다.In connection with this technology, a pin for measuring the internal displacement and the celestial displacement of a tunnel is disclosed in Korean Patent Registration No. 10-1190549, the configuration of which is an anchor bolt inserted into the inner wall of the tunnel and a target where light reflection occurs. Located between the plate and the anchor bolt and the target plate and includes an elastic portion fixed to the anchor bolt and the target plate, the length of the elastic portion can be determined in consideration of the thickness of the shotcrete, and to prevent foreign matter from entering the elastic portion It is characterized by wrapping with a cover.

그러나 이와 같은 구성의 측량 타겟을 비롯하여 종래의 변위 측정용 타겟은 숏크리트의 두께를 고려하여 탄성부의 길이를 선택하여야 하고, 설치 후 숏크리트의 두께가 예상보다 두꺼워 질 경우 매립될 수 있는 문제가 있다.However, a conventional target for measuring displacement, including a measurement target having such a configuration, needs to select the length of the elastic portion in consideration of the thickness of the shotcrete, and there is a problem that can be embedded when the thickness of the shotcrete becomes thicker than expected.

또한, 탄성부를 플라스틱 커버로 감싸더라도 터널 내부의 계속적인 발파를 위해 폭발물이나 대형 굴착기 등으로 작업을 지속하는 과정에서 굴착부로부터 예기치 않게 고속으로 날아오는 바위나 돌 등의 파편을 맞게 되어 파손을 가져올 수 있다. 플라스틱 커버가 손상되어 탄성부에 이물질이 유입되면 탄성스프링의 탄성력이 떨어져 외부의 충격을 흡수하는 성능이 감소하는 문제가 있다.In addition, even if the elastic part is wrapped with a plastic cover, in the process of continuing to work with explosives or large excavators for continuous blasting inside the tunnel, fragments such as rocks or stones flying at unexpectedly high speeds from the excavation part will be damaged. You can. When the plastic cover is damaged and foreign matter flows into the elastic part, the elastic force of the elastic spring falls and the performance of absorbing external shock is reduced.

대한민국 등록특허 제10-1190549호Republic of Korea Registered Patent No. 10-1190549 대한민국 등록특허 제10-0971713호Republic of Korea Registered Patent No. 10-0971713

본 발명은 종래의 문제점을 해결하기 위하여 안출된 것으로서, 숏크리트의 횟수나 두께에 상관없이 한 번 설치로 계속하여 사용할 수 있는 터널 변위 측정용 타겟 유니트를 제공하는 것을 목적으로 한다.The present invention has been devised to solve the conventional problems, and an object of the present invention is to provide a target unit for measuring tunnel displacement that can be continuously used in one installation regardless of the number or thickness of shotcrete.

또한, 탄성스프링 전체를 감싸는 케이싱을 부가하여 탄성스프링에 이물질이 침투하는 것을 차단할 수 있는 터널 변위 측정용 타겟 유니트를 제공하는 것을 목적으로 한다.In addition, an object of the present invention is to provide a target unit for measuring tunnel displacement that can block foreign substances from entering the elastic spring by adding a casing enclosing the entire elastic spring.

본 발명의 일 측면에 따르면, 터널의 변위 측정용 반사가 이루어지는 타겟판; 상기 타겟판이 일측으로만 회동 가능하도록 연결되는 케이싱; 상기 케이싱이 일측으로만 회동 가능하도록 연결되며, 터널의 굴착부 내측의 1차 숏크리트(shotcrete)에 고정되는 기초부재; 및 상기 타겟판과 상기 기초부재를 연결하며, 상기 케이싱에 내장되는 탄성스프링;을 포함하는 터널 변위 측정용 타겟 유니트가 제공될 수 있다.According to one aspect of the invention, the target plate is made of reflection for measuring the displacement of the tunnel; A casing to which the target plate is rotatably connected to only one side; A base member connected to the casing to be rotatable only on one side, and fixed to a primary shotcrete inside the excavation part of the tunnel; And an elastic spring connecting the target plate and the base member and embedded in the casing. A target unit for measuring tunnel displacement may be provided.

상기 케이싱은 강판을 절곡하여 마련되고, 상기 타겟판에 연결되는 제1케이싱부재와 상기 제1케이싱부재에 연결되는 제2케이싱부재로 구성되며, 상기 제1케이싱부재는 상기 제2케이싱부재에 대하여 일측으로만 회동 가능하게 연결될 수 있다.The casing is provided by bending a steel sheet, and is composed of a first casing member connected to the target plate and a second casing member connected to the first casing member, wherein the first casing member is relative to the second casing member. It can be connected to be able to rotate only on one side.

또한, 상기 제2케이싱부재는 터널 내측에 2차 숏크리트 시 제1케이싱부재가 회동할 수 있는 부분까지 매립되는 길이로 마련되고, 상기 제1케이싱부재는 3차 숏크리트 시 상기 타겟판이 회동할 수 있는 부분까지 매립되는 길이로 마련될 수 있다.In addition, the second casing member is provided with a length that is embedded in the tunnel to the portion where the first casing member can rotate when the second shotcrete is inside, and the first casing member can rotate the target plate during the third shotcrete. It may be provided with a length that is embedded up to a part.

또한, 상기 케이싱은 터널 안쪽을 향하여 뾰족한 알파벳 "V"자 형태의 단면을 갖을 수 있다.In addition, the casing may have a cross section in the shape of a pointed alphabet "V" toward the inside of the tunnel.

또한, 상기 타겟판은 상기 탄성스프링을 고정할 수 있는 후크가 형성되는 제1스프링걸이부와, 상기 제1스프링걸이부로부터 양측으로 수직으로 절곡되어 연장되는 타겟결합부가 마련되고, 상기 타겟판과 상기 제1케이싱부재는 제1회동축에 의해 터널의 후방측으로만 회동 가능하게 연결되고, 상기 제1케이싱부재는 양측 하부로 연장되는 제1연장부가 마련되고, 상기 제2케이싱부재는 양측 상부로 연장되는 제2연장부가 마련되며, 상기 제1연장부와 상기 제2연장부가 중첩되도록 결합한 상태에서 제2회동축이 삽입되어 터널의 후방측으로만 회동 가능하게 연결되며, 상기 기초부재는와 상기 제2케이싱부재는 제3회동축에 의해 터널의 후방측으로만 회동 가능하게 연결되될 수 있다.In addition, the target plate is provided with a first spring hook portion on which a hook capable of fixing the elastic spring is formed, and a target coupling portion extending vertically bent from both sides of the first spring hook portion, and the target plate The first casing member is rotatably connected only to the rear side of the tunnel by the first pivoting shaft, the first casing member is provided with first extensions extending downwardly at both sides, and the second casing member is upwards at both sides. An extended second extension is provided, and a second rotation shaft is inserted in a state in which the first extension and the second extension are combined so as to be rotatable only to the rear side of the tunnel, and the foundation member and the second The casing member may be rotatably connected only to the rear side of the tunnel by the third pivot shaft.

본 발명의 터널 변위 측정용 타겟 유니트는 수회에 걸쳐 숏크리트 타설이 이루어져 일부가 매립되더라도 계속하여 사용할 수 있다.The target unit for measuring tunnel displacement of the present invention can be continuously used even if a part of it is buried because shotcrete is poured over several times.

또한, 비산되는 파편으로부터 타겟 유니트의 망실을 방지하여 터널의 막장 근접부에 설치가 가능하다.In addition, it is possible to prevent the loss of the target unit from scattered debris and install it in the close proximity of the tunnel.

도 1은 본 발명의 일 실시예에 따른 터널 변위 측정용 타겟 유니트의 사시도이다.
도 2는 도 1의 배면도이다.
도 3은 도 1의 분해 사시도이다.
도 4는 도 1의 단면도이다.
도 5와 도 6은 터널 내측에 설치된 터널 변위 측정용 타겟 유니트의 설치 상태도이다.
도 7은 1차 숏크리트에 고정된 상태에서 외력이 작용하였을 때의 작동 상태도이다.
도 8은 2차 숏크리트에 의해 제2케이싱부재가 매립된 상태의 작동 상태도이다.
도 9는 3차 숏크리트에 의해 제1케이싱부재가 매립된 상태의 작동 상태도이다.
1 is a perspective view of a target unit for measuring tunnel displacement according to an embodiment of the present invention.
FIG. 2 is a rear view of FIG. 1.
3 is an exploded perspective view of FIG. 1.
4 is a cross-sectional view of FIG. 1.
5 and 6 are installation state diagrams of a target unit for measuring tunnel displacement installed inside a tunnel.
7 is an operation state diagram when an external force is applied in a state fixed to the primary shotcrete.
8 is an operational state diagram of a state in which the second casing member is embedded by the secondary shotcrete.
9 is an operation state diagram of a state in which the first casing member is buried by the third shotcrete.

이하, 첨부된 도면들을 참조하여 본 발명에 따른 실시예를 상세히 설명한다. 이 과정에서 도면에 도시된 구성요소의 크기나 형상 등은 설명의 명료성과 편의상 과장되게 도시될 수 있다. 또한, 본 발명의 구성 및 작용을 고려하여 특별히 정의된 용어들은 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 한다. 그리고 본 발명의 사상은 제시되는 실시예에 제한되지 아니하고 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서 다른 실시예를 용이하게 실시할 수 있을 것이나, 이 또한 본 발명의 범위 내에 속함은 물론이다.Hereinafter, embodiments according to the present invention will be described in detail with reference to the accompanying drawings. In this process, the size or shape of the components shown in the drawings may be exaggerated for clarity and convenience of description. In addition, terms specifically defined in consideration of the configuration and operation of the present invention may vary depending on the intention or custom of the user or operator. Definitions of these terms should be made based on the contents throughout this specification. And the spirit of the present invention is not limited to the embodiments presented, and those skilled in the art who understand the spirit of the present invention will be able to easily implement other embodiments within the scope of the same spirit, but this also falls within the scope of the present invention. Of course.

도 1은 본 발명의 일 실시예에 따른 터널 변위 측정용 타겟 유니트의 사시도이고, 도 2는 도 1의 배면도이며, 도 3은 도 1의 분해 사시도이고, 도 4는 도 1의 단면도이다.1 is a perspective view of a target unit for measuring tunnel displacement according to an embodiment of the present invention, FIG. 2 is a rear view of FIG. 1, FIG. 3 is an exploded perspective view of FIG. 1, and FIG. 4 is a cross-sectional view of FIG. 1.

이들 도면을 참조하면, 본 발명의 일 실시예에 따른 터널 변위 측정용 타겟 유니트(100)는, 터널의 변위 측정용 반사가 이루어지는 타겟판(10)과, 타겟판(10)에 연결되는 케이싱(20)과, 케이싱(20)의 하부에 연결되고 숏크리트(shotcrete)에 고정되는 기초부재(30)와, 타겟판(10)과 기초부재(30)를 연결하는 탄성스프링(40)을 포함한다.Referring to these drawings, the target unit 100 for tunnel displacement measurement according to an embodiment of the present invention includes a target plate 10 for reflecting a displacement measurement of a tunnel and a casing connected to the target plate 10 20), the base member 30 connected to the lower portion of the casing 20 and fixed to the shotcrete, and an elastic spring 40 connecting the target plate 10 and the base member 30.

타겟판(10)은 광(光) 반사가 이루어지는 부분이다. 타겟판(10)에는 탄성스프링(40)을 고정할 수 있는 후크가 형성되는 스프링걸이부(11)와, 스프링걸이부로부(11)터 양측으로 수직으로 절곡되어 연장되는 타겟결합부(12)가 마련된다. 타겟결합부(12)에는 제1회동축(50)이 삽입된다. The target plate 10 is a portion where light reflection is made. The target plate 10 has a spring hook portion 11 on which a hook capable of fixing the elastic spring 40 is formed, and a target coupling portion 12 that is bent vertically to both sides from the spring hook portion 11 to extend. Is prepared. The first rotational shaft 50 is inserted into the target coupling portion 12.

케이싱(20)은 타겟결합부(12)와 연결되는 제1케이싱부재(21)와, 제1케이싱부재(21)의 하부에 연결되는 제2케이싱부재(22)로 이루어진다. 제2케이싱부재(22)는 터널 내측에 2차 숏크리트 시 제1케이싱부재(21)가 회동할 수 있는 부분까지 매립되는 길이로 마련되고, 제1케이싱부재(21)는 3차 숏크리트 시 타겟판(10)이 회동할 수 있는 부분까지 매립되는 길이로 마련된다.The casing 20 consists of a first casing member 21 connected to the target coupling portion 12 and a second casing member 22 connected to a lower portion of the first casing member 21. The second casing member 22 is provided with a length that is buried to the portion where the first casing member 21 can rotate when the second shotcrete is inside the tunnel, and the first casing member 21 is the target plate during the third shotcrete (10) is provided with a length that is buried up to a part that can rotate.

제1케이싱부재(21)와 제2케이싱부재(22) 모두 알파벳 "V"형태의 단면을 갖는 전방부와 전방부로부터 양측으로 평행하게 연장되는 측면부로 구성되고 후방부는 개방된 형태이다. 여기서 전방부는 설치시 발파가 이루어지는 터널의 막장쪽을 향하는 부분이고, 후방부는 터널 입구쪽을 향하고 있는 부분이다. 전방부가 "V" 형태를 이루고 있어 터널 내측에서 발파공사가 진행될 때 비산되는 파편이 케이싱(20)에 가하는 충격이 최소화 될 수 있다. 또한, 강판을 절곡하여 마련되므로 비산물의 강한 충격에도 손상되거나 망실되지 않는다.Both the first casing member 21 and the second casing member 22 are composed of a front portion having an alphabetic "V" cross section and a side portion extending parallel to both sides from the front portion, and the rear portion is in an open shape. Here, the front part is the part facing the end of the tunnel where the blasting occurs during installation, and the rear part is the part facing the entrance of the tunnel. Since the front portion has a “V” shape, when the blasting work is performed inside the tunnel, the impact that the shattered fragments exert on the casing 20 can be minimized. In addition, since it is prepared by bending the steel sheet, it is not damaged or lost even by strong impacts of flying products.

제1케이싱부재(21)에는 타겟판(10)이 후방측으로만 회동 가능하게 연결된다. 타겟결합부(12) 내측으로 제1케이싱부재(21)의 상부가 중첩되도록 삽입되고, 타겟결합부(12)와 제1케이싱부재(21)를 관통하여 제1회동축(50)이 삽입된다.The target plate 10 is rotatably connected to the first casing member 21 only to the rear side. The upper portion of the first casing member 21 is inserted into the target coupling portion 12 so as to overlap, and the first pivot shaft 50 is inserted through the target coupling portion 12 and the first casing member 21. .

제2케이싱부재(22)에는 제1케이싱부재(21)가 후방측으로 회동 가능하게 연결된다. 이를 위해 제1케이싱부재(21)의 제1연결부(211)와 제2케이싱부재(22)의 제2연결부(221)가 상호 교차하도록 결합된 후 제2회동축(60)이 삽입된다.The first casing member 21 is rotatably connected to the second casing member 22 to the rear side. To this end, the first connecting portion 211 of the first casing member 21 and the second connecting portion 221 of the second casing member 22 are combined to cross each other, and then the second rotating shaft 60 is inserted.

기초부재(30)는 앵커볼트에 의해 터널 내의 숏크리트에 고정되며, 제2스프링걸이부(31)가 마련된다. 기초부재(30)와 제2케이싱부재(22)를 중첩되게 연결하고 제3회동축(70)이 삽입되어 제2케이싱부재(22)가 기초부재(30)에 대하여 후방측으로만 회동 가능하게 연결된다.The base member 30 is fixed to the shotcrete in the tunnel by an anchor bolt, and a second spring hook portion 31 is provided. The base member 30 and the second casing member 22 are overlapped, and the third pivot shaft 70 is inserted so that the second casing member 22 is rotatably connected only to the rear side with respect to the base member 30 do.

탄성스프링(40)은 타겟판(10)의 제1스프링걸이부(11)와 기초부재(30)의 제2스프링걸이부(31)의 후크에 각각 양단이 연결된다. 탄성스프링(40)의 탄성력에 의해 타겟판(10)과 케이싱(20)과 기초부재(30)가 외력이 작용하지 않는 한 움직이지 않도록 결합된다. Both ends of the elastic spring 40 are respectively connected to hooks of the first spring hook portion 11 of the target plate 10 and the second spring hook portion 31 of the base member 30. By the elastic force of the elastic spring 40, the target plate 10, the casing 20 and the base member 30 are coupled so as not to move unless an external force is applied.

탄성스프링(40)은 터널의 막장에 타겟 유니트(100)가 설치된 경우 암반 발파시 비산되는 파편에 의하여 타겟 유니트(100)가 받는 충격을 흡수하여 타겟 유니트(100)가 손상되거나 망실되는 것을 방지하여 계측의 정밀도 및 신뢰도를 높인다.The elastic spring 40 absorbs the shock received by the target unit 100 by debris scattered during rock blasting when the target unit 100 is installed in the tunnel wall to prevent the target unit 100 from being damaged or lost. Increase the precision and reliability of measurement.

도 5 내지 9를 참조하여, 매립위치에 따라 비산물의 충격 등 외력이 가해졌을 때 회동하는 형태를 설명한다.With reference to FIGS. 5 to 9, a form in which rotation occurs when an external force such as impact of a flying product is applied according to a buried position is described.

도 5와 도 6은 터널 내측에 설치된 터널 변위 측정용 타겟 유니트의 설치 상태도이고, 도 7은 1차 숏크리트에 고정된 상태에서 외력이 작용하였을 때의 작동 상태도이고, 도 8은 2차 숏크리트에 의해 제2케이싱부재가 매립된 상태의 작동 상태도이면, 도 9는 3차 숏크리트에 의해 제1케이싱부재가 매립된 상태의 작동 상태도이다. 5 and 6 are installation state diagrams of a target unit for measuring tunnel displacement installed inside a tunnel, and FIG. 7 is an operation state diagram when an external force is applied in a state fixed to the primary shotcrete, and FIG. 8 is a secondary shotcrete If the second casing member is buried in an operating state, FIG. 9 is an operational state diagram in which the first casing member is buried by tertiary shotcrete.

먼저, 도 5 내지 7을 참조하면, 본 발명의 터널 변위 측정용 타겟 유니트(100)는 터널 내측에 일정 간격으로 설치된다. 본 발명의 타겟 유니트(100)가 1차 숏크리트에 설치된 상태에서 비산하는 파편 등 외력이 가해졌을 때 기초부재(30)와 제2케이싱부재(22)를 연결하는 제3회동축(70)을 중심으로 회동하여 충격을 흡수한다. 1차 숏크리트에 설치된 타겟 유니트(100)는 막장에 가깝기 때문에 다양한 형태의 비산물이 충격을 가할 수 있다. 제3회동축(70)은 가장 큰 회전모멘텀이 작용하는 점으로 작은 충격에도 회동하기 때문에 다양한 충격을 흡수할 수 있다.First, referring to FIGS. 5 to 7, the target unit 100 for measuring tunnel displacement of the present invention is installed at a predetermined interval inside the tunnel. When the target unit 100 of the present invention is applied to an external force such as debris scattering while installed in the primary shotcrete, the third pivot shaft 70 connecting the base member 30 and the second casing member 22 is centered. Rotate to absorb shock. Since the target unit 100 installed in the primary shotcrete is close to the curtain, various types of scattering products may be impacted. The third rotation shaft 70 is a point at which the largest rotational momentum acts, and thus rotates even at a small shock, thereby absorbing various shocks.

도 8은 터널 내측에 2차 숏크리트가 행해져 제2케이싱부재(22)가 매립된 상태이다. 이러한 상태에서 외력이 제1케이싱부재(21)나 타겟판(10)에 작용하면 제2회동축(60)을 중심으로 타겟판(10)과 제1케이싱부재(21)가 함께 회동하며 충격을 흡수한다. 8 is a state in which a second shotcrete is performed inside the tunnel and the second casing member 22 is buried. In this state, when an external force acts on the first casing member 21 or the target plate 10, the target plate 10 and the first casing member 21 rotate together with a shock around the second pivot shaft 60 to generate an impact. Absorb.

도 9는 터널 내측에 3차 숏크리트가 행해져 제1케이싱부재(21)가 매립된 상태에서 외력이 가해졌을 때 타겟판(10)이 제1회동축(50)을 중심으로 회동하며 충격을 흡수하게 된다.FIG. 9 shows that the target plate 10 rotates around the first pivot 50 to absorb shock when an external force is applied in a state in which the third casing is performed inside the tunnel and the first casing member 21 is buried. do.

이와 같이 본 발명의 터널 변위 측정용 타겟 유니트(100)은 최대 3차 숏크리트가 행해지는 터널 굴착 작업에서도 타겟을 새로 설치할 필요 없이 계속하여 사용할 수 있는 장점이 있다.As described above, the target unit 100 for measuring tunnel displacement of the present invention has an advantage that it can be continuously used without the need to newly install a target even in a tunnel excavation operation in which up to 3rd shotcrete is performed.

또한, 탄성스프링(40)이 케이싱(20)에 내장되어 있어 비산하는 파편이 탄성스프링(40)에 끼어 탄성력을 떨어뜨리는 일이 발생하지 않으며, 케이싱(20)의 전방부 형태를 알파벳 "V" 형태로 하여 발파시 비산물에 의해 타겟에 가해지는 충격량을 최소화할 수 있다.In addition, since the elastic spring 40 is embedded in the casing 20, scattering debris does not occur by dropping the elastic force by being caught in the elastic spring 40, and the shape of the front portion of the casing 20 is represented by the letter “V”. In the form, it is possible to minimize the amount of impact applied to the target by scattering products during blasting.

본 발명은 기재된 실시예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 수정 예 또는 변형 예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이다.The present invention is not limited to the described embodiments, and it is apparent to those skilled in the art that various modifications and variations can be made without departing from the spirit and scope of the present invention. Therefore, such modifications or variations will have to belong to the claims of the present invention.

10: 타겟판 20: 캐이싱
21: 제1케이싱부재 22: 제2케이싱부재
30: 기초부재 40: 탄성스프링
10: Target plate 20: Caching
21: first casing member 22: second casing member
30: base member 40: elastic spring

Claims (5)

터널의 변위 측정용 반사가 이루어지는 타겟판;
상기 타겟판이 일측으로만 회동 가능하도록 연결되는 제1케이싱부재와, 상기 제1케이싱부재에 연결되는 제2케이싱부재로 구성되며, 상기 제1케이싱부재는 상기 제2케이싱부재에 대하여 일측으로만 회동 가능하게 연결되는 케이싱;
상기 케이싱이 일측으로만 회동 가능하도록 연결되며, 터널의 굴착부 내측의 1차 숏크리트(shotcrete)에 고정되는 기초부재; 및
상기 타겟판과 상기 기초부재를 연결하며, 상기 케이싱에 내장되는 탄성스프링;을 포함하며,
상기 타겟판은 상기 탄성스프링을 고정할 수 있는 후크가 형성되는 제1스프링걸이부와, 상기 제1스프링걸이부로부터 양측으로 수직으로 절곡되어 연장되는 타겟결합부가 마련되고, 상기 타겟판과 상기 제1케이싱부재는 제1회동축에 의해 터널의 후방측으로만 회동 가능하게 연결되며,
상기 제1케이싱부재는 양측 하부로 연장되는 제1연장부가 마련되고, 상기 제2케이싱부재는 양측 상부로 연장되는 제2연장부가 마련되며, 상기 제1연장부와 상기 제2연장부가 중첩되도록 결합한 상태에서 제2회동축이 삽입되어 상기 제1케이싱부재가 상기 제2케이싱부재에 대하여 터널 후방측으로만 회동 가능하게 연결되며,
상기 제2케이싱부재는 상기 기초부재에 대하여 제3회동축에 의해 터널의 후방측으로만 회동 가능하게 연결되는 터널 변위 측정용 타겟 유니트.
A target plate on which reflection for measuring displacement of a tunnel is made;
The target plate comprises a first casing member connected so as to be rotatable only to one side, and a second casing member connected to the first casing member, and the first casing member rotates only to one side with respect to the second casing member A casing possibly connected;
A base member connected to the casing to be rotatable only on one side, and fixed to a primary shotcrete inside the excavation part of the tunnel; And
Includes; connecting the target plate and the base member, an elastic spring embedded in the casing;
The target plate is provided with a first spring hook portion on which a hook capable of fixing the elastic spring is formed, and a target coupling portion extending vertically bent from both sides of the first spring hook portion, and the target plate and the first 1 The casing member is rotatably connected only to the rear side of the tunnel by the first pivot,
The first casing member is provided with a first extension portion extending to the lower side of both sides, the second casing member is provided with a second extension portion extending to the upper side of both sides, and the first extension portion and the second extension portion are combined to overlap. In the state, the second rotating shaft is inserted so that the first casing member is rotatably connected only to the rear side of the tunnel with respect to the second casing member,
The second casing member is a target unit for measuring tunnel displacement that is only rotatably connected to the rear side of the tunnel by a third pivoting shaft with respect to the base member.
삭제delete 제1항에 있어서,
상기 제2케이싱부재는 터널 내측에 2차 숏크리트 시 제1케이싱부재가 회동할 수 있는 부분까지 매립되는 길이로 마련되고, 상기 제1케이싱부재는 3차 숏크리트 시 상기 타겟판이 회동할 수 있는 부분까지 매립되는 길이로 마련되는 터널 변위 측정용 타겟 유니트.
According to claim 1,
The second casing member is provided with a length that is embedded in the tunnel to the portion where the first casing member can rotate during the second shotcrete, and the first casing member is provided to the portion where the target plate can rotate during the third shotcrete. Target unit for measuring tunnel displacement provided in a buried length.
제1에 있어서,
상기 케이싱은 터널 안쪽을 향하여 뾰족한 알파벳 "V"자 형태의 단면을 갖는 터널 변위 측정용 타겟 유니트.
According to claim 1,
The casing is a target unit for measuring tunnel displacement having a pointed alphabet "V" cross section toward the inside of the tunnel.
삭제delete
KR1020190110572A 2019-09-06 2019-09-06 Target unit for measuring the displacement in tunnel KR102105117B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190110572A KR102105117B1 (en) 2019-09-06 2019-09-06 Target unit for measuring the displacement in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190110572A KR102105117B1 (en) 2019-09-06 2019-09-06 Target unit for measuring the displacement in tunnel

Publications (1)

Publication Number Publication Date
KR102105117B1 true KR102105117B1 (en) 2020-04-27

Family

ID=70467592

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190110572A KR102105117B1 (en) 2019-09-06 2019-09-06 Target unit for measuring the displacement in tunnel

Country Status (1)

Country Link
KR (1) KR102105117B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100971713B1 (en) 2010-01-28 2010-07-22 권영억 A target for measure the displacement in tunnel and method for installation thereof
KR101086836B1 (en) * 2009-02-24 2011-11-24 (주)지오넷 Unit structure of pivot joint for measuring 3D displacement and apparatus measuring 3D displacement by it
KR101190549B1 (en) 2010-04-16 2012-10-16 케이앤씨컨설턴트 주식회사 A pin for measuring a tunnel convergence and crown settlement
KR200481015Y1 (en) * 2014-07-14 2016-08-03 권영억 a target with Compulsion Rotation
KR20190000356A (en) * 2018-12-24 2019-01-02 주식회사 누림 Displacement determination apparatus of tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101086836B1 (en) * 2009-02-24 2011-11-24 (주)지오넷 Unit structure of pivot joint for measuring 3D displacement and apparatus measuring 3D displacement by it
KR100971713B1 (en) 2010-01-28 2010-07-22 권영억 A target for measure the displacement in tunnel and method for installation thereof
KR101190549B1 (en) 2010-04-16 2012-10-16 케이앤씨컨설턴트 주식회사 A pin for measuring a tunnel convergence and crown settlement
KR200481015Y1 (en) * 2014-07-14 2016-08-03 권영억 a target with Compulsion Rotation
KR20190000356A (en) * 2018-12-24 2019-01-02 주식회사 누림 Displacement determination apparatus of tunnel

Similar Documents

Publication Publication Date Title
KR101190549B1 (en) A pin for measuring a tunnel convergence and crown settlement
US20100012377A1 (en) System And Apparatus For Locating And Avoiding An Underground Obstacle
KR102105117B1 (en) Target unit for measuring the displacement in tunnel
US20120298440A1 (en) Excitation device and method for downhole seismic testing using the same
JP2019120116A (en) Tooth for bucket of excavator
US20090183917A1 (en) System and apparatus for locating and avoiding an underground obstacle
CA2281762C (en) Mine disposal apparatus and mine disposal method
KR101383847B1 (en) Apparatus for forefinger of an excavator
KR100755987B1 (en) Percussive apparatus of the rock breaker type
JPS6057998B2 (en) Tools mainly used in combination with breakers
KR200446441Y1 (en) Folder Type Surveying Target
KR20210145274A (en) casing protection bit
KR101574727B1 (en) protection housing for crown settlement and target displacement measuring convergence
KR100686697B1 (en) Tension and compressure supporting pile
KR20160032669A (en) protection housing for Target displacement measuring convergence
KR102559205B1 (en) Displacement measurement targets in tunnels with automatic transport
KR20100009902A (en) Surveying target for measuring displacement and settlement
KR20000042623A (en) Target apparatus for electro optical distance measurement
KR20150006257A (en) Spiral Base Pile for Column Mounting
KR200476586Y1 (en) A target absorbing both side impacts
KR940008833B1 (en) Anti-personal land mines
Dowden et al. Coping with boulders in soft ground TBM tunneling.
JP2007056647A (en) Excavating apparatus using full slewing machine
JPS60261892A (en) Obstruction detector of shield drilling machine
KR100278367B1 (en) Rotary target attaching device for measuring internal displacement and shear displacement

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant