KR101488721B1 - Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same - Google Patents

Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same Download PDF

Info

Publication number
KR101488721B1
KR101488721B1 KR20120129199A KR20120129199A KR101488721B1 KR 101488721 B1 KR101488721 B1 KR 101488721B1 KR 20120129199 A KR20120129199 A KR 20120129199A KR 20120129199 A KR20120129199 A KR 20120129199A KR 101488721 B1 KR101488721 B1 KR 101488721B1
Authority
KR
South Korea
Prior art keywords
grout
bulb
hose
anchor
hole
Prior art date
Application number
KR20120129199A
Other languages
Korean (ko)
Other versions
KR20140062914A (en
Inventor
김정열
Original Assignee
주식회사 삼우기초기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼우기초기술 filed Critical 주식회사 삼우기초기술
Priority to KR20120129199A priority Critical patent/KR101488721B1/en
Publication of KR20140062914A publication Critical patent/KR20140062914A/en
Application granted granted Critical
Publication of KR101488721B1 publication Critical patent/KR101488721B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B53/00Component parts, details or accessories not provided for in, or of interest apart from, groups F04B1/00 - F04B23/00 or F04B39/00 - F04B47/00
    • F04B53/10Valves; Arrangement of valves
    • F04B53/1037Flap valves
    • F04B53/1047Flap valves the valve being formed by one or more flexible elements
    • F04B53/106Flap valves the valve being formed by one or more flexible elements the valve being a membrane

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 천공홀에 중력방식 또는 압력식으로 그라우트를 주입하여 1차 구근을 형성한 후 구근의 고결화가 진행되기 전에 재차 반복적으로 고압 그라우트를 주입하는 포스트 그라우팅을 통하여 그라우트 구근의 균열을 발생시키고, 균열 틈새로 고압그라우트재를 침투시켜 구근 형성을 확대할 수 있는 지중 앵커파일의 구근확장방법 및 상기 방법에 사용되는 구근확장장치에 관한 것이다.
본 발명은 지반을 천공하여 앵커홀을 형성한 후 프리 그라우팅(pre grouting)을 실시하는 제1 단계; 앵커체를 앵커홀에 삽입하고 채움그라우팅을 실시한 후 양생하는 제2 단계; 앵커체와 함께 삽입되는 그라우트 호스의 분출홀을 통하여 고압의 그라우트를 분출함으로써 채움그라우트체에 무작위 균열을 발생시키고, 균열 틈새로 고압그라우트를 침투시키는 제3 단계; 및 상기 제3 단계를 반복적으로 실시하여 구근을 확장하는 제4 단계를 포함하는 지중 앵커파일의 구근확장방법 및 상기 방법에 사용되는 구근확장장치를 제공한다.
In the present invention, cracks in the grout bulb are generated through post grouting in which a high-pressure grout is repeatedly injected repeatedly before the bulging of the bulb proceeds after gravity is injected into the perforation hole by gravity or by pressure, The present invention relates to a method of expanding a bulb of an underground anchor pile and a bulb expanding device used in the method, in which a high-pressure grout material is infiltrated with cracks to enlarge bulb formation.
The present invention relates to a method for manufacturing an anchor hole, comprising: a first step of pre grouting after forming an anchor hole by drilling the ground; A second step of inserting an anchor body into an anchor hole, performing filling grouting, and then curing the anchor body; A third step of generating a random crack in the filled grout by ejecting the high pressure grout through the ejection hole of the grout hose inserted together with the anchor body and infiltrating the high pressure grout with cracks; And a fourth step of repeatedly performing the third step to expand the bulb, and a bulb extending device for use in the method.

Description

지중 앵커파일의 구근확장방법 및 상기 방법에 사용되는 구근확장장치{Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same}BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a method for expanding a bulb of an underground anchor pile and a bulb extending device for use in the method,

본 발명은 포스트그라우팅(post grouting)을 통하여 지중 앵커파일의 구근을 확장할 수 있는 방법 및 그 방법에 사용되는 구근확장장치에 관한 것으로, 더욱 상세하게는 천공홀에 1차 그라우트 채움을 통해 얻어진 구근에 재차 반복적으로 고압그라우팅을 실시하여 구근에 균열을 발생시키고 균열틈새로 고압 그라우트를 침투시켜 구근을 확장함으로써 지반을 강화할 수 있는 지중앵커파일의 구근확장방법 및 상기 방법에 사용되는 구근확장장치에 관한 것이다.
The present invention relates to a method of expanding a bulb of an underground anchor pile through post grouting and a bulb expanding device used in the method. More particularly, the present invention relates to a method of expanding a bulb of a bulb obtained through primary grouting in a perforation hole A method for expanding a bulge of an underground anchor pile which is capable of strengthening the ground by expanding the bulge by penetrating the high pressure grout by generating a crack in the bulge by repeatedly performing high pressure grouting, will be.

일반적으로, 앵커공법은 천공홀에 삽입된 고강도의 강재에 그라우팅을 실시하여 구속하고, 상기 강재에 큰 인장력을 도입하여 선행하중을 가함으로써 지반과의 주면마찰력으로 지반을 보강하는 공법으로서, 가설토류벽의 지보공, 영구앵커 토류벽, 송전탑 기초, 댐 보강, 지하구조물의 부력앵커, 사면보강 등에 주로 이용된다.Generally, an anchor method is a method of reinforcing a ground by grouting and restraining a high-strength steel material inserted in a perforation hole, introducing a large tensile force into the steel material and applying a preceding load to the ground, , A permanent anchor earth wall, a power transmission tower foundation, a dam reinforcement, a buoyancy anchor of an underground structure, and slope reinforcement.

절개 및 굴착 사면의 앵커시공은 사면 천공 후 네일, 앵커 등의 보강재를 삽입하고, 고점도의 시멘트 밀크를 무압 주입하는 형식으로 시공되며, 시멘트 밀크가 굳어 형성된 그라우트 구근과 지반과의 주면마찰력을 이용하여 인발저항력을 확보하는 방식이다. 이는 대상 지반이 연약하거나, 천공 홀의 일부 구간에서 붕괴가 예상되거나 시멘트 밀크의 수축이 발생하는 경우, 또는 지반 절리 및 균열을 통한 시멘트 밀크의 유실이 발생되는 경우에는 앵커의 적절한 인발저항력을 확보할 수 없게 되는 문제를 가지고 있다.Anchor construction of incision and excavation slope is performed by inserting reinforcing materials such as nail and anchor after slope drilling and pressureless injection of high viscosity cement milk. Using the grouting force of grout bulge formed with hardened cement milk and ground It is a method to secure the pullout resistance. This is because if the target ground is weak, collapse is expected in some sections of the perforation hole, shrinkage of cement milk occurs, or loss of cement milk through ground joints and cracks, adequate pulling resistance of the anchor can be secured I have a problem that does not exist.

지중앵커파일체를 형성하는 공정에서 시멘트 밀크 또는 몰탈을 주입하는 그라우팅 방식으로는 중력식 주입공법(straight shaft gravity grouted)과 가압식 주입공법(straight shaft pressure-grouted)이 주로 이용되고 있다. 이 밖에 이론적으로 접근한 시공방법으로서 구근을 확장하여 지반의 강도를 증대시키기 위한 포스트 그라우팅(post-grouted), 언더 림드(underreamed) 공법 등이 제안되어 있으나 이들 확장공법들은 실제 현장에 적용한 사례는 없다.As a grouting method for injecting cement milk or mortar in a process of forming an underground anchor pile, a straight shaft gravity grouted and a straight shaft pressure-grouted are mainly used. In addition, post-grouting and underreamed construction methods have been proposed to increase the strength of the ground by expanding the bulb as a theoretical approach, but these expansion methods have not been applied to actual sites .

여기서, 중력식 주입공법은 중력에 의해 그라우트를 실시하기 때문에, 천공시 발생한 지반이완영역에 대한 복원이 명확하지 않아 지반구조에 결함이 유발될 우려가 있고, 채움물질의 지반침투 및 수축현상을 보완하기 위하여 수회 반복하여 그라우팅 공정을 실시하여야 하므로 지반 보강공사가 번거롭고 공정이 길어져서 시공성이 저하된다. Here, since the gravity type injection method is carried out by gravity, the restoration of the ground relaxation area caused by the perforation is not clear, and there is a possibility that the ground structure is defective, and the infiltration and contraction phenomenon of the filling material is compensated It is necessary to perform the grouting process by repeating several times, so that the ground reinforcement is troublesome and the process is prolonged and the workability is lowered.

중력식 주입공법의 단점을 보강하기 위해 최근에는 가압식 주입공법을 개발하여 그라우팅 공정을 실시하고 있다. 가압식 주입공법은 지반에 천공된 홀에 중력식 주입공법으로 그라우트를 1차 주입한 후 천공홀의 입구부 또는 소정의 위치에 패커장치를 설치하고 그를 부풀려 입구를 폐쇄시키고, 가압에 의해 2차 그라우팅을 실시하는 일련의 과정을 거친다.In order to reinforce the disadvantages of the gravity type injection method, a pressurized injection method has been recently developed and a grouting process is carried out. In the pressurized injection method, the grout is first injected into the hole drilled in the ground, and a packing device is installed at the entrance of the perforation hole or at a predetermined position, the inlet is closed by inflating the hole, and the secondary grouting is performed by pressurization It is a series of processes.

이러한 시공법은 천공시 발생한 지반이완영역을 일정부분 복원시켜주는 효과가 있으나, 가압 주입된 그라우트의 양생이 이루어지기 전에 지반침투 및 흡수, 수축 등으로 인한 압력 소산현상으로 상당부분 그 기능을 상실하는 문제가 있다. 상기 소산현상이 심한 지층의 경우에는 패커 하부에 공동까지 발생할 수 있으나, 이에 대한 확인이 어렵고, 또한 공동부 충진을 위한 재주입을 할 수가 없어 부실시공이 이루어지는 문제가 있다. 또한, 가압식 주입공법은 토목섬유 등을 이용하여 패커를 제작하게 되는데 토목섬유의 내구성이 낮아 시공 및 자재의 보관, 운반 중 파손되기 용이하고, 한번 파손된 패커는 그 기능을 상실하는 문제가 있다. This method has the effect of restoring a part of the soil relaxation area caused by perforation, but the function is lost due to the pressure dissipation phenomenon due to infiltration, absorption and contraction of the ground before curing of the grout under pressure injection . In the case of a stratum having a severe dissipation phenomenon, it may occur up to the bottom of the packer. However, it is difficult to confirm the fact, and the construction can not be carried out for filling the cavity portion. Also, the pressurized injection method uses a geosynthetic fiber or the like to produce a packer. Since the geosynthetic fiber has low durability, it is easy to damage the construction and materials during storage and transportation, and once the damaged packer has lost its function.

상기한 문제점을 극복하고자 종래에는 국내 특허 제10-0941669호의 지중앵커파일 압력 재주입시공장치가 개시되어 있다. 상기 특허는 도1에 도시한 바와 같이 제1열 및 제2열 주입관(102, 103)으로 이루어진 U자형 관로(100)에 재주입공(103a)을 다수 설치하고, 상기 재주입공(103a)을 탄성밴드(104)로 차폐하고, 재주입공(103a)의 하부에는 배출공(105)과 관로를 차폐하는 폐쇄장치(106)가 장착된 구조로 되어 있다. 이 구조는 단열 가압주입관(A), 양열가압주입관(B), 양열순차 가압주입관(C), 가압재주입관(D) 및 역류방지장치 가압주입관(E)의 실시형태로 되어 있다.In order to overcome the above-mentioned problem, the factory value at the time of reloading the underground anchor file of the Korean Patent No. 10-0941669 has been disclosed. 1, a plurality of re-entrant holes 103a are provided in a U-shaped conduit 100 made up of first and second heat injection pipes 102 and 103, And a closing device 106 for blocking the vent hole 105 and the channel is mounted on the lower portion of the re-insertion hole 103a. This structure is an embodiment of the adiabatic pressure injection tube A, the heat and pressure injection tube B, the heat and pressure sequential pressure injection tube C, the pressure receiving tube D and the backflow prevention device pressure injection tube E .

상기한 특허는 제1열 주입관(102)으로부터 제2열 주입관(103)으로 주입되는 그라우트가 폐쇄장치(106)에 의해 가압되고, 제2열 주입관(103)에 형성된 재주입공(103a)을 통해 기초지반으로 충진되는 시공방법으로서, 지반 천공시 발생한 이완지반의 복원 및 그라우팅과 주면지반과의 압력밀착을 가능하게 하여 주면마찰저항을 증대할 수 있다. 그러나, 상기 구조는 지반 하단부터 그라우트가 채워지고 나서 천공홀 외면으로부터 근접된 재주입공(103a)을 통해 재주입 그라우팅을 실시하는 구조이기 때문에 인접지반에 그라우트를 주입하는 정도이며, 그라우트 구체의 확장은 기대할 수가 없다.In the above-mentioned patent, the grout injected from the first heat injection pipe 102 into the second heat injection pipe 103 is pressurized by the closing device 106, and the grooves 103a It is possible to increase the frictional resistance by making restoration and grouting of the loosening ground occurred during the drilling of the ground and pressure contact with the ground surface. However, since the structure is such that the grout is filled from the bottom of the ground and re-injection grouting is performed through the adjacent re-entrant hole 103a from the outer surface of the perforation hole, the grout is injected into the adjacent ground, I can not expect.

종래의 구근을 확장하는 방법으로 국내특허 제10-1001273호의 쐐기형 구근형성방법이 제안되어 있다. 상기 구조는 도2에 도시한 바와 같이, V자 형태로 분사되도록 선단에 그라우트 분사부(210)가 형성된 앵커조립체(200)를 지반에 삽입하고 그라우트 분사부(210)를 통해 천공홀(220)의 측방 상측으로 경사진 방향으로 그라우트(G)를 분사하여 쐐기형 구근을 형성하는 구조이다. 상기 구조는 그라우트 분사부(210)가 V자 형태로 분출됨으로써 쐐기형상의 구근을 형성하므로 우수한 인발하중을 얻을 수 있으나, 지반 하단의 그라우트가 유실되는 경우에는 이를 채울만한 방법이 없다. 이에 따라 그라우트체의 강도가 떨어져 결국에는 소망하는 인발하중을 얻을 수가 없고, 또 상측방향으로만 그라우트가 분출되므로 지반의 여러방향으로 구근을 확장할 수 없는 문제점이 있다.
As a method of expanding conventional bulbs, a wedge-shaped bulb forming method of Korean Patent No. 10-1121273 has been proposed. 2, an anchor assembly 200 having a grout injection part 210 formed at a tip end thereof to be injected in a V shape is inserted into a ground, and a perforation hole 220 is formed through a grout injection part 210. [ And a wedge-shaped bulb is formed by injecting the grout G in an inclined direction to the lateral upper side of the wedge-shaped bulb. Since the grout injection part 210 is sprayed in a V shape to form a wedge-shaped bulb, excellent pulling load can be obtained. However, there is no method to fill the grout at the bottom of the ground if the grout is lost. As a result, the strength of the grout body is lowered, so that a desired pulling load can not be obtained. Moreover, since the grout is ejected only in the upward direction, the bulb can not be extended in various directions of the ground.

따라서, 본 발명은 상기의 제반문제점을 해결하기 위하여 제안된 것으로서, 천공홀에 중력방식 또는 압력식으로 그라우트를 주입하여 1차 구근을 형성한 후 1차 구근의 고결화가 진행되기 전에 재차 반복적으로 고압 그라우트를 주입하는 포스트 그라우팅을 통하여 그라우트 구근의 균열을 발생시키고, 균열 틈새로 고압그라우트를 침투시켜 구근 형성을 확대할 수 있는 지중 앵커파일의 구근확장장치 및 그를 이용한 구근확장방법을 제공함에 그 목적이 있다.
SUMMARY OF THE INVENTION Accordingly, the present invention has been made in order to solve all of the above problems, and it is an object of the present invention to solve the above problems, and it is an object of the present invention to provide a method of manufacturing a pre- The present invention provides a bulb extension device of an underground anchor pile and a bulb bulging method using the same, which can crack the grout bulge through a post grouting injecting grout and penetrate the high pressure grout with a crevice crack to enlarge the bulb formation. have.

상기 목적을 달성하기 위하여 본 발명은, 앵커체에 장착된 그라우트 호스를 지반에 천공된 앵커공에 삽입하여 그라우트 구근을 형성하는 장치에 있어서, 그라우트 호스는 외주면에 그라우트 분출홀이 형성되고, 상기 그라우트 분출홀을 차단할 수 있도록 그라우트 호스에 끼워져 그라우트 분출홀을 개폐하는 멤브레인 밸브를 포함하되, 상기 그라우트 호스의 분출홀을 통하여 분출되는 고압의 그라우트에 의해 멤브레인 밸브가 개방되면서 그라우트를 누출하여 고결이 진행되고 있는 채움그라우트로 침투되도록 함으로써 구근을 확장하는 것을 특징으로 하는 지중 앵커파일의 구근확장장치를 제공한다.In order to attain the above object, the present invention provides an apparatus for forming a grout bulb by inserting a grout hose mounted on an anchor body into an anchor hole drilled in a ground, wherein the grout hose has a grout ejection hole formed on an outer circumferential surface thereof, And a membrane valve which is inserted into the grout hose so as to block the spray hole and opens and closes the grout spraying hole, wherein the membrane valve is opened by the high pressure grout sprayed through the spray hole of the grout hose, Wherein the bulb is inflated by infiltration with a filling grout. ≪ RTI ID = 0.0 > [10] < / RTI >

또한, 본 발명은 지반을 천공하여 앵커홀을 형성한 후 프리 그라우팅(pre grouting)을 실시하는 제1 단계; 앵커체를 앵커홀에 삽입하고 채움그라우팅을 실시한 후 양생하는 제2 단계; 앵커체와 함께 삽입되는 그라우트 호스의 분출홀을 통하여 고압의 그라우트를 분출함으로써 채움그라우트에 무작위 균열을 발생시키고, 균열 틈새로 고압그라우트를 침투시키는 제3 단계; 및 상기 제3 단계를 반복적으로 실시하여 구근을 확장하는 제4 단계를 포함하는 지중 앵커파일의 구근확장방법을 제공한다.According to another aspect of the present invention, there is provided a method for manufacturing an anchor hole, comprising: a first step of pre grouting after forming an anchor hole by drilling the ground; A second step of inserting an anchor body into an anchor hole, performing filling grouting, and then curing the anchor body; A third step of injecting high-pressure grout through the ejection hole of the grout hose inserted together with the anchor body to generate random cracks in the filling grout, and penetrating the high-pressure grout with cracks; And a fourth step of repeatedly performing the third step to expand the bulb.

전술한 바와 같이 본 발명에 따르면, 다음과 같은 효과를 구현한다.As described above, according to the present invention, the following effects are realized.

첫째, 앵커공에 주입된 채움그라우트가 고결되기 전에 고압으로 포스트 그라우팅을 실시하여 그라우트에 무작위 균열을 발생시키고, 상기 균열부위의 틈새로 그라우트가 침투되면서 구근을 확장함으로 신뢰적으로 지반을 강화할 수 있다.First, post grouting is carried out at a high pressure before the filled grout injected into the anchor hole causes random cracks in the grout, and the grout is infiltrated into the cracks of the grooves and the bulb is expanded, thereby reliably strengthening the ground .

둘째, 연약지반의 경우 포스트 그라우팅을 통한 구근 확장으로 연약지반의 지내력을 획기적으로 상승시킬 수 있으며, 그라우트의 고결화전에 반복적인 고압 그라우팅을 실시하면서 구근을 확장하기 때문에 공사기간을 단축할 수 있는 효과가 있다.Second, in case of soft ground, it is possible to drastically increase the grounding capacity of the soft ground by post-grouting, and it is possible to shorten the construction period by repeatedly performing high-pressure grouting before grouting, .

셋째, 구근의 확장에 소요되는 시멘트 밀크 또는 몰탈과 같은 그라우트재의 소모량을 최소화할 수 있고 고압주입시공에서 발생하는 산업폐기물량을 감소시킬 수 있다.
Third, it is possible to minimize consumption of grout material such as cement milk or mortar for bulb expansion and to reduce the amount of industrial waste generated in high pressure injection construction.

도1은 종래의 앵커파일의 압력재주입장치의 시공도,
도2는 종래기술에 따른 쐐기 구근을 형성하기 위한 시공도,
도3은 본 발명에 의한 지중 앵커파일의 구근확장방법을 나타낸 시공흐름도,
도4는 본 발명에 의한 지중 앵커파일의 구근확장방법에 적용되는 구근확장장치의 제1 실시예 구성도,
도5는 본 발명의 요부인 멤브레인 밸브의 다른 구성도,
도6은 본 발명에 의한 지중 앵커파일의 구근확장장치의 제2 실시예 구성도,
도7은 본 발명에 의한 지중 앵커파일의 구근확장장치의 제3 실시예 구성도,
도8은 본 발명의 제3 실시예에 따른 구근확장장치를 이용한 구근 확장시공도,
도9는 그라우트 호스를 세척하는 구성도이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing the construction of a conventional pressure re-
FIG. 2 is a view showing a construction for forming a wedge bulb according to the prior art,
3 is a construction flowchart showing a bulging method of an underground anchor pile according to the present invention,
FIG. 4 is a view showing a first embodiment of a bulb expanding apparatus applied to a bulb extending method of an underground anchor pile according to the present invention;
FIG. 5 is another configuration diagram of a membrane valve which is a main part of the present invention. FIG.
6 is a view showing a configuration of a second embodiment of a bulb extending device for an underground anchor pile according to the present invention,
7 is a view showing a third embodiment of a bulb extending device for an underground anchor pile according to the present invention,
8 is a view showing a bulb expansion using a bulb expansion device according to a third embodiment of the present invention,
Fig. 9 is a configuration diagram for cleaning the grout hose.

이하, 첨부된 도3 내지 도9를 참조하여 본 발명의 실시예를 상세히 설명한다. Hereinafter, embodiments of the present invention will be described in detail with reference to FIGS. 3 to 9 attached hereto.

본 발명에 의한 지중 앵커파일의 구근확장방법 및 상기 방법에 사용되는 구근확장장치는 채움그라우트에 고압의 포스트 그라우팅을 반복적으로 실시하여 그라우트체에 균열을 발생시키고, 상기 균열 틈새로 고압의 그라우트를 침투시켜 구근을 확장할 수 있도록 구현한 것이다. The method for expanding a bulb of an underground anchor pile according to the present invention and the bulb expanding device used in the method repeatedly perform high-pressure post grouting in a filling grout to generate cracks in the grouting body, To extend the bulge.

도3은 본 발명에 의한 지중 앵커파일의 구근확장방법을 나타낸 시공흐름도이다. FIG. 3 is a construction flowchart showing a bulging method of an underground anchor pile according to the present invention.

도면에 도시한 바와 같이, 먼저 지반 천공 후에(S2), 프리 그라우팅(pre grouting)을 실시한다(S4). 다음, 앵커체를 삽입하고(S6), 채움 그라우팅을 실시하게 된다(S8). 상기 채움 그라우팅이 고결되기 전에 1차 포스트 그라우팅(post grouting)을 실시하고, 1차 양생 후 2차 포스트 그라우팅을 실시 및 2차 양생한다(S12). 상기와 같이 1차 및 2차 양생 및 포스트 그라우팅을 수회에 걸쳐 반복적으로 실시함으로써 채움그라우트체를 균열시키고 균열된 틈새로 고압의 그라우트가 지속적으로 침투되어 지반의 구근을 확장하게 된다(S14). As shown in the figure, after pre-grounding (S2), pre grouting is performed (S4). Next, the anchor body is inserted (S6), and the filling grouting is performed (S8). The first post grouting is performed before the filling grouting is consolidated, the second post grouting is performed after the first curing, and the second curing is performed (S12). As described above, the primary and secondary curing and post grouting are repeatedly performed several times to crack the filled grout, and the high-pressure grout continuously penetrates into the cracked gap to extend the bulb of the ground (S14).

도4는 본 발명에 의한 지중 앵커파일의 구근확장방법에 사용되는 구근확장장치의 제1 실시예 구성도이고, 도5는 본 발명의 요부인 멤브레인 밸브의 다른 구성도이다. 본 실시예는 싱글타입(single type) 그라우트 호스의 구성을 나타낸다.FIG. 4 is a view of a first embodiment of a bulb expansor used in a bulb dilation method of an underground anchor pile according to the present invention, and FIG. 5 is another structural view of a membrane valve as a main part of the present invention. The present embodiment shows the construction of a single type grout hose.

본 발명의 제1 실시예에 따른 구근확장장치는 도면에 도시한 바와 같이, 앵커체에 장착된 그라우트 호스(2)를 포함한다. 상기 그라우트 호스(2)는 외주면에 간격을 두고 그라우트 분출홀(4)이 형성되어 있다. 상기 그라우트 호스(2)의 외주면에는 그라우트 분출홀(4)을 차폐하기 위한 멤브레인 밸브(6)가 장착된다. 상기 멤브레인 밸브(6)는 밀착 및 신축성이 양호한 고무 밴드로 형성되어 있으며, 일측 단부가 철밴드(8)가 묶여있고 그라우트 분출홀(4)을 통해 분출되는 그라우트의 압력에 의해 타측단부가 확장되어 그라우트를 누출시키는 체크밸브기능을 수행한다.The bulb expands according to the first embodiment of the present invention includes a grouting hose 2 mounted on an anchor body as shown in the figure. The grout hose (2) is formed with a grout ejection hole (4) spaced apart from the outer circumferential surface. A membrane valve (6) for shielding the grout injection hole (4) is mounted on the outer circumferential surface of the grouting hose (2). The membrane valve 6 is formed of a rubber band having good adhesion and stretchability. One end of the membrane valve 6 is bundled with the iron band 8 and the other end is expanded by the pressure of the grout blown out through the grout blowing hole 4 Perform a check valve function to leak the grout.

다른 예로 상기 멤브레인 밸브(6)는 도5에 도시한 바와 같이 양단이 철밴드(8)로 묶여 있고, 그라우트 분출홀(4)에 대향되는 부위에 십자절개선(6a)이 형성될 수 있다. 상기 십자절개선(6a)은 그라우트 분출홀(4)을 통해 그라우트가 분출할 때의 압력에 의해 개방되어 그라우트를 누출시키는 작용을 한다. As another example, the membrane valve 6 is bound at both ends by an iron band 8 as shown in Fig. 5, and a cross cutting 6a may be formed at a portion opposed to the grout blowing hole 4. [ The cruciform incision 6a is opened by the pressure at which the grout is blown out through the grout ejection hole 4 and serves to leak the grout.

상기한 구성을 갖는 구근확장장치는 프리그라우팅 및 채움 그라우팅 실시 후에 고압의 그라우트를 호스(2)내로 주입하여 반복적으로 포스트 그라우팅을 실시하게 된다. 이 과정에서, 그라우트 호스(2)의 분출홀(4)로부터 분출되는 그라우트의 압력에 의해 멤브레인 밸브(6)의 일측이 확장 즉 철밴드(8)에 묶여있는 반대측으로 확장되면서 고압의 그라우트가 호스 밖으로 누출된다. 누출된 그라우트는 고결이 진행되고 있는 채움그라우트체에 균열을 발생시키고, 균열 틈새로 침투하여 구근을 확장시키게 되는 것이다.
또한, 도9에 도시한 바와 같이 구근 확장시공 완료 후 그라우트 호스에 채워져 있는 그라우트가 고화되기 전에 관세척을 하기 위한 세척수관(10)을 더 구비함으로써 나중에 재시공이나 재보강할 수 있다. 즉, 세척수관(10)을 통해 미리 그라우트 호스 내부를 세척해 둠으로써 지반에 도입된 앵커력이 설계값에 미치지 못하여 재보강을 실시하여야만 하는 경우, 기 도입된 앵커체의 앵커력이 시간이 지나면서 느슨해져 재인장이 필요한 경우에 그라우트 호스(2)를 통해 고압 그라우트의 재주입을 반복 실시함으로써 완전 경화된 그라우트에 균열을 발생시키고 균열틈새로 그라우트를 주입하여 구근을 더욱 크게 형성할 수 있고, 이를 통해 앵커체의 소요 인장력을 확보할 수 있는 것이다.
The bulb expansion apparatus having the above-described configuration injects the high-pressure grout into the hose 2 after performing the pre-grouting and the filling grouting, and repeatedly performs the post-grouting. In this process, by the pressure of the grout ejected from the ejection hole 4 of the grout hose 2, one side of the membrane valve 6 is expanded, that is, extended to the opposite side tied to the iron band 8, Leak out. The leaked grout generates cracks in the filled grout body which is undergoing consolidation, and penetrates into cracks to expand the bulb.
Further, as shown in FIG. 9, after the completion of the bulb extension work, the washing water pipe 10 for washing the pipe before solidifying the grout filled in the grout hose is further provided, so that it can be reworked or re-reinforced later. That is, if the anchor force introduced into the ground by the washing water pipe 10 is previously washed through the washing water pipe 10 and the reinforcement should be performed because the anchor force introduced into the ground does not reach the design value, the anchor force of the introduced- It is possible to generate a crack in the fully hardened grout and to inject the grout into the crevice gap so that the bulb can be formed to a larger size, It is possible to secure the required tensile force of the sieve.

도6은 본 발명에 의한 지중 앵커파일의 구근확장방법에 사용되는 구근확장장치의 제2 실시예 구성도이다. 본 실시예는 멀티타입(multi type) 그라우트 호스의 구성을 나타낸다. 6 is a block diagram of a second embodiment of a bulb extender used in a bulb dilation method of an underground anchor pile according to the present invention. The present embodiment shows the construction of a multi-type grout hose.

도면에 도시한 바와 같이, 본 실시예에서는 계단형태로 배열된 복합앵커체의 각 앵커마다 그라우트 호스(2)가 장착되며, 상기 그라우트 호스(2)에는 선단측에 하나의 분출홀(4)이 형성되고, 상기 분출홀(4)을 멤브레인 밸브(6)가 차폐하는 구조로 되어 있다. As shown in the figure, in the present embodiment, a grout hose 2 is attached to each anchor of a composite anchor body arranged in a staircase shape, and one grooved hole 4 is formed in the grout hose 2 at the tip side And the membrane valve 6 shields the spray hole 4.

상기한 구조는 앵커체가 계단형태로 배열된 각 앵커체에 장착된 그라우트 호스(2)가 계단구간별로 고압그라우팅을 실시하면서 채움그라우트에 침투하여 구근을 확장하는 것이다. The above-described structure is such that the grout hose 2 mounted on each anchor body in which the anchors are arranged in the form of stairs penetrates into the filling grout and expands the bulb while performing high-pressure grouting for each step section.

도7은 본 발명에 의한 지중 앵커파일의 구근확장방법에 사용되는 구근확장장치의 제3 실시예 구성도이고, 도8은 본 발명의 제3 실시예에 따른 구근확장장치를 이용한 구근 확장시공도이다. 본 실시예는 구간별 주입이 가능하도록 구성한 것이다.FIG. 7 is a view showing a third embodiment of a bulb extending device used in a bulb extending method of an underground anchor pile according to the present invention, FIG. 8 is a view showing a bulb extending method using a bulb extending device according to a third embodiment of the present invention to be. The present embodiment is configured to enable injection by section.

즉, 본 실시예에서는 도면에 도시한 바와 같이, 간격을 두고 형성된 분출홀(32)을 멤브레인 밸브(34)가 각각 차폐한 구조의 그라우트 호스(30)에 다수의 관통공(36a)이 형성된 그라우트 주입관(36)을 끼운 상태에서 구간별로 그라우팅을 실시한 구조이다. That is, in the present embodiment, as shown in the drawing, grout hoses 30 having a structure in which the membrane valve 34 is shielded by the spray holes 32 formed at intervals are formed with grooves 36a having a plurality of through- Grouting is performed for each section with the injection tube 36 interposed therebetween.

즉, 본 실시예에서는 도8에 도시한 바와 같이 1차적으로 그라우트 호스(30)의 선단부 분출홀(32)측까지 주입관(36)을 삽입하고, 상기 주입관(36)에 그라우트를 주입하여 관통공(36a)을 통해 누출된 그라우트가 분출홀(32)측으로 분출되도록 하여 1차 구간의 구근을 확장한다. 그리고, 그라우트 호스(30)의 중간 및 후단측 분출홀(32) 구간으로 상기 주입관(36)을 순차적으로 이탈시키고 그라우트를 주입하면서 2차 구간 및 3차 구간의 구근을 단계별로 확장시키게 되는 것이다.That is, in this embodiment, as shown in FIG. 8, the injection pipe 36 is first inserted to the side of the front end blow-out hole 32 of the grout hose 30, and grout is injected into the injection pipe 36 The grout leaking through the through hole 36a is ejected toward the ejection hole 32 to expand the bulb of the primary section. The injection tube 36 is sequentially removed from the middle and rear end injection holes 32 of the grouting hose 30 and the grooves are injected to expand the bulbs of the secondary section and the tertiary section in stages .

한편, 본 발명의 제1 내지 제3 실시예에서 그라우트 호스를 통해 그라우트를 주입하고 구근을 확장한 다음에는 도9에 도시한 바와 같이, 그라우트 호스(2)에 세척수관(10)을 삽입하여 그라우트 호스에 잔재하는 그라우트를 세척한다.Meanwhile, in the first to third embodiments of the present invention, the grout is injected through the grout hose and the bulb is expanded. Then, as shown in FIG. 9, the washing water pipe 10 is inserted into the grout hose 2, Clean grout remaining in hose.

이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것은 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위내에서 여러가지 치환, 변형 및 변경이 가능함은 본 발명이 속하는 기술분야에서 통상의 지식을 가진자에게 있어 명백할 것이다.
While the present invention has been described in connection with what is presently considered to be practical exemplary embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, It will be clear to those who have knowledge.

2: 그라우트 호스 4: 그라우트 분출홀
6: 멤브레인 밸브 8: 철밴드
10: 세척수관
2: Grout hose 4: Grout ejection hole
6: Membrane valve 8: Iron band
10: Washing water pipe

Claims (13)

삭제delete 앵커공에 설치된 앵커체의 인장력 향상을 위한 그라우트 구근확장장치에 있어서,
앵커공에 1차로 채워지는 채움 그라우트체;
외주면에 간격을 두고 다수의 그라우트 분출홀이 형성된 그라우트 호스;
상기 그라우트 호스의 분출홀 외면에 끼워져 그라우트 분출홀을 개폐하는 멤브레인 밸브; 및
구근의 확장시공완료 후 그라우트 호스에 삽입되어 관세척을 실시하기 위한 세척수관을 포함하되,
상기 멤브레인 밸브는 일단이 철밴드로 고정되고 타측단이 고압의 그라우트에 의해 벌어지도록 구성되어 상기 그라우트 호스의 분출홀을 통하여 분출되는 고압의 그라우트에 의해 멤브레인 밸브가 개방되면서 그라우트를 누출하여 고결이 진행되고 있는 채움 그라우트체로 침투되도록 함으로써 구근을 확장하는 것을 특징으로 하는 지중 앵커파일의 구근확장장치.
A grout bulging device for improving tension of an anchor body installed in an anchor hole,
Filled first grout in anchor ball;
A grout hose in which a plurality of grout spray holes are formed at intervals on an outer circumferential surface;
A membrane valve that is fitted to an outer surface of the ejection hole of the grout hose and opens and closes the grout ejection hole; And
And a washing water pipe to be inserted into the grout hose after completion of the extension of the bulb to perform the pipe washing,
The membrane valve is structured such that one end thereof is fixed by an iron band and the other end is opened by a high pressure grout. The membrane valve is opened by the high pressure grout sprayed through the ejection hole of the grout hose to leak the grout, Wherein the bulb is inflated so as to be infiltrated with a filled grout.
앵커공에 설치된 앵커체의 인장력 향상을 위한 그라우트 구근확장장치에 있어서,
앵커공에 1차로 채워지는 채움 그라우트체;
외주면에 간격을 두고 다수의 그라우트 분출홀이 형성된 그라우트 호스;
상기 그라우트 호스의 분출홀 외면에 끼워져 그라우트 분출홀을 개폐하는 멤브레인 밸브; 및
구근의 확장 시공 완료 후 그라우트 호스에 삽입되어 관세척을 실시하기 위한 세척수관을 포함하되,
상기 멤브레인 밸브는 양단이 철밴드에 의해 묶여 있고, 상기 그라우트 분출홀에 대향되는 부위에 십자절개선이 형성된 구성으로 이루어져 상기 그라우트 분출홀을 통하여 고압의 그라우트가 분출할 때 상기 십자절개선이 개방되어 그라우트를 누출하여 고결이 진행되고 있는 채움 그라우트체로 침투되도록 함으로써 구근을 확장하는 것을 특징으로 하는 지중 앵커파일의 구근확장장치.
A grout bulging device for improving tension of an anchor body installed in an anchor hole,
Filled first grout in anchor ball;
A grout hose in which a plurality of grout spray holes are formed at intervals on an outer circumferential surface;
A membrane valve that is fitted to an outer surface of the ejection hole of the grout hose and opens and closes the grout ejection hole; And
And a washing water pipe to be inserted into the grout hose after completion of the extension of the bulb to perform the pipe washing,
The membrane valve has a structure in which both ends of the membrane valve are bound by an iron band and a cross-section is formed at a portion opposed to the grout injection hole. When the high pressure grout is injected through the grout injection hole, the cross- Wherein the bulb is expanded by allowing the grout to leak into the filled grout body which is being cemented.
제 2 항 또는 제 3 항에 있어서,
상기 그라우트 호스는 계단형태로 배열된 앵커체 각각에 장착되며, 그라우트 호스의 그라우트 분출홀도 계단형태로 배열되는 것을 특징으로 하는 지중 앵커파일의 구근확장장치.
The method according to claim 2 or 3,
Wherein the grout hose is mounted on each of the anchor bodies arranged in a stair-like shape, and the grout ejection holes of the grout hose are also arranged in a stepped shape.
제 2 항 또는 제 3 항에 있어서,
상기 그라우트 호스에 끼워지며, 간격을 두고 다수의 관통공이 형성된 그라우트 주입관을 더 포함하되, 상기 그라우트 주입관을 호스의 삽입위치에서 구간별로 이탈시키면서 그라우트를 호스측으로 주입하는 것을 특징으로 하는 지중 앵커파일의 구근확장장치.
The method according to claim 2 or 3,
Further comprising a grout injection pipe fitted in the grout hose and formed with a plurality of through holes spaced apart from each other, wherein the grout injection pipe is injected into the hose side while separating the grout injection pipe at a position where the hose is inserted, Bulb extension device.
삭제delete 삭제delete 지반을 천공하여 앵커홀을 형성한 후 프리 그라우팅(pre grouting)을 실시하는 제1 단계;
그라우트 호스에 형성된 다수의 분출홀에 멤브레인 밸브를 끼우고 상기 멤브레인 밸브 일단을 철밴드로 묶어 구성한 고압 그라우트 호스장치를 앵커체와 함께 앵커홀에 삽입하고 채움그라우팅을 실시한 후 양생하는 제2 단계;
채움그라우트체가 고결이 진행되는 과정에서 상기 그라우트 호스의 분출홀과 멤브레인 밸브의 작동을 통하여 고압의 그라우트를 분출함으로써 채움 그라우트체에 무작위 균열을 발생시키고, 균열 틈새로 고압그라우트를 침투시키는 제3 단계;
상기 제3 단계 수행후 균열틈새로 침투된 그라우트가 채움그라우트의 고결화가 진행되는 과정에 재차 반복적으로 실시하여 구근을 확장하는 제4 단계; 및
상기 제4 단계 수행 후 그라우트 호스에 세척수관을 삽입하여 관세척을 실시하는 제5 단계
를 포함하는 지중 앵커파일의 구근확장방법.
A first step of pre-grouting after forming an anchor hole by drilling the ground;
A second step of inserting a high pressure grout hose device formed by bundling a membrane valve into a plurality of ejection holes formed in the grout hose and connecting one end of the membrane valve with an iron band, and inserting the grout hose device together with the anchor into the anchor hole,
A third step of injecting high-pressure grout through the operation of the ejection hole and the membrane valve of the grout hose in the process of solidification of the filled grout, thereby generating random cracks in the grout, and penetrating the high-pressure grout with cracks;
A fourth step in which the grout penetrated into the crevice gap after the third step is repeatedly carried out in the process of cementing the filled grout to expand the bulb; And
A fifth step of performing a pipe cleaning by inserting a washing water pipe into the grout hose after performing the fourth step
A method of expanding a bulb of an underground anchor file.
지반을 천공하여 앵커홀을 형성한 후 프리 그라우팅(pre grouting)을 실시하는 제1 단계;
그라우트 호스에 형성된 다수의 분출홀에 십자절개선이 형성된 멤브레인 밸브를 끼우고 상기 멤브레인 밸브 양단을 철밴드로 묶어 구성한 고압 그라우트 호스장치를 앵커체와 함께 앵커홀에 삽입하고 채움그라우팅을 실시한 후 양생하는 제2 단계;
채움그라우트체가 고결이 진행되는 과정에서 상기 그라우트 호스의 분출홀과 멤브레인 밸브의 작동을 통하여 고압의 그라우트를 분출함으로써 채움 그라우트체에 무작위 균열을 발생시키고, 균열 틈새로 고압그라우트를 침투시키는 제3 단계;
상기 제3 단계 수행후 균열틈새로 침투된 그라우트가 채움그라우트의 고결화가 진행되는 과정에 재차 반복적으로 실시하여 구근을 확장하는 제4 단계; 및
상기 제4 단계 수행 후 그라우트 호스에 세척수관을 삽입하여 관세척을 실시하는 제5 단계
를 포함하는 지중 앵커파일의 구근확장방법.
A first step of pre-grouting after forming an anchor hole by drilling the ground;
A high pressure grout hose device comprising a membrane valve with cross-section formed in a plurality of ejection holes formed in a grout hose and a membrane band connected to both ends of the membrane valve by an iron band is inserted into an anchor hole together with an anchor body, followed by filling grouting, A second step;
A third step of injecting high-pressure grout through the operation of the ejection hole and the membrane valve of the grout hose in the process of solidification of the filled grout, thereby generating random cracks in the grout, and penetrating the high-pressure grout with cracks;
A fourth step in which the grout penetrated into the crevice gap after the third step is repeatedly carried out in the process of cementing the filled grout to expand the bulb; And
A fifth step of performing a pipe cleaning by inserting a washing water pipe into the grout hose after performing the fourth step
A method of expanding a bulb of an underground anchor file.
제 8 항 또는 제 9항에 있어서,
제2 단계에서의 그라우트 호스는 앵커체와 함께 계단형태로 배열되고, 각 그라우트 호스에 형성된 그라우트 분출홀도 계단형태로 배열된 것을 특징으로 하는 지중 앵커파일의 구근확장방법.
10. The method according to claim 8 or 9,
Wherein the grout hose in the second step is arranged in a stepped shape together with the anchor body and the grout ejection holes formed in each grout hose are arranged in a stepped shape.
제 8 항 또는 제 9 항에 있어서,
제3 단계는 선단부에 간격을 두고 관통공이 형성된 주입관을 멤브레인 밸브에 의해 그라우트 분출홀이 차폐된 그라우트 호스 내부로 삽입하되, 상기 주입관을 서서히 이탈시키면서 구간별로 포스트 그라우팅을 실시하는 것을 특징으로 하는 지중 앵커파일의 구근확장방법.





10. The method according to claim 8 or 9,
The third step is to insert the injection tube having a through hole with a gap at the distal end thereof into the grout hose which is shielded by the grout injection hole by the membrane valve, while post grouting is performed for each section while slowly releasing the injection tube How to Extend the Bulk of Underground Anchor Files.





삭제delete 삭제delete
KR20120129199A 2012-11-15 2012-11-15 Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same KR101488721B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20120129199A KR101488721B1 (en) 2012-11-15 2012-11-15 Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20120129199A KR101488721B1 (en) 2012-11-15 2012-11-15 Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same

Publications (2)

Publication Number Publication Date
KR20140062914A KR20140062914A (en) 2014-05-27
KR101488721B1 true KR101488721B1 (en) 2015-02-04

Family

ID=50891017

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20120129199A KR101488721B1 (en) 2012-11-15 2012-11-15 Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same

Country Status (1)

Country Link
KR (1) KR101488721B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372793A (en) * 2014-11-07 2015-02-25 岩土科技股份有限公司 Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method
CN104727315B (en) * 2015-03-26 2017-04-12 上海市房屋建筑设计院有限公司 Post-grouting prestressed concrete hollow pile and manufacturing method thereof
CN104895072B (en) * 2015-04-08 2018-04-27 中国建筑第八工程局有限公司 A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method
CN106917401A (en) * 2017-02-28 2017-07-04 中国二十冶集团有限公司 Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100420502B1 (en) * 1999-12-28 2004-03-02 쿄카도 엔지니어링 주식회사 Pouring pipe apparatus and the ground pouring method of construction
JP2010070923A (en) * 2008-09-16 2010-04-02 Nittoc Constr Co Ltd Ground grouting device, and ground improving method using the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100420502B1 (en) * 1999-12-28 2004-03-02 쿄카도 엔지니어링 주식회사 Pouring pipe apparatus and the ground pouring method of construction
JP2010070923A (en) * 2008-09-16 2010-04-02 Nittoc Constr Co Ltd Ground grouting device, and ground improving method using the same

Also Published As

Publication number Publication date
KR20140062914A (en) 2014-05-27

Similar Documents

Publication Publication Date Title
KR101070072B1 (en) A multistaged equipment of pipe grouting by double packer system and its construction
CN110206560A (en) A kind of adaptive composite lining structure suitable for large deformation soft rock tunnel
CN107060774B (en) A kind of anti-tunnel portal wall damage device and construction method
KR101233794B1 (en) Tunnel reinforcing method by multi-forepoling
KR101353882B1 (en) Method of reinforcement and construction of pillar of neighboring tunnel
KR101488721B1 (en) Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same
CN208136918U (en) A kind of tubular type Soil-Nailing Wall Structure
KR100437910B1 (en) grouting apparatus for earth anchor using compound packer and earth anchor construction method using the same
KR100550359B1 (en) Construction method for reinforcing the ground using steel pipes and prestressed concrete piles
KR101141526B1 (en) Pressure Grouting Method
KR101236765B1 (en) Method for placing adhesive filling into the expanded drill hole to increase bearing capacity of piles and tention members and apparatus therefor
KR20100124028A (en) Construction method of lower end expanded type cast-in-place piles
KR101029320B1 (en) Rock bolt and fixation method the rock bolt
CN108222022A (en) A kind of tubular type Soil-Nailing Wall Structure and its construction method
KR100616359B1 (en) Support-pipe using method of soil nailing
KR200381572Y1 (en) Paker can pressure with milk grouting
KR100871467B1 (en) Ground pressure anchor and constructing method thereof
KR102123570B1 (en) Multi-stage expansion type ground reinforcement and ground reinforcement construction method
KR101757975B1 (en) Anchor having a fixing device at a side of pressure plate to depress the land slope and method of installing the same
KR100951872B1 (en) The ground reinforcement apparatus and ground reinforcement method
KR100556668B1 (en) Structure of a slop reinforced of carrying out by physical environment
KR100710866B1 (en) Pressure Grouting Method using Milk Grouting and Paker
JP5504463B2 (en) Reinforcing method of concrete frame
JP4223337B2 (en) Ground reinforcement method and ground reinforcement structure by the method
KR101024257B1 (en) The earth anchor operate method which reinforces a soft ground and the device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20180103

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190130

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20200128

Year of fee payment: 6