KR101507056B1 - Method for excavating bedrock - Google Patents

Method for excavating bedrock Download PDF

Info

Publication number
KR101507056B1
KR101507056B1 KR20130027131A KR20130027131A KR101507056B1 KR 101507056 B1 KR101507056 B1 KR 101507056B1 KR 20130027131 A KR20130027131 A KR 20130027131A KR 20130027131 A KR20130027131 A KR 20130027131A KR 101507056 B1 KR101507056 B1 KR 101507056B1
Authority
KR
South Korea
Prior art keywords
space
hexahedral
rock
excavation
hexahedral space
Prior art date
Application number
KR20130027131A
Other languages
Korean (ko)
Other versions
KR20140112716A (en
Inventor
양병태
Original Assignee
양병태
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양병태 filed Critical 양병태
Priority to KR20130027131A priority Critical patent/KR101507056B1/en
Publication of KR20140112716A publication Critical patent/KR20140112716A/en
Application granted granted Critical
Publication of KR101507056B1 publication Critical patent/KR101507056B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명에 따른 암반 굴착 방법은, 암반 내에 최초의 육면체 형상의 공간을 형성하는 단계와, 상기 최초의 육면체 형상의 공간에서 깊이 방향으로 두번째 육면체 형상의 공간을 형성하는 단계와, 상기 최초의 육면체 형상의 공간으로부터 인접하는 부분을 절단하여 추가적인 육면체 형상의 공간을 형성하는 단계를 포함한다.
본 발명에 의해, 소수의 작업 인원을 통해서도 안전하게 암반의 굴착이 가능하며, 암반 굴착 시 발생되는 소음을 획기적으로 감소시킬 수 있다.
또한, 암반 굴착에 의해 형성되는 공간에서의 낙석을 방지하고, 지하수에 의한 붕괴를 방지할 수 있다.
또한, 암반 굴착에 의해 육면체 형상의 암석을 채취함으로써 이후 다양한 용도로 육면체 형상의 암석을 이용할 수 있다.
A rock excavation method according to the present invention comprises the steps of: forming a first hexahedral space in a rock; forming a second hexahedral space in a depth direction in the first hexahedral space; To form an additional hexahedral space.
According to the present invention, it is possible to drill rocks safely through a small number of working personnel, and the noise generated upon rock excavation can be drastically reduced.
In addition, it is possible to prevent falling down in a space formed by rock excavation and prevent collapse by groundwater.
Further, by taking a rock having a hexahedral shape by rock excavation, a hexahedral rock can be used for various purposes.

Description

암반 굴착 방법{METHOD FOR EXCAVATING BEDROCK}METHOD FOR EXCAVATING BEDROCK

본 발명은 암반 굴착 방법에 관한 발명으로서, 보다 상세하게는 암반 굴착 시 육면체 형상의 공간을 연속적으로 형성하면서 암반을 굴착함으로써, 굴착에 의해 육면체 형상의 암석의 획득이 가능하면서도 소수의 인원을 통해서도 안전하게 암반굴착이 가능한 방법에 관한 발명이다.The present invention relates to a rock excavation method, and more particularly, to a rock excavation method which is capable of acquiring a cubic rock by excavation by excavating a rock while continuously forming a hexahedral space during rock excavation, This invention relates to a method capable of rock excavation.

통상적으로 암반을 굴착하기 위한 방법으로서는, 굴착하고자 하는 암반에 긴 홈을 형성하고 상기 홈 내에 폭약을 배치하여 폭파함으로써 암반을 파괴하는 발파공법이 주로 이용된다.Conventionally, as a method for excavating rock masses, a blasting method is mainly used in which a long groove is formed in a rock mass to be excavated, explosives are disposed in the groove, and the rock is destroyed by blowing.

특히, 터널 또는 지하철 공사 등의 경우 지하의 암반을 굴착하여 일정 공간을 형성하는 것이 공사의 주요한 부분인데, 이러한 공사에 이용되는 발파 공법은 폭약의 폭발 에너지를 이용한다.Particularly, in case of tunnel or subway construction, excavation of underground rocks is a major part of the construction work. The blasting method used for such construction uses explosive energy of explosives.

따라서, 상기와 같은 발파 공법은 폭약의 폭파 시 발생되는 에너지에 의해 인접 건물의 균열, 지반의 침하 및 강력한 소음을 일으키는 원인이 된다.Therefore, such a blasting method causes cracks in adjacent buildings, settlement of the ground, and strong noise due to the energy generated in explosion explosion.

또한, 상기와 같은 발파공법을 위해서는 폭약에 대한 전문지식을 구비한 전문가의 참여하에 발파가 이루어져야하며, 폭약의 설치 및 이후 발파된 암석의 제거를 위한 작업이 번거로운 문제점이 있다.In addition, blasting must be carried out in the blasting process with participation of experts having expert knowledge on explosives, and there is a problem in that work for removing explosive rocks and installing explosives is troublesome.

또한, 인접 건물의 균열, 강력한 소음 등의 문제로 인해 한번의 발파로 파괴할 수 있는 암반의 범위에 한계가 있으며, 폭약의 폭발 및 이후의 작업은 안전에 매우 유의해야 하는 위험한 작업이다.In addition, due to cracks in adjacent buildings, strong noise, etc., there is a limit to the range of rocks that can be destroyed by a single blasting. Explosion of explosives and subsequent work is a dangerous task that must be paid attention to safety.

본 발명의 목적은, 소수의 작업 인원을 통해서도 안전하게 암반의 굴착이 가능한 암반 굴착방법을 제공하는 것이다.An object of the present invention is to provide a rock excavation method capable of securely excavating a rock through a small number of working people.

본 발명의 또 다른 목적은, 암반 굴착 시 발생되는 진동 및 소음을 획기적으로 감소시킬 수 있는 암반 굴착방법을 제공하는 것이다.It is still another object of the present invention to provide a rock excavation method capable of drastically reducing vibration and noise generated in rock excavation.

본 발명의 또 다른 목적은, 암반 굴착에 의해 형성되는 공간에서의 낙석을 방지할 수 있도록 구성되는 암반 굴착방법을 제공하는 것이다.It is still another object of the present invention to provide a rock excavation method which is configured to prevent falling in a space formed by rock excavation.

본 발명의 또 다른 목적은, 암반 굴착에 의해 형성되는 공간에서 지하수에 의한 붕괴를 방지할 수 있도록 구성되는 암반 굴착방법을 제공하는 것이다.It is still another object of the present invention to provide a rock excavation method which is configured to prevent collapse by groundwater in a space formed by rock excavation.

본 발명의 또 다른 목적은, 암반 굴착에 의해 육면체 형상의 암석을 채취함으로써, 이후 다양한 용도로 육면체 형상의 암석을 이용가능하도록 구성되는 암반 굴착방법을 제공하는 것이다.It is still another object of the present invention to provide a rock excavation method that is capable of utilizing a rock having a hexahedral shape for various purposes by collecting a rock having a hexahedral shape by rock excavation.

상기 목적을 달성하기 위한 본 발명에 따른 암반 굴착 방법은, 암반 내에 최초의 육면체 형상의 공간을 형성하는 단계와, 상기 최초의 육면체 형상의 공간에서 깊이 방향으로 두번째 육면체 형상의 공간을 형성하는 단계와, 상기 최초의 육면체 형상의 공간으로부터 인접하는 부분을 절단하여 추가적인 육면체 형상의 공간을 형성하는 단계를 포함한다.According to another aspect of the present invention, there is provided a rock excavation method comprising: forming a first hexahedral space in a rock; forming a second hexahedral space in a depth direction in the first hexahedral space; And cutting the adjacent portion from the first hexahedral space to form an additional hexahedral space.

바람직하게는, 상기 인접하는 부분의 절단은 상기 최초의 육면체 형상의 공간에서 어느 한 면에 포함되는 모서리 부분을 상기 면에 수직한 방향으로 절단하여 형성된다.Preferably, the cutting of the adjacent portion is formed by cutting an edge portion included in one surface in the first hexahedral space in a direction perpendicular to the surface.

또한, 상기 추가적인 육면체 형상의 공간의 어느 한 면에 포함되는 모서리 부분을 상기 면에 수직한 방향으로 절단하여 연속적으로 육면체 형상의 공간을 형성하는 단계를 추가적으로 포함한다.Further, the method further includes the step of forming a continuous hexahedral space by cutting the corner portion included in one side of the additional hexahedral space in a direction perpendicular to the plane.

여기서, 상기 연속적인 육면체 형상의 공간을 형성하여 미리 지정된 최종적인 형태의 공간을 형성하고, 상기 최종적인 형태의 공간 표면에 홈을 형성하는 단계를 추가적으로 포함할 수 있다.The method may further include the step of forming the continuous hexahedral space to form a predetermined final space and forming a groove on the final spatial surface.

또한, 상기 홈 내에 미리 지정된 제 1 간격으로 미리 지정된 제 1 의 직경을 가지는 금속재질의 선형 부재를 배치시키고 합성수지로 고정하는 단계를 추가적으로 포함할 수 있다.The method may further include the step of disposing a linear member made of a metal having a first diameter, which is previously designated at a first predetermined interval in the groove, and fixing the linear member with synthetic resin.

또한, 상기 최종적인 형태의 공간 표면에 추가적인 홈을 형성하고, 상기 홈 내에 미리 지정된 제 2 간격으로 미리 지정된 제 2 의 직경을 가지는 금속재질의 선형 부재를 배치시키고 합성수지로 고정하는 단계를 추가적으로 포함할 수 있다.The method may further include the step of forming additional grooves on the final surface of the space and arranging a linear member made of a metal having a second predetermined diameter at a second predetermined interval in the groove and fixing the same with a synthetic resin .

바람직하게는, 상기 최종적인 형태의 공간 표면에 일측에 개구가 천공된 파이프를 매설하는 단계를 추가적으로 포함한다.Preferably, the method further comprises embedding a perforated pipe on one side of the final surface of the space.

또한, 상기 모서리 부분의 절단은 다축드릴을 이용하여 절단될 수 있다.In addition, the cutting of the corner portion can be cut using a multi-axial drill.

여기서, 상기 최종적인 형태의 공간은 터널일 수 있다.Here, the final space may be a tunnel.

본 발명에 의해, 소수의 작업 인원을 통해서도 안전하게 암반의 굴착이 가능하다.According to the present invention, it is possible to excavate a rock bed safely through a small number of working personnel.

또한, 암반 굴착 시 발생되는 진동 및 소음을 획기적으로 감소시킬 수 있다.In addition, the vibration and noise generated in rock excavation can be drastically reduced.

또한, 암반 굴착에 의해 형성되는 공간에서의 낙석을 방지할 수 있다.In addition, it is possible to prevent falling in a space formed by rock excavation.

또한, 암반 굴착에 의해 형성되는 공간에서 지하수의 용출로 인한 붕괴를 방지할 수 있다.In addition, it is possible to prevent collapse due to elution of groundwater in a space formed by rock excavation.

또한, 암반 굴착에 의해 육면체 형상의 암석을 채취함으로써 이후 다양한 용도로 이용할 수 있다.Further, by taking a rock having a hexahedron shape by rock excavation, it can be used for various purposes thereafter.

첨부의 하기 도면들은, 발명의 상세한 설명과 함께 본 발명의 기술적 사상을 이해시키기 위한 것이므로, 본 발명은 하기 도면에 도시된 사항에 한정 해석되어서는 아니 된다.
도 1 은 본 발명에 따른 암반 굴착 방법에 의해 형성되는 공간의 사시도이며,
도 2 는 상기 공간의 평면도이며,
도 3 은 상기 굴착방법을 통해 터널을 굴착하는 방법을 도시하는 개념도이며,
도 4 는 상기 굴착방법을 통해 형성된 터널의 사시도이며,
도 5 는 상기 굴착방법을 통해 형성된 터널의 정면도이며,
도 6 은 상기 굴착방법에 이용되는 다축드릴의 개략적인 구성도이다.
BRIEF DESCRIPTION OF THE DRAWINGS The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiments of the invention and, together with the description, serve to explain the principles of the invention.
1 is a perspective view of a space formed by a rock excavation method according to the present invention,
2 is a plan view of the space,
3 is a conceptual diagram showing a method of excavating a tunnel through the excavation method,
4 is a perspective view of a tunnel formed through the excavation method,
Figure 5 is a front view of a tunnel formed through the excavation method,
6 is a schematic configuration diagram of a multi-axial drill used in the excavation method.

이하, 첨부된 도면을 참조하여 본 발명의 구성을 상세히 설명하기로 한다. Hereinafter, the configuration of the present invention will be described in detail with reference to the accompanying drawings.

이에 앞서, 본 명세서 및 청구범위에 사용된 용어는 사전적인 의미로 한정 해석되어서는 아니되며, 발명자는 자신의 발명을 최선의 방법으로 설명하기 위해 용어의 개념을 적절히 정의할 수 있다는 원칙에 입각하여, 본 발명의 기술적 사상에 부합되는 의미와 개념으로 해석되어야 한다.Prior to this, the terms used in the specification and claims should not be construed in a dictionary sense, and the inventor may, on the principle that the concept of a term can be properly defined in order to explain its invention in the best way And should be construed in light of the meanings and concepts consistent with the technical idea of the present invention.

따라서, 본 명세서에 기재된 실시예 및 도면에 도시된 구성은 본 발명의 바람직한 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 표현하는 것은 아니므로, 본 출원 시점에 있어 이들을 대체할 수 있는 다양한 균등물과 변형예들이 존재할 수 있음을 이해하여야 한다.Therefore, the embodiments shown in the present specification and the drawings are only exemplary embodiments of the present invention, and not all of the technical ideas of the present invention are presented. Therefore, various equivalents It should be understood that water and variations may exist.

도1 은 본 발명에 따른 암반 굴착 방법에 의해 형성되는 공간의 사시도이며, 도 2 는 상기 공간의 평면도이며, 도 3 은 상기 굴착방법을 통해 터널을 굴착하는 방법을 도시하는 개념도이며, 도 4 는 상기 굴착방법을 통해 형성된 터널의 사시도이며, 도 5 는 상기 굴착방법을 통해 형성된 터널의 정면도이며, 도 6 은 상기 굴착방법에 이용되는 다축드릴의 개략적인 구성도이다.FIG. 1 is a perspective view of a space formed by the rock excavation method according to the present invention, FIG. 2 is a plan view of the space, FIG. 3 is a conceptual view showing a method of excavating a tunnel through the excavation method, FIG. 5 is a front view of a tunnel formed through the excavation method, and FIG. 6 is a schematic view of a multi-axial drill used in the excavation method.

본 발명에 따른 암반 굴착 방법은, 암반 내에 최초의 육면체 형상의 공간(10)을 형성하는 단계와, 상기 최초의 육면체 형상의 공간(10)에서 깊이 방향으로 두번째 육면체 형상의 공간(20)을 형성하는 단계와, 상기 최초의 육면체 형상의 공간(10)으로부터 인접하는 부분을 절단하여 추가적인 육면체 형상의 공간(30, 40, 50, 60)들을 형성하는 단계를 포함한다. A rock excavation method according to the present invention includes the steps of forming a first hexahedral space (10) in a rock mass and forming a second hexahedral space (20) in the depth direction in the first hexahedral space , And cutting the adjacent portion from the first hexahedral space (10) to form additional cubic spaces (30, 40, 50, 60).

상기 최초의 육면체 형상의 공간(10)은 암반 내에서 도 2 에 도시되는 중앙 사각형(10) 영역을 지면(地面)에 수직한 방향으로 굴착하여 형성된다.The first hexahedral space 10 is formed by excavating the central rectangular area 10 shown in FIG. 2 in a direction perpendicular to the ground.

즉, 상기 중앙 사각형(10) 전체 영역에 대해 드릴로 지면에 수직한 방향으로 굴착하면 굴착된 부분 사이 사이에 존재하는 암석에는 굴착 시의 진동으로 인해 크랙이 발생되어, 결과적으로 최초 육면체 형상의 공간(10) 영역에 존재하는 암석들이 분리 파괴되며, 이후 파괴된 암석들을 덜어냄으로써 중앙 사각형 영역(10)에서 최초의 육면체 형상의 공간(10)을 형성한다.That is, if the entire area of the central square 10 is excavated in a direction perpendicular to the ground by drilling, cracks are generated in the rocks existing between the excavated portions due to vibration during excavation, The rocks existing in the region 10 are separated and destroyed, and then the destroyed rocks are removed to form the first hexahedral space 10 in the central rectangular region 10.

상기 두번째 육면체 형상의 공간(20)은 상기 최초 육면체 형상의 공간(10)에서 지면에 수직한 방향으로 추가적으로 형성된 육면체 형상의 공간이다.The second hexahedron shaped space 20 is a hexahedron shaped space additionally formed in the first hexahedron shaped space 10 in a direction perpendicular to the paper.

즉, 상기 최초의 육면체 형상의 공간의 깊이를 d 로 가정한다면 상기 두번째 육면체 형상의 공간은 지면으로부터 총 2 X d 깊이로 굴착된 육면체 형상의 공간이다.That is, assuming that the depth of the first hexahedral space is d, the second hexahedral space is a hexahedral space excavated at a total depth of 2 X d from the ground.

상기 두번째 육면체 형상의 공간(20) 역시 상기 중앙 사각형(10) 영역에서 첫번째 육면체 형상의 공간(10) 바닥 부분 전체를 지면에 수직한 방향으로 굴착함으로써, 상기 최초 육면체 형상의 공간(10) 영역의 하부에서 두번째 육면체 형상의 공간(20)이 형성한다.The second hexahedral space 20 is also formed by excavating the entirety of the bottom portion of the first hexahedral space 10 in the central rectangular area 10 in a direction perpendicular to the plane of the paper, And a space 20 in the shape of a second hexahedron is formed from the bottom.

상기 첫번째 육면체 형상의 공간(10)과 두번째 육면체 형상의 공간(20)은 이후의 육면체 형상의 공간들(30, 40, 50, 60..)을 연속적으로 작업하기 위한 작업 공간을 형성하기 위한 부분으로서, 이후에는 상기와 같이 형성된 첫번째 육면체 형상의 공간(10)과 두번째 육면체 형상의 공간(20)에 작업자가 작업 장비를 가지고 들어가 인접하는 육면체 형상의 공간들(30, 40, 50)을 연속적으로 형성하게 된다.The first hexahedral space 10 and the second hexahedral space 20 may be formed by forming a portion for forming a working space for continuously working the later hexahedral spaces 30, 40, 50, The worker brings the work equipment into the space of the first hexahedral shape 10 and the space of the second hexahedron 20 formed as described above and then the adjacent hexahedral spaces 30, Respectively.

상기와 같은 암석의 굴착 작업을 위해 통상적인 파이프 드릴을 이용할 수도 있으나, 도 6 에 도시되는 바와 같은 다축드릴을 이용하여 수행되는 것이 바람직하다.A conventional pipe drill may be used for drilling the rock as described above, but it is preferable to use a multi-axial drill as shown in FIG.

상기 다축드릴은 모터(110)로부터의 회전력을 축(120)을 통해 전달하여 복수개의 굴착드릴파이프(140)에 회전력을 전달할 수 있도록 구성된 드릴로서, 각 굴착드릴파이프(140)의 전단에는 원통형의 착탈가능한 다이아몬드 커팅날(150)이 장착된다.The multi-axial drill is a drill configured to transmit a rotational force from a motor 110 through a shaft 120 to transmit a rotational force to a plurality of drill pipes 140. The drill pipe 140 has a cylindrical A removable diamond cutting blade 150 is mounted.

그리하여, 상기 다축드릴을 이용하여 암반을 굴착함으로써, 상기 굴착드릴 파이프(140) 부분에서는 암석이 원형으로 절단되며, 절단된 암석의 사이 사이에 배치되는 암석에는 상기 굴착드릴 파이프(140)의 회전 시 발생되는 진동으로 인해 크랙이 발생된다.Thus, by rocking the rock mass using the multi-axial drill, the rock is cut into a circular shape at the part of the excavation drill pipe 140, and the rock placed between the cut rocks is subjected to rotation of the excavation drill pipe 140 Cracks are generated by the generated vibration.

따라서, 상기 다축드릴을 이용하여 복수 개의 굴착드릴 파이프(140)를 동시에 회전시켜 암반을 굴착함으로써, 하나의 굴착드릴 파이프를 회전시켜 암반을 굴착할 경우의 일직선적인 굴착이 아니라, 일면적인 굴착이 수행될 수 있다.Therefore, it is possible to perform a one-sided excavation instead of a straight excavation in the case of excavating a rock by rotating one excavation drill pipe by rotating a plurality of excavation drill pipes 140 simultaneously by using the multi- .

즉, 하나의 굴착드릴파이프를 회전시켜 암반을 굴착할 경우에는 암반 내에 하나의 원통형 공간이 형성되지만, 상기와 같은 다축드릴을 이용하여 암반을 굴착할 경우에는 복수 개의 원통형 공간과 함께 공간 사이사이의 암반에는 크랙이 발생하여 결과적으로는 하나의 사각형 면의 형상으로 암반이 절단된다.That is, when one rock drill is excavated by rotating one excavation drill pipe, one cylindrical space is formed in the rock. However, when excavating a rock by using the multi-axial drill as described above, a plurality of cylindrical spaces, Cracks occur in the rock, resulting in the rock being cut into a single square surface.

바람직하게는, 상기 다축드릴에 포함되는 굴착드릴 파이프(140)들의 전체폭(너비)은 상기 육면체 형상의 공간의 한 변의 길이로 형성된다.Preferably, the entire width (width) of the excavation drill pipes 140 included in the multi-axis drill is formed to have a length of one side of the hexahedral space.

그리하여, 상기 다축드릴을 이용한 한번의 굴착에 의해 상기 육면체 형상의 공간에 포함되는 하나의 면만큼 굴착하는 것이 가능하다.Thus, by one excavation using the multi-axial drill, it is possible to excavate one surface included in the hexahedral space.

즉, 도 1 및 2 에서 상기 첫번째 육면체 형상의 공간(10)에 포함되는 지면에 수직한 하나의 면(15) 방향으로 상기 다축드릴을 이용하여 굴착함으로써 한번의 굴착에 의해 상기 면(15)에 대해 굴착이 가능하다.1 and 2, by using the multiaxial drill in the direction of one surface 15 perpendicular to the plane of the sheet included in the first hexahedral space 10, Excavation is possible for.

또한, 도 2 에 도시되는 상기 첫번째 육면체 형상의 공간에 포함되는 나머지 세 변(52, 62, 19)에 대해 지면에 수직한 방향으로 상기 다축드릴을 이용하여 굴착함으로써, 나머지 세 면에 대한 굴착이 가능하다.Further, by excavating the remaining three sides (52, 62, 19) included in the first hexahedral space shown in Fig. 2 using the multi-axial drill in a direction perpendicular to the paper surface, It is possible.

이후, 상기 첫번째 육면체 형상의 공간(10)에 포함되며 상기 면(15)을 대면하는 반대편 면(19) 방향으로 상기 면(15)에서부터 상기 다축드릴을 이용하여 일정한 간격마다 굴착함으로써, 전체 육면체 형상의 공간(10)이 굴착된다.Thereafter, by excavating from the surface 15 in the direction of the opposite surface 19 included in the first hexahedral space 10 and facing the surface 15 at regular intervals using the multi-axial drill, The space 10 is excavated.

그리고, 상기 첫번째 육면체 형상의 공간(10)에 잔여하는 파쇄된 암석들을 제거함으로써, 상기 첫번째 육면체 형상의 공간(10)이 형성될 수 있다.By removing the remaining crushed rocks in the first hexahedral space 10, the first hexahedral space 10 can be formed.

또한, 상기 두번째 육면체 형상의 공간(20) 역시 상기 첫번째 육면체 형상의 공간(10) 형성 방법과 동일한 방법으로 굴착함으로써 형성될 수 있다.Also, the second hexahedral space 20 may be formed by excavating in the same manner as the first hexahedral space 10.

이후, 상기 인접하는 공간들(30, 40, 50, 60)은 상기 최초의 육면체 형상의 공간(10)의 어느 한 면에 포함되는 모서리 부분을 상기 면에 수직한 방향으로 절단하여 형성된다.The adjacent spaces 30, 40, 50, and 60 are formed by cutting a corner portion included in one side of the first hexahedral space 10 in a direction perpendicular to the plane.

즉, 도 1 및 2 를 참조하면, 상기 첫번째 육면체 형상의 공간(10)은 바닥면과 상면 이외의 네개의 측면을 가지는데, 상기 네개의 측면들은 모두 사각형이며, 상기 사각형에서 상변은 지면(地面)을 구성한다.1 and 2, the first hexahedral space 10 has four sides other than a bottom surface and a top surface, all of the four sides are rectangular, and the top surface of the square is a ground surface ).

그러므로, 상기 첫번째 육면체 형상의 공간(10)의 네개의 측면 중 어느 하나의 면(사각형)에서 상변을 제외한 나머지 세변(11, 12, 13)에 대해 측방으로 굴착하고 인접하는 육면체 형상의 공간(30)에서 32번 변에 대해 지면에 수직한 방향으로 굴착하면 인접하는 육면체 형상의 공간(30)에 존재하는 암석이 분리될 수 있도록 절단된다.Therefore, it is possible to excavate the three sides (11, 12, 13) except for the upper side from any one of the four sides (quadrangle) of the first hexahedral space 10 to sidewise the adjacent hexahedral spaces 30 ) Is excavated in a direction perpendicular to the plane of the drawing to the side of 32, so that the rocks existing in the adjacent hexahedral space 30 are cut off.

또는, 인접하는 육면체 형상의 공간(30)에 포함되는 세개의 변(32, 34, 36)에 대해 지면에 수직한 방향으로 굴착하고, 13번 변에 대해 인접하는 공간(30) 방향으로 즉, 측방으로 굴착하면 마찬가지로 인접하는 육면체 형상의 공간(30)에 존재하는 암석은 분리될 수 있도록 절단된다.Or, it is possible to excavate the three sides 32, 34 and 36 included in the adjacent hexahedral space 30 in the direction perpendicular to the paper surface, and in the direction of the space 30 adjacent to the 13th side, The rocks existing in the adjacent hexahedral space 30 are cut off so as to be separated.

상기와 같은 방식으로 최초 육면체 형상의 공간(10) 및 두번째 육면체 형상의 공간(20)에 작업자 및 다축드릴이 투입된 상태에서 인접하는 육면체 형상의 공간들(30, 40, 50, 60)을 연속적으로 형성해 나갈 수 있다.In the same manner, adjacent hexahedral spaces 30, 40, 50, and 60 are continuously connected to the first hexahedral space 10 and the second hexahedral space 20 in a state where the operator and the multi- Can form.

따라서, 기 형성된 육면체 형상의 공간에서 상기 육면체 형상의 공간에 포함되는 모서리 부분을 상기 다축드릴을 이용하여 굴착함으로써, 결과적으로는 인접하는 육면체 형상의 공간에 포함되는 하나의 면을 절단하는 효과를 발휘할 있으므로, 인접하는 육면체 형상의 공간을 형성하기 위해 세번 또는 네번의 굴착 작업만이 요구된다.Therefore, by engaging the corner portions included in the hexahedral space in the preformed hexahedral space with the multi-axial drill, the effect of cutting one surface included in the adjacent hexahedral space can be obtained Therefore, only three or four drilling operations are required to form an adjacent hexahedral space.

즉, 최초 및 두번째 육면체 형상의 공간(10, 20)을 형성하기 위해서는 진동에 의한 크랙을 통해 암석을 파괴하기 위해 전체 육면체 형상의 공간에 대해 좁은 간격마다 굴착이 요구되지만, 상기와 같은 첫번째 및 두번째 육면체 형상의 공간(10, 20)을 형성한 이후에는, 상기 두 육면체 형상의 공간(10, 20)에 인접하는 육면체 형상의 공간들을 형성하기 위해 세면 또는 네면에 대해서만 다축드릴을 이용한 굴착작업을 수행하면 족하다.That is, in order to form the first and second hexahedral spaces 10 and 20, excavation is required at narrow intervals for the entire hexahedral space in order to break the rock through cracks due to vibration, After the hexahedral spaces 10 and 20 are formed, drilling operations using multi-axial drills are performed only on the three sides or four sides to form hexahedral spaces adjacent to the two hexahedral spaces 10 and 20 It is enough.

즉, 상기 인접하는 육면체 형상의 공간(30, 40, 50, 60...)들을 형성해 나가기 위해서는, 하나의 육면체 형상의 공간 형성을 위해 상기 다축드릴을 이용한 굴착작업이 세번 또는 네번만 요구되며, 이러한 굴착작업에 의해 육면체 형상의 암석을 확보하면서 동시에 육면체 형상의 공간을 형성해 나갈 수 있다.That is, in order to form the adjacent hexahedral spaces 30, 40, 50, 60,.., The drilling operation using the multi-axial drill is required three or four times for forming a hexahedral space, By this excavation work, it is possible to form a hexahedral space while securing a hexahedral rock.

상기와 같은 굴착 방법에 의해 지표면으로부터 지하로 암석을 굴착할 수도 있으며, 도 3 내지 5 에 도시되는 바와 같이 암석에 대해 지면(紙面))에 수직한 방향으로 굴착함으로써, 터널 공간을 형성할 수도 있다.The rock may be excavated from the ground surface to the ground by the excavation method as described above, and the tunnel space may be formed by excavating the rock in a direction perpendicular to the rock surface as shown in Figs. 3 to 5 .

즉, 상기와 같은 육면체 형상의 공간들을 형성하는 방법으로, 도 3 에서와 같이 암석(2)의 상부로부터 첫번째 육면체 형상의 공간(10)을 형성하고 인접하는 육면체 형상의 공간들(30, 40, 50...)을 형성해 나감으로써, 전체 터널 공간을 순차적으로 형성해 나갈 수 있다.That is, as shown in FIG. 3, the first hexahedral space 10 is formed from the upper part of the rock 2 and the adjacent hexahedral spaces 30, 40, 50 ...), so that the entire tunnel space can be formed sequentially.

상기와 같은 연속적인 육면체 형상의 공간 형성에 의해 형성된 최종적인 터널 형태의 공간 내부 표면에 홈을 형성하고, 상기 홈 내에 철근 또는 파이프 등을 배치 고정한다.Grooves are formed on the inner surface of the final tunnel-shaped space formed by the formation of the continuous hexahedral space as described above, and reinforcing bars, pipes, and the like are arranged and fixed in the grooves.

이때, 도 4 에 도시되는 바와 같이, 상기 공간 내부 표면에서 1 m 등의 미리 지정된 제 1 간격마다는 보다 굵은 직경의 철근(90)들을 배치시키고, 20 cm 등의 보다 좁은 간격마다는 보다 작은 직경의 철근(92)들을 배치시킨 상태에서 아미드계수지 또는 에폭시계수지로 고정시킨다.At this time, as shown in Fig. 4, reinforcing bars 90 having a larger diameter are arranged for every predetermined first interval such as 1 m on the inner surface of the space, and for each narrower interval such as 20 cm, The reinforcing bars 92 are fixed with an amide resin or an epoxy resin.

그리하여, 보다 큰 직경의 철근을 통해서는 큰 암석이 터널 공간의 내부로 낙하되는 것을 방지하는 지지력을 발휘하게 하고, 보다 작은 직경의 철근을 통해서는 작은 암석이 터널 공간의 내부로 낙하되는 것을 방지하도록 구성된다.Thus, through the reinforcing bar of a larger diameter, it is possible to provide a supporting force for preventing a large rock from falling into the tunnel space, and to prevent a small rock from falling into the tunnel space through a smaller diameter reinforcing bar .

또한, 상기 최종적으로 형성된 터널에 일측에 개구가 천공된 파이프(94)들을 매설하고 이들을 중간의 연결파이프(96)로 연결함으로서, 지하수의 유동 경로를 변경하도록 구성된다.In addition, it is configured to alter the flow path of the groundwater by embedding pipes 94 having perforated openings at one side of the finally formed tunnel and connecting them with an intermediate connecting pipe 96.

그리하여, 지하수가 터널 공간 내부로 용출하여 터널의 붕괴를 초래하는 것을 방지하도록 구성된다.Thus, it is configured to prevent the groundwater from leaking into the tunnel space to cause collapse of the tunnel.

이상, 본 발명은 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 발명의 기술적 사상은 이러한 것에 한정되지 않으며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해, 본 발명의 기술적 사상과 하기 될 특허청구범위의 균등범위 내에서 다양한 수정 및 변형 실시가 가능할 것이다.While the present invention has been described with reference to the exemplary embodiments and the drawings, it is to be understood that the technical scope of the present invention is not limited to these embodiments and that various changes and modifications will be apparent to those skilled in the art. Various modifications and variations may be made without departing from the scope of the appended claims.

10: 첫번째 육면체 형상의 공간 20: 두번째 육면체 형상의 공간
30: 인접하는 육면체 형상의 공간 40: 인접하는 육면에 형상의 공간
10: space of the first hexahedral shape 20: space of the second hexahedron shape
30: adjacent cubic space 40: adjacent cubic space

Claims (9)

암반 굴착 방법으로서,
암반 내에 최초의 육면체 형상의 공간을 형성하는 단계와;
상기 최초의 육면체 형상의 공간에서 깊이 방향으로 두번째 육면체 형상의 공간을 형성하는 단계와;
상기 최초의 육면체 형상의 공간으로부터 인접하는 부분을 절단하여 추가적인 육면체 형상의 공간을 형성하는 단계를 포함하며,
상기 인접하는 부분의 절단은 상기 최초의 육면체 형상의 공간에서 어느 한 면에 포함되는 모서리 부분을 상기 면에 수직한 방향으로 절단하여 형성되고,
상기 추가적인 육면체 형상의 공간의 어느 한 면에 포함되는 모서리 부분을 상기 면에 수직한 방향으로 절단하여 연속적으로 육면체 형상의 공간을 형성하며,
상기 모서리 부분의 절단은 작업자가 드릴 또는 다축드릴을 이용하여 절단하고,
상기 연속적으로 육면체 형상의 공간을 형성하여 미리 지정된 최종적인 형태의 공간을 형성하고, 상기 최종적인 형태의 공간 표면에 홈을 형성하는 단계를 포함하며,
상기 홈 내에 미리 지정된 제 1 간격으로 미리 지정된 제 1 의 직경을 가지는 금속재질의 선형 부재를 배치시키고 합성수지로 고정하는 단계와;
상기 홈 내에 미리 지정된 제 2 간격으로 미리 지정된 제 2 의 직경을 가지는 금속재질의 선형 부재를 배치시키고 합성수지로 고정하는 단계와;
상기 최종적인 형태의 공간 표면에 일측에 개구가 천공된 파이프를 매설하는 단계를 포함하는 것을 특징으로 하는 암반 굴착 방법.
As a rock excavation method,
Forming a first hexahedral space in the rock;
Forming a second hexahedral space in the depth direction in the first hexahedral space;
And cutting the adjacent portion from the first hexahedral space to form an additional hexahedral space,
The cutting of the adjacent portion is formed by cutting an edge portion included in one surface in the first hexahedral space in a direction perpendicular to the surface,
Wherein a corner portion included in one side of the additional hexahedral space is cut in a direction perpendicular to the plane to form a continuous hexahedral space,
The cutting of the corner portion is performed by a worker using a drill or a multiaxial drill,
Forming a continuous hexahedral space to form a space of a predetermined final shape and forming a groove in the space surface of the final shape,
Disposing a linear member of a metal material having a first diameter, which is predetermined at a first predetermined interval in the groove, and fixing the linear member with synthetic resin;
Arranging a linear member made of a metal having a second diameter, which is previously designated at a second predetermined interval in the groove, and fixing the linear member with synthetic resin;
And burying a pipe with an opening perforated on one side of the final surface of the space.
제 1 항에 있어서,
상기 최종적인 형태의 공간은 터널인 것을 특징으로 하는 암반 굴착 방법.
The method according to claim 1,
Wherein the final type of space is a tunnel.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR20130027131A 2013-03-14 2013-03-14 Method for excavating bedrock KR101507056B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20130027131A KR101507056B1 (en) 2013-03-14 2013-03-14 Method for excavating bedrock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20130027131A KR101507056B1 (en) 2013-03-14 2013-03-14 Method for excavating bedrock

Publications (2)

Publication Number Publication Date
KR20140112716A KR20140112716A (en) 2014-09-24
KR101507056B1 true KR101507056B1 (en) 2015-04-06

Family

ID=51757488

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20130027131A KR101507056B1 (en) 2013-03-14 2013-03-14 Method for excavating bedrock

Country Status (1)

Country Link
KR (1) KR101507056B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073766A (en) * 1993-06-18 1995-01-06 Toyo Constr Co Ltd Method for constructing tunnel
JPH09125867A (en) * 1995-11-02 1997-05-13 Kenki Eng:Kk Excavation method of tunnel
JPH10205272A (en) * 1997-01-21 1998-08-04 Hitachi Constr Mach Co Ltd Construction method of tunnel and widening method thereof
KR20120063210A (en) * 2010-12-07 2012-06-15 (주)한국투아치 Tunnel constructing method using double excavation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073766A (en) * 1993-06-18 1995-01-06 Toyo Constr Co Ltd Method for constructing tunnel
JPH09125867A (en) * 1995-11-02 1997-05-13 Kenki Eng:Kk Excavation method of tunnel
JPH10205272A (en) * 1997-01-21 1998-08-04 Hitachi Constr Mach Co Ltd Construction method of tunnel and widening method thereof
KR20120063210A (en) * 2010-12-07 2012-06-15 (주)한국투아치 Tunnel constructing method using double excavation method

Also Published As

Publication number Publication date
KR20140112716A (en) 2014-09-24

Similar Documents

Publication Publication Date Title
JP6145306B2 (en) Pile head processing method
KR20130094449A (en) Apparatus and method for continuous hole drilling
KR101889961B1 (en) Excavation method for rock blasting having no-vibration
CN109026028A (en) A kind of rock roadway in coal mine mechanical rock breaking method
CN107023033A (en) Urban Underground piping lane hard rock mass rope saw cut excavation method
KR102242613B1 (en) Wire-saw excavation apparatus that can change the cutting line according to the cutting section tunnel excavation method using the same
KR101507056B1 (en) Method for excavating bedrock
JP6461022B2 (en) Underground pile crushing method
KR101066296B1 (en) Rock cutting method using boring lid
CN206644159U (en) Hard rock mass rope saw cut structure
JP6868437B2 (en) How to hang the surface of a concrete skeleton to a predetermined depth
KR20200091780A (en) Wire-saw excavation apparatus using a frame of a matrix structure and tunnel excavation method using the same
KR20170142353A (en) Stone quarrying equipment and method for quarrying stone using the same
JP6310181B2 (en) Dismantling method
JP5795232B2 (en) Dismantling method
CN113605387B (en) Full-mechanical construction method for rectangular slide-resistant pile
KR20090028201A (en) Rock splitting method using the discontinuitys and the free surface performed by link drilling
KR101835389B1 (en) Method for demolishing an underground concrete structure
JPH07103700A (en) Blasting method for forming underground space
JP4110054B2 (en) Cutting method of underground structure
KR101633281B1 (en) construction method of caverna using the rock for charnel house
CN207032288U (en) Urban Underground piping lane hard rock mass rope saw cut excavates structure
JP5817284B2 (en) Method of dividing concrete structure
JP6824597B2 (en) Mechanical agitator used for ground improvement work
JP6230414B2 (en) Existing underground exterior wall removal method and building rebuilding method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
LAPS Lapse due to unpaid annual fee