KR101331217B1 - Assembling type water tank - Google Patents

Assembling type water tank Download PDF

Info

Publication number
KR101331217B1
KR101331217B1 KR1020110136698A KR20110136698A KR101331217B1 KR 101331217 B1 KR101331217 B1 KR 101331217B1 KR 1020110136698 A KR1020110136698 A KR 1020110136698A KR 20110136698 A KR20110136698 A KR 20110136698A KR 101331217 B1 KR101331217 B1 KR 101331217B1
Authority
KR
South Korea
Prior art keywords
wall
reservoir
pillar
cover
water tank
Prior art date
Application number
KR1020110136698A
Other languages
Korean (ko)
Other versions
KR20130069129A (en
Inventor
김태준
김하얀
Original Assignee
김하얀
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김하얀 filed Critical 김하얀
Priority to KR1020110136698A priority Critical patent/KR101331217B1/en
Publication of KR20130069129A publication Critical patent/KR20130069129A/en
Application granted granted Critical
Publication of KR101331217B1 publication Critical patent/KR101331217B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/02Wall construction
    • B65D90/08Interconnections of wall parts; Sealing means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/02Wall construction
    • B65D90/023Modular panels
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • E03B11/10Arrangements or adaptations of tanks for water supply for public or like main water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

본 발명은 저수조 및 그 시공방법에 관한 것으로서,
내부가 빈 벽체기둥(200)을 바닥(100)에 폐곡선 상으로 세워 벽을 형성함으로써 상부가 개방된 저수공간(900)을 형성하여, 상기 저수공간(900)에 물을 담아두게 형성되는 것임을 특징으로 하는 저수조 및 그 저수조를 시공하는 방법에 관한 것을 특징으로 하여,
조립식으로 신속하고 간편하게 설치할 수 있을 뿐만 아니라 유지보수 및 해체가 용이한 저수조를 얻을 수 있는 저수조 및 그 시공방법에 관한 것이다.
The present invention relates to a water tank and a construction method thereof.
The interior of the wall pillar 200 is formed in a closed curve on the floor 100 to form a wall to form a reservoir 900 with an open top, characterized in that it is formed to hold water in the reservoir 900 It characterized in that the reservoir and the method for constructing the reservoir,
The present invention relates to a reservoir and a construction method thereof, which can be quickly and easily installed in a prefabricated manner and obtain a reservoir that is easy to maintain and dismantle.

Description

저수조 및 그 시공방법{Assembling type water tank}Reservoir and construction method {Assembling type water tank}

본 발명은 저수조 및 그 시공방법에 관한 것으로, 특히 장마나 호우시 우수를 가두어 홍수를 조절하는 기능과 수량을 조절하는 기능을 할 수 있는 대용량의 저수조 외에도 다양한 용도로 사용되는 물을 저장할 수 있는 저수조 및 그 시공방법에 관한 것이다.The present invention relates to a storage tank and a construction method thereof, and in particular, a storage tank capable of storing water used for various purposes in addition to a large-capacity storage tank capable of controlling floods and the quantity of water by trapping rainwater or heavy rain. And a construction method thereof.

전통적으로 저수조는 일정량의 물을 저장하여 주거용 아파트 및 업무용 빌딩 등과 같이 생활용수의 사용이 많은 건축물에 공급하는 용도로 사용되고 있는 것으로서, 근래 들어서는 여름철에 강수량이 급격히 증가하는 현상이 발생함에 따라 집중 호우시 급격히 증가하는 우수를 저장하였다가 천천히 흘려 보냄으로써 수량을 조절할 수 있도록 하고자 지하에 시공이 되고 있기도 하다.Traditionally, water tanks are used to store a certain amount of water and supply it to buildings that use a lot of water, such as residential apartments and business buildings.In recent years, heavy rainfall has occurred due to the rapid increase in precipitation during summer. It is also installed underground to store the rapidly increasing rainwater and to control the yield by sending it slowly.

한편, 상기와 같은 종래의 저수조는 대한민국 특허공개 제10-2005-0032939호(2005. 4. 8.) "조립식 저수조"에 개시된 바와 같이 콘크리트를 타설하거나 미리 일정한 형태로 형성된 콘크리트 블록을 조립하여서 형성하고 내부를 방수시트로 마무리하여 일정량의 물을 저장할 수 있도록 형성하고 있는 것이 대부분이었다.On the other hand, the conventional water tank as described above is formed by pouring concrete or assembling the concrete block formed in a predetermined form as disclosed in the Republic of Korea Patent Publication No. 10-2005-0032939 (2005. 4. 8.) "Assembly type reservoir" Most of them were formed to finish a waterproof sheet to store a certain amount of water.

그러나 상기와 같이 콘크리트를 이용해 형성하는 저수조는 한번 설치하고 나면 해체하기가 상당히 곤란할 뿐만 아니라 콘크리트를 타설하여 시공하는 경우 타설과 양생에 따른 긴 시공 기간이 필요하게 되고, 콘크리트 블록을 조립하여 형성하는 경우에도 블록의 무게와 크기가 크기 때문에 시공이 어렵다는 단점 등이 있는 것이었다.However, the water tank formed by using concrete as described above is not only very difficult to dismantle once installed, but also requires a long construction period due to the casting and curing when concrete is poured. Edo blocks had a disadvantage in that construction was difficult because of the large weight and size.

본 발명은 다양한 용량의 저수조를 조립식으로 신속하게 형성할 수 있도록 할 뿐만 아니라 필요에 따라 저수조를 해체하는 경우 해체 작업이 비교적 용이한 저수조를 얻는데 그 목적이 있다.The present invention not only makes it possible to quickly form a reservoir of various capacities in a prefabricated manner, but also to obtain a reservoir that is relatively easy to dismantle when dismantling the reservoir as necessary.

본 발명에서는 봉을 세워 벽을 형성하는 방식으로 물을 담을 수 있는 저수공간을 형성하여 저수조를 조립식으로 설치할 수 있도록 함으로써 상기의 목적을 달성한다.In the present invention, the above object is achieved by forming a reservoir to hold water in a manner of forming a wall to form a wall so that the reservoir can be prefabricated.

본 발명에 따르면 조립식으로 신속하고 간편하게 설치할 수 있을 뿐만 아니라 유지보수 및 해체가 용이한 저수조를 얻을 수 있게 된다.According to the present invention, it is possible to obtain a water tank that can be easily and quickly installed as well as easy to maintain and dismantle.

도 1 내지 6은 본 발명에 의한 저수조의 시공 과정을 차례로 보여주는 과정도,
도 7은 본 발명에 의한 저수조에 물이 차 있는 상태를 보여주는 단면도.
1 to 6 is a process diagram showing the construction process of the reservoir according to the present invention in sequence,
7 is a cross-sectional view showing a state in which water is filled in the reservoir according to the present invention.

본 발명에서는 다양한 용량의 저수조를 조립식으로 신속하게 형성할 수 있도록 할 뿐만 아니라 필요에 따라 저수조를 해체하는 경우 해체 작업이 비교적 용이한 저수조를 얻기 위해, 내부가 빈 벽체기둥을 바닥에 폐곡선 상으로 세워 벽을 형성함으로써 상부가 개방된 저수공간을 형성하여, 상기 저수공간에 물을 담아두게 형성되는 것임을 특징으로 하는 저수조를 제안한다.In the present invention, not only to be able to quickly form a variety of storage tanks in a prefabricated manner, but also to obtain a storage tank relatively easy to dismantle when dismantling the storage tank, if necessary, the interior of the hollow wall column on the floor in a closed curve By forming a wall to form a reservoir having an open top, it proposes a reservoir characterized in that it is formed to contain water in the reservoir space.

이하, 본 발명을 첨부된 도면 도 1 내지 도 7을 참고로 하여 상세하게 설명한다.Hereinafter, the present invention will be described in detail with reference to FIGS. 1 to 7.

도 1 내지 6은 본 발명에 의한 저수조의 시공 과정을 차례로 보여주는 과정도, 도 7은 본 발명에 의한 저수조에 물이 차 있는 상태를 보여주는 단면도이다.1 to 6 is a process diagram showing the construction process of the reservoir according to the present invention in sequence, Figure 7 is a cross-sectional view showing a state in which the water filled in the reservoir according to the present invention.

도시된 바와 같이 본 발명에 의한 저수조는 바닥(100)에 세워져 벽을 형성하는 벽체기둥(200)을 포함하는바, 상기 벽체기둥(200)는 바닥(100)에 폐곡선 상으로 세워져 상부가 개방된 저수공간(900)을 형성한다.As shown, the water tank according to the present invention includes a wall pillar 200 that stands on the bottom 100 to form a wall. The wall pillar 200 stands on a closed curve on the bottom 100 to open the top. The reservoir 900 is formed.

바닥(100)은 콘크리트를 타설하거나 일정한 형태로 형성된 콘크리트 블록을 조립하여 등의 방법으로 평평한 면으로 형성된다. 이러한 바닥(100)에는 벽체기둥(200)이 세워져야 할 지점을 따라 한 쌍의 설치레일(110)이 나란히 형성되어 상기 설치레일(110) 사이에 벽체기둥(200)을 세워 고정되는 것이다.The floor 100 is formed of a flat surface by pouring concrete or assembling a concrete block formed in a predetermined shape. A pair of mounting rails 110 are formed side by side along the point at which the wall pillars 200 are to be erected on the bottom 100 so that the wall pillars 200 are erected and fixed between the mounting rails 110.

상기 설치레일(110)은 바닥으로부터 일정한 높이로 돌출되는 것으로서 단면 'ㄱ'자 형상의 금속 바(bar)를 바닥에 고정하여서 형성할 수 있다. 마치 철로와 같이 두 개를 일정 간격을 두고 나란히 배열됨으로써 그 사이에 벽체기둥(200)이 세워진다. The installation rail 110 may protrude to a certain height from the bottom and may be formed by fixing a metal bar having a cross-section 'b' shape to the floor. As if the two are arranged side by side at a predetermined interval, such as a rail, the wall pillar 200 is built therebetween.

바닥(100)은 다양한 방법으로 형성하는 것이 가능한바, 본 발명에 의한 저수조의 크기가 작을 때에는 콘크리트 블록이나 금속판, 합성수지 판 상면에 상기 설치레일(110)을 고정하여 바닥(100)을 준비할 수 있으며, 저수조의 크기가 커질수록 콘크리트를 타설하여 형성하게 된다.The floor 100 may be formed in various ways, and when the size of the water tank according to the present invention is small, the floor 100 may be prepared by fixing the installation rail 110 to an upper surface of a concrete block, a metal plate, or a synthetic resin plate. The larger the size of the reservoir, the more concrete is poured.

상기 벽체기둥(200)은 설치레일(110) 사이에서 하단에 볼트가 체결되어 세워진다. 이때, 다양한 구성의 볼트를 이용해 벽체기둥(200)을 세워줄 수 있으나, 작업의 편의성을 위해 설치레일(110)에 벽체기둥(200) 방향으로 탄성적으로 출몰하는 출몰볼트(112)를 구비하여 상기 출몰볼트(112)가 벽체기둥(200)의 하단에 형성되어 있는 구멍에 박히게 할 수 있다. The wall pillar 200 is erected by the bolt is fastened to the bottom between the installation rails (110). At this time, the wall pillar 200 can be erected using various configurations of bolts, but the mounting rail 110 is provided with a mounting bolt 112 that is resilient in the direction of the wall pillar 200 for convenience of the work. The bolt bolt 112 may be embedded in a hole formed in the lower end of the wall pillar (200).

벽체기둥(200)은 연달아 세워진 상태에서 몸체를 횡 방향으로 관통하는 와이어(210)가 설치되어 서로 결속된다. 상기 와이어(210)은 벽체기둥(200)의 상단과 하단 및 중단에 선택적으로 설치될 수 있는바, 이로 인해 벽체기둥(200)이 서로 견고하게 결속된다.The wall column 200 is provided with wires 210 penetrating the body in the transverse direction in a standing state and are bound to each other. The wire 210 may be selectively installed at the top and bottom and the interruption of the wall pillar 200, whereby the wall pillar 200 is firmly bound to each other.

이러한 벽체기둥(200) 사이에는 실링재(220)가 설치되는 것이 바람직하다. 실리콘이나 고무와 같이 탄성을 가진 재질로 실링재(220)를 형성한 다음 이러한 실링재(220)를 벽체기둥(200) 사이에 대어주고 와이어(210)로 강하게 당겨줌으로써 기밀이 유지되게 하는 것이다. 이때, 상기 실링재(220)는 벽체기둥(200) 사이에 끼워질때 벽체기둥(200) 바깥면에 밀착할 수 있도록 그 형상이 결정된다. 예를 들어 도시된 바와 같이 벽체기둥(200)이 원기둥 형태라면 양쪽 면을 기둥의 횡단면과 동일한 형태로 오목하게 형성되는 것이다. It is preferable that the sealing material 220 is installed between the wall pillars 200. The sealing material 220 is formed of an elastic material such as silicone or rubber, and then the sealing material 220 is applied between the wall pillars 200 and strongly pulled by the wire 210 to maintain the airtightness. At this time, when the sealing member 220 is fitted between the wall pillar 200, its shape is determined to be in close contact with the outer surface of the wall pillar 200. For example, as shown, if the wall column 200 has a cylindrical shape, both sides are formed to be concave in the same shape as the cross section of the column.

상기 벽체기둥(200)은 내부가 비어있는 것을 채택될 수 있다. 충분한 강도가 확보된다면 내부가 비어있는 것이 채택됨으로써 벽체기둥(200)을 형성하는 재료를 절약할 수 있을 뿐만 아니라 무게를 가볍게 하여 시공의 편의성을 증대시킬 수 있는 것이다.The wall pillar 200 may be adopted that the interior is empty. If sufficient strength is secured, the interior is empty, so that not only the material forming the wall pillar 200 can be saved, but also the weight can be lightened to increase the convenience of construction.

내부가 비어 있는 벽체기둥(200)이 채택되는 경우 벽체기둥(200)에서 저수공간(900)에 담기는 물과 접하는 면에 통공(202)이 형성된다. 이를 통해 물이 통공(202)을 통과하여 벽체기둥(200) 내부로 유입되게 함으로써 저수 용량의 증가를 꾀할 수 있게 된다. In the case where the wall pillar 200 having an empty interior is adopted, a through hole 202 is formed at a surface in contact with the water contained in the reservoir space 900 in the wall pillar 200. This allows water to flow through the through hole 202 into the wall pillar 200 to increase the storage capacity.

상기와 같이 벽체기둥(200)이 연달아 세워져 벽이 형성되면, 상기 벽 바깥면에는 마감재(230)를 부착하여 줄 수 있다. 마감재(230)는 벽 표면을 보호하고 기밀을 유지하게 하는 역할을 담당하게 되는바, 충격을 흡수할 수 있는 재질을 선택하는 것이 바람직하다. 나아가 저수조가 지하에 매설되는 경우 또는 혹한이나 혹서지역 등 가혹한 환경에 설치되는 경우 벽체기둥(200)을 보호할 수 있는 재질이 선택될 수 있다. As described above, when the wall pillars 200 are formed in succession to form a wall, the outer surface of the wall may be attached to the finishing material 230. Finishing material 230 is to serve to protect the wall surface and to maintain the airtight, it is preferable to select a material that can absorb the impact. Furthermore, when the reservoir is buried underground or installed in harsh environments such as cold or cold areas, a material that can protect the wall pillar 200 may be selected.

이상에서 설명한 바와 같이 벽체기둥(200)이 세워져 벽을 형성함으로써 일정한 저수공간(900)이 형성되면 상기 저수공간(900)에 물을 담아 보관하게 된다. 이때, 상기 저수공간(900)은 상부가 개방되어 있는바, 본 발명에 의한 저수조는 상기 저수공간(900) 입구를 덮어주는 덮개를 더 포함할 수 있다.As described above, when the wall pillar 200 is erected to form a wall to form a constant reservoir 900, water is stored in the reservoir 900. At this time, the reservoir 900 is open to the upper bar, the reservoir according to the present invention may further include a cover covering the inlet of the reservoir 900.

상기 덮개는 벽체기둥(200)의 상단에 안착되어 저수공간(900)의 입구를 덮어주게 되는데, 저수공간(900)의 면적이 넓어지는 경우 덮개의 너비도 커져야 하므로 덮개를 적절하게 지지하기 위해 저수공간(900)에 중간기둥(250)이 세워진다. The cover is seated on the top of the wall pillar 200 to cover the inlet of the reservoir 900, when the area of the reservoir 900 is wide, the width of the lid must also be large, so that the reservoir to properly support the lid The intermediate column 250 is erected in the space 900.

상기 중간기둥(250)은 덮개를 지지하는 형태라면 어느 것이라도 가능하나 벽체기둥(200)과 마찬가지로 내부가 비어 있되 다수의 통공(252)이 형성된 것을 채택하여 바닥에 설치되어 중간기둥(250)의 하단이 끼워져 결합되는 기둥지지대(120)에 착탈식으로 세워 설치할 수 있다. 이를 통해 중간기둥(250)에서도 물이 내부로 유입되게 하여 덮개를 지지하면서도 저수용량 또한 증가시킬 수 있는 것이다.The intermediate column 250 may be any type as long as the cover supports the cover, but similar to the wall pillar 200, the inside of the intermediate pillar 250 is empty but is installed on the floor by adopting a plurality of through holes 252. The lower end can be installed detachably mounted on the column support 120 is coupled. Through this, even in the middle column (250), the water is introduced into the inside, while supporting the cover can also increase the low capacity.

덮개는 상기 벽체기둥(200) 상단에 얹혀지는 덮개틀(310)과 상기 덮개틀(310)에 결합되는 덮개판(320)을 포함하여 조립식으로 설치될 수 있다. 여기서, 본 발명에서는 상기 덮개틀(310)을 상기 벽체기둥(200) 상단을 따라 안착되는 테두리봉(312)과 상기 테두리봉(312) 내부에 격자로 설치되어 중간기둥(250)에 지지되는 내부봉(314)을 포함하여 형성된다. 이를 통해 덮개틀(310)을 조립식으로 시공할 수 있게 되는 것이다.The cover may be installed in a prefabricated manner including a cover frame 310 mounted on the top of the wall pillar 200 and a cover plate 320 coupled to the cover frame 310. Here, in the present invention, the cover frame 310 is installed as a lattice inside the edge rod 312 and the edge rod 312 which is seated along the top of the wall pillar 200, and is supported by the intermediate pillar 250. It is formed including the rod 314. This will be able to construct the cover frame 310 in a prefabricated manner.

상기와 같이 덮개틀(310)이 조립식으로 형성되는 경우 상기 중간기둥(250)은 상기 내부봉(314)이 교차하는 지점을 지지하게 설치됨으로써 덮개를 보다 안전하게 지지하도록 한다. When the cover frame 310 is formed as described above, the intermediate column 250 is installed to support the point where the inner rod 314 intersects to support the cover more securely.

상기 중간기둥(250)과 상기 테두리봉(312) 상단에는 덮개틀(310)을 지지하는 안착캡(330)을 씌워줄 수 있다. 상기 안착캡(330)은 상기 테두리봉(312)과 내부봉(314)이 지나는 지점 및 테두리봉(312)과 내부봉(314)의 교차하는 지점에서 각각 해당 지점을 지지하기 위해 최적화된 홈이 형성된다. 따라서 테두리봉(312)와 내부공(314)을 상기 안착캡(330)에 형성된 홈을 따라 안착시키면서 자연스럽게 덮개틀(310)이 조립되고, 덮개틀(310)의 조립이 완료된 후에도 조립된 상태가 해체되지 않게 되는 것이다. The middle pillar 250 and the upper edge of the edge bar 312 may be fitted with a seating cap 330 supporting the cover frame 310. The seating cap 330 has a groove optimized for supporting the respective points at the point where the edge rod 312 and the inner rod 314 passes and the intersection of the edge rod 312 and the inner rod 314 respectively. Is formed. Therefore, the cover frame 310 is naturally assembled while seating the rim bar 312 and the inner hole 314 along the groove formed in the seating cap 330, and the assembled state is completed even after the assembly of the cover frame 310 is completed. It will not be dismantled.

상기와 같이 형성된 덮개틀(310) 상부에는 지지캡(340)을 씌워줄 수 있다. 테두리봉(312)과 내부봉(314)을 따라 씌워주는 것으로서, 상면이 평면으로 형성되어 덮개판(320)을 원활하게 안착시킬 수 있도록 하기 위한 구성이다. 이러한 지지캡(340)은 덮개틀(310)을 이루는 테두리봉(312)과 내부봉(314)의 단면 형상을 고려하여 덮개판(320)을 안전하게 안착시킬 수 있는 형태라면 채택하지 않아도 되는 구성임은 당연하다.The cover cap 310 formed as described above may cover the support cap 340. Covering the rim rod 312 and the inner rod 314, the upper surface is formed in a flat configuration for allowing the cover plate 320 to be seated smoothly. The support cap 340 is a configuration that does not need to be adopted if the shape that can safely seat the cover plate 320 in consideration of the cross-sectional shape of the edge bar 312 and the inner rod 314 forming the cover frame 310. Of course.

이상에서와 같은 구조를 가지는 본 발명에 의한 저수조는 적절한 위치에 물의 유입과 배출을 담당할 수 있는 관(도시되지 않음)을 설치하여 줄 수 있다. 예를 들어 유입관은 덮개의 일부에 구멍을 내어 연결하고 배출관은 벽체기둥(200)으로 형성된 벽의 하단에 구멍을 내어서 연결하여 줄 수 있는바, 밸브를 설치하는 등의 방법으로 물의 유입과 유출을 단속하여 유입되는 물을 저장하였다가 적당한 시기에 배출하여 줄 수 있는 저수조를 형성하는 것이다. The reservoir according to the present invention having the structure as described above can be provided with a pipe (not shown) that can be in charge of the inflow and discharge of water at an appropriate position. For example, the inlet pipe can be connected by making a hole in a part of the cover, and the outlet pipe can be connected by making a hole in the bottom of the wall formed by the column pillar 200. It is to form a reservoir to control the outflow to store the incoming water and discharge it at a suitable time.

이하, 본 발명에 의한 저수조의 설치과정을 설명한다.Hereinafter, the installation process of the reservoir according to the present invention.

우선 도 1에 도시된 바와 같이 콘크리트를 타설한 다음 양생하여 평평한 바닥(100)을 형성하고 바닥(100) 상면에 설치레일(110)과 기둥지지대(120)를 고정한다. 이때, 기둥지지대(120)는 필요에 따라 선택적으로 설치하는 것이다. 상기 바닥(100)은 콘크리트 블록을 조립하여 형성하는 것도 가능한바, 평평하면서도 충분한 강도를 가지는 것이라면 어떠한 방식으로도 형성할 수 있음은 물론이다. First, as shown in FIG. 1, the concrete is poured and then cured to form a flat bottom 100 and fix the installation rail 110 and the column support 120 on the bottom 100. At this time, the pillar support 120 is to be selectively installed as needed. The floor 100 can also be formed by assembling the concrete block bar, as long as it has a flat enough strength, of course, can be formed in any way.

설치레일(110)의 설치가 완료되면 도 2에 도시된 바와 같이 상기 설치레일(110)을 따라 벽체기둥(200)을 연달아 세운 다음 와이어(210)를 관통시켜 벽을 형성한다. 이때, 기둥지지대(120)에 중간기둥(250)을 미리 세워 설치할 수 있다. When the installation of the installation rail 110 is completed, as shown in Figure 2, the wall pillar 200 in a row along the installation rail 110 and then through the wire 210 to form a wall. At this time, the intermediate pillar 250 may be installed in advance on the column support 120.

이후 상기 벽체기둥(200)과 중간기둥(250)이 세워진 콘크리트를 일정 두께로 타설한다. 타설되는 콘크리트의 두께는 설치레일(110)을 덮는 두께로 하는 것이 바람직하다. 상기와 같이 콘크리트를 타설함으로써 벽체기둥(200)이 하단을 지지함과 아울러 기밀을 유지케 하는 것이다.Thereafter, the wall pillar 200 and the intermediate pillar 250 are poured into a predetermined thickness. The thickness of the concrete to be poured is preferably set to a thickness covering the installation rail (110). By pouring concrete as described above, the wall pillar 200 supports the bottom and maintains airtightness.

콘크리트의 타설이 완료되면 벽체기둥(200)이 세워져 형성된 벽 외부에 마감재(230)를 차례로 부착하여 가감을 한다. 이에 따라 상부 입구가 개방된 저수공간(900)이 형성된다.When the casting of the concrete is completed, the wall pillar 200 is attached to the finishing material 230 in sequence to the outside of the wall formed by standing up and down. As a result, the reservoir 900 having an upper entrance is formed.

상기와 같이 저수공간(900)의 형성이 완료되면 저수공간(900) 입구에 덮개를 설치한다. 덮개는 도 3 내지 도 5에 도시된 바와 같이 중간기둥(250)과 상기 테두리봉(312) 상단에는 안착캡(330)을 씌운 다음 상기 안착캡(330)을 따라 테두리봉(312)과 내부봉(314)을 조립하여서 덮개틀(310)을 형성하고, 이어서 덮개틀(310) 상부에 지지캡(340)을 씌워준 후 마지막으로 덮개판(320)을 지지캡(340) 상면에 안착시켜 고정함으로써 덮개를 덮어주는 것이다. 이를 통해 덮개를 시공현장에서 조립식으로 설치하여 줄 수 있게 된다. When the formation of the reservoir 900 is completed as described above, a cover is installed at the inlet of the reservoir 900. 3 to 5, the cover is covered with a seating cap 330 on the top of the middle column 250 and the rim bar 312, and then the rim bar 312 and the inner rod along the seating cap 330. 314 to form a cover frame 310, and then cover the support cap 340 on the upper cover frame 310 and finally by seating and fixing the cover plate 320 on the upper surface of the support cap 340 Cover the cover. This allows the cover to be installed prefabricated at the construction site.

이상이 과정을 통해 도 6에 도시된 바와 같은 저수조가 완성이 되는바, 모든 과정을 시공 현장에서 조립식으로 진행하여 줄 수 있어 편리하며, 조립과 분해가 용이한 저수조를 얻을 수 있게 된다. As described above, the water tank as shown in FIG. 6 is completed through the above process, and thus, all the processes can be carried out prefabricated at the construction site, thereby obtaining a water tank that is convenient and easy to assemble and disassemble.

상기와 같이 완성된 저수조는 물이 유입되면 도 7에 도시된 바와 같이 저수공간(900)에 물이 차오르게 됨과 아울러 벽체기둥(200)과 중간기둥(250)에도 통공(202)(252)을 통해 물이 유입되면서 저장되는 것으로서, 우수의 저장시설이나 각종 용수의 저장시설로 널리 사용할 수 있다.When the water tank is completed as described above, the water is filled in the reservoir space 900 as shown in FIG. 7, and the through holes 202 and 252 are also provided in the wall pillar 200 and the intermediate pillar 250. As water is stored through inflow, it can be widely used as a storage facility of rainwater or a storage facility for various types of water.

100 : 바닥, 110 : 설치레일,
112 : 출몰볼트, 120 : 기둥지지대,
200 : 벽체기둥, 202 : 통공,
210 : 와이어, 220 : 실링재,
250 : 중간기둥, 252 : 통공,
310 : 덮개틀, 312 : 테두리봉,
314 : 내부봉, 320 : 덮개판,
330 : 안착캡, 340 : 지지캡,
900 : 저수공간.
100: floor, 110: mounting rail,
112: the bolt bolt, 120: pillar support,
200: wall pillar, 202: through hole,
210: wire, 220: sealing material,
250: middle pillar, 252: through hole,
310: cover frame, 312: edge bar,
314: inner rod, 320: cover plate,
330: seating cap, 340: support cap,
900: reservoir space.

Claims (20)

내부가 빈 벽체기둥(200)을 바닥(100)에 폐곡선 상으로 세워 벽을 형성함으로써 상부가 개방된 저수공간(900)을 형성하여 상기 저수공간(900)에 물을 담아두되,
상기 바닥(100)에는 벽체기둥(200)이 세워지는 지점을 따라 한 쌍의 설치레일(110)이 나란히 형성되어 상기 설치레일(110) 사이에 벽체기둥(200)을 세워 고정하는 것을 특징으로 하는 저수조.
By forming a wall column 200 on the bottom 100 in a closed curve on the floor 100 to form a wall to form a reservoir 900, the top of which is open to hold water in the reservoir 900,
A pair of installation rails 110 are formed side by side along the point where the wall pillars 200 are erected on the bottom 100 to establish and fix the wall pillars 200 between the installation rails 110. Reservoir.
제1 항에 있어서,
상기 벽체기둥(200)은 연달아 세워진 상태에서 몸체를 횡 방향으로 관통하는 와이어(210)가 설치되어 서로 결속되는 것임을 특징으로 하는 저수조.
The method according to claim 1,
The wall pillar (200) is a water tank, characterized in that the wire 210 is installed to penetrate the body in the transverse direction in a standing state to bind to each other.
제1 항에 있어서,
상기 벽체기둥(200)은 저수공간(900)에 담기는 물과 접하는 면에 통공(202)이 형성되어 물이 벽체기둥(200) 내부로 유입되게 함으로써 저수 용량을 증가시키는 것임을 특징으로 하는 저수조.
The method according to claim 1,
The wall pillar (200) is a reservoir, characterized in that the through-hole 202 is formed in contact with the water contained in the reservoir space 900 to increase the storage capacity by allowing water to flow into the wall pillar (200).
제1 항에 있어서,
상기 벽체기둥(200) 사이에는 실링재(220)가 설치되어 기밀을 유지케 하는 것임을 특징으로 하는 저수조.
The method according to claim 1,
The water tank, characterized in that the sealing member 220 is installed between the wall pillars 200 to maintain the airtightness.
제1 항에 있어서,
상기 벽체기둥(200)이 연달아 세워져 형성되는 벽 바깥면을 따라 마감재(230)가 설치되어 상기 벽 표면을 보호하고 기밀을 유지하는 것임을 특징으로 하는 저수조.
The method according to claim 1,
A water tank, characterized in that the finishing material 230 is installed along the outer wall of the wall pillar 200 is formed in succession to protect the wall surface and maintain airtightness.
삭제delete 제1 항에 있어서,
상기 설치레일(110)에는 벽체기둥(200)이 방향으로 탄성적으로 출몰하며 상기 벽체기둥(200)의 하단에 박히는 출몰볼트(112)가 형성되어 벽체기둥(200)을 고정하는 것임을 특징으로 하는 저수조.
The method according to claim 1,
The mounting rail 110 has a wall bolt 200 is retracted elastically in the direction and is formed on the lower end of the wall pillar 200 is driven bolt 112 is characterized in that to fix the wall pillar 200 Reservoir.
제1 항에 있어서,
상기 저수공간(900) 입구를 덮어주는 덮개를 더 포함하는 것을 특징으로 하는 저수조.
The method according to claim 1,
Reservoir tank further comprises a cover for covering the inlet of the reservoir (900).
제8 항에 있어서,
상기 저수공간(900)에는 중간기둥(250)에 세워져 상기 덮개를 지지하는 것임을 특징으로 하는 저수조.
The method of claim 8,
Reservoir tank, characterized in that standing in the middle pillar (250) to support the cover.
제9 항에 있어서,
상기 중간기둥(250)은 내부가 비어 있되, 다수의 통공(252)이 형성되어 물이 중간기둥(250) 내부로 유입되게 함으로써 저수용량을 증가시키는 것을 특징으로 하는 저수조.
10. The method of claim 9,
The intermediate column (250) is empty inside, but a plurality of through-holes (252) is formed so that the water flows into the intermediate column (250) by storing water, characterized in that to increase the low capacity.
제9 항에 있어서,
상기 덮개는 상기 벽체기둥(200) 상단에 얹혀지는 덮개틀(310)과 상기 덮개틀(310)에 결합되는 덮개판(320)을 포함하여 조립식으로 설치되는 것임을 특징으로 하는 저수조.
10. The method of claim 9,
The cover is a water tank, characterized in that it is installed prefabricated including a cover frame 310 is mounted on top of the wall pillar (200) and a cover plate 320 coupled to the cover frame (310).
제11 항에 있어서,
상기 덮개틀(310)은 상기 벽체기둥(200) 상단을 따라 안착되는 테두리봉(312)과 상기 테두리봉(312) 내부에 격자로 설치되어 중간기둥(250)에 지지되는 내부봉(314)을 포함하는 것을 특징으로 하는 저수조.
12. The method of claim 11,
The cover frame 310 has an inner rod 314 that is installed as a lattice in the rim rod 312 and the rim rod 312 that is seated along the top of the wall pillar 200 and is supported by the intermediate pillar 250. Reservoir, characterized in that it comprises.
제12 항에 있어서,
상기 중간기둥(250)은 상기 내부봉(314)이 교차하는 지점을 지지하게 설치되는 것임을 특징으로 하는 저수조.
13. The method of claim 12,
The intermediate column 250 is a reservoir, characterized in that installed to support the point where the inner rod (314) intersects.
제13 항에 있어서,
상기 중간기둥(250)과 상기 테두리봉(312) 상단에는 안착캡(330)이 결합되되,
상기 안착캡(330)은 상기 테두리봉(312)과 내부봉(314)의 교차지점이 각각 안착되는 홈이 형성된 것임을 특징으로 하는 저수조.
The method of claim 13,
The seating cap 330 is coupled to the upper end of the middle column 250 and the edge rod 312,
The seating cap 330 is a water reservoir, characterized in that the groove is formed to the intersection of the edge bar 312 and the inner rod 314, respectively.
바닥에 폐곡선 상으로 설치레일(110)을 설치하고,
상기 설치레일(110)을 따라 벽체기둥(200)을 연달아 세워 벽을 형성함으로써 상부가 개방된 저수공간(900)을 형성한 다음,
상기 저수공간(900) 입구에 덮개를 설치하는 과정을 포함하는 것을 특징으로 하는 저수조 시공방법.
Install the mounting rail 110 on the bottom of the closed curve,
After forming the wall by successively standing the column pillar 200 along the installation rails 110 to form a reservoir 900 with an open top,
Reservoir construction method comprising the step of installing a cover at the inlet of the reservoir (900).
제15 항에 있어서,
상기 벽체기둥(200)이 세워진 바닥에 콘크리트를 일정 두께로 타설하여 벽체기둥(200)을 지지함과 아울러 기밀을 유지케 하는 것임을 특징으로 하는 저수조 시공방법.
16. The method of claim 15,
A water tank construction method, characterized in that to support the wall pillar (200) to maintain the airtight by pouring concrete to a certain thickness on the floor on which the wall pillar (200) is built.
제16 항에 있어서,
상기 콘크리트는 설치레일(110)을 덮는 두께로 타설하는 것임을 특징으로 하는 저수조 시공방법.
17. The method of claim 16,
The concrete is a water tank construction method characterized in that the pouring to the thickness covering the installation rail (110).
제15 항에 있어서,
상기 벽체기둥(200)에 와이어(210)를 관통시켜 체결함으로써 서로 결속시키는 것임을 특징으로 하는 저수조 시공방법.
16. The method of claim 15,
The water tank construction method characterized in that the binding to each other by passing through the wire 210 to the wall pillar (200).
제15 항에 있어서,
상기 덮개는 상기 벽체기둥(200) 상단을 따라 테두리봉(312)을 안착시킨 다음, 테두리봉(312) 내부에 내부봉(314)을 격자로 설치하여 덮개틀(310)을 형성한 후, 상기 덮개틀(310)에 덮개판(320)을 조립하여서 형성하는 것임을 특징으로 하는 저수조 시공방법.
16. The method of claim 15,
The cover seats the rim bar 312 along the top of the wall pillar 200, and then forms the cover frame 310 by installing the inner rod 314 inside the rim bar 312 as a grid, Water tank construction method characterized in that the cover plate 310 is formed by assembling the cover plate (320).
제19 항에 있어서,
상기 바닥에 기둥지지대(120)를 더 설치하고 상기 기둥지지대(120)에 중간기둥(250)을 세우되,
상기 기둥지지대(120)는 상기 내부봉(314)이 교차되는 지점에 세워 덮개를 지지하게 하는 것임을 특징으로 하는 저수조 시공방법.
20. The method of claim 19,
The pillar support 120 is further installed on the bottom and the intermediate pillar 250 is erected on the pillar support 120,
The pillar support 120 is a water tank construction method characterized in that to support the cover to stand at the point where the inner rod (314) intersect.
KR1020110136698A 2011-12-16 2011-12-16 Assembling type water tank KR101331217B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110136698A KR101331217B1 (en) 2011-12-16 2011-12-16 Assembling type water tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110136698A KR101331217B1 (en) 2011-12-16 2011-12-16 Assembling type water tank

Publications (2)

Publication Number Publication Date
KR20130069129A KR20130069129A (en) 2013-06-26
KR101331217B1 true KR101331217B1 (en) 2013-11-25

Family

ID=48864584

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110136698A KR101331217B1 (en) 2011-12-16 2011-12-16 Assembling type water tank

Country Status (1)

Country Link
KR (1) KR101331217B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5330018A (en) * 1976-08-31 1978-03-20 Mitsui Eng & Shipbuild Co Ltd Oil storage tank at sea
JP2000313494A (en) * 1999-05-06 2000-11-14 Achilles Corp Air expansion type liquid tank

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5330018A (en) * 1976-08-31 1978-03-20 Mitsui Eng & Shipbuild Co Ltd Oil storage tank at sea
JP2000313494A (en) * 1999-05-06 2000-11-14 Achilles Corp Air expansion type liquid tank

Also Published As

Publication number Publication date
KR20130069129A (en) 2013-06-26

Similar Documents

Publication Publication Date Title
KR100994805B1 (en) Multipurpose reservoir apparatus
EP3221527B1 (en) Precast insulated load bearing roof element and methods of manufacturing a roof element
KR101052857B1 (en) The water-storage tank block and method for constructing thereof
KR101259156B1 (en) Method constructing precasting water-storage tank
KR101203503B1 (en) Water tank based on height-adjustable
KR101321992B1 (en) Block type rain retaining facility
KR101143511B1 (en) Storm water attenuation tanks and culverts
KR101331217B1 (en) Assembling type water tank
KR101750404B1 (en) Structure using same time pouring process for wall and foundation concrete and construction method therefor
KR101495997B1 (en) Upright type rainwater storaging structure and Rainwater storaging facility having the structure and Method for building the facility
KR200414927Y1 (en) rain water tank manufacture structure
KR100899677B1 (en) Prefabricated summerhouse using precast concrete construction method
JP4800716B2 (en) Artificial ground
KR100886343B1 (en) The ascent and descent where the assembly dissolution is possible just the infrastructure
US6477722B2 (en) Overflow system with a spillway rim, particularly for a prefabricated swimming pool to be sunk into the ground, and a method and apparatus for its construction
JP6970529B2 (en) Simple structure
KR20150140006A (en) Sump for building
KR102301811B1 (en) Prefabricated Pergola
JP4757590B2 (en) Seismic reinforcement method for existing reinforced concrete structures
AU2005203085C1 (en) Improved Storage Tank and Method of Installation
KR101513257B1 (en) Foundation pad for storage tank and construction method using the same
KR100999938B1 (en) The top story structure of building using green panels and roof garden structure using the same
KR100394435B1 (en) Structure for Installing Large Water
CZ2012745A3 (en) For height adjustable swimming pool floor
KR102528588B1 (en) Open type water tank for quick construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee