KR101921715B1 - Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel - Google Patents

Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel Download PDF

Info

Publication number
KR101921715B1
KR101921715B1 KR1020180048044A KR20180048044A KR101921715B1 KR 101921715 B1 KR101921715 B1 KR 101921715B1 KR 1020180048044 A KR1020180048044 A KR 1020180048044A KR 20180048044 A KR20180048044 A KR 20180048044A KR 101921715 B1 KR101921715 B1 KR 101921715B1
Authority
KR
South Korea
Prior art keywords
panel
precast concrete
temporary
stiffener
temporary stiffener
Prior art date
Application number
KR1020180048044A
Other languages
Korean (ko)
Inventor
이성원
Original Assignee
주식회사 신원알피씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 신원알피씨 filed Critical 주식회사 신원알피씨
Priority to KR1020180048044A priority Critical patent/KR101921715B1/en
Application granted granted Critical
Publication of KR101921715B1 publication Critical patent/KR101921715B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a precast concrete panel, a manufacturing method thereof, and a method of constructing a bridge slab using the same. To prevent the panel from being cracked during transportation which is a main factor of a crack, a temporal reinforcing member to protect the panel until the transportation is completed is engaged to the panel when the panel is manufactured. The temporal reinforcing member is simply disassembled on site after transportation, thereby solving a problem of a cracking reason of the panel and thus preventing the panel from being cracked during transportation. An upper portion of the panel is provided with a plurality of grooves when the temporal reinforcing member is disassembled, thereby strengthening a horizontal shearing force when the panel is applied to construction of the bridge slab, and thus maximizing a composite force of the upper portion of the panel with concrete deposited on site. After the temporal reinforcing member is disassembled, an engaging member is engaged to the temporal reinforcing member, which is used as a front end connecting member. An upper portion of the engaging member used as the front end connecting member and a top surface of the panel are reinforced with rebars on site, thereby improving placing work of the rebars onto the upper portion of the panel when being applied to the construction of the bridge slab, and thus remarkably improving construct ability of the bridge slab.

Description

프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법{Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast concrete panel, a method of manufacturing the precast concrete panel, and a method of constructing a bridge slab using the precast concrete panel,

본 발명은 프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법에 관한 것으로서, 더욱 상세하게는 패널의 이동중에 균열을 방지하기 위하여 균열 발생의 주원인이 되는 이동완료시까지 보호하기 위한 임시보강재를 패널제작시에 결합하여 제작하며 이동완료 후 현장에서 간단히 임시보강재를 해체하도록 구성함으로써 패널의 균열원인을 해소하여 패널의 이동중 균열발생을 방지할 수 있도록 하는 한편, 임시보강재의 분리시에 패널의 단면이 상부에 다수의 오목한 홈이 형성되도록 함으로써 교량 슬래브 시공에 적용시 수평전단력을 강화하여 패널 상부에 현장에서 타설되는 콘크리트와의 합성력을 극대화할 수 있으며, 임시보강재의 분리 후에 임시보강재의 결합을 위한 결합부재를 결합하여 전단연결재로 사용하며, 이러한 전단연결재로 사용되는 결합부재 상부 및 패널의 상면에 현장에서의 철근 배근 작업을 진행함으로써 종래와 달리 교량 슬래브의 시공에 적용시 패널 상부에 대한 현장 철근 배근 작업에 대한 작업성을 향상시켜 교량 슬래브에 대한 시공성을 현격히 향상시킬 수 있도록 한 프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast concrete panel, a method of manufacturing the precast concrete panel, and a method of constructing a bridge slab using the precast concrete panel. More particularly, And the temporary stiffener is simply disassembled at the site after the completion of the movement, thereby eliminating the cause of the cracks of the panel, thereby preventing the occurrence of cracks during the movement of the panel. In addition, the provision of the temporary stiffener It is possible to maximize the composite force with the concrete placed on the site at the upper part of the panel by strengthening the horizontal shear force when the slab is applied to the construction of the bridge slab by forming a plurality of concave grooves at the upper part of the panel, By joining the joining members for joining the stiffeners, As a result, reinforcement work on the upper part of the joining member and the upper part of the panel used as the shear connection material is carried out. Thus, when applied to the construction of the bridge slab, The present invention relates to a precast concrete panel, a method for manufacturing the precast concrete panel, and a method for constructing a bridge slab using the precast concrete panel.

일반적으로 교량이나 도로 등의 바닥 판으로 적용되는 슬래브를 시공하기 위하여 프리캐스트 콘크리트 패널(Precast concrete panel)이 적용되고 있다.In general, a precast concrete panel is applied to a slab applied to a bottom plate of a bridge or a road.

상기와 같은 프리캐스트 콘크리트 패널 중 특히, 교량시공용 프리캐스트 콘크리트 패널은 공장에서 기 제작되어 기 제작된 패널을 소 운반 및 현장이동시 통상 5 내지 7단으로 적재하여 운반하고 있었다.Among the precast concrete panels as described above, the precast concrete panels used in bridges have been manufactured and transported at a factory usually in 5 to 7 stages during small-scale and field-moving.

그러나 상기와 같은 적재방식은 팔레트 위에 층층이 쌓고 지게차에 의한 공장 및 현장운반, 트레일러에 의한 장거리 운반과 현장진입시 공사중 진입로의 평탄성이 불량하여 순간적이고 반복적인 충격으로 인하여 특히 팔레트 위에 적재된 맨 아랫부분의 패널은 많은 휨 균열로 인하여 사용성에 제한을 받아 오는 현실이다.However, the above-mentioned stacking method has a problem that the stacking on the pallet causes the flatness of the factory and the on-site transportation by the forklift, the long distance transportation by the trailer, The panel is limited in usability due to many bending cracks.

실제로 상부하중을 받는 프리캐스트 콘크리트 패널은 설치 후 패널 상부에서 가해지는 작업하중 및 사하중, 충격하중보다도 앞서 언급한 이동중의 반복적이고 순간적인 충격으로 인하여 균열이 발생한다. 이에 따라, 패널 상부에서 콘크리트 타설 후 사하중에 의해 균열이 노출되어 사용성 및 강성이 저하되는 문제가 있었다.Actually, precast concrete panels subjected to the overload are cracked due to repetitive and momentary impacts during the movement mentioned above than working load, dead load and impact load applied at the top of the panel after installation. Accordingly, there is a problem that cracks are exposed by the dead load after the concrete is poured at the upper part of the panel, and usability and rigidity are lowered.

또한, 상기와 같은 종래의 프리캐스트 콘크리트 패널은 교량 슬래브의 시공에 적용시 패널의 상부에 대한 현장 철근 배근 작업시 패널 상면에 일부가 돌출되는 것으로, 통상 삼각형상의 철근과 양측에 길이방향으로 지그재그 형상을 이루도록 연장되는 래티스바가 연결되게 구성된 트러스 거더에 대하여 현장에서의 철근 배근시 트러스 거더의 돌출된 사이에 끼움 작업을 통해 철근을 배근하여야하는 등 철근 배근시 장애가 발생하여 현장 철근 배근의 작업이 번거롭다는 문제가 있었다.In addition, the conventional precast concrete panel as described above is partly protruded on the upper surface of the panel when the field reinforcement is applied to the upper part of the panel when it is applied to the construction of the bridge slab. Generally, a triangular reinforcing bar and a zig- The reinforcing bars are inserted through the projecting portions of the truss girders when the reinforcing bars are installed in the field, so that troubles occur when the reinforcing bars are laid. There was a problem.

다시 말하면, 종래의 프리캐스트 콘크리트 패널은 패널 본체의 상부로 일부가 드러나도록 횡방향으로 일정간격을 가지고 배치되어 종방향으로 길게 연장 설치되는 상기 트러스 거더를 포함한다.In other words, the conventional precast concrete panel includes the truss girder which is arranged at a certain interval in the lateral direction so as to expose a part of the upper part of the panel body and is extended in the longitudinal direction.

이러한 트러스 거더는 일정거리 이격되어 패널 본체 내부에 매립되는 횡방향 보강철근과 용접연결되는 한 쌍의 하단근과, 상기 하단근 상부에 삼각형상을 이루도록 배치되는 상단근과, 하단근과 상단근이 이루는 삼각형상의 각 빗변 부분에 상하 지그재그 형상으로 연장되도록 용접 연결되는 래티스바를 포함하여 구성된다.The truss girder has a pair of lower ends welded to a transverse rebar that is spaced a certain distance and embedded in the panel body, an upper end disposed in a triangular shape on the lower end, and a lower end, And a lattice bar welded to each of the hypotenuses on the triangle to extend in a zigzag shape upward and downward.

즉, 상기와 같은 트러스 거더를 포함하는 종래의 프리캐스트 콘크리트 패널은 전술한 트러스 거더에 대하여 현장에서의 철근 배근시 트러스 거더의 돌출된 사이에 끼움 작업을 통해 철근을 배근하여야하는 등 철근 배근시 장애가 발생하여 현장 철근 배근의 작업이 번거롭다는 문제가 있는 것이다.That is, in the conventional precast concrete panel including the truss girder described above, it is necessary to reinforce the truss girder by fitting the protrusions between the truss girders when the reinforcement is placed in the field, And there is a problem that the operation of the field reinforcement is cumbersome.

아울러, 상기와 같은 종래의 프리캐스트 콘크리트 패널은 전술한 바와 같은 현장 철근 배근 작업이 번거로우므로, 시공성이 현격히 떨어지고 공기가 지연되는 문제가 있었다.In addition, the conventional precast concrete panel as described above has a disadvantage that the workability is significantly reduced and air is delayed because the above-described field reinforcement work is cumbersome.

그러므로, 패널의 이동중에 균열을 방지할 수 있도록 하는 한편, 교량 슬래브의 시공에 적용시 패널 상부에 대한 현장 철근 배근 작업에 대한 작업성을 향상시켜 교량 슬래브에 대한 시공성을 현격히 향상시킬 수 있도록 한 프리캐스트 콘크리트 패널 및 그를 이용한 교량 슬래브 시공방법 등에 대한 연구 및 개발이 요구되는 실정이다.
Therefore, it is possible to prevent cracks during the movement of the panel, and to improve the workability on the field reinforcement work for the upper part of the panel when applied to the construction of the bridge slab, thereby improving the workability on the bridge slab remarkably. A cast concrete panel and a method of constructing a bridge slab using the same.

대한민국 등록특허 제1014570호 2011.02.08.등록.Registered Korean Patent No. 1014570 Registered on Feb. 08, 2011. 대한민국 공개특허 제2013-0111862호 2013.10.11.공개.Korean Laid-Open Patent No. 2013-0111862 issued October 31, 2013. 대한민국 등록특허 제1395129호 2014.05.08.등록.Registered in Korea Registered Patent No. 1395129 May 2014.

상기와 같은 문제점을 해결하기 위하여, 본 발명은 패널의 이동중에 균열을 방지하기 위하여 균열 발생의 주원인이 되는 이동완료시까지 보호하기 위한 임시보강재를 패널제작시에 결합하여 제작하며 이동완료 후 현장에서 간단히 임시보강재를 해체하도록 구성함으로써 패널의 균열원인을 해소하여 패널의 이동중 균열발생을 방지할 수 있도록 한 프리캐스트 콘크리트 패널, 그 제작방법을 제공하는 것을 목적으로 한다.In order to solve the above problems, in order to prevent cracks during the movement of the panel, temporary stiffeners for protecting the panel until the completion of movement, which is the main cause of cracks, are assembled at the time of panel manufacturing, The present invention provides a precast concrete panel and a method of manufacturing the precast concrete panel, wherein the temporary stiffener is disassembled to solve the cause of the cracks of the panel.

또한, 본 발명에 따른 기술의 다른 목적은 임시보강재의 분리시에 패널의 단면이 상부에 다수의 오목한 홈이 형성되도록 함으로써 교량 슬래브 시공에 적용시 수평전단력을 강화하여 패널 상부에 현장에서 타설되는 콘크리트와의 합성력을 극대화할 수 있도록 한 프리캐스트 콘크리트 패널, 그 제작방법을 제공하는 것에 있다.Another object of the present invention is to provide a method for reinforcing a horizontal slab when a temporary stiffener is separated by forming a plurality of concave grooves on the upper surface of the panel at the time of separating the temporary stiffener, And to provide a method of manufacturing the precast concrete panel.

그리고, 본 발명에 따른 기술의 또 다른 목적은 임시보강재의 분리 후에 임시보강재의 결합을 위한 결합부재를 결합하여 전단연결재로 사용하며, 이러한 전단연결재로 사용되는 결합부재 상부 및 패널의 상면에 현장에서의 철근 배근 작업을 진행함으로써 종래와 달리 교량 슬래브의 시공에 적용시 패널 상부에 대한 현장 철근 배근 작업에 대한 작업성을 향상시켜 교량 슬래브에 대한 시공성을 현격히 향상시킬 수 있도록 한 프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법을 제공하는 것에 있다.
It is a further object of the present invention to provide a method of manufacturing a reinforced concrete structure which is used as a shear connection member by joining a joining member for joining a temporary stiffener after separation of a temporary stiffener, A precast concrete panel which can improve the workability of the reinforced concrete slab by improving the workability of the reinforced concrete installation on the upper part of the panel when applied to the construction of the bridge slab, And a method of constructing a bridge slab using the precast concrete panel.

전술한 목적을 달성하기 위한 본 발명은 다음과 같다. 즉, 본 발명에 따른 프리캐스트 콘크리트 패널은 콘크리트의 타설을 통해 성형되는 패널 본체와, 상기 패널 본체의 하단으로부터 상향 일정거리 떨어져 배치되되, 종방향으로 일정간격을 가지고 다수 개로 배치되는 횡방향 보강철근과, 상기 횡방향 보강철근의 길이방향으로 일정간격을 가지고 직교하여 종방향으로 배치고정되는 종방향 보강철근을 포함하여 구성된 프리캐스트 콘크리트 패널에 있어서, 상기 패널본체는 횡방향으로 일정간격을 가지고 상면으로부터 하향 함몰되는 결합홈이 형성되는 한편, 상기 종방향 보강철근 중 복수 개의 종방향 보강철근 일 측에 밀착고정되는 고정철근과, 상기 고정철근의 상기 종방향 보강철근과 대향되는 일 측에 길이방향으로 일정간격을 가지고 다수 개로 고정되어 상면이 상기 결합홈 바닥면으로 노출되는 결합너트와, 상기 결합홈에 하단부분이 일정길이 밀착된 상태로 상부 일정길이만큼 상기 패널 본체의 상단으로부터 돌출되며, 선택적으로 상기 결합홈으로부터 분리되는 임시보강재 및 상기 임시보강재가 상기 결합홈에 밀착된 상태로 상기 임시보강재의 상, 하부에 형성된 관통공을 관통하여 하단이 상기 결합너트와 결합고정되며, 상기 임시보강재를 선택적으로 분리가 가능토록 하부 일정길이만큼 상기 결합홈에 삽입되어 밀착된 상태로 고정하는 결합부재를 더 포함하는 구성으로 이루어진다.The present invention for achieving the above-mentioned objects is as follows. That is, the precast concrete panel according to the present invention comprises a panel main body formed through the pouring of concrete, and a transverse reinforcing steel reinforcing member disposed at a certain distance upward from the lower end of the panel main body, And a longitudinal reinforcing bar longitudinally arranged and fixed at regular intervals in the longitudinal direction of the transverse reinforcing steel bars, wherein the panel main body has a predetermined width in the transverse direction, Wherein a longitudinal direction of the longitudinal reinforcing steel bars is defined by a longitudinal direction of the longitudinal reinforcing steel bars and a longitudinal direction of the longitudinal reinforcing steel bars, So that the upper surface is exposed to the bottom surface of the engaging groove And a temporary stiffener protruding from an upper end of the panel main body by an upper predetermined length in a state in which the lower end portion of the coupling groove is in constant contact with the coupling groove and being separated from the coupling groove, And a lower end of the through hole is inserted and fixed to the coupling nut by a predetermined constant length so that the temporary stiffener can be selectively separated from the coupling nut. And a fixing member for fixing the fixing member to the fixing member.

여기서, 상기 결합홈은 상기 임시보강재의 상향 분리가 가능할 수 있도록 상광하협의 형상을 가지고 함몰형성되는 한편, 상기 임시보강재는 상기 결합홈과 대응되어 상광하협의 사다리꼴 육면체 형상으로 제공되는 것이 바람직하다.Here, it is preferable that the coupling groove is recessed with an upper light-tight shape so as to enable upward separation of the temporary stiffener, and the temporary stiffener is provided in a shape of a trapezoidal hexahedron corresponding to the coupling groove so as to have an upper light-

또한, 상기 결합부재는 하단부분에 나선이 형성된 결합볼트로 제공되는 것이 양호하다.Further, it is preferable that the coupling member is provided as a coupling bolt having a spiral at a lower end portion thereof.

더욱이, 상기 패널 본체는 하면에 횡방향으로 일정간격을 가지고 상광하협의 사다리꼴 타입으로 보강리브가 더 돌출형성될 수 있다.Further, the panel main body may have a trapezoidal shape with a certain interval in the lateral direction on the lower surface thereof, and the reinforcing ribs may further protrude from the reinforcing ribs.

한편, 본 발명에 따른 프리캐스트 콘크리트 패널의 제작방법은 다수 개의 횡방향 보강철근 상부에 직교하여 일정간격을 가지고 다수의 종방향 보강철근이 격자형상을 가지도록 용접고정하는 격자형상 보강철근 준비단계; 임시보강재의 상, 하부에 길이방향으로 일정간격을 가지고 관통형성된 관통공을 통하여 상, 하부로부터 결합부재와 결합너트를 결합하며, 상기 임시보강재의 하면에 밀착된 결합너트 일 측에 이웃하는 결합너트가 상호 연결되도록 고정철근을 용접고정하는 임시보강재 조립체 준비단계; 상기 격자형상 보강철근 준비단계를 통해 준비된 격자형상 보강철근 중 복수의 상기 종방향 보강철근의 일 측에 대하여 대응되는 복수의 세트로 상기 임시보강재 조립체 준비단계를 거쳐 완성된 임시보강재 조립체의 고정철근이 밀착되도록 하여 용접고정하는 임시보강재 조립체 고정단계; 상기 임시보강재 조립체 고정단계를 거쳐 일체화된 격자형상 보강철근과 임시보강재 조립체를 상기 횡방향 보강철근의 하단이 하부를 향하도록 패널 제작용 성형 틀에 내에 안착시키되, 상기 횡방향 보강철근의 하단이 성형 틀의 바닥면으로부터 상향 일정거리 떨어지도록 다수의 스페이서를 개재하여 안착시키는 안착단계; 상기 패널 제작용 성형 틀 내에 콘크리트를 타설한 후 양생하며, 타설하여 양생되는 패널 본체에 대하여, 상기 임시보강재의 하단으로부터 상향 일정거리 떨어진 위치까지 매립되도록 하여 상기 임시보강재의 분리시 패널 본체 상면에 횡방향으로 일정간격을 가지고 결합홈이 형성되도록 콘크리트를 타설하여 양생하는 콘크리트 타설/양생단계; 및 상기 콘크리트 타설/양생단계를 통해 양생 완료된 후, 탈형하여 프리캐스트 콘크리트 패널의 제작을 완료하는 탈형단계를 포함한다.A method of manufacturing a precast concrete panel according to the present invention comprises the steps of: preparing a grid-shaped rebar in which a plurality of longitudinal reinforcing bars are welded and fixed so as to have a lattice shape at regular intervals and orthogonal to a plurality of transverse reinforcing bars; The coupling member and the coupling nut are coupled from above and below through the through holes formed at the upper and lower portions of the temporary stiffener at regular intervals in the longitudinal direction, and the coupling nut, which is in close contact with the lower surface of the coupling nut, A temporary stiffener assembly preparation step for welding and fixing the fixed steel bars so as to be interconnected; The reinforcing bars of the temporary stiffener assemblies prepared through the provision of the temporary stiffener assemblies with a plurality of sets corresponding to one side of the plurality of longitudinal reinforcing bars prepared through the grid- Fixing the temporary stiffener assembly to be welded and fixed; Wherein the transverse reinforcing bars are fixed in the forming mold for lowering the transverse reinforcing bars so that the lower ends of the transverse reinforcing bars are downwardly inserted through the temporary stiffener assembly fixing step, A plurality of spacers interposed between the bottom surface of the frame and the bottom surface of the frame; The panel main body is cured by pouring concrete after casting the concrete in the panel making mold. The panel main body is cured by being poured into the panel main body at a position spaced upwards a certain distance from the lower end of the temporary stiffener. Concrete pouring / curing step in which the concrete is cured by forming a coupling groove at a predetermined interval in the direction of the concrete; And a demolding step of demolding and completing the precast concrete panel after completion of curing through the concrete pouring / curing step.

이때, 상기 임시보강재 조립체 준비단계에서의, 상기 임시보강재는 선택적으로 상기 패널 본체로부터 상향 분리될 수 있도록, 상광하협의 사다리꼴 육면체 형상으로 제공되는 것이 바람직하다.At this time, the provisional stiffener in the temporary stiffener assembly preparation step may be provided in the form of a trapezoidal hexahedron having an upper light-tight narrowing so as to be selectively separated upward from the panel main body.

한편, 본 발명에 따른 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법은 프리캐스트 콘크리트 패널의 제작방법을 통해 제작된 프리캐스트 콘크리트 패널을 사용하되, 프리캐스트 콘크리트 패널을 다수의 단으로 적층한 상태로 교량 슬래브를 시공하기 위한 현장으로 운반한 후에, 교량 슬래브를 시공하기 위한 교각 상부의 거더 상에 횡방향으로 양측이 맞대어지도록 상기 프리캐스트 콘크리트 패널을 다수 개로 안착설치하는 패널 안착설치단계; 상기 패널 안착설치단계를 통해 거더 상에 안착설치된 상기 프리캐스트 콘크리트 패널로부터 임시보강재에 대하여 패널 본체를 기준으로 상향 분리하는 임시보강재 분리단계; 상기 임시보강재 분리단계를 통해 임시보강재가 분리된 후 패널 본체 상면에 횡방향으로 일정간격을 가지고 함몰된 결합홈 바닥면에 노출된 결합너트 상에 전단연결재의 하단이 결합되도록 하여 전단연결재를 조립하는 전단연결재 조립단계; 상기 프리캐스트 콘크리트 패널의 패널 본체 상면과 상기 전단연결재 상단부분에 각각 격자형상을 이루도록 슬래브용 철근을 현장 배근 조립하는 현장 배근 조립단계; 및 상기 현장 배근 조립단계를 거쳐 슬래브용 철근에 대한 배근 조립 완료된 상기 프리캐스트 콘크리트 패널의 상부에 슬래브용 현장 콘크리트를 타설/양생하는 현장 콘크리트 타설/양생단계를 포함하여 이루어진다.Meanwhile, the method of constructing a bridge slab using the precast concrete panel according to the present invention uses a precast concrete panel manufactured through a method of manufacturing a precast concrete panel, wherein a precast concrete panel is stacked at a plurality of stages, Installing a plurality of precast concrete panels so as to be horizontally opposed to each other on a girder at an upper part of a pier for constructing a bridge slab after carrying the slab to a site for constructing the slab; A temporary stiffener separating step of upwardly separating the temporary stiffener from the precast concrete panel mounted on the girder through the panel seating installation step with reference to the panel main body; After the temporary stiffener is separated through the temporary stiffener separation step, the lower end of the shear connection member is coupled to the coupling nut exposed on the bottom surface of the coupling groove recessed at a predetermined interval in the transverse direction on the upper surface of the panel main body, A step of assembling the shear connector; Assembling a reinforcing bar for a slab on a top surface of the panel main body of the precast concrete panel and a top end of the front end connecting member of the precast concrete panel in a lattice shape; And a site concrete casting / curing step of placing / curing the slabsite field concrete on the upper part of the precast concrete panel in which the reinforcement for the slab reinforcement is assembled through the field assembly step.

여기서, 상기 전단연결재 조립단계에 적용되는 전단연결재는 하단이 상기 결합너트와 결합되면서 상기 임시보강재가 상기 프리캐스트 콘크리트 패널의 패널 본체 상에 결합고정된 상태에서 상기 임시보강재를 분리한 후의 결합부재로 적용되는 것이 바람직하다.Here, the front end joint applied to the front end joint assembly may be a joining member after the temporary stiffener is separated in a state that the lower end of the shear joint member is engaged with the coupling nut and the temporary stiffener is fixedly coupled to the panel main body of the precast concrete panel. .

더욱이, 상기 전단연결재 조립단계에 적용되는 전단연결재 중 상기 프리캐스트 콘크리트 패널의 패널 본체에 대한 횡방향 최외측을 제외한 중앙 측에 조립되는 전단연결재는 상기 결합부재로 적용되는 한편, 상기 전단연결재 조립단계에 적용되는 전단연결재 중 상기 프리캐스트 콘크리트 패널의 패널 본체에 대한 횡방향 최외측에 조립되는 전단연결재는 'ㄱ'자 형상의 봉 타입으로 형성된 인터로킹용 전단연결재로 제공되는 것이 양호하다.In addition, the front end joint member to be assembled to the center side of the precast concrete panel excluding the transversely outermost side of the panel main body among the shear joint members applied to the shear joint assembly step is applied as the joint member, It is preferable that the front end connection member to be assembled to the outermost transverse direction with respect to the panel body of the precast concrete panel is provided as an interlocking shear connection member formed into a "

아울러, 상기 전단연결재로 적용되는 결합부재는 상단부분에 머리부를 가지며, 하단부분 일정길이에 대하여 나선이 형성된 결합볼트로 제공되는 한편, 상기 전단연결재로 적용되는 인터로킹용 전단연결재는 'ㄱ'자 형상의 상측 단부에 머리부를 가지며 하측 단부에 나선이 형성되는 것이 바람직하다.
In addition, the joining member used as the shear connection member is provided as a coupling bolt having a head at an upper portion and a spiral at a lower end portion of a predetermined length, and the interlocking shear connection member applied as the shear connection member is a ' It is preferable that the upper end of the shape has a head and the lower end has a spiral.

본 발명에 따른 프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법의 효과를 설명하면 다음과 같다.A precast concrete panel according to the present invention, a method of manufacturing the precast concrete panel, and a method of constructing a bridge slab using the precast concrete panel will now be described.

첫째, 패널의 이동중에 균열을 방지하기 위하여 균열 발생의 주원인이 되는 이동완료시까지 보호하기 위한 임시보강재를 패널제작시에 결합하여 제작하며 이동완료 후 현장에서 간단히 임시보강재를 해체하도록 구성함으로써 패널의 균열원인을 해소하여 패널의 이동중 균열발생을 방지할 수 있다.First, in order to prevent cracks during the movement of the panel, a temporary stiffener for protection of the movement until the completion of the movement, which is the main cause of the crack, is assembled at the time of panel manufacturing and the temporary stiffener is easily disassembled at the site after the completion of the movement. It is possible to prevent the occurrence of cracks during the movement of the panel.

둘째, 임시보강재의 분리시에 패널의 단면이 상부에 다수의 오목한 홈이 형성되도록 함으로써 교량 슬래브 시공에 적용시 수평전단력을 강화하여 패널 상부에 현장에서 타설되는 콘크리트와의 합성력을 극대화할 수 있다.Second, when the temporary stiffener is separated, a plurality of concave grooves are formed on the upper part of the panel, thereby enhancing the horizontal shear force applied to the slab construction of the bridge, thereby maximizing the composite force with the concrete placed on the site above the panel.

셋째, 임시보강재의 분리 후에 임시보강재의 결합을 위한 결합부재를 결합하여 전단연결재로 사용하며, 이러한 전단연결재로 사용되는 결합부재 상부 및 패널의 상면에 현장에서의 철근 배근 작업을 진행함으로써 종래와 달리 교량 슬래브의 시공에 적용시 패널 상부에 대한 현장 철근 배근 작업에 대한 작업성을 향상시켜 교량 슬래브에 대한 시공성을 현격히 향상시킬 수 있다.
Third, after separating the temporary stiffener, the joining members for joining the temporary stiffeners are combined to be used as the shear connection members. In this case, reinforcement work is performed on the upper surface of the joining member and the upper surface of the panel, When applied to the construction of the bridge slab, the workability for the field reinforcement work on the upper part of the panel is improved, so that the workability for the bridge slab can be remarkably improved.

도 1은 본 발명에 따른 프리캐스트 콘크리트 패널을 나타낸 것으로, 임시보강재의 결합구조를 나타낸 일부 분리 사시구성도.
도 2는 본 발명에 따른 프리캐스트 콘크리트 패널을 나타낸 사시구성도.
도 3은 본 발명에 따른 프리캐스트 콘크리트 패널을 나타낸 단면구성도.
도 4는 본 발명에 따른 프리캐스트 콘크리트 패널의 다른 실시예를 나타낸 저면 사시구성도.
도 5는 본 발명에 따른 프리캐스트 콘크리트 패널의 제작방법을 나타낸 블록도.
도 6은 본 발명에 따른 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법을 나타낸 블록도.
도 7 및 8은 본 발명에 따른 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법에서, 프리캐스트 콘크리트 패널의 상호 맞대어지는 이음부에 대한 시공구조를 나타낸 요부 단면 및 요부 사시구성도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a pre-cast concrete panel according to the present invention. FIG.
2 is a perspective view showing a precast concrete panel according to the present invention.
3 is a cross-sectional view of a precast concrete panel according to the present invention.
4 is a bottom perspective view illustrating another embodiment of the precast concrete panel according to the present invention.
5 is a block diagram illustrating a method of manufacturing a precast concrete panel according to the present invention.
6 is a block diagram showing a method of constructing a bridge slab using a precast concrete panel according to the present invention.
FIGS. 7 and 8 are a cross-sectional view and a configuration view showing a construction of a joint structure for a joint portion of a precast concrete panel in a bridge slab construction method using the precast concrete panel according to the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 따른 프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법의 바람직한 실시예를 상세히 설명한다.Hereinafter, a precast concrete panel according to the present invention, a method of manufacturing the same, and a method of constructing a bridge slab using the precast concrete panel will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 프리캐스트 콘크리트 패널을 나타낸 것으로, 임시보강재의 결합구조를 나타낸 일부 분리 사시구성도이고, 도 2는 본 발명에 따른 프리캐스트 콘크리트 패널을 나타낸 사시구성도이며, 도 3은 본 발명에 따른 프리캐스트 콘크리트 패널을 나타낸 단면구성도이다.2 is a perspective view of a precast concrete panel according to an embodiment of the present invention. FIG. 3 is a perspective view of a precast concrete panel according to the present invention. FIG. 1 is a cross-sectional view of a precast concrete panel according to the present invention.

도 1 내지 3에서 보는 바와 같이, 본 발명의 바람직한 실시예에 따른 프리캐스트 콘크리트 패널(100)은 콘크리트의 타설을 통해 성형되는 패널 본체(110)와, 상기 패널 본체(110)의 하단으로부터 상향 일정거리 떨어져 배치되되, 종방향으로 일정간격을 가지고 다수 개로 배치되는 횡방향 보강철근(120)과, 상기 횡방향 보강철근(120)의 길이방향으로 일정간격을 가지고 직교하여 종방향으로 배치고정되는 종방향 보강철근(130)을 포함하여 구성된다.1 to 3, the precast concrete panel 100 according to the preferred embodiment of the present invention includes a panel main body 110 formed through the pouring of concrete, A transverse reinforcing bar 120 disposed at a predetermined distance from the longitudinal direction of the transverse reinforcing bar 120 and spaced apart from the transverse reinforcing bar 120 by a predetermined distance in the longitudinal direction, And a direction reinforcing bar (130).

상기와 같은 프리캐스트 콘크리트 패널(100)에서, 특히 상기 패널본체(110)는 횡방향으로 일정간격을 가지고 상면으로부터 하향 함몰되는 결합홈(111)이 형성되며, 고정철근(150)과, 결합너트(160)와, 임시보강재(170) 및 결합부재(180)를 더 포함한다.In the precast concrete panel 100 as described above, the panel body 110 is formed with an engaging groove 111 that is downwardly recessed from the upper surface at a predetermined interval in the transverse direction, and includes a fixed reinforcing bar 150, (160), a temporary stiffener (170), and a coupling member (180).

여기서, 상기 고정철근(150)은 상기 종방향 보강철근(130) 중 복수 개의 종방향 보강철근(130) 일 측에 밀착고정되는 것이 바람직하다.Here, it is preferable that the fixed reinforcing bars 150 are closely fixed to one side of the plurality of longitudinal reinforcing bars 130 of the longitudinal reinforcing bars 130.

또한, 상기 결합너트(160)는 상기 고정철근(150)의 상기 종방향 보강철근(130)과 대향되는 일 측에 길이방향으로 일정간격을 가지고 다수 개로 고정되어 상면이 상기 결합홈(111) 바닥면으로 노출되는 것이 바람직하다.The coupling nut 160 is fixed to the one side of the fixed reinforcing bar 150 facing the longitudinal reinforcing steel bars 130 at a predetermined interval in the longitudinal direction, It is preferable that the surface is exposed.

그리고 상기 임시보강재(170)는 상기 결합홈(111)에 하단부분이 일정길이 밀착된 상태로 상부 일정길이만큼 상기 패널 본체(110)의 상단으로부터 돌출되며, 선택적으로 상기 결합홈(111)으로부터 분리되는 것이 바람직한 것이다.The temporary stiffener 170 protrudes from the upper end of the panel main body 110 by an upper predetermined length in a state where the lower end portion of the temporary stiffener 170 is adhered to the coupling groove 111 by a predetermined length, .

또한, 상기 결합부재(180)는 상기 임시보강재(170)가 상기 결합홈(111)에 밀착된 상태로 상기 임시보강재(170)의 상, 하부에 형성된 관통공(171)을 관통하여 하단이 상기 결합너트(160)와 결합고정되며, 상기 임시보강재(170)를 선택적으로 분리가 가능토록 하부 일정길이만큼 상기 결합홈(111)에 삽입되어 밀착된 상태로 고정하는 것이다.The joining member 180 passes through the through holes 171 formed in the upper and lower portions of the temporary stiffener 170 while the temporary stiffener 170 is in close contact with the coupling groove 111, And is inserted and fixed to the coupling groove 111 by a predetermined constant length so that the temporary stiffener 170 can be selectively separated from the coupling nut 160.

전술한 바와 같은 구성으로 이루어진 본 발명에 따른 프리캐스트 콘크리트 패널(100)에서, 특히 상기 패널 본체(110)의 결합홈(111)은 상기 임시보강재(170)의 상향 분리가 가능할 수 있도록 상광하협의 형상을 가지고 함몰형성되는 것이 바람직하다.In the pre-cast concrete panel 100 according to the present invention having the above-described structure, the coupling grooves 111 of the panel body 110 are vertically spaced from each other so that the temporary stiffener 170 can be separated upward. It is preferable to be recessed with a shape.

아울러, 상기 임시보강재(170)는 상기 결합홈(111)과 대응되어 상광하협의 사다리꼴 육면체 형상으로 제공되는 것이 바람직한 것이다.Preferably, the temporary stiffener 170 is provided in a trapezoidal hexahedron shape corresponding to the coupling groove 111 so as to have an upper light-tight narrowing.

즉, 상기 결합홈(111)과 임시보강재(170)가 상광하협의 형상으로 형성됨으로써 후술될 프리캐스트 콘크리트 패널의 제작방법에 의해 제작되어, 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법에서 시공시 상기 임시보강재(170)를 패널 본체(110)의 결합홈(111)으로부터 분리가 용이하게 이루어질 수 있게 되는 것이다.That is, the joining groove 111 and the temporary stiffener 170 are formed in a shape of an upper light-tight narrow shape to be manufactured by a method of manufacturing a precast concrete panel to be described later. In the method of constructing a bridge slab using the precast concrete panel, The temporary stiffener 170 can be easily detached from the coupling groove 111 of the panel main body 110.

한편, 전술한 바와 같은 구성으로 이루어진 본 발명에 따른 프리캐스트 콘크리트 패널(100)에서의 결합부재(180)는 하단부분에 나선이 형성된 결합볼트로 제공되는 것이 바람직하다.Meanwhile, it is preferable that the coupling member 180 of the precast concrete panel 100 according to the present invention having the above-described structure is provided with a coupling bolt having a spiral at the lower end portion thereof.

다시 말하면, 상기 결합부재(180)가 결합볼트로 제공됨으로서 상기 임시보강재(170)의 관통공(171)을 관통하여 하단이 상기 결합너트(160)와 결합되면서, 상기 임시보강재(170)에 대한 상기 패널 본체(110)의 결합홈(111) 상에 밀착된 상태로 고정이 이루어질 수 있게 된다.In other words, since the coupling member 180 is provided as an engagement bolt, the lower end of the coupling member 180 is coupled to the coupling nut 160 through the through hole 171 of the temporary stiffener 170, So that it can be fixed in a state of being in close contact with the coupling groove 111 of the panel body 110.

이를 통하여, 전술한 바와 같은 본 발명에 따른 프리캐스트 콘크리트 패널(100)의 다수의 단으로 적층하여 이동하는 이동중에 상기 임시보강재(170)를 통해 다수의 단으로 적층되는 하단부분에 배치된 패널에 대하여서도 균열 발생을 안정적으로 방지할 수 있게 되는 것이다.Through the above process, it is possible to provide a precast concrete panel 100 according to the present invention in which a plurality of stages are stacked, and a plurality of stages are stacked by the provisional stiffener 170, It is possible to stably prevent cracks from occurring.

도 4는 본 발명에 따른 프리캐스트 콘크리트 패널의 다른 실시예를 나타낸 저면 사시구성도이다.4 is a bottom perspective view illustrating another embodiment of the precast concrete panel according to the present invention.

도 4에서 보는 바와 같은 실시예는 도 1 내지 3을 참조하여 설명한 실시예와는 패널 본체(110)의 하면에 횡방향으로 일정간격을 가지고 다수의 보강리브(115)가 더 돌출형성되는 점에서만 차이를 가지므로, 이하 동일부호를 갖는 구성에 대한 상세한 설명은 생략하기로 한다.The embodiment shown in FIG. 4 is different from the embodiment described with reference to FIGS. 1 to 3 in that a plurality of reinforcing ribs 115 are further protruded from the lower surface of the panel body 110 at regular intervals in the horizontal direction The detailed description of the components having the same reference numerals will be omitted below.

도 4에서 보는 바와 같은 본 발명의 다른 실시예에 따른 프리캐스트 콘크리트 패널(100)은 특히, 패널 본체(110)의 하면에 횡방향으로 일정간격을 가지고 상광하협의 사다리꼴 타입으로 보강리브(115)가 더 돌출형성되는 것이 바람직한 것이다.The precast concrete panel 100 according to another embodiment of the present invention as shown in FIG. 4 has a trapezoidal shape with a predetermined interval in the lateral direction on the lower surface of the panel body 110, It is preferable to further protrude.

즉, 상기와 같은 프리캐스트 콘크리트 패널(100)에 의하면 패널 본체(110)의 하면에 다수의 보강리브(115)가 더 돌출형성됨으로써 프리캐스트 콘크리트 패널(100)에 대한 강성을 더욱 강화할 수 있게 되는 것이다.That is, according to the precast concrete panel 100 as described above, a plurality of reinforcing ribs 115 are further protruded on the lower surface of the panel body 110, so that the rigidity of the precast concrete panel 100 can be further enhanced will be.

한편, 본 발명에 따른 프리캐스트 콘크리트 패널의 제작방법은 도 5를 참조하되, 도 1 내지 3을 함께 참조하면 크게 격자형상 보강철근 준비단계(S110), 임시보강재 조립체 준비단계(S120), 임시보강재 조립체 고정단계(S130), 안착단계(S140), 콘크리트 타설/양생단계(S150) 및 탈형단계(S160)를 포함한다.Referring to FIG. 5, a method of manufacturing a precast concrete panel according to the present invention will be described with reference to FIGS. 1 to 3. Referring to FIGS. 1 to 3, An assembly fixing step S130, a seating step S140, a concrete casting / curing step S150, and a demolding step S160.

구체적으로, 상기 격자형상 보강철근 준비단계(S110)는 다수 개의 횡방향 보강철근(120) 상부에 직교하여 일정간격을 가지고 다수의 종방향 보강철근(130)이 격자형상을 가지도록 용접고정하는 과정으로 이루어진다.Specifically, the lattice-shaped rebar preparation step S110 includes a step of welding and fixing a plurality of longitudinal reinforcing bars 130 having a grid shape at regular intervals and orthogonal to a plurality of lateral reinforcing bars 120 Lt; / RTI >

또한, 상기 임시보강재 조립체 준비단계(S120)는 임시보강재(170)의 상, 하부에 길이방향으로 일정간격을 가지고 관통형성된 관통공(171)을 통하여 상, 하부로부터 결합부재(180)와 결합너트(160)를 결합하며, 상기 임시보강재(170)의 하면에 밀착된 결합너트(160) 일 측에 이웃하는 결합너트(160)가 상호 연결되도록 고정철근(150)을 용접고정하는 과정으로 이루어진다.In addition, the temporary stiffener assembly preparation step (S120) may include a step of joining the coupling member 180 and the coupling nut 180 from the upper and lower portions of the temporary stiffener 170 through the through holes 171 formed at the upper and lower portions of the temporary stiffener 170, And fixing the reinforcing bar 150 to the coupling nut 160 which is in close contact with the lower surface of the temporary stiffener 170 so that the coupling nuts 160 adjacent to one side of the coupling nut 160 are mutually connected.

그리고 상기 임시보강재 조립체 고정단계(S130)는 상기 격자형상 보강철근 준비단계(S110)를 통해 준비된 격자형상 보강철근 중 복수의 상기 종방향 보강철근(130)의 일 측에 대하여 대응되는 복수의 세트로 상기 임시보강재 조립체 준비단계(S120)를 거쳐 완성된 임시보강재 조립체의 고정철근(150)이 밀착되도록 하여 용접고정하는 과정으로 이루어진다.The temporary stiffener assembly fixing step S130 may include a plurality of sets corresponding to one side of the plurality of longitudinal reinforcing bars 130 among the grid-shaped reinforcing bars prepared through the lattice-shaped rebar preparing step S110 And a step of preparing the temporary stiffener assembly (S120) and welding and fixing the finished reinforcing bars 150 of the temporary stiffener assembly so that they are in close contact with each other.

또한, 상기 안착단계(S140)는 상기 임시보강재 조립체 고정단계(S130)를 거쳐 일체화된 격자형상 보강철근과 임시보강재 조립체를 상기 횡방향 보강철근(120)의 하단이 하부를 향하도록 패널 제작용 성형 틀에 내에 안착시키되, 상기 횡방향 보강철근(120)의 하단이 성형 틀의 바닥면으로부터 상향 일정거리 떨어지도록 다수의 스페이서(미도시)를 개재하여 안착시키는 과정으로 이루어진다.In the seating step S140, the grid-shaped reinforcing bars and the temporary stiffener assembly, which are integrated through the temporary stiffener assembly fixing step (S130), are inserted into the panel-forming molding process so that the lower ends of the transverse- (Not shown) so that the lower end of the transverse reinforcing steel bar 120 is spaced upward a certain distance from the bottom surface of the forming mold.

그리고 상기 콘크리트 타설/양생단계(S150)는 상기 패널 제작용 성형 틀 내에 콘크리트를 타설한 후 양생하며, 타설하여 양생되는 패널 본체(110)에 대하여, 상기 임시보강재(170)의 하단으로부터 상향 일정거리 떨어진 위치까지 매립되도록 하여 상기 임시보강재(170)의 분리시 패널 본체(110) 상면에 횡방향으로 일정간격을 가지고 결합홈(111)이 형성되도록 콘크리트를 타설하여 양생하는 과정으로 이루어진다.The concrete pouring / curing step S150 is a step of pouring the concrete into the panel forming mold for curing, curing and pouring the panel main body 110, And curing the concrete by pouring the concrete so that the coupling grooves 111 are formed at a predetermined interval in the horizontal direction on the upper surface of the panel body 110 when the temporary stiffener 170 is separated.

또한, 본 발명에 따른 프리캐스트 콘크리트 패널의 제작방법의 마지막 단계로서의 상기 탈형단계(S160)는 상기 콘크리트 타설/양생단계(S150)를 통해 양생 완료된 후, 탈형하여 프리캐스트 콘크리트 패널(100)의 제작을 완료하는 과정으로 이루어진다.The demolding step (S160) as a final step of the method of manufacturing a precast concrete panel according to the present invention is performed after the curing is completed through the concrete pouring / curing step (S150), followed by demolding to produce a precast concrete panel .

전술한 바와 같은 과정들로 이루어진 본 발명에 따른 프리캐스트 콘크리트 패널의 제작방법에서, 특히 상기 임시보강재 조립체 준비단계(S120)에서의, 상기 임시보강재(170)는 선택적으로 상기 패널 본체(110)로부터 상향 분리될 수 있도록 하는 것이 중요하다.In the method of manufacturing a precast concrete panel according to the present invention, the temporary stiffener 170 may be selectively removed from the panel body 110 in the step of preparing the temporary stiffener assembly (S120) It is important to be able to separate upward.

이를 위하여, 상기 임시보강재 조립체 준비단계(S120)에서의, 상기 임시보강재(170)는 상광하협의 사다리꼴 육면체 형상으로 제공되는 것이 바람직한 것이다.For this, the temporary stiffener 170 in the temporary stiffener assembly preparing step (S120) is preferably provided in the shape of a trapezoidal hexahedron having a vertical light-tight narrowing.

아울러, 프리캐스트 콘크리트 패널의 제작방법에 의해 제작된 프리캐스트 콘크리트 패널(100)에서, 상기 임시보강재(170)는 패널 본체(110)의 결합홈(111) 상에 하단 일정길이만큼 매립된 상태이므로, 선택적으로 분리가 용이하도록 제작시 상기 임시보강재 조립체 준비단계(S120)에서 상기 임시보강재(170)의 상기 결합홈(111)과 밀착되는 면 상에 이형제를 추가로 발라주는 것이 더욱 바람직한 것이다.In addition, in the precast concrete panel 100 manufactured by the method of manufacturing a precast concrete panel, the temporary stiffener 170 is embedded in the coupling groove 111 of the panel body 110 by a predetermined length at the lower end , It is more preferable to further apply a releasing agent on the surface of the temporary stiffener 170 which is in close contact with the engaging groove 111 in the temporary stiffener assembly preparation step S120 during manufacture so as to facilitate easy separation.

한편, 도 6 내지 7에서 보는 바와 같은 프리캐스트 콘크리트 패널의 제작방법에 의해 제작된 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법은 도 1 내지 3과 도 5를 참조하여 앞서 설명한 바와 같은 프리캐스트 콘크리트 패널의 제작방법을 통해 제작된 프리캐스트 콘크리트 패널(100)을 사용하여 교량 슬래브를 시공하는 것으로서, 크게 패널 안착설치단계(S210), 임시보강재 분리단계(S220), 전단연결재 조립단계(S230), 현장 배근 조립단계(S240) 및 현장 콘크리트 타설/양생단계(S250)를 포함한다.6 to 7, a method of constructing a bridge slab using a precast concrete panel manufactured by the method of manufacturing a precast concrete panel is shown in FIGS. 1 to 3 and 5, The panel slab is constructed using the precast concrete panel 100 manufactured by the method of manufacturing the bridge slab 100. The panel slab is largely divided into a panel seating installation step S210, a temporary stiffener separation step S220, a shear connector assembly step S230, An assembly step S240 and an on-site concrete pouring / curing step S250.

여기서, 상기 패널 안착설치단계(S210)는 프리캐스트 콘크리트 패널(100)을 다수의 단으로 적층한 상태로 교량 슬래브를 시공하기 위한 현장으로 운반한 후에, 교량 슬래브를 시공하기 위한 교각 상부의 거더 상에 횡방향으로 양측이 맞대어지도록 상기 프리캐스트 콘크리트 패널(100)을 다수 개로 안착설치하는 과정으로 이루어진다.The panel seating installation step S210 is a step of placing the precast concrete panel 100 in a plurality of stages and transporting the bridge slab to a site for constructing the girder slab, A plurality of precast concrete panels 100 are installed so that both sides of the precast concrete panels 100 are opposed to each other in a lateral direction.

또한, 상기 임시보강재 분리단계(S220)는 상기 패널 안착설치단계(S210)를 통해 거더 상에 안착설치된 상기 프리캐스트 콘크리트 패널(100)로부터 임시보강재(170)에 대하여 패널 본체(110)를 기준으로 상향 분리하는 과정으로 이루어진다.In addition, the temporary stiffener separation step S220 may be performed on the temporary stiffener 170 from the precast concrete panel 100 placed on the girder through the panel seating installation step S210 with respect to the panel main body 110 Upwards.

그리고 상기 전단연결재 조립단계(S230)는 상기 임시보강재 분리단계(S220)를 통해 임시보강재(170)가 분리된 후 패널 본체(110) 상면에 횡방향으로 일정간격을 가지고 함몰된 결합홈(111) 바닥면에 노출된 결합너트(160) 상에 전단연결재의 하단이 결합되도록 하여 전단연결재를 조립하는 과정으로 이루어진다.In the step of assembling the front end connection member S230, the temporary stiffener 170 is separated from the temporary stiffener separation step S220, and then the upper surface of the panel main body 110 is coupled with the coupling recess 111, And a lower end of the shear connection member is coupled to the joint nut 160 exposed on the bottom surface to assemble the shear connection member.

또한, 상기 현장 배근 조립단계(S240)는 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110) 상면과 상기 전단연결재 상단부분에 각각 격자형상을 이루도록 슬래브용 철근을 현장 배근 조립하는 과정으로 이루어진다.In addition, the field assembly step S240 includes assembling the reinforcing bars for the slabs on the upper surface of the panel body 110 of the precast concrete panel 100 and the upper end of the shear connection member, respectively.

그리고 상기 현장 콘크리트 타설/양생단계(S250)는 상기 현장 배근 조립단계(S240)를 거쳐 슬래브용 철근에 대한 배근 조립 완료된 상기 프리캐스트 콘크리트 패널(100)의 상부에 슬래브용 현장 콘크리트를 타설/양생하는 과정으로 이루어진다.Then, the on-site concrete pouring / curing step S250 is performed by placing / curing the slabsite concrete on the upper part of the precast concrete panel 100 in which the reinforcement for the slab reinforcing bars has been assembled through the field assembly step S240 Process.

전술한 바와 같은 과정들로 이루어진 본 발명에 따른 프리캐스트 콘크리트 패널의 제작방법에 의해 제작된 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법에서, 특히 상기 전단연결재 조립단계(S230)에 적용되는 전단연결재는 하단이 상기 결합너트(160)와 결합되면서 상기 임시보강재(170)가 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110) 상에 결합고정된 상태에서 상기 임시보강재(170)를 분리한 후의 결합부재(180)로 적용되는 것이 바람직한 것이다.In the method of constructing a bridge slab using the precast concrete panel manufactured by the method of manufacturing a precast concrete panel according to the present invention having the above-described processes, in particular, the shear connection material applied to the shear joint assembly step S230 The provisional stiffener 170 is coupled with the coupling nut 160 and the temporary stiffener 170 is coupled to the panel body 110 of the precast concrete panel 100, Member 180 as shown in FIG.

물론, 상기 전단연결재 조립단계(S230)에 적용되는 전단연결재 중 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110)에 대한 횡방향 최외측을 제외한 중앙 측에 조립되는 전단연결재는 상기 결합부재(180)로 적용될 수 있다.Of course, the front end joint member to be assembled to the center side of the precast concrete panel 100 excluding the outermost transverse direction with respect to the panel body 110 among the shear connection members applied in the shear connection member assembling step S230, 180).

이러한 경우에는 상기 전단연결재 조립단계(S230)에 적용되는 전단연결재 중 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110)에 대한 횡방향 최외측에 조립되는 전단연결재는 'ㄱ'자 형상의 봉 타입으로 형성된 인터로킹용 전단연결재(180a)로 제공되는 것이 바람직한 것이다.In this case, the shear connection material to be assembled outermost in the transverse direction with respect to the panel body 110 of the precast concrete panel 100 among the shear connection materials applied to the shear connection material assembling step (S230) Type interlocking shear connection member 180a formed in the shape of an interlocking member.

또한, 전술한 바와 같은 상기 전단연결재로 적용되는 결합부재(180)는 상단부분에 머리부를 가지며, 하단부분 일정길이에 대하여 나선이 형성된 결합볼트로 제공되는 것이 바람직하다.Further, it is preferable that the coupling member 180, which is applied to the shear connection member as described above, is provided with a coupling bolt having a head portion at an upper end portion and a spiral formed at a lower end portion of a predetermined length.

더욱이, 상기 전단연결재로 적용되는 인터로킹용 전단연결재(180a)는 'ㄱ'자 형상의 상측 단부에 머리부를 가지며 하측 단부에 나선이 형성되는 것이 더욱 바람직한 것이다.Further, it is more preferable that the interlocking shear connector 180a used as the shear connector has a head at the upper end of the 'A' shape and a spiral at the lower end.

상기와 같은 인터로킹용 전단연결재(180a)를 적용하는 이유는 상호 횡방향으로 이웃하는 프리캐스트 콘크리트 패널(100)에서의 패널 본체(110)에 대한 횡방향 측부에 형성된 경사면 상에 대하여 취약구조에 따라 반사균열이 발생하는 것을 방지할 수 있도록 강화하기 위함인 것이다.The reason for applying the above interlocking shear connection member 180a is that the shear connection member 180a is formed on the inclined surface formed on the transverse side portion of the precast concrete panel 100 adjacent to the panel body 110 in the mutually transverse direction So that reflection cracks can be prevented from occurring.

아울러, 전술한 바와 같은 전단연결재 조립단계(S230)에 적용되는 전단연결재는 상기 결합부재(180) 및 인터로킹용 전단연결재(180a) 이외에도, 현장여건을 고려하여 예컨대 패널 본체(110)로부터 상향 돌출되는 길이가 달라지도록 길이가 다른 결합볼트나 스터드 볼트 타입의 전단연결재 등으로 다양하게 적용할 수도 있는 것이다.In addition to the above-described joint member 180 and the interlocking shear connection member 180a, the shear connection member applied to the shear connection assembly step S230 as described above may be formed by, for example, projecting upward from the panel body 110 A stud bolt type shear connector having different lengths may be used in various ways so that the length of the shear joint may vary.

전술한 바와 같은 본 발명에 따른 프리캐스트 콘크리트 패널, 그 제작방법 및 그 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법에 의하면, 패널의 이동중에 균열을 방지하기 위하여 균열 발생의 주원인이 되는 이동완료시까지 보호하기 위한 임시보강재를 패널제작시에 결합하여 제작하며 이동완료 후 현장에서 간단히 임시보강재를 해체하도록 구성함으로써 패널의 균열원인을 해소하여 패널의 이동중 균열발생을 방지할 수 있다.According to the precast concrete panel according to the present invention as described above, the method for manufacturing the same, and the method for constructing a bridge slab using the precast concrete panel, in order to prevent cracking during the movement of the panel, And the temporary stiffener is simply disassembled at the site after the completion of the movement, thereby eliminating the cause of the crack in the panel, thereby preventing the occurrence of cracks during the movement of the panel.

또한, 임시보강재의 분리시에 패널의 단면이 상부에 다수의 오목한 홈이 형성되도록 함으로써 교량 슬래브 시공에 적용시 수평전단력을 강화하여 패널 상부에 현장에서 타설되는 콘크리트와의 합성력을 극대화할 수 있다.In addition, when the temporary stiffener is separated, a plurality of concave grooves are formed in the upper part of the cross section of the panel, thereby enhancing the horizontal shear force when applied to the bridge slab construction, thereby maximizing the composite force with the concrete placed on the site.

더욱이, 임시보강재의 분리 후에 임시보강재의 결합을 위한 결합부재를 결합하여 전단연결재로 사용하며, 이러한 전단연결재로 사용되는 결합부재 상부 및 패널의 상면에 현장에서의 철근 배근 작업을 진행함으로써 종래와 달리 교량 슬래브의 시공에 적용시 패널 상부에 대한 현장 철근 배근 작업에 대한 작업성을 향상시켜 교량 슬래브에 대한 시공성을 현격히 향상시킬 수 있는 것이다.Further, after the temporary stiffener is separated, a joining member for joining the temporary stiffener is combined to be used as a shear connection member. In this case, reinforcing bars are placed on the upper surface of the joining member and the upper surface of the panel, When applied to the construction of a bridge slab, it is possible to improve the workability for the installation work of the field reinforcement on the upper part of the panel, thereby remarkably improving the workability of the bridge slab.

이상에서 본 발명의 구체적인 실시예를 상세히 설명하였으나, 본 발명은 이에 한정되는 것은 아니며, 본 발명은 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 다양한 변형의 실시가 가능하며, 이러한 변형은 본 발명의 범위에 포함된다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, the invention is not limited thereto. Various modifications may be made by those skilled in the art. Are included in the scope of the present invention.

100: 프리캐스트 콘크리트 패널
110: 패널 본체 111: 결합홈
115: 보강리브 120: 횡방향 보강철근
130: 종방향 보강철근 150: 고정철근
160: 결합너트 170: 임시보강재
171: 관통공 180: 결합부재
180a: 인터로킹 전단연결재
100: precast concrete panel
110: panel main body 111: engaging groove
115: reinforcing rib 120: transverse rebar
130: longitudinal rebar 150: fixed rebar
160: coupling nut 170: temporary stiffener
171: Through hole 180: Coupling member
180a: Interlocking shear connector

Claims (10)

콘크리트의 타설을 통해 성형되는 패널 본체(110)와, 상기 패널 본체(110)의 하단으로부터 상향 일정거리 떨어져 배치되되, 종방향으로 일정간격을 가지고 다수 개로 배치되는 횡방향 보강철근(120)과, 상기 횡방향 보강철근(120)의 길이방향으로 일정간격을 가지고 직교하여 종방향으로 배치고정되는 종방향 보강철근(130)을 포함하여 구성된 프리캐스트 콘크리트 패널(100)에 있어서,
상기 패널본체(110)는 횡방향으로 일정간격을 가지고 상면으로부터 하향 함몰되는 결합홈(111)이 형성되는 한편,
상기 종방향 보강철근(130) 중 복수 개의 종방향 보강철근(130) 일 측에 밀착고정되는 고정철근(150)과,
상기 고정철근(150)의 상기 종방향 보강철근(130)과 대향되는 일 측에 길이방향으로 일정간격을 가지고 다수 개로 고정되어 상면이 상기 결합홈(111) 바닥면으로 노출되는 결합너트(160)와,
상기 결합홈(111)에 하단부분이 일정길이 밀착된 상태로 상부 일정길이만큼 상기 패널 본체(110)의 상단으로부터 돌출되며, 선택적으로 상기 결합홈(111)으로부터 분리되는 임시보강재(170) 및
상기 임시보강재(170)가 상기 결합홈(111)에 밀착된 상태로 상기 임시보강재(170)의 상, 하부에 형성된 관통공(171)을 관통하여 하단이 상기 결합너트(160)와 결합고정되며, 상기 임시보강재(170)를 선택적으로 분리가 가능토록 하부 일정길이만큼 상기 결합홈(111)에 삽입되어 밀착된 상태로 고정하는 결합부재(180)를 더 포함하는 것을 특징으로 하는 프리캐스트 콘크리트 패널.
A transverse rebar 120 disposed at a certain distance upward from the lower end of the panel body 110 and disposed at a plurality of positions at regular intervals in the longitudinal direction, And a longitudinal reinforcing bar (130) vertically arranged and fixed at regular intervals in the longitudinal direction of the transverse reinforcing bar (120). The precast concrete panel (100)
The panel body 110 is formed with a coupling groove 111 which is spaced downward in the horizontal direction and is downwardly recessed from the upper surface,
A fixed reinforcing bar 150 tightly fixed to one side of the plurality of longitudinal reinforcing bars 130 among the longitudinal reinforcing bars 130,
A coupling nut 160 whose upper surface is exposed at the bottom surface of the coupling groove 111 is fixed to a side of the fixed reinforcing bar 150 opposite to the longitudinal reinforcing steel bar 130 at a predetermined interval in the longitudinal direction, Wow,
A temporary stiffener 170 protruding from the upper end of the panel main body 110 by an upper predetermined length and separated from the coupling groove 111 selectively in a state in which the lower end portion of the coupling groove 111 is in constant contact with a predetermined length,
The lower end of the temporary stiffener 170 passes through the through holes 171 formed in the upper and lower portions of the temporary stiffener 170 in a state in which the temporary stiffener 170 is in close contact with the coupling groove 111, , And a joining member (180) for inserting the temporary stiffener (170) into the coupling groove (111) by a predetermined constant length so as to selectively separate the temporary stiffener (170) .
제1항에 있어서,
상기 결합홈(111)은 상기 임시보강재(170)의 상향 분리가 가능할 수 있도록 상광하협의 형상을 가지고 함몰형성되는 한편,
상기 임시보강재(170)는 상기 결합홈(111)과 대응되어 상광하협의 사다리꼴 육면체 형상으로 제공되는 것을 특징으로 하는 프리캐스트 콘크리트 패널.
The method according to claim 1,
The coupling grooves 111 are recessed with a shape of upper light-tight narrowing so that the temporary stiffener 170 can be separated upward,
Wherein the provisional stiffener (170) is provided in a trapezoidal hexahedron shape corresponding to the coupling groove (111) so as to have an upper light-tight narrowing.
제1항에 있어서,
상기 결합부재(180)는 하단부분에 나선이 형성된 결합볼트로 제공되는 것을 특징으로 하는 프리캐스트 콘크리트 패널.
The method according to claim 1,
Wherein the coupling member (180) is provided as a coupling bolt having a spiral at a lower end portion thereof.
제1항에 있어서,
상기 패널 본체(110)는 하면에 횡방향으로 일정간격을 가지고 상광하협의 사다리꼴 타입으로 보강리브(115)가 더 돌출형성되는 것을 특징으로 하는 프리캐스트 콘크리트 패널.
The method according to claim 1,
Wherein the panel main body (110) has a trapezoidal shape with a predetermined interval in the horizontal direction and a vertical rib, and a reinforcing rib (115) is further protruded from the panel main body (110).
다수 개의 횡방향 보강철근(120) 상부에 직교하여 일정간격을 가지고 다수의 종방향 보강철근(130)이 격자형상을 가지도록 용접고정하는 격자형상 보강철근 준비단계(S110);
임시보강재(170)의 상, 하부에 길이방향으로 일정간격을 가지고 관통형성된 관통공(171)을 통하여 상, 하부로부터 결합부재(180)와 결합너트(160)를 결합하며, 상기 임시보강재(170)의 하면에 밀착된 결합너트(160) 일 측에 이웃하는 결합너트(160)가 상호 연결되도록 고정철근(150)을 용접고정하는 임시보강재 조립체 준비단계(S120);
상기 격자형상 보강철근 준비단계(S110)를 통해 준비된 격자형상 보강철근 중 복수의 상기 종방향 보강철근(130)의 일 측에 대하여 대응되는 복수의 세트로 상기 임시보강재 조립체 준비단계(S120)를 거쳐 완성된 임시보강재 조립체의 고정철근(150)이 밀착되도록 하여 용접고정하는 임시보강재 조립체 고정단계(S130);
상기 임시보강재 조립체 고정단계(S130)를 거쳐 일체화된 격자형상 보강철근과 임시보강재 조립체를 상기 횡방향 보강철근(120)의 하단이 하부를 향하도록 패널 제작용 성형 틀에 내에 안착시키되, 상기 횡방향 보강철근(120)의 하단이 성형 틀의 바닥면으로부터 상향 일정거리 떨어지도록 다수의 스페이서(미도시)를 개재하여 안착시키는 안착단계(S140);
상기 패널 제작용 성형 틀 내에 콘크리트를 타설한 후 양생하며, 타설하여 양생되는 패널 본체(110)에 대하여, 상기 임시보강재(170)의 하단으로부터 상향 일정거리 떨어진 위치까지 매립되도록 하여 상기 임시보강재(170)의 분리시 패널 본체(110) 상면에 횡방향으로 일정간격을 가지고 결합홈(111)이 형성되도록 콘크리트를 타설하여 양생하는 콘크리트 타설/양생단계(S150); 및
상기 콘크리트 타설/양생단계(S150)를 통해 양생 완료된 후, 탈형하여 프리캐스트 콘크리트 패널(100)의 제작을 완료하는 탈형단계(S160)를 포함하여 이루어진 프리캐스트 콘크리트 패널의 제작방법.
(S110) a grid-shaped rebar preparation step (S110) in which a plurality of longitudinally-reinforced reinforcing bars (130) are welded and fixed to a plurality of transverse reinforcing bars (120) at regular intervals and having a grid shape;
The coupling member 180 and the coupling nut 160 are coupled to the upper and lower portions of the temporary stiffener 170 through the through holes 171 formed at predetermined intervals in the longitudinal direction through the through holes 171. The temporary stiffeners 170 A temporary stiffener assembly preparation step (S120) for welding and fixing the fixed reinforcing bar (150) to mutually connect the coupling nuts (160) adjacent to one side of the coupling nut (160)
After the temporary stiffener assembly preparation step S120 is performed with a plurality of sets corresponding to one side of the plurality of longitudinal reinforcing bars 130 among the grid-shaped reinforcing bars prepared through the lattice-shaped reinforcing bar preparation step S110 A temporary stiffener assembly fixing step (S130) for fixing the reinforcing bars 150 of the completed temporary stiffener assembly by welding;
The lattice-shaped rebar and the temporary stiffener assembly, which are integrated through the temporary stiffener assembly fixing step (S130), are seated in the forming mold for panel manufacture such that the lower ends of the transverse reinforcing bars 120 are directed downward, A seating step (S140) in which the lower end of the reinforcing bar (120) is seated via a plurality of spacers (not shown) such that the lower end of the reinforcing bar (120)
The panel main body 110 cured by pouring concrete after being poured into the mold for making a panel is filled up to a position spaced upward by a certain distance from the lower end of the temporary stiffener 170 to form the temporary stiffener 170 A concrete pouring / curing step (S150) for pouring and curing the concrete so as to form a coupling groove (111) at a predetermined interval in the lateral direction on the upper surface of the panel body (110) And
And a demolding step (S160) of demolding and completing the precast concrete panel (100) after completion of curing through the concrete pouring / curing step (S150).
제5항에 있어서,
상기 임시보강재 조립체 준비단계(S120)에서의, 상기 임시보강재(170)는 선택적으로 상기 패널 본체(110)로부터 상향 분리될 수 있도록, 상광하협의 사다리꼴 육면체 형상으로 제공되는 것을 특징으로 하는 프리캐스트 콘크리트 패널의 제작방법.
6. The method of claim 5,
The temporary stiffener (170) is optionally provided in a trapezoidal hexahedron shape so as to be upwardly separated from the panel main body (110) in the temporary stiffener assembly preparation step (S120) How to make a panel.
제5항 또는 제6항에 따른 프리캐스트 콘크리트 패널의 제작방법을 통해 제작된 프리캐스트 콘크리트 패널(100)을 사용하되,
프리캐스트 콘크리트 패널(100)을 다수의 단으로 적층한 상태로 교량 슬래브를 시공하기 위한 현장으로 운반한 후에, 교량 슬래브를 시공하기 위한 교각 상부의 거더 상에 횡방향으로 양측이 맞대어지도록 상기 프리캐스트 콘크리트 패널(100)을 다수 개로 안착설치하는 패널 안착설치단계(S210);
상기 패널 안착설치단계(S210)를 통해 거더 상에 안착설치된 상기 프리캐스트 콘크리트 패널(100)로부터 임시보강재(170)에 대하여 패널 본체(110)를 기준으로 상향 분리하는 임시보강재 분리단계(S220);
상기 임시보강재 분리단계(S220)를 통해 임시보강재(170)가 분리된 후 패널 본체(110) 상면에 횡방향으로 일정간격을 가지고 함몰된 결합홈(111) 바닥면에 노출된 결합너트(160) 상에 전단연결재의 하단이 결합되도록 하여 전단연결재를 조립하는 전단연결재 조립단계(S230);
상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110) 상면과 상기 전단연결재 상단부분에 각각 격자형상을 이루도록 슬래브용 철근을 현장 배근 조립하는 현장 배근 조립단계(S240); 및
상기 현장 배근 조립단계(S240)를 거쳐 슬래브용 철근에 대한 배근 조립 완료된 상기 프리캐스트 콘크리트 패널(100)의 상부에 슬래브용 현장 콘크리트를 타설/양생하는 현장 콘크리트 타설/양생단계(S250)를 포함하여 이루어진 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법.
A precast concrete panel (100) manufactured through the method for manufacturing a precast concrete panel according to claim 5 or 6 is used,
After the precast concrete panels 100 are transported to a site for constructing the bridge slabs in a stacked state at a plurality of stages, the precast concrete slabs are transported to a site for constructing the bridge slabs, A panel seating installation step (S210) in which a plurality of concrete panels (100) are seated;
A temporary stiffener separation step (S220) of separating the preliminary stiffener (170) from the precast concrete panel (100) placed on the girder through the panel seating installation step (S210) upward with reference to the panel main body (110);
After the temporary stiffener 170 is detached through the temporary stiffener separation step S220, the coupling nut 160 exposed on the bottom surface of the coupling groove 111, which is recessed at a predetermined interval in the lateral direction on the upper surface of the panel body 110, (S230) of assembling the shear connection member by coupling the lower end of the shear connection member to the upper end of the shear connection member;
(S240) assembling the reinforcing bars for the slabs on the upper surface of the panel body (110) of the precast concrete panel (100) and the upper end portions of the front end joint members so as to have a lattice shape; And
A step S250 of placing and curing the concrete for the slab on the upper part of the precast concrete panel 100 in which the reinforcement for the slab reinforcement assembly is completed through the assembling of the site assembly S240, A Method of Construction of Bridge Slab Using Precast Concrete Panel.
제7항에 있어서,
상기 전단연결재 조립단계(S230)에 적용되는 전단연결재는 하단이 상기 결합너트(160)와 결합되면서 상기 임시보강재(170)가 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110) 상에 결합고정된 상태에서 상기 임시보강재(170)를 분리한 후의 결합부재(180)로 적용되는 것을 특징으로 하는 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법.
8. The method of claim 7,
The lower end of the shear connection member applied to the shear connection member assembling step S230 is coupled with the coupling nut 160 so that the temporary reinforcing member 170 is fixedly coupled to the panel main body 110 of the precast concrete panel 100. [ Is applied as a joining member (180) after the temporary stiffener (170) is separated from the pre-cast concrete panel.
제8항에 있어서,
상기 전단연결재 조립단계(S230)에 적용되는 전단연결재 중 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110)에 대한 횡방향 최외측을 제외한 중앙 측에 조립되는 전단연결재는 상기 결합부재(180)로 적용되는 한편,
상기 전단연결재 조립단계(S230)에 적용되는 전단연결재 중 상기 프리캐스트 콘크리트 패널(100)의 패널 본체(110)에 대한 횡방향 최외측에 조립되는 전단연결재는 'ㄱ'자 형상의 봉 타입으로 형성된 인터로킹용 전단연결재(180a)로 제공되는 것을 특징으로 하는 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법.
9. The method of claim 8,
The front end joint member assembled at the center side of the precast concrete panel 100 excluding the outermost transversely outward side of the panel main body 110 among the front end joint members applied in the step of assembling the front end joint member S230, While,
The front end joint member to be assembled on the outermost lateral side of the panel body 110 of the precast concrete panel 100 among the shear connection members applied in the shear connection member assembling step S230 is formed into a " Wherein the pre-cast concrete slab is provided as an interlocking shear connection member (180a).
제9항에 있어서,
상기 전단연결재로 적용되는 결합부재(180)는 상단부분에 머리부를 가지며, 하단부분 일정길이에 대하여 나선이 형성된 결합볼트로 제공되는 한편,
상기 전단연결재로 적용되는 인터로킹용 전단연결재(180a)는 'ㄱ'자 형상의 상측 단부에 머리부를 가지며 하측 단부에 나선이 형성되는 것을 특징으로 하는 프리캐스트 콘크리트 패널을 이용한 교량 슬래브 시공방법.
10. The method of claim 9,
The joining member 180, which is used as the shear connection member, has a head portion at the upper end portion and is provided with a coupling bolt having a helix at a lower end portion of a predetermined length,
Wherein the interlocking shear connection member 180a applied as the shear connection member has a head at the upper end of the 'A' shape and a spiral at the lower end thereof.
KR1020180048044A 2018-04-25 2018-04-25 Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel KR101921715B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180048044A KR101921715B1 (en) 2018-04-25 2018-04-25 Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180048044A KR101921715B1 (en) 2018-04-25 2018-04-25 Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel

Publications (1)

Publication Number Publication Date
KR101921715B1 true KR101921715B1 (en) 2018-11-23

Family

ID=64565347

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180048044A KR101921715B1 (en) 2018-04-25 2018-04-25 Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel

Country Status (1)

Country Link
KR (1) KR101921715B1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109370616A (en) * 2018-12-10 2019-02-22 中国三冶集团有限公司 A kind of coke oven door castable block installation method and fire door hoisting structure
CN109699502A (en) * 2019-02-26 2019-05-03 郑州大智农牧科技有限公司 A kind of assembly concrete leakage dropping-board
WO2020145466A1 (en) * 2019-01-10 2020-07-16 김선곤 Temporary bridge and construction method therefor
KR102144400B1 (en) * 2020-02-05 2020-08-13 주식회사 신원알피씨 Psc girder for precast slab and construction method thereof
KR102186544B1 (en) * 2020-07-13 2020-12-03 조우일 Precast deck and slab having the same
KR102294468B1 (en) 2021-07-20 2021-08-26 (주) 효성 Prestressed Concrete Girder Manufacturing Method
KR102294467B1 (en) 2021-07-15 2021-08-26 (주) 효성 Shear Connector for Coastal Structure and Coastal Structures using the Shear Connector
KR102316270B1 (en) 2021-07-20 2021-10-22 (주) 효성 Prestressed Concrete Girder
CN114232516A (en) * 2021-12-17 2022-03-25 中国建筑土木建设有限公司 Method for constructing cavity of bridge large-height-difference pavement layer
KR102386349B1 (en) 2022-02-03 2022-04-14 (주)효명피씨 Girder installed precast panel
KR102386348B1 (en) 2022-02-03 2022-04-14 (주)효명피씨 Girder installed strengthen and space cap device
CN114525872A (en) * 2022-01-14 2022-05-24 福建省实盛建设工程有限公司 Construction method of assembled type superposed beam slab
KR20230166687A (en) * 2022-05-31 2023-12-07 이영우 A lift bed panel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101014570B1 (en) 2010-04-27 2011-02-16 신우산업개발 주식회사 Deck for constructing concrete slabes
KR101206353B1 (en) 2012-10-08 2012-11-29 (주)대우건설 Construction method of precast concrete floor slab for partial assembly and displacement

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101014570B1 (en) 2010-04-27 2011-02-16 신우산업개발 주식회사 Deck for constructing concrete slabes
KR101206353B1 (en) 2012-10-08 2012-11-29 (주)대우건설 Construction method of precast concrete floor slab for partial assembly and displacement

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109370616A (en) * 2018-12-10 2019-02-22 中国三冶集团有限公司 A kind of coke oven door castable block installation method and fire door hoisting structure
CN109370616B (en) * 2018-12-10 2024-02-06 中国三冶集团有限公司 Method for mounting castable block of coke oven door
WO2020145466A1 (en) * 2019-01-10 2020-07-16 김선곤 Temporary bridge and construction method therefor
CN109699502A (en) * 2019-02-26 2019-05-03 郑州大智农牧科技有限公司 A kind of assembly concrete leakage dropping-board
KR102144400B1 (en) * 2020-02-05 2020-08-13 주식회사 신원알피씨 Psc girder for precast slab and construction method thereof
KR102186544B1 (en) * 2020-07-13 2020-12-03 조우일 Precast deck and slab having the same
KR102294467B1 (en) 2021-07-15 2021-08-26 (주) 효성 Shear Connector for Coastal Structure and Coastal Structures using the Shear Connector
KR102316270B1 (en) 2021-07-20 2021-10-22 (주) 효성 Prestressed Concrete Girder
KR102294468B1 (en) 2021-07-20 2021-08-26 (주) 효성 Prestressed Concrete Girder Manufacturing Method
CN114232516A (en) * 2021-12-17 2022-03-25 中国建筑土木建设有限公司 Method for constructing cavity of bridge large-height-difference pavement layer
CN114525872A (en) * 2022-01-14 2022-05-24 福建省实盛建设工程有限公司 Construction method of assembled type superposed beam slab
KR102386349B1 (en) 2022-02-03 2022-04-14 (주)효명피씨 Girder installed precast panel
KR102386348B1 (en) 2022-02-03 2022-04-14 (주)효명피씨 Girder installed strengthen and space cap device
KR20230166687A (en) * 2022-05-31 2023-12-07 이영우 A lift bed panel
KR102650475B1 (en) * 2022-05-31 2024-03-21 이영우 A lift bed panel

Similar Documents

Publication Publication Date Title
KR101921715B1 (en) Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel
KR100903398B1 (en) Precast multi tee fiber and wiremesh slab
KR20090050520A (en) Libbed half pc slab and manufacturing method of the same
KR20100121866A (en) Pc slave for building having reinforcement structure as a set
KR101954155B1 (en) Bridge with full-deck and protective wall, and construction method for the same
KR101678999B1 (en) Method of manufacturing composite girder and of constructing birdge upper structure using same
KR101742046B1 (en) Composite girder and method of manufacturing composite girder and of constructing birdge upper structure using same
KR101229263B1 (en) Slab-type box girder with a vertical connecting structure made by precast concrete and method constructing the bridge thereof
KR101727745B1 (en) Retaining wall construction method in which the vertical precast structures utilizing this structure
KR102451811B1 (en) Precast PSC beam girder that can be made long-term by step construction
KR101308053B1 (en) Precast Concrete Column Connecting Structure Using The Low Bending Moment Zone
KR100650411B1 (en) Tunnel cover plate
KR20060041078A (en) Continuous steel bridge having precast concrete slab and construction method thereof
KR101785722B1 (en) Insulation Integrated Deck Plate
KR102470160B1 (en) Ramp structure using precast concrete wall
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
KR101954387B1 (en) Grid precast concrete structure and constructing method thereof
KR101008555B1 (en) Hybrid girder for underpass and underpass using the same
KR101610442B1 (en) Framework for Prestressed concrete girder
JP3064841B2 (en) Dam corridor construction method and corridor cell used for this
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR100456192B1 (en) Composition of precast concrete wall and precast concrete column for outdoor to sustain external force
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
KR20210017720A (en) Vehicle protection wall connecting apparatus and method for constructing vehicle protection wall of bridge using the same
KR100997450B1 (en) Temporary bridge and method for constucting an temporary bridge

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant