KR101377119B1 - Methods for connecting of concrete filling pipe and concrete filling pipe - Google Patents

Methods for connecting of concrete filling pipe and concrete filling pipe Download PDF

Info

Publication number
KR101377119B1
KR101377119B1 KR1020130035057A KR20130035057A KR101377119B1 KR 101377119 B1 KR101377119 B1 KR 101377119B1 KR 1020130035057 A KR1020130035057 A KR 1020130035057A KR 20130035057 A KR20130035057 A KR 20130035057A KR 101377119 B1 KR101377119 B1 KR 101377119B1
Authority
KR
South Korea
Prior art keywords
steel pipe
concrete
pillar
outer steel
steel
Prior art date
Application number
KR1020130035057A
Other languages
Korean (ko)
Inventor
엄순섭
Original Assignee
엄순섭
한우물중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 엄순섭, 한우물중공업 주식회사 filed Critical 엄순섭
Priority to KR1020130035057A priority Critical patent/KR101377119B1/en
Application granted granted Critical
Publication of KR101377119B1 publication Critical patent/KR101377119B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/36Columns; Pillars; Struts of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a concrete filling steel pillar including a dual steel pipe and a method for connecting the steel pillar, and more particularly, to a concrete filling steel pillar including a dual steel pipe, which comprises an inner steel pipe, an outer steel pipe, and concrete, which is filled between the inner steel pipe and the outer steel pipe in order to greatly improve bonding strength between the dual steel pipe and the concrete and durability and to make it easy to longitudinally extend and connect the steel pillar, and a method for extending and connecting the steel pillar. The present invention provides the concrete filling steel pillar including the dual steel pipe with the inner steel pipe and the outer steel pipe and the concrete filled between the inner steel pipe and the outer steel pipe and provides the method for extending and connecting the steel pillar. The concrete filling steel pillar also includes a stud, which protrudes from the inner circumferential surface of the outer steel pipe; a support ring, which is formed in upper and lower parts of the inner circumferential surface of the outer steel pipe and supports the outer peripheral surface of the inner steel pipe in order to maintain a certain gap between the inner steel pipe and the outer steel pipe; a concrete inlet, which is formed so that concrete can be placed in the support ring; and a reinforcing bar insertion hole, which is used for reinforcing bars to be longitudinally installed.

Description

이중강관이 구비된 콘크리트 충전 강재기둥 및 그 충전 강재기둥의 연장 연결방법 {Methods for connecting of Concrete filling pipe and Concrete filling pipe}Concrete-filled steel pillars with double steel pipes and extension method of filling steel pillars {Methods for connecting of Concrete filling pipe and Concrete filling pipe}

본 발명은 이중강관이 구비된 콘크리트 충전 강재기둥 및 그 강재기둥의 연결방법에 관한 것으로, 더욱 구체적으로는 내부강관과 외부강관으로 이루어진 이중강관에서 내부강관과 외부강관 사이에 콘크리트를 충전하여 구성하는 강재기둥에서 이중강관과 콘크리트와의 결합력과 내구력이 크게 향상되고, 이러한 강재기둥을 길이방향으로 연장하는 연결작업이 편리하도록 한 이중강관이 구비된 콘크리트 충전 강개기둥 및 그 강재기둥의 연장 연결방법에 관한 것이다.
The present invention relates to a concrete-filled steel pillar with a double steel pipe and a method of connecting the steel pillar, and more specifically to the concrete between the inner steel pipe and the outer steel pipe in the double steel pipe consisting of the inner steel pipe and the outer steel pipe In the steel pillar, the strength and strength of the double steel pipe and concrete are greatly improved, and the concrete filled duct and the extension method of the steel pillar are equipped with a double steel pipe to facilitate the connection work to extend the steel pillar in the longitudinal direction. It is about.

일반적으로 건축구조물의 설계 및 시공기술의 연구는 고층화, 장스팬화의 추세이며, 현장 작업의 단축에 의한 경제성을 추구하고 있다. 이와 같은 건설산업의 추세에 따라 건축물의 구조형식을 발진시키는데 구심점은 재료의 고강도화 및 고인성화, 혼합구조화, 구조의 단순화 및 시공기간 단축 등에 있다.
In general, the research on the design and construction technology of building structures is the trend of high-rise and long-span, and pursue economics by shortening the field work. In accordance with the trend of the construction industry, the core point of oscillating the structural form of the building is to increase the strength and toughness of the material, to mix the structure, simplify the structure and shorten the construction period.

특히 합성구조에는 강관의 내부에 콘크리트를 충전하는 충전형식과 압연형강을 콘크리트가 피복하는 피복형식등이 있다. 이러한 구조형식은 건축구조물의 고층화에 따른 축하중 저항구조부재로 적합하다. 즉, 충전강관 기둥부재는 단면 크기의 증가 없이 부재 내력을 증가시킬 수 있는 구조로 강관의 구속효과에 따른 충전 콘크리트의 내력상승과 충전콘크리트에 의한 강관의 국부좌굴 보강효과에 의해 부재 내력이 상승하고 뛰어난 변형성능을 갖는다. 충전강관 부재를 기둥에 적용하면 시공시 기둥부재의 철근조립과 거푸집공사가 배제되어 인건비 절감 및 공기단축, 현장안전사고 등의 측면에서 우수한 장점이 있다.
In particular, the composite structure includes a filling type for filling concrete inside a steel pipe and a covering type for covering the rolled steel with concrete. This type of structure is suitable as a structural member during celebrations due to the high rise of building structures. In other words, the filling steel pipe pillar member has a structure that can increase the member strength without increasing the cross-sectional size, and the member strength increases due to the increase of the strength of the filled concrete according to the restraining effect of the steel pipe and the local buckling reinforcement effect of the steel pipe by the filling concrete. It has excellent deformation performance. The application of the filled steel pipe member to the pillar eliminates the reinforcing reinforcement and formwork of the pillar member during construction, which has advantages in terms of labor cost reduction, air shortening, and site safety accidents.

즉, 선행기술로서 개시된 공개특허 제10-2009-0108880호에서도 속이 빈 내측강관; 상기 내측강관과 일정간격 이격되어 내측강관을 감싸는 외측강관; 및, 상기 내측강관과 외측강관 사이에 충진되는 충진재; 로 이루어지는 콘크리트 충전기둥이 제시된 바 있다.
That is, the hollow inner steel pipe also disclosed in Patent Publication No. 10-2009-0108880 disclosed in the prior art; An outer steel pipe spaced apart from the inner steel pipe at a predetermined interval to surround the inner steel pipe; And a filler filled between the inner steel pipe and the outer steel pipe. It has been suggested that the concrete filling pole made of.

상기와 같은 선행기술을 포함하는 종래의 이중강관이 구비된 콘크리트 충전 강재기둥에서는 이중강관과 콘크리트와의 결합력이 떨어질 뿐만 아니라 내부강관과 외부강관 사이에서 콘크리트만으로 지지되는 것이어서 콘크리트 충전 강재기둥의 전체적인 내구성이 좋지 않고, 이러한 강재기둥을 길이방향으로 연장하기 위해 연결하고자 할 경우에는 충전 강재기둥 끝단에 별도의 플랜지를 용접 부착하여 플랜지와 플랜지에 볼트 체결하는 방법으로 연결하게 되므로 외관상 일체감이 떨어져서 외관도 좋지 않고 견고성도 떨어지는 단점과 함께 이러한 강재기둥에 플랜지가 부착된 것을 사용하기 위해서는 콘크리트 충전된 상태의 완제품 강재기둥을 제조공장에서 만들어서 현장까지 운반
In the concrete-filled steel column equipped with a conventional double steel pipe including the prior art as described above, not only the bond strength between the double steel pipe and the concrete falls, but also the concrete between the inner steel pipe and the outer steel pipe is supported only by concrete, so that the overall durability of the concrete-filled steel pillar This is not good, if you want to connect such steel pillars to extend in the longitudinal direction, by attaching a separate flange to the end of the filling steel pillar by welding and bolted to the flange and the flange, the appearance is inferior in appearance and appearance is also good In order to use the flanges attached to these steel pillars with the disadvantage of poor rigidity, the finished steel pillars in the concrete-filled state are made at the manufacturing plant and transported to the site.

되고 운반비용이 많이 드는 등 문제점이 있으므로 현장에서는 콘크리트 충전작업을 하면서 충전기둥을 견고하게 연장 연결할 수 있도록 하는 기술을 필요로 필요로 하고 있다.
Since there is a problem such as a lot of transportation costs are required in the field, there is a need for a technology that can be firmly extended connection of the charger pillar while filling concrete.

본 발명은 이러한 문제점을 해결하기 위하여 안출한 것으로, 외부강관의 내주면에 다수의 돌출된 스터드와 받침링을 형성하여 스터드에 의해 충전되는 콘크리트와의 결합력을 높일 수 있도록 하고 받침링으로 내부강관과의 간격이 유지될 수 있도록 함과 아울러 상기 받침링은 콘크리트 투입부와 철근삽입구멍을 형성하여 콘크리트 충전과 철근 매립이 용이하도록 한 이중강관이 구비된 콘크리트 충전 강재기둥을 제공함에 있다.
The present invention has been made to solve this problem, to form a plurality of protruding studs and bearing rings on the inner peripheral surface of the outer steel pipe to increase the bonding strength with the concrete filled by the stud and with the inner steel pipe as the bearing ring. In addition to maintaining the gap, the support ring is to provide a concrete filled steel pillar with a double steel pipe to facilitate the filling and reinforcement of the concrete by forming the concrete input portion and the reinforcement insertion hole.

또, 상기 콘크리트 충전 강재기둥을 길이방향으로 다단으로 연장 연결하되 1단 내부강관 상단부를 외측으로 절곡하여 경사진 확장단부를 형성하고 상기 경사진 확장단부에 2단 내부강관의 하단부를 받쳐주도록 한 구성으로 연장 연결하고 1.2단 외부강관은 상호 맞닿게 하여 용접 부착하는 구성으로 연장 연결한 다음 콘크리트 충전 및 철근을 매립하는 단계를 거쳐 충전 강재기둥을 길이방향으로 연장 연결하도록 함으로써 연결작업이 편리하면서 연장 연결부위가 미려하고 견고성도 좋도록 한 이중강관이 구비된 콘크리트 충전 강재기둥의 연결방법을 제공함에 있다.
In addition, the concrete-filled steel pillars extend in the longitudinal direction in multiple stages, but the first stage of internal steel pipes bent outward to form an inclined extension end to support the lower end of the two-stage internal steel pipe to the inclined expansion end And connect the 1.2-stage external steel pipes to each other so as to be in contact with each other to extend the connection by welding. Then, the filling steel pillars are extended in the longitudinal direction through concrete filling and reinforcing steel bars. It is to provide a method of connecting a concrete-filled steel column equipped with a double steel pipe with a beautiful site and good rigidity.

본 발명은 내부강관과 외부강관으로 이루어진 이중강관에서 내부강관과 외부강관 사이에 콘크리트를 충전하여 구성하는 강재기둥으로 이루어지되 상기 외부강관의 내주면에 돌출되게 형성되는 스터드와, 상기 외부강관의 내주면 상,하부에 형성되어 내부강관의 외주면이 받쳐져서 간격을 유지하도록 한 받침링과, 상기 받침링에 콘크리트 타설이 가능하도록 형성된 콘크리트 주입구 및 철근이 길이방향으로 설치되도록 하는 철근삽입구멍이 포함된 이중강관이 구비된 콘크리트 충전 강재기둥을 특징으로 한다.
The present invention is made of a steel column configured by filling the concrete between the inner steel pipe and the outer steel pipe in the double steel pipe consisting of the inner steel pipe and the outer steel pipe stud and protruding to the inner peripheral surface of the outer steel pipe, on the inner peripheral surface of the outer steel pipe A double steel pipe is formed in the lower part and includes a support ring formed to support the outer circumferential surface of the inner steel pipe to maintain a gap, and a concrete injection hole formed to enable concrete placing on the support ring and a reinforcing hole for reinforcing the reinforcing bars. It is characterized by a concrete filled steel column provided.

상기 받침링은 외부강관의 내주면 상,하부에 용접 부착으로 형성되되 외부강관의 길이방향과 직교로 배치되고, 받침링의 내주면은 내부강관의 외주면과 동일한 곡률 반경으로 형성됨을 특징으로 한다.
The bearing ring is formed by welding attachment to the upper and lower inner circumferential surfaces of the outer steel pipe and is orthogonal to the longitudinal direction of the outer steel pipe, and the inner circumferential surface of the supporting ring is formed to have the same radius of curvature as the outer circumferential surface of the inner steel pipe.

상기 받침링에 형성되는 콘크리트 주입구는 받침링의 내주면에 절개된 형태로 등간격 형성되고, 상기 철근삽입구멍은 받침링의 둘레를 따라 수직으로 관통하여서 됨을 특징으로 한다.
The concrete injection hole formed in the support ring is formed at equal intervals in a form cut in the inner peripheral surface of the support ring, the reinforcing hole is characterized in that it penetrates vertically along the circumference of the support ring.

또, 본 발명은 내부강관의 상단부를 외측으로 절곡하여 경사진 확장단부를 형성하여 또 다른 내부강관의 하단부와 연장 연결할 수 있도록 한 것을 특징으로 한다.
In addition, the present invention is characterized in that the upper end of the inner steel pipe is bent outward to form an inclined expansion end so as to extend the connection with the lower end of another inner steel pipe.

또, 본 발명은 내부강관과 외부강관 사이에 콘크리트가 충전된 강재기둥을 연장 연결하는 것에 있어서, 내주면에 스터드와 받침링이 형성된 외부강관을 1단으로 직립되게 설치하는 단계와; 상기 외부강관의 받침링에 형성된 철근삽입구멍을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근에 철선을 횡으로 연결하여 1차 고정하는 단계와; 상단부를 외측으로 절곡하여 경사진 확장단부가 형성된 내부강관을 1단으로 직립되게 설치하는 단계와; 상기 1단 외부강관의 상단부에 2단 외부강관의 하단부가 맞닿은 상태로 용접 연결하는 단계와; 상기 외부강관의 받침링에 형성된 철근삽입구멍을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근에 철선을 횡으로 연결하여 2차 고정하는 단계와; 상기 1단 내부강관 상단부의 경사진 확장단부에 2단 내부강관의 하단부가 받져지도록 연결하는 단계와; 상기 1,2단 외부강관과 1,2단 내부강관 사이에 콘크리트를 충전하는 단계;로 이루어진 이중강관이 구비된 콘크리트 충전 강재기둥 연장 연결방법을 특징으로 한다.
In addition, the present invention is to extend the connection of the steel column filled with concrete between the inner steel pipe and the outer steel pipe, the step of installing the outer steel pipe with the stud and the support ring formed on the inner circumferential surface in one stage upright; Inserting reinforcing bars vertically through the reinforcing rod insertion holes formed in the support ring of the outer steel pipe and then first fixing the reinforcing bars horizontally by connecting the reinforcing bars to the inserted reinforcing bars; Bending the upper end to the outside to install the inner steel pipe in which the inclined extension end is formed upright in one end; Welding connecting the lower end of the second-stage outer steel pipe to the upper end of the first-stage outer steel pipe; Inserting rebars vertically through the reinforcing rod insertion holes formed in the support ring of the outer steel pipe, and then secondarily fixing the reinforcing bars by connecting the steel wires laterally; Connecting the lower end of the second stage inner steel pipe to the inclined extension end of the first stage inner steel pipe; Filling concrete between the 1,2-stage outer steel pipe and the 1,2-stage inner steel pipe; characterized in that the concrete filled steel pillar extension connection method provided with a double steel pipe.

본 발명은 외부강관의 내주면에 형성된 스터드에 의해 충전되는 콘크리트와의 결합력을 높일 수 있도록 하고 받침링으로 외부강관과 내부강관 사이에 간격이 균일하게 유지될 수 있도록 함과 아울러 받침링에 형성된 철근삽입구멍을 통해 철근이 안정되게 지지되면서 콘크리트에 의해 매설되는 철근에 의해 강재기둥의 전체적인 내구성을 크게 향상시킬 수 있는 효과가 있다.
The present invention is to increase the bonding force with the concrete filled by the stud formed on the inner peripheral surface of the outer steel pipe and to insert the reinforcement formed in the bearing ring to maintain a uniform gap between the outer steel pipe and the inner steel pipe with the support ring While reinforcing the reinforcing bars through the holes there is an effect that can greatly improve the overall durability of the steel column by the reinforcing steel bars embedded by concrete.

또한, 본 발명은 콘크리트 충전 강재기둥을 길이방향으로 연장 연결시에 내부강관의 상단부를 외측으로 절곡한 경사진 확장단부에 또 다른 내부강관의 하단부를 받쳐지도록 하고, 외부강관의 연결부만을 용접하는 형태로 간편하고 신속하게 연결작업을 할 수 있으면서 강재기둥의 연결부위는 콘크리트가 연결되는 형태로 충전되고 길이방향으로 매립 설치되는 철근에 의해 견고한 연결상태를 유지하게 되므로 장대한 길이의 강재기둥을 구성하더라도 전체적으로 일체감을 갖도록 하면서 내구성이 좋고 연결부위가 돌출되지 않도록 하므로 외관상으로도 미려한 상태를 유지할 수 있는 효과가 있다.
In addition, the present invention is to support the lower end of another inner steel pipe to the inclined expansion end bent outwardly the upper end of the inner steel pipe when connecting the concrete-filled steel pillar in the longitudinal direction, and welds only the connecting portion of the outer steel pipe The connection part of the steel column can be easily and quickly connected, and the connection part of the steel column is filled in the form of concrete connection and is maintained in a solid connection state by reinforcing bars installed in the longitudinal direction. While having a sense of unity as a whole, the durability is good and the connection part does not protrude so that the appearance can be beautifully maintained.

도 1은 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥의 구성을 나타낸 단면도.
도 2는 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥에서 내,외부강관 및 받침링을 구성을 나타낸 평면도.
도 3은 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥에서 외부강관의 구성을 나타낸 단면도.
도 4는 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥에서 외부강관이 받침링을 관통하여 철근이 삽입 설치되고 철선으로 연결 고정한 상태를 나타낸 단면도.
도 5는 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥에서 외부강관의 받침링 내주면에 맞닿게 내부강관이 설치된 상태를 나타낸 단면도.
도 6은 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥에서 내부강관과 외부강관사이에 콘크리트가 충전된 상태를 나타낸 단면도.
도 7은 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥을 길이방향으로 연장 연결하기 위한 내부강관이 설치된 상태를 나타낸 단면도.
도 8은 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥에서 내부강관과 외부강관이 1,2단으로 연결된 상태를 나타낸 단면도.
도 9는 본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥을 연장 연결한 상태를 나타낸 단면도.
본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥
구성을 나타낸 단면도.
1 is a cross-sectional view showing the configuration of a concrete-filled steel pillar provided with a double steel pipe according to the present invention.
Figure 2 is a plan view showing the configuration of the inner and outer steel pipe and the support ring in a concrete-filled steel column equipped with a double steel pipe according to the present invention.
Figure 3 is a cross-sectional view showing the configuration of the outer steel pipe in the concrete-filled steel column provided with a double steel pipe according to the present invention.
Figure 4 is a cross-sectional view showing a state in which a steel reinforcement is inserted through the supporting ring in the concrete-filled steel column provided with a double steel pipe according to the present invention is connected and fixed with a steel wire.
5 is a cross-sectional view showing a state in which the inner steel pipe is installed in contact with the inner circumferential surface of the support ring of the outer steel pipe in the concrete-filled steel column provided with a double steel pipe according to the present invention.
Figure 6 is a cross-sectional view showing a state in which the concrete is filled between the inner steel pipe and the outer steel pipe in the concrete-filled steel column provided with a double steel pipe according to the present invention.
Figure 7 is a cross-sectional view showing a state in which the inner steel pipe is installed for extending the longitudinally connected concrete-filled steel column provided with a double steel pipe according to the present invention.
8 is a cross-sectional view showing a state in which the inner steel pipe and the outer steel pipe is connected to the first and second stages in the concrete-filled steel pillar provided with a double steel pipe according to the present invention.
Figure 9 is a cross-sectional view showing a state in which the extension of the concrete filled steel column provided with a double steel pipe according to the present invention.
Concrete filled steel column equipped with double steel pipe according to the present invention
Sectional drawing showing the configuration.

이하 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다. 그리고 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

본 발명은 내부강관(10)과 외부강관(20)으로 이루어진 이중강관에서 내부강관(10)과 외부강관(20) 사이에 콘크리트(40)를 충전하여 구성하는 강재기둥(A)으로 이루어지되 상기 외부강관(20)의 내주면에 돌출되게 용접 부착되어 형성되는 스터드(22)와, 상기 외부강관(20)의 내주면 상,하부에 형성되어 내부강관(10)의 외주면이 받쳐져서 간격을 유지하도록 한 받침링(24)과, 상기 받침링(24)에 콘크리트 타설이 가능하도록 형성된 콘크리트 주입구(25) 및 철근이 길이방향으로 설치되도록 하는 철근삽입구멍(26)이 포함된 것을 특징으로 한다.
The present invention is made of a steel pillar (A) configured by filling the concrete 40 between the inner steel pipe 10 and the outer steel pipe 20 in the double steel pipe consisting of the inner steel pipe 10 and the outer steel pipe 20 Stud 22 formed by welding to protrude to the inner circumferential surface of the outer steel pipe 20 and the upper and lower inner circumferential surface of the outer steel pipe 20 is formed to support the outer circumferential surface of the inner steel pipe 10 to maintain a gap. The support ring 24, the concrete inlet 25 and the reinforcing rod insertion hole 26 to be installed in the longitudinal direction, the concrete inlet 25 formed so as to enable the concrete placing on the support ring 24 is characterized in that it is included.

상기 외부강관(20)에는 다수의 스터드(22)가 형성되어 내부강관(10)과 외부강관(20) 사이에 충전되는 콘크리트(40)와의 결합력을 높일 수 있도록 하여 강재기둥(A)이 전체적으로 일체감을 갖도록 함에 있다.
The outer steel pipe 20 has a plurality of studs 22 are formed to increase the bonding force between the concrete 40, which is filled between the inner steel pipe 10 and the outer steel pipe 20, the steel pillar (A) as a whole sense of unity. To have

상기 받침링(24)은 외부강관(20)의 내주면 상,하부에 용접 부착으로 형성되되 받침링(24) 부분에는 스터드(22)가 구비되지 않도록 하고, 이러한 받침링(24)은 외부강관(20)의 길이방향과 직교로 배치되어 받침링(24)의 내주면은 내부강관(10)의 외주면과 동일한 곡률 반경으로 형성되어 외부강관(20)의 받침링(24)에 내부강관(10) 외주면이 받쳐질 수 있도록 함으로써 외부강관(20)과 내부강관(10) 사이의 간격이 일정하게 유지될 수 있도록 함과 아울러 지지기능을 수행하도록 한다.
The support ring 24 is formed on the inner circumferential surface of the outer steel pipe 20 by welding, but the studs 22 are not provided on the support ring 24, and the support ring 24 is an external steel pipe ( 20 is disposed orthogonal to the longitudinal direction and the inner circumferential surface of the support ring 24 is formed with the same radius of curvature as the outer circumferential surface of the inner steel pipe 10 to the outer circumferential surface of the inner steel pipe 10 on the support ring 24 of the outer steel pipe 20. By allowing it to be supported, the interval between the outer steel pipe 20 and the inner steel pipe 10 can be kept constant and to perform a supporting function.

상기 받침링(24)에 형성되는 콘크리트 주입구(25)는 받침링(24)의 내주면에 절개된 형태로 등간격 형성되어 내부강관(10)에 콘크리트 주입구(25) 분분에서도 내부강관(10)에 콘크리트가 충전 밀착되게 함이 바람직하며, 이는 외부강관(20)은 스터드(22) 및 받침링(24)이 형성되어 콘크리트와의 결합력을 높일 수 있는 부분이 많은 데 반하여 내부강관(10)은 거푸집과 같은 기능으로 콘크리트와 밀착된 상태된 상태를 유지하도록 한 구성상의 특성을 감안한 것이다.
The concrete injection hole 25 formed in the support ring 24 is formed at equal intervals in a form cut in the inner circumferential surface of the support ring 24 to the internal steel pipe 10 even in the concrete injection hole 25 in the inner steel pipe 10. Concrete is preferably in close contact with the filling, which is the outer steel pipe 20 has a stud 22 and the support ring 24 is formed to increase the bonding strength with the concrete, while the inner steel pipe 10 is a formwork In consideration of the characteristics of the configuration to maintain the state in close contact with the concrete with the same function.

상기 철근삽입구멍(26)은 받침링(24)의 둘레를 따라 수직으로 관통하는 형태로 천공되어 외부강관(20)의 길이방향으로 삽입되는 철근이 측부로 유동되는 것을 방지하는 지지기능을 수행할 수 있도록 하며, 받침링(24)의 둘레를 따라 배치되는 철근삽입구멍(26)에 외부강관(20)의 길이방향(수직방향)으로 철근이 각각 삽입되는 형태로 배열이 되면 삽입된 철근(30)을 감싸는 형태로 철선(32)으로 연결 고정한 다음 콘크리트 충전이 이루어지도록 함이 바람직하며, 상기에서 철선 대신에 철근을 사용할 수도 있다.
The reinforcing bar insertion hole 26 is perforated vertically along the circumference of the support ring 24 to perform a supporting function to prevent the reinforcing bar inserted in the longitudinal direction of the outer steel pipe 20 from flowing to the side. When the reinforcing bars 30 are arranged along the periphery of the support ring 24, the reinforcing bars 30 are arranged in the form in which the reinforcing bars are respectively inserted in the longitudinal direction (vertical direction) of the outer steel pipe 20. ) Is fixed to the wire (32) in the form of wrapping and then to be filled with concrete, it is preferable to use a reinforcing bar in place of the wire.

이러한 본 발명의 강재기둥(A)은 외부강관(20)의 내주면에 돌출되게 형성된 스터드(22)에 의해 내부강관(10)과 외부강관(20) 사이에 충전되는 콘크리트와의 결합력을 크게 높여주게 됨과 아울러 외부강관(20)의 내주면 상,하부에 형성된 받침링(24)에 의해 내부강관(10)의 간격이 균일하게 유지할 수 있도록 하며, 받침링(24)에 형성된 철근삽입구멍(26)을 통해 철근이 지지되면서 콘크리트에 의해 매설되는 철근에 의해 강재기둥(A)의 전체적인 내구성을 크게 향상시키게 된다.
Steel column (A) of the present invention to significantly increase the bonding force between the concrete and the concrete filled between the inner steel pipe 10 and the outer steel pipe 20 by the stud 22 formed to protrude on the inner peripheral surface of the outer steel pipe (20). In addition, by the support ring 24 formed on the upper and lower inner circumferential surface of the outer steel pipe 20 to maintain the interval of the inner steel pipe 10 uniformly, the reinforcing hole 26 formed in the support ring 24 Reinforcing the reinforcement through the reinforcement is reinforced by the concrete will significantly improve the overall durability of the steel column (A).

상기와 같은 본 발명의 강재기둥(A)은 제조공장에서 완제품을 생산하여 공급할 수 있으나, 작업현장에서 내부강관(10)과 외부강관(20) 사이에 철근(30)을 설치하고 콘크리트(40)를 충전하여서 된 강재기둥을 현장에서 직접 시공할 수 있다.
Steel column (A) of the present invention as described above can be produced and supplied to the finished product in the manufacturing plant, but installed the reinforcing bar 30 between the inner steel pipe 10 and the outer steel pipe 20 at the work site and concrete (40) Steel pillars can be constructed directly by filling the

본 발명에 따른 이중강관이 구비된 콘크리트 충전 강재기둥의 현장 시공시에는 내주면에 스터드(22)와 받침링(24)이 형성된 외부강관(20)을 직립되게 설치하고, 이어서 상기 외부강관(20)의 받침링(24)에 형성된 철근삽입구멍(26)을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근에 철선을 횡으로 연결하여 고정하고, 이어서 외부강관(20)의 내측에 내부강관(10)을 직립되게 설치하고, 상기 내부강관(10)과 외부강관(20) 사이에 콘크리트를 충전함으로써 시공이 완료된다.
At the time of site construction of the concrete-filled steel column provided with a double steel pipe according to the present invention, the outer steel pipe 20 having the studs 22 and the support ring 24 formed on the inner circumferential surface is installed upright, and then the outer steel pipe 20 Insert the rebars vertically through the reinforcing rod insertion holes 26 formed in the support ring 24, and then connect the steel wires horizontally to the inserted reinforcing bars, and then fix the inner steel pipes to the inside of the outer steel pipes 20. 10 is installed upright, and the construction is completed by filling the concrete between the inner steel pipe 10 and the outer steel pipe 20.

또한, 본 발명에서는 작업현장에서 소정길이의 강재기둥(A)을 이용하여 장대한 길이의 높이로 설치하기 위해서 다단으로 연결시공자 하는 경우에는 1단 내부강관(10)의 상단부를 외측으로 절곡하여 경사진 확장단부(12)를 형성하고, 상기 확장단부에 2단 내부강관(10)의 하단부를 밀착되게 받쳐주도록 한 구성으로 내부강관(10)을 연장 연결할 수 있도록 하면서 콘크리트가 누출되지 않도록 하는 기능을 하도록 하며, 상기에서 1,2단 내부강관(10)이라 함은 내부강관(10)을 길이방향으로 연결하고자할 때 다단으로 상호 연결되는 부분을 설명하기 위한 것이므로 3단 이상으로 다단 연결하는 경우에는 내부강관(10)의 하단부에 위치하는 모든 내부강관(10)의 상단부를 외측으로 절곡하여 경사진 확장단부(12)가 구비된 것을 사용하게 됨은 물론이다.
In addition, in the present invention, when the construction site is to be connected in multiple stages in order to install the steel pole (A) of a predetermined length in the length of the work site by bending the upper end of the first stage inner steel pipe 10 to the outside by bending Photo extended end portion 12, and the structure to support the lower end of the two-stage inner steel pipe 10 in close contact with the extended end to allow the inner steel pipe (10) to extend the connection while preventing the concrete from leaking In the above, the first and second stage internal steel pipe (10) is intended to describe the parts that are interconnected in multiple stages when connecting the internal steel pipe (10) in the longitudinal direction, so when connecting in multiple stages or more Of course, the upper end portions of all the inner steel pipes 10 located at the lower end of the inner steel pipe 10 are bent outward to use the one provided with the inclined extension end 12.

본 발명에 의한 이중강관이 구비된 콘크리트 충전 강재기둥의 연장 연결방법은 다음과 같다.
The extension connection method of the concrete-filled steel column provided with a double steel pipe according to the present invention is as follows.

내부강관(10)과 외부강관(20) 사이에 콘크리트가 충전된 강재기둥(A)을 연장 연결하는 것에 있어서, 내주면에 스터드(22)와 받침링(24)이 형성된 외부강관(20)을 1단으로 직립되게 설치하는 단계와; 상기 외부강관(20)의 받침링(24)에 형성된 철근삽입구멍(26)을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근(30)에 철선(32)을 횡으로 연결하여 1차 고정하는 단계와; 상단부를 외측으로 절곡한 확장단부(12)가 형성된 내부강관(10)을 1단으로 직립되게 설치하는 단계와; 상기 1단 외부강관(20)의 상단부에 2단 외부강관(20)의 하단부가 맞닿은 상태로 연결부(B)를 용접 연결하는 단계와; 상기 외부강관(20)의 받침링(24)에 형성된 철근삽입구멍(26)을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근에 철선을 횡으로 연결하여 2차 고정하는 단계와; 상기 1단 내부강관(10)의 상부 확장단부(12)에 2단 내부강관(10)의 하단부가 받져지도록 연결하는 단계와; 상기 1,2단 외부강관(20)과 1,2단 내부강관(10) 사이에 콘크리트를 충전하는 단계;로 이루어진 것을 특징으로 한다.
In extending connection of the steel column A filled with concrete between the inner steel pipe 10 and the outer steel pipe 20, the outer steel pipe 20 having a stud 22 and the support ring 24 formed on the inner circumferential surface 1 Installing upright in stages; The reinforcing bars are vertically inserted through the reinforcing bar insertion holes 26 formed in the support ring 24 of the outer steel pipe 20, and then the iron wires 32 are laterally connected to the inserted reinforcing bars 30. Fixing; Installing the inner steel pipe 10 having the extended end portion 12 bent to the outside of the upper end so as to stand upright in one end; Welding connecting the connection part (B) in a state where the lower end of the second stage outer steel pipe (20) abuts on the upper end of the first stage outer steel pipe (20); Inserting reinforcing bars vertically through the reinforcing rod insertion holes 26 formed in the support ring 24 of the outer steel pipe 20, and then secondarily fixing the reinforcing bars by connecting iron wires laterally; Connecting the lower end of the two-stage inner steel pipe (10) to the upper extension end (12) of the first-stage inner steel pipe (10); Filling concrete between the 1,2-stage outer steel pipe 20 and the 1,2-stage inner steel pipe 10; characterized in that consisting of.

상기와 같이 본 발명은 콘크리트 충전 강재기둥(A)을 길이방향으로 연장 연결시에 1단 내부강관(10)의 상단부를 외측으로 절곡한 경사진 확장단부(12)에 또 다른 2단 내부강관(10)의 하단부를 받쳐지도록 하는 형태로 연결한 다음 1,2단 외부강관(20)의 연결부(B)만을 용접하여 연결하는 형태로 간편하고 신속하게 연결작업을 할 수 있게 된다.
As described above, the present invention is another two-stage inner steel pipe on the inclined expansion end portion 12 bent outwardly the upper end of the first-stage inner steel pipe 10 when connecting the concrete-filled steel column (A) in the longitudinal direction ( After connecting in the form to support the lower end of 10) and then only the connecting portion (B) of the first and second stage external steel pipe 20 can be connected simply and quickly in the form of connecting.

이렇게 연결된 강재기둥(A)에서 내부강관(10)은 일반적인 거푸집과 같은 기능으로 콘크리트가 충전되도록 하고 연결부위가 견고하게 연결되지 않더라도 외부강관(20)의 내주면에 형성된 스터드(22)에 크게 콘크리트와의 결합력이 높고, 받침링(24)의 내주면에 내부강관(10)이 밀착되어 수평방향으로 안정되게 지지된 상태를 유지하게 됨과 아울러 강재기둥(A)의 1,2단 연결부위는 콘크리트가 연결되는 형태로 충전되고 길이방향으로 매립 설치되는 철근에 의해 견고한 연결상태를 유지하게 되므로 이러한 연결방법에 의해 다단으로 연장하여 장대한 길이의 강재기둥을 구성하더라도 전체적으로 일체감을 갖도록 하면서 내구성이 좋고 연결부위가 돌출되지 않도록 하므로 외관상으로도 미려한 상태가 된다.
In this way, the steel pillar (A) connected to the inner steel pipe 10 is to be filled with concrete in the same function as the general formwork and even if the connection portion is not firmly connected to the stud 22 formed on the inner circumferential surface of the outer steel pipe 20 and the concrete and High coupling force, the inner steel pipe 10 is in close contact with the inner circumferential surface of the support ring 24 to maintain a stable support in the horizontal direction and the concrete connection is connected to the first and second stages of the steel column (A) Since it is maintained in the form of steel poles which are filled in the form and are embedded in the longitudinal direction and are installed in the longitudinal direction, they are extended to multiple stages by such a connection method, so that even if a long length steel column is formed, they have a sense of unity as a whole and have good durability. Since it does not protrude, the appearance is also beautiful.

이상에서 본 발명은 상기 실시예를 참고하여 설명하였지만 본 발명의 기술사상범위내에서 다양한 변형실시가 가능함은 물론이다.
While the present invention has been described with reference to the exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments.

A : 강재기둥 10 : 내부강관
12 : 확장단부 20 : 외부강관
22 : 스터드 24 : 받침링
25 : 콘크리트 주입구 26 : 철근삽입구멍
30 : 철근 32 : 철선
40 : 콘크리트
A: Steel column 10: Internal steel pipe
12: extended end 20: outer steel pipe
22: stud 24: bearing ring
25 concrete inlet 26 rebar insertion hole
30: rebar 32: iron wire
40: concrete

Claims (6)

내부강관(10)과 외부강관(20)으로 이루어진 이중강관에서 내부강관(10)과 외부강관(20) 사이에 콘크리트(40)를 충전하여 구성하는 강재기둥(A)으로 이루어지되
상기 외부강관(20)의 내주면에 돌출되게 형성되는 스터드(22)와, 상기 외부강관(20)의 내주면 상,하부에 용접 부착으로 형성되어 내부강관(10)의 외주면이 받쳐져서 간격을 유지하도록 한 받침링(24)과, 상기 받침링(24)에 콘크리트 타설이 가능하도록 형성된 콘크리트 주입구(25) 및 철근이 길이방향으로 설치되도록 하는 철근삽입구멍(26)을 포함하고,
상기 내부강관(10)의 상단부를 외측으로 절곡하여 경사진 확장단부(12)를 형성하여 또 다른 내부강관(10)의 하단부와 연장 연결할 수 있도록 한 것을 특징으로 하는 이중강관이 구비된 콘크리트 충전 강재기둥.
In the double steel pipe consisting of the inner steel pipe (10) and the outer steel pipe (20) is made of a steel pillar (A) to fill the concrete 40 between the inner steel pipe (10) and the outer steel pipe (20)
The stud 22 formed to protrude on the inner circumferential surface of the outer steel pipe 20 and the upper and lower inner circumferential surfaces of the outer steel pipe 20 are formed by welding to support the outer circumferential surface of the inner steel pipe 10 to maintain a gap. One supporting ring 24, and the concrete inlet 25 and the reinforcing rod insertion hole 26 to be installed in the longitudinal direction, the concrete inlet 25 is formed in the support ring 24 to enable concrete pouring,
Bending the upper end of the inner steel pipe 10 to form an inclined expansion end 12 to form a concrete-filled steel with a double steel pipe, characterized in that it can be extended to connect with the lower end of another inner steel pipe 10 Pillar.
삭제delete 삭제delete 삭제delete 삭제delete 내부강관(10)과 외부강관(20) 사이에 콘크리트가 충전된 강재기둥(A)을 연장 연결하는 것에 있어서, 내주면에 스터드(22)와 받침링(24)이 부착되어 형성된 외부강관(20)을 1단으로 직립되게 설치하는 단계와; 상기 외부강관(20)의 받침링(24)에 형성된 철근삽입구멍(26)을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근에 철선을 횡으로 연결하여 1차 고정하는 단계와; 상단부를 외측으로 절곡하여 경사진 확장단부(12)가 형성된 내부강관(10)을 1단으로 직립되게 설치하는 단계와; 상기 1단 외부강관(20)의 상부에 2단 외부강관(20)의 하부가 맞닿은 상태로 용접 연결하는 단계와; 상기 외부강관(20)의 받침링(24)에 형성된 철근삽입구멍(26)을 관통하여 철근을 수직으로 각각 삽입한 다음 상기 삽입된 철근에 철선을 횡으로 연결하여 2차 고정하는 단계와; 상기 1단 내부강관(10) 상단부의 경사진 확장단부(12)에 2단 내부강관(10)의 하단부가 받져지도록 연결하는 단계와; 상기 1,2단 외부강관(20)과 1,2단 내부강관(10) 사이에 콘크리트를 충전하는 단계;로 이루어진 것을 특징으로 하는 이중강관이 구비된 콘크리트 충전 강재기둥 연장 연결방법.





In extending connection of the steel pillar A filled with concrete between the inner steel pipe 10 and the outer steel pipe 20, the outer steel pipe 20 is formed by attaching a stud 22 and the support ring 24 to the inner peripheral surface Installing to stand upright in one stage; Inserting reinforcing bars vertically through the reinforcing rod insertion holes 26 formed in the support ring 24 of the outer steel pipe 20, and then first fixing the reinforcing bars horizontally by connecting steel wires to the inserted reinforcing bars; Bending the upper end to the outside to install the inner steel pipe 10 having the inclined extended end portion 12 formed upright in one end; Welding connecting a lower portion of the second stage outer steel pipe 20 to an upper portion of the first stage outer steel pipe 20; Inserting reinforcing bars vertically through the reinforcing rod insertion holes 26 formed in the support ring 24 of the outer steel pipe 20, and then secondarily fixing the reinforcing bars by connecting iron wires laterally; Connecting the lower end of the second stage inner steel pipe 10 to the inclined expansion end portion 12 of the upper end of the first stage inner steel pipe 10; Filling concrete between the 1,2-stage outer steel pipe 20 and the 1,2-stage inner steel pipe 10; Concrete filled steel pillar extension connection method provided with a double steel pipe, characterized in that consisting of.





KR1020130035057A 2013-04-01 2013-04-01 Methods for connecting of concrete filling pipe and concrete filling pipe KR101377119B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130035057A KR101377119B1 (en) 2013-04-01 2013-04-01 Methods for connecting of concrete filling pipe and concrete filling pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130035057A KR101377119B1 (en) 2013-04-01 2013-04-01 Methods for connecting of concrete filling pipe and concrete filling pipe

Publications (1)

Publication Number Publication Date
KR101377119B1 true KR101377119B1 (en) 2014-04-15

Family

ID=50656020

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130035057A KR101377119B1 (en) 2013-04-01 2013-04-01 Methods for connecting of concrete filling pipe and concrete filling pipe

Country Status (1)

Country Link
KR (1) KR101377119B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200125277A (en) * 2019-04-26 2020-11-04 주식회사 포스코 Composite column and composite column structure
CN114856084A (en) * 2022-04-24 2022-08-05 龙信建设集团有限公司 Steel column installation structure capable of being installed quickly and installation process thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100862005B1 (en) * 2007-07-16 2008-10-07 아주대학교산학협력단 Manufacturing method of segmental internally confined hollow concrete filled tube
KR101059578B1 (en) * 2011-05-13 2011-08-26 대영스틸산업주식회사 Tube in concrete beam girder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100862005B1 (en) * 2007-07-16 2008-10-07 아주대학교산학협력단 Manufacturing method of segmental internally confined hollow concrete filled tube
KR101059578B1 (en) * 2011-05-13 2011-08-26 대영스틸산업주식회사 Tube in concrete beam girder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200125277A (en) * 2019-04-26 2020-11-04 주식회사 포스코 Composite column and composite column structure
KR102218456B1 (en) * 2019-04-26 2021-02-19 주식회사 포스코 Composite column and composite column structure
CN114856084A (en) * 2022-04-24 2022-08-05 龙信建设集团有限公司 Steel column installation structure capable of being installed quickly and installation process thereof

Similar Documents

Publication Publication Date Title
KR101570484B1 (en) Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same
KR100863974B1 (en) Pre-fabrication method of rebar for reinforced concrete column
KR101432260B1 (en) Steel-exposed type steel framed reinforced concrete pillar
KR101862278B1 (en) Steel composite concrete member
CN104831818A (en) Connection node of precast reinforced concrete beam and laminated column
KR101663132B1 (en) Self-supporting type column structure
CN204753836U (en) Connected node of precast reinforced concrete roof beam and coincide post
KR20160079458A (en) Hybrid bridge connecting structure and method for constructing thereof
KR20230090300A (en) A twin wall structure using a PC panel and method for manufacturing of it
KR101377119B1 (en) Methods for connecting of concrete filling pipe and concrete filling pipe
KR101443444B1 (en) Reinforcement structures for construction structure
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
KR101269639B1 (en) The core-type sleeve of precast concrete for member of framework
JP2019116795A (en) Beam reinforcement and method of arranging the same
KR101105883B1 (en) Basic mat constructing method of high rise concrete structure
KR101029087B1 (en) Complex concrete shaft construction
JP2009002101A (en) Method and structure for joining precast-concrete construction beam-column
KR20170105778A (en) Prestressed concrete-steel composite pile, form of prestressed concrete-steel composite pile and construction method using same
KR101150369B1 (en) Complex girder for building
JP2005155036A (en) Column of building and rigid-frame structure using this column
KR101176197B1 (en) concrete girder structure
KR101616483B1 (en) Construction Method Of Underground Parking Lot Using Precast Concrete Beam With Changing Cross Section
KR101528033B1 (en) Precast segment assembly and precast segment structure by using of it)
KR101270502B1 (en) Precast concrete for member of framework with none sleeve
JP6261860B2 (en) Reinforcing bar anchoring structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170123

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180219

Year of fee payment: 5