layer
forming
base frame
concrete
concrete layer
Prior art date
Application number
KR1020140026848A
Other languages
Korean (ko)
Inventor
한창열
Original Assignee
주식회사 두리이앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 두리이앤씨 filed Critical 주식회사 두리이앤씨
Priority to KR1020140026848A priority Critical patent/KR101455318B1/en
Application granted granted Critical
Publication of KR101455318B1 publication Critical patent/KR101455318B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/60After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone of only artificial stone
    • C04B41/61Coating or impregnation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/04Apparatus or processes for treating or working the shaped or preshaped articles for coating or applying engobing layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • C04B2111/27Water resistance, i.e. waterproof or water-repellent materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/54Substitutes for natural stone, artistic materials or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Laminated Bodies (AREA)

Abstract

An artificial sculpture having a waterproof structure according to the present invention comprises a base frame and multiple concrete layers formed on the base frame and mixing a glass fiber, wherein a concrete layer in the innermost side among the multiple concrete layers, at least, is a waterproof structure layer. And a construction method of the same comprises the steps of: forming a base frame; and stacking multiple concrete layers mixed with a glass fiber on the base frame, wherein at least the innermost concrete layer, among the multiple concrete layers, has waterproof properties.

Description

방수 구조를 가지는 인공조형물 및 그 시공방법{Artificial Sculpture Having Waterproof Structure and Its Construction Method}Technical Field [0001] The present invention relates to an artificial sculpture having a waterproof structure,

본 발명은 인공조형물 및 그 시공방법에 관한 것으로서, 보다 상세하게는 방수 구조가 형성되어 외부로부터의 수분 침투 및 결로 발생을 방지할 수 있는 방수 구조를 가지는 인공조형물 및 그 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an artificial molding and a method of constructing the same, and more particularly, to an artificial molding having a waterproof structure capable of preventing water penetration and dew formation from the outside by forming a waterproof structure and a construction method thereof.

워터파크, 동물원, 놀이공원, 인공폭포 등 조경을 목적으로 인공조형물을 설치하는 경우, 바위, 나무 등 원하는 질감의 효과를 내기 위해 프레임 상에 시멘트를 도포하고, 상기 시멘트에 질감을 형성함으로써 이와 같은 효과를 낼 수 있다.When artificial sculptures are installed for landscaping such as water parks, zoos, amusement parks, and artificial waterfalls, cement is applied on the frame to obtain desired texture effects such as rocks and trees, Effect can be obtained.

하지만, 이와 같은 인공조형물, 특히 워터파크 등에 시공되는 인공조형물은 수분에 직접 노출되는 경우가 많으며, 특히 상기 인공조형물이 장기간 에 걸쳐 노후가 일어났을 경우에 상기 시멘트 내부로 수분 및 습기가 쉽게 침투하게 된다. 그 결과, 상기 시멘트에 갈라짐, 파편 탈락 등과 같은 현상이 발생되며, 백화현상 등의 화학적 변성이 일어나기도 한다.However, artificial sculptures such as artificial sculptures, especially water parks, are often exposed directly to moisture, and in particular, when the artificial sculpture is aged for a long period of time, moisture and moisture easily penetrate into the cement do. As a result, a phenomenon such as cracking and debris dislocation occurs in the cement, and chemical denaturation such as bleaching occurs.

이와 같은 현상을 방지하기 위해, 종래에는 상기 인공조형물의 표면에 방수액이 포함된 도료를 사용하여 도장 작업을 수행하기도 하였다. 하지만, 이는 상기 인공조형물이 외부에 노출된 면에 대해서만 효과가 있는 것이며, 상기 프레임이 설치된 기반 및 지면 등에서 상기 시멘트 측으로 수분 및 습기가 침투하는 것을 막을 방법이 없다는 문제가 있었다.In order to prevent such a phenomenon, a paint work including a waterproofing liquid on the surface of the artificial molding has been conventionally performed. However, there is a problem in that there is no way to prevent moisture and moisture from penetrating into the cement side on the base and the ground on which the frame is installed, and the method is effective only for the surface exposed to the outside of the artificial molding.

또한 수분의 침투로 인해 인공조형물의 골격을 형성하는 금속 등에 부식이 발생하기도 하며, 이에 따라 인공조형물 자체의 내구도가 감소하여 수명이 감소되는 것은 물론, 붕괴의 위험이 따르기도 한다. 또한 내부에서 녹물 등이 발생하여 수질을 오염시키게 되는 문제가 있다.Also, due to the penetration of moisture, corrosion occurs on metal forming the skeleton of the artificial sculpture, thereby reducing the durability of the artificial sculpture itself, thereby reducing the life span and possibly causing the collapse. In addition, there is a problem that the water quality is contaminated due to the occurrence of rust and the like in the inside.

따라서 이와 같은 문제점들을 해결하기 위한 방법이 요구된다.Therefore, a method for solving such problems is required.

한국등록실용신안 제20-0437876호Korean Registered Utility Model No. 20-0437876

본 발명은 상술한 종래 기술의 문제점을 해결하기 위하여 안출된 발명으로서, 방수성을 향상시켜 수분에 의한 피해를 방지할 수 있는 인공조형물을 제공하기 위함이다.Disclosure of Invention Technical Problem [8] Accordingly, the present invention has been made to solve the above-mentioned problems occurring in the prior art, and it is an object of the present invention to provide an artificial sculpture capable of improving waterproof property and preventing damage by moisture.

또한 내구도를 보다 향상시킬 수 있는 인공조형물을 제공하기 위함이다.And an artificial sculpture capable of further improving the durability.

본 발명의 과제들은 이상에서 언급한 과제들로 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.The problems of the present invention are not limited to the above-mentioned problems, and other problems not mentioned can be clearly understood by those skilled in the art from the following description.

상기한 목적을 달성하기 위한 본 발명의 방수 구조를 가지는 인공조형물은, 베이스프레임 및 상기 베이스프레임 상에 구비되며, 유리섬유가 혼합된 복수의 콘크리트층을 포함하고, 상기 복수의 콘크리트층 중 적어도 가장 내측에 위치된 콘크리트층은 방수성을 가지는 구조층을 포함한다.In order to attain the above object, the artificial sculpture having a waterproof structure according to the present invention comprises a base frame and a plurality of concrete layers provided on the base frame and mixed with glass fibers, The inner concrete layer includes a waterproof structured layer.

그리고 상기 베이스프레임은, 서로 교차되도록 배열되어 소정 면적을 형성하는 복수의 제1프레임 및 상기 복수의 제1프레임이 형성하는 면적의 면 방향으로 연장 형성된 복수의 제2프레임을 포함할 수 있다.The base frame may include a plurality of first frames arranged to intersect with each other to form a predetermined area, and a plurality of second frames extending in the plane direction of the area formed by the plurality of first frames.

또한 상기 복수의 제2프레임은 시공될 인공조형물의 굴곡에 대응되는 길이를 가질 수 있다.Further, the plurality of second frames may have a length corresponding to the curvature of the artificial sculpture to be installed.

그리고 상기 베이스프레임은, 상기 제2프레임 상에 구비되어 시공될 인공조형물의 굴곡을 형성하며, 내부식성을 가지는 기초프레임을 더 포함할 수 있다.The base frame may further include a base frame provided on the second frame and forming a bend of an artificial molding to be installed, and having corrosion resistance.

또한 상기 기초프레임은, 서로 연결되는 복수 개의 파이프를 포함할 수 있다.The base frame may include a plurality of pipes connected to each other.

그리고 상기 기초프레임 상에 구비되는 제1메쉬층을 더 포함할 수 있다.And a first mesh layer provided on the base frame.

또한 상기 구조층은, 상기 복수 개의 콘크리트층 사이에 구비되는 제2메쉬층을 더 포함할 수 있다.The structure layer may further include a second mesh layer disposed between the plurality of concrete layers.

그리고 상기 베이스프레임 상에 돌출되도록 구비되어 상기 구조층의 고정력을 향상시키는 고정부재를 더 포함할 수 있다.And a fixing member protruding on the base frame to improve fixing force of the structural layer.

또한 상기 고정부재의 끝단에는, 시공될 인공조형물의 굴곡 형태를 형성하는 환봉이 구비될 수 있다.The end of the fixing member may be provided with a round bar that forms a curved shape of the artificial molding to be installed.

그리고 상기한 목적을 달성하기 위한 본 발명의 방수 구조를 가지는 인공조형물 시공방법은, 베이스프레임을 형성하는 단계 및 상기 베이스프레임 상에 유리섬유가 혼합된 복수의 콘크리트층을 적층하되, 상기 복수의 콘크리트층 중 적어도 가장 내측에 위치된 콘크리트층은 방수성을 가지도록 적층하여 구조층을 형성하는 단계를 포함한다.According to another aspect of the present invention, there is provided a method of constructing an artificial building having a waterproof structure, comprising: forming a base frame; and laminating a plurality of concrete layers mixed with glass fibers on the base frame, And at least the innermost concrete layer of the layer is laminated to have a waterproof property to form a structural layer.

또한 상기 베이스프레임을 형성하는 단계는, 복수의 제1프레임을 서로 교차되도록 배열하는 과정 및 상기 복수의 제1프레임이 형성하는 면적의 면 방향으로 연장되는 제2프레임을 설치하는 과정을 포함할 수 있다.The forming of the base frame may include arranging a plurality of first frames so as to intersect with each other and installing a second frame extending in a plane direction of an area formed by the plurality of first frames have.

그리고 상기 제2프레임을 설치하는 과정 이후에는, 상기 제2프레임 상에, 시공될 인공조형물의 굴곡에 대응되고, 내부식성을 가지는 기초프레임을 형성하는 과정이 더 포함될 수 있다.The method may further include the step of forming a base frame having corrosion resistance on the second frame, corresponding to the bending of the artificial molding to be installed, after the step of installing the second frame.

또한 상기 기초프레임을 형성하는 과정 이후에는, 상기 기초프레임 상에 제1메쉬층을 설치하는 과정을 더 포함할 수 있다.The method may further include a step of providing a first mesh layer on the base frame after the base frame is formed.

그리고 상기 구조층을 형성하는 단계는, 상기 베이스프레임 상에 방수성을 가지는 제1콘크리트층을 형성하는 과정 및 상기 제1콘크리트층 상에 제2콘크리트층을 형성하는 과정을 더 포함할 수 있다.The step of forming the structural layer may further include forming a first concrete layer having waterproof property on the base frame and forming a second concrete layer on the first concrete layer.

또한 상기 제1콘크리트층을 형성하는 과정 및 상기 제2콘트리트층을 형성하는 과정 사이에는, 상기 제1콘크리트층 상에 제2메쉬층을 설치하는 과정이 더 포함될 수 있다.The method may further include the step of providing a second mesh layer on the first concrete layer between the process of forming the first concrete layer and the process of forming the second concrete layer.

그리고 상기 제2콘크리트층을 형성하는 과정 이후에는, 상기 제2콘크리트층 상에 제3콘크리트층을 형성하는 과정이 더 포함될 수 있다.The method may further include forming a third concrete layer on the second concrete layer after forming the second concrete layer.

또한 상기 제2콘크리트층을 형성하는 과정 및 상기 제3콘트리트층을 형성하는 과정 사이에는, 상기 제2콘크리트층 상에 보호층을 설치하는 과정이 더 포함될 수 있다.The method may further include the step of providing a protective layer on the second concrete layer between the process of forming the second concrete layer and the process of forming the third concrete layer.

그리고 상기 제2콘크리트층을 형성하는 과정 및 상기 제3콘트리트층을 형성하는 과정 사이에는, 상기 제2콘크리트층의 표면에 융착홈을 형성하는 단계가 더 포함될 수 있다.The method may further include forming a fused groove on the surface of the second concrete layer between the process of forming the second concrete layer and the process of forming the third concrete layer.

또한 상기 베이스프레임을 형성하는 단계 및 상기 구조층을 형성하는 단계 사이에는, 상기 베이스프레임 상에 상기 구조층의 고정력을 향상시키는 고정부재를 설치하는 단계가 더 포함될 수 있다.The step of forming the base frame and the step of forming the structure layer may further include the step of providing a fixing member for enhancing the fixing force of the structure layer on the base frame.

그리고 상기 고정부재를 설치하는 단계 이후에는, 상기 고정부재의 끝단에, 시공될 인공조형물의 굴곡 형태를 형성하는 환봉을 설치하는 단계가 더 포함될 수 있다.Further, after the step of installing the fixing member, a step of installing a round bar that forms a curved shape of the artificial molding to be installed may be further provided at the end of the fixing member.

또한 상기 구조층을 형성하는 단계 이후에는, 상기 구조층의 표면에 후처리를 수행하는 단계가 더 포함될 수 있다.Further, after the step of forming the structure layer, a step of performing post-processing on the surface of the structure layer may be further included.

상기한 과제를 해결하기 위한 본 발명의 방수 구조를 가지는 인공조형물 및 그 시공방법은 다음과 같은 효과가 있다.In order to solve the above-described problems, the artificial sculpture having the waterproof structure of the present invention and the construction method thereof have the following effects.

첫째, 구조층을 형성하는 복수의 콘크리트층 중 적어도 가장 내측에 구비된 콘크리트층은 방수성을 가지도록 형성되므로, 외부로부터의 수분 및 습기의 차단이 보다 효율적이며, 결로가 발생하는 것을 효과적으로 방지할 수 있는 장점이 있다.First, since at least the innermost concrete layer of the plurality of concrete layers forming the structural layer is formed to have a waterproof property, it is possible to effectively block moisture and moisture from the outside and to prevent condensation from occurring There is an advantage.

둘째, 이에 따라 수분, 습기 등에 의한 백화현상, 파편 탈락 등의 물리, 화학적 변화를 방지할 수 있다는 장점이 있다.Second, it has the advantage of preventing physical and chemical changes such as bleeding due to moisture, moisture, and dropout.

셋째, 방수 구조로 인해 골격을 형성하는 금속성 부재들에 녹이 발생하는 것을 방지할 수 있으며, 또한 금속성 부재 역시 자체적으로 방수성을 가지도록 형성될 수 있는 장점이 있다.Thirdly, it is possible to prevent rust from occurring in the metallic members forming the skeleton due to the waterproof structure, and the metallic member can also be formed to have water resistance by itself.

넷째, 구조층을 형성하는 콘크리트층에는 유리섬유가 포함되므로, 내구도를 보다 향상시킬 수 있는 장점이 있다.Fourth, since the concrete layer forming the structural layer includes glass fiber, the durability can be further improved.

본 발명의 효과들은 이상에서 언급한 효과들로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 청구범위의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to the effects mentioned above, and other effects not mentioned can be clearly understood by those skilled in the art from the description of the claims.

도 1은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법의 각 단계를 나타낸 흐름도;
도 2는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1프레임 및 제2프레임을 설치한 모습을 나타낸 도면;
도 3은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 기초프레임을 형성한 모습을 나타낸 도면;
도 4는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1메쉬층을 설치한 모습을 나타낸 도면;
도 5는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 베이스프레임 상에 고정부재를 설치한 모습을 나타낸 도면;
도 6은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 베이스프레임 상에 제1콘크리트층을 형성한 모습을 나타낸 도면;
도 7은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1콘크리트층 상에 제2메쉬층을 형성한 모습을 나타낸 도면;
도 8은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1메쉬층 상에 제2콘크리트층을 형성한 모습을 나타낸 도면;
도 9는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제2콘크리트층 상에 보호층을 형성한 모습을 나타낸 도면;
도 10은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제2메쉬층 상에 제3콘크리트층을 형성한 모습을 나타낸 도면; 및
도 11은 본 발명의 방수 구조를 가지는 인공조형물 시공방법에 따라 실제 시공된 인공조형물의 모습을 나타낸 사진이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a flowchart illustrating steps of a method for constructing a waterproof structure according to an embodiment of the present invention; FIG.
BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to an artificial sculpture construction method, and more particularly, to a method of constructing an artificial sculpture having a waterproof structure according to an embodiment of the present invention.
FIG. 3 is a view illustrating a method of constructing an artificial molding according to an embodiment of the present invention, in which a base frame is formed; FIG.
FIG. 4 is a view illustrating a method of installing an artificial building material having a waterproof structure according to an embodiment of the present invention, in which a first mesh layer is installed; FIG.
FIG. 5 is a view illustrating a method of constructing an artificial molding according to an embodiment of the present invention, in which a fixing member is installed on a base frame; FIG.
FIG. 6 is a view illustrating a first concrete layer formed on a base frame in a method for constructing a waterproof structure according to an embodiment of the present invention; FIG.
FIG. 7 is a view illustrating a second mesh layer formed on a first concrete layer in a method of constructing an artificial building according to an embodiment of the present invention; FIG.
FIG. 8 is a view illustrating a second concrete layer formed on a first mesh layer in an artificial molding method having a waterproof structure according to an embodiment of the present invention; FIG.
FIG. 9 is a view illustrating a method of forming a protective layer on a second concrete layer in a method of constructing a waterproof structure according to an embodiment of the present invention; FIG.
10 is a view illustrating a third concrete layer formed on a second mesh layer in a method of constructing an artificial molding according to an embodiment of the present invention; And
11 is a photograph showing a state of an artificial sculpture actually constructed according to a method of constructing an artificial sculpture having a waterproof structure of the present invention.

이하 본 발명의 목적이 구체적으로 실현될 수 있는 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 설명한다. 본 실시예를 설명함에 있어서, 동일 구성에 대해서는 동일 명칭 및 동일 부호가 사용되며 이에 따른 부가적인 설명은 생략하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. In describing the present embodiment, the same designations and the same reference numerals are used for the same components, and further description thereof will be omitted.

도 1은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법의 각 단계를 나타낸 흐름도이다.FIG. 1 is a flowchart illustrating steps of a method for constructing a waterproof structure according to an embodiment of the present invention. Referring to FIG.

본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법은 전체적으로 베이스프레임을 형성하는 단계와, 상기 베이스프레임 상에 유리섬유가 혼합된 복수의 콘크리트층을 적층하되, 상기 복수의 콘크리트층 중 적어도 가장 내측에 위치된 콘크리트층은 방수성을 가지도록 적층하여 구조층을 형성하는 단계를 포함한다. 그리고 이들 각 단계는, 다양한 실시 형태에 따라 구체화될 수 있다.According to another aspect of the present invention, there is provided a method for constructing a waterproof structure, comprising the steps of: forming a base frame as a whole; stacking a plurality of concrete layers mixed with glass fibers on the base frame, And at least the innermost concrete layer is laminated to have a waterproof property to form a structural layer. And each of these steps may be embodied according to various embodiments.

이에 따라 도 1에 도시된 본 발명의 일 실시예에 따른 인공조형물 시공방법의 경우, 구체적으로 제1프레임을 배열하는 단계(S100)와, 제2프레임을 설치하는 단계(S110)와, 기초프레임을 형성하는 단계(S120)와, 제1메쉬층을 설치하는 단계(S130)와, 고정부재를 설치하는 단계(S140)와, 제1콘크리트층을 형성하는 단계(S150)와, 제2메쉬층을 설치하는 단계(S160)와, 제2콘크리트층을 형성하는 단계(S170)와, 융착홈을 형성하는 단계(S180)와, 환봉을 설치하는 단계(S190)와, 보호층을 형성하는 단계(S200)와, 제3콘크리트층을 형성하는 단계(S210)와, 후처리를 수행하는 단계(S220)를 포함한다.Accordingly, in the case of the method of constructing an artificial building according to an embodiment of the present invention shown in FIG. 1, specifically, a step S100 of arranging a first frame, a step of installing a second frame S110, (S140), forming a first concrete layer (S150), forming a second mesh layer (S130), forming a first mesh layer (S160), forming a second concrete layer (S170), forming a fused groove (S180), installing a round bar (S190), forming a protective layer S200), forming a third concrete layer (S210), and performing a post-process (S220).

이하에서는 이들 각 단계에 대해 자세히 설명하도록 한다.Each of these steps will be described in detail below.

도 2는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1프레임(10) 및 제2프레임(12)을 설치한 모습을 나타낸 도면이다.FIG. 2 is a view showing a state in which a first frame 10 and a second frame 12 are installed in a method of constructing an artificial building according to an embodiment of the present invention.

도 2에 도시된 바와 같이, 먼저 베이스프레임을 형성하기 위해, 제1프레임(10)을 배열하는 단계와, 제2프레임(12)을 설치하는 단계가 수행된다.As shown in Fig. 2, a step of arranging the first frame 10 and a step of installing the second frame 12 are carried out to form the base frame first.

상기 베이스프레임은 인공조형물의 기초를 이루며, 본 실시예에서 상기 베이스프레임은, 제1프레임(10) 및 제2프레임(12)을 포함한다. 상기 제1프레임(10)은 복수 개가 서로 교차되도록 배열되어 소정 면적을 형성하며, 상기 제2프레임(12)은 복수 개가 상기 복수의 제1프레임(10)이 형성하는 면적의 면 방향으로 연장 형성된다.The base frame forms the basis of an artificial molding, and in the present embodiment, the base frame includes a first frame 10 and a second frame 12. A plurality of first frames (10) are arranged so as to intersect with each other to form a predetermined area, and a plurality of second frames (12) are formed extending in a plane direction of an area formed by the plurality of first frames do.

이때 상기 복수의 제2프레임(12)은 이후 시공될 인공조형물의 표면 굴곡에 대응되는 길이를 가지도록 형성될 수 있다. 즉 제2프레임(12)은 인공조형물의 표면 굴곡에 대응되도록 각 위치마다 제1프레임(10)에 다양한 길이로 설치되며, 이에 따라 이후 적층될 각 구성요소들은 제2프레임(12)의 길이에 따라 경사도를 가지게 될 것이다.At this time, the plurality of second frames 12 may be formed to have a length corresponding to the surface curvature of the artificial sculpture to be formed subsequently. That is, the second frame 12 is installed in various lengths in the first frame 10 at each position corresponding to the surface curvature of the artificial molding, so that the respective components to be laminated thereafter are arranged at the length of the second frame 12 It will have an inclination along it.

상기 제1프레임(10) 및 제2프레임(12)은 다양한 자재를 이용하여 다양한 방법으로 형성할 수 있으며, 본 실시예에서 상기 제1프레임(10) 및 제2프레임(12)은 복수 개의 파이프를 포함한다. 상기 파이프로는 다양한 종류의 파이프가 사용될 수 있으며, 본 실시예에서는 내부식성을 가지는 용융아연도금파이프가 사용되는 것으로 하였다. 용융아연도금파이프는 내부식성이 뛰어나 이후 인공조형물의 내부에 결로 등으로 인한 습기가 발생하더라도 부식이 발생하는 것을 방지할 수 있다.The first frame 10 and the second frame 12 may be formed in various ways using various materials. In the present embodiment, the first frame 10 and the second frame 12 are formed by a plurality of pipes . Various types of pipes can be used as the pipe. In this embodiment, a hot-dip galvanized pipe having corrosion resistance is used. The hot-dip galvanized pipe is excellent in corrosion resistance, and corrosion can be prevented from occurring even if moisture due to condensation or the like is generated inside the artificial molding.

다만, 인공조형물의 크기가 크거나 높이가 높을 경우 등 특수한 경우에는 상기 용융아연도금파이프의 적어도 일부를 ㄱ자형강 등으로 대체할 수도 있다.However, in a special case, such as when the size of the artificial molding is large or the height is high, at least a part of the hot-dip galvanized pipe may be replaced with a rectangular steel.

도 3은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 기초프레임(20)을 형성한 모습을 나타낸 도면이다.3 is a view showing a state in which a foundation frame 20 is formed in a method of constructing a waterproof structure according to an embodiment of the present invention.

도 3에 도시된 바와 같이, 제2프레임 설치 이후에는 기초프레임(20)을 형성하는 단계가 수행되며, 상기 기초프레임(20)은 시공될 인공조형물의 굴곡에 대응되는 형태로 형성된다.3, the step of forming the base frame 20 is performed after the second frame is installed, and the base frame 20 is formed in a shape corresponding to the curvature of the artificial sculpture to be installed.

본 실시예의 경우, 전술한 바와 같이 제2프레임(12)이 인공조형물의 표면 굴곡에 대응되는 길이를 가지도록 형성되므로, 상기 기초프레임(20) 역시 이와 같은 굴곡을 가지도록 형성될 수 있다.In this embodiment, since the second frame 12 is formed to have a length corresponding to the surface curvature of the artificial molding as described above, the base frame 20 can also be formed to have such a curvature.

상기 기초프레임(20)은 다양한 자재를 이용하여 다양한 방법으로 형성할 수 있으며, 본 실시예에서 기초프레임(20)은 환봉 형태로 형성된다. 즉 상기 기초프레임(20)은 복수 개의 환봉이 서로 가로 및 세로 방향으로 연결된 형태를 가지며, 구체적으로 각 환봉의 양단은 상기 제2프레임(12)의 끝단에 용접 등에 의해 설치된다.The base frame 20 can be formed by various methods using various materials. In this embodiment, the base frame 20 is formed in the shape of a round bar. That is, the base frame 20 has a plurality of round bars connected to each other in the lateral and longitudinal directions. Specifically, both ends of each round bar are installed at the end of the second frame 12 by welding or the like.

상기 환봉으로는 다양한 종류의 환봉이 사용될 수 있으며, 본 실시예에서는 용융아연철근을 사용하였다. 용융아연철근 역시 내부식성이 강하므로, 습기에 의한 부식을 방지할 수 있다.As the round bar, various types of round bars may be used, and in the present embodiment, a molten zinc bar is used. The hot-dip galvanized steel is also highly resistant to corrosion, so that corrosion due to moisture can be prevented.

또한 상기 기초프레임(20)으로는 전술한 제1프레임(10) 및 제2프레임(12)에 사용하였던 용융아연도금파이프가 포함될 수도 있다.Also, the base frame 20 may include a hot-dip galvanizing pipe used for the first frame 10 and the second frame 12 described above.

도 4는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1메쉬층(22)을 설치한 모습을 나타낸 도면이다.4 is a view showing a state in which the first mesh layer 22 is installed in a method of constructing an artificial molding having a waterproof structure according to an embodiment of the present invention.

도 4에 도시된 바와 같이, 기초프레임(20) 형성 이후에는 내부식성을 가지는 제1메쉬층(22)을 설치하는 단계가 수행된다. 상기 제1메쉬층(22)은 기초프레임(20) 상에 구비되어 강도를 보강함과 동시에 이후 구조층이 적층될 수 있도록 할 수 있다.4, after the base frame 20 is formed, a step of installing the first mesh layer 22 having corrosion resistance is performed. The first mesh layer 22 may be provided on the base frame 20 to reinforce the strength of the first mesh layer 22 and to stack the structural layer thereafter.

상기 제1메쉬층(22)으로 일반 메탈라스 철망을 사용하는 경우, 습기에 의한 녹물이 내부 크랙에 의해 외부로 유출될 가능성이 있다. 따라서 이를 방지하기 위해 본 실시예에서는 용융도금 메탈라스 철망을 사용하여 내부식성을 향상시키도록 하였다.In the case of using a general metal mesh wire net as the first mesh layer 22, there is a possibility that the green rust due to moisture is leaked to the outside by an internal crack. Therefore, in order to prevent this, in this embodiment, the corrosion resistance is improved by using a hot-dip galvanized metal wire mesh.

이와 같은 각 단계를 거쳐 베이스프레임이 형성되며, 상기 베이스프레임은 별도의 구조물 등에 설치될 수 있다.The base frame is formed through the steps described above, and the base frame can be installed in a separate structure or the like.

도 5는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 베이스프레임 상에 고정부재(30)를 설치한 모습을 나타낸 도면이다.FIG. 5 is a view showing a state in which a fixing member 30 is installed on a base frame in a method of constructing an artificial molding having a waterproof structure according to an embodiment of the present invention.

도 5에 도시된 바와 같이, 베이스프레임 형성 이후에는 고정부재(30)를 설치하는 단계가 수행된다. 상기 고정부재(30)는 상기 베이스프레임 상에 돌출되도록 구비되어, 이후 상기 베이스프레임 상에 구비되는 구조층의 고정력을 향상시키는 구성요소이다.As shown in FIG. 5, after the base frame is formed, a step of installing the fixing member 30 is performed. The fixing member 30 is provided to be protruded on the base frame and is a component for enhancing the fixing force of the structure layer provided on the base frame.

즉 상기 고정부재(30)는 소정 간격을 가지고 면 방향으로 돌출된 형태로 구비되어, 후술될 각 층을 보강시키는 동시에, 부착성을 향상시켜 안정성을 확보할 수 있다.That is, the fixing member 30 is provided in a shape protruding in a planar direction with a predetermined interval, so that each layer to be described later can be reinforced, and adhesion can be improved to secure stability.

본 실시예의 경우, 상기 고정부재(30)로 콘크리트 스터드 볼트를 사용하였다. 다만, 고정부재(30)의 형태는 이에 제한되지는 않으며 다양한 형태로 구현될 수 있음은 물론이다.In the case of this embodiment, a concrete stud bolt is used as the fixing member 30. However, it is needless to say that the shape of the fixing member 30 is not limited thereto and can be implemented in various forms.

이후 상기 베이스프레임 상에 구비되며, 유리섬유가 혼합된 복수의 콘크리트층을 포함하는 구조층을 형성하는 과정이 수행된다. 이때 상기 복수의 콘크리트층 중 적어도 가장 내측에 위치된 콘크리트층은 방수성을 가지도록 형성된다.Thereafter, a process of forming a structural layer including a plurality of concrete layers, which are provided on the base frame and in which glass fibers are mixed, is performed. At this time, at least the innermost concrete layer of the plurality of concrete layers is formed to have waterproof property.

본 실시예에서 상기 구조층은 제1콘크리트층과, 제2메쉬층과, 제2콘크리트층과, 보호층과, 제3콘크리트층을 포함하며, 이하에서는 이에 대해 설명하도록 한다.In the present embodiment, the structure layer includes a first concrete layer, a second mesh layer, a second concrete layer, a protective layer, and a third concrete layer.

도 6은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 베이스프레임 상에 제1콘크리트층(40)을 형성한 모습을 나타낸 도면이다.FIG. 6 is a view illustrating a first concrete layer 40 formed on a base frame in a method of constructing an artificial building according to an embodiment of the present invention.

도 6에 도시된 바와 같이, 구조층을 형성하기 위해 먼저 베이스프레임 상에 제1콘크리트층(40)이 소정 두께로 형성된다. 그리고 상기 제1콘크리트층(40)은 구조층의 가장 내측에 위치되므로, 방수성을 가지는 다양한 재료 또는 자재 등으로 이루어질 수 있다.As shown in FIG. 6, a first concrete layer 40 is formed on the base frame to a predetermined thickness to form a structural layer. Since the first concrete layer 40 is located at the innermost part of the structural layer, the first concrete layer 40 may be made of various materials or materials having waterproof properties.

본 실시예의 경우, 상기 제1콘크리트층(40)은 유리섬유를 포함하며, 시멘트, 모래, 물, 몰다인, 방수액이 혼합된 재료가 도포된 형태를 가진다. 상기 각 재료의 함량은 다양하게 이루어질 수 있으나, 본 실시예에서는 시멘트 25%, 모래 40%, 물 30%, 몰다인 2%, 방수액 3%의 함량을 가지도록 하였다.In the present embodiment, the first concrete layer 40 includes glass fiber, and has a form in which a mixed material of cement, sand, water, moldin, and a waterproofing liquid is applied. The content of each of the above materials can be varied, but in this embodiment, the content of cement 25%, sand 40%, water 30%, molybdenum 2%, and waterproofing liquid 3%.

그리고 상기 제1콘크리트층(40)은 상기 재료들에 의해 방수의 역할을 수행하는 한편, 유리섬유에 의해 내구도가 향상되므로 인공조형물에 균열이 발생하는 것을 방지할 수 있다.In addition, the first concrete layer 40 plays a role of waterproof by the materials, while the durability is improved by the glass fiber, thereby preventing the artificial molding from being cracked.

이와 같이 복수의 콘크리트층 중 적어도 가장 내측에 구비된 제1콘크리트층(40)이 방수성을 가지도록 형성되므로, 외부로부터의 수분 및 습기의 차단이 보다 효율적이며, 결로가 발생하는 것을 효과적으로 방지할 수 있게 된다.Since the first concrete layer 40 provided at least on the innermost part of the plurality of concrete layers is formed to have waterproof property, it is possible to more effectively block moisture and moisture from the outside, and to effectively prevent condensation from occurring .

도 7은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제1콘크리트층(40) 상에 제2메쉬층(50)을 형성한 모습을 나타낸 도면이다.7 is a view illustrating a method of forming a second mesh layer 50 on a first concrete layer 40 in a method of constructing an artificial building according to an embodiment of the present invention.

도 7에 도시된 바와 같이, 상기 제1콘크리트층(40) 도포 이후에는 제2메쉬층(50)을 설치하게 된다. 상기 제2메쉬층(50)은 상기 제1콘크리트층(40)을 부착 고정시키는 한편 인공구조물의 내구도를 향상시키는 역할을 한다.As shown in FIG. 7, after the first concrete layer 40 is applied, the second mesh layer 50 is installed. The second mesh layer 50 serves to attach and fix the first concrete layer 40 and improve the durability of the artificial structure.

이때 상기 제2메쉬층(50)으로는 전술한 제1메쉬층(22)보다 메쉬의 간격이 넓은 콘크리트 구강망을 사용하였다.At this time, as the second mesh layer 50, a concrete mesh having a mesh interval larger than that of the first mesh layer 22 was used.

도 8은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제2메쉬층(50) 상에 제2콘크리트층(60)을 형성한 모습을 나타낸 도면이다.FIG. 8 is a view illustrating a second concrete layer 60 formed on a second mesh layer 50 in a method of constructing an artificial building having a waterproof structure according to an embodiment of the present invention.

도 8에 도시된 바와 같이, 상기 제2메쉬층(50) 설치 이후에는 제2콘크리트층(60)을 형성하게 된다. 이때 상기 제2콘크리트층(60) 형성 과정에서는 일반적인 콘크리트가 사용될 수도 있으나, 전술한 제1콘크리트층(40)과 마찬가지로 방수성을 가지는 다양한 재료 또는 자재 등으로 이루어질 수도 있다.As shown in FIG. 8, after the second mesh layer 50 is installed, the second concrete layer 60 is formed. At this time, in the process of forming the second concrete layer 60, general concrete may be used, but it may be made of various materials or materials having waterproof properties like the first concrete layer 40 described above.

본 실시예의 경우, 상기 제2콘크리트층(60)은 유리섬유를 포함하며, 시멘트, 모래, 물, 몰다인, 레미몰이 혼합된 재료를 도포한 형태를 가진다. 마찬가지로 상기 각 재료의 함량은 다양하게 이루어질 수 있으나, 본 실시예에서는 시멘트 25%, 모래 40%, 물 31%, 몰다인 2%, 레미몰 2%의 함량을 가지도록 하였다. 여기서 상기 레미몰은 분말 형태를 가지며, 방수성과 접합 능력을 향상시키는 역할을 수행한다.In the present embodiment, the second concrete layer 60 includes glass fiber, and has a form in which a mixed material of cement, sand, water, moldin, and remium is applied. Likewise, the content of each of the above materials can be varied, but in this embodiment, the content of cement 25%, sand 40%, water 31%, molybdenum 2%, remy mol 2%. Here, remi-mol has a powder form, and plays a role of improving water-resistance and bonding ability.

도 9는 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제2콘크리트층(60) 상에 보호층(70)을 형성한 모습을 나타낸 도면이다.9 is a view showing a protective layer 70 formed on a second concrete layer 60 in a method of constructing an artificial building according to an embodiment of the present invention.

도 9에 도시된 바와 같이, 상기 제2콘크리트층(60) 도포 이후에는 보호층(70)을 형성하게 된다. 상기 보호층(70)은 몰탈 등을 도포하는 것으로 하여 상기 제2콘크리트층(60)을 부착 고정시키는 한편 인공구조물의 내구도를 향상시키는 역할을 한다.As shown in FIG. 9, after the second concrete layer 60 is applied, a protective layer 70 is formed. The protective layer 70 is coated with a mortar or the like to fix and fix the second concrete layer 60, while improving the durability of the artificial structure.

한편 구조층 형성 과정 중에는, 상기 고정부재(30)의 끝단에 이후 시공될 인공조형물의 굴곡 형태를 형성하는 환봉(32)을 설치하는 단계가 더 포함될 수 있다. 상기 환봉(32)은 인공조형물의 외곽 형태를 최종적으로 잡아 주는 역할을 하며, 본 실시예에서는 일반 철근 대신 9mm의 환봉을 사용하여 보다 세밀하게 형태를 잡을 수 있도록 하였다.Meanwhile, the step of forming the structure layer may further include the step of providing a round bar 32 which forms a curved shape of the artificial molding to be formed later on the end of the fixing member 30. The round bar 32 finally serves to hold the outer shape of the artificial molding. In this embodiment, a 9 mm round bar is used instead of the ordinary reinforcing bar so that it can be more finely shaped.

더불어 상기 제2콘크리트층(60)을 형성하는 과정 중에는, 상기 제2콘크리트층(60)의 표면에 융착홈을 형성하는 단계가 더 포함될 수 있다. 상기 융착홈은 상기 내층의 표면에 스크래치 형태로 형성되며, 이는 후술할 제3콘크리트층이 쉽게 융착될 수 있도록 하는 역할을 수행한다.In addition, during the process of forming the second concrete layer 60, a step of forming a fused groove on the surface of the second concrete layer 60 may be further included. The fused grooves are formed in a scratch shape on the surface of the inner layer, which serves to easily fuse the third concrete layer, which will be described later.

즉 상기 융착홈은 복수의 콘크리트층 중 가장 외측에 형성되는 콘크리트층의 내측에 접촉되는 콘크리트층에 형성될 수 있다.That is, the fused grooves may be formed in the concrete layer contacting the inside of the concrete layer formed outermost among the plurality of concrete layers.

도 10은 본 발명의 일 실시예에 따른 방수 구조를 가지는 인공조형물 시공방법에 있어서, 제2메쉬층(70) 상에 제3콘크리트층(80)을 형성한 모습을 나타낸 도면이다.10 is a view showing a third concrete layer 80 formed on the second mesh layer 70 in the method of constructing an artificial molding according to an embodiment of the present invention.

도 10에 도시된 바와 같이, 제2메쉬층 설치 이후에는 제3콘크리트층(80)을 형성하는 과정이 수행된다. 상기 제3콘크리트층(80)은 구조층의 가장 외곽을 형성하며, 표면에 조형 작업을 수행하여 최종적인 형태를 구현할 수 있도록 구비된다.As shown in FIG. 10, the third concrete layer 80 is formed after the second mesh layer is installed. The third concrete layer 80 forms the outermost layer of the structure layer and is provided to perform final shaping work on the surface.

본 실시예에서 상기 제3콘크리트층(80)은 전술한 제1콘크리트층(40) 및 제2콘크리트층(60)과 마찬가지로 방수성을 가지도록 형성되며, 시멘트, 모래, 몰다인, 레미몰이 혼합된 형태를 가진다. 각 재료의 함량은 시멘트 30%, 모래 35%, 몰다인 3%, 레미몰 2%이며, 이때 최종 결과물의 발색 효과를 보다 향상시키기 위해 자연색 분말이 더 혼합될 수 있다.In the present embodiment, the third concrete layer 80 is formed to have waterproof properties like the first concrete layer 40 and the second concrete layer 60, and the cement, sand, moldin, . The content of each material is 30% of cement, 35% of sand, 3% of moldin and 2% of remimole, and natural color powder can be further mixed to improve the coloring effect of the final product.

이와 같이 제3콘크리트층을 형성하는 과정 이후에는, 후처리 단계가 더 수행될 수 있다. 상기 후처리는 최종 결과물의 품질을 더욱 향상시키기 위해 이루어지며, 하도, 착색, 상도, 코팅, 자외선 코팅 중 어느 하나 이상을 포함할 수 있다.After the process of forming the third concrete layer, a post-treatment step can be further performed. The post-treatment may be performed to further improve the quality of the final product, and may include at least one of priming, coloring, topcoating, coating, and ultraviolet coating.

구체적으로 상기 하도는 도료 부착성을 증가시키는 공정이며, 착색은 도장을 수행하는 공정, 상도는 형태에 맞는 색상을 구현하는 공정이다. 또한 코팅은 빗물 등 산성 물질로부터 도료를 보호하고 미려한 광택을 유지하기 위해 수행되는 공정이며, 자외선 코팅은 자외선으로부터 색상이 변질되는 것을 방지하기 위한 공정이다.Specifically, the above step is a step of increasing the paint adhesion, the coloring step is a step of performing painting, and the upper part is a step of embodying hues corresponding to the shape. In addition, the coating is a process carried out to protect the paint from acidic substances such as rainwater and to maintain a beautiful gloss, and ultraviolet coating is a process for preventing color change from ultraviolet rays.

도 11은 본 발명의 방수 구조를 가지는 인공조형물 시공방법에 따라 실제 시공된 인공조형물(100)의 모습을 나타낸 사진이다.11 is a photograph showing a state of an artificial sculpture 100 actually constructed according to a method of constructing an artificial sculpture having a waterproof structure of the present invention.

도 11에 도시된 바와 같이, 전술한 각 단계를 거쳐 다양한 형태의 인공조형물(100)을 시공할 수 있으며, 이에 따라 시공된 인공조형물(100)은 방수 구조로 인해 수분 및 습기의 침투, 결로 등에 의한 백화현상, 파편 탈락 등의 물리, 화학적 변화를 방지할 수 있게 된다.
As shown in FIG. 11, various types of artificial sculptures 100 can be constructed through the above-described steps, and the artificial sculpture 100 thus constructed can be used for penetration of moisture and moisture, It is possible to prevent physical and chemical changes such as bleaching phenomenon and dropout of particles.

이상과 같이 본 발명에 따른 바람직한 실시예를 살펴보았으며, 앞서 설명된 실시예 이외에도 본 발명이 그 취지나 범주에서 벗어남이 없이 다른 특정 형태로 구체화될 수 있다는 사실은 해당 기술에 통상의 지식을 가진 이들에게는 자명한 것이다. 그러므로, 상술된 실시예는 제한적인 것이 아니라 예시적인 것으로 여겨져야 하고, 이에 따라 본 발명은 상술한 설명에 한정되지 않고 첨부된 청구항의 범주 및 그 동등 범위 내에서 변경될 수도 있다.It will be apparent to those skilled in the art that the present invention can be embodied in other specific forms without departing from the spirit or scope of the invention as defined in the appended claims. It is obvious to them. Therefore, the above-described embodiments are to be considered as illustrative rather than restrictive, and the present invention is not limited to the above description, but may be modified within the scope of the appended claims and equivalents thereof.

10: 제1프레임 12: 제2프레임
20: 기초프레임 22: 제1메쉬층
30: 고정부재 32: 환봉
40: 제1콘크리트층 50: 제2메쉬층
60: 제2콘크리트층 70: 보호층
80: 제3콘크리트층 100: 인공조형물
10: first frame 12: second frame
20: base frame 22: first mesh layer
30: Fixing member 32: Round bar
40: first concrete layer 50: second mesh layer
60: second concrete layer 70: protective layer
80: Third concrete layer 100: Artificial molding

Claims (21)

서로 교차되도록 배열되어 소정 면적을 형성하는 복수의 제1프레임과, 상기 복수의 제1프레임이 형성하는 면적의 면 방향으로 연장 형성된 복수의 제2프레임을 포함하는 베이스프레임;
상기 제2프레임의 끝단에 설치되며, 복수 개가 서로 가로 및 세로 방향으로 연결된 환봉을 포함하고, 상기 제2프레임 상에 구비되어 시공될 인공조형물의 굴곡을 형성하며, 내부식성을 가지는 기초프레임;
상기 기초프레임 상에 구비되는 제1메쉬층; 및
상기 제1메쉬층 상에 구비되며, 유리섬유가 혼합된 복수의 콘크리트층을 포함하고, 상기 복수의 콘크리트층 중 가장 내측에 위치되어 일면이 상기 베이스프레임 방향으로 노출되는 콘크리트층은 방수성을 가지도록 형성된 구조층;
을 포함하는 방수 구조를 가지는 인공조형물.
A base frame including a plurality of first frames arranged to intersect with each other to form a predetermined area and a plurality of second frames extending in the plane direction of an area formed by the plurality of first frames;
A base frame provided on an end of the second frame and having a plurality of circular rods connected to each other in the transverse and longitudinal directions and forming a curvature of the artificial sculpture to be installed on the second frame;
A first mesh layer provided on the base frame; And
A plurality of concrete layers which are provided on the first mesh layer and are mixed with glass fibers and which are located on the innermost side of the plurality of concrete layers and whose one surface is exposed in the direction of the base frame, A formed structure layer;
And a waterproof structure.
삭제delete 제1항에 있어서,
상기 복수의 제2프레임은 시공될 인공조형물의 굴곡에 대응되는 길이를 가지는 방수 구조를 가지는 인공조형물.
The method according to claim 1,
Wherein the plurality of second frames have a waterproof structure having a length corresponding to the curvature of the artificial sculpture to be installed.
삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 구조층은,
상기 복수 개의 콘크리트층 사이에 구비되는 제2메쉬층을 더 포함하는 방수 구조를 가지는 인공조형물.
The method according to claim 1,
The structure layer may comprise,
And a second mesh layer disposed between the plurality of concrete layers.
제1항에 있어서,
상기 베이스프레임 상에 돌출되도록 구비되어 상기 구조층의 고정력을 향상시키는 고정부재를 더 포함하는 방수 구조를 가지는 인공조형물.
The method according to claim 1,
And a fixing member protruding on the base frame to improve the fixing force of the structural layer.
삭제delete 복수의 제1프레임을 서로 교차되도록 배열하는 단계;
상기 복수의 제1프레임이 형성하는 면적의 면 방향으로 연장되는 제2프레임을 설치하여 베이스프레임을 형성하는 단계;
상기 제2프레임의 끝단에 복수 개의 환봉을 가로 및 세로 방향으로 연결하여, 시공될 인공조형물의 굴곡에 대응되고, 내부식성을 가지는 기초프레임을 형성하는 단계;
상기 기초프레임 상에 제1메쉬층을 설치하는 단계; 및
상기 제1메쉬층 상에 유리섬유가 혼합된 복수의 콘크리트층을 적층하되, 상기 복수의 콘크리트층 중 가장 내측에 위치되어 일면이 상기 베이스프레임 방향으로 노출되는 콘크리트층은 방수성을 가지도록 적층하여 구조층을 형성하는 단계;
를 포함하는 방수 구조를 가지는 인공조형물 시공방법.
Arranging a plurality of first frames to intersect with each other;
Providing a second frame extending in a plane direction of an area formed by the plurality of first frames to form a base frame;
Connecting a plurality of round bars to the end of the second frame in the transverse and longitudinal directions to form a base frame having corrosion resistance corresponding to the bending of the artificial sculpture to be installed;
Providing a first mesh layer on the base frame; And
Wherein a plurality of concrete layers in which glass fibers are mixed on the first mesh layer are laminated so that a concrete layer located on the innermost side of the plurality of concrete layers and exposed on one side in the direction of the base frame is laminated so as to have water- Forming a layer;
Wherein the waterproof structure has a waterproof structure.
삭제delete 삭제delete 삭제delete 제10항에 있어서,
상기 구조층을 형성하는 단계는,
상기 베이스프레임 상에 방수성을 가지는 제1콘크리트층을 형성하는 과정; 및
상기 제1콘크리트층 상에 제2콘크리트층을 형성하는 과정;
을 포함하는 방수 구조를 가지는 인공조형물 시공방법.
11. The method of claim 10,
Wherein forming the structure layer comprises:
Forming a first concrete layer having waterproof property on the base frame; And
Forming a second concrete layer on the first concrete layer;
Wherein the waterproof structure has a waterproof structure.
제14항에 있어서,
상기 제1콘크리트층을 형성하는 과정 및 상기 제2콘트리트층을 형성하는 과정 사이에는,
상기 제1콘크리트층 상에 제2메쉬층을 설치하는 과정이 더 포함되는 방수 구조를 가지는 인공조형물 시공방법.
15. The method of claim 14,
Between the process of forming the first concrete layer and the process of forming the second concrete layer,
And installing a second mesh layer on the first concrete layer.
제14항에 있어서,
상기 제2콘크리트층을 형성하는 과정 이후에는,
상기 제2콘크리트층 상에 제3콘크리트층을 형성하는 과정이 더 포함되는 방수 구조를 가지는 인공조형물 시공방법.
15. The method of claim 14,
After the process of forming the second concrete layer,
Further comprising the step of forming a third concrete layer on the second concrete layer.
제16항에 있어서,
상기 제2콘크리트층을 형성하는 과정 및 상기 제3콘트리트층을 형성하는 과정 사이에는,
상기 제2콘크리트층 상에 보호층을 형성하는 과정이 더 포함되는 방수 구조를 가지는 인공조형물 시공방법.
17. The method of claim 16,
Between the process of forming the second concrete layer and the process of forming the third concrete layer,
And forming a protective layer on the second concrete layer. The method of any preceding claim, further comprising forming a protective layer on the second concrete layer.
제16항에 있어서,
상기 제2콘크리트층을 형성하는 과정 및 상기 제3콘트리트층을 형성하는 과정 사이에는,
상기 제2콘크리트층의 표면에 융착홈을 형성하는 단계가 더 포함되는 방수 구조를 가지는 인공조형물 시공방법.
17. The method of claim 16,
Between the process of forming the second concrete layer and the process of forming the third concrete layer,
And forming a fused groove on the surface of the second concrete layer.
제10항에 있어서,
상기 베이스프레임을 형성하는 단계 및 상기 구조층을 형성하는 단계 사이에는,
상기 베이스프레임 상에 상기 구조층의 고정력을 향상시키는 고정부재를 설치하는 단계가 더 포함되는 방수 구조를 가지는 인공조형물 시공방법.
11. The method of claim 10,
Between the step of forming the base frame and the step of forming the structure layer,
Further comprising the step of providing a fixing member for improving the fixing force of the structural layer on the base frame.
삭제delete 제10항에 있어서,
상기 구조층을 형성하는 단계 이후에는,
상기 구조층의 표면에 후처리를 수행하는 단계가 더 포함되는 방수 구조를 가지는 인공조형물 시공방법.
11. The method of claim 10,
After the step of forming the structure layer,
Further comprising the step of performing a post-treatment on the surface of the structural layer.
KR1020140026848A 2014-03-07 2014-03-07 Artificial Sculpture Having Waterproof Structure and Its Construction Method KR101455318B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140026848A KR101455318B1 (en) 2014-03-07 2014-03-07 Artificial Sculpture Having Waterproof Structure and Its Construction Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140026848A KR101455318B1 (en) 2014-03-07 2014-03-07 Artificial Sculpture Having Waterproof Structure and Its Construction Method

Publications (1)

Publication Number Publication Date
KR101455318B1 true KR101455318B1 (en) 2014-10-27

Family

ID=51998880

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140026848A KR101455318B1 (en) 2014-03-07 2014-03-07 Artificial Sculpture Having Waterproof Structure and Its Construction Method

Country Status (1)

Country Link
KR (1) KR101455318B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101767491B1 (en) 2017-04-20 2017-08-11 이우연 Concrete artificial sculpture and constructiom method thereof
KR102400785B1 (en) * 2021-07-01 2022-05-20 김용광 Manufacturing method of carving based sculpture and the sculpture by the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100860270B1 (en) * 2008-03-18 2008-09-25 (주) 아트파밀리아 Manufacturing method of artificial carving work using cement
KR20090047261A (en) * 2007-11-07 2009-05-12 주식회사 두리이앤씨 Method of fabricating an artificial sculpture
KR20110071558A (en) * 2009-12-21 2011-06-29 이강혁 Using waste materials architectural molding composition construction methods and the structural and composition

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090047261A (en) * 2007-11-07 2009-05-12 주식회사 두리이앤씨 Method of fabricating an artificial sculpture
KR100860270B1 (en) * 2008-03-18 2008-09-25 (주) 아트파밀리아 Manufacturing method of artificial carving work using cement
KR20110071558A (en) * 2009-12-21 2011-06-29 이강혁 Using waste materials architectural molding composition construction methods and the structural and composition

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101767491B1 (en) 2017-04-20 2017-08-11 이우연 Concrete artificial sculpture and constructiom method thereof
KR102400785B1 (en) * 2021-07-01 2022-05-20 김용광 Manufacturing method of carving based sculpture and the sculpture by the same

Similar Documents

Publication Publication Date Title
KR100860270B1 (en) Manufacturing method of artificial carving work using cement
US20080248302A1 (en) Rod Member and Method for Producing the Same
KR20120105548A (en) Composite building and panel systems
CN206486820U (en) Repair fixing device in a kind of road and bridge crack
KR101341554B1 (en) Artificial rock and its constructing method
MX2012011043A (en) System for reinforcing structure using site-customized materials.
KR101735936B1 (en) building construction method using of an Autoclaved Lightweight Concrete and of the same building
KR101455318B1 (en) Artificial Sculpture Having Waterproof Structure and Its Construction Method
KR101450234B1 (en) Artificial Sculpture Constructed Precast Method and Its Construction Method
CN104153495B (en) A kind of attachment structure of Multi-function light concrete curtain wall
JP2015187342A (en) Foundation structure
CN103821144B (en) Anti-float anchor rod water proof structure and construction method thereof
CN206070797U (en) A kind of thermal-insulating and anti-cracking external wall structure
KR101151395B1 (en) High strength reinforced for concrete structure
RU2452827C1 (en) Wall panel with protective-decorative finishing and method of its manufacturing
KR101293407B1 (en) A large size artificial rock manufacturing method
CN213233548U (en) Control device for improving flatness of appearance of basement exterior wall construction joint
KR102140578B1 (en) Wet waterproof method of artificial structure using fiber reinforced cement
JP5759330B2 (en) Mortar outer wall joining structure and mortar outer wall joining method
RU78121U1 (en) DECORATIVE COATING
KR200359033Y1 (en) the compound framework which strengthened rigidity of wooden framework
EP2092133B1 (en) Building block and method of bricking a wall using the same
KR101293430B1 (en) Light weight artificial rock manufacturing method
CN205857443U (en) A kind of shaped steel fireproof construction of steel building
CN205857444U (en) A kind of shaped steel fireproof construction of steel building

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20171016

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20181017

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20191021

Year of fee payment: 6