KR102014125B1 - 3-axis seismic pile structure and method - Google Patents

3-axis seismic pile structure and method Download PDF

Info

Publication number
KR102014125B1
KR102014125B1 KR1020190065170A KR20190065170A KR102014125B1 KR 102014125 B1 KR102014125 B1 KR 102014125B1 KR 1020190065170 A KR1020190065170 A KR 1020190065170A KR 20190065170 A KR20190065170 A KR 20190065170A KR 102014125 B1 KR102014125 B1 KR 102014125B1
Authority
KR
South Korea
Prior art keywords
pile
ground
coupling plate
guide tube
head coupling
Prior art date
Application number
KR1020190065170A
Other languages
Korean (ko)
Inventor
신상훈
안성율
Original Assignee
(주)효창이엔지
주식회사 에스와이텍
신상훈
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)효창이엔지, 주식회사 에스와이텍, 신상훈 filed Critical (주)효창이엔지
Priority to KR1020190065170A priority Critical patent/KR102014125B1/en
Application granted granted Critical
Publication of KR102014125B1 publication Critical patent/KR102014125B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
    • E02D7/30Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes by driving cores
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1671Shapes helical or spiral
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a 3-axis seismic pile structure to respond to a horizontal load by an earthquake and a method. According to the present invention, provided is a 3-axis seismic pile structure which comprise: a head portion coupling plate provided with a ground mounting unit in a lower portion of the center thereof; three guide pipes spaced at equidistant intervals to be arranged at 120 degrees in the center of the head portion coupling plate, and installed to be inclined at an angle in which the guide pipes are broadened to an external side in a lower direction; and a pile passing through each of the guide pipes and mounted on the ground in an installation direction of the guide pipes.

Description

3축 내진 말뚝 구조 및 공법{3-axis seismic pile structure and method}3-axis seismic pile structure and method

본 발명은 지진에 의한 수평하중에 대항할 수 있는 3축 내진 말뚝 구조 및 공법에 관한 것이다.The present invention relates to a three-axis seismic pile structure and construction method capable of countering the horizontal load caused by the earthquake.

지진에 대응하기 위한 건축물의 내진 구조에 대한 많은 연구가 이루어지고 있으나, 지진 발생시 건축물 자체 붕괴 보다는 기초 붕괴 및 전도에 의한 피해가 크게 발생한다. Many studies have been done on the seismic structure of buildings to cope with earthquakes, but when the earthquake occurs, the damage caused by foundation collapse and fall occurs more than the collapse of the building itself.

다만, 건축 기초에 대한 내진 구조 적용이 보편화되지 않은 실정이며, 특히 3~7층의 중규모 건축물에 적용할 수 있는 내진 말뚝 기술을 찾기 어렵다. 파일 상부에 대한 전단 보강 기술은 대규모 구조물에 적용 가능하며, 중규모 건축물의 전도 방지를 위해 다수개의 소구경 마이크로 파일을 설치하는 사례가 있으나 효율성이 떨어지는 문제가 있다. 또한, 소구경 마이크로 파일은 수평하중에 의한 모멘트와 전단력에 취약하여 수평 가진력 0.2~0.3g의 하중 작용시 파괴되어 말뚝의 기능을 하지 못하게 된다.However, the application of seismic structures to building foundations is not common, and it is difficult to find seismic pile technology that can be applied to medium-sized buildings with 3 ~ 7 stories. Shear reinforcement technology for the upper part of the pile is applicable to large-scale structures, there is a case of installing a plurality of small diameter micro pile to prevent the fall of the medium-sized building, but there is a problem of low efficiency. In addition, small-diameter micropile is vulnerable to moment and shear force caused by horizontal load, and is destroyed when load of 0.2 ~ 0.3g of horizontal excitation force is not working.

1. 공개특허 10-2014-0077487 "헬리컬 말뚝부와 프리캐스트 팽이부의 일체화 구조를 가지는 팽이파일 및 이를 이용한 팽이파일 시공방법"1. Patent Document 10-2014-0077487 "Top pile having an integrated structure of the helical pile portion and the precast top portion, and a top pile construction method using the same" 2. 등록특허 10-1859136 "하부 말뚝이 구비된 현장 타설 일체형 팽이말뚝 기초 및 이의 시공 방법"2. Registered Patent 10-1859136 "Integration of top pile pile on-site with bottom pile and construction method thereof" 3. 등록특허 10-1921099 "내진용 파일보강 구조 및 그 시공방법"3. Patent 10-1921099 "Reinforcement structure for seismic pile and construction method thereof" 4. 등록특허 10-1712648 "파일선단부재를 이용한 연약지반용 파일 설치 구조"4. Patent 10-1712648 "File installation structure for soft ground using pile tip member"

본 발명은 지진에 의해 작용하는 수평하중에 대한 내력을 갖으며, 중규모 건축 구조물에 효율적으로 적용할 수 있는 파일 기초 및 그 설치 공법을 제공함에 목적이 있다.An object of the present invention is to provide a pile foundation and an installation method thereof that have a load capacity for a horizontal load acting by an earthquake and can be efficiently applied to a medium-scale building structure.

전술한 과제 해결을 위해 본 발명은 「중앙 하부에 지반 정착부가 구비된 두부(頭部) 결합판; 상기 두부 결합판의 중앙에서 등간격으로 이격하여 120°각도로 배치되며, 하방향 외측으로 벌어지는 각도로 경사지게 설치된 3개의 가이드관; 및 상기 가이드관을 각각 지나며 상기 가이드관 설치 방향으로 지반에 정착되는 파일(pile); 을 포함하는 3축 내진 말뚝 구조」를 제공한다.The present invention for solving the above problems "head coupling plate provided with a ground fixing unit in the lower center; Three guide tubes spaced at equal intervals from the center of the head coupling plate and disposed at an angle of 120 °, the three guide tubes being inclined at an angle extending downwardly; And piles passing through the guide tubes and fixed to the ground in the guide tube installation direction. It provides a three-axis earthquake pile structure comprising a.

또한, 본 발명은 상기 3축 내진 말뚝 구조의 시공 방법으로서, 「(a) 계획 지점에 상기 두부 결합판을 배치하는 단계; (b) 파일을 상기 가이드관에 각각 삽입하고, 상기 가이드관 설치 방향을 따라 지반에 삽입·정착시키는 단계; (c) 상기 파일의 두부(頭部)가 상기 가이드관 상부에 돌출한 상태에서 상기 두부를 고정시키는 단계; 및 (d) 상기 두부 결합판 상부에 기초 콘크리트를 타설·양생하는 단계; 를 포함하는 3축 내진 말뚝 공법」을 함께 제공한다.In addition, the present invention is a construction method of the three-axis earthquake pile structure, "(a) disposing the head coupling plate at the planning point; (b) inserting a file into the guide tube and inserting and fixing the file into the ground along the guide tube installation direction; (c) fixing the head with the head of the pile protruding from the upper portion of the guide tube; And (d) pouring and curing the foundation concrete on top of the head coupling plate; It provides a three-axis seismic pile method including a.

상기 두부 결합판은 중앙홀이 형성되고, 상기 두부 결합판의 지반 정착부는 상기 중앙홀과 하방향으로 수직 연통하도록 결합된 서포트관 및 상기 서포트관 하부에 결합되고 중앙에 통공이 형성된 지지판을 포함하여 구성된 것을 적용할 수 있으며, 이 경우 상기 (a)단계 또는 (b)단계에서는 상기 지지판을 지면에 접지시키고, 상기 중앙홀, 서포트관 및 지지판의 통공을 지나 지반에 정착되는 고정봉을 설치한다.The head coupling plate is formed with a central hole, the ground fixing portion of the head coupling plate includes a support pipe coupled to the vertical communication with the central hole in the downward direction and the support plate coupled to the lower support pipe formed in the center; In the case of (a) or (b), the supporting plate is grounded to the ground, and the fixing rod is fixed to the ground through the through hole of the central hole, the support pipe and the supporting plate.

상기 지반 정착부가 하방으로 수렴하는 역립 원뿔형으로 구성되어, 전체적으로 팽이파일 형태로 구성된 상기 두부 결합판을 적용할 수 있으며, 이 경우 상기 (a)단계 또는 (b)단계에서는 상기 두부 결합판을 눌러 상기 역립 원뿔형 지반 정착부가 지반에 박혀 정착되도록 할 수 있다.The ground fixing unit is composed of an inverted conical shape converging downward, and can be applied to the head coupling plate composed of a top pile shape, in this case, in the step (a) or step (b) by pressing the head coupling plate The inverted conical ground anchorage may be embedded in the ground and anchored.

상기 (b)단계에서는 헬리컬 선단부를 상기 가이드관의 하방에 배치하여, 상기 가이드관의 상방에서 인입하는 파일의 하단을 상기 헬리컬 선단부와 결합시키고, 상기 헬리컬 선단부가 결합된 파일을 회전시킴으로써, 상기 파일을 지반에 자천공 관입·정착시킬 수 있다.In the step (b), the helical end portion is disposed below the guide tube, and the lower end of the pile introduced from above the guide tube is coupled with the helical end portion, and the helical tip portion is rotated to rotate the pile, Can penetrate and settle in the ground.

또한, 상기 (b)단계에서는 내부에 오거(auger)가 구비된 강관을 상기 가이드관에 삽입하여 상기 가이드관 설치 방향을 따라 지반을 천공한 후, 천공홀에 파일을 삽입·정착시킬 수 있다.In addition, in the step (b), a steel pipe having an auger inside may be inserted into the guide tube to drill the ground along the guide tube installation direction, and then the pile may be inserted and fixed in the drilling hole.

전술한 본 발명에 따르면 다음의 효과를 기대할 수 있다.According to the present invention described above, the following effects can be expected.

1. 지반에 경사지게 삽입, 고정된 3축 내진 말뚝은 상부 구조물에 의한 수직 하중은 물론 지진에 의한 수평하중에 대한 내력을 갖는다.1. The 3-axis seismic piles inserted and fixed inclined to the ground have a bearing capacity for vertical loads as well as horizontal loads due to earthquakes.

2. 삼발이 형태의 경사진 3축 내진 말뚝은 수평방향의 지진하중에 대해 방향에 관계 없이 동일한 힘으로 저항할 수 있으며, 각 파일에 가해지는 모멘트와 전단력이 줄어들어 효율적이고 안정적인 기초 구조가 형성된다.2. The triaxially inclined triaxial seismic pile can resist horizontal seismic loads with the same force regardless of direction, and the moment and shear force applied to each pile are reduced to form an efficient and stable foundation structure.

3. 3축 내진 말뚝의 각 파일 두부는 두부 결합판에 결합, 고정되며, 가이드관에 의해 파일의 지반 내 삽입 각도를 일정하게 유지시킬 수 있다.3. Each pile head of the three-axis seismic pile is fixed and coupled to the head coupling plate, and the insertion angle of the pile can be kept constant by the guide tube.

4. 두부 결합판을 핀 고정 방식 또는 압입 방식으로 지반에 고정시킬 수 있다.4. The head coupling plate can be fixed to the ground by pinning or press-fitting.

5. 헬리컬 선단부에 의한 자천공 방식의 파일 관입 방식과 오거 보링에 의한 파일 삽입 방식을 선택적으로 적용할 수 있다.5. It is possible to selectively apply the file penetration method of self-poring method by helical tip and the file insertion method by auger boring.

[도 1]은 본 발명에 적용되는 두부 결합판의 제1실시예를 도시한 것이다.
[도 2]는 본 발명에 적용되는 두부 결합판의 제2실시예를 도시한 것이다.
[도 3]은 두부 결합판 제1실시예를 적용하여 파일 하단에 헬리컬 선단부 결합시키는 과정을 도시한 것이다.
[도 4]는 두부 결합판 제2실시예를 적용하여 파일 하단에 헬리컬 선단부 결합시키는 과정을 도시한 것이다.
[도 5]는 3축 내진 말뚝이 지반에 삽입, 고정된 상태를 도시한 것이다.
Figure 1 shows a first embodiment of the head coupling plate applied to the present invention.
Figure 2 shows a second embodiment of the head coupling plate applied to the present invention.
FIG. 3 illustrates a process of coupling the helical tip to the bottom of the pile by applying the first embodiment of the head coupling plate.
4 illustrates a process of coupling the helical tip to the bottom of the pile by applying the second embodiment of the head coupling plate.
FIG. 5 illustrates a state in which the triaxial seismic pile is inserted into and fixed to the ground.

이하에서는 첨부된 도면과 함께 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with the accompanying drawings.

본 발명은 「중앙 하부에 지반 정착부(20)가 구비된 두부(頭部) 결합판(10); 상기 두부 결합판(10)의 중앙에서 등간격으로 이격하여 120°각도로 배치되며, 하방향 외측으로 벌어지는 각도로 경사지게 설치된 3개의 가이드관(30); 및 상기 가이드관(30)을 각각 지나며 상기 가이드관(30) 설치 방향으로 지반에 정착되는 파일(pile, 50); 을 포함하는 3축 내진 말뚝 구조」를 제공한다.The present invention "head coupling plate 10 provided with a ground fixing unit 20 in the lower center; Three guide tubes 30 disposed at 120 ° angles spaced at equal intervals from the center of the head coupling plate 10 and installed to be inclined at an angle extending downwardly; And piles (pile, 50) passing through each of the guide tube 30 and fixed to the ground in the direction of the guide tube 30 installation; It provides a three-axis earthquake pile structure comprising a.

상기 두부 결합판(10)에는 중앙홀(11)을 형성시키고 상기 지반 정착부(20)는 [도 1]에 도시된 바와 같이 상기 중앙홀(11)과 하방향으로 수직 연통하는 서포트관(21)과 상기 서포트관(21) 하부에 결합되고 중앙에 통공이 형성된 지지판(22)을 포함하여 구성할 수 있다. 이 경우 상기 지지판(22)을 지면에 접지시킨 상태에서 상기 중앙홀(11), 서포트관(21) 및 지지판(22)의 통공을 지나 지반에 정착되는 고정봉(40)을 설치하는 핀 고정 방식으로 상기 두부 결합판(10)을 지반에 고정시킬 수 있다(이하 '제1실시예'라 함).A central hole 11 is formed in the head coupling plate 10, and the ground fixing unit 20 is vertically connected to the central hole 11 in a downward direction as shown in FIG. 1. And it is configured to include a support plate 22 is coupled to the support tube 21 and the through-hole formed in the center. In this case, the pin fixing method for installing the fixing rod 40 is fixed to the ground through the through hole of the central hole 11, the support pipe 21 and the support plate 22 in a state that the support plate 22 is grounded to the ground The head coupling plate 10 can be fixed to the ground (hereinafter referred to as 'first embodiment').

또한, 상기 두부 결합판(10) 하부의 지반 정착부(20)를 하방으로 수렴하는 역립 원뿔형으로 구성하여, 상기 두부 결합판(10)을 전체적으로 팽이파일 형태로 구성할 수 있다. 이 경우 팽이파일 형태의 두부 결합판(10)을 눌러, 상기 역립 원뿔형의 지반 정착부(20)가 지반에 눌려 박히도록 하는 방식으로 상기 두부 결합판(10)을 지반에 고정시킬 수 있다(이하 '제2실시예'라 함). In addition, the head fixing plate 20 in the lower portion of the head coupling plate 10 may be configured in a conical shape converging downward, so that the head coupling plate 10 may be configured in the shape of a top pile. In this case, the head coupling plate 10 may be fixed to the ground by pressing the head coupling plate 10 having a top pile shape so that the ground cone fixing portion 20 of the inverted cone shape is pressed into the ground. Referred to as the 'second embodiment').

제1실시예의 경우 상기 가이드관(30)은 [도 1]에 도시된 바와 같이 3개의 단관이 상기 두부 결합판(10)의 중앙에서 등간격으로 이격하여 120°각도로 배치되며, 하방향 외측으로 벌어지는 각도로 경사지게 설치된 것으로서, 파일(50)의 설치 각도를 유지시킨다.In the case of the first embodiment, the guide tube 30 is arranged in a 120 ° angle spaced apart at equal intervals in the center of the head coupling plate 10 as shown in [FIG. 1] As installed at an inclined angle at the opening, the installation angle of the pile 50 is maintained.

제2실시예의 경우, 전술한 바와 같은 별도의 단관을 설치하여 가이드관으로 활용할 수도 있으나, [도 2]에 도시된 바와 같이 팽이파일 형태의 두부 결합판 본체에 중앙에서 등간격으로 이격하여 120°각도로 배치되며 하방향 외측으로 벌어지는 각도로 경사지게 형성된 관통홀을 개념상 가이드관(30)으로 활용할 수 있다.In the case of the second embodiment, it may be used as a guide tube by installing a separate single tube as described above, as shown in Figure 2 to 120 ° apart from the center at equal intervals in the head coupling plate body of the top pile type The through-holes are arranged at an angle and formed to be inclined at an angle that is downwardly outward, and may be utilized as a guide pipe 30 in concept.

상기 가이드관(30)을 각각 지나며 상기 가이드관(30) 설치 방향으로 지반에 정착되는 파일(50)은 삼발이 형태로 상부 구조물을 지지하며, 이와 같이 경사지게 설치된 파일은 수직하중과 함께 수평하중에도 대항할 수 있게 된다.The pile 50 which passes through the guide tube 30 and is settled on the ground in the direction in which the guide tube 30 is installed supports the upper structure in the form of a trivet, and the pile inclined in this way is opposed to the horizontal load along with the vertical load. You can do it.

본 발명은 상기 3축 내진 말뚝 구조의 시공 방법으로서, 「(a) 계획 지점에 상기 두부 결합판(10)을 배치하는 단계; (b) 파일(50)을 상기 가이드관(30)에 각각 삽입하고, 상기 가이드관(30) 설치 방향을 따라 지반에 삽입·정착시키는 단계; (c) 상기 파일(50)의 두부(頭部)가 상기 가이드관(30) 상부에 돌출한 상태에서 상기 두부를 고정시키는 단계; 및 (d) 상기 두부 결합판(10) 상부에 기초 콘크리트를 타설·양생하는 단계; 를 포함하는 3축 내진 말뚝 공법」을 함께 제공한다.The present invention is a construction method of the three-axis earthquake pile structure, "(a) disposing the head coupling plate 10 at the planning point; (b) inserting the piles 50 into the guide tubes 30, respectively, and inserting and fixing the piles 50 into the ground along the direction in which the guide tubes 30 are installed; (c) fixing the head in a state in which a head of the pile 50 protrudes above the guide tube 30; And (d) placing and curing the base concrete on the head coupling plate 10; It provides a three-axis seismic pile method including a.

상기 (a)단계 실시 전, 구조 계산에 의해 3축 내진 말뚝의 설치 지점 및 설치 수량을 결정하고 이에 따른 계획 지점에 상기 두부 결합판을 배치한다.Before the step (a), the installation point and the number of installation of the three-axis earthquake piles are determined by the structural calculation, and the head coupling plate is disposed at the planning point accordingly.

상기 두부 결합판(10)의 배치((a)단계)와 파일(50) 설치((b)단계)는 순차적으로 진행되나, 상기 두부 결합판(10)을 지반에 고정시키는 작업은 상기 (a)단계와 (b)단계에서 선택적으로 실시할 수 있다.The arrangement of the head coupling plate 10 (step (a)) and the installation of the pile 50 (step (b)) proceeds sequentially, but the operation of fixing the head coupling plate 10 to the ground is (a) Step) and step (b).

상기 제1실시예의 경우, 상기 두부 결합판(10)을 지반에 고정시키는 작업은 상기 지지판(22)을 지면에 접지시키고, 상기 중앙홀(11), 서포트관(21) 및 지지판(22)의 통공을 지나 지반에 정착되는 고정봉(40)을 설치하는 과정으로 진행된다.In the case of the first embodiment, the operation of fixing the head coupling plate 10 to the ground is to ground the support plate 22 to the ground, the center hole 11, the support pipe 21 and the support plate 22 It proceeds through the process of installing the fixing rod 40 is settled through the through hole.

이러한 작업은 상기 (a)단계에서 상기 두부 결합판(10)을 계획 지점에 배치한 후 곧바로 시행하거나, 상기 (b)단계에서 [도 3]에 도시된 바와 같이 파일(50)의 지반 관입을 위한 사전 작업(예를 들어 헬리컬 선단부를 가이드관 하방에 배치하는 작업) 실시 후에 시행할 수 있다.This operation is performed immediately after placing the head coupling plate 10 in the planning point in step (a), or ground penetration of the pile 50 as shown in [3] in step (b). This may be done after the preliminary work has been done (eg placing the helical tip below the guide tube).

제2실시예의 경우, 상기 두부 결합판(10)을 지반에 고정시키는 작업은, 전체적으로 팽이파일 형태로 구성된 두부 결합판(10)을 눌러 역립 원뿔형의 지반 정착부(20)가 지반에 박힘으로서 정착되는 과정으로 진행된다.In the case of the second embodiment, the operation of fixing the head coupling plate 10 to the ground is fixed by pressing the head coupling plate 10 composed of a top pile shape as a whole, the conical ground fixing portion 20 is embedded in the ground. Proceeds to the process.

이러한 작업 역시 상기 (a)단계에서 상기 두부 결합판(10)을 계획 지점에 배치한 후 곧바로 시행하거나, 상기 (b)단계에서 [도 4]에 도시된 바와 같이 파일(50)의 지반 관입을 위한 사전 작업(예를 들어 헬리컬 선단부를 가이드관 하방에 배치하는 작업) 실시 후에 시행할 수 있다.This operation is also performed immediately after placing the head coupling plate 10 in the planning point in step (a), or ground penetration of the pile 50 as shown in [4] in step (b). This may be done after the preliminary work has been done (eg placing the helical tip below the guide tube).

한편, 상기 (b)단계에서는 헬리컬 선단부(60)를 이용한 자천공 방식과 오거(auger) 보링 방식을 선택적으로 적용할 수 있다.On the other hand, in the step (b) it is possible to selectively apply the self-poring method and the auger (auger) boring method using the helical tip portion (60).

상기 자천공 방식 적용을 위해서는 상기 (b)단계에서, 외주연에 스크류 블레이드가 구비된 헬리컬 선단부(60)를 상기 가이드관(30)의 하방에 배치하여, 상기 가이드관(30)의 상방에서 인입하는 파일(50)의 하단을 상기 헬리컬 선단부(60)와 결합시킨다. 이후 상기 헬리컬 선단부(60)가 결합된 파일을 회전시킴으로써, 상기 파일(50)을 지반에 자천공 관입·정착시킨다. [도 5]는 위와 같은 과정을 통해 3축 내진 말뚝이 지반에 관입·정착된 상태를 다각도로 도시한 것이다.In order to apply the self-perforation method, in step (b), a helical tip portion 60 having a screw blade on an outer circumference is disposed below the guide tube 30 and drawn in from above the guide tube 30. The lower end of the pile 50 is coupled to the helical tip 60. Thereafter, by rotating the pile coupled to the helical tip portion 60, the pile 50 is self-penetrating and fixed in the ground. FIG. 5 illustrates a state in which the three-axis seismic pile is penetrated and settled on the ground through the above process.

상기 오거 보링 방식 적용을 위해서는 상기 (b)단계에서, 내부에 오거(auger)가 구비된 강관(미도시)을 상기 가이드관(30)에 삽입하여 상기 가이드관(30) 설치 방향을 따라 지반을 천공한 후, 천공홀에 파일을 삽입·정착시킨다. 이 과정에서 상기 천공홀에 모르타르를 압입, 양생하는 작업을 병행시킬 수 있다. In order to apply the auger boring method, in step (b), a steel pipe (not shown) having an auger inside is inserted into the guide tube 30 so that the ground along the installation direction of the guide tube 30 is inserted. After drilling, the pile is inserted and fixed in the drilling hole. In this process, the work of injecting and curing the mortar into the drilling hole may be performed in parallel.

상기 (c)단계는 상기 파일(50)의 두부(頭部)가 상기 가이드관(30) 상부에 돌출한 상태에서 상기 두부를 고정시키는 단계이다. 상기 두부 고정 작업은 너트형 체결구, 쐐기형 체결구, 용접 등의 다양한 수단을 선택적으로 적용할 수 있다. In the step (c), the head of the pile 50 is fixed in the state where the head protrudes from the upper portion of the guide tube 30. The head fixing operation may selectively apply a variety of means, such as nut-type fasteners, wedge-shaped fasteners, welding.

상기 (d)단계는 상기 두부 결합판(10) 상부에 기초 콘크리트를 타설·양생하는 단계이다. 즉, 상기 두부 결합판(10)과 파일(50)의 두부는 모두 기초 콘크리트에 매립되며, 이에 따라 상기 기초 콘크리트 위에 구축되는 상부 구조물의 하중이 상기 3축 내진 말뚝에 전달된다.Step (d) is a step of pouring and curing the base concrete on the head coupling plate 10. That is, both heads of the head coupling plate 10 and the pile 50 are embedded in the foundation concrete, and thus the load of the upper structure built on the foundation concrete is transmitted to the triaxial seismic pile.

이상에서 본 발명에 대하여 구체적인 실시예와 함께 상세하게 살펴보았다. 그러나 본 발명은 위의 실시예에 의하여 한정되는 것은 아니며 본 발명의 요지를 벗어남이 없는 범위에서 수정 및 변형될 수 있다. 따라서 본 발명의 청구범위는 이와 같은 수정 및 변형을 포함한다.In the above, the present invention has been described in detail with specific examples. However, the present invention is not limited to the above embodiments and may be modified and modified without departing from the gist of the present invention. Therefore, the claims of the present invention include such modifications and variations.

10 : 두부 결합판 11 : 중앙홀
20 : 지반 정착부 21 : 서포트관
22 : 지지판 30 : 가이드관
40 : 고정봉 50 : 파일
60 : 헬리컬 선단부
10: head coupling plate 11: the central hole
20: ground fixing part 21: support pipe
22: support plate 30: guide tube
40: fixed rod 50: file
60: helical tip

Claims (6)

중앙 하부에 지반 정착부(20)가 구비되고 중앙홀(11)이 형성된 두부(頭部) 결합판(10);
상기 두부 결합판(10)의 중앙에서 등간격으로 이격하여 120°각도로 배치되며, 하방향 외측으로 벌어지는 각도로 경사지게 설치된 3개의 가이드관(30); 및
상기 가이드관(30)을 각각 지나며 상기 가이드관(30) 설치 방향으로 지반에 정착되는 파일(pile, 50); 을 포함하고,
상기 지반 정착부(20)는 상기 중앙홀(11)과 하방향으로 수직 연통하도록 결합된 서포트관(21) 및 상기 서포트관(21) 하부에 결합되고 중앙에 통공이 형성된 지지판을 포함하여 구성된 3축 내진 말뚝 구조.
A head coupling plate 10 provided with a ground fixing unit 20 at a center lower portion thereof and having a central hole 11 formed therein;
Three guide tubes 30 disposed at 120 ° angles spaced at equal intervals from the center of the head coupling plate 10 and installed to be inclined at an angle extending downwardly; And
A pile (pile, 50) passing through each of the guide pipes 30 and fixed to the ground in a direction in which the guide pipes 30 are installed; Including,
The ground fixing unit 20 is configured to include a support pipe 21 coupled to vertical communication with the central hole 11 in the downward direction and a support plate coupled to the support tube 21 and formed in the center through the center. Axial seismic pile structure.
제1항의 3축 내진 말뚝 구조의 시공 방법으로서,
(a) 계획 지점에 상기 두부 결합판(10)을 배치하는 단계;
(b) 파일(50)을 상기 가이드관(30)에 각각 삽입하고, 상기 가이드관(30) 설치 방향을 따라 지반에 삽입·정착시키는 단계;
(c) 상기 파일(50)의 두부(頭部)가 상기 가이드관(30) 상부에 돌출한 상태에서 상기 두부를 고정시키는 단계; 및
(d) 상기 두부 결합판(10) 상부에 기초 콘크리트를 타설·양생하는 단계; 를 포함하며,
상기 (a)단계 또는 (b)단계에서는 상기 지지판(22)을 지면에 접지시키고, 상기 중앙홀(11), 서포트관(21) 및 지지판(22)의 통공을 지나 지반에 정착되는 고정봉(40)을 설치하는 것을 특징으로 하는 3축 내진 말뚝 공법.
As a construction method of the 3-axis earthquake pile structure of claim 1,
(a) placing the head coupling plate 10 at a planning point;
(b) inserting each of the piles 50 into the guide tubes 30 and inserting and fixing the piles 50 into the ground along the guide tube 30 in the installation direction;
(c) fixing the head in a state in which a head of the pile 50 protrudes above the guide tube 30; And
(d) pouring and curing the foundation concrete on the head coupling plate 10; Including;
In the step (a) or (b), the support plate 22 is grounded to the ground, and the fixing rod is fixed to the ground through the through hole of the central hole 11, the support pipe 21 and the support plate 22 ( 3-axis seismic pile method characterized in that the installation 40.
삭제delete 삭제delete 제2항에서,
상기 (b)단계는 헬리컬 선단부(60)를 상기 가이드관(30)의 하방에 배치하여, 상기 가이드관(30)의 상방에서 인입하는 파일(50)의 하단을 상기 헬리컬 선단부(60)와 결합시키고, 상기 헬리컬 선단부(60)가 결합된 파일(50)을 회전시킴으로써, 상기 파일(50)을 지반에 자천공 관입·정착시키는 것을 특징으로 하는 3축 내진 말뚝 공법.
In claim 2,
In the step (b), the helical tip portion 60 is disposed below the guide tube 30, and the lower end of the pile 50 drawn from above the guide tube 30 is coupled to the helical tip portion 60. And rotating the pile (50) to which the helical distal end portion (60) is coupled, thereby allowing the pile (50) to self-penetrate and settle in the ground.
제2항에서,
상기 (b)단계는 내부에 오거(auger)가 구비된 강관(미도시)을 상기 가이드관(30)에 삽입하여 상기 가이드관(30) 설치 방향을 따라 지반을 천공한 후, 천공홀에 파일(50)을 삽입·정착시키는 것을 특징으로 하는 3축 내진 말뚝 공법.
In claim 2,
Step (b) inserts a steel pipe (not shown) having an auger inside the guide tube 30 to drill the ground along the installation direction of the guide tube 30, and then piles the hole A three-axis seismic pile method, characterized in that 50 is inserted and settled.
KR1020190065170A 2019-06-03 2019-06-03 3-axis seismic pile structure and method KR102014125B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190065170A KR102014125B1 (en) 2019-06-03 2019-06-03 3-axis seismic pile structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190065170A KR102014125B1 (en) 2019-06-03 2019-06-03 3-axis seismic pile structure and method

Publications (1)

Publication Number Publication Date
KR102014125B1 true KR102014125B1 (en) 2019-08-26

Family

ID=67806473

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190065170A KR102014125B1 (en) 2019-06-03 2019-06-03 3-axis seismic pile structure and method

Country Status (1)

Country Link
KR (1) KR102014125B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102294532B1 (en) * 2021-02-24 2021-08-30 (주)에스와이텍 Multiaxial pile construction method for seismic reinforcement of foundation concrete
KR102400909B1 (en) * 2021-07-23 2022-05-24 주식회사 에스와이텍 Seismic isolation device applied to a triaxial lattice girder pile
KR20220164975A (en) * 2021-06-07 2022-12-14 주식회사 에스와이텍 Complex foundation pre-loading structure and construction method to reduce residual settlement and improve support performance
KR20220169658A (en) 2021-06-21 2022-12-28 (주) 효창이엔지 Bracing Tie Triaxial Seismic Pile Structure
KR102549479B1 (en) * 2022-10-05 2023-06-29 한국건설기술연구원 Multi-axial seismic pile and construction method using the same
KR102651176B1 (en) * 2023-04-20 2024-03-26 김영미 Steel pile foundation and its construction method
KR102655153B1 (en) 2022-12-27 2024-04-08 (주) 효창이엔지 Small-diameter multi-axial stabilizing pile structure and construction method for slope reinforcement

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03228914A (en) * 1990-02-05 1991-10-09 Ohbayashi Corp Driving method for steel-pipe pile
JP2007262686A (en) * 2006-03-27 2007-10-11 Ana-Tec:Kk Pile structure
JP2011241590A (en) * 2010-05-18 2011-12-01 Lasco Japan Co Ltd Simple foundation for columnar member
KR20140077487A (en) 2012-12-14 2014-06-24 주식회사 삼보지반기술 Top Pile having Helical Body and Constructing Method of such Top Pile
KR101712648B1 (en) 2016-03-16 2017-03-06 주식회사 태하 Pile installation structure in soft ground using pile tip member
KR101852826B1 (en) * 2017-07-13 2018-04-27 김용모 Helical pile of edge extension type
KR101859136B1 (en) 2017-04-20 2018-05-16 (주)삼일이엔씨 Cast in place top base having deep pile and construction method thereof
KR101921099B1 (en) 2018-07-10 2018-11-27 유구이앤씨(주) Pile reinforce structure for vibration proof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03228914A (en) * 1990-02-05 1991-10-09 Ohbayashi Corp Driving method for steel-pipe pile
JP2007262686A (en) * 2006-03-27 2007-10-11 Ana-Tec:Kk Pile structure
JP2011241590A (en) * 2010-05-18 2011-12-01 Lasco Japan Co Ltd Simple foundation for columnar member
KR20140077487A (en) 2012-12-14 2014-06-24 주식회사 삼보지반기술 Top Pile having Helical Body and Constructing Method of such Top Pile
KR101712648B1 (en) 2016-03-16 2017-03-06 주식회사 태하 Pile installation structure in soft ground using pile tip member
KR101859136B1 (en) 2017-04-20 2018-05-16 (주)삼일이엔씨 Cast in place top base having deep pile and construction method thereof
KR101852826B1 (en) * 2017-07-13 2018-04-27 김용모 Helical pile of edge extension type
KR101921099B1 (en) 2018-07-10 2018-11-27 유구이앤씨(주) Pile reinforce structure for vibration proof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102294532B1 (en) * 2021-02-24 2021-08-30 (주)에스와이텍 Multiaxial pile construction method for seismic reinforcement of foundation concrete
KR20220164975A (en) * 2021-06-07 2022-12-14 주식회사 에스와이텍 Complex foundation pre-loading structure and construction method to reduce residual settlement and improve support performance
KR102515848B1 (en) * 2021-06-07 2023-03-30 주식회사 에스와이텍 Complex foundation pre-loading structure and construction method to reduce residual settlement and improve support performance
KR20220169658A (en) 2021-06-21 2022-12-28 (주) 효창이엔지 Bracing Tie Triaxial Seismic Pile Structure
KR102552985B1 (en) * 2021-06-21 2023-07-07 (주)효창이엔지 Bracing Tie Triaxial Seismic Pile Structure
KR102400909B1 (en) * 2021-07-23 2022-05-24 주식회사 에스와이텍 Seismic isolation device applied to a triaxial lattice girder pile
KR102549479B1 (en) * 2022-10-05 2023-06-29 한국건설기술연구원 Multi-axial seismic pile and construction method using the same
KR102655153B1 (en) 2022-12-27 2024-04-08 (주) 효창이엔지 Small-diameter multi-axial stabilizing pile structure and construction method for slope reinforcement
KR102651176B1 (en) * 2023-04-20 2024-03-26 김영미 Steel pile foundation and its construction method

Similar Documents

Publication Publication Date Title
KR102014125B1 (en) 3-axis seismic pile structure and method
KR102294532B1 (en) Multiaxial pile construction method for seismic reinforcement of foundation concrete
JP2019522129A (en) Micropile corrugated grout bulb and method of forming the same
US20210381188A1 (en) Ground Anchor
KR101633289B1 (en) Head anchor device of micro pile and reinforced method of foundation concrete using the same
CN205822200U (en) A kind of composite steel tube taper pile foundation pit enclosure structure
KR101331219B1 (en) Method for constructing micro pile using reinforcing end bearing capacity
KR102053231B1 (en) Foundation reinforcing method using existing pile
CN113605401B (en) Foundation pit steel structure supporting system and construction method thereof
CN101608449B (en) Big-end anchor rod and construction method for implementing same
KR102480876B1 (en) Structure for reinforcing foundation using steel piles and construction method thereof
CN106988327A (en) A kind of upright controling slip casting steel floral tube pile base beam barrier wall structure and its construction method
WO2016122215A1 (en) Screw pile for ground reinforcement having front end expanding reinforcement plate coupled thereto
CN108411962B (en) Hole forming construction device and method for soil nailing wall
CN206693256U (en) A kind of upright controling slip casting steel floral tube pile base beam barrier wall structure
KR102655153B1 (en) Small-diameter multi-axial stabilizing pile structure and construction method for slope reinforcement
KR102549479B1 (en) Multi-axial seismic pile and construction method using the same
KR102643714B1 (en) Thread bar coupling device, seismic pile having the same and construction method for seismic pile
KR100937170B1 (en) Straight drilling method of ground for micro-pile construction
KR102578665B1 (en) Concrete Reinforcing Method Using Reaction Anchor
CN210975834U (en) Combined type inclined stress body
KR102650519B1 (en) Reinforcement structure and reinforcement method of foundation structure using micropile
KR101765061B1 (en) Apparatus for supporting an augered pile
CN210263072U (en) High-pressure jet grouting anchor cable suitable for deep foundation pit support
CN210564379U (en) Rock wall beam excavation sample frame

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant