KR101932118B1 - Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof - Google Patents

Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof Download PDF

Info

Publication number
KR101932118B1
KR101932118B1 KR1020160072248A KR20160072248A KR101932118B1 KR 101932118 B1 KR101932118 B1 KR 101932118B1 KR 1020160072248 A KR1020160072248 A KR 1020160072248A KR 20160072248 A KR20160072248 A KR 20160072248A KR 101932118 B1 KR101932118 B1 KR 101932118B1
Authority
KR
South Korea
Prior art keywords
filler
base
pillar
tunnel
column
Prior art date
Application number
KR1020160072248A
Other languages
Korean (ko)
Other versions
KR20170139824A (en
Inventor
윤석오
Original Assignee
주식회사 신성이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 신성이엔씨 filed Critical 주식회사 신성이엔씨
Priority to KR1020160072248A priority Critical patent/KR101932118B1/en
Publication of KR20170139824A publication Critical patent/KR20170139824A/en
Application granted granted Critical
Publication of KR101932118B1 publication Critical patent/KR101932118B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/02Shores or struts; Chocks non-telescopic
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D13/00Large underground chambers; Methods or apparatus for making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/02Non-telescopic props

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명은 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법에 관한 것으로, 복수의 터널이 상호 중첩되도록 건설되는 다중 아치 터널에 중첩되는 중앙에 지반 하중을 지지하도록 설치되는 필러 설치 장치에 있어서, 상기 터널이 중첩되는 위치에 배치되어 있으며, 지면에 상기 터널의 길이 방향으로 설치되는 기초필러몸체와, 상기 기초필러몸체의 상부에 기둥형태로 기설정된 거리로 떨어져 설치되는 필러기둥몸체, 및 상기 필러기둥몸체의 상부에 상기 터널의 상부면에 접촉되면서 하중을 지지하도록 설치되는 상부필러몸체가 조립에 의해 중첩되는 위치에 상기 터널의 지반을 지지하는 필러부; 상기 기초필러몸체의 상부에 배치되어 있으며, 상기 기초필러몸체의 상부의 양측면과 양측에 구름 지지되어 인가된 동력에 의해 상기 기초필러몸체를 따라서 상기 필러기둥몸체와 상기 상부필러몸체를 구름 이송시키는 이송대차부; 상기 이송대차부의 상부에 배치되어 있으며, 상기 필러기둥몸체가 안치된 상태에서 상기 이송대차부의 작동에 의해 상기 기초필러몸체와 상호 고정되는 위치로 이송되도록 설치된 안치부; 및 상기 안치부의 상부에 배치되어 있으며, 상기 안치부와 함께 상기 이송대차부의 작동으로 이송되면서 상기 상부필러몸체가 안치된 상태에서 상하 좌우로 이동시키도록 설치된 위치조절부;를 포함하는 다중 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법에 관한 것이다. The present invention relates to an apparatus for installing a filler for an arch tunnel and an installation method using the same, the apparatus for installing a filler installed to support a ground load at a center, which is superimposed on a multiple arch tunnel constructed to overlap a plurality of tunnels, A filler pillar body disposed at a predetermined distance in the form of a column on an upper portion of the base pillar body; and a filler pillar body disposed at a predetermined distance in the form of a column on an upper portion of the base pillar body, A pillar portion supporting the ground of the tunnel at a position where the upper pillar body is assembled by assembling the upper pillar body installed to support the load while being in contact with the upper surface of the tunnel, Wherein the filler pillar body and the upper filler body are rolled and conveyed along the base filler body by power applied by being supported on both sides and both sides of the upper portion of the base filler body, A bogie portion; An inner pipe disposed at an upper portion of the transporting bogie and adapted to be transported to a position mutually fixed with the base filler body by operation of the feed bogie with the filler column body being laid; And a position adjusting unit disposed on the upper portion of the cradle unit and configured to move up and down and left and right in a state in which the upper filler body is transported by the operation of the transporting cradle together with the cradle unit. A pillar mounting device and a mounting method using the same.

Description

다중 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법 {Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof}Technical Field [0001] The present invention relates to a multi-arch tunnel, and more particularly,

본 발명은 다중 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법에 관한 것으로, 보다 상세하게는 터널을 다중 아치 공법으로 시공함에 있어 터널을 지지하는 필러를 설치하는 장치와 방법을 개선하여 작업자의 안전을 도모하면서 공사기간을 단축시킬 수 있고, 용이하게 이동하면서 조립이 가능하여 조립의 작업의 편의성을 향상시킬 수 있는 다중 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법에 관한 것이다. The present invention relates to an apparatus for installing a filler for a multi-arch tunnel and a method for installing the same, and more particularly, to an apparatus and a method for installing a tunnel supporting a tunnel in a multi-arch construction method, The present invention relates to a multi-arch tunnel filler mounting apparatus and a mounting method using the same, which can shorten a construction period and can be easily assembled while moving.

일반적으로, 터널(Tunnel)은 도로, 철도, 및 지하철과 같은 육상 교통 수단이 산악, 시가지 및 수중을 통과하기 위해서 땅속을 굴착한 통로를 말한다. 통상적으로 통행 중에 자주 접하게 되는 터널은 산악지역에서 육상 교통 수단이 통과되는 형태로 제작된 것으로, 원활한 교통 소통을 위해서 통행되는 방향에 따라 각각 분리하여 굴착 건설된다.Generally, a tunnel is a passage through which ground transportation such as roads, railways, and subways is excavated in order to pass through mountain, city, and underwater. Generally, tunnels that are frequently encountered during passage are constructed in the form of a road where the land transportation means is passed through in mountainous areas, and they are separately excavated and constructed according to the direction of traffic for smooth traffic communication.

이렇게, 통행되는 방향에 따라 건설되는 터널은 최소한으로 상행선과 하행선의 위치에 각각 굴착에 의해 각각 건설하여야 함에 따라 비용이 증대되고, 공사기간이 길어지는 문제점이 있었다.In this way, the tunnels constructed according to the direction in which they are traveling must be constructed at least by the excavation at the positions of the upstream line and the downstream line, respectively, thereby increasing the cost and the construction period.

또한, 통상적인 터널은 통행 방향에 따라 각각 건설됨에 따라 사용되는 토지 면적이 확대됨에 따라 토지 이용의 효율성이 저하되고, 건설 면적이 넓어져 환경 오염이 발생되는 문제점이 있었다.In addition, since the conventional tunnels are constructed in accordance with the direction of travel, the land area used is widened, and the efficiency of land use is lowered, and the construction area is widened, thereby causing environmental pollution.

이에, 최근에는 토지 사용을 효율화하면서 환경을 보호하면서 공사 기간을 단축하기 위해서 하나의 터널을 건설한 후에 양측으로 확장하는 중첩형 터널인 2아치 터널 공법이 개발되어 건설되고 있다.Recently, in order to reduce the construction period while protecting the environment while improving the efficiency of land use, a two - arch tunnel method, which is a superposition type tunnel which is expanded to both sides after constructing one tunnel, has been developed and constructed.

이런, 2아치 터널 공법은 두개의 터널을 건설되는 중앙 위치에 하나의 터널을 굴착하여 건설하고, 중앙에 필러(Pillar)라고 불리우는 벽체를 설치하여 지반 하중을 지지한 상태에서 양측으로 터널의 크기를 확장하여 두개의 터널이 상호 겹치는 형상으로 터널을 시공하여 한번의 시공으로 두개의 터널이 건설되어 공사 기간을 축소하면서 이용 토지 면적을 최소화하여 토지의 활용도를 높이고, 환경오염을 최소화 함에 따라 많이 사용되고 있다.In this way, the two arch tunnel method is constructed by excavating one tunnel at a central location where two tunnels are constructed, and by installing a wall called a pillar at the center, the size of the tunnel to both sides The tunnel is constructed by overlapping two tunnels. Two tunnels are constructed by one construction to reduce the construction period, minimize the land area used, increase the utilization of the land, and minimize environmental pollution .

상술된 2아치 터널 공법은 지속적인 개발에 의해 3개의 터널을 중첩되게 구비한 3아치 터널 공법이 개발되고, 향후에 3개 이상의 다중 아치 터널 공법으로 발전되도록 개발되고 있는 실정이다.In the above-mentioned two-arch tunnel method, a three-arch tunnel method having three tunnels superimposed by continuous development has been developed and developed to be developed into three or more multi-arch tunnel methods in the future.

이런, 다중 아치 터널 공법에서 중앙에 설치되는 필러는 중첩되는 중앙 위치에서 모든 하중을 견디어야 함에 따라 수십톤에 달하는 중량물의 콘크리크 구조물로 설치되어야 한다. 통산적으로 필러를 설치하기 위해서는 거푸집을 필러 위치에 설치한 상태에서 콘크리트를 타설하여 양생 과정을 거쳐서 설치됨에 따라 많이 시간이 소요되는 문제점이 있었다.In such a multi-arch tunnel method, the centrally installed filler must be installed as a cone-crick structure of tens of tons of heavy weight as it must withstand all loads at the overlapping central location. In order to install the filler in a general manner, there is a problem that it takes a lot of time since the concrete is installed through the curing process while the form is installed at the filler position.

또한, 필러가 설치되는 터널 내부에서 하중을 지지한 상태에서 거푸집을 설치하고, 콘크리트를 타설하는 과정에서 붕괴와 낙석의 위험에 작업자가 장시간 노출되어 있어 안정성이 취약한 문제점이 있었다.In addition, there is a problem that the worker is exposed to the risk of collapse and falling stone for a long time in the course of installing the concrete in the state where the load is supported in the tunnel inside the tunnel where the filler is installed, and the stability is poor.

이에 따라, 다중 아치 터널에 하중을 지지하는 필러의 공사 기간을 단축시키면서 설치 효율을 향상시키기 위해서 공장에서 구조물을 완성하여 조립에 의해 설치되는 프리캐스트 공법을 이용하여 짧은 시간에 조립에 의해 설치됨에 따라 콘크리트 타설하는 공법과 비교하여 공사 기간을 축소시키고, 하중을 설치와 동시에 지지하여 안정성을 증대시킬 수 있다.Accordingly, in order to improve the installation efficiency while shortening the construction period of the pillars supporting the load in the multi-arch tunnel, the structure is completed in the factory and installed by assembling in a short time using the precast method installed by assembling Compared with the concrete pouring method, the construction period can be reduced and the load can be supported at the same time as the installation, thereby increasing the stability.

그러나, 종래 기술의 다중 아치 터널용 필러 설치 방법은 중량이 무거운 프리캐스트 구조물을 좁은 터널 내부로 이동하여 터널 내부에서 조립함에 따라 조립이 어려운 문제점이 있었다.However, in the conventional method of installing a filler for a multi-arch tunnel, there is a problem that it is difficult to assemble a precast structure having a heavy weight by moving it into a narrow tunnel and assembling it in a tunnel.

즉, 필러로 조립되는 프리캐스트 구조물은 수십톤에 달하는 중량을 가지는 것으로, 중량물을 옮기기 위해서 중장비가 사용되어야 하나 좁은 터널 내부에서 작업이 어려운 문제점이 있었다.That is, a precast structure to be assembled with a filler has a weight of several tens of tons, and heavy equipment has to be used to move heavy objects, but it is difficult to work in a narrow tunnel.

특히, 터널은 상부가 폐쇄되어 있어 중량물을 상부에서 들어올리는 타워크레인과 같은 중장비를 사용할 수 없고, 좁은 터널 내부에서 중량물을 이동해서 들어올리는 작업이 어려운 문제점이 있었다.Particularly, since the tunnel is closed at its upper part, heavy equipment such as a tower crane for lifting a heavy object from the upper part can not be used, and it is difficult to move a heavy object in a narrow tunnel to lift it.

또한, 종래 기술의 필러는 프리캐스트 공법으로 복수의 세그먼트로 분할되어 있는 중량물 형태로 구비되어 있어 이동이나 설치 시에 터널의 내부와 충돌하거나, 설치 시에 하부로 낙하하게 되면 작업자의 부상이 발생될 수 있고, 충격량이 크면 터널이 붕괴되는 문제점이 있었다. In addition, the prior art filler is provided in the form of a heavy object divided into a plurality of segments by the precast method, so that when the tunnel collides with the inside of the tunnel at the time of movement or installation, or falls down at the time of installation, If the amount of impact is large, there is a problem that the tunnel collapses.

본 발명은 상술한 문제점을 해결하기 위하여 안출된 것으로, 본 발명의 목적은 터널을 다중 아치 공법으로 시공함에 있어 터널을 지지하는 필러를 복수의 세그멘트로 분할한 프리캐스트 구조물 형태로 제작하고, 복수의 세그먼트를 각각의 위치에 따라 터널 내에 레일을 따라 이동되는 대차 형태로 수납하여 이동하면서 조립 설치하는 장치와 이를 이용한 방법을 제시함으로써, 용이하게 이동하면서 조립이 가능하여 조립의 작업의 편의성을 향상시킬 수 있는 다중 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법을 제공함에 있다. SUMMARY OF THE INVENTION The present invention has been conceived to solve the above-described problems, and an object of the present invention is to provide a tunnel structure, in which a tunnel supporting a tunnel is formed into a precast structure in which a plurality of segments are divided into a plurality of segments, The present invention relates to an apparatus and method for assembling and disassembling segments while accommodating segments in a form of bogie moving along a rail in a tunnel according to respective positions, And an installation method using the same.

본 발명의 목적들은 이상에서 언급한 목적들로 제한되지 않으며, 언급되지 않은 또 다른 목적들은 아래의 기재로부터 명확하게 이해될 수 있을 것이다.The objects of the present invention are not limited to the above-mentioned objects, and other objects not mentioned can be clearly understood from the following description.

상기 목적을 달성하기 위하여, 본 발명이 일 실시예에 따른 다중 아치 터널용 필러 설치 장치는 복수의 터널이 상호 중첩되도록 건설되는 다중 아치 터널에 중첩되는 중앙에 지반 하중을 지지하도록 설치되는 필러 설치 장치에 있어서, 상기 터널이 중첩되는 위치에 배치되어 있으며, 지면에 상기 터널의 길이 방향으로 설치되는 기초필러몸체와, 상기 기초필러몸체의 상부에 기둥형태로 기설정된 거리로 떨어져 설치되는 필러기둥몸체, 및 상기 필러기둥몸체의 상부에 상기 터널의 상부면에 접촉되면서 하중을 지지하도록 설치되는 상부필러몸체가 조립에 의해 중첩되는 위치에 상기 터널의 지반을 지지하는 필러부; 상기 기초필러몸체의 상부에 배치되어 있으며, 상기 기초필러몸체의 상부의 양측면과 양측에 구름 지지되어 인가된 동력에 의해 상기 기초필러몸체를 따라서 상기 필러기둥몸체와 상기 상부필러몸체를 구름 이송시키는 이송대차부; 상기 이송대차부의 상부에 배치되어 있으며, 상기 필러기둥몸체가 안치된 상태에서 상기 이송대차부의 작동에 의해 상기 기초필러몸체와 상호 고정되는 위치로 이송되도록 설치된 안치부; 및 상기 안치부의 상부에 배치되어 있으며, 상기 안치부와 함께 상기 이송대차부의 작동으로 이송되면서 상기 상부필러몸체가 안치된 상태에서 상하 좌우로 이동시키도록 설치된 위치조절부;를 포함한다.In order to achieve the above object, a filler mounting apparatus for a multi-arch tunnel according to an embodiment of the present invention includes a filler mounting device installed to support a ground load at a center superposed on a multi-arch tunnel constructed to overlap a plurality of tunnels, A filler pillar body disposed at a predetermined distance in the form of a column on an upper portion of the base pillar body, a base pillar body disposed at a position where the tunnel is overlapped and installed on the ground in a longitudinal direction of the tunnel, And a filler part for supporting the ground of the tunnel at a position where the upper filler body installed to support the load while being in contact with the upper surface of the tunnel, Wherein the filler pillar body and the upper filler body are rolled and conveyed along the base filler body by power applied by being supported on both sides and both sides of the upper portion of the base filler body, A bogie portion; An inner pipe disposed at an upper portion of the transporting bogie and adapted to be transported to a position mutually fixed with the base filler body by operation of the feed bogie with the filler column body being laid; And a position adjusting unit disposed on the upper portion of the cradle and configured to move vertically and horizontally while the upper filler body is being transported by the operation of the cradle together with the cradle.

또한, 상기 기초필러몸체의 양측면에 각각 배치되어 있으며, 상기 이송대차부의 구동 부분이 상부에 구름 접촉되어 구름 이송되는 레일 형태로 구비된 기초레일체; 및 상기 기초필러몸체의 중앙에 상부 방향으로 돌출되어 있으며, 상기 필러기둥몸체의 하부에 고정되는 기둥 형태로 구비된 기초기둥체;를 더 포함할 수 있다.A base rail disposed on both sides of the base filler body and provided in a rail shape in which a driving portion of the transportation bogie portion is in rolling contact with an upper portion in a rolling manner; And a columnar body protruding upward in the center of the base filler body and having a column shape fixed to a lower portion of the pillars column body.

그리고, 상기 이송대차부는, 상기 기초필러몸체의 상부에 배치되어 있으며, 상기 필러기둥몸체와 상기 상부필러몸체를 이송시키도록 설치되고, 중앙에는 상기 기초필러몸체와 상기 필러기둥몸체가 상호 고정되도록 관통된 필러삽입공이 형성된 이송대차; 상기 이송대차의 하부에 배치되어 있으며, 상기 기초필러몸체의 구름 접촉되는 양쪽 상부 위치에 설치된 구동브라켓; 상기 구동브라켓의 하부에 각각 배치되어 있으며, 상기 구동브라켓에 회전 가능하게 지지된 상태에서 상기 기초필러몸체와 구름 접촉되어 상기 구동브라켓에 지지된 상기 이송대차가 이송되도록 회전 구동되는 구동바퀴; 및 상기 구동브라켓의 각각의 바깥 방향으로 하부에 배치되어 있으며, 상기 구동바퀴와 연결되어 사용자의 조작에 의해 상기 구동바퀴를 회전시키는 동력을 제공하는 구동모터;를 포함할 수 있다.The feed bulkhead is disposed at an upper portion of the base filler body, and is installed to feed the filler column body and the upper filler body. In the center, the feed filler body and the filler column body are passed through A transfer bogie having a filler insertion hole formed therein; A driving bracket disposed at a lower portion of the conveying carriage and installed at both upper positions of rolling contact of the base filler body; A driving wheel rotatably driven by the driving bracket so as to be rotatably supported by the driving bracket and in a rolling contact with the base pillar body so that the driving carriage supported on the driving bracket is rotated; And a driving motor disposed at a lower portion of the drive bracket in an outer direction of the drive bracket and connected to the drive wheels to provide power for rotating the drive wheels by a user's operation.

아울러, 상기 기초필러몸체의 양측에 떨어져 배치되어 있으며, 지면에서 상기 이송대차의 이송 시에 양측에서 유동을 지지하는 위치에 구름 지지되는 레일 형태로 구비된 지지레일; 상기 이송대차의 하부에 배치되어 있으며, 상기 지지레일의 상부에 각각 설치된 지지브라켓; 및 상기 지지브라켓의 하부에 각각 배치되어 있으며, 상기 지지브라켓에 회전 가능하게 지지된 상태에서 상기 지지레일에 구름 접촉되어 상기 지지브라켓에 지지된 상기 이송대차의 이송을 구름 지지하도록 회전되는 지지바퀴;를 포함할 수 있다.A support rail disposed at both sides of the base filler body and provided in the form of a rail that is supported in a rolling manner at a position for supporting the flow at both sides of the conveyance truck when the conveyance truck is transported from the ground; A support bracket disposed at a lower portion of the transporting carriage and provided at an upper portion of the support rail; And a support wheel rotatably supported on the support bracket and rotatably supported on the support bracket to support the conveyance of the conveyance truck supported by the support bracket in a rolling manner while being rotatably supported by the support bracket; . ≪ / RTI >

더불어, 상기 안치부는, 상기 이송대차부의 상부에 배치되어 있으며, 상기 이송대차부와 함께 이송되면서 중앙에 상기 기초필러몸체와 상기 필러기둥몸체가 연결되는 위치가 삽입되도록 관통된 안치삽입공을 가지는 안치몸체; 상기 안치몸체의 테두리 위치에 복수로 배치되어 있으며, 상기 이송대차부에 상기 안치몸체를 체결시키도록 설치된 안치체결체; 상기 안치몸체의 상부에 돌출 배치되어 있으며, 내부에 상기 필러기둥몸체가 삽입 안치되는 기둥안치공간을 가지는 안치브라켓; 및 상기 안치브라켓의 양측면에 배치되어 있으며, 하부가 상기 안치브라켓의 양측에 떨어진 위치에서 상기 안치몸체에 고정되고, 상부가 상기 안치브라켓의 양측면에 경사지도록 고정되어 상기 안치브라켓을 보강하는 안치보강체;를 포함할 수 있다.In addition, it is preferable that the anchoring portion is disposed at an upper portion of the transporting carriage portion, and is provided with an installation hole having an insertion hole penetrated to insert a position where the base filler body and the filler column body are connected to each other, Body; A plurality of anchoring bodies arranged at a frame position of the anchoring body and installed to fasten the anchoring body to the transportation bogie; An inner bracket protruding from an upper portion of the observation body and having a columnar space in which the filler column body is inserted; And an upper bracket fixed to both sides of the front bracket so as to be fixed to both sides of the front bracket so as to reinforce the front bracket, ; ≪ / RTI >

또한, 상기 위치조절부는, 상기 안치부의 상부에 배치되어 있으며, 서로 떨어져 상기 상부필러몸체와 상기 필러기둥몸체가 연결되는 위치가 개방되는 조절공간을 가지도록 구비되어 상부에 상기 상부필러몸체가 안치되도록 설치되는 조절몸체; 상기 조절몸체와 상기 안치부 사이에 배치되어 있으며, 사용자의 조작에 의해 상기 상부필러몸체가 안치되어 있는 상기 조절몸체를 상하로 이송시키는 상하조절체; 및 상기 조절몸체와 상기 안치부 사이에 배치되어 있으며, 사용자의 조작에 의해 상기 상부필러몸체가 안치되어 있는 상기 조절몸체를 좌우로 이송시키는 좌우조절체;를 포함할 수 있다.In addition, the position adjuster is disposed on the upper portion of the seat portion, and has a control space that allows the position where the upper filler body and the filler column body are connected to each other to be opened, so that the upper filler body is placed on the upper portion. An adjustable body installed; An upper and lower adjuster disposed between the adjusting body and the mouth and for vertically moving the adjusting body in which the upper filler body is placed by a user's operation; And a left and right regulating body disposed between the regulating body and the toilet seat to transfer the regulating body, in which the upper filler body is housed by a user's operation, to the left and right.

그리고, 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치를 이용한 설치방법은 복수의 터널이 상호 중첩되도록 건설되는 다중 아치 터널에 중첩되는 중앙에 지반 하중을 지지하도록 설치되는 필러부를 지면에 설치되어 기초필러몸체, 상기 기초필러몸체의 중앙에 상부 방향으로 기둥 형태의 필러기둥몸체, 및 상기 필러기둥몸체의 상부에 상기 터널의 중첩되는 상면을 지지하는 상부필러몸체로 구분하여 프리캐스트 형태로 공장에서 제작하는 단계; 상기 터널에 상기 기초필러몸체, 상기 필러기둥몸체, 및 상기 상부필러몸체를 이송시킨 상태에서 상기 기초필러몸체를 상기 터널 내에 하중이 지지되는 위치인 지반에 설치하는 단계; 상기 상부필러몸체를 위치조절부에 안치한 상태에서 상기 필러기둥몸체가 삽입 지지된 안치부의 상부에 설치하고, 상기 안치부와 함께 이송되도록 하부에 고정된 이송대차부가 상기 기초필러몸체의 양측 상부에 구름 지지되도록 설치하는 단계; 상기 기초필러몸체의 상부에 상기 필러기둥몸체가 고정되는 위치로 상기 이송대차부의 구동에 의해 상기 필러기둥몸체를 이송하여 상기 기초필러몸체와 상기 필러기둥몸체를 상호 고정하는 단계; 상기 필러기둥몸체가 상기 기초필러몸체에 고정 설치되면 상부에 위치한 상기 위치조절부의 작동에 의해 하중이 지지되는 정확한 위치로 상하 좌우로 이동한 후에 상기 필러기둥몸체에 상기 상부필러몸체를 고정하여 설치하는 단계; 및 상기 기초필러몸체에 상기 필러기둥몸체와 상기 상부필러몸체를 고정하여 설치를 마치면 상기 안치부와 상기 위치조절부를 해체하여 상기 이송대차부의 작동에 의해 다른 상기 필러기둥몸체와 상기 상부필러몸체를 설치하도록 이동하여 설치를 마치는 단계;를 포함한다.A method of installing a multi-arch tunnel filler installation apparatus according to an embodiment of the present invention includes a method of installing a filler installation apparatus in a multi-arch tunnel, A filler pillar body in the form of a column in the upper direction at the center of the base filler body and an upper filler body for supporting the upper surface of the filler pillar body in which the tunnel is overlapped, A factory-made stage; Installing the foundation filler body in a ground where a load is supported in the tunnel in a state where the foundation filler body, the filler column body, and the upper filler body are transferred to the tunnel; Wherein the pillar body is installed on an upper portion of the cage where the pillar pillar body is inserted and supported while the upper pillar body is placed on the position adjusting part, ; Transferring the filler column body to a position where the filler column body is fixed to the upper portion of the base filler body by driving the transfer bed portion to fix the base filler body and the filler column body to each other; When the filler column body is fixed to the base filler body, the upper filler body is fixed to the filler column body after moving upward, downward, rightward and leftward to an accurate position where the load is supported by the operation of the position adjuster located at the upper portion step; And the upper filler body is fixed to the base filler body, and when the installation is completed, the planar body and the position adjuster are disassembled and the other filler column body and the upper filler body are installed And terminating the installation.

아울러, 상기 프리캐스트 형태로 공장에서 제작하는 단계에서 제작되는 상기 기초필러몸체의 양측에 돌출되어 상기 이송대차부의 구동모터로 구동되는 구동바퀴가 구름 접촉되는 기초레일체를 구비하고, 상기 기초필러몸체의 상부에 돌출되어 상기 필러기둥몸체와 연결되는 기둥 형태의 기초기둥체를 구비하여 상기 이송대차부가 구름 접촉되면서 상기 기초필러몸체와 결합되도록 제작할 수 있다.And a base rail body which is protruded from both sides of the base pillar body and is driven by a driving motor of the transportation bogie to be rolled in contact with the foundation rail body manufactured in the factory in the precast type, And a columnar base column protruding from the upper part of the columnar body and connected to the pillars column body, so that the transfer column can be formed in a rolling contact with the base filler body.

더불어, 상기 기초필러몸체의 양측 상부에 구름 지지되도록 설치하는 단계에서 상기 안치부의 안치몸체에 형성된 안치삽입공으로 상기 필러기둥몸체을 삽입 안치하고, 상기 안치몸체의 상부에 위치한 상기 위치조절부의 조절몸체로 상기 상부필러몸체의 하부를 지지한 상태로 상기 이송대차부의 이송대차 상부에 체결되어 함께 이송되도록 설치하며, 상기 이송대차는 하부에 설치된 구동모터로 구동되는 구동바퀴가 상기 기초필러몸체의 양측에 구름 지지되도록 설치될 수 있다.In addition, in the step of installing the filler pillar body on both upper sides of the foundation filler body, the filler pillar body is inserted into the pillar insertion hole formed in the pillar body of the pillar, and the pillar body is inserted into the adjustment body of the pillar body, And a driving wheel driven by a driving motor provided at a lower portion of the conveying carriage is supported on both sides of the base filler body so as to be supported by the supporting pillars of the upper and lower filler bodies, .

또한, 상기 상부필러몸체를 고정하여 설치하는 단계에서 상기 상부필러몸체는 상기 위치조절부의 조절몸체 하부에 설치된 상하조절체 작동으로 상하로 조절되면서 좌우조절체의 작동에 의해 좌우로 조절되어 정확한 위치에서 상기 터널의 상면을 지지할 수 있다.Further, in the step of fixing and installing the upper filler body, the upper filler body is vertically adjusted by a vertically adjusting body installed at the lower part of the adjusting body of the position adjusting part, and is adjusted right and left by the operation of the left and right adjusting body, The upper surface of the tunnel can be supported.

상기 목적을 달성하기 위한 구체적인 사항들은 첨부된 도면과 함께 상세하게 후술된 실시예들을 참조하면 명확해질 것이다.BRIEF DESCRIPTION OF THE DRAWINGS The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: FIG.

그러나 본 발명은 이하에서 개시되는 실시예들에 한정되는 것이 아니라, 서로 다른 다양한 형태로 구성될 수 있으며, 본 실시예들은 본 발명의 개시가 완전하도록 하고 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이다.The present invention may, however, be embodied in many different forms and should not be construed as being limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. It is provided to fully inform the owner of the scope of the invention.

전술한 본 발명의 과제 해결 수단 중 하나에 의하면, 본 발명의 실시예에 따른 다중 아치 터널용 필러 설치 장치 및 이를 이용한 설치 방법은 다중 아치 터널을 시공하기 위해서 설치되는 필러 위치에 레일을 설치하고 레일 상에서 이동되는 대차에 복수의 세그먼트로 분할되어 있는 필러 구조물을 지지되어 이동하여 고정 설치함에 따라 용이하게 이동하면서 조립이 가능하여 조립의 작업의 편의성을 향상시키는 효과를 제공한다.According to one aspect of the present invention, there is provided an apparatus for installing a filler for a multi-arch tunnel and an installation method using the same, wherein a rail is installed at a filler installed to construct a multi-arch tunnel, The pillar structure is divided into a plurality of segments in a bogie moved on the bogie moving on the bogie, and is fixedly installed.

또한, 복수의 세그먼트로 분리되어 있는 필러의 구조물 중에서 하부에 위치한 기초필러몸체의 양측면을 레일로 사용하고, 기초필러몸체의 양측에 레일을 부가 설치하여 기초필러몸체에 고정되는 필러기둥몸체와 상부필러몸체를 이송시키는 대차 형태의 이송대차부가 기초필러몸체와 레일을 따라서 설치 위치로 운송 시킴에 따라 좁은 터널 내부에서 중량물을 효과적으로 운송할 수 있어 운송 효율을 향상시키는 효과를 제공한다.In addition, the filler pillar body and the upper pillar body, which are fixed to the base filler body by using both sides of the base filler body located at the lower portion among the structures of the pillars separated by the plurality of segments as rails and providing a rail at both sides of the base filler body, The conveyance truck in the form of a bogie for transporting the body is transported to the installation site along the base filler body and the rail, thereby effectively transporting the heavy objects within the narrow tunnel, thereby improving the transportation efficiency.

그리고, 기초필러몸체의 상부에 기둥형태로 지지되는 필러기둥몸체와 필러기둥몸체의 상부에 하중을 지지하도록 설치되는 상부필러몸체가 이송대차부에 조립 고정되는 위치로 안치된 상태로 기초필러몸체의 상부에서 이동되면서 설치됨에 따라 터널 내부에서 중량물을 용이하게 이동하면서 조립 고정시킬 수 있어 작업 효율성이 향상되고, 공사 기간을 축소시키는 효과를 제공한다.The filler pillar body, which is supported on the upper part of the base filler body, and the upper filler body, which is installed to support the load on the upper part of the filler pillar body, Since the tunnel is installed while being moved from the upper part, the heavy objects can be assembled and fixed easily while moving within the tunnel, so that the work efficiency is improved and the construction period is reduced.

아울러, 이송대차부에는 콘크리트 중량물인 상부필러몸체가 안치된 위치에 상하좌우로 위치를 조절할 수 있는 위치조절부가 설치되어 사용자의 조작에 따라서 상호 중첩되는 터널의 하중을 지지하는 위치에 따라 상부필터몸체의 위치를 조절할 수 있어 하중 지지력을 향상하면서 설치의 용이성을 증대시키는 효과를 제공한다.In addition, a position adjuster for adjusting the position of the upper and lower pillars is installed at a position where the upper filler body, which is a heavy load of the concrete, is placed, So that it is possible to increase the ease of installation while improving the load bearing capacity.

도 1은 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치로 필러부가 터널에 설치된 상태를 나타내는 구성도이다.
도 2는 도 1의 터널 내부에 필러를 설치한 상태에서 터널을 확장하여 중첩된 터널로 건설하는 상태를 나타내는 구성도이다.
도 3은 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치를 나타내는 정면도이다.
도 4는 도 3의 다중 아치 터널용 필러 설치 장치를 나타내는 평면도이다.
도 5는 도 3의 다중 아치 터널용 필러 설치 장치를 나타내는 측면도이다.
도 6은 도 3의 다중 아치 터널용 필러 설치 장치의 주요부분인 필러부의 일부와 이송대차부를 나타내는 정면도이다.
도 7은 도 3의 다중 아치 터널용 필러 설치 장치의 주요부분인 안치부와 위치조절부를 나타내는 정면도이다.
도 8은 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치를 이용한 설치방법을 나타내는 공정도이다.
도 9은 도 8의 다중 아치 터널용 필러 설치 장치를 이용한 설치방법의 기초필러몸체 설치단계에서 기초필러몸체가 설치된 상태를 나타내는 정면도이다.
도 10은 도 8의 다중 아치 터널용 필러 설치 장치를 이용한 설치방법의 이송대차부 설치단계에서 필러기둥몸체와 상부기둥몸체가 안치된 상태에서 이송대차부가 기초필러몸체에 설치된 상태를 나타내는 정면도이다.
도 11은 도 8의 다중 아치 터널용 필러 설치 장치를 이용한 설치방법의 필러 설치 완료단계에서 필러부가 설치된 상태를 나타내는 정면도이다.
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a configuration diagram showing a state in which a filler attaching device for a multiple arch tunnel according to an embodiment of the present invention is installed in a filler attaching tunnel; FIG.
FIG. 2 is a configuration diagram showing a state in which a tunnel is expanded to construct a superimposed tunnel in a state where a filler is installed inside the tunnel of FIG. 1;
3 is a front view showing a pillar installation device for a multi-arch tunnel according to an embodiment of the present invention.
4 is a plan view showing a pillar installation device for a multiple arch tunnel in Fig.
Fig. 5 is a side view showing the pillar installation device for the multiple arch tunnel in Fig. 3; Fig.
Fig. 6 is a front view showing a part of the pillar portion and the conveyance carriage portion which are the main portions of the pillar installation device for the multiple arch tunnel in Fig. 3;
FIG. 7 is a front view showing a mouth part and a position adjusting part which are a main part of the filler mounting device for a multiple arch tunnel in FIG. 3;
FIG. 8 is a process diagram illustrating an installation method using a pillar installation device for multiple arch tunnels according to an embodiment of the present invention.
FIG. 9 is a front view showing a state in which the base filler body is installed in a foundation filler body installation step of the installation method using the apparatus for installing a multi-arch tunnel in FIG. 8; FIG.
FIG. 10 is a front view showing a state in which the conveying cart is installed on the base filler body in a state in which the filler column body and the upper column body are placed in the conveyance carriage installing step of the installation method using the multi-arch tunneling apparatus for multi-arch tunnel in FIG.
Fig. 11 is a front view showing a state in which a pillar is installed in a filler installation completion step of the installation method using the pillar installation device for multiple arch tunnels of Fig. 8; Fig.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 이를 상세한 설명을 통해 상세히 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.While the present invention has been described in connection with certain exemplary embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and similarities. It should be understood, however, that the invention is not intended to be limited to the particular embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.

본 발명을 설명함에 있어서, 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우, 그 상세한 설명을 생략한다. 또한, 본 명세서의 설명 과정에서 이용되는 숫자(예를 들어, 제1, 제2 등)는 하나의 구성요소를 다른 구성요소와 구분하기 위한 식별기호에 불과하다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. In addition, numerals (e.g., first, second, etc.) used in the description of the present invention are merely an identifier for distinguishing one component from another.

또한, 본 명세서에서, 일 구성요소가 다른 구성요소와 "연결된다" 거나 "접속된다" 등으로 언급된 때에는, 상기 일 구성요소가 상기 다른 구성요소와 직접 연결되거나 또는 직접 접속될 수도 있지만, 특별히 반대되는 기재가 존재하지 않는 이상, 중간에 또 다른 구성요소를 매개하여 연결되거나 또는 접속될 수도 있다고 이해되어야 할 것이다.Also, in this specification, when an element is referred to as being "connected" or "connected" with another element, the element may be directly connected or directly connected to the other element, It should be understood that, unless an opposite description is present, it may be connected or connected via another element in the middle.

이하의 설명에서 사용되는 구성요소에 대한 접미사 "모듈" 및 "부"는 명세서 작성의 용이함만이 고려되어 부여되거나 혼용되는 것으로서, 그 자체로 서로 구별되는 의미 또는 역할을 갖는 것은 아니다. 또한, 본 발명을 명확하게 설명하기 위하여 설명과 관계없는 부분은 도면에서 생략하였으며, 도면들에 있어서 구성요소의 폭, 길이, 두께 등은 편의를 위하여 과장되어 표현될 수 있다. 명세서 전체에 걸쳐서 동일한 참조부호들은 동일한 구성요소들을 나타낸다.The suffix "module" and " part "for the components used in the following description are given or mixed in consideration of ease of specification, and do not have their own meaning or role. Further, in order to clearly explain the present invention, parts not related to the description are omitted in the drawings, and the width, length, thickness, etc. of the components may be exaggerated for convenience. Like reference numerals refer to like elements throughout the specification.

이하, 첨부된 도면들을 참조하여 본 발명의 실시를 위한 구체적인 내용을 설명하도록 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치로 필러부가 터널에 설치된 상태를 나타내는 구성도이고, 도 2는 도 1의 터널 내부에 필러를 설치한 상태에서 터널을 확장하여 중첩된 터널로 건설하는 상태를 나타내는 구성도이며, 도 3은 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치를 나타내는 정면도이고, 도 4는 도 3의 다중 아치 터널용 필러 설치 장치를 나타내는 평면도이며, 도 5는 도 3의 다중 아치 터널용 필러 설치 장치를 나타내는 측면도이고, 도 6은 도 3의 다중 아치 터널용 필러 설치 장치의 주요부분인 필러부의 일부와 이송대차부를 나타내는 정면도이며, 도 7은 도 3의 다중 아치 터널용 필러 설치 장치의 주요부분인 안치부와 위치조절부를 나타내는 정면도이다.FIG. 1 is a view showing a state in which a filler attaching device for a multiple arch tunnel according to an embodiment of the present invention is installed in a filler attaching tunnel, FIG. 2 is a view showing a state where a filler is installed in the tunnel of FIG. FIG. 3 is a front view showing a pillar installation device for a multi-arch tunnel according to an embodiment of the present invention, and FIG. 4 is a front view showing a pillar installation device for a multi- FIG. 6 is a front view showing a part of a pillar portion and a conveyance carriage portion which are a main portion of a pillar installation device for a multiple arch tunnel in FIG. 3, and FIG. 5 is a side view showing a pillar installation device for a multi- FIG. 7 is a front view showing a mouth part and a position adjusting part which are a main part of the filler mounting device for a multiple arch tunnel in FIG. 3;

도 1 내지 도 7을 참고하면 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치(100)는 두개 이상의 중첩되는 터널을 설치하기 위해서 중첩되는 위치에 터널을 건설하고, 건설된 터널의 중앙으로 지면에서 터널에 상면을 지지하는 필러를 설치한 상태에서 필러의 양측을 확장하여 중첩된 터널을 설치하는 다중 아치 터널의 필러를 설치하는 장치이다.Referring to FIGS. 1 to 7, a multi-arch tunnel filler installation apparatus 100 according to an embodiment of the present invention constructs a tunnel at an overlapped position in order to install two or more overlapping tunnels, Is a device for installing a filler of a multi-arch tunnel in which a filler for supporting an upper surface of a tunnel is installed on the ground, and both sides of the filler are extended to provide superimposed tunnels.

즉, 도 1 및 도 2에서 도시한 바와 같이, 필러부(110)는 중첩되는 터널의 중앙에 설치되어 지반을 지지하도록 설치되는 것으로, 중첩 위치에 건설된 터널의 하중을 지지하면서 양측으로 확장 시공 시에 시공 충격을 견디도록 중량이 큰 콘크리트 구조물로 설치된다.1 and 2, the pillar 110 is installed at the center of the overlapping tunnel to support the ground, and supports the load of the tunnel constructed at the overlapping position, It is installed as heavy concrete structure to withstand construction shock at the time.

이런, 중량이 큰 콘크리트 구조물인 필러부(110)는 터널이 중첩되는 위치에 필러 설치 장치(100)로 설치시킨다.The pillar 110, which is a heavy concrete structure, is installed at a location where the tunnel is overlapped by the pillar installation device 100.

상술된 다중 아치 터널용 필러 설치 장치(100)는 터널 내부에 중첩되는 중앙에 하중을 지지하도록 설치되는 필러부(110), 이송대차부(120), 안치부(130), 및 위치조절부(140)를 포함한다.The above-described multi-arch tunnel filler installation apparatus 100 includes a pillar 110 installed to support a load at the center, which overlaps inside the tunnel, a conveyance bogie 120, a guide 130, 140).

필러부(110)는 터널 내부에 중첩되는 중앙의 지면에 가로질러 설치되는 기초필러몸체(111), 기초레일체(112), 기초기둥체(113), 필러기둥몸체(114), 및 상부필러몸체(115)를 포함한다. 즉, 필러부(110)는 터널 내부에 중첩되는 중앙 위치로 설치되는 필러를 복수의 세그먼트로 분할하여 프리캐스트 공법으로 제작한다.The pillar portion 110 includes a base filler body 111, a base rail body 112, a base column body 113, a filler column body 114, and an upper filler body 112, which are installed across a central ground plane, And a body (115). That is, the pillar 110 is divided into a plurality of segments by a precast method.

기초필러몸체(111)는 중첩되는 중앙의 지면에 터널의 길이 방향으로 가로질러 배치되어 있으며, 지면에 고정되는 기초 형태로 프리캐스트 공법에 의해 하나의 세그먼트로 공장에서 제작되어 터널 위치로 이동 설치된다.The base filler body 111 is disposed at the center of the superimposed surface in the longitudinal direction of the tunnel and is manufactured in the factory as a single segment by the precast method in a base form fixed to the ground and is installed and moved to the tunnel position .

기초레일체(112)는 기초필러몸체(111)의 양측면에 터널에 길이 방향으로 각각 배치되어 있으며, 이송대차부(120)의 구동 부분이 상부에 구름 접촉되어 구름 이송되는 레일 형태로 구비된다. 기초레일체(112)는 기초필러몸체(111)의 양측으로 돌출되어 필러기둥몸체(114)와 상부필러몸체(115)를 지지한 상태로 이동시키는 이송대차부(120)가 기초필러몸체(111)의 상부에서 이송되도록 구름 접촉하는 레일 형태로 구비된다.The base rail 112 is disposed on both sides of the base filler body 111 in the longitudinal direction of the tunnel and is provided in a rail shape in which the driving part of the conveyance carriage 120 is in rolling contact with the upper part to be cloud- The base rail 112 protrudes from both sides of the base filler body 111 so that the feeder carriage 120 for moving the filler column body 114 and the upper filler body 115 in a state of being supported by the base filler body 111 In the form of a rail which is in rolling contact to be conveyed from above.

기초기둥체(113)는 기초필러몸체(111)의 중앙에 상부 방향으로 필러기둥몸체(114)가 설치되는 기설정된 간격으로 떨어진 위치에 돌출되어 있으며, 필러기둥몸체(114)의 하부에 고정되는 기둥 형태로 구비된다. 기초기둥체(113)는 기초 형태로 지면에 설치되는 기초필러몸체(111)와 기설정된 간격으로 떨어져 복수로 구비된 필러기둥몸체(114)가 상호 연결되는 기둥형태로 상부 방향에 돌출되도록 구비된다.The base column body 113 protrudes at a predetermined distance apart from the center of the base filler body 111 and is fixed to the lower part of the filler column body 114 As shown in FIG. The base column body 113 is provided in a columnar shape in which the base pillars body 111 provided on the ground as a base form and the plurality of filler column bodies 114 separated from each other at predetermined intervals are connected to each other so as to protrude upward .

필러기둥몸체(114)는 기초필러몸체(111)의 상부에 기둥형태로 기설정된 간격으로 떨어져 복수로 구비되어 있으며, 기초필러몸체(111)와 상부필러몸체(115)를 상호 연결하는 기둥 형태로 구비된다. 필러기둥몸체(114)는 터널의 지면에 설치된 기초필러몸체(111)에서 가로지른 방향으로 기설정된 간격으로 떨어져 복수로 설치되는 것으로, 터널의 하중을 고려하여 각각 떠받쳐 지지될 수 있는 위치에 상부필러몸체(115)와 함께 설치되도록 구비된다. The filler column body 114 is divided into a plurality of columns at predetermined intervals in the upper part of the base filler body 111. The filler column body 114 has a columnar shape in which the base filler body 111 and the upper filler body 115 are connected to each other Respectively. The filler column body 114 is installed at a predetermined interval in a direction transverse to the base filler body 111 installed on the ground of the tunnel. And to be installed together with the filler body 115.

상부필러몸체(115)는 기초필러몸체(111)의 상부에 배치되어 있으며, 터널의 하중을 지지하는 위치에 접촉되어 터널의 하중을 직접적으로 떠받치도록 설치된다. The upper filler body 115 is disposed on the upper part of the base filler body 111 and is installed to directly support the load of the tunnel in contact with the position of supporting the load of the tunnel.

즉, 필러부(110)는 기초필러몸체(111), 필러기둥몸체(114), 및 상부필러몸체(115)의 3개의 세그먼트로 분할되어 프리캐스트 공법에 의해 각각 공장에서 제조되어 현장으로 운송된 상태에서 조립에 의해 설치된다. That is, the pillar portion 110 is divided into three segments, that is, the base filler body 111, the filler column body 114, and the upper filler body 115, and is manufactured in a factory by the precast method, Lt; / RTI >

이송대차부(120)는 기초필러몸체(111)의 상부에서 필러기둥몸체(114)와 상부필러몸체(115)를 이송시키는 이송대차(121), 구동브라켓(123), 구동바퀴(124), 구동모터(125), 지지레일(126), 지지브라켓(127), 및 지지바퀴(128)를 포함한다. The transfer bogie 120 includes a transfer bogie 121 for transferring the filler column body 114 and the upper filler body 115 from the upper part of the base filler body 111, a drive bracket 123, a drive wheel 124, A drive motor 125, a support rail 126, a support bracket 127, and a support wheel 128.

이송대차(121)는 기초필러몸체(111)의 상부에 배치되어 있으며, 필러기둥몸체(114)와 상부필러몸체(115)를 이송시키도록 설치되고, 중앙에는 기초필러몸체(111)의 상부에 돌출된 기초기둥체(113)와 상부필러몸체(115)가 상호 고정되도록 관통된 필러삽입공(122)이 형성된다. The transfer bogie 121 is disposed on the upper part of the base filler body 111 and is installed to transfer the filler column body 114 and the upper filler body 115, A filler insertion hole 122 penetrating the protruded base column body 113 and the upper filler body 115 is formed.

이송대차(121)는 기초필러몸체(111)의 상부에서 터널의 길이방향으로 가로지른 위치로 이동되면서 필러기둥몸체(114)와 상부필러몸체(115)를 설치되는 위치로 이송시키도록 바퀴의 회전으로 이동되는 대차 형태로 구비된다.The transfer bogie 121 is moved from the upper part of the base pillar body 111 to a position crossing in the longitudinal direction of the tunnel so that the pillar body 114 and the upper pillar body 115 are rotated As shown in FIG.

필러삽입공(122)은 이송대차(121)의 중앙에 통공 형태로 형성되어 이송되는 필러기둥몸체(114)와 기초기둥체(113)를 연결하도록 상호 고정시키는 공간 형태로 형성된다.The filler insertion hole 122 is formed at the center of the conveyance truck 121 in the form of a through hole and is formed as a space for mutually fixing the pillar body 114 and the base column body 113 to be connected.

구동브라켓(123)은 이송대차(121)의 하부에 배치되어 있으며, 기초필러몸체(111)의 양측에 돌출된 기초레일체(112)의 상부에 각각 위치하도록 양쪽 상부에 설치된다. 구동브라켓(123)은 이송대차(121)가 기초레일체(112)를 따라서 필러기둥몸체(114)와 상부필러몸체(115)가 이송 구동되도록 하부에 서로 떨어져 구비되어 기초기둥체(113)의 양측에서 터널의 길이방향으로 이동되도록 구비된다.The drive bracket 123 is disposed at the lower portion of the conveyance truck 121 and is provided on both sides of the base rail body 112 so as to be positioned on the upper portion of the base rail body 112 protruding from both sides of the base filler body 111. The drive bracket 123 is provided at the lower portion of the drive bracket 121 so as to be driven by the filler column body 114 and the upper filler body 115 along the base rail 112, So as to move in the longitudinal direction of the tunnel from both sides.

구동바퀴(124)는 구동브라켓(123)의 하부에 각각 배치되어 있으며, 구동브라켓(123)에 회전 가능하게 지지된 상태에서 기초레일체(112)에 구름 접촉되어 구동브라켓(123)에 지지된 이송대차(121)가 이송시키기 위해서 회전 구동하도록 설치된다. The driving wheels 124 are disposed under the driving brackets 123 so that the driving wheels 124 are rotatably supported by the driving brackets 123 and are supported by the driving brackets 123 in a rolling contact with the base rail 112, And the conveyance truck 121 is rotationally driven for conveyance.

구동모터(125)는 구동브라켓(123)의 각각의 바깥 방향으로 하부에 배치되어 있으며, 구동바퀴(124)와 연결되어 사용자의 조작에 의해 구동바퀴(124)를 회전시키는 동력을 제공하도록 구비된다. 사용자가 구동모터(125)를 작동시키면 구동바퀴(124)가 회전되면서 구동브라켓(123)에 지지된 이송대차(121)가 터널의 길이 방향으로 이송되도록 작동된다.The driving motor 125 is disposed below the driving bracket 123 in the outward direction and is connected to the driving wheel 124 to provide power for rotating the driving wheel 124 by a user's operation . When the user actuates the drive motor 125, the drive wheel 124 is rotated and the transport truck 121 supported by the drive bracket 123 is operated to be transported in the longitudinal direction of the tunnel.

지지레일(126)은 기초필러몸체(111)의 양측에 떨어져 배치되어 있으며, 지면에서 이송대차(121)의 이송 시에 양측에서 유동을 지지하는 위치에 구름 지지되는 레일 형태로 구비된다.The support rails 126 are disposed on both sides of the base filler body 111 and are provided in the form of a rail that is supported in a rolling manner at a position for supporting the flow from both sides when the conveyance truck 121 is transported from the ground.

지지브라켓(127)은 이송대차(121)의 하부에 배치되어 있으며, 지지레일(126)의 상부에 각각 설치된다.The support brackets 127 are disposed at the lower portion of the conveyance truck 121 and are respectively installed at the upper portions of the support rails 126.

지지바퀴(128)는 지지브라켓(127)의 하부에 각각 배치되어 있으며, 지지브라켓(127)에 회전 가능하게 지지된 상태에서 지지레일(126)에 구름 접촉되어 지지브라켓(127)에 지지된 이송대차(121)의 이송을 구름 지지하도록 회전된다.The support wheels 128 are respectively disposed at the lower portions of the support brackets 127. The support wheels 128 are rotatably supported by the support brackets 127 and are supported by the support brackets 127 in a rolling contact with the support rails 126, And is rotated to support the conveyance of the bogie 121 in a rolling manner.

즉, 이송대차(121)는 양쪽 끝의 하부에 지지바퀴가 설치되는 지지브라켓(127)이 기초필러몸체(111)의 양쪽에 설치된 지지레일(126) 상에서 회전에 의해 구름 지지되어 유동을 방지하면서 이송대차(121)가 이탈되는 것을 방지할 수 있다.That is, the support bracket 127, on which the support wheels are mounted, is supported on the support rails 126 provided on both sides of the base filler body 111 by rolling, The transfer truck 121 can be prevented from being disengaged.

안치부(130)는 이송대차(121)의 상부에 함께 이송되도록 구비된 안치몸체(131), 안치체결체(133), 안치브라켓(134), 및 안치보강체(136)를 포함한다.The anchor unit 130 includes an anchor body 131, an anchor assembly 133, an anchor bracket 134, and an anchor reinforcement member 136, which are arranged to be transported together at an upper portion of the transport bail 121.

안치몸체(131)는 이송대차(121)의 상부에 배치되어 있으며, 이송대차(121)와 함께 이송되면서 중앙에 기초기둥체(113)와 필러기둥몸체(114)가 연결되는 위치가 삽입되도록 관통된 안치삽입공(132)을 가진다.The body 131 is disposed at the upper portion of the conveying truck 121 and is conveyed together with the conveying truck 121 so as to be inserted into the center so that the position where the base post 113 and the pillar body 114 are connected is inserted And an inserted seat insertion hole 132.

안치브라켓(134)은 안치몸체(131)의 상부에 돌출 배치되어 있으며, 내부에 필러기둥몸체(114)가 삽입 안치되는 기둥안치공간(135)을 가진다.The placement bracket 134 protrudes from the top of the body 131 and has a pillar placement space 135 in which a filler pillar body 114 is inserted.

안치체결체(133)는 안치몸체(131)의 테두리 위치에 복수로 배치되어 있으며, 이송대차(121)에 안치몸체(131)를 체결시키도록 설치된다. A plurality of the anchoring bodies 133 are arranged at the edge of the body 131 and are installed to fasten the body 131 to the conveying truck 121.

안치브라켓(134)은 안치몸체(131)의 상부에 돌출 배치되어 있으며, 내부에 필러기둥몸체(114)가 삽입 안치되는 기둥안치공간(135)을 가진다.The placement bracket 134 protrudes from the top of the body 131 and has a pillar placement space 135 in which a filler pillar body 114 is inserted.

안치보강체(136)는 안치브라켓(134)의 양측면에 배치되어 있으며, 하부가 안치브라켓(134)의 양측에 떨어진 위치에서 안치몸체(131)에 고정되고, 상부가 안치브라켓(134)의 양측면에 경사지도록 고정되어 안치브라켓(134)을 보강하도록 설치된다. The upper and lower portions of the left and right side brackets 134 and 136 are disposed on both sides of the left and right side brackets 134 and 134, So as to reinforce the position bracket 134.

위치조절부(140)는 안치부(130)의 상부에 상부필러몸체(115)를 지지하는 조절몸체(141), 상하조절체(143), 및 좌우조절체(144)를 포함한다.The position adjusting unit 140 includes an adjusting body 141, a vertical adjusting body 143, and a left and right adjusting body 144 for supporting the upper filler body 115 on the upper portion of the inner holding unit 130.

조절몸체(141)는 안치몸체(131)의 상부에 배치되어 있으며, 서로 떨어져 상부필러몸체(115)와 필러기둥몸체(114)가 연결되는 위치가 개방되는 조절공간(142)을 가지도록 구비되어 상부에 상부필러몸체(115)가 안치되도록 설치된다. The adjustment body 141 is disposed on the upper portion of the body 131 and has an adjustment space 142 in which the upper filler body 115 and the filler column body 114 are connected to each other, And the upper filler body 115 is placed on the upper part.

상하조절체(143)는 조절몸체(141)와 안치몸체(131) 사이에 배치되어 있으며, 사용자의 조작에 의해 상부필러몸체(115)가 안치되어 있는 조절몸체(141)를 상하로 이송시키도록 구비된다. 상하조절체(143)는 조절몸체(141)의 하부에서 중량물인 상부필러몸체(115)를 상하로 이송시키면서 정확한 위치로 위치를 조절하도록 설치된다. 여기서, 상하조절체(143)는 터널의 하중을 떠받치기 위해서 중량의 콘크리트물인 상부필러몸체(115)를 상하로 이송시켜 위치를 조절할 수 있는 모든 수단이 포함된다. 즉, 상하조절체(143)는 중량물을 들어올리는 유압잭, 및 유압실린더 등이 사용될 수 있다.The upper and lower adjuster body 143 is disposed between the adjusting body 141 and the body of the user and is configured to vertically move the adjusting body 141 on which the upper filler body 115 is placed by the user's operation Respectively. The upper and lower adjuster body 143 is installed to adjust the position to the correct position while vertically conveying the upper filler body 115, which is a heavy object, from the lower part of the adjustment body 141. The upper and lower adjuster 143 includes all means for adjusting the position by vertically conveying the upper filler body 115, which is heavy concrete, to support the load of the tunnel. That is, the vertical adjuster 143 may be a hydraulic jack for lifting a heavy object, a hydraulic cylinder, or the like.

좌우조절체(144)는 조절몸체(141)와 안치몸체(131) 사이에 배치되어 있으며, 사용자의 조작에 의해 상부필러몸체(115)가 안치되어 있는 조절몸체(141)를 좌우로 이송시키도록 설치된다. 좌우조절체(144)는 조절몸체(141)의 하부에서 중량물인 상부필러몸체(115)를 좌우로 이송시키면서 정확한 위치로 위치를 조절하도록 설치된다. 여기서, 좌우조절체(144)는 터널의 하중을 떠받치기 위해서 중량의 콘크리트물인 상부필러몸체(115)를 좌우로 이송시켜 위치를 조절할 수 있는 모든 수단이 포함된다. 즉, 좌우조절체(144)는 중량물을 좌우로 이동시키는 유압잭, 및 유압실린더 등이 사용될 수 있다.The left and right adjusting members 144 are disposed between the adjusting body 141 and the adjusting body 131 so that the adjusting body 141 in which the upper filler body 115 is placed by the user is moved to the left and right Respectively. The left and right adjuster 144 is installed to adjust the position of the upper filler body 115, which is a heavy object, from the lower portion of the adjustment body 141 to the correct position while transferring the same. Here, the left and right adjuster 144 includes all the means for adjusting the position by moving the upper filler body 115, which is heavy concrete, to the right and left to support the load of the tunnel. That is, the left and right adjuster 144 may be a hydraulic jack for moving the weight to the left or right, a hydraulic cylinder, or the like.

도 8은 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치를 이용한 설치방법을 나타내는 공정도이고, 도 9은 도 8의 다중 아치 터널용 필러 설치 장치를 이용한 설치방법의 기초필러몸체 설치단계에서 기초필러몸체가 설치된 상태를 나타내는 정면도이며, 도 10은 도 8의 다중 아치 터널용 필러 설치 장치를 이용한 설치방법의 이송대차부 설치단계에서 필러기둥몸체와 상부기둥몸체가 안치된 상태에서 이송대차부가 기초필러몸체에 설치된 상태를 나타내는 정면도이고, 도 11은 도 8의 다중 아치 터널용 필러 설치 장치를 이용한 설치방법의 필러 설치 완료단계에서 필러부가 설치된 상태를 나타내는 정면도이다.FIG. 8 is a process diagram illustrating a method of installing a multi-arch tunnel filler installation apparatus according to an embodiment of the present invention, FIG. 9 is a cross- And FIG. 10 is a front view showing a state in which the filler pillar body and the upper pillar body are installed in the installation step of the installation method using the pillar installation device for multiple arch tunnels of FIG. 8, Fig. 11 is a front view showing a state in which a pillar is installed in a filler installation completion step of the installation method using the pillar installation device for multiple arch tunnels in Fig. 8; Fig.

도 8 내지 도 11을 참고하면, 본 발명의 일 실시예에 따른 다중 아치 터널용 필러 설치 장치를 이용한 설치방법은 터널의 중첩되는 위치에 설치되는 필러제작단계(S10), 기초필러몸체 설치단계(S20), 이송대차부 설치단계(S30), 필러기둥몸체 고정단계(S40), 상부필러몸체 고정단계(S50), 및 필러 설치 완료단계(S60)를 포함한다. 8 to 11, a method for installing a multi-arch tunnel filler mounting apparatus according to an embodiment of the present invention includes a filler manufacturing step S10 installed at an overlapping position of a tunnel, a base filler body mounting step S20), a conveying truck mounting step S30, a filler column body fixing step S40, an upper filler body fixing step S50, and a filler installation completion step S60.

필러제작단계(S10)는 복수의 터널이 상호 중첩되도록 건설되는 다중 아치 터널에 중첩되는 중앙에 지반 하중을 지지하도록 설치되는 필러부(110)를 지면에 설치되어 기초필러몸체(111), 기초필러몸체(111)의 중앙에 상부 방향으로 기둥 형태의 필러기둥몸체(114), 및 필러기둥몸체(114)의 상부에 터널의 중첩되는 상면을 지지하는 상부필러몸체(115)로 구분하여 프리캐스트 형태로 공장에서 제작하는 단계이다.The filler manufacturing step S10 includes a pillar 110 installed on the ground to support a ground load at the center, which is superimposed on a multi-arch tunnel constructed so that a plurality of tunnels are overlapped with each other. The pillar 110 includes a base filler body 111, A filler column body 114 in the form of a column in the upper direction at the center of the body 111 and an upper filler body 115 for supporting the upper surface of the tunnel at the upper part of the filler column body 114, It is the stage to make in the factory.

또한, 필러제작단계(S10)에서 프리캐스트 형태로 공장에서 제작되는 기초필러몸체(111)의 양측에 돌출되어 이송대차부(120)의 구동모터(125)로 구동되는 구동바퀴가 구름 접촉되는 기초레일체(112)를 구비하고, 기초필러몸체(111)의 상부에 돌출되어 필러기둥몸체(114)와 연결되는 기둥 형태의 기초기둥체(113)를 구비하여 이송대차부(120)가 구름 접촉되면서 기초필러몸체(111)와 결합되도록 제작한다. In the pillar manufacturing step S10, the driving wheels 125 protruding from both sides of the base pillar body 111 manufactured in the factory in a precast form and driven by the driving motor 125 of the transportation bogie 120, And a columnar base column body 113 protruding from the upper portion of the base pillars body 111 and connected to the filler column body 114 so that the conveyance bogie 120 is in rolling contact with the filler column body 114. [ So that it is combined with the base filler body 111.

기초필러몸체 설치단계(S20)는 터널에 기초필러몸체(111), 필러기둥몸체(114), 및 상부필러몸체(115)를 이송시킨 상태에서 기초필러몸체(111)를 터널 내에 하중이 지지되는 위치인 지반에 설치하는 단계이다.The base filler body mounting step S20 is a step of installing the base filler body 111 in the tunnel while the base filler body 111, the filler column body 114 and the upper filler body 115 are fed to the tunnel This is the stage to install on the ground.

이송대차부 설치단계(S30)는 상부필러몸체(115)를 위치조절부(140)에 안치한 상태에서 필러기둥몸체(114)가 삽입 지지된 안치부(130)의 상부에 설치하고, 안치부(130)와 함께 이송되도록 하부에 고정된 이송대차부(120)가 기초필러몸체(111)의 양측 상부에 구름 지지되도록 설치하는 단계이다.In the step S30, the upper filler body 115 is placed on the position adjusting part 140, and the filler pillar body 114 is installed on the upper part of the hole 130 where the filler pillar body 114 is inserted. 130 are installed so that they are supported on upper portions of both sides of the base filler body 111 so as to be supported by the lower part.

또한, 이송대차부 설치단계(S30)에서, 안치부(130)의 안치몸체(131)에 형성된 안치삽입공(132)으로 필러기둥몸체(114)을 삽입 안치하고, 안치몸체(131)의 상부에 위치한 위치조절부(140)의 조절몸체(141)로 상부필러몸체(115)의 하부를 지지한 상태로 이송대차부(120)의 이송대차(121) 상부에 체결되어 함께 이송되도록 설치하며, 이송대차(121)는 하부에 설치된 구동모터(125)로 구동되는 구동바퀴(124)가 기초필러몸체(111)의 양측으로 돌출된 기초레일체(112)에 구름 지지되도록 설치된다.The filler pillar body 114 is inserted into the insertion hole 132 formed in the seat body 131 of the seat portion 130 and the upper portion of the seat body 131 The upper part of the upper filler body 115 is supported by the adjusting body 141 of the position adjusting part 140 installed on the upper part of the conveying carriage 121 of the conveying carriage part 120, The conveying truck 121 is installed such that the driving wheels 124 driven by the driving motor 125 installed at the lower portion are supported in a rolling manner on the base rail 112 protruding from both sides of the base filler body 111.

필러기둥몸체 고정단계(S40)는 기초필러몸체(111)의 상부에 필러기둥몸체(114)가 고정되는 위치로 이송대차부(120)의 구동에 의해 필러기둥몸체(114)를 이송하여 기초기둥체(113)와 필러기둥몸체(114)를 상호 고정하는 단계이다.The filler column body fixing step S40 is a step of fixing the filler column body 114 to the position where the filler column body 114 is fixed to the upper part of the base filler body 111 by driving the feeder carriage 120, And fixing the body 113 and the filler column body 114 to each other.

상부필러몸체 고정단계(S50)는 필러기둥몸체(114)가 기초필러몸체(111)의 기초기둥체(113)에 고정 설치되면 상부에 위치한 위치조절부(140)의 작동에 의해 하중이 지지되는 정확한 위치로 상하 좌우로 이동한 후에 필러기둥몸체(114)에 상부필러몸체(115)를 고정하여 설치하는 단계이다.When the filler column body 114 is fixed to the base column body 113 of the base filler body 111, the upper filler body fixing step S50 is performed such that the load is supported by the operation of the position adjustment unit 140 located at the upper side And then the upper filler body 115 is fixed to the filler column body 114 after the upper and lower parts are moved to the correct positions.

또한, 상부필러몸체 고정단계(S50)에서 상부필러몸체(115)는 위치조절부(140)의 조절몸체(141) 하부에 설치된 상하조절체(143) 작동으로 상하로 조절되면서 좌우조절체(144)의 작동에 의해 좌우로 조절되어 정확한 위치에서 터널의 상면을 지지하도록 구비된다. In the upper filler body fixing step S50, the upper filler body 115 is vertically adjusted by the upper and lower adjuster 143 installed below the adjuster body 141 of the position adjuster 140, So as to support the upper surface of the tunnel at the correct position.

필러 설치 완료단계(S60)는 기초필러몸체(111)에 필러기둥몸체(114)와 상부필러몸체(115)를 고정하여 설치를 마치면 안치부(130)와 위치조절부(140)를 해체하여 이송대차부(120)의 작동에 의해 다른 필러기둥몸체(114)와 상부필러몸체(115)를 설치하도록 이동하여 설치를 마치는 단계이다.In the filler installation completion step S60, the filler pillar body 114 and the upper filler body 115 are fixed to the base filler body 111, and when the installation is completed, the hole portion 130 and the position adjustment portion 140 are disassembled, And the other filler column body 114 and the upper filler body 115 are moved by the operation of the bogie portion 120 to complete the installation.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention.

따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다.Therefore, the embodiments disclosed in the present invention are intended to illustrate rather than limit the scope of the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments.

본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

<도면의 주요부분에 대한 부호의 설명>
100 : 설치 장치 110 : 필러부
111 : 기초필러몸체 112 : 기초레일체
113 : 기초기둥체 114 : 필러기둥몸체
115 : 상부필러몸체 120 : 이송대차부
121 : 이송대차 122 : 필러삽입공
123 : 구동브라켓 124 : 구동바퀴
125 : 구동모터 126 : 지지레일
127 : 지지브라켓 128 : 지지바퀴
130 : 안치부 131 : 안치몸체
132 : 안치삽입공 133 : 안치체결체
134 : 안치브라켓 135 : 기둥안치공간
136 : 안치보강체 140 : 위치조절부
141 : 조절몸체 142 : 조절공간
143 : 상하조절체 144 : 좌우조절체
Description of the Related Art
100: mounting device 110: pillar portion
111: base filler body 112: base rail
113: base column body 114: filler column body
115: upper filler body 120:
121: Feed truck 122: Filler insertion hole
123: drive bracket 124: drive wheel
125: drive motor 126: support rail
127: support bracket 128: support wheel
130: Anchoring portion 131: Anchoring body
132: Anchor insertion hole 133: Anchorage fastener
134: Anchor bracket 135: Pillar space
136: an inner reinforcement member 140:
141: Adjustable body 142: Adjustable space
143: Up and down adjuster 144: Right and left adjuster

Claims (10)

복수의 터널이 상호 중첩되도록 건설되는 다중 아치 터널에 중첩되는 중앙에 지반 하중을 지지하도록 설치되는 필러 설치 장치에 있어서,
상기 터널이 중첩되는 위치에 배치되어 있으며, 지면에 상기 터널의 길이 방향으로 설치되는 기초필러몸체와, 상기 기초필러몸체의 상부에 기둥형태로 기설정된 거리로 떨어져 설치되는 필러기둥몸체, 및 상기 필러기둥몸체의 상부에 상기 터널의 상부면에 접촉되면서 하중을 지지하도록 설치되는 상부필러몸체가 조립에 의해 중첩되는 위치에 상기 터널의 지반을 지지하는 필러부;
상기 기초필러몸체의 상부에 배치되어 있으며, 상기 기초필러몸체의 상부의 양측면과 양측에 구름 지지되어 인가된 동력에 의해 상기 기초필러몸체를 따라서 상기 필러기둥몸체와 상기 상부필러몸체를 구름 이송시키는 이송대차부;
상기 이송대차부의 상부에 배치되어 있으며, 상기 필러기둥몸체가 안치된 상태에서 상기 이송대차부의 작동에 의해 상기 기초필러몸체와 상호 고정되는 위치로 이송되도록 설치된 안치부; 및
상기 안치부의 상부에 배치되어 있으며, 상기 안치부와 함께 상기 이송대차부의 작동으로 이송되면서 상기 상부필러몸체가 안치된 상태에서 상하 좌우로 이동시키도록 설치된 위치조절부;를 포함하되,
상기 이송대차부는,
상기 기초필러몸체의 상부에 배치되어 있으며, 상기 필러기둥몸체와 상기 상부필러몸체를 이송시키도록 설치되고, 중앙에는 상기 기초필러몸체와 상기 필러기둥몸체가 상호 고정되도록 관통된 필러삽입공이 형성된 이송대차;
상기 이송대차의 하부에 배치되어 있으며, 상기 기초필러몸체의 구름 접촉되는 양쪽 상부 위치에 설치된 구동브라켓;
상기 구동브라켓의 하부에 각각 배치되어 있으며, 상기 구동브라켓에 회전 가능하게 지지된 상태에서 상기 기초필러몸체와 구름 접촉되어 상기 구동브라켓에 지지된 상기 이송대차가 이송되도록 회전 구동되는 구동바퀴; 및
상기 구동브라켓의 각각의 바깥 방향으로 하부에 배치되어 있으며, 상기 구동바퀴와 연결되어 사용자의 조작에 의해 상기 구동바퀴를 회전시키는 동력을 제공하는 구동모터;를 포함하는
다중 아치 터널용 필러 설치 장치.
A pillar installation device installed to support a ground load at a center which overlaps with a multi-arch tunnel constructed so that a plurality of tunnels are overlapped with each other,
A base filler body disposed at a position where the tunnels are overlapped with each other and installed in a longitudinal direction of the tunnel on the ground; a filler column body installed at a predetermined distance in the form of a column on an upper portion of the base filler body; A pillar portion supporting the ground of the tunnel at a position where the upper pillar body, which is installed to support the load while being in contact with the upper surface of the tunnel, is overlapped with the upper portion of the pole body by assembling;
Wherein the filler pillar body and the upper filler body are rolled and conveyed along the base filler body by power applied by being supported on both sides and both sides of the upper portion of the base filler body, A bogie portion;
An inner pipe disposed at an upper portion of the transporting bogie and adapted to be transported to a position mutually fixed with the base filler body by operation of the feed bogie with the filler column body being laid; And
And a position adjuster disposed at an upper portion of the seat portion and installed to move up and down and right and left while the upper filler body is being transported by the operation of the transporting truck with the seat portion,
The conveying /
And a filler insert hole formed at an upper portion of the base filler body and configured to feed the filler column body and the upper filler body, the filler insert body being penetrated to fix the base filler body and the filler column body to each other, ;
A driving bracket disposed at a lower portion of the conveying carriage and installed at both upper positions of rolling contact of the base filler body;
A driving wheel rotatably driven by the driving bracket so as to be rotatably supported by the driving bracket and in a rolling contact with the base pillar body so that the driving carriage supported on the driving bracket is rotated; And
And a driving motor which is disposed at a lower portion of each of the driving brackets and which is connected to the driving wheels and provides power for rotating the driving wheels by a user's operation
Filler mounting device for multiple arch tunnels.
제 1 항에 있어서,
상기 기초필러몸체의 양측면에 각각 배치되어 있으며, 상기 이송대차부의 구동 부분이 상부에 구름 접촉되어 구름 이송되는 레일 형태로 구비된 기초레일체; 및
상기 기초필러몸체의 중앙에 상부 방향으로 돌출되어 있으며, 상기 필러기둥몸체의 하부에 고정되는 기둥 형태로 구비된 기초기둥체;를 더 포함하는
다중 아치 터널용 필러 설치 장치.
The method according to claim 1,
A base rail disposed on both side surfaces of the base filler body and having a rail shape in which a driving part of the transportation bogie part is rolling in an upper part in a rolling contact manner; And
And a base column body protruding upward in the center of the base filler body and provided in a column shape fixed to a lower portion of the pillars column body;
Filler mounting device for multiple arch tunnels.
삭제delete 제 1 항에 있어서,
상기 기초필러몸체의 양측에 떨어져 배치되어 있으며, 지면에서 상기 이송대차의 이송 시에 양측에서 유동을 지지하는 위치에 구름 지지되는 레일 형태로 구비된 지지레일;
상기 이송대차의 하부에 배치되어 있으며, 상기 지지레일의 상부에 각각 설치된 지지브라켓; 및
상기 지지브라켓의 하부에 각각 배치되어 있으며, 상기 지지브라켓에 회전 가능하게 지지된 상태에서 상기 지지레일에 구름 접촉되어 상기 지지브라켓에 지지된 상기 이송대차의 이송을 구름 지지하도록 회전되는 지지바퀴;를 포함하는
다중 아치 터널용 필러 설치 장치.
The method according to claim 1,
A supporting rail disposed at both sides of the base filler body and provided in a form of a rail which is supported in a rolling manner at a position for supporting the flow at both sides of the conveyance truck when the conveyance truck is transported from the ground;
A support bracket disposed at a lower portion of the transporting carriage and provided at an upper portion of the support rail; And
A supporting wheel rotatably supported on the support bracket and rotatably supported on the support rails for supporting the conveyance of the transport brakes supported by the support brackets in a rolling manner while being rotatably supported by the support brackets; Included
Filler mounting device for multiple arch tunnels.
제 1 항에 있어서,
상기 안치부는,
상기 이송대차부의 상부에 배치되어 있으며, 상기 이송대차부와 함께 이송되면서 중앙에 상기 기초필러몸체와 상기 필러기둥몸체가 연결되는 위치가 삽입되도록 관통된 안치삽입공을 가지는 안치몸체;
상기 안치몸체의 테두리 위치에 복수로 배치되어 있으며, 상기 이송대차부에 상기 안치몸체를 체결시키도록 설치된 안치체결체;
상기 안치몸체의 상부에 돌출 배치되어 있으며, 내부에 상기 필러기둥몸체가 삽입 안치되는 기둥안치공간을 가지는 안치브라켓; 및
상기 안치브라켓의 양측면에 배치되어 있으며, 하부가 상기 안치브라켓의 양측에 떨어진 위치에서 상기 안치몸체에 고정되고, 상부가 상기 안치브라켓의 양측면에 경사지도록 고정되어 상기 안치브라켓을 보강하는 안치보강체;를 포함하는
다중 아치 터널용 필러 설치 장치.
The method according to claim 1,
The above-
An upper body disposed at an upper portion of the transporting carriage and having an insertion hole penetrated to be inserted with a position where the base filler body and the filler column body are connected to each other while being transported together with the transporting carriage;
A plurality of anchoring bodies arranged at a frame position of the anchoring body and installed to fasten the anchoring body to the transportation bogie;
An inner bracket protruding from an upper portion of the observation body and having a columnar space in which the filler column body is inserted; And
An anchor bracket disposed on both sides of the mount bracket and fixed to the mount body at a position where a lower portion of the mount bracket is spaced apart from both sides of the mount bracket and an upper portion thereof is inclined at both sides of the mount bracket to reinforce the mount bracket; Containing
Filler mounting device for multiple arch tunnels.
제 1 항에 있어서,
상기 위치조절부는,
상기 안치부의 상부에 배치되어 있으며, 서로 떨어져 상기 상부필러몸체와 상기 필러기둥몸체가 연결되는 위치가 개방되는 조절공간을 가지도록 구비되어 상부에 상기 상부필러몸체가 안치되도록 설치되는 조절몸체;
상기 조절몸체와 상기 안치부 사이에 배치되어 있으며, 사용자의 조작에 의해 상기 상부필러몸체가 안치되어 있는 상기 조절몸체를 상하로 이송시키는 상하조절체; 및
상기 조절몸체와 상기 안치부 사이에 배치되어 있으며, 사용자의 조작에 의해 상기 상부필러몸체가 안치되어 있는 상기 조절몸체를 좌우로 이송시키는 좌우조절체;를 포함하는
다중 아치 터널용 필러 설치 장치.
The method according to claim 1,
Wherein the position adjusting unit comprises:
An adjusting body disposed at an upper portion of the anchoring portion and having an adjusting space in which a position where the upper filler body and the filler column body are connected to each other is opened so that the upper filler body is placed on the upper portion;
An upper and lower adjuster disposed between the adjusting body and the mouth and for vertically moving the adjusting body in which the upper filler body is placed by a user's operation; And
And a left and right regulating body disposed between the regulating body and the toilet seat for transferring the regulating body on which the upper filler body is placed by a user's operation,
Filler mounting device for multiple arch tunnels.
복수의 터널이 상호 중첩되도록 건설되는 다중 아치 터널에 중첩되는 중앙에 지반 하중을 지지하도록 설치되는 필러부를 지면에 설치되어 기초필러몸체, 상기 기초필러몸체의 중앙에 상부 방향으로 기둥 형태의 필러기둥몸체, 및 상기 필러기둥몸체의 상부에 상기 터널의 중첩되는 상면을 지지하는 상부필러몸체로 구분하여 프리캐스트 형태로 공장에서 제작하는 단계;
상기 터널에 상기 기초필러몸체, 상기 필러기둥몸체, 및 상기 상부필러몸체를 이송시킨 상태에서 상기 기초필러몸체를 상기 터널 내에 하중이 지지되는 위치인 지반에 설치하는 단계;
상기 상부필러몸체를 위치조절부에 안치한 상태에서 상기 필러기둥몸체가 삽입 지지된 안치부의 상부에 설치하고, 상기 안치부와 함께 이송되도록 하부에 고정된 이송대차부가 상기 기초필러몸체의 양측 상부에 구름 지지되도록 설치하는 단계;
상기 기초필러몸체의 상부에 상기 필러기둥몸체가 고정되는 위치로 상기 이송대차부의 구동에 의해 상기 필러기둥몸체를 이송하여 상기 기초필러몸체와 상기 필러기둥몸체를 상호 고정하는 단계;
상기 필러기둥몸체가 상기 기초필러몸체에 고정 설치되면 상부에 위치한 상기 위치조절부의 작동에 의해 하중이 지지되는 정확한 위치로 상하 좌우로 이동한 후에 상기 필러기둥몸체에 상기 상부필러몸체를 고정하여 설치하는 단계; 및
상기 기초필러몸체에 상기 필러기둥몸체와 상기 상부필러몸체를 고정하여 설치를 마치면 상기 안치부와 상기 위치조절부를 해체하여 상기 이송대차부의 작동에 의해 다른 상기 필러기둥몸체와 상기 상부필러몸체를 설치하도록 이동하여 설치를 마치는 단계;를 포함하는
다중 아치 터널용 필러 설치 장치를 이용한 설치방법.
A filler section provided on the ground so as to support a ground load at the center to be superimposed on a multiple arch tunnel constructed so that a plurality of tunnels are overlapped with each other; a base filler body; a columnar filler column body And an upper filler body supporting an upper surface of the tunnel, the upper surface of which is superimposed on the upper part of the pillars column body.
Installing the foundation filler body in a ground where a load is supported in the tunnel in a state where the foundation filler body, the filler column body, and the upper filler body are transferred to the tunnel;
Wherein the pillar body is installed on an upper portion of the cage where the pillar pillar body is inserted and supported while the upper pillar body is placed on the position adjusting part, ;
Transferring the filler column body to a position where the filler column body is fixed to the upper portion of the base filler body by driving the transfer bed portion to fix the base filler body and the filler column body to each other;
When the filler column body is fixed to the base filler body, the upper filler body is fixed to the filler column body after moving upward, downward, rightward and leftward to an accurate position where the load is supported by the operation of the position adjuster located at the upper portion step; And
When the filler pillar body and the upper pillar body are fixed to the base filler body and the installation is finished, the pillar body and the position adjustment unit are disassembled and the other pillar body and the upper pillar body are installed by the operation of the transfer bogie Moving and finishing the installation
Installation method using filler installation device for multiple arch tunnel.
제 7 항에 있어서,
상기 프리캐스트 형태로 공장에서 제작하는 단계에서 제작되는 상기 기초필러몸체의 양측에 돌출되어 상기 이송대차부의 구동모터로 구동되는 구동바퀴가 구름 접촉되는 기초레일체를 구비하고, 상기 기초필러몸체의 상부에 돌출되어 상기 필러기둥몸체와 연결되는 기둥 형태의 기초기둥체를 구비하여 상기 이송대차부가 구름 접촉되면서 상기 기초필러몸체와 결합되도록 제작하는
다중 아치 터널용 필러 설치 장치를 이용한 설치방법.
8. The method of claim 7,
And a base rail protruding from both sides of the base filler body and being driven by a driving motor of the transportation bogie rollingly contacted with the foundation rail, And a base body in the form of a column connected to the filler column body so as to be coupled with the base filler body while the transfer body is in rolling contact
Installation method using filler installation device for multiple arch tunnel.
제 7 항에 있어서,
상기 기초필러몸체의 양측 상부에 구름 지지되도록 설치하는 단계에서 상기 안치부의 안치몸체에 형성된 안치삽입공으로 상기 필러기둥몸체을 삽입 안치하고, 상기 안치몸체의 상부에 위치한 상기 위치조절부의 조절몸체로 상기 상부필러몸체의 하부를 지지한 상태로 상기 이송대차부의 이송대차 상부에 체결되어 함께 이송되도록 설치하며, 상기 이송대차는 하부에 설치된 구동모터로 구동되는 구동바퀴가 상기 기초필러몸체의 양측에 구름 지지되도록 설치되는
다중 아치 터널용 필러 설치 장치를 이용한 설치방법.
8. The method of claim 7,
Wherein the filler pillar body is inserted into the insertion hole formed in the seat body of the seat portion in such a manner that the pillow body is rotatably supported on both upper sides of the base filler body, And a driving wheel driven by a driving motor provided at a lower portion of the conveying carriage is supported on both sides of the base filler body so as to be supported by the driving motor, felled
Installation method using filler installation device for multiple arch tunnel.
제 7 항에 있어서,
상기 상부필러몸체를 고정하여 설치하는 단계에서 상기 상부필러몸체는 상기 위치조절부의 조절몸체 하부에 설치된 상하조절체 작동으로 상하로 조절되면서 좌우조절체의 작동에 의해 좌우로 조절되어 정확한 위치에서 상기 터널의 상면을 지지하는
다중 아치 터널용 필러 설치 장치를 이용한 설치방법.
8. The method of claim 7,
In the step of fixing the upper filler body, the upper filler body is vertically adjusted by the upper and lower adjustment body installed at the lower part of the adjustment body of the position adjustment part and adjusted to the left and right by the operation of the left and right adjustment body, Supporting the upper surface of
Installation method using filler installation device for multiple arch tunnel.
KR1020160072248A 2016-06-10 2016-06-10 Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof KR101932118B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160072248A KR101932118B1 (en) 2016-06-10 2016-06-10 Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160072248A KR101932118B1 (en) 2016-06-10 2016-06-10 Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof

Publications (2)

Publication Number Publication Date
KR20170139824A KR20170139824A (en) 2017-12-20
KR101932118B1 true KR101932118B1 (en) 2018-12-24

Family

ID=60931486

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160072248A KR101932118B1 (en) 2016-06-10 2016-06-10 Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof

Country Status (1)

Country Link
KR (1) KR101932118B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102199881B1 (en) * 2020-04-24 2021-01-08 합자회사 세화산업사 Coffin supporter transfer equipment and installation method of cinerator

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345798A (en) * 1999-06-07 2000-12-12 Kawasaki Heavy Ind Ltd Assembling method and equipment for columnar segment for multiple type shield drive machine
KR100390303B1 (en) * 2003-02-11 2003-07-04 Sang Il Kim Form for constructing central wall of tunnel and movable construction method thereby

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4509844B2 (en) * 2005-04-04 2010-07-21 清水建設株式会社 Vertical wall assembly apparatus and vertical wall construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345798A (en) * 1999-06-07 2000-12-12 Kawasaki Heavy Ind Ltd Assembling method and equipment for columnar segment for multiple type shield drive machine
KR100390303B1 (en) * 2003-02-11 2003-07-04 Sang Il Kim Form for constructing central wall of tunnel and movable construction method thereby

Also Published As

Publication number Publication date
KR20170139824A (en) 2017-12-20

Similar Documents

Publication Publication Date Title
JP4504910B2 (en) Dolly and method of erection of temporary pier using it
JP5295989B2 (en) Rotating support structure for construction of overhanging beam of bridge pier
JP2005083014A (en) Pre-cast tunnel method and member conveyor used therefor
JP5477898B2 (en) Construction equipment and construction method for foundation work of directly elevated viaduct
JP2020200754A (en) Method for constructing rail foundation and rail foundation block
KR101040731B1 (en) Movable temporary structure for constructing composite covering arch structure
JP5184248B2 (en) Construction method of level crossing
CN210714718U (en) Subway station rail top air duct and shield synchronous construction mobile trolley
JP4318042B2 (en) Tunnel construction method
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JP2020002778A (en) Bridge pier construction method
KR101932118B1 (en) Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof
CN107313628A (en) A kind of basic digging-free assembled tower-type space garage and its construction method
JP5470220B2 (en) Method of transferring and laying precast concrete structures while changing the transfer direction
JP2011202406A (en) Method of assembling and disassembling movable working device for bridge
KR20150062284A (en) Rail Track Structure Using Beam having Embedded Rail and Supporting Pile, and Constructing Method of Rail Track Structure
JP3991067B1 (en) Temporary bridge between railway platforms
JP2012052338A (en) Method for drilling hole for falling-rock prevention fence post
JP6843001B2 (en) Reinforcing bar cage built-in system
JP4004423B2 (en) Road three-dimensional intersection construction method and pier connection structure
JP3692043B2 (en) Construction method of three-dimensional detour
JP2008303537A (en) Transportation method for precast floor slab
JPH0745800B2 (en) Method and apparatus for installing precast plate for tunnel
KR102100692B1 (en) Construction method of concrete ballast in tunnel
JP2004176322A (en) Method of forming floor slab of road tunnel

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant