KR101476411B1 - Precast concrete frame for buildings using precast concrete beam continued by post tensioning - Google Patents

Precast concrete frame for buildings using precast concrete beam continued by post tensioning Download PDF

Info

Publication number
KR101476411B1
KR101476411B1 KR1020110102743A KR20110102743A KR101476411B1 KR 101476411 B1 KR101476411 B1 KR 101476411B1 KR 1020110102743 A KR1020110102743 A KR 1020110102743A KR 20110102743 A KR20110102743 A KR 20110102743A KR 101476411 B1 KR101476411 B1 KR 101476411B1
Authority
KR
South Korea
Prior art keywords
precast concrete
beams
column
precast
hollow
Prior art date
Application number
KR1020110102743A
Other languages
Korean (ko)
Other versions
KR20130038089A (en
Inventor
이석
Original Assignee
이석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이석 filed Critical 이석
Priority to KR1020110102743A priority Critical patent/KR101476411B1/en
Publication of KR20130038089A publication Critical patent/KR20130038089A/en
Application granted granted Critical
Publication of KR101476411B1 publication Critical patent/KR101476411B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

본 발명은 프리캐스트 콘크리트 기둥과 보로 구성된 건축물용 골조에 관한 것으로, 본 발명의 적절한 실시 형태에 따르면, 내부에 중공이 형성된 원통형 단면 형상을 가지는 몸체와, 이 몸체의 상단에 일체로 주두가 일체로 형성된 프리캐스트 콘크리트 기둥과, 프리캐스트 콘크리트 기둥의 주두 위 양측에 거치된 프리캐스트 콘크리트 보로 구성되고, 프리캐스트 콘크리트 기둥 위에 거치된 양측의 프리캐스트 콘크리트 보는 포스트텐션닝에 의해 연속화된 것을 특징으로 하는 프리캐스트 콘크리트 골조가 제공된다.The present invention relates to a frame for a building comprising a precast concrete column and a beam. According to a preferred embodiment of the present invention, there is provided a frame for a building, comprising: a body having a cylindrical cross-sectional shape in which a hollow is formed; Wherein the precast concrete columns formed on both sides of the precast concrete column and the precast concrete beams mounted on both sides of the precast concrete column are continuous by post tensioning, A cast concrete frame is provided.

Description

포스트텐션 방식으로 연속화된 프리캐스트 콘크리트 보를 이용한 건축물용 프리캐스트 콘크리트 골조{Precast concrete frame for buildings using precast concrete beam continued by post tensioning}TECHNICAL FIELD [0001] The present invention relates to a precast concrete frame for buildings, and more particularly, to a precast concrete frame for buildings using post-tensioned continuous precast concrete beams,

본 발명은 프리캐스트 콘크리트 기둥과 보로 구성된 건축물용 골조에 관한 것으로, 보다 상세하게는 내부에 중공이 형성된 원통형 단면 형상을 가지고 상단에는 주두가 일체로 형성된 프리캐스트 콘크리트 기둥과 이 기둥 위에 거치된 프리캐스트 콘크리트 보로 구성되고 프리캐스트 콘크리트 보는 포스트텐션닝에 의해 연속화된 프리캐스트 콘크리트 골조에 관한 것이다.The present invention relates to a framework for a building comprising a precast concrete column and a beam. More particularly, the present invention relates to a precast concrete column having a cylindrical sectional shape in which a hollow is formed therein, The present invention relates to a precast concrete frame constituted by a concrete beam and serialized by post tensioning of precast concrete.

콘크리트는 타설시기에 따라 현장타설 콘크리트와 프리캐스트 콘크리트로 분류된다. 프리캐스트 콘크리트는 공장에서 다양한 형태로 제작된 몰드에 타설되는 콘크리트를 말한다. 타설된 프리캐스트 콘크리트 부재는 양생 후 수송차량에 의해 현장으로 운반되어 최종 위치에 조립된다.Concretes are classified as on-site concrete and precast concrete depending on the time of casting. Precast concrete refers to concrete placed in molds manufactured in various forms at factories. The cured precast concrete member is transported to the site by the transport vehicle after curing and assembled in the final position.

프리캐스트 콘크리트를 PC라고 부르며, PC를 이용하여 구조물을 건축하는 공법을 PC공법이라 한다. 공사현장에서 거푸집을 설치하고 철근을 배근한 뒤 콘크리트를 타설하여 건물을 완성하는 현장타설공법과 달리 PC공법은 기둥, 보, 슬래브, 벽체와 같은 구조부재들을 기후나 계절의 영향을 받지 않는 전천후 시설을 갖추고 있는 공장에서 엄격한 품질관리 아래 제작한 후 현장으로 운반, 조립하여 건물을 완성하는 공법이다. 따라서 생산에서 조립까지 전 공정에 걸쳐 장비와 기계 사용을 극대화한 대표적인 공업화 공법이다.Precast concrete is called PC, and the construction method of building structure using PC is called PC method. Unlike on-site casting method in which concrete is laid by placing formwork on a construction site and reinforcing concrete is laid to complete the building, the PC method is used to construct structural members such as columns, beams, slabs, and walls, It is a method to manufacture under the strict quality control at the factory equipped with the equipment, and then to carry it to the site and assemble it to complete the building. Therefore, it is a typical industrialization method that maximizes the use of equipment and machinery throughout the entire process from production to assembly.

우리나라에서 PC공법은 정부의 200만호 주택건설계획과 조립식 주택에 대한 정책적 지원으로 괄목할 발전을 보이게 되고 2000년대 들어서면서 경기장, 지하주차장, 대형 할인매장, 공장, 물류창고 등으로 PC공법의 적용범위가 넓어지고 있다. In the country, the PC construction method has shown remarkable development with the government's 2 million housing construction plan and the policy support for the prefabricated housing. In the 2000s, the PC construction method is applied to the stadium, underground parking lot, large discount store, factory, .

지하주차장을 예로 들어 PC공법을 적용하여 시공하는 순서를 보면, 기둥, 보 및 바닥판을 공장에서 제작한 다음 현장으로 운반한 후에, 현장에서는 먼저 기둥고정용 앵커를 설치하고, 기둥을 조립한 다음, 보를 거치하고, 바닥판을 설치한 뒤, 보와 바닥판 상부철근을 배근하고 덧침 콘크리트를 타설하여 기둥과 보 및 바닥판을 일체화시키는 단계로 시공된다. 기둥은 주로 사각형 형상의 단면 형상을 가지고 보는 기둥에 단부가 거치되고 덧침 콘크리트에 의해 기둥과 일체화된다. For example, in the underground parking lot, the PC construction method is used to construct the columns, beams and floor plates in the factory and then to the site. Then, on the site, the column anchors are installed first, After the beam is mounted, the bottom plate is installed, and the reinforcing bars and bottom reinforcing bars are laid out, and the concrete is put in place to integrate the columns and the beams and the bottom plate. The column has a rectangular cross-sectional shape, and the end is mounted on the column to be viewed and integrated with the column by the filled concrete.

일반 바닥층에서 보는 단순지지로 설계되는 것이 일반적이고 따라서 보의 중앙부에 작용하는 휨모멘트를 기준으로 단면이 설계되므로 양쪽 단부에서는 과다 설계되어 비경제적이 된다는 단점을 가진다. 만일 기둥 위에 거치되는 보를 서로 연속화시킨다면 보다 효율적인 단면 설계가 가능하고 접합부의 내진성능도 향상시킬 수 있을 것이다. 연속성을 확보하기 위한 가장 일반적인 배근방식으로는 보 하부철근은 후크 형태로 기둥-보 접합부 내에 정착시키고 상부철근은 현장배근이 가능함으로 재래식 방법과 동일하게 철근을 상호 관통시켜 시공하는 합성 모멘트 접합 방식이다. 그러나 이 방식 또한 보를 연속화시키기 위한 보 단부 철근 배근으로 인해 부재 단면이 커져 효율적이지 못하다는 단점을 가진다.It is generally designed to be simple support from the general bottom layer and thus has a disadvantage in that the cross section is designed on the basis of the bending moment acting on the center of the beam, so that it is excessively designed at both ends and is uneconomical. If the beams mounted on the columns are serialized to each other, a more efficient cross-sectional design is possible and seismic performance of the joints can be improved. The most common method for ensuring continuity is to use a composite moment connection method in which the reinforcement of beams is fixed in a column-to-beam connection with a hook shape and the upper reinforcement is capable of field reinforcement, . However, this method also has a disadvantage in that it is not efficient due to the large cross-section of the members due to the reinforcement reinforcement for continuous beam.

본 발명의 배경이 되는 기술로서 다른 보-기둥 접합방식으로는 대한민국 공개특허 제2010-0121864호 '피알씨 복합화 공법에 의한 건축 구조물에 이용되는 피씨 보의 연속식 결속구조'가 있다(특허문헌 1). 이 선행기술에서는 피씨 기둥의 양측에 배치되는 피씨 보의 단부에 체결홈과 안치홈부를 각각 형성하여 서로 마주하는 피씨 보를 연결하도록 별도의 결속철근을 삽입하고 상기 체결홈으로 돌출된 결속철근의 단부에는 체결너트를 결합 형성하는 피씨 보 연속식 결속구조가 제시되어 있다.As another background technique of the present invention, another type of beam-column joining method is the continuous joining structure of PC beams used in architectural structures by the Korean Patent Publication No. 2010-0121864 (Patent Document 1 ). In this prior art, a fastening groove and an internal groove are formed at the ends of the PC beam disposed on both sides of the PC column, and a separate coupling steel rod is inserted to connect the opposite PC beams to each other. A continuous connection structure of a PC beam is proposed in which a coupling nut is coupled.

본 발명의 배경이 되는 다른 선행기술로는 대한민국 공개특허 제2006-0102785호 '철근 볼트 접합에 의한 프리캐스트 콘크리트 기둥과 보의 건식 연결부 개발'이 있다(특허문헌 2). 이 선행기술에서는 기둥의 일정 높이에 나사공이 일측면에서 노출되도록 결합구를 갖춘 철근이 매립된 프리캐스트 콘크리트 기둥과; 철근의 일측 선단에 서레든 바가 돌출되도록 배근된 프리캐스트 콘크리트 보로 이루어져 상기 보의 서레든 바가 삽입될 수 있는 ㄷ자형 앵글에 고정된 덕트관을 포함하고 한편으로는 기둥 결합구의 나사공에 체결할 서레든 바 관통공으로 형성되는 연결부로 이루어져, 상기 보 일측 단부의 관통공을 통해 상기 기둥 나사공에 서레든 바를 체결하고 너트로 고정시킴으로써 프리캐스트 콘크리트 보의 보 상하부의 주철근을 기둥으로 트랜스퍼 블럭 없이 직접 연결하여 프리캐스트 기둥과 보가 강 접합되도록 구성한 프리캐스트 콘크리트 기둥과 보의 건식 연결부가 제시되어 있다.Another prior art which is the background of the present invention is disclosed in Korean Patent Publication No. 2006-0102785, 'Development of Dry Connections of Precast Concrete Columns and Beams by Reinforcing Bolted Joints' (Patent Document 2). In this prior art, a precast concrete column having a reinforcing bar embedded with a joint so that a screw hole is exposed at one side of the column at a predetermined height; And a duct pipe fixed to a U-shaped angle into which a standing leaf bar of the beam is inserted, the duct pipe being composed of a precast concrete beam arranged so that a laden bar protrudes from one end of a reinforcing bar, And a laden bar through-hole, and the laden bar is fastened to the column or the through hole through the through hole at the side of the beam side, and is fixed with a nut, thereby directly connecting the cast iron bars of the upper and lower portions of the precast concrete beam to the columns without a transfer block The precast concrete column and the dry connection of the beam are shown in Fig.

본 발명의 종래의 합성 모멘트 접합 방식 및 선행기술들이 가지는 단점을 해소하기 위한 것으로 아래와 같은 목적을 가진다.The present invention has the following object to overcome the disadvantages of the prior art synthetic moment bonding method and prior art.

대한민국 공개특허 제2010-0121864호, 2010.11.19.Korean Patent Publication No. 2010-0121864, November 19, 2010. 대한민국 공개특허 제2006-0102785호, 2006.09.28.Korean Patent Publication No. 2006-0102785, September 28, 2006.

본 발명은 경량화를 이루고 또한 물량을 절감하여 경제성을 갖춘 건축물용 프리캐스트 콘크리트 골조를 제공하는 것을 목적으로 한다.It is an object of the present invention to provide a precast concrete frame for a building which is lightweight and economical by reducing the amount of water.

본 발명의 다른 목적은 간편한 방법으로 보의 연속성을 확보할 수 있는 건축물용 프리캐스트 콘크리트 골조를 제공하는 것을 목적으로 한다.It is another object of the present invention to provide a precast concrete framework for a building which can ensure continuity of beams by a simple method.

본 발명의 적절한 실시 형태에 따르면, 내부에 중공이 형성된 원통형 단면 형상을 가지는 몸체와, 이 몸체의 상단에 일체로 주두가 일체로 형성된 프리캐스트 콘크리트 기둥과, 프리캐스트 콘크리트 기둥의 주두 위 양측에 거치된 프리캐스트 콘크리트 보로 구성되고, 프리캐스트 콘크리트 기둥 위에 거치된 양측의 프리캐스트 콘크리트 보는 포스트텐션닝에 의해 연속화된 것을 특징으로 하는 프리캐스트 콘크리트 골조가 제공된다.According to a preferred embodiment of the present invention, there is provided a concrete structure, comprising: a body having a cylindrical cross-sectional shape in which a hollow is formed; a precast concrete column integrally formed with the upper end of the body; And the precast concrete on both sides of the precast concrete column is continuous by post tensioning.

본 발명의 다른 적절한 실시 형태에 따르면, 프리캐스트 콘크리트 보의 양쪽 단부에는 각각 주근 수용홈이 형성되고 내부에는 쉬스관이 그 양쪽 끝이 노출되도록 매설되며, 프리캐스트 콘크리트 기둥의 일측에 거치된 프리캐스트 콘크리트 보의 내부에 설치된 쉬스관에 긴장재를 삽입한 후 프리캐스트 콘크리트 기둥과의 접합부를 지나 타측에 거치된 프리캐스트 콘크리트 보의 내부에 설치된 쉬스관에 긴장재를 삽입하는 방식으로 프리캐스트 콘크리트 보의 길이방향으로 연장한 선상에 위치하는 프리캐스트 콘크리트 보를 모두 관통하도록 쉬스관 내부로 긴장재를 배치하고 최외측에 위치하는 프리캐스트 콘크리트 보에서 각각 긴장재를 긴장 정착함으로써 한 번의 긴장작업으로 동시에 다수 개의 프리캐스트 콘크리트 보를 연속시킨 것을 특징으로 하는 프리캐스트 콘크리트 골조가 제공된다.According to another preferred embodiment of the present invention, the main concrete receiving grooves are formed at both ends of the precast concrete beam, the sheath pipe is buried so that both ends of the sheath pipe are exposed, and the precast concrete post placed on one side of the precast concrete column A method of inserting a tensile material into a sheath tube installed in the interior of a concrete beam and inserting a tensile material into a sheath tube installed inside the precast concrete beam which is mounted on the other side of the joint between the precast concrete column and the length of the precast concrete beam The prestressed concrete beams positioned on the outermost side of the sheath tube are tensioned and the tensioned materials are tensioned on the outermost precasted concrete beams so that a plurality of precast concrete Characterized in that the beam is continuous A precast concrete frame is provided.

본 발명의 또 다른 적절한 실시 형태에 따르면, 프리캐스트 콘크리트 보는 단부에서 내측으로 일정 거리 이격된 위치에 각각 포켓이 형성되고 포켓과 단부 사이에 정착구가 설치되며 정착구에는 외측을 향해 쉬스관이 연결되며, 프리캐스트 콘크리트 보는 프리캐스트 콘크리트 기둥 위에 거치된 후 프리캐스트 콘크리트 기둥의 일측에 거치된 프리캐스트 콘크리트 보의 포켓을 통해 긴장재를 삽입하고 기둥과 보의 접합부를 지나 다른 일측의 프리캐스트 콘크리트 보의 포켓으로 돌출시킨 다음 긴장한 후 정착구를 이용해 정착함으로써 프리캐스트 콘크리트 기둥의 양측에 위치하는 프리캐스트 콘크리트 보를 서로 연속시킨 것을 특징으로 하는 프리캐스트 콘크리트 골조가 제공된다.According to another preferred embodiment of the present invention, the piles are formed at positions spaced a predetermined distance inward from the end portions of the precast concrete, the fixing holes are provided between the pockets and the end portions, the sheath pipes are connected to the fixing holes to the outside, Precast Concrete Beams are mounted on precast concrete columns and then inserted through the pockets of precast concrete beams placed on one side of the precast concrete columns and passed through the joints of columns and beams to the pockets of precast concrete beams on the other side And the precast concrete beams located on both sides of the precast concrete column are connected to each other by being fixed by using a fixture after being stretched.

본 발명의 또 다른 적절한 실시 형태에 따르면, 주두에는 몸체의 중공과 연통되는 개구를 형성하여 몸체 내부의 중공에 콘크리트를 충전시킬 수 있도록 구성하고, 몸체의 중공을 둘러싸는 면은 거친 면으로 처리하여 충전되는 콘크리트와의 부착력을 증대시킨 것을 특징으로 하는 포스트텐션 방식으로 연속화된 프리캐스트 콘크리트 보를 이용한 건축물용 프리캐스트 콘크리트 골조가 제공된다.According to another preferred embodiment of the present invention, the opening is formed in the circumference of the body so as to communicate with the hollow of the body, so that the hollow can be filled with the concrete. The surface surrounding the hollow of the body is treated with a rough surface There is provided a precast concrete frame for a building using a pre-cast concrete beam which is continuous in a post-tensioning manner, characterized in that the adhesive strength to the concrete to be filled is increased.

본 발명에 따르면 기둥 부재는 내부에 중공이 형성된 속이 빈 원통형 단면으로서 경량일 뿐만 아니라 콘크리트 물량이 절감되어 경제적이며, 기둥 위에 보를 거치한 후 긴장재를 설치하고 한 번의 긴장으로 다수 개의 보를 서로 연속시킬 수 있어 보 연속성을 확보하기 위한 현장 작업이 간편하고 구조가 단순하다는 장점을 가진다. 또한 포스트텐션닝에 의해 다경간에 걸쳐 보가 연속화됨으로써 효율적으로 보의 단면을 설계할 수 있는 장점이 있다. 또한 포스트텐션닝에 의해 보가 연속화됨으로써 기둥과 보 접합부의 일체성이 향상되고 아울러 내진성능이 향상된다. According to the present invention, the pillar member is a hollow hollow cylindrical cross-section having a hollow inside and is economical because the amount of concrete is reduced as well as being lightweight. It is possible to install a tensile material after the beam is mounted on the pillar, It has a merit that the field work is simple and the structure is simple to secure continuity. In addition, post-tensioning is effective in designing the cross-section of the beam by serializing the beam over multiple beams. In addition, since the beams are continuous by the post tensioning, the integrity of the column and the beam joint is improved and the seismic performance is improved.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1은 본 발명에 따른 프리캐스트 콘크리트 기둥을 나타낸 도면으로 (a)는 사시도이고 (b)는 A-A선을 따라 절단한 단면도이다.
도 2는 본 발명에 따른 프리캐스트 콘크리트 보를 나타낸 도면으로 (a)는 사시도이고 (b)는 B-B선을 따라 절단한 단면도이다.
도 3은 본 발명의 다른 실시예에 따른 프리캐스트 콘크리트 보를 나타낸 사시도이다.
도 4는 도 2에 도시된 보를 이용하여 프리캐스트 골조를 시공한 모습을 나타낸 도면이다.
도 5a는 도 3에 도시된 보를 이용하여 프리캐스트 골조를 시공한 모습을 나타낸 도면이다.
도 5b는 도 3에 도시된 보를 이용하여 프리캐스트 골조를 시공한 모습의 다른 실시예를 나타낸 도면이다.
BRIEF DESCRIPTION OF THE DRAWINGS The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate exemplary embodiments of the invention and, together with the description, serve to explain the principles of the invention, Shall not be construed as limiting.
1 is a view showing a precast concrete column according to the present invention, wherein (a) is a perspective view and (b) is a sectional view taken along line AA.
2 is a view showing a precast concrete beam according to the present invention, wherein (a) is a perspective view and (b) is a cross-sectional view taken along the line BB.
3 is a perspective view illustrating a precast concrete beam according to another embodiment of the present invention.
FIG. 4 is a view showing a construction of a precast frame using the beam shown in FIG. 2. FIG.
FIG. 5A is a view showing a construction of a precast frame using beams shown in FIG. 3. FIG.
FIG. 5B is a view showing another embodiment of the construction of the precast frame using the beam shown in FIG. 3. FIG.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited thereto.

본 발명에 따른 프리캐스트 콘크리트 골조는 내부에 중공이 형성된 원통형 단면 형상을 가지고 상단에는 주두가 일체로 형성된 프리캐스트 콘크리트 기둥과 이 기둥 위에 거치된 프리캐스트 콘크리트 보로 구성되고 프리캐스트 콘크리트 보는 포스트텐션닝에 의해 연속화된다. 아래에서는 먼저 기둥과 보의 구성을 도면을 참조하여 상세히 설명하고 이어서 이들 기둥과 보로 구성된 골조에 대해 설명한다.The precast concrete frame according to the present invention is composed of a precast concrete column having a cylindrical sectional shape in which a hollow is formed and an upper part is integrally formed with a pillar and a precast concrete beam mounted on the pillar, . In the following, the construction of columns and beams will be described in detail with reference to the drawings, followed by the construction of these columns and beams.

도 1은 본 발명에 따른 프리캐스트 콘크리트 기둥을 나타낸 도면으로 (a)는 사시도이고 (b)는 A-A선을 따라 절단한 단면도이다.1 is a view showing a precast concrete column according to the present invention, wherein (a) is a perspective view and (b) is a sectional view taken along line A-A.

도 1에 도시된 바와 같이 본 발명에 따른 프리캐스트 콘크리트 기둥(10, 이하 간단히 'PC 기둥'이라고도 한다)은 내부에 중공(11a)이 형성된 원통형 단면 형상을 가지는 몸체(11)의 상단에 주두(12)가 일체로 형성된 형상을 가진다. 이처럼 단면을 속이 빈 원통형으로 구성함에 따라 기둥 부재를 경량화할 수 있고 또한 콘크리트 물량을 절감할 수 있어 경제성을 확보할 수 있다. PC 기둥(10)은 일반적인 PC 기둥과 마찬가지로 철근에 의해 보강되는데, 길이방향으로는 다수 개의 주근(111)이 배근되고, 주근(111)을 감싸도록 길이방향을 따라 일정 간격을 두고 길이방향에 대해 직각방향으로는 다수 개의 대근(112)이 배근된다. 주근(111)은 주두(12)의 위쪽으로 일정 길이를 돌출시켜 상하층의 기둥이 서로 일체로 연결될 수 있도록 한다. 주두(12)는 프리캐스트 보가 얹혀질 수 있는 폭을 가지면 되고 형상이 반드시 도시된 사각판형으로 제한될 필요는 없다. 주두(12)에는 몸체(11)의 중공(11a)과 연통되는 개구(12a)를 형성하여 몸체(11) 내부의 중공(11a)에 콘크리트를 충전시킬 수 있도록 구성할 수 있고 중공(11a)을 둘러싸는 면은 거친 면으로 처리하여 충전되는 콘크리트와의 부착력을 증대시킬 수 있다. 또한 주두(12)에는 PC 보(20)의 조립시 낙하를 방지하여 안전성을 높일 수 있도록 PC 보(20)의 양쪽의 단부를 관통하는 PC 보(20) 조립용 철근(113)을 돌출되게 설치할 수 있다.1, a precast concrete column 10 (hereinafter, simply referred to as a "PC column") according to the present invention has a cylindrical body 11 having a hollow 11a formed therein, 12 are integrally formed. By constructing the hollow cylindrical section as described above, it is possible to reduce the weight of the column member and to reduce the amount of concrete, thereby ensuring economical efficiency. The PC column 10 is reinforced by a reinforcing bar like a general PC column. A plurality of main rods 111 are arranged in the longitudinal direction, and the PC columns 10 are arranged at regular intervals along the longitudinal direction so as to surround the main rods 111, And a plurality of large rods 112 are laid out in a direction perpendicular thereto. The main rope 111 protrudes a predetermined length upward from the top 12 so that the pillars of the upper and lower layers can be integrally connected to each other. The shoulder 12 should have a width that allows the precast beam to rest, and the shape need not necessarily be limited to the rectangular plate shape shown. The opening 12a communicating with the hollow 11a of the body 11 is formed in the top 12 so that the hollow 11a inside the body 11 can be filled with concrete and the hollow 11a The surrounding surface can be treated with a rough surface to increase the adhesion to the filled concrete. In addition, a reinforcing bar 113 for assembling the PC beam 20 penetrating the both ends of the PC beam 20 is protruded to prevent the falling of the PC beam 20 during the assembly of the PC beam 20, .

도 2는 본 발명에 따른 프리캐스트 콘크리트 보를 나타낸 도면으로 (a)는 사시도이고 (b)는 B-B선을 따라 절단한 단면도이다.2 is a view showing a precast concrete beam according to the present invention, wherein (a) is a perspective view and (b) is a cross-sectional view taken along line B-B.

도 2에 도시된 것처럼 본 발명에 따른 프리캐스트 콘크리트 보(20, 이하 간단히 'PC 보'라고도 한다)는 직사각형 단면 형상을 가지고 양쪽의 단부에는 각각 주두(12) 위로 돌출된 주근(111)이 관통할 수 있는 수용홈(20a)이 형성되어 있다. PC 보(20)는 일반적인 PC 보와 동일하게 철근에 의해 보강되는데, 길이방향으로는 다수 개의 주근(21)이 배근되고, 주근(21)을 감싸도록 길이방향을 따라 일정 간격을 두고 길이방향에 대해 직각방향으로는 다수 개의 늑근(22)이 배근된다. 늑근(22)은 PC 보(20)의 상면으로 일정 길이가 돌출되어 덧침 콘크리트와의 부착력을 높이게 된다. PC 보(20)의 내부에는 쉬스관(23)이 매설되어 있고 이 쉬스관(23)의 양쪽 끝은 보(20)의 상면 위로 노출되어 있다. 본 실시예에 따른 PC 보(20)는 후술하는 것처럼 PC 기둥(10) 위에 PC 보(20)를 거치한 후 보의 길이방향으로 연장한 선상에 위치하는 PC 보(20)를 관통하도록 쉬스관(23) 내부로 긴장재를 배치하고 최외측의 PC 보(20)에서 각각 긴장재를 긴장 정착함으로써 한 번의 긴장작업으로 동시에 다수 개의 PC 보(20)를 연속시킬 수 있게 된다. 그리고 PC 보(20)의 중량을 절감하기 위해 양쪽의 수용홈(20a)과 늑근(20) 사이에 블럭아웃부(20b)를 둘 수 있다. As shown in FIG. 2, the precast concrete beam 20 (hereinafter also simply referred to as 'PC beam') according to the present invention has a rectangular cross-sectional shape, and main ropes 111, Receiving grooves 20a are formed. The PC beam 20 is reinforced by a reinforcing bar in the same manner as a general PC beam. A plurality of main ropes 21 are arranged in the longitudinal direction, and a plurality of main ropes 21 are arranged in the longitudinal direction And a plurality of coats 22 are arranged in a direction perpendicular to the plane. A certain length of the stay 22 protrudes from the upper surface of the PC beam 20 to increase the adhesion with the overwhelming concrete. A sheath tube 23 is embedded in the PC beam 20 and both ends of the sheath tube 23 are exposed on the upper surface of the beam 20. [ The PC beam 20 according to the present embodiment has a structure in which the PC beam 20 is placed on the PC column 10 as described later and then passed through the PC beam 20 positioned on the line extending in the longitudinal direction of the beam, A plurality of PC beams 20 can be connected at the same time by one tension work by disposing a tensile material inside the PC board 20 and tensioning the tension members respectively at the outermost PC beam 20. [ In order to reduce the weight of the PC beam 20, a block-out portion 20b may be provided between the receiving recess 20a and the housing 20 on both sides.

도 3은 본 발명의 다른 실시예에 따른 프리캐스트 콘크리트 보를 나타낸 사시도이다.3 is a perspective view illustrating a precast concrete beam according to another embodiment of the present invention.

본 실시예에 따른 프리캐스트 콘크리트 보(20')는 단부에서 내측으로 일정 거리 이격된 위치에 각각 포켓(24)이 형성되고 포켓(24)과 단부 사이에 정착구(25)가 설치되며 정착구(25)에 외측을 향해 쉬스관(26)이 설치되어 있다. PC 보(20')는 앞서 설명한 실시예와 동일하게 다수 개의 주근(21)과 늑근(22)으로 보강되고 늑근(22)은 PC 보(20)의 상면으로 일정 길이가 돌출되어 있다. 후술하는 것처럼 본 실시예에 따른 PC 보(20')는 기둥(10) 위에 거치된 후 포켓(24)을 통해 긴장재를 삽입하고 긴장한 후 정착구(25)를 이용해 정착함으로써 PC 기둥(10)의 양측에 위치하는 PC 보(20')를 서로 연속시킬 수 있다. The precast concrete beam 20 'according to the present embodiment is formed with pockets 24 at positions spaced inwardly from the ends by a predetermined distance and a fixture 25 is provided between the pockets 24 and the ends, A sheath tube 26 is provided toward the outside. The PC beam 20 'is reinforced by a plurality of main ropes 21 and a ridge 22 in the same manner as the above-described embodiment, and the ridge 22 is protruded by a predetermined length from the upper surface of the PC beam 20. As described later, the PC beam 20 'according to the present embodiment is mounted on the column 10, and after the tension member is inserted through the pockets 24, the PC beam 20' is fixed by using the fixture 25, The PC beam 20 'located at the center can be connected to each other.

도 4는 도 2에 도시된 보를 이용하여 프리캐스트 골조를 시공한 모습을 나타낸 도면이다.FIG. 4 is a view showing a construction of a precast frame using the beam shown in FIG. 2. FIG.

도 4에 도시된 것처럼 PC 기둥(10)의 주두(12) 위 양측에 PC 보(20)를 각각 얹히고 PC 보(20)의 내부에 설치된 쉬스관(23)에 긴장재(30)를 삽입한 후 PC 기둥(10)과의 접합부를 지나 이웃하는 PC 보(20)의 내부에 설치된 쉬스관(23)에 긴장재(30)를 삽입하는 방식으로 PC 보(20)의 길이방향으로 연장한 선상에 위치하는 PC 보(20)를 모두 관통하도록 쉬스관(23) 내부로 긴장재(30)를 배치하고 최외측에 위치하는 PC 보(20)에서 각각 긴장재(30)를 긴장 정착함으로써 한 번의 긴장작업으로 동시에 다수 개의 PC 보(20)를 연속시킬 수 있게 된다. 4, the PC beam 20 is placed on both sides of the top 12 of the PC column 10 and the stress material 30 is inserted into the sheath tube 23 provided inside the PC beam 20 The tensioning member 30 is inserted into the sheath tube 23 provided inside the neighboring PC beam 20 through the joining portion with the post PC column 10 so as to extend in the longitudinal direction of the PC beam 20 The tension members 30 are disposed in the sheath tube 23 so as to penetrate all the PC beams 20 positioned thereon and the tension members 30 are tensioned and fixed on the PC beams 20 positioned on the outermost side, The plurality of PC beams 20 can be continuously connected at the same time.

이처럼 본 실시예에 따른 프리캐스트 콘크리트 골조에서 PC 기둥(10) 위에 거치되는 양측의 PC 보(20)는 기둥과 보의 접합부를 지나 연속적으로 배치되는 긴장재(30)를 긴장 정착하는 것으로 연속화된다. 따라서 종래의 합성 모멘트 접합 방식에 비해 기둥과 보의 접합부에서 이웃하는 보를 연속시키는 작업이 간편해지는 잇점이 있고 한 번의 긴장작업으로 보의 길이방향으로 동일선 상에 위치하는 모든 기둥과 보의 접합부에서 보를 연속시킬 수 있는 장점이 있다. As described above, in the precast concrete frame according to the present embodiment, the PC beams 20 on both sides of the PC column 10 are successively fixed by tensioning and fixing the tension members 30 continuously disposed over the joining portions of the columns and the beams. Therefore, there is an advantage in that it is easier to continue the neighboring beam at the junction of the column and the beam compared to the conventional composite moment bonding method. In a single tension operation, the beam is observed at the junction of all the columns and beams located on the same line in the longitudinal direction of the beam There is an advantage that it can be continuous.

이후 PC 보(20) 사이에 프리캐스트 콘크리트 슬래브를 거치하고 슬래브 상부 철근을 배근한 후 덧침 콘크리트(40)를 타설하면 1개층의 프리캐스트 콘크리트 골조가 완성된다. 그 후 상층의 PC 기둥(50)을 주두(12) 위로 노출된 주근(111)을 이용하여 하층의 PC 기둥(10)과 서로 연결시키고 위에서 설명한 것과 같이 보(20) 거치, 보(20) 연속화, 슬래브 거치 및 덧침 콘크리트 타설(40) 공정을 반복하여 골조를 완성하게 된다.Thereafter, the precast concrete slab is placed between the PC beams 20, the upper slab reinforcing bar is laid, and the overwritting concrete 40 is laid. Thus, a one-layer precast concrete frame is completed. Thereafter, the upper PC column 50 is connected to the PC column 10 of the lower layer by using the main rope 111 exposed on the top 12, and as described above, , Slab mounting and filling concrete pouring (40) are repeated to complete the frame.

도 5a는 도 3에 도시된 보를 이용하여 프리캐스트 골조를 시공한 모습을 나타낸 도면이고, 도 5b는 도 3에 도시된 보를 이용하여 프리캐스트 골조를 시공한 모습d의 다른 실시예을 나타낸 도면이다.FIG. 5A is a view showing the construction of the precast frame using the beams shown in FIG. 3, and FIG. 5B is a view showing another embodiment of the precast frame d using the beam shown in FIG.

본 실시예에서는 앞서 설명한 실시예와 달리 모든 PC 보(20)가 한 번의 긴장작업으로 연속되는 것이 아니라 PC 기둥(10)의 양측에 위치하는 PC 보(20')가 서로 연속되는 방식이다. 본 실시예에 따르면 각 기둥-보 접합부마다 기둥-보 접합부를 지나 기둥의 양측에 거치된 PC 보(20')에 긴장재(30)를 배치하고 긴장 정착하는 공정을 반복해야 하지만 더욱 확실하고 견고하게 프리캐스트 콘크리트 보(20')를 연속시킬 수 있다는 장점을 가진다. In this embodiment, unlike the above-described embodiment, all of the PC beams 20 are not continuous in one tension operation, but the PC beams 20 'located on both sides of the PC column 10 are continuous with each other. According to the present embodiment, it is necessary to repeat the process of placing the tension members 30 on the PC beams 20 'mounted on both sides of the column through the column-to-beam joints for each column-to-beam joint and tightly fixing them. The precast concrete beam 20 'can be continuous.

구체적으로 PC 보(20')는 PC 기둥(10) 위에 거치된 후 PC 기둥(10)의 일측에 거치된 PC 보(20')의 포켓(24)을 통해 긴장재(30)를 삽입하고 기둥과 보의 접합부를 지나 다른 일측의 PC 보(20')의 포켓(24)으로 돌출시킨 다음 긴장한 후 정착구(25)를 이용해 정착함으로써 PC 기둥(10)의 양측에 위치하는 PC 보(20')를 서로 연속시킬 수 있다. More specifically, the PC beam 20 'is mounted on the PC column 10, and then the tension member 30 is inserted through the pockets 24 of the PC beam 20' mounted on one side of the PC column 10, The PC beam 20 'located on both sides of the PC column 10 is fixed by using the fixing port 25 after being stretched after being projected to the pockets 24 of the other PC beam 20' They can be connected to each other.

이후 PC 보(20') 사이에 프리캐스트 콘크리트 슬래브를 거치하고 슬래브 상부 철근을 배근한 후 덧침 콘크리트(40)를 타설하면 1개층의 프리캐스트 콘크리트 골조가 완성된다. 그 후 상층의 PC 기둥(50)을 주두(12) 위로 노출된 주근(111)을 이용하여 하층의 PC 기둥(10)과 서로 연결시키고 위에서 설명한 것과 같이 PC 보(20') 거치, PC 보(20') 연속화, 슬래브 거치 및 덧침 콘크리트 타설(40) 공정을 반복하여 골조를 완성하게 된다. Thereafter, a precast concrete slab is placed between the PC beams 20 ', the upper slab reinforcing bar is laid, and the overwritting concrete 40 is laid. Thus, a one-layer precast concrete frame is completed. Thereafter, the upper PC column 50 is connected to the lower PC column 10 by using the main rope 111 exposed on the top 12, and as described above, the PC beam 20 ' 20 ') sequencing, slab mounting and filling concrete pouring (40) are repeated to complete the frame.

한편, 이상에서는 PC 기둥(10)이 1층 1절 방식인 경우에 대해 설명하였지만 도 5b에 나타낸 것처럼 2층 1절 방식의 PC 기둥(10)에도 동일하게 적용할 수 있다. Although the PC column 10 has been described as a single-storey single-storey system, the present invention can be similarly applied to a two-storey single-storey PC column 10 as shown in FIG. 5B.

지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art in light of the above teachings. will be. The invention is not limited by these variations and modifications, but is limited only by the claims appended hereto.

10: PC 기둥
11: 몸체
11a: 중공
12: 주두
12a: 개구
20, 20': PC 보
20a: 수용홈
23, 26: 쉬스관
25: 정착구
30: 긴장재
40: 덧침 콘크리트
50: 상층 PC 기둥
10: PC pole
11: Body
11a: hollow
12: Top
12a: opening
20, 20 ': PC beam
20a: receiving groove
23, 26: Sheath tube
25: anchorage
30: Tension material
40: Overburdened concrete
50: upper layer PC column

Claims (4)

내부에 중공이 형성된 원통형 단면 형상을 가지는 몸체와, 이 몸체의 상단에 일체로 형성된 주두를 포함하고, 길이방향으로 배근된 주근이 주두의 위쪽으로 돌출된 프리캐스트 콘크리트 기둥과,
프리캐스트 콘크리트 기둥의 주두 위 양측에 거치되며, 양쪽의 단부에는 각각 주두 위로 돌출된 주근이 관통할 수 있는 수용홈이 형성되고, 수용홈 사이에는 블럭아웃부가 형성된 프리캐스트 콘크리트 보로 구성되고,
프리캐스트 콘크리트 기둥의 주두에는 프리캐스트 콘크리트 보의 조립시 낙하를 방지하여 안전성을 높일 수 있도록 프리캐스트 콘크리트 보의 양쪽의 단부를 관통하는 프리캐스트 콘크리트 보 조립용 철근이 더 돌출되게 설치되며,
프리캐스트 콘크리트 기둥 위에 거치된 양측의 프리캐스트 콘크리트 보는 포스트텐션닝에 의해 연속화된 것을 특징으로 하는 포스트텐션 방식으로 연속화된 프리캐스트 콘크리트 보를 이용한 건축물용 프리캐스트 콘크리트 골조.
A precast concrete column including a body having a cylindrical cross-sectional shape having a hollow formed therein, a main shaft integrally formed at an upper end of the main body,
The precast concrete beams are mounted on both sides of the pillar of the precast concrete column. The end portions of the precast concrete pillars are formed with receiving grooves through which main beams protruding above the pier are respectively inserted.
In order to prevent falling of the precast concrete beams during the assembly of the precast concrete beams, the reinforced concrete beams for reinforcing the precast concrete beams are installed so as to penetrate the ends of the precast concrete beams,
Wherein the precast concrete on both sides of the precast concrete column is continuous by post tensioning. The precast concrete frame for a building using post-tensioned continuous precast concrete beams.
청구항 1에 있어서,
프리캐스트 콘크리트 보의 양쪽 단부에는 각각 주근 수용홈이 형성되고 내부에는 쉬스관이 그 양쪽 끝이 노출되도록 매설되며,
프리캐스트 콘크리트 기둥의 일측에 거치된 프리캐스트 콘크리트 보의 내부에 설치된 쉬스관에 긴장재를 삽입한 후 프리캐스트 콘크리트 기둥과의 접합부를 지나 타측에 거치된 프리캐스트 콘크리트 보의 내부에 설치된 쉬스관에 긴장재를 삽입하는 방식으로 프리캐스트 콘크리트 보의 길이방향으로 연장한 선상에 위치하는 프리캐스트 콘크리트 보를 모두 관통하도록 쉬스관 내부로 긴장재를 배치하고 최외측에 위치하는 프리캐스트 콘크리트 보에서 각각 긴장재를 긴장 정착함으로써 한 번의 긴장작업으로 동시에 다수 개의 프리캐스트 콘크리트 보를 연속시킨 것을 특징으로 하는 포스트텐션 방식으로 연속화된 프리캐스트 콘크리트 보를 이용한 건축물용 프리캐스트 콘크리트 골조.
The method according to claim 1,
At both ends of the precast concrete beams, main-groove receiving grooves are formed, and a sheath pipe is buried so that both ends of the sheath pipe are exposed.
A prestressed concrete beam is placed on one side of a precast concrete column. After the tension member is inserted into the sheath tube, a sheath tube installed inside the precast concrete beam, which passes through the joint with the precast concrete column, A prestressed concrete beam is inserted into the sheath tube so as to penetrate all of the precast concrete beams extending in the longitudinal direction of the precast concrete beam and the tensioned material is tensioned and fixed in the outermost precast concrete beam And a plurality of precast concrete beams are continuously formed at the same time by one tensioning operation. The precast concrete frame for buildings using post-tensioned continuous precast concrete beams.
청구항 1에 있어서,
프리캐스트 콘크리트 보는 단부에서 내측으로 일정 거리 이격된 위치에 각각 포켓이 형성되고 포켓과 단부 사이에 정착구가 설치되며 정착구에는 외측을 향해 쉬스관이 연결되며,
프리캐스트 콘크리트 보는 프리캐스트 콘크리트 기둥 위에 거치된 후 프리캐스트 콘크리트 기둥의 일측에 거치된 프리캐스트 콘크리트 보의 포켓을 통해 긴장재를 삽입하고 기둥과 보의 접합부를 지나 다른 일측의 프리캐스트 콘크리트 보의 포켓으로 돌출시킨 다음 긴장한 후 정착구를 이용해 정착함으로써 프리캐스트 콘크리트 기둥의 양측에 위치하는 프리캐스트 콘크리트 보를 서로 연속시킨 것을 특징으로 하는 포스트텐션 방식으로 연속화된 프리캐스트 콘크리트 보를 이용한 건축물용 프리캐스트 콘크리트 골조.
The method according to claim 1,
The precast concrete is formed with pockets at positions spaced a certain distance inward from the end of the concrete, a fixing port is provided between the pocket and the end, a sheath pipe is connected to the fixing port toward the outside,
Precast Concrete Beams are mounted on precast concrete columns and then inserted through the pockets of precast concrete beams placed on one side of the precast concrete columns and passed through the joints of columns and beams to the pockets of precast concrete beams on the other side And the precast concrete beams located on both sides of the precast concrete column are continuously connected to each other by fixing them by using an anchorage hole after protruding and then tightening the precast concrete beams. The precast concrete frame for buildings using the post tensioned continuous continuous precast concrete beam.
청구항 1에 있어서,
주두에는 몸체의 중공과 연통되는 개구를 형성하여 몸체 내부의 중공에 콘크리트를 충전시킬 수 있도록 구성하고, 몸체의 중공을 둘러싸는 면은 거친 면으로 처리하여 충전되는 콘크리트와의 부착력을 증대시킨 것을 특징으로 하는 포스트텐션 방식으로 연속화된 프리캐스트 콘크리트 보를 이용한 건축물용 프리캐스트 콘크리트 골조.
The method according to claim 1,
The hollow of the body is configured to fill the hollow in the body by forming an opening communicating with the hollow of the body, and the surface surrounding the hollow of the body is treated with a rough surface to increase the adhesion with the filled concrete Precast concrete frame for buildings using post - tensioned continuous precast concrete beams.
KR1020110102743A 2011-10-07 2011-10-07 Precast concrete frame for buildings using precast concrete beam continued by post tensioning KR101476411B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110102743A KR101476411B1 (en) 2011-10-07 2011-10-07 Precast concrete frame for buildings using precast concrete beam continued by post tensioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110102743A KR101476411B1 (en) 2011-10-07 2011-10-07 Precast concrete frame for buildings using precast concrete beam continued by post tensioning

Publications (2)

Publication Number Publication Date
KR20130038089A KR20130038089A (en) 2013-04-17
KR101476411B1 true KR101476411B1 (en) 2014-12-24

Family

ID=48438880

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110102743A KR101476411B1 (en) 2011-10-07 2011-10-07 Precast concrete frame for buildings using precast concrete beam continued by post tensioning

Country Status (1)

Country Link
KR (1) KR101476411B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101460559B1 (en) * 2013-09-26 2014-11-12 대림산업 주식회사 Structure and Method for Connecting between Precast Column and In-situ Concrete Slab
CN111962481A (en) * 2020-08-28 2020-11-20 华南理工大学 UHPC prefabricated arched girder combined aqueduct
KR102551807B1 (en) * 2021-05-11 2023-07-05 주식회사 후레씨네코리아 Construction method of post-tensioned PC beam system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782837A (en) * 1993-09-17 1995-03-28 P S Co Ltd Pc member
KR20010091703A (en) * 2000-03-17 2001-10-23 배종렬 Precast Concrete hollow main post and construction method thereof
KR100704870B1 (en) * 2006-09-08 2007-04-09 (주) 동양구조안전기술 Compressed joint of pc-column and pc-beam, and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782837A (en) * 1993-09-17 1995-03-28 P S Co Ltd Pc member
KR20010091703A (en) * 2000-03-17 2001-10-23 배종렬 Precast Concrete hollow main post and construction method thereof
KR100704870B1 (en) * 2006-09-08 2007-04-09 (주) 동양구조안전기술 Compressed joint of pc-column and pc-beam, and construction method thereof

Also Published As

Publication number Publication date
KR20130038089A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN107165272B (en) Prestressed assembled concrete frame node connecting structure and construction method thereof
KR100797194B1 (en) Composite concrete column and construction method using the same
KR100423757B1 (en) Prestressed composite truss girder and construction method of the same
KR100549649B1 (en) Precast Tall Pier for Bridge
KR101505579B1 (en) Prestressed precast concrete using pipe rack or beam column joint structure and construction method of the same
KR101652664B1 (en) Precast deckplate and composite slab and concrete slab manufacturing method using the same
KR101225661B1 (en) Concrete shear key strengthened with steel cover plate and tension member and the construction method therewith
KR101693256B1 (en) Construction method of prefabricated psc bridge
KR101663132B1 (en) Self-supporting type column structure
KR101478131B1 (en) Construction Method of Precast Pier
KR200383490Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
CN110656566A (en) Assembled combined box girder and construction method thereof
KR101482522B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR101329443B1 (en) Precast concrete frame and its construction method for buildings using precast concrete slab continued by post tensioning
KR101476411B1 (en) Precast concrete frame for buildings using precast concrete beam continued by post tensioning
KR101582599B1 (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR101705002B1 (en) Prefabricated double composite plate girder bridge and its construction method
KR101036177B1 (en) Method for constructing building using PRC integrating method
KR20140125754A (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR101044730B1 (en) Beam having steel bar structure for reinforcing shearing force and upper tensile force, and providing space for passing through of plumbing, electric wire or communication wire etc
KR101920681B1 (en) Bridge structure using Precast concrete girder bridge with pretension and PC wall
KR101150369B1 (en) Complex girder for building
KR20130090709A (en) Construction method for corrugated steel plate web-psc composite beam
CN107023078B (en) Assembled cast-in-situ combined type superposed box net beam floor and construction method
KR101640921B1 (en) Precast Concrete Underground Box Structures for Underground Roads and Construction Method of Such Structures

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180619

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20181108

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20191212

Year of fee payment: 6