KR101683587B1 - Method and system for paving road using porous concrete - Google Patents

Method and system for paving road using porous concrete Download PDF

Info

Publication number
KR101683587B1
KR101683587B1 KR1020160034409A KR20160034409A KR101683587B1 KR 101683587 B1 KR101683587 B1 KR 101683587B1 KR 1020160034409 A KR1020160034409 A KR 1020160034409A KR 20160034409 A KR20160034409 A KR 20160034409A KR 101683587 B1 KR101683587 B1 KR 101683587B1
Authority
KR
South Korea
Prior art keywords
cement
water
weight
layer
parts
Prior art date
Application number
KR1020160034409A
Other languages
Korean (ko)
Inventor
황익현
황주철
Original Assignee
황익현
황주철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황익현, 황주철 filed Critical 황익현
Priority to KR1020160034409A priority Critical patent/KR101683587B1/en
Application granted granted Critical
Publication of KR101683587B1 publication Critical patent/KR101683587B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/0018Coating or impregnating "in situ", e.g. impregnating of artificial stone by subsequent melting of a compound added to the artificial stone composition
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B14/00Use of inorganic materials as fillers, e.g. pigments, for mortars, concrete or artificial stone; Treatment of inorganic materials specially adapted to enhance their filling properties in mortars, concrete or artificial stone
    • C04B14/38Fibrous materials; Whiskers
    • C04B14/386Carbon
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B16/00Use of organic materials as fillers, e.g. pigments, for mortars, concrete or artificial stone; Treatment of organic materials specially adapted to enhance their filling properties in mortars, concrete or artificial stone
    • C04B16/02Cellulosic materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B24/00Use of organic materials as active ingredients for mortars, concrete or artificial stone, e.g. plasticisers
    • C04B24/24Macromolecular compounds
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B24/00Use of organic materials as active ingredients for mortars, concrete or artificial stone, e.g. plasticisers
    • C04B24/24Macromolecular compounds
    • C04B24/28Macromolecular compounds obtained otherwise than by reactions only involving carbon-to-carbon unsaturated bonds
    • C04B24/282Polyurethanes; Polyisocyanates
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/45Coating or impregnating, e.g. injection in masonry, partial coating of green or fired ceramics, organic coating compositions for adhering together two concrete elements
    • C04B41/52Multiple coating or impregnating multiple coating or impregnating with the same composition or with compositions only differing in the concentration of the constituents, is classified as single coating or impregnation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/142Mixtures or their components, e.g. aggregate
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/101Dedicated additional structures, interposed or parallel to the sewer system

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Nanotechnology (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a pavement method using water-permeable concrete, and to a system thereof. The pavement method using water-permeable concrete comprises the following processes of: preparing single-sized aggregates having maximum coarse aggregate size of 5-25 mm; preparing cement having compression strength; preparing water having 100-150 kg/m^3; preparing an emulsion resin using at least one selected among epoxy, acryl, urethane, EVA, LATEX resin, and a waterproofing agent; preparing water-permeable concrete by mixing at least one material selected among an admixture, an emulsion resin, and reinforcing fibers with the single-sized aggregates, cement, and water; pouring the water-permeable concrete and compacting the same; preparing a primary cement polymer by mixing water, cement, and emulsion resin, spraying the same on the water-permeable concrete, and compacting the same; hardening the primary cement polymer sprayed on the water-permeable concrete; and preparing a secondary cement polymer by mixing water, cement, and emulsion resin, and spraying the secondary cement polymer on the primary cement polymer to protect internal pores.

Description

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pavement method for pavement,

BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a road pavement method using a permeable concrete having porosity and a system thereof.

The permeable concrete using cement is classified into the road pavement method using continuous pore to allow the excellent pavement to flow through the pavement, the compaction method using roller, and the pavement method using manpower.

In addition, permeable concrete road pavement with porous structure is divided into permeable pavement which absorbs rainwater from base layer and hearth, and drainage pavement which drains rainwater from pavement inside pavement.

The inventors of the present invention have invented colored water permeable concrete, fine water permeable concrete, and drainage permeable concrete, which are plastered with a roller, in connection with permeable concrete, and there have been various inventions such as color permeable concrete since then.

The permeable concrete and porous concrete using cement are composed of water, cement, single particle aggregate, pigment and the like. This method is a method in which the slump value is set to 0 cm, And screed, which is an overhanging material. When the concrete is installed as a screed, the permeable concrete is reinforced by adding an emulsion resin.

In addition, since the permeable concrete is colored by mixing an inorganic pigment, it is completed by coating the surface with a paint such as oil type epoxy after the construction. Since the construction process is complicated and coated with oil paint, Is contaminated. Particularly, since the surface is coated with paint, there is a high possibility of occurrence of slip accident, and the use frequency is decreased.

In addition, when wrapping on sidewalks and bicycle roads, durability is reduced due to the influence of calcium chloride sprayed on the road in the winter, resulting in deterioration of durability due to collapse of the cement part as well as surface separation.

1 is a view showing pores of a conventional permeable concrete.

As shown in FIG. 1, when the aggregate used in the existing permeable concrete is assumed to be circular particles of about 13 mm and the surface voids and internal voids are compared, the internal voids are about 6.85 cm 2, and the surface voids are open State pore is also present, so that it reaches about 18.17 cm < 2 >.

As a result, the difference between the surface voids and the internal voids reaches about 11.32 cm 2, and the surface voids reach 165% of the internal voids, so that there is a problem that the surface strength becomes extremely weak.

As described above, the conventional permeable concrete has a variety of problems.

First, in the case of the Kali permeable concrete, there is a problem that the production cost is increased because the pigment is mixed with the entire package.

Secondly, since the surface is coated with a paint such as oil-based epoxy, the construction cost is increased, and the atmosphere is contaminated by the oil-based thinner. Since the paint is sprayed after curing, the construction process becomes complicated, There is a problem that the opening time is delayed and safety accident occurs frequently due to the surface being slippery with the epoxy spraying.

Third, there is a problem that durability is weakened by the calcium chloride sprayed in the winter season.

Fourth, since the surface pore is 1.65 times the internal supply, the surface strength is weakened and the durability is weak. Thus, there is a disadvantage that it is not suitable for packing by car.

Fifth, when the curing time is not sufficiently secured, there is a fear that cracks are generated when the curing time is sufficient, since the surface pore is large, so that when the cement is cut at an early stage, aggregate particles are separated, .

Sixth, existing cement concrete absorbs moisture, and therefore there is a problem that freezing and thawing is weak.

KR 1998-066436 (1998.10.15)

The present invention relates to a coating composition for a paint which is protected from calcium chloride sprayed on the road in the winter season, has improved surface strength, has improved durability by improving freeze-thaw resistance and is capable of coloring in a packaging process by spraying a color cement polymer, The method of road pavement using permeable concrete capable of constructing color permeable concrete without mixing, spraying cement polymer without spraying, increasing slip resistance, reinforcing surface strength, The purpose of the system is to provide.

Further, another object of the present invention is to provide a pavement method and system for pavement concrete using pavement concrete which can be used as agriculture water and domestic water by constituting pavement concrete pavement with pavement pavement and purifying excellent pavement.

delete

delete

delete

To achieve the above object, the present invention provides a road paving method using permeable concrete, comprising the steps of preparing 1,500 to 1,800 kg / m3 of monolithic aggregate having a maximum number of coarse aggregates of 5 to 25 mm; Preparing a cement having a compressive strength of 120 to 350 kg / cm < 2 > Preparing 100 to 150 kg / m < 3 > of water so as to satisfy a slump value of 5 cm or less; The emulsion resin is selected from epoxy, acrylic, urethane, EVA, LATEX resin and waterproofing agent, and is used within a range of 2 to 30% by weight based on 50% of solid content of cement. Preparing a water permeable concrete by mixing at least one material selected from the group consisting of an admixture, an emulsion resin and a reinforcing fiber with the single particle aggregate, cement and water; A step of installing and compaction of the permeable concrete; The primary cement polymer is prepared by mixing water, cement, and emulsion resin so that the time from the top to 100 mm is 5 seconds or longer, into a funnel for measuring a kneader having a top diameter of 150 mm, a bottom diameter of 15 mm, and a height of 200 mm, Adding and mixing at least one material selected from charcoal, activated carbon, yellow soil, zeolite, elvan, and germanium, and spraying and mixing the permeable concrete; A step of allowing the primary cement polymer sprayed on the water permeable concrete to solidify for 1 hour or more; And the coagulated primary cement polymer was placed in a funnel for measurement of a kneader having an upper end diameter of 150 mm, a lower end diameter of 15 mm and a height of 200 mm so that the time from the upper end to 100 mm was less than 5 seconds. Water, cement, emulsion resin To prepare a secondary cement polymer, and spraying the secondary cement polymer to protect the internal pores.
20 to 200 parts by weight of cement, 5 to 200 parts by weight of an emulsion resin based on a solid content of 50%, and 5 to 200 parts by weight of silica sand are dispersed in 100 parts by weight of water, and the above primary cement polymer is sprayed in a range of 0.5 to 2 kg / The secondary cement polymer is sprayed in a range of 0.5 to 2 kg / m 2, and 5 to 50 parts by weight of cement is mixed with 10 to 500 parts by weight of emulsion resin solids based on 100% .
3 to 30 parts by weight of the cement is added to the primary cement polymer, and a pigment is added to the secondary cement polymer in an amount of 20 parts by weight of the cement.
In order to achieve the above object, the road pavement method using permeable concrete according to the present invention is characterized in that a single ply aggregate having a maximum coarse aggregate number of 5 to 25 mm and a compressive strength of 120 to 350 kg / Cement, and water, which are prepared by mixing at least one selected from the group consisting of cement, cement, cement, and water at 100 to 150 kg / m 3 satisfying a slump value of 5 cm or less and admixture, emulsion resin, Placing the concrete on the impervious layer and compaction; Spraying a second cement polymer on the permeable concrete with the first cement polymer as a surface protecting agent and the inner pore protecting agent; And a step of providing an aggregate having a gravel layer, a sand layer, an activated carbon layer, or a char layer successively installed on one side of the permeable concrete and the impervious layer in the flow direction of the stormwater, and connecting the aggregate to the water tank, A gravel layer, a sand layer, and a gravel layer, each of which is made of at least one material selected from PET, PP and PE and has a permeability coefficient of 1 * 10 -2 cm / sec or more so that the stormwater passing through the permeable concrete can pass sequentially, An activated carbon layer or a char layer is sequentially installed.
The gravel layer, the sand layer, the activated carbon layer, or the char layer may be respectively installed in the compartments defined by the stainless steel, the coated porous net, and the net.
20 to 200 parts by weight of cement, 5 to 200 parts by weight of an emulsion resin based on a solid content of 50%, and 5 to 200 parts by weight of silica sand are dispersed in 100 parts by weight of water, and the above primary cement polymer is sprayed in a range of 0.5 to 2 kg / The secondary cement polymer is sprayed in a range of 0.5 to 2 kg / m 2, and 5 to 50 parts by weight of cement is mixed with 10 to 500 parts by weight of an emulsion resin solids based on 50% .
3 to 30 parts by weight of the cement is added to the primary cement polymer, and a pigment is added to the secondary cement polymer in an amount of 20 parts by weight of the cement.
A road pavement method using water permeable concrete according to the present invention comprises the steps of laying a rectangular or cylindrical structure of a relative calcined section having a trapezoidal cross section after permeable concrete laid so that the storm can flow into the pavement, A step of spraying a second cement polymer (0.5 ~ 2 kg / m 2) as a pore protection material and spraying a first cement polymer over 2 kg / m 2 to form a surface impermeable layer; The method may further include the step of removing the structure and then inserting a porous container having a shape corresponding to the shape of the structure and having any one material selected from the group consisting of iron, stainless steel, and plastic.
The road pavement system using the water permeable concrete according to the present invention comprises: an impervious layer; The aggregate having a maximum coarse aggregate number of 5 to 25 mm and a cement having a compressive strength of 120 to 350 kg / m < 3 > and a slump value of 5 cm or less, Water permeable concrete which is produced by mixing at least one selected from water, water, and water, 150 kg / m 3 of water, an admixture, an emulsion resin and a reinforcing fiber with the single-stage aggregate, cement and water, An aggregate installed on one side of the impervious layer and the permeable concrete; And a water tank connected to the collecting unit. The collecting unit is made of one or more materials selected from among PET, PP, and PE so that the stormwater passing through the permeable concrete can pass sequentially, A gravel layer, a sand layer, an activated carbon layer or a char layer, which are respectively contained in a saddle having a permeability coefficient of 2 cm / sec or more, are sequentially installed.

delete

delete

delete

delete

delete

delete

delete

delete

delete

According to the present invention, the following various effects can be obtained.

First, by reinforcing the surface strength of the porous permeable concrete according to the first cement polymer spraying, it is possible to improve the durability of the permeable concrete and to the roadway packaging.

Secondly, since the color cement polymer is used, there is an advantage that various colored water permeable concrete can be completed without using pigments in a hop combination.

Third, since a dilute secondary cement polymer is used, it is possible to prevent durability from being deteriorated and to prevent the primary cement polymer from being whitened by preventing salting by calcium chloride sprayed in the winter season.

Fourth, the spraying process, which is sprayed before the sprayed surface is completely dried, is omitted, the air pollution is prevented, and the process advantage is expressed.

Fifth, in addition to permeable pavement, pavement pavement can control the flow rate in pavement during rainfall and store water in pavement and tank to prevent overflow of rivers and rivers, purify stormwater, There is an advantage that can be recycled.

Sixth, by pouring materials that are beneficial to the human body into pores, environmentally friendly packaging can be realized.

Seventh, since the emulsion resin is used, the durability can be increased by increasing the strength and increasing the resistance to freezing and thawing.

1 is a view showing pores of a conventional permeable concrete,
Figure 2 shows a tool for measuring a kneader,
FIG. 3 (a) shows an embodiment of the permeable concrete pavement system of the present invention,
Figure 3 (b) shows another embodiment of the permeable concrete pavement system of the present invention,
Figure 3 (c) shows another embodiment of the permeable concrete pavement system of the present invention,
4 is a view illustrating an embodiment of the permeable concrete packing method of the present invention,
5 shows another embodiment of the permeable concrete packing method of the present invention,
6 is a view showing another embodiment of the permeable concrete packing method of the present invention.

The objects, particular advantages and novel features of the present invention will become more apparent from the following detailed description and examples taken in conjunction with the accompanying drawings. It should be noted that, in the present specification, the reference numerals are added to the constituent elements of the drawings, and the same constituent elements have the same numerical numbers as much as possible even if they are displayed on different drawings. Also, the terms first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another. In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a water permeable concrete according to the present invention, a method for manufacturing the same, and a road pavement method using permeable concrete will be described in detail with reference to the accompanying drawings.

The water permeable concrete of the present invention is prepared by preparing and mixing monolithic aggregate, cement and water, and adding at least one selected from admixture, emulsion resin, reinforcing fiber and waterproofing agent.

Aggregate is a coarse aggregate having a particle size of 5 to 25 mm. When aggregate having a maximum dimension of 25 mm is used, the aggregate having a 25 mm body weight and a weight percentage of 90 to 100%, a 2.5 mm body weight and a percentage of 0 to 10% Use granular aggregate.

In the case of using aggregates having a maximum aggregate size of 25 mm or less, that is, 19 mm, 13 mm, 10 mm, 8 mm, and 5 mm aggregates, the aggregates of 19 mm body weight and percentage, 13 mm body weight and percentage, 10 mm body weight and percentage, 8 mm body weight and percentage, Use single-layer aggregates with body percentage and percentage of 90-100%, 2.5mm body weight and 0-10% percent.

That is, if the aggregate of 25 mm or less is used as the coarse aggregate, it is possible to secure the permeability if only the 2.5 mm scale and the percentage are managed, and if the cement composed of the fine particles is used, the cement will wrap the aggregate, .

The maximum size of coarse aggregate can be used in different sizes depending on the kind of pavement. In case of roadway, 19mm and 13mm coarse aggregate are mainly used. In case of sidewalk, 13mm, 10mm, 8mm and 5mm aggregate are mainly used do.

25mm thick coarse aggregate is generally used to manufacture waterproof concrete for an economical base layer with a thick pavement.

When the size of the aggregate is determined, the unit usage amount is determined. The unit usage amount is the amount of the material contained in the volume of 1 m 3 in a state in which the material is put into a container of a certain size and the maximum compaction or vibration is applied, And determine by measurement.

The unit volume weight of single-grain aggregate is controlled within the range of 1500 ~ 1800kg / ㎥.

Cement is applied within the range of compressive strength 120 ~ 350kg / ㎠ according to the use of the sidewalk or roadway. When the compressive strength is less than 120 kg / cm 2, it can not be used for road pavement. When the compressive strength exceeds 350 kg / cm 2, the strength as a permeable concrete is difficult to manifest.

The amount of cement used should be adjusted within the range of 200 ~ 400kg / ㎥.

When the amount of cement used is less than 200 kg / m 3, it is difficult to realize a compressive strength of 120 kg / cm 2 or more. When the cement is used in excess of 400 kg / m 3, it becomes difficult to secure the continuous porosity required by filling the pores.

The amount of water is determined so that the slump value can be adjusted within the range of 0 to 5 cm. The amount of water is proportional to the aggregate, the amount of cement used and the slump value. If the amount of water used is less than 100 kg per 1 m 3, The water is evaporated in the water to be hydrated. When it is used in excess of 150 kg, the slump value is more than 5 cm, so that when the roller is compaction, the moisture increases to fill the surface void, . Therefore, the amount of water used is adjusted within a range of 100 to 150 kg / m 3.

The amount of water used is determined on the basis of the saturation state of the surface of the aggregate (the water is saturated in the aggregate but dried on the surface).

As described above, the amount of the admixture, the emulsion resin, and the reinforcing fiber is determined for the purpose of quality enhancement after the basic amount of aggregate, cement and water is determined.

The admixture is a cement admixture which acts as an air-entraining agent having a sedative effect and a delayed effect. It is difficult to determine the amount of the admixture to be used depending on the type and manufacturer of the admixture. However, Used within 2% range.

The emulsion resin may use at least one selected from the group consisting of epoxy, acrylic, urethane, EVA and LATEX resins, or a waterproofing agent or a water repellent agent may be used.

Waterproofing agent and water repellent agent are different according to the production company, and it is preferable to use the amount of usage proposed by the production company.

The emulsion resin, the waterproofing agent and the water repellent agent reinforce the watertightness of the cement and are used for the purpose of waterproofing. The waterproofing agent and the water repellent agent improve the durability of the cement by preventing the penetration of water into the cement, and further improve the durability of the cement from the calcium chloride It protects it.

Since the water permeable concrete has a structure allowing water to permeate, it is particularly vulnerable to calcium chloride or soot sprayed on the road, and durability is ensured because the watertightness of the cement is ensured.

The amount of emulsion resin used is in the range of 1 to 30% based on 50% of the solid content of cement. When it is used in an amount less than 1%, the effect of use can not be expected. When it is used in an amount exceeding 30%, stickiness results in inconvenient installation and increases cost compared to the expected effect.

Waterproofing agent or water repellent agent can be used to ensure watertightness. If water repellent agent and water repellent agent are used, the amount suggested by the manufacturer and the kind thereof is used.

If necessary, cement reinforcing fibers can also be used. Such cement reinforcing fibers prevent cracking and improve the flexural strength, and cellulose fibers, PP, PE, carbon fiber, and the like can be used. Further, the strength and water tightness of the cement can be improved by using fly ash, silica, or the like.

The metering and mixing of aggregate, cement, water, admixture and emulsion resin can be done at the factory, but it is preferable to produce the facility by site taking into consideration transportation time delay and transportation cost.

When the permeable concrete is manufactured through the above-described procedure, the permeable concrete is laid by using a finisher or a gravitational force, and the roller is compaction. When the roller is compaction, the slump value should be adjusted to 0 to 5 cm. If it exceeds 5 cm, the water rises to the surface and the surface becomes stained and the surface uniformity is lowered.

The roller compaction is selected by selecting one or more of the following: a mercedem, a tandem, a tire, a combination roller, or a compactor.

On the other hand, the road pavement method using the permeable concrete is characterized by the fact that the permeable concrete pavement that flows water to the ground, the pore filling structure which pours water from the pavement inside the pavement or the water- And can be divided into packaging.

First, in the case of a permeable concrete pavement that flows water to the ground, the roadbed is absorbed into the bedrock so that it can be separated into water and soil inside the pavement.

The bedding includes a filter layer, a permeable sheet, and a crusher layer, and the filter layer functions as a filter to prevent mixing of the hearth and the base material. Such a filter layer is formed by sand or fine aggregate on a hearth and compaction with a roller, and should have a permeability coefficient of 1 * 10 -4 cm / sec or more.

The permeable sheet is prepared so as to have a water permeability coefficient of 1 * 10 -2 cm / sec or more by using at least one material selected from PET, PP and PE materials. The permeable sheet prevents the residual particles of the filter layer from penetrating into the crusher layer provided on the upper part, thereby preventing formation of voids in the lower part.

After this process, the crushed stone is laid on the permeable sheet and compaction is performed to form a crusher layer having a permeability coefficient of 1 * 10 -2 cm / sec or more.

After the crusher layer has been laid and plastered, the single-layer aggregate having a particle size of 5 to 25 mm and the cement having a compressive strength of 120 to 350 kg / m < 3 > Water permeable concrete prepared by mixing 100 to 150 kg / m 3 of water satisfying the slump value of the aggregate, emulsion resin, waterproofing agent and reinforcing fiber with single-layer aggregate, cement, and water is installed on the crusher layer And pledge.

When the compaction is completed, the primary cement polymer, which is a surface protection agent, and the secondary cement polymer, which is an inner cavity protection agent, are sprayed to reinforce the surface strength, prevent cement oxidation from various harmful substances such as calcium chloride and soot, Thereby ensuring durability.

In order to improve the surface strength lowered due to the surface pores larger than the inner pores to a level higher than the internal strength, it is necessary to grasp the surface pores with a material having excellent durability. The primary cement polymer described above is for increasing the surface strength, It should be formulated so that it does not clog the internal void and does not affect the water permeability.

Such a primary cement polymer may be prepared by mixing water, cement, emulsion resin, silica sand, or the like.

The primary cement polymer is prepared by mixing 20 to 200 parts by weight of cement and 5 to 200 parts by weight of an emulsion resin based on 50% by weight of solids in 100 parts by weight of water, wherein the emulsion resin is selected from the group consisting of epoxy, acrylic, EVA and urethane One or more of them may be selected and used, and waterproofing agents and water repellents may be used if necessary.

If cement is used less than 20 parts by weight, adhesion and durability are inferior. (When resin is used alone, resin is weak in ultraviolet ray and can be separated from cement mixed with permeable concrete.) Cement use effect can not be expected, When the emulsion resin is added in an amount of less than 5 parts by weight, the effect of using the emulsion resin can not be obtained (sufficient adhesion can not be exhibited). When the amount of the emulsion resin is more than 200 parts by weight, The effect is deteriorated.

The primary cement polymer may include an extender and silica sand for improved skid resistance. Silica is used from 6th to 8th. Materials larger than 6th grade can be separated after material separation and particles can be dropped, and the slip resistance effect of materials thinner than 8th grade is lowered.

Such silica sand is used in a range of 5 to 200 parts by weight, and when it is added in an amount of 5 parts by weight or less, the sliding resistance is lowered. When it is used in an amount of more than 200 parts by weight, adhesion and sprayability are lowered. A glass powder may be used together with such silica sand, and an advantage of improving the heat shielding effect when glass powder is used is advantageous.

On the other hand, it is also possible to add a pigment to the primary cement polymer to color the pavement, and as a result, it is possible to improve the economical efficiency in comparison with the permeable concrete using the pigment as the coloring pavement.

The pigment is used in a range of 3 to 30% of the amount of cement used. When less than 3% is added, the coloring effect can not be expected. When the pigment is used in excess of 30%, the use effect is lowered.

In addition to silica sand, it is possible to mix and disperse charcoal and activated carbon, which are storage materials, in order to lower freezing points on the surface of winter season. In addition to heat storage materials, far infrared rays and yellow clay, zeolite, It may be mixed.

The primary cement polymer should be filled to the top of the funnel in Figure 2 and measured in seconds until it reaches the bottom line and the flow time should be 5 seconds or more, It is because.

The mixed primary cement polymer can be sprayed after the water permeable concrete is laid, before the roller compaction, or after the waterproof concrete is laid, after the first roller compaction and before the second roller compaction.

The primary cement polymer is sprayed while adjusting within the range of 0.5 to 2 kg / m 2.

If the applied amount of the primary cement polymer is less than 0.5 kg, the effect of increasing the surface strength is not expected. If the applied amount exceeds 2 kg, the surface voids are covered and the permeability decreases.

After spraying the primary cement polymer, which is a surface protection agent, a secondary cement polymer is sprayed inside the pores to protect the package from harmful substances such as calcium chloride and soot.

The secondary cement polymer is prepared by mixing 5 to 50 parts by weight of cement and 10 to 500 parts by weight of an emulsion resin based on 50% of solids, 100 parts by weight of water, and mixing a waterproofing agent and a water repellent agent if necessary.

If the cement is mixed in an amount of less than 5 parts by weight, the effect of use can not be expected. If the cement is used in an amount exceeding 50 parts by weight, there is a disadvantage in that it can not penetrate into the internal void and coloring of the permeable concrete occurs.

If the emulsion resin selected from epoxy, acrylic, EVA, urethane and LATEX resins is added in an amount of less than 10 parts by weight, the effect of use can not be expected. If the amount of the emulsion resin is more than 500 parts by weight, .

The pigment can be added to the secondary cement polymer if necessary, and it is added within the range of 3 ~ 20% of the amount of cement when the pigment is added.

The secondary cement polymer should be less than 5 seconds from filling the top of the funnel in Fig. 2 to reach the bottom line. This is because it affects the surface pore in the case of 5 seconds or more and does not reach the bottom by coating with the inner pore.

The secondary cement polymer should be sprayed at least one hour after the application of the primary cement polymer so that the primary cement polymer is sprayed in a solidified state above the solidification point to prevent mixing with the primary cement polymer .

Spray is applied to the base layer as much as the lining is installed on the permeable pavement. It should be sprayed in the range of 0.5 ~ 2.0kg, since the flow rate should be high by increasing the number of used pesticides.

It is possible to prevent the internal voids from clogging by separating the surface pores by dividing the surface pores into the remaining pores after the pearling concrete pavement is installed and to easily remove the foreign matter filtered from the surface and to improve the durability of the pores, In order to improve the durability of the packaging, it is necessary to add one to three mm single-sided silica sand or EPDM, urethane or waste tire rubber chip to the surface of the concrete pavement to improve the durability of the pavement, And mixed with epoxy resin, urethane, or acrylic resin, which is an oil-based resin.

At this time, 5 to 30 parts by weight of a resin may be mixed with 100 parts by weight of silica sand. If less than 5 parts by weight of the resin is added, the adhesive strength is lowered. If the added amount is more than 30 parts by weight,

In addition, it is possible to open the packaging within three days by using One Day packaging, which uses the cement as raw material directly on the site using crude steel and cementitious steel cement.

On the other hand, the pavement pavement can be used as an asphalt pavement layer of 1 x 10 -5 cm / sec or less, cement pavement, packaging using recycled asbestos aggregate, stabilized pavement of pavement using recycled cement aggregate, It is completed by installing and completing the permeable concrete on the existing packaging, and connecting the waterproof tank and the waterproof concrete installed on one side of the permeable concrete to the water tank through the pipe.

PP, PE, or the like so that the water can be purified while passing through gravel, sand, and activated carbon, and is sandwiched between a plurality of gravels having a coefficient of permeability of 1 * 10 -2 cm / sec or more, , And after putting activated carbon, it is installed sequentially in house collection.

In addition, stainless steel, coated pore netting, hooks, etc. may be installed in the inside of the pore to facilitate the installation and replacement of gravel, sand and activated carbon.

The clean water that has passed the house modification is transferred to the tank through the piping and stored. It can control the water level during the flood and can be used for various purposes in case of water shortage.

In this way, when the drainage packaging is performed, the humidity around the road can be controlled, and the flood control function can be adjusted by controlling the flow rate of the water concentrated in rivers and rivers, The flow rate can be adjusted according to the flow of the water to the inside of the package, thereby making it possible to equalize the amount of water to be supplied to the water collection.

In order to achieve eco-friendly packaging, after the pitcher concrete is first compromised, the primary cement polymer is sprayed at 2 to 5 kg / m < 2 > to fill the surface voids, Pore-filling packaging is also possible in which 0.2 to 0.5 kg / m 2 of polymer is sprayed.

In the case of applying the pore-filling package, the primary and secondary cement polymers to be sprayed on the permeable concrete for environmental friendliness include charcoal, activated carbon, ocher, zeolite, elvan, germanium Is added in an amount of 10 to 100 parts by weight based on the emulsion resin used.

As described above, charcoal and activated carbon, which are storage materials, reduce freezing points on the surface of winter season. When yellow soil is used instead of pigment, a color showing the original color of yellow soil can be obtained. When using zeolite, elvan, germanium, And an anion can constitute an environmentally friendly pavement.

After laying a square or cylindrical structure of a comparative calcination section having a trapezoidal cross section, the structure is removed and then the above structure is removed. Then, the above-described structure of iron, stainless steel , A porous container made of plastic is put in to induce an excellent light, so that the impurities can be guided into the inside of the package.

Such a structure not only prevents the pores of the permeable concrete from being clogged by the foreign matter of the package collected in the container, but also has an advantage that the foreign substance can be easily removed by cleaning the container.

Permeable concrete is paved with gray charcoal, which is a storage material on the sidewalk.

T = 10cm, permeability coefficient 1 * 10 -2 cm / sec, the maximum size of coarse aggregate is 10mm and the compressive strength is 180kg / ㎠.

1. Materials

(1) pitching concrete

① Aggregate particle size distribution

division Percent of Pass Weight (%) Checker 13mm 10mm 25mm Particle size distribution 100 100 2.5 standard 90-100 90-100 0 to 10

② Binding table



Name of material


aggregate
(10 mm)


cement

Admixture
(AE
Water reducing agent)


water

emulsion
Suzy
(Acrylic)
(50% of solid count)

Reinforcing strength agent (cellulose fiber)


system

Material amount
(10 kg / m 3)


1650


289


1.4


110


14


0.9


2065.3

※ The aggregate amount is the maximum compaction criterion by the vibrator (1 / 2HP, 1700RPM, 3 layers compaction) using the container of the aggregate unit volume test method of KS regulations.

※ Quantity of cement unit is set by mixing design.

※ Pigment is not used.

(2) Primary cement polymer (surface reinforcing agent)

Name of material water cement
(White)
Emulsion resin
(Acrylic)
(Solid content 50%)
Silica sand
(8th company)
charcoal system
Material weight (kg) 100 100 100 100 10 410

(3) Secondary cement polymer (inner porosity protecting agent: penetration agent)

Name of material water cement
(White)
Emulsion resin
(Acrylic)
(Solid content 50%)
charcoal Waterproofing agent system
Material weight (kg) 300 40 200 7 0.4 547.4

2. Test results of materials

(1) pitching concrete

Exam name Slump (cm) Porosity (wet)
(%)
Compressive strength
(kg / cm2)
Freeze-thaw
(100 cycles,%)
Flexural strength
(kg / cm2)
Indoor permeability coefficient
(cm / sec)
Slip resistance (BPN)

Test result

0

17

197

95

31
5.7 * 10 -2 55

standard

0.5

12 or more

180

More than 80

2.5 or more
1 * 10 -2 or more 40 or more

(2) Cement polymer

① Primary cement polymer


Exam name

Kneading
(second)

color

Temperature difference (℃)

Remarks

After the test

7.5

grey

+3.9

Mixing is done by mixed mixing method. Mixing is used to prevent material separation and used within 2 hours.

standard

5 or more

grey

+3 or higher

※ Check the temperature difference between brick and cement brick after T = 1mm after coating (temperature difference: after 10 hours at atmospheric temperature 10 ℃, after 10 hours at minus -10 ℃ freezer)

※ The kneading time is the time (in seconds) when the material is put into the funnel as shown in Fig.

② Secondary cement polymer


Exam name

Kneading (second)

color

Remarks

After the test

2

grey
Mixing is done by mixed mixing method. Mixing is used to prevent material separation and used within 2 hours.

standard

Less than 5

grey

3. Installation

(1) pitching concrete

① Organize the street.

② Lay sand on the runway and roll up the roller.

③ Install a permeable sheet (permeability coefficient: 1 * 10 -2 cm / sec, T = 1 mm)

④ Install crushing base layer and roll up the rollers (maximum thickness of aggregate: 25mm)

⑤ Install pitcher concrete and compose the primary roller.

※ The compaction is 3.5ton of combination roller and 5 times of 5 times compaction (5 times the number of design compaction).

(2) Primary cement polymer

After first compaction, first cement polymer spraying (0.8kg per ㎡) and second compaction (3 times) are carried out.

(3) Secondary cement polymer

After 3 hours, the pearl concrete is covered with a wide plywood so as not to be impacted, and the secondary cement polymer is charged (1.2kg per ㎡)

(4) Joint time

After 24 hours (atmospheric mean temperature: 20 ° C), cut the joints at intervals of 5 mm and install joints, backing agents, and joints.

(5) Curing

Walking after 2nd curing (48 hours).

Pavement concrete using permeable concrete is packed in T = 20cm on the apartment roadway (the bottom layer is packed 10cm with the maximum number of coarse aggregates 25mm and the top layer is packed with 10cm with the maximum number of coarse aggregates 13mm) Coefficient is 1 * 10 -2 cm / sec or more, coarse aggregate maximum size is 25mm (lower layer), 13mm (upper layer), compressive strength is 210kg / ㎠, and bending strength is 45kg / ㎠.

Sand, and activated carbon in a pitcher bag in the order of stormwater passing through the reservoir, and use 500ton reservoir capacity (100mm or better water storage capacity per day) Of the water tank is buried in the underground concrete road.

The stored rainwater is used as drinking water.

For drainage packaging, a stabilized layer (10cm) with cement is installed on the bottom.

1. Materials

(1) pitching concrete

① Particle size distribution of aggregate

end. Bottom layer

Checker (mm)
Body Weight and Weight Percentage (%)
40 25 2.5 Particle size distribution 100 100 0.3 standard 100 90-100 0 to 10

I. Upper layer

Checker (mm)
Body Weight and Weight Percentage (%)
2 13 2.5 Particle size distribution 100 95.5 1.5 standard 100 90-100 0 to 10

② Binding table


Name of material

aggregate

cement

Admixture

water
emulsion
Resin (solid content 50%)

system


Material amount
(kg / m3)

Bottom layer

1610

302

1.5

110

8

2031.5

Upper layer

1660

315

1.5

116

10

2102.5

※ The aggregate amount is the maximum compaction load standard by the vibration equipment (1 / 2HP, 1700RPM, 3 layers compaction) using the container of the aggregate unit volume test method of KS regulations.

※ Aggregate is based on surface dry saturation condition.

(2) Primary cement polymer (surface strength reinforcement)

Name of material water cement Emulsion Resin Acrylic
(Solid content 50%)
Silica (8th company) system
Material weight (kg) 100 100 50 200 450

(3) Secondary cement polymer (inner porosity protecting agent: penetration agent)

Name of material water cement Emulsion Resin Acrylic
(Solid content 50%)
system
Material weight (kg) 300 40 200 540

2. Test results of materials

(1) pitching concrete


Exam name

Slump (cm)

wet
Porosity
(%)

Compressive strength
(kg / cm2)

Freezing and thawing (100 cycles,%)

Flexural strength
(kg / cm2)

Permeability coefficient
(cm / sec)

Slip resistance (BPN)

Test result

Bottom layer

2.5

17.5

245

92

49

1.5 * 10 -1


-

Upper layer

0.5

14.7

261

90

51

8.5 * 10 -2

62

standard

0-5

12
More than

210 or more

More than 80

45 or more

1 * 10 -2

57 or more

(2) Cement polymer

① Primary cement polymer

Kneading (sec): 6.5

② Secondary cement polymer

Kneading: 2

3. Installation

(1) Process for water storage

① Boundary stones and water troughs are installed, and water collecting troughs are installed in the water troughs.

② to install one water collection per 2,000㎡, water collection, the permeability 1.5 * 10 -1 cm / sec or more in each of the multi-PET into the void between the Sack gravel, sand, activated carbon film yeoseo Lay from the lower activated carbon, sand (5mm or less ), And gravel (13mm).

* Here, the upper part should be opened to replace the gravel, sand and activated carbon installed in the house fix, and the house fix cover should be installed.

③ Install a 500L water tank for each 10000㎡ on the road, and connect it to the bottom of the house.

(2) Installation of barrier layer for drainage packaging

① The road surface is arranged, and the frost protection layer and the auxiliary layer are installed with the thickness according to the design.

(2) The cement stabilized layer, which is a normal impervious layer and has a compressive strength of 180 kg / cm 2 or more, is packed in a thickness of 10 cm.

③ Pack the stabilized layer and install 0.1mm vinyl on the top.

(3) Waterproof concrete

①Precipitated concrete using 25mm thick coarse aggregate on top of vinyl is poured into a finishing machine with rubber wheel to prevent vinyl from tearing. After that, it is laid down to a thickness of 10cm to form a lower layer. Compaction is carried out three times with a Merced roller and a tandem roller.

② After compaction, the permeable concrete using 13mm thick coarse aggregate is laid with a thickness of 10cm, and it is plastered twice with a tandem roller.

(4) Primary cement polymer spraying

After compaction with a temporary roller, 0.8 kg of primary cement polymer is sprayed per ㎡, and compaction is performed 5 times with a combination roller so that it is 96% or more of the test specimen compaction density.

(5) Secondary cement polymer spraying

Primary cement polymer is sprayed, plumbed, and after 60 minutes, 1.8 kg of secondary cement polymer per square meter is charged.

(6) Joints

After the lapse of 24 hours (at an atmospheric average temperature of 20 ° C), the shrinkage joints were cut to a length of 5 mm and a length of 7 cm at intervals of 5 m, completely cut to a thickness of 20 mm at intervals of 50 m and cleaned with high pressure spraying, Install backup materials and joints.

(7) Curing

The car is opened after the second curing (14 days).

Pitcher (porous) concrete, non-pitching environmentally friendly packaging, bicycle road.

A coarse aggregate size is 20mm, the porosity is more than 12%, permeability 1 * 10 -2 cm / sec, compression strength more than 180kg / ㎠, package thickness is 10cm, 1 primary apertures juipjae uses a gypsum and activated charcoal, in Winter It is possible to accumulate heat and to express heat resistance during the summer season, and since the filling material only covers the surface pore (penetration thickness: 20 mm) at the surface, the silica sand of the primary spraying agent uses No. 6.

1. Materials

(1) pitching concrete

① Particle size distribution of aggregate

Checker (mm)
Percentage passed (%)
25mm 20mm 2.5 mm Particle size distribution 100 100 2.5 standard 100 90-100 0 to 10

② Binding table

Name of material aggregate cement Admixture water Emulsion resin
(Solid content 50%)
system
Material weight (kg) 1630 275 1.4 105 8 2019.4

※ The aggregate amount is the maximum compaction load standard by the vibration equipment (1 / 2HP, 1700RPM, 3 layers compaction) using the container of the aggregate unit volume test method of KS regulations.

※ Aggregate is based on surface dry saturation condition.

(2) Primary cement polymer

Name of material water cement
(White)
emulsion
Resin (Acrylic)
(Solid content 50%)
Silica sand
(6th company)
ocher Activated carbon system
Material amount
(kg)
150 100 50 200 50 15 565

(3) Secondary cement polymer

Name of material water cement
(White)
emulsion
Resin (Acrylic)
(Solid content 50%)
ocher charcoal system
Material amount
(kg)
100 40 100 50 15 305

2. Test results of materials

(1) pitching concrete

Exam name slump
(cm)
Wet porosity
(%)
Compressive strength
(kg / cm2)
Freezing and thawing (100 cycles,%) Permeability coefficient
(cm / sec)
Test result 1.5 15.7 192 89 8.5 * 10 -2 standard 0-5 12 or more Over 180 More than 80 1 * 10 -2 or more

(2) Primary cement polymer


Exam name

Kneading
Temperature difference (℃)
Winter season Summer Test result 8.5 +4.2 -12 standard 5 or more +3 or higher -over 10

※ The temperature difference in the summer season is the temperature difference compared with general concrete package by installing a thermometer inside the product (10cm) and forming the atmospheric temperature at 35 ℃.

※ Winter season is measured as in Example 1 after permeation with porous permeable concrete material with same conditions as the site.

(3) Secondary cement polymer

Kneading: 3.5 seconds

3. Installation

(1) pitching concrete

① Clear the street.

② Install auxiliary function by 20cm according to the packaging design thickness and pledge.

③ After sprinkling on top of the auxiliary layer, 10 cm of porous concrete is laid, and the first and second compaction are carried out by combination roller.

(2) Primary cement polymer

The primary cement polymer was sprayed with 7.8 kg per square meter (1 m 2 * 0.02 (injection depth: 20 mm) * 0.3 (surface porosity) * 1,300 kg / m 3 (volume of spraying agent) = 7.8 kg) , Diameter 20 cm, length 100 cm), and then surface sieving to the Kwangmok Stream.

(3) Secondary cement polymer

After the surface is cleaned with hand rollers, the secondary cement polymer is contained at 0.3 kg per ㎡.

(4) Joints

After 24 hours, cut into 3 mm thickness and 5 mm width at intervals of 5 m.

(5) Curing

After curing for 72 hours, bicycle road is opened.

Although the present invention has been described in detail with reference to the concrete examples, it is to be understood that the present invention is not limited to the concrete of the present invention, It will be apparent to those skilled in the art that variations and modifications may be made without departing from the scope of the present invention.

It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (13)

Preparing a single-coarse aggregate having a maximum coarse aggregate number of 5 to 25 mm at 1500 to 1800 kg / m3;
Preparing a cement having a compressive strength of 120 to 350 kg / cm < 2 >
Preparing 100 to 150 kg / m < 3 > of water so as to satisfy a slump value of 5 cm or less;
The emulsion resin is selected from epoxy, acrylic, urethane, EVA, LATEX resin and waterproofing agent, and is used within a range of 2 to 30% by weight based on 50% of solid content of cement.
Preparing a water permeable concrete by mixing at least one material selected from the group consisting of an admixture, an emulsion resin and a reinforcing fiber with the single particle aggregate, cement and water;
A step of installing and compaction of the permeable concrete;
The primary cement polymer is prepared by mixing water, cement, and emulsion resin so that the time from the top to 100 mm is 5 seconds or longer, into a funnel for measuring a kneader having a top diameter of 150 mm, a bottom diameter of 15 mm, and a height of 200 mm, Adding and mixing at least one material selected from charcoal, activated carbon, yellow soil, zeolite, elvan, and germanium, and spraying and mixing the permeable concrete;
A step of allowing the primary cement polymer sprayed on the water permeable concrete to solidify for 1 hour or more; And
Water, cement and emulsion resin were added to the coagulated primary cement polymer so that the time from the top to 100 mm was less than 5 seconds on top of the primary cement polymer with a top diameter of 150 mm, a bottom diameter of 15 mm and a height of 200 mm. And mixing the mixture to prepare a secondary cement polymer and spraying the same to protect the internal voids.
The method according to claim 1,
20 to 200 parts by weight of cement, 5 to 200 parts by weight of an emulsion resin based on a solid content of 50%, and 5 to 200 parts by weight of silica sand are dispersed in 100 parts by weight of water, and the above primary cement polymer is sprayed in a range of 0.5 to 2 kg / Respectively,
Wherein the secondary cement polymer is sprayed in a range of 0.5 to 2 kg / m 2, and 5 to 50 parts by weight of cement and 10 to 500 parts by weight of emulsion resin solids are mixed with 100 parts by weight of water. Road Pavement Method Using Pitcher Concrete.
The method of claim 2,
Characterized in that 3 to 30 parts by weight of the cement used is further added to the primary cement polymer and a pigment is further added to the secondary cement polymer in an amount of 20 parts by weight of the amount of the cement used. Road packing method.
A single-coarse aggregate having a maximum coarse aggregate size of 5 to 25 mm, a single-coarse aggregate having a coarse aggregate size of 1500 to 1800 kg / m 3, a cement having a compressive strength of 120 to 350 kg / m 2 and a cement having a coarse aggregate size of 100 to 150 kg / M 3 of water, an admixture, an emulsion resin, and a reinforcing fiber is mixed with the single-layered aggregate, cement, and water to form a water permeable concrete on the impervious layer and compaction thereof;
Spraying a second cement polymer on the permeable concrete with the first cement polymer as a surface protecting agent and the inner pore protecting agent; And
A step of providing an aggregate having a gravel layer, a sand layer, an activated carbon layer or a char layer successively installed on one side of the permeable concrete and the impervious layer in the flow direction of the stormwater, and connecting the aggregate to the water tank,
For the collection,
A gravel layer, a sand layer, and an activated carbon layer, each of which is made of at least one material selected from PET, PP and PE and has a water permeability coefficient of 1 * 10 -2 cm / sec or more so that the stormwater passing through the permeable concrete can pass sequentially. Layer or a char layer is sequentially installed on the surface of the pavement.
The method of claim 4,
Wherein the gravel layer, the sand layer, the activated carbon layer, or the char layer is installed in a space defined by the stainless steel, the coated multi-mesh network, and the cornice in the corrugation.
The method of claim 5,
20 to 200 parts by weight of cement, 5 to 200 parts by weight of an emulsion resin based on a solid content of 50%, and 5 to 200 parts by weight of silica sand are dispersed in 100 parts by weight of water, and the above primary cement polymer is sprayed in a range of 0.5 to 2 kg / Mixed and formed,
Wherein the secondary cement polymer is sprayed in a range of 0.5 to 2 kg / m 2, and 5 to 50 parts by weight of cement and 10 to 500 parts by weight of emulsion resin solids are mixed with 100 parts by weight of water. Road Pavement Method Using Pitcher Concrete.
The method of claim 6,
Characterized in that 3 to 30 parts by weight of the cement used is further added to the primary cement polymer and a pigment is further added to the secondary cement polymer in an amount of 20 parts by weight of the amount of the cement used. Road packing method.
The method according to claim 1,
In order for the storm to flow into the package,
A process of laying a rectangular or cylindrical structure of a relative calcined section having a trapezoidal shape after the permeable concrete is laid, compacting and eco-packaging;
A step of spraying a second cement polymer (0.5 ~ 2 kg / m 2) as a pore protection material and spraying a first cement polymer over 2 kg / m 2 to form a surface impermeable layer;
Further comprising the step of removing the structure and then inserting a porous container having a shape corresponding to the shape of the structure and having a material selected from the group consisting of iron, stainless steel, and plastic.
Impervious layer;
The aggregate having a maximum coarse aggregate number of 5 to 25 mm and a cement having a compressive strength of 120 to 350 kg / m < 3 > and a slump value of 5 cm or less, Water permeable concrete which is produced by mixing at least one selected from water, water, and water, 150 kg / m 3 of water, an admixture, an emulsion resin and a reinforcing fiber with the single-stage aggregate, cement and water,
An aggregate installed on one side of the impervious layer and the permeable concrete; And
And a water tank connected to the collection tank,
The collection-
A gravel layer, a sand layer, and an activated carbon layer, each of which is made of at least one material selected from PET, PP and PE and has a water permeability coefficient of 1 * 10 -2 cm / sec or more so that the stormwater passing through the permeable concrete can pass sequentially. Layer or a char layer is sequentially installed on the surface of the pavement.
delete delete delete delete
KR1020160034409A 2016-03-23 2016-03-23 Method and system for paving road using porous concrete KR101683587B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160034409A KR101683587B1 (en) 2016-03-23 2016-03-23 Method and system for paving road using porous concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160034409A KR101683587B1 (en) 2016-03-23 2016-03-23 Method and system for paving road using porous concrete

Publications (1)

Publication Number Publication Date
KR101683587B1 true KR101683587B1 (en) 2016-12-07

Family

ID=57572704

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160034409A KR101683587B1 (en) 2016-03-23 2016-03-23 Method and system for paving road using porous concrete

Country Status (1)

Country Link
KR (1) KR101683587B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101905744B1 (en) 2018-01-23 2018-10-11 동광산업주식회사 A high-performance permeable concrete composition using waterborne urethane binder and construction method using the same
CN109694222A (en) * 2019-02-27 2019-04-30 中原工学院 Prefabricated sash constraint is without the permeable regeneration concrete of sand
CN109761644A (en) * 2019-04-09 2019-05-17 北京琦正德科技有限责任公司 A method of raising has occurred and that frost and melt damage concrete frost resistance
KR20190083440A (en) 2018-01-04 2019-07-12 박노윤 Road paving method
KR102302127B1 (en) * 2021-02-24 2021-09-16 (주)동양후로아 Eco-friendly acrylic polymer concrete water permeable pavement material composition and the polymer concrete water permeable block using the same and the water permeable pavement construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980066436A (en) 1997-01-24 1998-10-15 최순호 High strength pitched concrete
KR20020071241A (en) * 2001-03-05 2002-09-12 황익현 Paving method of permeable concrete having high endurance
KR20070110674A (en) * 2006-05-15 2007-11-20 홍종현 Permeable concrete road pavement structure and construction method thereof
KR100982233B1 (en) * 2009-07-03 2010-09-14 황익현 Water permeable polymer road pavement having increased moisture content and durability and method for constructing the pavement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980066436A (en) 1997-01-24 1998-10-15 최순호 High strength pitched concrete
KR20020071241A (en) * 2001-03-05 2002-09-12 황익현 Paving method of permeable concrete having high endurance
KR20070110674A (en) * 2006-05-15 2007-11-20 홍종현 Permeable concrete road pavement structure and construction method thereof
KR100982233B1 (en) * 2009-07-03 2010-09-14 황익현 Water permeable polymer road pavement having increased moisture content and durability and method for constructing the pavement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190083440A (en) 2018-01-04 2019-07-12 박노윤 Road paving method
KR101905744B1 (en) 2018-01-23 2018-10-11 동광산업주식회사 A high-performance permeable concrete composition using waterborne urethane binder and construction method using the same
CN109694222A (en) * 2019-02-27 2019-04-30 中原工学院 Prefabricated sash constraint is without the permeable regeneration concrete of sand
CN109761644A (en) * 2019-04-09 2019-05-17 北京琦正德科技有限责任公司 A method of raising has occurred and that frost and melt damage concrete frost resistance
KR102302127B1 (en) * 2021-02-24 2021-09-16 (주)동양후로아 Eco-friendly acrylic polymer concrete water permeable pavement material composition and the polymer concrete water permeable block using the same and the water permeable pavement construction method thereof

Similar Documents

Publication Publication Date Title
KR101683587B1 (en) Method and system for paving road using porous concrete
US5788407A (en) Paving method of water-permeable concrete
CN201386248Y (en) Anti-blockage permeable brick
AM et al. Development of high quality pervious concrete specifications for Maryland conditions.
CN105256692A (en) Color and pervious concrete pavement structure and construction technology therefor
KR100939237B1 (en) Pavement material for road surface, and method for paving the road surface with use thereof
KR101311748B1 (en) The binder for water permeable concrete and paving method using the same
KR100982233B1 (en) Water permeable polymer road pavement having increased moisture content and durability and method for constructing the pavement
KR20190006233A (en) Construction method of water-permeable pavement with excellent properties of stability, economy and conduct ability for pavement and road
Zhuge A review of permeable concrete and its application to pavements
CN114606823B (en) Cement-based permeable concrete pavement structure and paving method thereof
KR100984775B1 (en) Construction method of sidewalk with permeability and water storage and sidewalk block for the method
KR100324249B1 (en) A thin-water permeable concrete paving method with fine aggregate
KR100404679B1 (en) pavement overlaid with waste tire chip composition
GB2410282A (en) Water management system
JP4699081B2 (en) Water retentive pavement and its pavement method
KR20010070938A (en) Methods of paving cement concrete roads and of making blocks using soil as a part thereof
CN206752237U (en) Stealthy passageway for fire apparatus
CN202787016U (en) Novel water seepage concrete member
KR100243568B1 (en) A method for preparing water-permeable pavement with a thin and permeable top layer
CN208844383U (en) A kind of colorful water-permeable pavement structure
KR0134989B1 (en) Paving method for water permeable concrete with granule type aggregate
KR100411911B1 (en) Paving method of permeable concrete having high endurance
CN107881874A (en) A kind of ecological permeable concrete structure road surface with holes
KR100428811B1 (en) Paving method for cement concrete road having drainage layer

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20191126

Year of fee payment: 4