KR101559813B1 - Management system for bar-code omission process of surface mounting technology line and control method thereof - Google Patents

Management system for bar-code omission process of surface mounting technology line and control method thereof Download PDF

Info

Publication number
KR101559813B1
KR101559813B1 KR1020140031716A KR20140031716A KR101559813B1 KR 101559813 B1 KR101559813 B1 KR 101559813B1 KR 1020140031716 A KR1020140031716 A KR 1020140031716A KR 20140031716 A KR20140031716 A KR 20140031716A KR 101559813 B1 KR101559813 B1 KR 101559813B1
Authority
KR
South Korea
Prior art keywords
equipment
server program
management system
production
bar code
Prior art date
Application number
KR1020140031716A
Other languages
Korean (ko)
Other versions
KR20150108651A (en
Inventor
구용국
남경수
Original Assignee
(주)남강하이테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)남강하이테크 filed Critical (주)남강하이테크
Priority to KR1020140031716A priority Critical patent/KR101559813B1/en
Publication of KR20150108651A publication Critical patent/KR20150108651A/en
Application granted granted Critical
Publication of KR101559813B1 publication Critical patent/KR101559813B1/en

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • General Factory Administration (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)

Abstract

The present invention relates to a surface mounting line bar code missing process tracking management system and a control method therefor, and an object of the present invention is to provide a surface mounting line bar code missing process tracking management system and a control method therefor, in which a plurality of process equipment is installed on one conveyor, And to provide a system and a method of controlling the same.
A surface mount line bar code missing process tracking management system according to the present invention includes: a loader equipment for loading a board for surface mounting; a surface mounting line composed of a plurality of equipment for performing a predetermined job on a board inserted from a loader equipment; A first additional bar code reader and a second additional bar code reader are installed at the rear end of the loader equipment and at the front end of the unloader equipment, respectively; Each of the first additional bar code reader, each of the devices constituting the surface mounting line, and the second additional bar code reader correspond to the first equipment server to the nth equipment server to which the bar code information of the corresponding board or the real- To-one relationship; The first equipment server to the nth equipment server are connected to each other and connected to the production management system server. Then, the surface mounting process of the board, which is loaded through the loader equipment and then discharged through the unloader equipment through a series of surface mounting operations, And is configured to be integrally managed by the system server.

Description

TECHNICAL FIELD [0001] The present invention relates to a process management system and a control method thereof,

The present invention relates to a surface mount line bar code missing process tracking management system and a control method therefor. More particularly, the present invention relates to a surface mount line bar code missing process tracking management system and a control method thereof, The present invention relates to a system and method for controlling a missing track of a surface mounted line barcode.

      Generally, the surface mounting line (SMT Line) consists of a production line in which a plurality of processes are installed on one conveyor. In this case, As a result of the miniaturization and high integration, the defective rate is getting higher due to difficulty in the operation, and a production management system for improving the productivity has been increasingly applied.

      To this end, the production management system of the surface mount line, which has recently been applied, is mainly used for the operation and production status of each process, equipment, and various production related statistics of the finished product and for the follow-up management. It is necessary to distinguish a printed circuit board to be put into a production line. In general, a bar code is printed on a printed circuit board.

      However, in the devices used in the above-described surface mounting line, the reader for recognizing a bar code is an optional device, or there are many devices without a reader, and it is difficult to collect production management data for each board A problem occurred.

      1 and 2, the surface mounting line includes a loader device 1, a soldering device 2, a lead application inspection device 3, The first to eighth steps via the chip mount 4, the release mounter 5, the reflow 6, the placement tester 7, and the unloader equipment 8, At this time, in the case of the lead application tester 3 in the third process as the inspection equipment and the packaging tester 7 in the seventh process, since it is an equipment for inspection, a bar code reader capable of reading bar codes is provided However, in the remaining devices, the presence or absence of the device is determined depending on whether the option device is purchased or not. At this time, the production data from each device to the production management system server 9 is transmitted according to the presence or absence of the barcode reader .

      First, if the barcode reader is attached to the corresponding equipment, the barcode for reading the production-related data corresponding to the board is read along with the barcode for distinguishing the printed circuit board for each equipment, and the production management system server 9 .

      In the case where the barcode reader is not attached to the equipment, only the production-related data corresponding to the board currently being produced is transmitted to the production management system server 9 in a state in which the barcode information on the PCB is missing .

      In this case, in order to complete the mounting operation on one printed circuit board, the first to eighth steps as described above must be completed. At this time, the production data generated from the equipments of each process is transmitted to the production management system server 9) should be combined into one piece of information.

      However, as shown in FIG. 2, when the barcode of the printed circuit board on which the corresponding operation is performed can not be read from equipment provided in each process, there arises a problem in collecting production data.

      That is, the first, second, and third boards are sequentially loaded on the boards on which the bar code is printed in the "job 1", and the bar code on the first board is read in the [equipment 1] of the "job 2" After that, the production-related data is transmitted to the production management system server side together with the barcode, and at the same time, the first board is transferred to the next equipment. Then, the first board passes through all the steps of the production line, The production is completed.

      In addition, the [equipment 1] of the 'task 2' carries out the operation of the second board continuously after the first board is transferred to the next equipment. At this time, And the board is removed by the 'job 3' because the failure is not detected in the next process 'job 4', the job for the third board is again performed in the 'job 2' And the third board is transferred to the equipment [2]. If the third board has no problem in all the process operations, the production is completed in the 'operation 6' as the finished product.

      On the other hand, the second board removed through the 'job 3' is inserted into the production line again by 'job 5' after the defect is repaired, and the process is continued until the 'job 6' , The final order of production is the order of the first, second, and third boards, not the first, second, and third boards.

      Also, the production data generated in real time from each equipment and transmitted to the production management system server side is also performed in order of the first, second, and third boards in some equipment, and in addition, 3, and 2 boards.

      Accordingly, all the production data collected by the production management system server need to include all of the barcode information of each board, so that there is no problem in collecting production data for each device of the finalized board. However, Since the bar code reader is not installed in [Equipment 2], bar code information can not be included when the production data is transmitted to the production management system server. Therefore, As the production data is transmitted in the order of the first, third, and second boards without being judged, the difference from the first, second, and third order of the boards transmitted in the 'task 2' occurs.

      Therefore, in the actual surface mounting line in which the equipment on which the bar code reader is mounted and the equipment on which the bar code reader is not mounted are mixed, it is impossible to anticipate which process the board will be removed from. In addition, There is a problem that it is impossible to integrate and manage the production data generated and transmitted in real time in each equipment to the same board, There is a problem that the data to be managed and reused for improving the productivity in the mobile communication system must be limited.

Korean Patent No. 10-0254782 Korean Patent No. 10-1278999

SUMMARY OF THE INVENTION It is therefore an object of the present invention to provide a method and an apparatus for mounting a bar code on a surface mounting line on which a plurality of processes are installed on a single conveyor, The present invention also provides a system and method for controlling a missing track of a surface-mounted-line barcode that can efficiently manage production-related data.

 According to an aspect of the present invention, there is provided a surface mount line barcode missing process tracking management system including: a loader equipment for loading a board for surface mounting; a plurality of And a unloader device for discharging a board in which a series of operations are completed, wherein a rear end of the loader device and a front end of the unloader device are respectively provided with a first additional bar code reader and a second additional bar code reader A barcode reader is installed; The first additional bar code reader, each of the devices constituting the surface mounting line, and the second additional bar code reader are respectively connected to a first equipment server to an nth equipment server through which bar code information of the corresponding board or real- Respectively; The first equipment server to the nth equipment server are connected to each other and are connected to a production management system server. The first equipment server and the nth equipment server are connected through a loader equipment, Are integrated and managed by the production management system server.

Preferably, the first equipment server to the n-th equipment server are programs for collecting production management data generated from each equipment, wherein the programs are independently configured for each equipment, or integrated into one program .

Preferably, the first equipment server to the nth equipment server are integrally operated through a single computer or separately operated through a plurality of computers.

Meanwhile, the control method of the surface mounting line barcode missing process tracking management system according to the present invention includes the steps of: reading barcode information of a board inserted from a loader equipment as a first equipment, from the first additional barcode reader and transmitting the barcode information to the first equipment server; ; The production data generated in the second equipment is transmitted to the second equipment server side after the corresponding board is inserted into the second equipment disposed after the loader equipment and the second equipment server transmits the information to the production management system server side When the bar code reader is provided in the second equipment, the production data including the bar code information is transmitted to the production management system server, and when the bar code reader is not provided, Matching the barcode information with the production data and transmitting the barcode information to the production management system server; The production data generated in the third equipment is transmitted to the third equipment server side after the board is inserted into the third equipment disposed after the second equipment, and the third equipment server transmits the information to the production management system server If the barcode reader is provided in the third equipment, the production data including the barcode information is transmitted to the production management system server, and if the barcode reader is not provided, Matching the generated barcode information with the production data and transmitting the barcode information to the production management system server; 1, the production data generated in the (n-1) th equipment is transmitted to the (n-1) th equipment server side after the corresponding board is inserted into the (n-1) If the barcode reader is provided in the n-1th equipment, the production data including the barcode information is transmitted to the production management system server, and the barcode reader is provided If not, matching the barcode information transmitted from the n-2 < th > equipment server with the production data and transmitting the barcode information to the production management system server; The barcode information of the board on which the surface mounting operation is completed is read from the second additional barcode reader installed on the upstream side of the unloader equipment as the nth equipment, and transmitted to the nth equipment server side. As the information is transmitted to the sansan management system server, And the surface mounting process of the recognized board is controlled through an integrated management step.

Preferably, the first equipment server is controlled to compare the data transmitted from the first additional barcode reader with the barcode information previously stored in the production management system server. If it is determined that the barcode information is valid, And notifies the production management system server of the input of the corresponding board. If it is determined that the barcode information is invalid, the barcode information is notified to the production management system server so that the operation is stopped.

In addition, the equipment server connected to the predetermined equipment equipped with the barcode reader compares the barcode information read from the barcode reader with the barcode information transmitted from the equipment server of the previous stage. If the result is determined to be invalid, It is preferable to notify the server so as to control the work to be stopped.

      According to the present invention as described above, it is possible to effectively manage the production-related data even in a process in which the barcode can not be recognized in the surface mounting line in which the equipment is installed in one conveyor and various operations are performed .

      In addition, integrated data for production control of all printed circuit boards produced through this process can be segmented into all processes and equipment to accurately grasp the reliability of all the results operated in the production management system. There is an effect that can be improved.

1 is a view showing a schematic configuration of a conventional surface mount line production data management system,
FIG. 2 is a control flowchart of a production operation to which a conventional surface mount line production data management system is applied,
FIG. 3 is a diagram showing a schematic configuration of a surface mounting line bar code missing process tracking management system according to the present invention;
4 is a control flowchart of a production operation to which the surface mount line bar code missing process tracking management system according to the present invention is applied.

Hereinafter, the present invention configured as described above will be described in detail with reference to the accompanying drawings.

FIG. 3 is a view showing a schematic configuration of a surface mount line barcode missing process tracking management system according to the present invention, and FIG. 4 is a control flowchart of a production process using a surface mount line barcode missing process tracking management system according to the present invention.

The surface mount line bar code missing process tracking management system and the control method thereof according to the present invention are a surface mount line in which a plurality of apparatuses are installed on one conveyor to perform various operations, The production-related data in the unrecognized process can be accurately grasped and managed through the matching of the barcode information.

3, the surface mount line bar code missing process tracking management system according to the present invention includes a loader device 10 for inputting a board for surface mounting, A surface mounting line composed of a plurality of devices for performing operations, and an unloader device 80 for discharging a board on which a series of operations have been completed.

In the embodiment of the present invention, the equipment constituting the surface mounting line includes a lead abandoner 20, a lead application tester 30, a chip mounter 40, a release mounter 50, And a mounting inspection tester 70. The barcode reader may be provided in the lead application tester 30 and the mounting tester 70, which are inspection devices.

In the meantime, according to the present invention, the front end of the unloader equipment 80, which is a completion step for discharging the rear end of the loader equipment 10, which is a grounding step for loading the board for surface mounting, A first additional bar code reader 90 and a second additional bar code reader 92 are provided.

In this case, when the barcode reader is attached to equipment provided before or after the installation position of the additional barcode reader 90 or 92, it is not necessary to add the barcode reader, It is needless to say that an additional bar code reader may be installed as needed.

The first additional bar code reader 90 and the solder dispensing equipment 20 constituting the surface mounting line, the lead application tester 30, the chip mounter 40, the mold release mounter 50, The barcode information of the corresponding board and the real-time generation data of each device are transmitted to the first to eighth device servers, the reflow 60, the placement inspectors 70 and the second additional barcode readers 92, 22, 32, 42, 52, 62, 72, and 82, respectively.

      The first to eighth equipment servers (12, 22, 32, 42, 52, 62, 72, and 82) are programs for collecting production management data generated in each of the associated equipment. Or may be integrated into one program.

      The computer operating the program can be modified and designed in accordance with the configuration of the line or the amount of collected data. That is, the first equipment server to the eighth equipment server 12, 22, 32 , 42, 52, 62, 72, and 82), or the programs of all the equipment servers may be configured to operate on separate computers.

The first to eighth equipment servers 12, 22, 32, 42, 52, 62, 72, and 82 associated with each equipment are linked to each other and are connected to the production management system server 100 .

Accordingly, the production data according to the surface mounting operation of the board, which is inserted through the loader equipment 10 and then discharged through the unloader equipment 80 through a series of surface mounting operations, And can be integratedly managed.

Next, a process of controlling the surface mounted line bar code missing process tracking management system according to the present invention as described above will be described in detail with reference to FIG.

First, when the first board B, which is a printed circuit board for surface mounting, is loaded through the first equipment 10 as a loader equipment, the first additional bar code reader 90 in 'operation 1 (S 1) Reads the bar code of the inserted board (B), and transmits it to the first equipment server side.

Accordingly, the first equipment server transmits the barcode information transmitted from the first additional barcode reader 90 in operation 1-1 (S 1-1) to the barcode information received from the production management system server 100 in advance (B) to the production management system server 100 in the case where there is no problem by comparing the barcode information of the board B with the barcode information of the board B (production model, lot, quantity information, And the full-scale mounting work for the first board B can be performed according to the control of the production management system server 100. FIG.

At this time, if it is determined that the barcode information of the board B transmitted from the first additional barcode reader 90 to the first equipment server side is invalid, The server 100 is notified so that the operation is immediately stopped so that the operator of the corresponding line can take measures to solve the problem.

Next, in 'Operation 2 (S 2)', the production data generated from the equipment 2, which is the lead packaging cost, is transmitted to the second equipment server side. At this time, since the equipment 2 is not provided with the barcode reader, (B) of the first board (B) transmitted from the first job server through the 'job 2-1 (S 2 - 1)', and the second job server transmits the bar code And transmits the generated production data to the production management system server 100. In this case,

In the equipment 3, which is the inspection equipment performing the inspection function in the 'job 3 (S 3)', the production data of the generated first board B is transmitted to the third equipment server side. At this time, Since the reader is provided, the production data transmitted to the production management system server 100 is transmitted together with the read barcode information.

At this time, the third equipment server compares the bar code information of the first board (B) received from the second equipment server before the production data is transmitted to the production management system server (100) A process of checking whether the barcode information is valid is additionally performed.

If it is determined that the barcode information has a problem as a result of the validity check, the information is immediately notified to the production management system server 100 so that the operator can take measures to solve the problem.

Next, in the 'job 5 (S 5)', the barcode information of the first board B which is finally produced is read again via the second additional barcode reader 92, 5-1) 'to the production management system server 100 side.

At this time, the data for production management of the equipment included in the job 4 (S 4) and the job 5 (S 5) including the job 5 - 1 (S 5 - 1) The process from the job 2 (S 2) to the job 4 (S 4) is continuously repeated, and the barcode integration for the data of the productivity of the barcode and the production management data generated by each device is performed. The surface mounting operation for the first board B 'is completed.

Immediately after the insertion of the first board is completed, the second board is sequentially inserted, and the same operation as the first board is performed.

At this time, for example, if a failure of the second board is found from the equipment 3, the operator immediately removes the board 2, which is a bad board, from the production line. In the 'job 3', the production data To the production management system server through the third equipment server.

Thereafter, when the second board is removed and the third board can not find any defect, the surface mounting operation is completed through all the same operation procedures as the first board while passing through the inspection equipment 3 .

In addition, if the action of the second board which is found to be defective by the operator is found and the action of the second board is completed and is immediately put into the production line after the third board, the 'work 1 (S 1)' The production management data for the second board can always be transmitted to the production management system server 100 together with the effective barcode information through the process of 'job 5-1 (S 5-1)'.

While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the scope of the appended claims.

That is, in the embodiment of the present invention, there is provided a simple structure including a lead-free packaging cost, inspection equipment, mounting equipment, etc. between the loader equipment in which the board for surface mounting work is put and the unloader equipment in which the surface- The present invention is not limited to the above-described embodiments, but the present invention is not limited thereto. For example, the surface mount line may be a surface mount line, The removed board may be discarded, the removed board may be re-inserted, and the like. Therefore, the present invention can be applied to various applications based on the detailed description of the invention described in the present invention and the description of the claims I can do it.

10: Loader equipment, 20: Lead abandon equipment,
30: lead coating tester, 40: chip mounter,
50: mold mount, 60: reflow,
70: mounting inspection machine, 80: unloader equipment,
90: first additional bar code reader, 92: second additional bar code reader,
100: Production management system server.

Claims (6)

A surface mounting line composed of a loader equipment for putting a board for surface mounting, a surface mounting line composed of a plurality of equipment for performing a predetermined job on a board input from the loader equipment, and an unloader equipment for discharging a series of completed boards Respectively,
A first additional bar code reader and a second additional bar code reader are installed at the rear end of the loader device and at the front end of the unloader device, respectively;
The first additional server program to the n-th equipment, in which barcode information of the corresponding board or real-time generation data of each device is transmitted to the first additional barcode reader, each of the devices constituting the surface mounting line and the second additional barcode reader, A server program is configured to be associated with each other;
The first equipment server program to the nth equipment server program are connected to each other through a communication means with a production management system server program. The first equipment server program and the nth equipment server program are inputted through the loader equipment and then subjected to a series of surface mounting operations, The real-time generation data of each equipment is monitored by each equipment server program and transmitted to the production management system server program, so that each process is integratedly managed in the production management system server program A surface mount line bar code missing process tracking management system.
The method according to claim 1,
The first equipment server program to the nth equipment server program are programs for collecting production management data generated from each equipment,
Wherein the program is independently configured for each device or integrated into a single program.
3. The method of claim 2,
The first equipment server program to the n-th equipment server program may include:
And a plurality of computers are separately operated through a single computer or a plurality of computers, respectively.
The barcode information of the board inserted from the loader equipment as the first equipment is read by the first additional barcode reader and transmitted to the first equipment server program side;
After the relevant board is inserted into the second equipment arranged next to the loader equipment, the production data generated in the second equipment is transferred to the second equipment server program, and the second equipment server program is transferred to the second equipment server program Real-time production data, including various kinds of production, defects, operation status, and quality information, which are generated, is transmitted to the production management system server program side through a predetermined communication means. When the barcode reader is provided in the second equipment, And transferring the generated production data to the production management system server program while matching the barcode information transmitted from the first equipment server with the production data if the barcode reader is not provided;
The production data generated by the third equipment is transmitted to the third equipment server program after the board is inserted into the third equipment arranged after the second equipment, Real-time production data, including various kinds of production, defects, operation status, and quality information, generated by the barcode reader, is transmitted to the production management system server program via the predetermined communication means. In the case where the barcode reader is provided in the third equipment, To the production management system server program, if the barcode reader is not provided, the barcode information transmitted from the second equipment server program is matched to the production data and transmitted to the production management system server program Wow;
1, the production data generated in the n-1th equipment is transmitted to the (n-1) th equipment server program after the corresponding board is inserted into the (n-1) The server program transmits real-time production data, including various kinds of production, defects, operation status, quality information, and the like generated during the production process of the relevant equipment to the production management system server program via the predetermined communication means, When the barcode reader is provided, the production data including the barcode information is transmitted to the production management system server program, and when the barcode reader is not provided, the barcode information transmitted from the n-2 & And transmitting the matching data to the production management system server program;
The bar code information of the board on which the surface mounting operation is completed is read from the second additional bar code reader installed on the upstream side of the unloader equipment as the nth equipment and transmitted to the nth equipment server program side. The real-time production data including the operation status, the quality information, and the like is transmitted to the production management system server program via the predetermined communication means, the surface mounting process of the board, which is recognized as being valid, Wherein the method comprises the steps of:
5. The method of claim 4,
The first equipment server program is controlled to compare the data transmitted from the first additional bar code reader with the bar code information pre-stored in the production management system server program,
If it is determined that the corresponding bar code information is valid, the control unit notifies the production management system server program of input of the corresponding board, and if it is determined that the corresponding bar code information is invalid, notifies the production management system server program thereof, Wherein the control is performed so that the bar code is missing.
5. The method of claim 4,
The equipment server program associated with the predetermined equipment provided with the barcode reader compares the barcode information read out from the barcode reader with the barcode information transmitted from the equipment server program of the previous stage. If it is determined that the barcode information is invalid, And notifies the server program that the job is stopped. [Claim 2] The method according to claim 1,
KR1020140031716A 2014-03-18 2014-03-18 Management system for bar-code omission process of surface mounting technology line and control method thereof KR101559813B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140031716A KR101559813B1 (en) 2014-03-18 2014-03-18 Management system for bar-code omission process of surface mounting technology line and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140031716A KR101559813B1 (en) 2014-03-18 2014-03-18 Management system for bar-code omission process of surface mounting technology line and control method thereof

Publications (2)

Publication Number Publication Date
KR20150108651A KR20150108651A (en) 2015-09-30
KR101559813B1 true KR101559813B1 (en) 2015-10-26

Family

ID=54246565

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140031716A KR101559813B1 (en) 2014-03-18 2014-03-18 Management system for bar-code omission process of surface mounting technology line and control method thereof

Country Status (1)

Country Link
KR (1) KR101559813B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210121405A (en) 2020-03-30 2021-10-08 김종렬 PCB location tracking system in SMT Line

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111832324B (en) * 2019-04-17 2024-01-30 深圳长城开发科技股份有限公司 Online automatic bar code scanning method and system for SMT production line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010251511A (en) 2009-04-15 2010-11-04 Fuji Mach Mfg Co Ltd Electronic circuit component mounting system
KR101155467B1 (en) 2010-07-16 2012-06-15 보성테크 주식회사 System and Method for Managing Materials on Real Time SMT Production Line
KR101195183B1 (en) 2010-06-29 2012-10-29 (주)넥스티지 Appatus for inspecting mount state of component
JP2013235905A (en) 2012-05-08 2013-11-21 Panasonic Corp Electronic component mounting system, and production history information generating method in electronic component mounting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010251511A (en) 2009-04-15 2010-11-04 Fuji Mach Mfg Co Ltd Electronic circuit component mounting system
KR101195183B1 (en) 2010-06-29 2012-10-29 (주)넥스티지 Appatus for inspecting mount state of component
KR101155467B1 (en) 2010-07-16 2012-06-15 보성테크 주식회사 System and Method for Managing Materials on Real Time SMT Production Line
JP2013235905A (en) 2012-05-08 2013-11-21 Panasonic Corp Electronic component mounting system, and production history information generating method in electronic component mounting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210121405A (en) 2020-03-30 2021-10-08 김종렬 PCB location tracking system in SMT Line

Also Published As

Publication number Publication date
KR20150108651A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
KR102102874B1 (en) Automatic optical inspection system and operating method thereof
US8188866B2 (en) Circuit board with radio frequency identification for collecting stage-by-stage manufacturing metrics
JPWO2014049872A1 (en) Production line monitoring device
CN103748981A (en) Method for manufacturing mounted circui
US20230262903A1 (en) Inspection and production of printed circuit board assemblies
JP5661527B2 (en) Production management apparatus and production management method for component mounting line
US8453526B2 (en) Method of inspecting mount state of component
EP3499330A1 (en) Management system, management device, management method, and program
KR101559813B1 (en) Management system for bar-code omission process of surface mounting technology line and control method thereof
JP5860357B2 (en) Component mounting system
WO2014068664A1 (en) System for monitoring production on component mounting line
JP2005303269A (en) Method and system for inspecting substrate for mounting components and method of producing substrate for mounting components
JP6008633B2 (en) Component mounting system
CN107396538A (en) A kind of mainboard production line automation production management method
US20100175965A1 (en) Pallet monitoring system and monitoring method
KR101633756B1 (en) Automatic interlock control system of fault substrate for surface mounting technology line
CN111421954A (en) Intelligent judgment feedback method and device
KR20090116114A (en) Teaching data generation apparatus and its method for pcb inspection
US7134599B2 (en) Circuit board inspection apparatus
KR101581894B1 (en) Apparatus for SMT management
KR20150104766A (en) Tracking method for badness history in inspection process
KR20170066046A (en) Automatic marking apparatus for printed circuit board
JP2003046300A (en) System for managing pcb manufacture line and pcb manufacture managing method
JP6498397B2 (en) Transport device
KR102375629B1 (en) PCB location tracking system in SMT Line

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180731

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190731

Year of fee payment: 5