KR102480876B1 - Structure for reinforcing foundation using steel piles and construction method thereof - Google Patents

Structure for reinforcing foundation using steel piles and construction method thereof Download PDF

Info

Publication number
KR102480876B1
KR102480876B1 KR1020200154643A KR20200154643A KR102480876B1 KR 102480876 B1 KR102480876 B1 KR 102480876B1 KR 1020200154643 A KR1020200154643 A KR 1020200154643A KR 20200154643 A KR20200154643 A KR 20200154643A KR 102480876 B1 KR102480876 B1 KR 102480876B1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pile
foundation
pile
ground
Prior art date
Application number
KR1020200154643A
Other languages
Korean (ko)
Other versions
KR20220067892A (en
Inventor
김정겸
Original Assignee
김정겸
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김정겸 filed Critical 김정겸
Priority to KR1020200154643A priority Critical patent/KR102480876B1/en
Publication of KR20220067892A publication Critical patent/KR20220067892A/en
Application granted granted Critical
Publication of KR102480876B1 publication Critical patent/KR102480876B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 천공홀 내에 삽입되는 강관 파일의 주입공을 통해 강관 파일의 내외부에 주입재를 충전하여 파일 지지력을 향상시킴으로써 소형 장비에 의한 파일 시공이 가능하여 신축 공사시 흙막이 가시설의 간섭으로 인한 영향이 적고, 기존 기초 보강시 기초 보링이 필요 없어 시공성이 우수하고 공기를 단축할 수 있는 강관 파일을 이용한 지반 보강 구조 및 이의 시공 방법에 대한 것이다.
본 발명 강관 파일을 이용한 지반 보강 구조는 기존 건물 기초의 외측 지반에 천공되고 상부에는 건물 기초의 하부로 확대공간부가 연장되도록 형성되는 천공홀; 상기 천공홀 내에 삽입되는 것으로 외주면에 복수의 주입공이 형성된 강관 파일; 상기 강관 파일의 주입공을 통해 강관 파일의 외부로 주입되어 강관 파일 내부, 천공홀과 강관 파일 사이 공간 및 확대공간부에 충전되는 주입재; 및 상기 확대공간부의 내부에 수용되도록 상기 강관 파일의 상단에 구비되어 상기 강관 파일의 상단에서 건물 기초의 하부 측으로 연장 형성됨으로써 기초의 하중을 강관 파일로 전달하는 두부 보강구; 로 구성되는 것을 특징으로 한다.
The present invention improves the pile bearing capacity by filling the injection material inside and outside the steel pipe pile through the injection hole of the steel pipe pile inserted into the drilling hole, so that pile construction is possible with small equipment, so there is little impact due to interference of retaining facilities during new construction , It is about a ground reinforcement structure and its construction method using steel pipe piles, which are excellent in workability and can shorten the construction period because foundation boring is not required when reinforcing existing foundations.
The ground reinforcement structure using the steel pipe pile of the present invention is drilled in the outer ground of the existing building foundation, and the upper part is formed to extend the expanded space portion to the lower part of the building foundation; A steel pipe file having a plurality of injection holes formed on an outer circumferential surface to be inserted into the perforation hole; An injection material that is injected to the outside of the steel pipe pile through the injection hole of the steel pipe pile and filled in the space between the drilling hole and the steel pipe pile and the enlarged space inside the steel pipe pile; And a head reinforcing tool provided at the upper end of the steel pipe pile to be accommodated in the enlarged space portion and extending from the upper end of the steel pipe pile to the lower side of the building foundation to transmit the load of the foundation to the steel pipe pile; It is characterized by consisting of.

Description

강관 파일을 이용한 지반 보강 구조 및 이의 시공 방법{Structure for reinforcing foundation using steel piles and construction method thereof}Ground reinforcement structure using steel pipe piles and its construction method {Structure for reinforcing foundation using steel piles and construction method thereof}

본 발명은 천공홀 내에 삽입되는 강관 파일의 주입공을 통해 강관 파일의 내외부에 주입재를 충전하여 파일 지지력을 향상시킴으로써 소형 장비에 의한 파일 시공이 가능하여 신축 공사시 흙막이 가시설의 간섭으로 인한 영향이 적고, 기존 기초 보강시 기초 보링이 필요 없어 시공성이 우수하고 공기를 단축할 수 있는 강관 파일을 이용한 지반 보강 구조 및 이의 시공 방법에 대한 것이다.The present invention improves the pile bearing capacity by filling the injection material inside and outside the steel pipe pile through the injection hole of the steel pipe pile inserted into the drilling hole, so that pile construction is possible with small equipment, so there is little impact due to interference of retaining facilities during new construction , It is about a ground reinforcement structure and its construction method using steel pipe piles, which are excellent in workability and can shorten the construction period because foundation boring is not required when reinforcing existing foundations.

건물 신축은 터파기 후 지반에 파일을 근입하고, 파일 상부의 지반에 기초콘크리트를 타설한 다음 상부에 구조물을 시공하는 순서로 진행된다.Building new construction proceeds in the order of inserting piles into the ground after excavation, pouring foundation concrete on the ground above the piles, and then constructing the structure on top.

그러나 터파기 공사시 흙막이 가시설 공사가 같이 이루어지는 경우가 많은데, 흙막이 가시설의 간섭으로 인해 파일 근입을 위한 중장비 반입이 어려워 파일 시공에 어려움이 있다.However, in many cases, temporary earth retaining facility construction is performed at the time of excavation work, and it is difficult to carry in heavy equipment for pile insertion due to interference of temporary earth retaining facilities, which makes pile construction difficult.

한편, 기시공된 구조물을 리모델링하거나 내진 보강하는 경우, 기둥이나 벽과 같은 상부 부재의 위치 변경, 하중 크기의 증가, 상부 구조물의 내진 보강으로 인한 기초 하중 부담 증대 등으로 인해 기존 콘크리트 기초 하부에 보강 파일을 시공하여 기초를 보강하여야 하는 경우 많다.Meanwhile, in the case of remodeling or seismic reinforcement of a pre-constructed structure, the lower part of the existing concrete foundation is reinforced due to a change in the position of upper members such as columns or walls, an increase in load size, and an increase in foundation load due to seismic reinforcement of the upper structure. In many cases, it is necessary to reinforce the foundation by constructing piles.

이를 위해 기존 콘크리트 기초 보강에서는 콘크리트 기초를 보링하여 관통홀을 형성하고, 지중에 마이크로 파일이나 강관 파일 등과 같은 보강 파일을 근입한 후 보강 파일 두부가 관통홀 내부에 매립되도록 관통홀 내부를 그라우팅하였다. 즉, 보강 파일 두부를 관통홀 내에 정착하여 보강 파일의 마찰력에 의해 콘크리트 기초와 보강 파일을 일체화하였다.To this end, in the existing concrete foundation reinforcement, a through-hole was formed by boring the concrete foundation, a reinforcing pile such as a micro pile or a steel pipe pile was inserted into the ground, and then the inside of the through-hole was grouted so that the head of the reinforcing pile was buried inside the through-hole. That is, the head of the reinforcing pile was fixed in the through hole, and the concrete foundation and the reinforcing pile were integrated by the frictional force of the reinforcing pile.

그러나 이러한 기존 기초 보강 방법은 실내에서 콘크리트 기초를 보링하여야 하므로 장비 반입이 어려워 시공이 번거롭고, 공기가 많이 소요되는 문제가 있다.However, since these existing foundation reinforcement methods require boring of the concrete foundation indoors, it is difficult to bring in equipment, which makes construction cumbersome and requires a lot of air.

KRKR 10-110537710-1105377 B1B1

상기와 같은 문제점을 해결하기 위하여 본 발명은 소형 장비에 의한 파일 시공이 가능하여, 신축 공사시 흙막이 가시설의 영향이 적은 강관 파일을 이용한 지반 보강 구조 및 이의 시공 방법을 제공하고자 한다.In order to solve the above problems, the present invention is to provide a ground reinforcement structure using a steel pipe pile and a construction method thereof, which can be piled by small equipment, and which is less affected by earth retaining facilities during new construction.

본 발명은 기존 기초 보강시 기초 보링이 필요 없어, 시공성이 우수하고 공기를 단축할 수 있는 강관 파일을 이용한 지반 보강 구조 및 이의 시공 방법을 제공하고자 한다.An object of the present invention is to provide a ground reinforcement structure using a steel pipe pile that does not require foundation boring when reinforcing an existing foundation and has excellent workability and can shorten the period and a construction method thereof.

바람직한 실시예에 따른 본 발명은 기존 건물 기초의 외측 지반에 천공되고 상부에는 건물 기초의 하부로 확대공간부가 연장되도록 형성되는 천공홀; 상기 천공홀 내에 삽입되는 것으로 외주면에 복수의 주입공이 형성된 강관 파일; 상기 강관 파일의 주입공을 통해 강관 파일의 외부로 주입되어 강관 파일 내부, 천공홀과 강관 파일 사이 공간 및 확대공간부에 충전되는 주입재; 및 상기 확대공간부의 내부에 수용되도록 상기 강관 파일의 상단에 구비되어 상기 강관 파일의 상단에서 건물 기초의 하부 측으로 연장 형성됨으로써 기초의 하중을 강관 파일로 전달하는 것으로, 상기 강관 파일에 일측이 상하 슬라이딩 가능하게 결합되어 기존 건물의 기초 하면에 밀착되는 기초받침부재와 상기 기초받침부재의 하부에서 강관 파일에 고정되어 기초받침부재를 지지하는 지지부재와 상기 기초받침부재와 지지부재의 사이에 구비되어 기초받침부재의 높이를 조절하는 높이조절부재로 구성되는 두부 보강구; 로 구성되는 것을 특징으로 하는 강관 파일을 이용한 지반 보강 구조를 제공한다.The present invention according to a preferred embodiment is drilled in the outer ground of the existing building foundation, and the upper part is formed to extend the expansion space portion to the lower part of the building foundation; A steel pipe file having a plurality of injection holes formed on an outer circumferential surface to be inserted into the perforation hole; An injection material that is injected to the outside of the steel pipe pile through the injection hole of the steel pipe pile and filled in the space between the drilling hole and the steel pipe pile and the enlarged space inside the steel pipe pile; And it is provided at the top of the steel pipe pile to be accommodated in the enlarged space unit and extends from the top of the steel pipe pile to the lower side of the building foundation to transfer the load of the foundation to the steel pipe pile, and one side of the steel pipe pile slides up and down A foundation supporting member that is possibly combined and in close contact with the lower surface of the foundation of an existing building and a support member that is fixed to a steel pipe pile at the lower part of the foundation supporting member and is provided between the foundation supporting member and the supporting member to support the foundation supporting member Head reinforcement consisting of a height adjusting member for adjusting the height of the support member; It provides a ground reinforcement structure using a steel pipe pile, characterized in that consisting of.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

다른 바람직한 실시예에 따른 본 발명은 상기 강관 파일을 이용한 지반 보강 구조를 시공하기 위한 것으로, (a) 기존 건물 기초 외측의 지반에 천공홀을 천공하는 단계; (b) 상기 천공홀의 내부에 강관 파일을 삽입하는 단계; (c) 상기 강관 파일의 내부에 주입재를 주입하여 주입재가 강관 파일의 주입공을 통해 천공홀 내부에 충전되도록 하는 단계; (d) 상기 강관 파일의 상부에 건물 기초 하부로 연장되는 확대공간부를 터파기하여 강관 파일의 상단이 확대공간부 내에 노출되도록 하는 단계; (e) 상기 확대공간부 내에서 강관 파일의 상단에 두부 보강구를 설치하여 기초 하부를 지지하도록 하는 단계; 및 (f) 상기 확대공간부의 내부에 주입재를 충전하는 단계; 로 구성되는 것을 특징으로 하는 강관 파일을 이용한 지반 보강 구조의 시공 방법을 제공한다.The present invention according to another preferred embodiment is for constructing a ground reinforcement structure using the steel pipe pile, (a) drilling a hole in the ground outside the existing building foundation; (b) inserting a steel pipe file into the drilling hole; (c) injecting an injection material into the steel pipe pile so that the injection material is filled in the perforation hole through the injection hole of the steel pipe pile; (d) exposing an upper end of the steel pipe pile in the expanded space by exposing an enlarged space extending from an upper portion of the steel pipe pile to a lower portion of the building foundation; (e) installing a head reinforcing tool at the top of the steel pipe pile in the enlarged space to support the lower part of the foundation; and (f) filling an injection material into the enlarged space. It provides a construction method of a ground reinforcement structure using a steel pipe pile, characterized in that consisting of.

본 발명에 따르면 다음과 같은 효과가 있다. According to the present invention, there are the following effects.

첫째, 지반의 천공홀 내에 삽입되는 강관 파일의 주입공을 통해 강관 파일의 내외부에 주입재가 충전되어 복합 파일을 구성하므로, 우수한 지반 보강 효과를 발휘할 수 있다. 아울러 파일 지지력이 향상되므로 파일 지름을 줄일 수 있고, 소형 장비에 의한 파일 시공이 가능하여 신축 공사시 흙막이 가시설의 간섭으로 인한 영향이 적다.First, since the injection material is filled inside and outside the steel pipe pile through the injection hole of the steel pipe pile inserted into the drilling hole of the ground to form a composite pile, an excellent ground reinforcement effect can be exhibited. In addition, since the pile bearing capacity is improved, the pile diameter can be reduced, and pile construction by small equipment is possible, so the effect of interference of retaining facilities during new construction is small.

둘째, 기존 기초 보강시 기존 건물 기초 외측의 강관 파일 상단에 결합되는 두부 보강부를 건물 기초 하부로 연장 형성된 확대공간부 내에 위치시켜 기초를 지지하도록 할 수 있다. 따라서 기초 보링이 필요 없어 기존 구조물의 손상을 최소화할 있고, 시공이 매우 단순하며, 공기 단축이 가능하다. Second, when reinforcing the existing foundation, the head reinforcement part coupled to the top of the steel pipe pile outside the existing building foundation can be positioned in the expanded space extending below the building foundation to support the foundation. Therefore, there is no need for foundation boring, so damage to existing structures can be minimized, construction is very simple, and construction period can be shortened.

도 1은 강관 파일을 이용한 지반 보강 구조의 제1실시예를 도시하는 도면.
도 2는 제1실시예에서 두부 보강구와 강관 파일의 결합 관계를 도시하는 사시도.
도 3은 본 발명 강관 파일을 이용한 지반 보강 구조의 제2실시예를 도시하는 도면.
도 4는 제2실시예에서 두부 보강구를 도시하는 사시도.
도 5는 높이조절부재에 의한 기초받침부재의 높이 조절 과정을 도시하는 도면.
도 6 내지 도 9는 제1실시예에 의한 강관 파일을 이용한 지반 보강 구조의 시공 방법을 도시하는 도면.
도 10 내지 도 14는 제2실시예에 의한 본 발명 강관 파일을 이용한 지반 보강 구조의 시공 방법을 도시하는 도면.
도 15는 두부 보강재의 설치 방법을 도시하는 평면도.
1 is a view showing a first embodiment of a ground reinforcement structure using steel pipe piles.
Figure 2 is a perspective view showing the coupling relationship between the head reinforcement and the steel pipe pile in the first embodiment.
3 is a view showing a second embodiment of a ground reinforcement structure using the steel pipe pile of the present invention.
Fig. 4 is a perspective view showing a head reinforcement tool in a second embodiment;
Figure 5 is a view showing a process of adjusting the height of the base support member by the height adjusting member.
6 to 9 are views showing a construction method of a ground reinforcement structure using a steel pipe pile according to a first embodiment.
10 to 14 are views showing a construction method of a ground reinforcement structure using the steel pipe pile of the present invention according to a second embodiment.
Fig. 15 is a plan view showing a method of attaching a head reinforcing member.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다. Hereinafter, the present invention will be described in detail according to the accompanying drawings and preferred embodiments.

도 1은 강관 파일을 이용한 지반 보강 구조의 제1실시예를 도시하는 도면이다.1 is a view showing a first embodiment of a ground reinforcement structure using a steel pipe pile.

도 1 등에 도시된 바와 같이, 본 발명 강관 파일을 이용한 지반 보강 구조는 지반(1)에 천공되는 천공홀(11); 상기 천공홀(11) 내에 삽입되는 것으로 외주면에 복수의 주입공(31)이 형성된 강관 파일(3); 상기 강관 파일(3)의 주입공(31)을 통해 강관 파일(3)의 외부로 주입되어 강관 파일(3) 내부 및 천공홀(11)과 강관 파일(3) 사이 공간에 충전되는 주입재(4); 및 상기 강관 파일(3)의 상단에 구비되어 기초(2)의 하중을 강관 파일(3)로 전달하는 두부 보강구(5); 로 구성되는 것을 특징으로 한다.As shown in FIG. 1, etc., the ground reinforcement structure using the steel pipe pile of the present invention includes a drilling hole 11 drilled in the ground 1; A steel pipe file (3) having a plurality of injection holes (31) formed on an outer circumferential surface to be inserted into the drilling hole (11); Injection material 4 injected to the outside of the steel pipe pile 3 through the injection hole 31 of the steel pipe pile 3 and filled in the space between the inside of the steel pipe pile 3 and the drilling hole 11 and the steel pipe pile 3 ); and a head reinforcement member 5 provided at an upper end of the steel pipe pile 3 to transmit the load of the foundation 2 to the steel pipe pile 3; It is characterized by consisting of.

본 발명은 파일의 지지력을 향상시킴으로써 소형 장비에 의한 파일 시공이 가능하여 신축 공사시 흙막이 가시설의 간섭으로 인한 영향이 적고, 기존 기초 보강시 기초 보링이 필요 없어 시공성이 우수하고 공기를 단축할 수 있는 강관 파일을 이용한 지반 보강 구조 및 이의 시공 방법을 제공하기 위한 것이다. The present invention improves the bearing capacity of the pile, so that pile construction by small equipment is possible, so that there is less impact due to interference of retaining facilities during new construction, and foundation boring is not required when reinforcing the existing foundation. Excellent workability and can shorten the period It is to provide a ground reinforcement structure using a steel pipe pile and a construction method thereof.

지반(1)에 천공되는 천공홀(11)은 연약지반을 관통하여 기반암층에 지지될 수 있는 심도까지 천공한다. The drilling hole 11 drilled in the ground 1 penetrates the soft ground to a depth that can be supported by the bedrock layer.

상기 강관 파일(3)은 보강재 역할을 하는 것으로 천공홀(11) 내에 삽입된다. The steel pipe pile 3 serves as a reinforcing material and is inserted into the drilling hole 11.

상기 강관 파일(3)은 내부에 중공이 형성되고, 외주면에는 복수의 주입공(31)이 형성된다.The steel pipe pile 3 has a hollow formed therein, and a plurality of injection holes 31 are formed on the outer circumferential surface.

상기 주입재(4)는 강관 파일(3)의 내부와 외부에 충전된다.The injection material 4 is filled inside and outside the steel pipe pile 3.

상기 주입재(4)는 강관 파일(3)의 주입공(31)을 통해 강관 파일(3)의 외부로 주입되어, 강관 파일(3) 내부 및 천공홀(11)과 강관 파일(3) 사이 공간에 충전된다. The injection material 4 is injected to the outside of the steel pipe pile 3 through the injection hole 31 of the steel pipe pile 3, and the space between the inside of the steel pipe pile 3 and the drilling hole 11 and the steel pipe pile 3 is charged to

구체적으로 상기 주입재(4)는 강관 파일(3)의 상단을 통해 강관 파일(3) 내부로 주입된 후, 주입공(31)을 통해 강관 파일(3)의 외부로 유출되어 천공홀(11) 내부 공간을 채운다.Specifically, the injection material 4 is injected into the steel pipe pile 3 through the upper end of the steel pipe pile 3, and then flows out of the steel pipe pile 3 through the injection hole 31 to form a drilling hole 11 fill the inner space.

따라서 상기 천공홀(11) 내에 충전되는 주입재(4)와 주입재(4) 내에 매립되는 강관 파일(3)로 구성되는 복합 파일을 제공할 수 있으므로, 우수한 지반 보강 효과를 발휘 가능하다. 아울러 파일 지지력이 우수하므로 파일 지름을 줄일 수 있고, 이에 따라 소형 장비로 파일 공사가 가능하다. 그러므로 신축 공사시 흙막이 가시설의 간섭으로 인한 영향이 적다.Therefore, since a composite pile composed of the injection material 4 filled in the drilling hole 11 and the steel pipe pile 3 embedded in the injection material 4 can be provided, an excellent ground reinforcement effect can be exhibited. In addition, since the pile bearing capacity is excellent, the diameter of the pile can be reduced, and accordingly, pile construction is possible with small equipment. Therefore, during new construction, the influence of the interference of temporary retaining facilities is small.

상기 주입재(4)는 주입패커를 이용하여 가압 주입함으로써, 연약지반 내 틈새로 주입하여 천공홀(11) 주변 지반을 보강할 수 있다.The injection material 4 can be injected under pressure using an injection packer, and injected into a gap in the soft ground to reinforce the ground around the perforation hole 11.

상기 주입재(4)는 고강도, 고내구성의 시멘트 모르타르 또는 비알칼리성 실리카졸을 사용 가능하다.The injection material 4 may use high-strength, high-durability cement mortar or non-alkaline silica sol.

상기 두부 보강구(5)는 강관 파일(3)의 상단에 구비되어 기초(2)의 하중을 강관 파일(3)로 전달한다. The head reinforcement 5 is provided at the top of the steel pipe pile 3 to transmit the load of the foundation 2 to the steel pipe pile 3.

도 2는 제1실시예에서 두부 보강구와 강관 파일의 결합 관계를 도시하는 사시도이다.Figure 2 is a perspective view showing the coupling relationship between the head reinforcement and the steel pipe pile in the first embodiment.

도 1, 도 2에 도시된 바와 같이, 상기 두부 보강구(5)는 강관 파일(3)의 상단에 구비되어 기초(2) 내부에 매립되는 정착플레이트(51) 및 상기 정착플레이트(51)의 하부에 결합되는 것으로 강관 파일(3)의 상단이 삽입되어 고정되도록 하부가 개방된 고정관(52)으로 구성할 수 있다. As shown in FIGS. 1 and 2, the head reinforcement 5 is provided at the top of the steel pipe pile 3 and is embedded in the foundation 2. It is coupled to the lower part and can be configured as a fixing pipe 52 with an open bottom so that the upper end of the steel pipe file 3 is inserted and fixed.

신축 공사의 경우, 상기 강관 파일(3)의 상단을 기초(2)에 정착시키기 위해 두부 보강구(5)를 정착플레이트(51)와 고정관(52)으로 구성할 수 있다.In the case of new construction, the head reinforcement 5 may be composed of a fixing plate 51 and a fixing pipe 52 to fix the upper end of the steel pipe pile 3 to the foundation 2.

상기 정착플레이트(51)는 강관 파일(3)의 상단에 구비되어 기초(2) 내부에 매립되는 것으로, 넓은 판 형상으로 형성된다. The fixing plate 51 is provided at the top of the steel pipe pile 3 and is buried in the foundation 2, and is formed in a wide plate shape.

상기 정착플레이트(51)는 기초(2)의 하중이 강관 파일(3)에 응력 집중 없이 전달되도록 한다.The fixing plate 51 allows the load of the foundation 2 to be transferred to the steel pipe pile 3 without stress concentration.

상기 고정관(52)은 정착플레이트(51)의 하부에 결합되는 것으로, 강관 파일(3)의 상단이 삽입되어 고정되도록 하부가 개방된다.The fixed pipe 52 is coupled to the lower portion of the fixing plate 51, and the lower portion is opened so that the upper end of the steel pipe file 3 is inserted and fixed.

상기 고정관(52)은 정착플레이트(51)의 하부 중앙에 구비될 수 있다. The fixing tube 52 may be provided at the lower center of the fixing plate 51 .

상기 고정관(52)과의 결합을 위해 강관 파일(3)의 상단은 지반(1) 상부로 일정 높이 돌출된다.For coupling with the fixed pipe 52, the upper end of the steel pipe pile 3 protrudes to a certain height above the ground 1.

상기 고정관(52)의 하단은 강관 파일(3)의 외주면에 용접 고정될 수 있다.The lower end of the fixing pipe 52 may be fixed by welding to the outer circumferential surface of the steel pipe pile 3.

상기 두부 보강구(5)의 시공 후에는 지반(1) 상부에 잡석 포설 또는 버림콘크리트 타설 후 상부에 기초콘크리트를 타설하여 기초(2)를 시공한다.After the construction of the head reinforcement (5), the foundation (2) is constructed by placing rubble or abandoned concrete on the upper part of the ground (1) and then pouring the foundation concrete on the upper part.

도 3은 본 발명 강관 파일을 이용한 지반 보강 구조의 제2실시예를 도시하는 도면이다.3 is a view showing a second embodiment of a ground reinforcement structure using the steel pipe pile of the present invention.

도 3, 도 4에 도시된 바와 같이, 상기 강관 파일(3)은 기존 건물 기초(2)의 외측에 위치하고, 상기 천공홀(11)의 상부에는 상기 두부 보강구(5)가 수용되는 확대공간부(12)가 건물 기초(2)의 하부로 연장되도록 형성되어, 상기 확대공간부(12)의 내부에 위치하는 두부 보강구(5)가 상기 강관 파일(3)의 상단에서 건물 기초(2)의 하부 측으로 연장 형성됨으로써 기초(2)를 지지하도록 구성할 수 있다. As shown in FIGS. 3 and 4, the steel pipe pile 3 is located outside the existing building foundation 2, and the upper part of the drilling hole 11 is an enlarged space in which the head reinforcement 5 is accommodated. The part 12 is formed to extend to the lower part of the building foundation 2, and the head reinforcement 5 located inside the enlarged space part 12 is located at the top of the steel pipe pile 3 to the building foundation 2 ) It can be configured to support the foundation 2 by being formed extending to the lower side of the.

기존 건물을 보강하는 경우, 기초(2)를 천공하지 않고, 기초(2) 외측 위치에서 천공홀(11)을 천공하고 파일을 시공할 수 있다.In the case of reinforcing an existing building, it is possible to drill a drilling hole 11 at a position outside the foundation 2 without drilling the foundation 2 and construct a pile.

이 경우 기초(2)의 하중을 기초(2) 외부의 복합 파일에 전달하기 위해 두부 보강구(5)를 강관 파일(3)에 편심되도록 설치한다.In this case, in order to transmit the load of the foundation (2) to the composite pile outside the foundation (2), the head reinforcement (5) is installed to be eccentric to the steel pipe pile (3).

즉, 상기 두부 보강구(5)를 기초(2)의 하부 측으로 연장하여 캔틸레버 형식으로 강관 파일(3)에 고정함으로써, 두부 보강구(5)의 전단 강성 또는 휨 강성에 의해 기초(2)의 하중을 강관 파일(3)로 전달하도록 할 수 있다.That is, by extending the head reinforcement member 5 to the lower side of the foundation 2 and fixing it to the steel pipe pile 3 in a cantilever form, the shear stiffness or bending stiffness of the head reinforcement member 5 causes the The load can be transmitted to the steel pipe pile (3).

기초가 나중에 타설되는 신축 공사와 달리, 기존 기초 보강의 경우에는 상기 두부 보강구(5)가 기초(2)의 하부에 위치하여야 한다. 그러므로 천공홀(11)의 상부에 상기 두부 보강구(5)가 수용될 수 있는 확대공간부(12)를 형성한다.Unlike new construction work in which the foundation is cast later, in the case of existing foundation reinforcement, the head reinforcement 5 must be located below the foundation 2. Therefore, an enlarged space 12 in which the head reinforcing sphere 5 can be accommodated is formed at the upper part of the drilling hole 11.

상기와 같이, 기존 기초 보강에 본 발명 적용시에는 기존 기초의 천공 과정이 생략된다. 그러므로 기존 구조물의 손상을 최소화할 수 있고, 시공이 매우 단순하며, 공기 단축 효과가 크다.As described above, when the present invention is applied to the existing foundation reinforcement, the drilling process of the existing foundation is omitted. Therefore, damage to the existing structure can be minimized, construction is very simple, and the construction period is greatly reduced.

상기 확대공간부(12)에는 주입재(4')가 충전될 수 있다. An injection material 4' may be filled in the enlarged space 12.

상기 확대공간부(12)의 내부에 주입재(4')를 충전하여 두부 보강구(5)가 주입재(4') 내부에 매립되도록 함으로써, 편심 설치되는 두부 보강구(5)의 변형을 방지하고 기초(2)의 응력이 강관 파일(3)로 원활하게 전달되게 할 수 있다. By filling the injection material 4' into the enlarged space portion 12 so that the head reinforcement 5 is embedded in the injection material 4', deformation of the eccentrically installed head reinforcement 5 is prevented, The stress of the foundation 2 can be smoothly transferred to the steel pipe pile 3.

또한, 상기 주입재(4')가 두부 보강구(5)와 강관 파일(3)의 접합부를 감싸므로, 두부 보강구(5)와 강관 파일(3)의 일체화가 가능하다. In addition, since the injection material 4' surrounds the junction between the head reinforcement 5 and the steel pipe pile 3, it is possible to integrate the head reinforcement 5 and the steel pipe pile 3.

도 4는 제2실시예에서 두부 보강구를 도시하는 사시도이다.Fig. 4 is a perspective view showing a head reinforcement tool in a second embodiment;

도 4에 도시된 바와 같이, 상기 두부 보강구(5)는 강관 파일(3)에 일측이 고정되어 기존 건물의 기초(2) 하면에 밀착되는 기초받침부재(53) 및 상기 기초받침부재(53)의 하부에서 강관 파일(3)에 고정되어 기초받침부재(53)를 지지하는 지지부재(54)로 구성할 수 있다. As shown in FIG. 4, the head reinforcement member 5 has one side fixed to the steel pipe pile 3, and the foundation support member 53 and the foundation support member 53 in close contact with the lower surface of the foundation 2 of the existing building. ) It can be configured as a support member 54 that is fixed to the steel pipe pile 3 at the bottom of the base support member 53 to support.

상기 강관 파일(3)과 편심되게 설치되는 두부 보강구(5)는 기초(2)의 하면에 밀착되어 기초(2)의 하중을 지지하는 기초받침부재(53)와 캔틸레버 형태로 결합되는 기초받침부재(53)를 지지하여 보강하는 지지부재(54)로 구성할 수 있다.The head reinforcement 5 installed eccentrically with the steel pipe pile 3 is in close contact with the lower surface of the foundation 2 and is coupled to the foundation support member 53 for supporting the load of the foundation 2 and the foundation support in the form of a cantilever. It can be composed of a support member 54 that supports and reinforces the member 53.

상기 기초받침부재(53)와 지지부재(54)는 H형강을 사용 가능하다.The base support member 53 and the support member 54 can use H-shaped steel.

이 경우 상기 기초받침부재(53)는 H형강의 플랜지를 좌우로 배치하고, 웨브를 천공하여 형성된 관통홀에 강관 파일(3)이 삽입되도록 구성할 수 있다.In this case, the base support member 53 may be configured such that the flanges of the H-beam are disposed left and right, and the steel pipe file 3 is inserted into the through-hole formed by perforating the web.

상기 지지부재(54)는 일단은 기초받침부재(53)의 하부에서 강관 파일(3)의 측면에 고정되고, 타단은 기초받침부재(53)의 하부를 지지하여 기초받침부재(53)의 휨 강성 및 전단 강성을 보강하도록 할 수 있다. One end of the support member 54 is fixed to the side of the steel pipe pile 3 at the bottom of the foundation support member 53, and the other end supports the lower portion of the foundation support member 53 so that the bending of the foundation support member 53 stiffness and shear stiffness can be reinforced.

상기 지지부재(54)도 H형강의 플랜지를 좌우로 배치하고, 웨브를 천공하여 형성된 관통홀에 강관 파일(3)이 삽입되도록 구성할 수 있다.The support member 54 may also be configured such that the flanges of the H-beam are disposed left and right, and the steel pipe file 3 is inserted into the through-hole formed by perforating the web.

도 5는 높이조절부재에 의한 기초받침부재의 높이 조절 과정을 도시하는 도면이다.5 is a view showing a process of adjusting the height of the base support member by the height adjusting member.

도 5에 도시된 바와 같이, 상기 기초받침부재(53)는 강관 파일(3)에 상하 슬라이딩 이동 가능하게 구비되고, 상기 기초받침부재(53)와 지지부재(54)의 사이에는 기초받침부재(53)의 높이를 조절하는 높이조절부재(55)가 구비될 수 있다. As shown in FIG. 5, the foundation support member 53 is provided to slide up and down on the steel pipe pile 3, and between the foundation support member 53 and the support member 54, the foundation support member ( 53) may be provided with a height adjusting member 55 for adjusting the height.

기존 기초를 보강하기 위해서는 강관 파일(3)에 두부 보강구(5)를 설치한 후 기초받침부재(53)가 기초(2) 하부에 밀착되어야 한다.In order to reinforce the existing foundation, after installing the head reinforcement 5 on the steel pipe pile 3, the foundation support member 53 should be in close contact with the lower portion of the foundation 2.

이를 위해 상기 기초받침부재(53)와 지지부재(54) 사이에 높이조절부재(55)를 구비할 수 있다. To this end, a height adjusting member 55 may be provided between the base support member 53 and the support member 54.

시공시에는 일단 상기 기초받침부재(53)가 기초(2) 하부와 약간 이격되도록 두부 보강구(5)를 설치한다. 이때, 상기 지지부재(54)는 확대공간부(12) 저면에 거치된 상태로 강관 파일(3)의 측면에 용접 등으로 고정한다.At the time of construction, the head reinforcement 5 is installed so that the foundation supporting member 53 is slightly spaced from the lower part of the foundation 2. At this time, the support member 54 is fixed to the side surface of the steel pipe pile 3 by welding or the like in a state of being mounted on the bottom surface of the enlarged space portion 12.

이후, 도 5에서와 같이 상기 높이조절부재(55)의 길이를 신장하여 기초받침부재(53)를 상승시킴으로써, 기초받침부재(53)를 기초(2) 하면에 밀착한다.Then, as shown in FIG. 5, by elevating the base support member 53 by extending the length of the height adjusting member 55, the base support member 53 is brought into close contact with the lower surface of the base 2.

그리고 도 3에서와 같이, 상기 기초받침부재(53)와 지지부재(54) 사이에 주입재(4')를 충전하여 주입재(4')와 두부 보강구(5)가 하나의 일체화된 지지 구조체를 형성하도록 한다. And as shown in Figure 3, by filling the injection material (4 ') between the base support member 53 and the support member 54 to form a support structure in which the injection material (4') and the head reinforcing member (5) are integrated into one. to form

상기 높이조절부재(55)는 하부결합부재(551), 상부결합부재(552), 조절볼트(553), 하부너트(554) 및 상부너트(555)로 구성할 수 있다. The height adjusting member 55 may include a lower coupling member 551, an upper coupling member 552, an adjusting bolt 553, a lower nut 554 and an upper nut 555.

상기 하부결합부재(551)는 지지부재(54)의 웨브 상부에 구비되는 것으로, 관통공이 형성된다. The lower coupling member 551 is provided on the upper portion of the web of the support member 54 and has a through hole.

상기 상부결합부재(552)는 기초받침부재(53)의 웨브 하부에 구비되는 것으로, 역시 관통공이 형성된다.The upper coupling member 552 is provided on the lower part of the web of the foundation support member 53, and also has a through hole.

상기 상하부결합부재(551, 552)는 각각 ㄷ자 형상으로 형성할 수 있다.The upper and lower coupling members 551 and 552 may each be formed in a c-shape.

상기 조절볼트(553)의 하단은 하부결합부재(551)의 관통공에 삽입되고, 조절볼트(553)의 외부에 체결된 하부너트(554)에 의해 지지된다.The lower end of the adjustment bolt 553 is inserted into the through hole of the lower coupling member 551 and supported by a lower nut 554 fastened to the outside of the adjustment bolt 553 .

상기 조절볼트(553)의 상단은 상부결합부재(552)의 관통공에 삽입된다. 그리고 상기 상부결합부재(552)의 하부 위치에서 조절볼트(553) 외부에 상부너트(555)를 체결하여 상부결합부재(552)를 지지하도록 한다.The upper end of the adjustment bolt 553 is inserted into the through hole of the upper coupling member 552. In addition, an upper nut 555 is fastened to the outside of the adjustment bolt 553 at a lower position of the upper coupling member 552 to support the upper coupling member 552 .

상기 상부너트(555)의 회전에 의해 상부너트(555)를 상승시키면, 이에 따라 기초받침부재(53)가 상승하여 기초(2) 하면에 밀착 지지될 수 있다. When the upper nut 555 is raised by the rotation of the upper nut 555, the foundation support member 53 is raised accordingly and can be closely supported on the lower surface of the foundation 2.

도 6 내지 도 9는 제1실시예에 의한 강관 파일을 이용한 지반 보강 구조의 시공 방법을 도시하는 도면이다.6 to 9 are views showing a construction method of a ground reinforcement structure using a steel pipe pile according to a first embodiment.

상기 강관 파일을 이용한 지반 보강 구조의 시공 방법은 도 1, 도 2를 참고하여 전술한 강관 파일을 이용한 지반 보강 구조를 시공하는 방법에 대한 것이다. The construction method of the ground reinforcement structure using the steel pipe pile relates to the method of constructing the ground reinforcement structure using the steel pipe pile described above with reference to FIGS. 1 and 2 .

이는 신축 공사시 적용 가능한 것으로, 강관 파일을 이용한 지반 보강 구조의 시공 방법에서는 먼저, (a) 지반(1)에 천공홀(11)을 천공한다(도 6).This is applicable during new construction, and in the construction method of the ground reinforcement structure using steel pipe piles, first, (a) drilling holes 11 in the ground 1 (FIG. 6).

상기 천공홀(11)은 기초(2)가 시공될 위치의 지반(1)에 복수 개 천공한다. A plurality of the drilling holes 11 are drilled in the ground 1 at the position where the foundation 2 is to be constructed.

다음으로, (b) 상기 천공홀(11)의 내부에 상단이 지반(1) 상부로 돌출되도록 강관 파일(3)을 삽입한다(도 7).Next, (b) insert the steel pipe file 3 into the drilling hole 11 so that the upper end protrudes to the top of the ground 1 (FIG. 7).

상기 강관 파일(3)의 상단은 후에 기초(2) 내부에 매립되므로, 지반(1) 상부로 일정 길이 돌출시킨다.Since the upper end of the steel pipe pile 3 is later buried inside the foundation 2, it protrudes a certain length to the top of the ground 1.

그리고 (c) 상기 강관 파일(3)의 내부에 주입재(4)를 주입하여 주입재(4)가 강관 파일(3)의 주입공(31)을 통해 천공홀(11) 내부에 충전되도록 한다(도 8).And (c) injecting the injection material 4 into the steel pipe pile 3 so that the injection material 4 is filled in the drilling hole 11 through the injection hole 31 of the steel pipe pile 3 (Fig. 8).

상기 (c) 단계에서는 강관 파일(3)의 내부를 통해 주입재(4)를 주입하여, 강관 파일(3)의 내부와 천공홀(11) 내부에 주입재(4)를 충전한다.In the step (c), the injection material 4 is injected through the inside of the steel pipe pile 3 to fill the inside of the steel pipe pile 3 and the drilling hole 11 with the injection material 4.

상기 주입재(4) 및 주입재(4) 내부에 매립되는 강관 파일(3)에 의해 복합 파일이 형성된다.A composite pile is formed by the injection material 4 and the steel pipe pile 3 embedded in the injection material 4.

상기 주입재(4)의 경화 후에는 지반(1) 상부에 잡석 포설 또는 버림콘크리트를 타설할 수 있다. After the injection material 4 is cured, rubble or abandoned concrete may be placed on the ground 1.

이후, (d) 상기 두부 보강구(5)의 고정관(52) 하부에 강관 파일(3)의 상단이 삽입되도록 상기 강관 파일(3)의 상단에 두부 보강구(5)를 설치한다(도 9).Then, (d) install the head reinforcement 5 at the top of the steel pipe pile 3 so that the upper end of the steel pipe pile 3 is inserted into the lower part of the fixing pipe 52 of the head reinforcement 5 (FIG. 9 ).

즉, 지반(1) 상부로 돌출된 강관 파일(3) 상단에 두부 보강구(5)를 결합한다.That is, the head reinforcement 5 is coupled to the top of the steel pipe pile 3 protruding above the ground 1.

상기 두부 보강구(5)의 고정관(52)은 강관 파일(3)에 용접 고정할 수 있다.The fixing pipe 52 of the head reinforcement 5 can be welded and fixed to the steel pipe pile 3.

마지막으로 (e) 상기 두부 보강구(5)가 매립되도록 상기 지반(1) 상부에 기초콘크리트를 타설한다(도 1).Finally (e) pour foundation concrete on top of the ground 1 so that the head reinforcement 5 is buried (FIG. 1).

상기 강관 파일(3)의 상단 및 두부 보강구(5)가 매립되도록 지반(1) 상부에 기초콘크리트를 타설하여 기초(2)를 시공한다. The foundation 2 is constructed by pouring foundation concrete on the top of the ground 1 so that the upper end of the steel pipe pile 3 and the head reinforcement 5 are buried.

도 10 내지 도 14는 제2실시예에 의한 본 발명 강관 파일을 이용한 지반 보강 구조의 시공 방법을 도시하는 도면이다. 그리고 도 15는 두부 보강재의 설치 방법을 도시하는 평면도이다.10 to 14 are diagrams showing a construction method of a ground reinforcement structure using a steel pipe pile according to the present invention according to a second embodiment. And Fig. 15 is a plan view showing an installation method of the head reinforcing member.

도 10 내지 도 14에 도시된 본 발명 강관 파일을 이용한 지반 보강 구조의 시공 방법은 도 3 내지 도 5를 참고하여 전술한 본 발명 강관 파일을 이용한 지반 보강 구조를 시공하는 방법에 대한 것이다. The construction method of the ground reinforcement structure using the steel pipe pile of the present invention shown in FIGS. 10 to 14 relates to the method of constructing the ground reinforcement structure using the steel pipe pile of the present invention described above with reference to FIGS. 3 to 5.

본 발명 강관 파일을 이용한 지반 보강 구조의 시공 방법은 기존 기초 보강시 적용 가능한 것으로, (a) 기존 건물 기초(2) 외측의 지반(1)에 천공홀(11)을 천공하는 단계부터 실시된다(도 10).The construction method of the ground reinforcement structure using the steel pipe pile of the present invention is applicable to the reinforcement of an existing foundation, and is carried out from the step of drilling a drilling hole 11 in the ground 1 outside the existing foundation 2 of the existing building (a) Figure 10).

상기 천공홀(11)은 기존 건물 기초(2)의 외곽선을 따라 기초(2) 외측에 복수 개 천공할 수 있다. A plurality of the perforation holes 11 may be drilled outside the foundation 2 along the outline of the existing building foundation 2 .

다음으로, (b) 상기 천공홀(11)의 내부에 강관 파일(3)을 삽입한다(도 11).Next, (b) insert the steel pipe file 3 into the drilling hole 11 (FIG. 11).

상기 강관 파일(3)은 상단이 지반(1) 상부로 돌출되지 않게 설치한다.The steel pipe pile (3) is installed so that the upper end does not protrude above the ground (1).

그리고 (c) 상기 강관 파일(3)의 내부에 주입재(4)를 주입하여 주입재(4)가 강관 파일(3)의 주입공(31)을 통해 천공홀(11) 내부에 충전되도록 한다(도 12).And (c) injecting the injection material 4 into the steel pipe pile 3 so that the injection material 4 is filled in the drilling hole 11 through the injection hole 31 of the steel pipe pile 3 (Fig. 12).

상기 주입재(4) 및 주입재(4) 내부에 매립되는 강관 파일(3)에 의해 복합 파일이 형성된다.A composite pile is formed by the injection material 4 and the steel pipe pile 3 embedded in the injection material 4.

이후, (d) 상기 강관 파일(3)의 상부에 건물 기초(2) 하부로 연장되는 확대공간부(12)를 터파기하여 강관 파일(3)의 상단이 확대공간부(12) 내에 노출되도록 한다(도 13).Then, (d) exposing the upper end of the steel pipe pile (3) in the expansion space (12) by exposing the expanded space portion (12) extending to the lower part of the building foundation (2) at the top of the steel pipe pile (3). (FIG. 13).

즉, 상기 강관 파일(3)과 천공홀(11) 상단 부분을 확대 굴착하여 건물 기초(2) 하부로 연장되는 확대공간부(12)를 형성한다.That is, the enlarged space portion 12 extending to the lower part of the building foundation 2 is formed by excavating the upper portion of the steel pipe pile 3 and the drilling hole 11 in an enlarged manner.

그리고 (e) 상기 확대공간부(12) 내에서 강관 파일(3)의 상단에 두부 보강구(5)를 설치하여 기초(2) 하부를 지지하도록 한다(도 14).And (e) to support the lower part of the foundation (2) by installing the head reinforcing tool (5) on the top of the steel pipe pile (3) in the expansion space (12) (FIG. 14).

상기 확대공간부(12) 내에서 두부 보강구(5)를 강관 파일(3)에 설치한다.The head reinforcing tool 5 is installed on the steel pipe pile 3 in the enlarged space 12.

상기 확대공간부(12)는 두부 보강구(5)를 기초(2) 외면과 평행하게 삽입한 후 90도 회전시켜 기초(2) 하부에 위치할 수 있도록 충분한 폭으로 형성한다(도 15).The enlarged space part 12 is formed with a sufficient width so that the head reinforcing tool 5 can be inserted parallel to the outer surface of the base 2 and then rotated 90 degrees to be positioned under the base 2 (FIG. 15).

상기 두부 보강구(5)는 상면이 기초(2) 하면에 밀착되도록 설치한다.The upper surface of the head reinforcing device 5 is installed so that it adheres to the lower surface of the foundation 2.

상기 높이조절부재(55)가 구비되는 경우에는 높이조절부재(55)를 이용하여 두부 보강구(5)의 기초받침부재(53)를 상승시켜 기초받침부재(53)가 기초(2)의 하면에 밀착되도록 한다. When the height adjustment member 55 is provided, the base support member 53 of the head reinforcing member 5 is raised using the height adjustment member 55 so that the foundation support member 53 is the lower surface of the foundation 2 make it stick to

마지막으로 (f) 상기 확대공간부(12)의 내부에 주입재(4')를 충전한다(도 3).Finally (f) filling the injection material 4 'into the enlarged space 12 (FIG. 3).

상기 확대공간부(12) 내에 주입재(4')를 충전하여 두부 보강구(5)와 강관 파일(3)을 일체화하고, 넓은 면적에 의해 기초(2)를 지지하여 응력 전달을 원활하게 하도록 한다.Filling the injection material 4 'in the expansion space 12 to integrate the head reinforcement 5 and the steel pipe pile 3, and supporting the foundation 2 by a large area to facilitate stress transmission .

1: 지반
11: 천공홀
12: 확대공간부
2: 기초
3: 강관 파일
31: 주입공
4: 주입재
5: 두부 보강구
51: 정착플레이트
52: 고정관
53: 기초받침부재
54: 지지부재
55: 높이조절부재
551: 하부결합부재
552: 상부결합부재
553: 조절볼트
554: 하부너트
555: 상부너트
1: ground
11: perforation hole
12: enlarged space
2: foundation
3: steel pipe files
31: injection hole
4: injection material
5: head reinforcement
51: fixing plate
52: fixed pipe
53: foundation support member
54: support member
55: height adjustment member
551: lower coupling member
552: upper coupling member
553: adjustment bolt
554: lower nut
555: upper nut

Claims (8)

기존 건물 기초(2)의 외측 지반(1)에 천공되고 상부에는 건물 기초(2)의 하부로 확대공간부(12)가 연장되도록 형성되는 천공홀(11);
상기 천공홀(11) 내에 삽입되는 것으로 외주면에 복수의 주입공(31)이 형성된 강관 파일(3);
상기 강관 파일(3)의 주입공(31)을 통해 강관 파일(3)의 외부로 주입되어 강관 파일(3) 내부, 천공홀(11)과 강관 파일(3) 사이 공간 및 확대공간부(12)에 충전되는 주입재(4, 4'); 및
상기 확대공간부(12)의 내부에 수용되도록 상기 강관 파일(3)의 상단에 구비되어 상기 강관 파일(3)의 상단에서 건물 기초(2)의 하부 측으로 연장 형성됨으로써 기초(2)의 하중을 강관 파일(3)로 전달하는 것으로, 상기 강관 파일(3)에 일측이 상하 슬라이딩 가능하게 결합되어 기존 건물의 기초(2) 하면에 밀착되는 기초받침부재(53)와 상기 기초받침부재(53)의 하부에서 강관 파일(3)에 고정되어 기초받침부재(53)를 지지하는 지지부재(54)와 상기 기초받침부재(53)와 지지부재(54)의 사이에 구비되어 기초받침부재(53)의 높이를 조절하는 높이조절부재(55)로 구성되는 두부 보강구(5); 로 구성되는 것을 특징으로 하는 강관 파일을 이용한 지반 보강 구조.
A perforated hole 11 formed in the outer ground 1 of the existing building foundation 2 and formed so that the expansion space 12 extends to the lower part of the building foundation 2 at the upper part;
A steel pipe file (3) having a plurality of injection holes (31) formed on an outer circumferential surface to be inserted into the drilling hole (11);
It is injected to the outside of the steel pipe pile 3 through the injection hole 31 of the steel pipe pile 3, and the space between the inside of the steel pipe pile 3, the drilling hole 11 and the steel pipe pile 3, and the enlarged space 12 ) Filled in the injection material (4, 4 '); and
It is provided at the upper end of the steel pipe pile 3 to be accommodated in the enlarged space portion 12 and extends from the upper end of the steel pipe pile 3 to the lower side of the building foundation 2, thereby reducing the load of the foundation 2. By transferring to the steel pipe pile (3), one side is coupled to the steel pipe pile (3) so that it can slide up and down, and the foundation support member 53 and the foundation support member 53 in close contact with the lower surface of the foundation (2) of the existing building A support member 54 fixed to the steel pipe pile 3 at the bottom of the foundation support member 53 and provided between the foundation support member 53 and the support member 54 to support the foundation support member 53 Head reinforcement (5) composed of a height adjusting member (55) for adjusting the height of; Ground reinforcement structure using a steel pipe pile, characterized in that consisting of.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 제1항에 의한 강관 파일을 이용한 지반 보강 구조를 시공하기 위한 것으로,
(a) 기존 건물 기초(2) 외측의 지반(1)에 천공홀(11)을 천공하는 단계;
(b) 상기 천공홀(11)의 내부에 강관 파일(3)을 삽입하는 단계;
(c) 상기 강관 파일(3)의 내부에 주입재(4)를 주입하여 주입재(4)가 강관 파일(3)의 주입공(31)을 통해 천공홀(11) 내부에 충전되도록 하는 단계;
(d) 상기 강관 파일(3)의 상부에 건물 기초(2) 하부로 연장되는 확대공간부(12)를 터파기하여 강관 파일(3)의 상단이 확대공간부(12) 내에 노출되도록 하는 단계;
(e) 상기 확대공간부(12) 내에서 강관 파일(3)의 상단에 두부 보강구(5)를 설치하여 기초(2) 하부를 지지하도록 하는 단계; 및
(f) 상기 확대공간부(12)의 내부에 주입재(4')를 충전하는 단계; 로 구성되는 것을 특징으로 하는 강관 파일을 이용한 지반 보강 구조의 시공 방법.
For constructing a ground reinforcement structure using a steel pipe pile according to claim 1,
(a) drilling a drilling hole 11 in the ground 1 outside the existing building foundation 2;
(b) inserting a steel pipe file (3) into the drilling hole (11);
(c) injecting the injection material 4 into the steel pipe pile 3 so that the injection material 4 is filled in the drilling hole 11 through the injection hole 31 of the steel pipe pile 3;
(d) exposing the upper end of the steel pipe pile (3) in the expansion space portion (12) by exposing the expanded space portion (12) extending to the lower portion of the building foundation (2) at the top of the steel pipe pile (3);
(e) installing a head reinforcement 5 at the top of the steel pipe pile 3 in the enlarged space 12 to support the lower portion of the foundation 2; and
(f) filling the injection material 4' into the enlarged space 12; Construction method of a ground reinforcement structure using a steel pipe pile, characterized in that consisting of.
KR1020200154643A 2020-11-18 2020-11-18 Structure for reinforcing foundation using steel piles and construction method thereof KR102480876B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200154643A KR102480876B1 (en) 2020-11-18 2020-11-18 Structure for reinforcing foundation using steel piles and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200154643A KR102480876B1 (en) 2020-11-18 2020-11-18 Structure for reinforcing foundation using steel piles and construction method thereof

Publications (2)

Publication Number Publication Date
KR20220067892A KR20220067892A (en) 2022-05-25
KR102480876B1 true KR102480876B1 (en) 2022-12-22

Family

ID=81796985

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200154643A KR102480876B1 (en) 2020-11-18 2020-11-18 Structure for reinforcing foundation using steel piles and construction method thereof

Country Status (1)

Country Link
KR (1) KR102480876B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102549479B1 (en) * 2022-10-05 2023-06-29 한국건설기술연구원 Multi-axial seismic pile and construction method using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005180015A (en) * 2003-12-19 2005-07-07 Daicho Tokushu Doboku Kk Method of improving unevenly settled foundation and structure for improving unevenly settled foundation
KR102151726B1 (en) * 2020-01-03 2020-09-03 주식회사 택한 Anchorage of pile head

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020084646A (en) * 2001-05-04 2002-11-09 허진구 Method of Constructing Piles in Civil Engineering Works
KR101105377B1 (en) 2011-05-04 2012-01-16 토성이앤씨주식회사 Seismic strenthening structure and working pocess using micro-pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005180015A (en) * 2003-12-19 2005-07-07 Daicho Tokushu Doboku Kk Method of improving unevenly settled foundation and structure for improving unevenly settled foundation
KR102151726B1 (en) * 2020-01-03 2020-09-03 주식회사 택한 Anchorage of pile head

Also Published As

Publication number Publication date
KR20220067892A (en) 2022-05-25

Similar Documents

Publication Publication Date Title
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
US9359725B2 (en) Stepwise repeated destabilization and stabilization of highly collapsible soil mass by ‘soil nailing technique’ used for construction of railway/road underpass
KR101341260B1 (en) Method of reinforcing existing concrete footing structure using micropile
KR102480876B1 (en) Structure for reinforcing foundation using steel piles and construction method thereof
KR20190022132A (en) Top-down method using precast-concrete colum
KR100970440B1 (en) Beam penetrating after lower part casting type cast-in-place pile method
KR101187170B1 (en) Application of under pinning method in remodeling
KR102223856B1 (en) Foundation structure of waste landfill site and construction method thereof
CN108678042A (en) Miniature steel pipe pile for foundation stabilization and the method using its progress foundation stabilization
JP2000352296A (en) Method o constructing passage just under underground structure
KR102082495B1 (en) Low part cast in place pile construction method
KR100625115B1 (en) downward reinforced-concrete underground structure using temporary assistant columns
KR100991248B1 (en) Foundation construction method of micro pile using pack and pile used in the same
US20220356663A1 (en) Load Transfer System
KR102277470B1 (en) Basement Composite Wall Using Retaing Wall And Method for Constructing the Same
KR20180062669A (en) Micropile and micropile molding method for earthquake-proof and strengthening ground
KR20110043976A (en) Top-down method using precast column and building structure thereof
KR101919608B1 (en) Ground reinforcement method using jacked pile and grouting
KR102146926B1 (en) Constructing method of micropile
JP3851581B2 (en) Ground strength reinforcement structure of the ground
KR20180093358A (en) Slot casing with spacer and a method of construction for retaining wall using slot casing
KR102264595B1 (en) Self supporting type phc pile and construction method for the same
KR102497620B1 (en) Construction method for columm intergrated cft pile and columm intergrated cft used the same
KR100638841B1 (en) Method for constructing cellar
KR102626431B1 (en) Thumb pile using guide bracket and bottom part of drilling diameter ground anchor and construction method for retaining temporary facility using the same

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant