KR101359951B1 - Pipe structure for fire-fighting water in derrick of drillship - Google Patents
Pipe structure for fire-fighting water in derrick of drillship Download PDFInfo
- Publication number
- KR101359951B1 KR101359951B1 KR1020120104297A KR20120104297A KR101359951B1 KR 101359951 B1 KR101359951 B1 KR 101359951B1 KR 1020120104297 A KR1020120104297 A KR 1020120104297A KR 20120104297 A KR20120104297 A KR 20120104297A KR 101359951 B1 KR101359951 B1 KR 101359951B1
- Authority
- KR
- South Korea
- Prior art keywords
- derrick
- pipe
- deck
- fire water
- fire
- Prior art date
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 58
- 238000005553 drilling Methods 0.000 claims description 48
- 238000000034 method Methods 0.000 claims description 11
- 238000005507 spraying Methods 0.000 claims description 10
- 239000013535 sea water Substances 0.000 claims description 5
- 238000009428 plumbing Methods 0.000 claims description 3
- 239000007921 spray Substances 0.000 description 3
- 230000008014 freezing Effects 0.000 description 2
- 238000007710 freezing Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 238000013021 overheating Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
- E21B33/064—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Earth Drilling (AREA)
Abstract
Description
본 발명은 시추선 데릭의 소방수 배관 구조에 관한 것으로, 더욱 상세하게는 데릭의 수직 방향 구조물을 따라 데크에 수직으로 마련된 배관 구조를 통해 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 시추선 데릭의 소방수 배관 구조에 관한 것이다.TECHNICAL FIELD The present invention relates to a firewater pipe structure of a drilling ship derrick, and more particularly, to move or operate a blowout preventor (BOP) or a BOP crane at a lower part of a derrick through a pipe structure provided perpendicularly to a deck along a vertical structure of the derrick. It's about the fireman's plumbing structure of the drill ship Derrick, which does not interfere.
국제적인 천연자원 수요의 급증으로 해양 자원에 대한 관심이 날로 증가하고 있다. 해저 채굴 기술 또한 이와 더불어 발달하였고, 해저 유전 개발에 적합한 시추설비가 구비된 시추선도 개발되어 있다.There is a growing interest in marine resources due to the international demand for natural resources. Subsea mining technology has also been developed, along with drilling ships equipped with drilling equipment suitable for the development of subsea oil fields.
종래의 해저 시추에는 예인선으로 이동시켜 계류 장치를 이용해 해상의 일 지점에 정박한 상태로 해저 시추 작업을 하는 해저 시추 전용 리그선(rig ship)이나 고정식 플랫폼이 주로 이용되었으나, 최근에는 첨단 시추장비를 탑재하고 자체 동력으로 항해가능한 선박 형태로 제작된 시추선(Drillship)이 개발되어 해저 시추에 이용되고 있다.Conventional subsea drilling used a rig ship or a fixed platform dedicated to subsea drilling, which moved to a tugboat and anchored at one point of the sea using a mooring device, but recently, advanced drilling equipment was used. Drillships have been developed and used in offshore drilling, which are manufactured in ship-powered and self-navigable vessels.
이러한 해저에 부존하는 석유나 가스 등을 시추할 수 있도록 각종 시추장비를 갖춘 리그선, 플랫폼, 또는 시추선의 중심부에는 해저의 석유나 가스 등을 시추하기 위한 라이저(riser) 또는 드릴 파이프(drill pipe)가 상하로 이동될 수 있도록 문풀(moonpool)이 형성되어 있다.In order to drill oil or gas existing on the seabed, a rig ship, platform, or a center of the drilling ship equipped with various drilling equipments, a riser or drill pipe for drilling oil or gas in the seabed, etc. Moonpool is formed so that it can be moved up and down.
도 1은 해수면에서 시추작업을 수행하는 종래의 시추선의 일 예를 개략적으로 도시한다.FIG. 1 schematically shows an example of a conventional drilling vessel for performing drilling at sea level.
바다에서 석유 또는 가스를 채굴하기 위한 시추선의 작업은 데크 바닥에 설치된 적치대로부터 시추용 파이프(드릴 파이프 또는 라이저 파이프 등)들을 라이저 핸들링 크레인(resier handling crane)으로 들어올려 캣워크(catwalk)로 이동시키고 다시 서브스트럭처(substructure) 상부의 드릴 플로어(drillfloor)로 수평이동시킨 다음 데릭(derrick)을 사용하여 세워 시추선의 중앙에 형성된 문풀을 통해 하향 전진시켜 해저 바닥(sea-bed) 아래의 저유지(reservoir)에 위치하는 유정(well)에 매장된 해저자원을 시추한다.Drilling operations for mining oil or gas at sea lift the drilling pipes (such as drill pipes or riser pipes) from the loading deck on the deck floor to the riser handling crane and move them to the catwalk. It is then horizontally moved to the drillfloor above the substructure, then raised using a derrick and advanced downward through the door pool formed in the center of the drilling rig to hold the reservoir below the sea-bed. Drill undersea resources buried in wells located at
라이저(4)는 드릴파이프(5)를 유정(13)까지 전진시키기 전에 미리 해저 바닥(6)까지 전진되는 부재로서 머드가 되돌아오는 통로를 제공한다. 라이저(4)가 설치되면 라이저 내부로 드릴 파이프(5)가 해저 지층(11)을 통해 유정(13)까지 하향 전진된다.The
이와 같이 라이저(4)를 해저 바닥(6)까지 하향 전진시키거나, 드릴 파이프를 유정까지 전진시킬 경우, 길게 연결된 라이저나 드릴 파이프를 하향 전진시키는 것이 아니라, 짧은 길이의 라이저나 드릴 파이프를 서로 연결하여 하향 전진시킨다. When the
해저 바닥에는 이상 고압이 드릴 파이프를 타고 올라오는 것을 차단하기 위해 분출 방지용 스택(blowout preventor: BOP)(7)이 설치된다.At the bottom of the seabed a blowout preventor (BOP) 7 is installed to prevent abnormally high pressure from rising up the drill pipe.
해저 지층에서는 시멘트에 의해 케이싱(8)을 고정한 후, 케이싱 내부로는 드릴비트(10)가 장착된 드릴 파이프를 삽입하여 해저자원을 시추한다. 드릴비트가 땅을 뚫을 때 발생하는 열로 드릴비트가 과열되는 것을 방지하고 윤활작용으로 드릴링을 더욱 쉽게 하기 위해, 드릴 파이프 속으로는 머드(9)가 삽입된다. 이러한 머드는 드릴 비트(10)를 통해 빠져나가 케이싱(8)과 라이저(4)를 통해 다시 되돌아온다.In the seam layer, the
시추 작업이 종료되면, 드릴 파이프는 문풀(3)을 통해 드릴플로어로 운반되어 분리된 후 적재장소로 운반된다.When the drilling operation is finished, the drill pipe is transported to the drill floor through the
시추선에 마련되는 데릭(2)은 스틸로 만들어진 트러스트형의 타워이며, 빔(beam)과 각종 시추장비로 구성되는 복잡한 형태의 대형 구조물이다. 데릭은 상부 갑판인 데크에 고정되어 있으며, 높이는 약 100m에 이른다.Derrick (2) is provided on the drilling ship is a trust-type tower made of steel, a large structure of a complex form consisting of a beam (beam) and various drilling equipment. The derrick is fixed to the deck, the upper deck, and is approximately 100 m high.
데릭은 시추장비에 연결된 와이어로프를 권선하거나 풀어서 드릴 파이프 등의 시추장비를 승강시키기 위한 것이다.Derrick is intended to elevate drilling equipment such as drill pipe by winding or unwinding the wire rope connected to the drilling equipment.
데릭(2)은 문풀(3) 상부에 배치된다. The
데릭의 하부로는 BOP(Blowout preventor) 또는 BOP 크레인 등을 포함한 다양한 시추장비들이 이동될 수 있다. 따라서 이러한 시추 장비들의 이동 및 작동을 방해하지 않도록 데릭의 하부구조는 설계되어야 하고, 데릭에 화재진압용 소방수 공급 배관을 설치하는 경우에도 이를 고려하여 시추 장비들이 통과해야 하는 부분에는 배관을 배치하지 않아야 하고, 시추 장비의 통과 높이를 감안하여 데크에서 상당한 높이의 데릭 부분에 수평으로 환형 배관을 설치할 수 있다.Under the derrick, various drilling equipment, including blowout preventors (BOPs) or BOP cranes, can be moved. Therefore, the substructure of the derrick must be designed so as not to interfere with the movement and operation of such drilling equipment, and even when installing a firefighting fire water supply pipe on the derrick, the pipe should not be arranged where the drilling equipment should pass. And, given the passing height of the drilling rig, the annular piping can be installed horizontally in the derrick portion at a considerable height on the deck.
이러한 배관은 데크 부분이나 문풀 주변에서 화재가 발생하는 경우, 소방수 배관의 높이나 분사 범위 측면에서 소화 작업에 효과적이지 못하고, 수평으로 설치된 배관에 소방수가 잔류하는 경우 겨울철 배관 동파 위험도 지적될 수 있다.These pipes are not effective for extinguishing work in terms of height or spraying range of the fireman's pipe in case of fire in the deck area or around the door pool, and the risk of freezing in winter can be pointed out if the fireman's water is left in the horizontally installed pipe.
본 발명은 전술한 바와 같은 문제를 해결하기 위한 것으로, 데릭의 수직 방향 구조물을 따라 상기 데크에 수직으로 마련되는 배관을 포함함으로써 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않으며 소방수 분사에 효과적인 소방수 배관 구조를 제공하고자 한다.The present invention is to solve the problems as described above, by including a pipe provided perpendicular to the deck along the vertical structure of the derrick does not interfere with the movement or operation of the blowout preventer (BOP) or BOP crane and spraying firefighters To provide an effective fire fighter piping structure.
본 발명의 일 측면에 따르면, 해상 시추선의 데크에 장착된 데릭(Derrick)의 소방수 배관 구조에 있어서,According to an aspect of the present invention, in the derrick (Derrick) fireman piping structure mounted on the deck of the offshore drilling ship,
상기 데릭의 하부 구조물을 따라 마련되는 수평 관부;Horizontal pipe portion provided along the lower structure of the derrick;
상기 수평 관부에 소방수를 공급하며 상기 데크에 수직으로 마련되는 적어도 하나의 공급 관부; 및At least one supply pipe that supplies fire water to the horizontal pipe and is provided perpendicular to the deck; And
상기 수평 관부에 연결되며 상기 데크에 수직으로 마련되는 적어도 하나의 배출 관부를 포함하되,At least one discharge pipe connected to the horizontal pipe and provided perpendicular to the deck,
상기 공급 관부 및 상기 배출 관부는 상기 데릭의 수직 방향 구조물을 따라 상기 데크에 수직으로 마련됨으로써 상기 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 것을 특징으로 하는 시추선 데릭의 소방수 배관 구조가 제공된다.The supply pipe portion and the discharge pipe portion is provided perpendicular to the deck along the vertical structure of the derrick drilling rig derrick characterized in that it does not interfere with the movement or operation of the blowout preventor (BOP) or BOP crane in the lower portion of the derrick Firefighter plumbing structures are provided.
상기 수평 관부에는 소방수가 분사되는 복수의 노즐이 마련되되, 상기 복수의 노즐 중 적어도 일부는 상기 수평 관부의 하부에 상기 데크 방향으로 마련될 수 있다.The horizontal pipe part may be provided with a plurality of nozzles for spraying fire water, and at least some of the plurality of nozzles may be provided in the deck direction under the horizontal pipe part.
상기 수평 관부 중 상기 데크로부터의 높이가 가장 낮은 부분에는 상기 노즐이 마련되어, 소방수를 사용하지 않는 때에는 상기 노즐로 상기 수평 관부의 소방수를 모두 배출시킬 수 있다. The nozzle is provided at a portion of the horizontal pipe portion having the lowest height from the deck, and when the fire water is not used, all the fire water can be discharged from the horizontal pipe portion through the nozzle.
상기 공급 관부는 상기 해상 시추선에 마련된 씨 체스트(sea chest)에 연결되는 석션 배관과, 상기 석션 배관에 마련되며 해수를 펌핑하는 공급 펌프와, 상기 석션 배관과 상기 수평 관부를 연결하는 수직 관로를 포함할 수 있다.
The supply pipe part includes a suction pipe connected to a sea chest provided on the offshore drilling vessel, a supply pump provided on the suction pipe to pump sea water, and a vertical pipe connecting the suction pipe to the horizontal pipe part. can do.
본 발명의 다른 측면에 따르면, 해상 시추선의 데크에 장착된 데릭(Derrick)의 소방수 배관 배치 방법에 있어서, According to another aspect of the invention, in the derrick (Derrick) fireman piping arrangement method mounted on the deck of the offshore drilling ship,
상기 데릭의 하부 구조물을 따라 상기 소방수 배관을 배치하고, 상기 소방수 배관에는 상기 데크로 소방수를 분사하는 복수의 노즐을 마련하되,Arrange the fire water pipe along the lower structure of the derrick, and the fire water pipe is provided with a plurality of nozzles for spraying the fire water to the deck,
상기 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인이 이동 또는 작동하는 위치에 마련되는 상기 소방수 배관의 부분은 상기 데릭의 수직 방향 구조물을 따라 상기 데크에 수직으로 배치됨으로써 상기 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 것을 특징으로 하는 시추선 데릭의 소방수 배관 배치 방법이 제공된다.A portion of the fireman's pipe provided at a position where a blowout preventor (BOP) or a BOP crane moves or operates at a lower portion of the derrick is disposed perpendicular to the deck along a vertical structure of the derrick, so that a BOP ( Provided is a method for arranging a fire pipe of a drill ship derrick characterized in that it does not interfere with the movement or operation of a blowout preventor) or a BOP crane.
상기 데크로부터의 높이가 가장 낮은 상기 소방수 배관 부분에는 적어도 하나의 상기 노즐이 마련되며, 상기 복수의 노즐 중 적어도 일부는 상기 소방수 배관을 따라 상기 데크 방향으로 마련됨으로써, 소방수를 사용하지 않는 때에는 상기 노즐로 상기 소방수 배관 내의 소방수를 모두 배출시킬 수 있다.At least one nozzle is provided in the fire water pipe portion having the lowest height from the deck, and at least some of the plurality of nozzles are provided in the deck direction along the fire water pipe, so that the nozzle when no fire water is used. It is possible to discharge all the fire water in the fire water pipe.
본 발명의 시추선 데릭의 소방수 배관 구조는 데릭의 수직 방향 구조물을 따라 데크에 수직으로 마련되는 배관을 포함함으로써 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않으며 소방수 분사에 효과적인 소방수 배관 구조를 제공할 수 있다.The firefighter piping structure of the drill line derrick of the present invention includes a pipe provided perpendicularly to the deck along the vertical structure of the derrick, thereby preventing the movement or operation of a blowout preventer (BOP) or a BOP crane, and effective for firefighter spraying. Can be provided.
도 1은 데릭이 마련된 시추선의 시추 모습의 일 예를 개략적으로 도시한다.
도 2는 도 1의 A부분인, 본 발명의 일 실시예에 따른 시추선 데릭의 소방수 배관 구조가 마련된 데릭 하부의 모습을 개략적으로 도시한다.
도 3은 도 2에서 본 실시예에 따른 소방수 배관 구조만을 분리하여 도시한 모습이다.
도 4는 도3의 소방수 배관 구조를 측면에서 바라본 모습을 도시한다.Figure 1 schematically shows an example of the drilling appearance of the drilling ship provided with a derrick.
FIG. 2 schematically illustrates a state of a lower part of a derrick provided with a fire water pipe structure of a drilling line derrick according to an embodiment of the present invention, which is part A of FIG. 1.
FIG. 3 is a view illustrating the fireman piping structure according to the present embodiment separated from FIG. 2.
4 is a side view of the fireman's pipe structure of FIG.
본 발명과 본 발명의 동작상의 이점 및 본 발명의 실시에 의하여 달성되는 목적을 충분히 이해하기 위해서는 본 발명의 바람직한 실시 예를 예시하는 첨부 도면 및 첨부 도면에 기재된 내용을 참조하여야만 한다.In order to fully understand the present invention, operational advantages of the present invention, and objects achieved by the practice of the present invention, reference should be made to the accompanying drawings and the accompanying drawings which illustrate preferred embodiments of the present invention.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 설명함으로써, 본 발명을 상세히 설명한다.
Hereinafter, the present invention will be described in detail with reference to the preferred embodiments of the present invention with reference to the accompanying drawings.
도 1은 데릭(2)이 마련된 시추선(1)의 일반적인 모습을 개략적으로 도시한다. 1 schematically shows a general view of a drilling line 1 provided with a
도 2는 도 1의 A부분인, 본 발명의 일 실시예에 따른 시추선 데릭(2)의 소방수 배관 구조가 마련된 데릭 하부의 모습을 개략적으로 도시한다. 도 3은 도 2에서의 소방수 배관 구조만을 분리하여 도시한 모습이며, 도 4는 도3의 소방수 배관 구조를 측면에서 바라본 모습이다.FIG. 2 schematically illustrates a state of a lower part of a derrick provided with a fire water pipe structure of a
도 2 및 도 3에 도시된 바와 같이, 본 발명의 일 실시예에 따른 시추선 데릭(2)의 소방수 배관 구조는, 해상 시추선(1)의 데크(D)에 장착된 데릭(Derrick, 2)의 소방수 배관 구조에 있어서, 데릭의 하부 구조물을 따라 마련되는 수평 관부(100)와, 수평 관부(100)에 소방수를 공급하며 데크(D)에 수직으로 마련되는 적어도 하나의 공급 관부(200)와, 수평 관부(100)에 연결되며 데크(D)에 수직으로 마련되는 적어도 하나의 배출 관부(300)를 포함하되, 공급 관부(200) 및 배출 관부(300)는 데릭(2)의 수직 방향 구조물을 따라 데크(D)에 수직으로 마련됨으로써 데릭(2)의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 것을 특징으로 한다.As shown in Figures 2 and 3, the fireman piping structure of the
소방수 배관은 데릭(2) 하부에서 시추 장비들이 통과해야 하는 부분에는 배관을 배치하지 않고, 시추 장비의 통과 높이를 감안하여 데크(D)에서 상당한 높이의 데릭(2) 부분에 수평으로 환형 배관을 설치하는 경우, 데크(D)나 데릭(2) 하부, 문풀(3) 주변에서 화재가 발생하는 경우 소방수 분사가능 범위가 한정적이므로 효과적으로 화재를 진압하기 어렵다. Do not place pipes in the lower part of the derrick (2) where the drilling equipment should pass, and consider the height of the drilling equipment to allow the horizontal pipe to be mounted horizontally in the deck (D) of the considerable height in the deck (D). In the case of installation, it is difficult to extinguish the fire effectively because the fire water spraying range is limited when the fire occurs around the deck (D) or the lower part of the derrick (2), the door pool (3).
그러나 본 실시예는 데릭(2)의 수직 방향 구조물을 따라 수직으로 소방수 배관 일부를 배치함으로써, 수평식 배관 설치시 시추 장비들이 이동이나 작동을 방해하지 않도록 배관을 높게 설치하거나 일부에는 소방수 배관을 아예 배치할 수 없는 한계를 극복할 수 있다.However, in this embodiment, by arranging a part of the fire water pipe vertically along the vertical structure of the derrick (2), to install a high pipe so that the drilling equipment does not interfere with the movement or operation when installing the horizontal pipe, or even a part of the fire water pipe at all Overcome limitations that you can't deploy.
수평 관부(100)에는 소방수가 분사되는 복수의 노즐(400)이 마련되되, 복수의 노즐(400) 중 적어도 일부는 수평 관부(100)의 하부에 데크(D) 방향으로 마련될 수 있다.The
배출 관부(300)에도 소방수가 분사되는 복수의 노즐(400)이 마련되며, 데크(D)에 수직 방향으로 마련된 배출 관부(300)의 하단부에도 노즐(400)을 마련함으로써 데크(D)나 문풀(3) 주변 등에도 효과적으로 소방수를 분사할 수 있다.A plurality of
수평 관부(100) 중 데크(D)로부터의 높이가 가장 낮은 부분에는 노즐(400)이 마련되어, 소방수를 사용하지 않는 때에는 노즐(400)로 수평 관부(100)의 소방수를 모두 배출시킬 수 있다. The
수평 관부(100)의 하부에 데크(D) 방향으로 마련된 노즐(400), 배출 관부(300)의 노즐(400) 및 수평 관부(100) 중 데크(D)로부터의 높이가 가장 낮은 부분에 마련된 노즐(400)을 통해, 소방수를 사용하지 않는 때에는 소방수 배관 내에 소방수를 모두 배출시킬 수 있어 소방수로 사용되는 해수가 배관 내에 머물면서 발생하는 배관 부식을 막을 수 있고, 특히 겨울철 등 기온이 낮아 소방수가 배관 내에서 얼어붙어 배관을 손상시킬 수 있는 위험을 제거한다.The
공급 관부(200)는 해상 시추선(1)에 마련된 씨 체스트(sea chest, SC)에 연결되는 석션 배관(210)과, 석션 배관(210)에 마련되며 해수를 펌핑하는 공급 펌프(220)와, 석션 배관(210)과 수평 관부(100)를 연결하는 수직 관로(230)를 포함할 수 있다.
씨 체스트(SC) 내의 해수를 공급 펌프(220)에서 펌핑하여 석션 배관(210) 및 수직 관로(230)를 거쳐 수평 관부(100)로 공급하여 소방수로 분사하게 된다.Sea water in the sea chest (SC) is pumped by the
도 3에는 하나의 공급 펌프(220)만을 도시하였으나, 신속하게 소방수를 수평 관부(100)로 공급할 수 있도록, 두 개 또는 그 이상의 수직 관로(230)를 마련하고 각각의 수직 관로(230)에 석션 배관(210)과 공급 펌프(220)를 배치할 수 있다.
Although only one
본 발명의 다른 측면에 따르면, 해상 시추선(1)의 데크(D)에 장착된 데릭(2)(Derrick)의 소방수 배관 배치 방법에 있어서, According to another aspect of the present invention, in the method for arranging a fire water pipe of a derrick 2 (Derrick) mounted on the deck D of an offshore drilling vessel 1,
데릭(2)의 하부 구조물을 따라 소방수 배관을 배치하고, 소방수 배관에는 데크(D)로 소방수를 분사하는 복수의 노즐(400)을 마련하되,Arrange the fireman pipe along the lower structure of the derrick (2), the fireman pipe is provided with a plurality of
데릭(2)의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인이 이동 또는 작동하는 위치에 마련되는 소방수 배관의 부분은 데릭(2)의 수직 방향 구조물을 따라 데크(D)에 수직으로 배치됨으로써 데릭(2)의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 것을 특징으로 하는 시추선 데릭(2)의 소방수 배관 배치 방법이 제공된다.The portion of the fireman piping provided at the bottom of the
데크(D)로부터의 높이가 가장 낮은 소방수 배관 부분에는 적어도 하나의 상기 노즐(400)이 마련되며, 복수의 노즐(400) 중 적어도 일부는 소방수 배관을 따라 데크(D) 방향으로 마련됨으로써, 소방수를 사용하지 않는 때에는 노즐(400)로 소방수 배관 내의 소방수를 모두 배출시킬 수 있다.
At least one
이상에서 살펴본 바와 같이 본 실시예에 따른 시추선 데릭(2)의 소방수 배관 구조는 데릭(2)의 수직 방향 구조물을 따라 데크(D)에 수직으로 마련되는 배관을 포함함으로써 BOP(Blowout preventor) 또는 BOP 크레인 등의 시추장비의 이동이나 작동을 방해하지 않으면서 소방수 분사에 효과적인 소방수 배관 구조를 제공할 수 있다. As described above, the fire water pipe structure of the
즉, 데크(D)에 근접한 데릭(2)의 하부에 배관이 마련됨으로써 데크(D)나 문풀(3) 주변에서 발생하는 화재 진압시 효과적으로 소방수를 분사시킬 수 있다. That is, since the pipe is provided in the lower part of the
또한 수직 방향으로 데크(D)로부터의 높이가 가장 낮은 소방수 배관 부분에는 분사 노즐(400)을 마련하고, 분사 노즐(400) 중 적어도 일부는 소방수 배관을 따라 데크(D) 방향으로 마련됨으로써, 소방수를 사용하지 않는 때에는 노즐(400)을 통해 소방수 배관 내의 소방수를 완전히 배출시킬 수 있어, 배관 내에 잔류하는 소방수가 저온에서 얼어붙어 배관이 파손되는 위험을 없앨 수 있다.
In addition, by providing a
이와 같은 본 발명은 기재된 실시 예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형될 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 수정 예 또는 변형 예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이다. It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention. Accordingly, such modifications or variations are intended to fall within the scope of the appended claims.
1: 해상 시추선
2: 데릭
3: 문풀
D: 데크
100: 수평 관부
200: 공급 관부
210: 석션 배관
220: 공급 펌프
230: 수직 관로
300: 배출 관부
400: 노즐
SC: 씨 체스트1: offshore drilling
2: derrick
3: moonpool
D: Deck
100: horizontal pipe
200: supply pipe
210: suction piping
220: feed pump
230: vertical pipeline
300: discharge pipe
400: nozzle
SC: Sea Chest
Claims (6)
상기 데릭의 하부 구조물을 따라 마련되는 수평 관부;
상기 수평 관부에 소방수를 공급하며 상기 데크에 수직으로 마련되는 적어도 하나의 공급 관부; 및
상기 수평 관부에 연결되며 상기 데크에 수직으로 마련되는 적어도 하나의 배출 관부를 포함하되,
상기 공급 관부 및 상기 배출 관부는 상기 데릭의 수직 방향 구조물을 따라 상기 데크에 수직으로 마련됨으로써 상기 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 것을 특징으로 하는 시추선 데릭의 소방수 배관 구조.In Derrick's firefighter piping structure mounted on the deck of an offshore drilling vessel,
Horizontal pipe portion provided along the lower structure of the derrick;
At least one supply pipe that supplies fire water to the horizontal pipe and is provided perpendicular to the deck; And
At least one discharge pipe connected to the horizontal pipe and provided perpendicular to the deck,
The supply pipe portion and the discharge pipe portion is provided perpendicular to the deck along the vertical structure of the derrick drilling rig derrick characterized in that it does not interfere with the movement or operation of the blowout preventor (BOP) or BOP crane in the lower portion of the derrick Firefighter plumbing structure.
상기 수평 관부에는 소방수가 분사되는 복수의 노즐이 마련되되,
상기 복수의 노즐 중 적어도 일부는 상기 수평 관부의 하부에 상기 데크 방향으로 마련되는 것을 특징으로 하는 시추선 데릭의 소방수 배관 구조.The method of claim 1,
The horizontal pipe is provided with a plurality of nozzles for spraying water,
At least a portion of the plurality of nozzles is a fire water pipe structure of the drill ship derrick, characterized in that provided in the deck direction in the lower portion of the horizontal pipe portion.
상기 수평 관부 중 상기 데크로부터의 높이가 가장 낮은 부분에는 상기 노즐이 마련되어, 소방수를 사용하지 않는 때에는 상기 노즐로 상기 수평 관부의 소방수를 모두 배출시킬 수 있는 것을 특징으로 하는 시추선 데릭의 소방수 배관 구조. 3. The method of claim 2,
The nozzle is provided in the part with the lowest height from the said deck among the said horizontal pipe parts, The fire-pipe piping structure of the drill ship derrick characterized by being able to discharge all the fire water of the said horizontal pipe part by the nozzle when a fire water is not used.
상기 해상 시추선에 마련된 씨 체스트(sea chest)에 연결되는 석션 배관;
상기 석션 배관에 마련되며 해수를 펌핑하는 공급 펌프; 및
상기 석션 배관과 상기 수평 관부를 연결하는 수직 관로를 포함하는 시추선 데릭의 소방수 배관 구조.The method of claim 1, wherein the supply pipe portion
A suction pipe connected to a sea chest provided in the offshore drilling vessel;
A supply pump provided in the suction pipe to pump sea water; And
A firefighter piping structure of a drill ship derrick including a vertical pipe connecting the suction pipe and the horizontal pipe.
상기 데릭의 하부 구조물을 따라 상기 소방수 배관을 배치하고, 상기 소방수 배관에는 상기 데크로 소방수를 분사하는 복수의 노즐을 마련하되,
상기 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인이 이동 또는 작동하는 위치에 마련되는 상기 소방수 배관의 부분은 상기 데릭의 수직 방향 구조물을 따라 상기 데크에 수직으로 배치됨으로써 상기 데릭의 하부에서 BOP(Blowout preventor) 또는 BOP 크레인의 이동이나 작동을 방해하지 않는 것을 특징으로 하는 시추선 데릭의 소방수 배관 배치 방법.In the method of arranging Derrick's fire fighter piping mounted on the deck of the offshore drilling vessel,
Arrange the fire water pipe along the lower structure of the derrick, and the fire water pipe is provided with a plurality of nozzles for spraying the fire water to the deck,
A portion of the fireman's pipe provided at a position where a blowout preventor (BOP) or a BOP crane moves or operates at a lower portion of the derrick is disposed perpendicular to the deck along a vertical structure of the derrick, so that a BOP ( A method of arranging fire pipes for a drill ship derrick, characterized in that it does not interfere with the movement or operation of a blowout preventor or a BOP crane.
상기 데크로부터의 높이가 가장 낮은 상기 소방수 배관 부분에는 적어도 하나의 상기 노즐이 마련되며, 상기 복수의 노즐 중 적어도 일부는 상기 소방수 배관을 따라 상기 데크 방향으로 마련됨으로써, 소방수를 사용하지 않는 때에는 상기 노즐로 상기 소방수 배관 내의 소방수를 모두 배출시킬 수 있는 것을 특징으로 하는 시추선 데릭의 소방수 배관 배치 방법.
6. The method of claim 5,
At least one nozzle is provided in the fire water pipe portion having the lowest height from the deck, and at least some of the plurality of nozzles are provided in the deck direction along the fire water pipe, so that the nozzle when no fire water is used. The fireman piping arrangement method of the drill ship derrick, characterized in that to discharge all the fire water in the firefighter piping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120104297A KR101359951B1 (en) | 2012-09-20 | 2012-09-20 | Pipe structure for fire-fighting water in derrick of drillship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120104297A KR101359951B1 (en) | 2012-09-20 | 2012-09-20 | Pipe structure for fire-fighting water in derrick of drillship |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101359951B1 true KR101359951B1 (en) | 2014-02-11 |
Family
ID=50270201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120104297A KR101359951B1 (en) | 2012-09-20 | 2012-09-20 | Pipe structure for fire-fighting water in derrick of drillship |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101359951B1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080106927A (en) * | 2006-02-15 | 2008-12-09 | 에커 엔지니어링 앤드 테크놀로지 에이에스 | Combined seawater and firewater system |
KR20120014777A (en) * | 2010-08-10 | 2012-02-20 | 삼성중공업 주식회사 | Fire water supply system and control method thereof |
KR20120022380A (en) * | 2010-09-02 | 2012-03-12 | 대우조선해양 주식회사 | Sea water fire fighting system for vessel |
KR20120005512U (en) * | 2011-01-21 | 2012-07-31 | 삼성중공업 주식회사 | Device for surge prevention of fire water |
-
2012
- 2012-09-20 KR KR1020120104297A patent/KR101359951B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080106927A (en) * | 2006-02-15 | 2008-12-09 | 에커 엔지니어링 앤드 테크놀로지 에이에스 | Combined seawater and firewater system |
KR20120014777A (en) * | 2010-08-10 | 2012-02-20 | 삼성중공업 주식회사 | Fire water supply system and control method thereof |
KR20120022380A (en) * | 2010-09-02 | 2012-03-12 | 대우조선해양 주식회사 | Sea water fire fighting system for vessel |
KR20120005512U (en) * | 2011-01-21 | 2012-07-31 | 삼성중공업 주식회사 | Device for surge prevention of fire water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9458680B2 (en) | Drilling rig | |
US20030159853A1 (en) | Multi-activity offshore drilling facility having a support for tubular string | |
US20090114443A1 (en) | Anchored riserless mud return systems | |
US20100326667A1 (en) | Production of hydrocarbons | |
US20110247827A1 (en) | Dual Drilling Activity Drilling Ship | |
NO348002B1 (en) | Flexible line installation and removal | |
KR101751827B1 (en) | Arrangment for blow-out preventer control equipment and semi-submersible drilling platform including the same | |
US20150197989A1 (en) | Underwater drilling rig assembly and method of operating the underwater drilling rig assembly | |
NO802222L (en) | FIRE FIGHTING SYSTEM FOR A OFFSHORE PLATFORM | |
KR101359951B1 (en) | Pipe structure for fire-fighting water in derrick of drillship | |
KR20120001055U (en) | Recess type structure of trolley rail for drillship | |
KR20150004082A (en) | Drill Ship with Watering Handrail | |
EP3209849B1 (en) | Marine drilling riser joint | |
KR20170000254U (en) | Install structure of fire fighting pipe on drill floor and drilling ship having the structure | |
KR20140002177U (en) | Parking structure of cradle and cradle with the structure in drillship | |
Christiansen et al. | Tender-Assisted Drilling in the North Sea | |
KR20110114127A (en) | Riser tensioner | |
KR101403615B1 (en) | Offshore structure having moon pool for multiples of blow out preventer | |
US20130248198A1 (en) | Safety System for Deep Water Drilling Units Using a Dual Blow Out Preventer System | |
KR20220036247A (en) | Moonpool riser structure for floating production storage offloading | |
KR20140015898A (en) | Structure for fluid supplying hose for bop and riser tensioner of drillship and drillship having the same | |
Figenschou et al. | Submudline silo system: A cost-effective alternative to conventional subsea protection structures | |
KR20150061157A (en) | Marine structure | |
KR20120132171A (en) | Loading station for drillship | |
KR20150003191U (en) | Bop backup control system and bop system comprising the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20170202 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20180131 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20190131 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20200129 Year of fee payment: 7 |