KR101327172B1 - Water-proof and retaining method - Google Patents

Water-proof and retaining method Download PDF

Info

Publication number
KR101327172B1
KR101327172B1 KR1020130025841A KR20130025841A KR101327172B1 KR 101327172 B1 KR101327172 B1 KR 101327172B1 KR 1020130025841 A KR1020130025841 A KR 1020130025841A KR 20130025841 A KR20130025841 A KR 20130025841A KR 101327172 B1 KR101327172 B1 KR 101327172B1
Authority
KR
South Korea
Prior art keywords
panel
high pressure
press
earth
pressure water
Prior art date
Application number
KR1020130025841A
Other languages
Korean (ko)
Other versions
KR20130030287A (en
Inventor
정성남
신종훈
Original Assignee
정성남
강릉건설 주식회사
주식회사경도
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정성남, 강릉건설 주식회사, 주식회사경도 filed Critical 정성남
Priority to KR1020130025841A priority Critical patent/KR101327172B1/en
Publication of KR20130030287A publication Critical patent/KR20130030287A/en
Application granted granted Critical
Publication of KR101327172B1 publication Critical patent/KR101327172B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/12Back-filling of foundation trenches or ditches
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명은 차수와 흙막이장치를 이용한 차수와 흙막이공법에 관한 것으로, 더욱 상세하게는 지중터널 굴착을 위해 수직갱을 굴착 시, 수직갱의 외측을 따라 차수 및 흙막이를 하고자 하는 위치에 가상 설치라인을 따라 일정 간격으로 압입 설치되는 다수의 H빔, 상기 압입 설치된 H빔 중 인접한 두 개의 H빔에 의해 양측부가 가이드되어 다수 개 압입 설치되는 패널, 상기 H빔과 패널에 의해 구획된 내부를 굴착한 후, 패널과 H빔을 덮도록 콘크리트를 타설하여 형성되는 토류벽, 및 상기 토류벽 설치 후, 설치된 패널을 인발하여 제거한 다음, 상기 패널이 제거된 공간에 충진되는 뒷채움재를 포함하여 이루어진다.
상기와 같은 본 발명에 의하면, H빔과 철판 패널을 이용하여 수직갱 굴착 시, 토압을 지지하여 흙이 수직갱으로 유입되는 것을 방지함은 물론, 토류벽을 용이하게 형성할 수 있으며, 패널을 제거함과 동시에 뒷채움재를 충진하여 수직갱 형상 유지는 물론, 차수 기능을 할 수 있어 종래보다 시공이 간단하고, 시공기간이 대폭 감소되어 작업비용은 물론 작업효율을 향상시킬 수 있다.
The present invention relates to the order and earth clogging method using the order and earthquake device, and more specifically, when excavating a vertical shaft for underground tunnel excavation, along the outside of the vertical shaft to a certain position along the virtual installation line A plurality of H-beams are press-installed at intervals, panels of which both sides are guided by two adjacent H-beams of the press-installed H-beams, and a plurality of press-installed panels are excavated, and the panel divided by the H-beams and the panel is excavated. And an earth wall formed by pouring concrete to cover the H beam, and after the earth wall is installed, the installed panel is drawn and removed, and a back fill material is filled in the space from which the panel is removed.
According to the present invention as described above, when excavation of the vertical gang using the H beam and the iron plate panel, supporting the earth pressure to prevent the soil from entering the vertical gang, as well as to easily form the earth wall, while removing the panel By filling the backfill material to maintain the shape of the vertical gang, as well as the order function, the construction is simpler than before, and the construction period is significantly reduced can improve the work cost and work efficiency.

Description

차수와 흙막이장치를 이용한 차수와 흙막이공법{Water-proof and retaining method}Water-proof and retaining method using order-and-blocking device

본 발명은 차수와 흙막이공법에 관한 것으로, 더욱 상세하게는 설치된 H빔을 따라 다수의 철판 패널을 압입시킨 후, 구획된 내부를 굴착함에 따라 토사가 굴착된 내부로 유입되는 것을 방지할 수 있고, 패널의 내측으로 콘크리트를 타설하여 토류벽을 용이하게 설치할 수 있으며, 패널 제거 후, 뒷채움재로 충진하여 차수의 기능을 할 수 있어 작업의 효율을 향상시킬 수 있는 차수와 흙막이장치를 이용한 차수와 흙막이공법에 관한 것이다.
The present invention relates to the order and earth clogging method, and more specifically, after pressing a plurality of iron plate panels along the installed H-beam, and excavated the partitioned interior to prevent the soil from entering the excavated interior, The earth wall can be easily installed by placing concrete inside the panel, and after removing the panel, it can be filled with a backfill material to function as the order, which can improve the work efficiency. It is about.

일반적으로, 건축물, 개착 터널, 지하철, 전력구, 통신구, 하수 관거 등과 같이 지반을 소정의 깊이 및 길이방향으로 연장하여 굴착하고, 그 굴착지반의 내부 공간에 구조물을 설치하는 건설공사가 종종 이루어지고 있다.In general, construction works such as buildings, cut-off tunnels, subways, power outlets, communication ports, sewer conduits, etc., extend the ground in a predetermined depth and length direction, and install a structure in the internal space of the excavated ground. ought.

이와 같은 경우에 있어서 굴착된 지반 면은 항상 토압(주동토압)에 의하여 붕괴되려고 하기 때문에, 통상은 등록특허 10-0998253에 기재된 도 1과 같이 H 파일과 같은 수직 빔(1)을 먼저 지반에 항타시켜 매설시킨 후, 지반을 굴착하면서 수직 빔(1) 사이에 토류판(2, 흙막이판, 통상 목재를 이용하게 된다.)을 끼워 설치하는 방식으로 굴착지반 지보공을 설치하게 된다.In such a case, since the excavated ground surface always tries to collapse by earth pressure (driven earth pressure), usually, the vertical beam 1, such as the H pile, is first hit on the ground as shown in FIG. After burying them, the excavation ground support is installed by inserting an earth plate (2, an earth plate, usually wood) between the vertical beams 1 while excavating the ground.

이때, 토류판(2)이 설치된 수직 빔(1)에는 수평빔 형태의 띠장(3, Wale, 통상 H 파일)을 설치하게 되는데, 이는 수직 빔(1)을 서로 수평방향으로 연결시켜 줌으로서 수직 빔(1)과 띠장(3)이 격자형태의 구조체에 작용하는 주동토압에 보다 효과적으로 저항할 수 있도록 하기 위함이다.At this time, the vertical beam (1) in which the earth plate (2) is installed is provided with a band (3, Wale, H file) in the form of a horizontal beam, which connects the vertical beam (1) in the horizontal direction to the vertical beam This is to make the (1) and the strip (3) more effectively resist the main earth pressure applied to the lattice structure.

나아가, 띠장(3)과 띠장(3) 사이에는 굴착지반을 가로질러 양단부가 띠장(3)에 지지되어 역시 토압에 저항할 수 있도록 버팀보(4, Strut)를 설치하게 되는데, 통상 이도 역시 H 파일이 사용되고 있다.Furthermore, between the strip 3 and the strip 3, both ends are supported by the strip 3 across the excavation ground, so that a brace (4, Strut) is installed so that it can also resist earth pressure. Is being used.

여기서, 도 2에서 도시한 바와 같이, 설치된 다수의 수직 빔(1)의 외측에 차수 그라우팅(5)이 이루어져 지하수가 굴착된 부위로 유입되는 것을 방지하게 된다.Here, as shown in FIG. 2, the order grouting 5 is formed on the outside of the plurality of vertical beams 1 installed to prevent the groundwater from entering the excavated portion.

또한 띠장(3)이나 버팀보(4)를 대신하여 수직 빔(1)과 토류판(2)의 내측으로 콘크리트(6)를 타설함에 따라 수직 빔(1)과 토류판(2)의 지지력을 증가시켜 토압을 지지하여 굴착된 터널의 형상을 유지하게 된다.In addition, as the concrete 6 is poured into the vertical beam 1 and the earth plate 2 in place of the belt 3 or the support 4, the bearing force of the vertical beam 1 and the earth plate 2 is increased. Supporting to maintain the shape of the excavated tunnel.

그러나 이러한 차수 및 흙막이 방식은 수직 빔(1)을 설치한 후, 일정 깊이 굴착이 이루어지고, 굴착된 외벽에 차수 그라우팅(5)과 토류판(2)이 순차적으로 설치된 다음, 토류판(2)의 내측으로 콘크리트(6)가 타설된다.However, in the order and the clogging method, after the vertical beam 1 is installed, excavation is carried out to a certain depth, and the order grouting 5 and the earth plate 2 are sequentially installed on the excavated outer wall, and then the inside of the earth plate 2. Concrete 6 is poured.

그리고 차수 및 흙막이가 마무리된 지반 하측으로 굴착한 후, 상기의 과정을 반복함에 따라 시공이 어려워 시공기간이 증가되는 문제점이 있다.
In addition, after excavating to the lower side of the ground and the degree of finishing the earthquake, there is a problem that the construction period is difficult to increase by repeating the above process.

이에 본 발명은 상기와 같은 문제점들을 해소하기 위해 안출된 것으로써, 수직갱을 굴착하기 위한 가상 설치라인을 따라 일정 간격으로 설치되는 다수의 H빔과 설치된 두 개의 H빔에 의해 가이드되며 압입되는 패널, 설치된 H빔과 패널 내측을굴착한 후, H빔과 패널을 덮도록 콘크리트가 타설되어 설치되는 토류벽 및 토류벽 설치 후, 패널을 인출하고, 인출된 공간에 뒷채움재가 충전됨에 따라 종래보다 간편하게 흙막이 시공을 할 수 있어 수직갱 굴착을 할 수 있음은 물론, 차수 시공 역시 용이하게 이루어져 시공기간을 단축하고, 비용을 감소시킬 수 있어 작업 효율을 향상시킬 수 있는 차수와 흙막이장치를 이용한 차수와 흙막이공법을 제공하는 것이 목적이다.
Accordingly, the present invention has been made to solve the above problems, the panel is guided and pressed by a plurality of H beams and two H beams installed at regular intervals along a virtual installation line for excavating a vertical shaft, After excavating the installed H-beam and the inside of the panel, after installing the earth-wall and the earth-wall installed with concrete to cover the H-beam and the panel, the panel is drawn out and the backfill is filled in the drawn space. As well as vertical rig excavation, the order construction is also easy to shorten the construction period and to reduce the cost, thereby providing the order and mud blocking method using the degree and mud block device which can improve the work efficiency. The purpose is.

상기 목적을 이루기 위한 본 발명은, 지중터널 굴착을 위해 수직갱을 굴착 시, 수직갱의 외측을 따라 차수 및 흙막이를 하고자 하는 위치에 가상 설치라인을 형성하는 설치라인 형성단계, 상기 설치라인을 따라 일정 간격으로 수직공을 천공하는 천공단계, 각각의 수직공에 H빔을 압입시켜 설치하되, H빔의 중간 가로대 양단에 각각 직교되도록 형성된 한 쌍의 세로대의 면이 수직갱의 내면과 굴착된 내부를 향하도록 설치되는 H빔 설치단계, 상기 압입 설치된 두 개의 H빔에 의해 양측부가 가이드되어 하측으로 다수의 패널을 압입 설치시키되, 상기 패널의 양측부 중앙 길이방향으로 가이드홈이 형성되어 상기 H빔의 세로대의 돌출된 단부에 끼워져 가이드되어 설치되며, 고압수 공급장치에 의해 패널의 하측 토사에 고압수를 분사하며 설치되는 패널 설치단계, 상기 H빔과 패널에 의해 구획된 지반을 굴착하여 수직갱을 굴착하는 굴착단계, 설치된 패널과 H빔을 덮도록 콘크리트를 타설하여 토류벽을 설치하는 토류벽 설치단계, 상기 토류벽 설치 후, 설치된 패널을 인발하여 제거하는 패널 제거단계, 및 상기 패널이 제거된 공간에 뒷채움재가 충진되는 뒷채움단계를 포함하여 이루어진다.The present invention for achieving the above object, when excavating a vertical shaft for underground tunnel excavation, the installation line forming step of forming a virtual installation line in the position to be ordered and earthed along the outside of the vertical shaft, a predetermined interval along the installation line In the drilling step of drilling the vertical hole, the H-beams are installed in each vertical hole, so that a pair of longitudinal surfaces formed to be orthogonal to both ends of the intermediate crossbars of the H-beams face the inner surface of the vertical shaft and the excavated interior. H-beam installation step is installed, both sides are guided by the press-installed two H-beams to press-install a plurality of panels to the lower side, the guide groove is formed in the longitudinal direction of the center of both sides of the panel is formed It is installed by being guided to the protruding end and installed by spraying high pressure water to the lower soil of the panel by the high pressure water supply device. Step, excavation step of excavating the vertical shaft by excavating the ground partitioned by the H beam and the panel, earth wall installation step of installing the earth wall by pouring concrete to cover the installed panel and the H beam, after installing the earth wall, the installed panel It comprises a panel removing step of drawing and removing, and a back filling step in which the back filling material is filled in the space from which the panel is removed.

바람직하게, 상기 패널 설치단계는, 선단 패널의 가이드홈이 상기 설치된 두 개의 H빔 세로대의 돌출된 단부에 끼워지도록 거치시키는 선단 패널 거치단계, 거치된 상기 선단 패널의 유입공 상단에 고압수 공급수단의 송수관을 연결하는 송수관 설치단계, 상기 고압수 공급수단에 의해 고압수가 선단 패널 하측 토사에 분사됨과 동시에 선단 패널을 하측으로 압입시키는 선단 패널 압입단계, 상기 선단 패널 상단부만 노출되도록 압입시킨 다음, 고압수 공급을 중단하여 상기 고압수 공급수단의 송수관을 분리하는 송수관 분리단계, 결합수단에 의해 선단 패널의 상측으로 연장 패널을 측방향으로 슬라이딩 결합하는 패널 결합단계, 상기 송수관이 패널의 유입공을 통과한 후, 상기 선단 패널의 유입공 상단에 송수관을 연결하는 송수관 재연결단계, 및 상기 고압수 공급수단에 의해 고압수가 선단 패널 하측 토사에 분사됨과 동시에 선단 패널과 연장 패널을 하측으로 압입시키는 패널 재압입단계를 포함하여 이루어지고, 상기 선단 패널이 수직갱의 저면까지 압입되도록, 상기 송수관 분리단계와 패널 결합단계, 송수관 재연결단계 및 패널 재압입단계가 반복된다.Preferably, the panel installation step, the end panel mounting step of mounting so that the guide groove of the front panel is fitted to the protruding end of the two H-beam longitudinals installed, high pressure water supply means on the top of the inlet hole of the mounted front panel A water pipe installation step for connecting a water pipe of the high pressure water supply means by the high pressure water is injected into the lower end of the front panel and the front panel press-in step to press the front panel downward, press-fitted so that only the top end of the front panel is exposed, Water supply pipe separation step of separating the water supply pipe of the high-pressure water supply means by stopping the water supply, panel joining step of slidingly coupling the extension panel to the upper side of the front panel by the coupling means, the water pipe passes through the inlet hole of the panel Then, the water pipe reconnection step for connecting the water pipe to the top of the inlet hole of the front panel, and the phase And a panel re-pressing step of pressurizing the tip panel and the extension panel downward while simultaneously pressurizing the tip panel and the extension panel downward by the high pressure water supply means by the high pressure water supply means, and the water supply pipe is press-fitted to the bottom of the vertical shaft. The separation step, panel joining step, water pipe reconnecting step and panel re-pressing step are repeated.

그리고 상기 패널 제거단계와 뒷채움단계는, 압입된 패널을 인발함과 동시에 패널의 유입공을 통해 뒷채움재를 공급하여 패널이 제거된 공간으로 뒷채움재가 충진된다.In the panel removing step and the back filling step, the back filling material is filled into the space where the panel is removed by supplying a back filling material through the inlet hole of the panel while drawing out the press-fitted panel.

또한, 상기 토류벽 설치단계에서 콘크리트 타설 시, 다수의 뒷채움공을 형성하고, 압입된 패널을 인발함과 동시에 상기 뒷채움공을 통해 뒷채움재를 공급하여 패널이 제거된 공간으로 뒷채움재가 충진된다.
In addition, when the concrete is poured in the earth wall installation step, a plurality of back-filling holes are formed, and the back-filling material is filled into the space from which the panel is removed by supplying a back-filling material through the back-filling hole while drawing a press-fitted panel.

상기한 바와 같이, 본 발명에 의한 차수와 흙막이장치를 이용한 차수와 흙막이공법에 의하면, H빔과 철판 패널을 이용하여 수직갱 굴착 시, 토압을 지지하여 흙이 수직갱으로 유입되는 것을 방지함은 물론, 토류벽을 용이하게 형성할 수 있으며, 패널을 제거함과 동시에 뒷채움재를 충진하여 수직갱 형상 유지는 물론, 차수 기능을 할 수 있어 종래보다 시공이 간단하고, 시공기간이 대폭 감소되어 작업비용은 물론 작업효율을 향상시킬 수 있게 하는 매우 유용하고 효과적인 발명이다.
As described above, according to the order and earth clogging method using the order and earth block device according to the present invention, when excavation of the vertical shaft using the H beam and the iron plate panel, supporting the earth pressure to prevent the soil from entering the vertical shaft, of course, The earth wall can be easily formed, and the panel can be removed and the backfill material can be filled to maintain the vertical shaft shape as well as the order function. Therefore, the construction is simpler than before. It is a very useful and effective invention that makes it possible to improve.

도 1은 종래 흙막이 공법을 도시한 도면이고,
도 2는 종래 차수와 흙막이 공법을 도시한 도면이며,
도 3은 본 발명에 따른 차수와 흙막이장치를 도시한 도면이고,
도 4는 본 발명에 따른 차수와 흙막이장치의 패널을 도시한 도면이며,
도 5는 본 발명에 따른 선단 패널을 도시한 도면이고,
도 6은 본 발명에 따른 차수와 흙막이장치의 결합수단을 도시한 도면이며,
도 7은 본 발명에 따른 다른 실시 예의 패널을 도시한 도면이고,
도 8은 도 7의 패널의 분해도를 도시한 도면이며,
도 9는 본 발명에 따른 차수와 흙막이공법의 순서도를 도시한 도면이고,
도 10은 본 발명에 따른 차수와 흙막이공법을 도시한 도면이며,
도 11은 본 발명에 따른 패널 설치단계의 순서도를 도시한 도면이고,
도 12는 본 발명에 따른 패널 설치단계를 도시한 도면이며,
도 13은 본 발명에 따른 패널 제거단계와 뒷채움단계를 도시한 도면이고,
도 14는 본 발명에 따른 다른 실시 예의 패널 제거단계와 뒷채움단계를 도시한 도면이다.
1 is a view showing a conventional earth film construction method,
Figure 2 is a view showing a conventional order and earth clogging method,
3 is a view showing the order and the earthenware apparatus according to the present invention,
4 is a view showing a panel of the order and earthenware apparatus according to the present invention,
5 is a view showing a front panel according to the present invention,
6 is a view showing a coupling means of the order and the earthenware device according to the present invention,
7 is a view showing a panel of another embodiment according to the present invention,
FIG. 8 is an exploded view of the panel of FIG. 7;
9 is a view showing a flowchart of the order and earth clogging method according to the invention,
10 is a view showing the degree and earth clogging method according to the invention,
11 is a view showing a flowchart of the panel installation step according to the present invention,
12 is a view showing a panel installation step according to the present invention,
FIG. 13 is a view illustrating a panel removing step and a back filling step according to the present invention;
14 is a view illustrating a panel removing step and a backfilling step according to another embodiment of the present invention.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 설명한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

또한, 본 실시 예는 본 발명의 권리범위를 한정하는 것은 아니고 단지 예시로 제시된 것이며, 그 기술적 요지를 이탈하지 않는 범위 내에서 다양한 변경이 가능하다.It should be noted that the present invention is not limited to the scope of the present invention but is only illustrative and various modifications are possible within the scope of the present invention.

도 3은 본 발명에 따른 차수와 흙막이장치를 도시한 도면이고, 도 4는 본 발명에 따른 차수와 흙막이장치의 패널을 도시한 도면이며, 도 5는 본 발명에 따른 선단 패널을 도시한 도면이고, 도 6은 본 발명에 따른 차수와 흙막이장치의 결합수단을 도시한 도면이며, 도 7은 본 발명에 따른 다른 실시 예의 패널을 도시한 도면이고, 도 8은 도 7의 패널의 분해도를 도시한 도면이며, 도 9는 본 발명에 따른 차수와 흙막이공법의 순서도를 도시한 도면이고, 도 10은 본 발명에 따른 차수와 흙막이공법을 도시한 도면이며, 도 11은 본 발명에 따른 패널 설치단계의 순서도를 도시한 도면이고, 도 12는 본 발명에 따른 패널 설치단계를 도시한 도면이며, 도 13은 본 발명에 따른 패널 제거단계와 뒷채움단계를 도시한 도면이고, 도 14는 본 발명에 따른 다른 실시 예의 패널 제거단계와 뒷채움단계를 도시한 도면이다.Figure 3 is a view showing the order and the mudguard device according to the invention, Figure 4 is a view showing a panel of the order and mudguard device according to the present invention, Figure 5 is a view showing a front panel according to the invention 6 is a view showing a coupling means of the order and the earthenware device according to the invention, Figure 7 is a view showing a panel of another embodiment according to the present invention, Figure 8 is an exploded view of the panel of Figure 7 9 is a view showing a flowchart of the order and earth clogging method according to the present invention, Figure 10 is a view showing the order and earth clogging method according to the present invention, Figure 11 is a panel installation step of the present invention 12 is a view illustrating a flowchart, FIG. 12 is a view illustrating a panel installation step according to the present invention, FIG. 13 is a view showing a panel removing step and a backfill step according to the present invention, and FIG. 14 is another view according to the present invention. Example panel A diagram illustrating a removal step and a backfill step.

도면에서 도시한 바와 같이, 차수와 흙막이장치(10)는 H빔(100)과 패널(200), 토류벽(300) 및 뒷채움재(400)로 구성된다.As shown in the figure, the order and the blocking device 10 is composed of the H beam 100 and the panel 200, the earth wall 300 and the backfill material (400).

H빔(100)은 지중터널 굴착을 위해 수직갱(40)을 굴착 시, 수직갱(40)의 외측을 따라 차수 및 흙막이를 하고자 하는 위치에 가상 설치라인(20)을 따라 일정 간격으로 다수 개 압입 설치된다.When the H beam 100 excavates the vertical shaft 40 for the underground tunnel excavation, a plurality of press-fits are installed at regular intervals along the virtual installation line 20 at positions to be ordered and blocked along the outside of the vertical shaft 40. do.

여기서, 가상 설치라인(20)은 원형이거나 타원형 또는 사각형 등 경우에 따라 다양하게 형성되는 것으로, 도 3에서는 일 실시 예로, 원형의 설치라인(20)에 대한 평면도와 단면도를 도시하였다.Here, the virtual installation line 20 is formed in a variety of cases, such as a circular, oval or square, in FIG. 3, in one embodiment, a plan view and a cross-sectional view of the circular installation line 20 is shown.

그리고 패널(200)은 압입 설치된 H빔(100) 중 인접한 두 개의 H빔(100)에 의해 양측부가 가이드되어 다수 개 압입 설치되는 것으로, 굴착되는 수직갱(40)의 저부까지 압입되도록 그 개수가 결정된다.In addition, the panel 200 has two side portions guided by two adjacent H beams 100 of the H-beams 100 which are press-fitted, and a plurality of panel 200 are press-installed. do.

토류벽(300)은 설치된 패널(200)과 H빔(100)을 덮도록 콘크리트를 타설하여 형성되는 것으로, H빔(100)과 패널(200)에 의해 구획된 내부를 굴착한 후, H빔(100)과 패널(200)을 덮도록 콘크리트를 타설하여 수직갱(40)의 내벽을 형성하게 된다.The earth wall 300 is formed by pouring concrete to cover the installed panel 200 and the H beam 100, and excavates the interior partitioned by the H beam 100 and the panel 200, and then the H beam ( Concrete is poured so as to cover 100 and the panel 200 to form an inner wall of the vertical shaft 40.

그리고 뒷채움재(400)는 토류벽(300) 설치 후, 설치된 패널(200)을 인발하여 제거한 다음, 패널(200)이 제거된 공간에 충진됨에 따라 토압을 지지하고, 차수기능을 하게 된다.After the earth fill material 300 is installed, the back filling material 400 is removed by removing the installed panel 200, and then supporting the earth pressure as the panel 200 is filled in the removed space, and serves as the order function.

이때, 도 3에서는 중심축을 기준으로, 패널(200)이 설치된 상태와 뒷채움재(400)가 충진된 상태로 도시하였다.In this case, in FIG. 3, the panel 200 is installed and the back filling material 400 is filled with reference to the central axis.

이에 따라, 굴착되는 수직갱(40)의 형상을 유지하고, 차수 및 흙막이가 이루어짐은 물론, 종래보다 시공이 간단하고, 시공기간이 단축되어 비용을 절감하며, 작업 효율을 향상시킬 수 있다.
Accordingly, the shape of the vertical shaft 40 to be excavated can be maintained, and the order and the earthenware can be made, as well as the construction is simpler than before, the construction period can be shortened, the cost can be reduced, and the work efficiency can be improved.

이를 위한 패널(200)은 도 4 내지 5에서 도시한 바와 같이, 일정 두께를 갖는 철판으로 형성되어 양측부 중앙 길이방향을 따라 가이드홈(212, 222)이 형성되고, 내부에 상하방향으로 유입공(214, 224)이 형성된다.For this purpose, the panel 200 is formed of an iron plate having a predetermined thickness, as shown in FIGS. 214 and 224 are formed.

이때, 유입공(214, 224)을 통해 고압수를 분사하도록 고압수 공급수단(500)이 구비되어 패널(200)의 압입 시, 패널(200)의 하측 지반으로 고압수를 분사함에 따라 패널(200)을 용이하게 압입시킬 수 있다.
At this time, the high pressure water supply means 500 is provided to inject the high pressure water through the inlet hole (214, 224) when the panel 200 is pressed, the high pressure water is injected into the lower ground of the panel 200, the panel ( 200 can be easily pressed in.

이러한 패널(200)은 선단 패널(210)과 연장 패널(220)로 구성되며, 선단 패널(210)은 패널(200) 중 선단에 위치되는 것으로, 하단부는 양측단부에서 중앙부로 갈수록 하향경사지게 돌출형성된다.The panel 200 is composed of a front panel 210 and an extension panel 220, the front panel 210 is located at the front end of the panel 200, the lower end protrudes downward from both side ends toward the center. do.

그리고 연장 패널(220)은 선단 패널(210)의 상측으로 적층되어 선단 패널(210)고 함께 H빔(100)을 따라 압입된다.The extension panel 220 is stacked above the leading panel 210 and pressed together along the H beam 100 with the leading panel 210.

이 연장 패널(220)의 유입공(224)은 선단 패널(210)의 유입공(214)보다 직경이 크게 형성되어 고압수 공급수단(500)의 송수관(510)이 관통된 후, 선단 패널(210)의 유입공(214) 상단부에서 탈부착된다.
The inlet hole 224 of the extension panel 220 has a diameter larger than that of the inlet hole 214 of the tip panel 210 so that the water pipe 510 of the high pressure water supply unit 500 passes therethrough, and then the tip panel ( Detachable from the upper end of the inlet hole 214 of 210.

이때, 도 5에서 도시한 바와 같이, 선단 패널(210)의 유입공(214)은 하단부가 다수 개로 분기됨에 따라 공급된 고압수를 다수의 각도로 분사시켜 선단 패널(210) 또는 연장 패널(220)이 결합된 선단 패널(210)을 용이하게 압입시킬 수 있다.
At this time, as shown in Figure 5, the inlet hole 214 of the tip panel 210 is sprayed at a plurality of angles of the supplied high pressure water as the lower end is divided into a plurality of front panel 210 or extension panel 220 ) Can be easily press-fit the combined front panel (210).

그리고 도 6에서 도시한 바와 같이, 패널(200)은 결합수단(600)에 의해 상호 결합되는 것으로, 이 결합수단(600)은 제1결합수단(610)과 제2결합수단(620)으로 구성된다.And, as shown in Figure 6, the panel 200 is coupled to each other by the coupling means 600, the coupling means 600 is composed of the first coupling means 610 and the second coupling means (620) do.

먼저, 제1결합수단(610)은 제1결합돌출부(612)와 제1연장돌출부(613), 제1결합홈부(614) 및 제1연장홈부(615)로 구성된다.First, the first coupling means 610 is composed of a first coupling protrusion 612, the first extension protrusion 613, the first coupling groove 614 and the first extension groove 615.

제1결합돌출부(612)는 어느 하나의 패널 상단면의 전측단부에서 상측으로 연장 형성되되, 상단부 후면부가 패널의 두께 중간부에 위치되도록 돌출된다.The first coupling protrusion 612 extends upward from the front end of any one panel top surface, and protrudes so that the rear end of the top portion is positioned at the middle portion of the panel thickness.

그리고 제1연장돌출부(613)는 제1결합돌출부(612)의 상측으로 연장 돌출되고, 제1결합홈부(614)는 제1결합돌출부(612)의 하측에 형성되며, 제1연장홈부(615)는 제1결합홈부(614)의 하측으로 연장 함몰된다.
The first extension protrusion 613 extends and protrudes upward from the first coupling protrusion 612, and the first coupling groove 614 is formed below the first coupling protrusion 612 and the first extension groove 615. ) Is recessed extending downward of the first coupling groove 614.

제2결합수단(620)은 제2결합돌출부(622)와 제2연장돌출부(623), 제2결합홈부(624) 및 제2연장홈부(625)로 구성된다.The second coupling means 620 includes a second coupling protrusion 622, a second extension protrusion 623, a second coupling groove 624, and a second extension groove 625.

제2결합돌출부(622)는 다른 하나의 패널 하단면에 우측단부에서 하측으로 연장 형성되되, 하단부 전면부가 제1결합홈부(614)에 끼워되도록 돌출된다.The second coupling protrusion 622 extends downward from the right end to the other bottom surface of the other panel, and protrudes so that the bottom front part is fitted into the first coupling groove 614.

그리고 제2연장돌출부(623)는 제1연장홈부(615)에 끼워지도록 제2결합돌출부(622)의 하측으로 연장 돌출되고, 제2결합홈부(624)는 제1결합돌출부(612)가 끼워지도록 제2결합돌출부(622)의 상측에 형성된다.The second extension protrusion 623 extends downward from the second coupling protrusion 622 so as to fit into the first extension groove 615, and the first coupling protrusion 612 is fitted into the second coupling groove 624. It is formed on the upper side of the second coupling protrusion 622.

제2연장홈부(625)는 제1연장돌출부(613)가 끼워지도록 제2결합홈부(624)의 상측으로 연장 함몰된다.
The second extension groove 625 is recessed extending upward of the second coupling groove 624 so that the first extension protrusion 613 is fitted.

이와 같이, 형성된 제1결합수단(610)과 제2결합수단(620)은 상호 측방향으로 슬라이딩되어 결합 또는 분리됨에 따라, 적층되는 두 개의 패널을 상호 결합 또는 분리시킬 수 있고, 결합 시, 결합력을 향상시켜 용이하게 압입이나 인출시킬 수 있다.
As such, the formed first coupling means 610 and the second coupling means 620 are laterally slid to each other to be coupled or separated, so that the two stacked panels can be mutually coupled or separated, and when coupled, It can improve pressurization and it can be easily press-fitted or taken out.

한편, 도 7 내지 도 8에서 도시한 바와 같이, 다른 실시 예의 패널(200')은 제1패널(210')과 수직판(220'), 수평판(230'), 돌출키(240'), 제2패널(250') 및 유입관(260')으로 구성된다.7 to 8, the panel 200 ′ according to another embodiment includes the first panel 210 ′, the vertical plate 220 ′, the horizontal plate 230 ′, and the protruding key 240 ′. , The second panel 250 'and the inlet pipe 260'.

제1패널(210')은 일정 두께를 갖는 철판으로 형성되고, 수직판(220')은 제1패널(210')의 양측단부와 평행하도록 수직방향으로 다수 개 구비되되, 제1패널(210')의 양측단부와 일정거리 이격되게 설치된다.The first panel 210 'is formed of an iron plate having a predetermined thickness, and a plurality of vertical plates 220' are provided in the vertical direction so as to be parallel to both end portions of the first panel 210 ', and the first panel 210 It is installed at a certain distance from both ends of ').

그리고 수평판(230')은 수직판(220')과 직각을 이루도록 제1패널(210')의 폭방향과 평행하게 다수 개 구비되고, 돌출키(240')는 수직판(220')과 수평판(230')의 직교되는 부위에 구비되어 수직판(220')과 수평판(230')보다 돌출된다.In addition, a plurality of horizontal plates 230 ′ are provided in parallel with the width direction of the first panel 210 ′ to form a right angle with the vertical plate 220 ′, and the protruding keys 240 ′ are provided with the vertical plate 220 ′. It is provided at a portion orthogonal to the horizontal plate 230 'and protrudes from the vertical plate 220' and the horizontal plate 230 '.

제2패널(250')은 제1패널(210')과 대응되도록 형성되며, 돌출키(240')가 끼워지도록 다수의 키구멍(252')이 형성되어 상호 끼워져 결합된다.The second panel 250 ′ is formed to correspond to the first panel 210 ′, and a plurality of key holes 252 ′ are formed to be fitted with the protruding key 240 ′ and are fitted to each other.

또한 유입관(260')은 고압수 공급수단(500)에서 공급되는 고압수가 내부를 통과하여 하측으로 분사됨에 따라 패널(200')을 하측으로 용이하게 압입시킬 수 있다.In addition, the inlet pipe 260 ′ can easily press-fit the panel 200 ′ as the high pressure water supplied from the high pressure water supply unit 500 is injected downward through the inside.

이러한 패널(200')은 내부에 다수의 수직판(220')과 수평판(230')이 설치되되, 설치되지 않는 곳은 빈 공간이기 때문에 사용되는 재료의 량을 감소시켜 비용을 절감시키고, 무게를 감소시킬 수 있다.The panel 200 'has a plurality of vertical plates 220' and horizontal plates 230 'installed therein, but since it is not installed in an empty space, the panel 200' reduces costs by reducing the amount of materials used, Can reduce weight.

그리고 제1패널(210')과 수직판(220'), 수평판(230'), 돌출키(240'), 제2패널(250') 및 유입관(260')은 용접에 의해 접합됨이 바람직하다.
The first panel 210 'and the vertical plate 220', the horizontal plate 230 ', the protruding key 240', the second panel 250 'and the inlet pipe 260' are joined by welding. This is preferred.

또한 패널(200)이 제거된 공간에 채워지는 뒷채움재(400)는 강모래와 시멘트 및 흙 중 어느 하나 이상이며, 패널(200)의 유입공(214)을 통해 빈 공간부로 충진되거나 토류벽(300) 타설 시, 다수의 뒷채움공(410)을 형성하고, 이 뒷채움공(410)을 통해 뒷채움재(400)를 충진할 수 있다.
In addition, the backfill material 400 which is filled in the space in which the panel 200 is removed is at least one of steel sand, cement and soil, and is filled into the empty space through the inlet hole 214 of the panel 200 or the earth wall 300. When pouring, a plurality of backfill holes 410 are formed, and the backfill material 400 may be filled through the backfill holes 410.

이러한 차수와 흙막이장치(10)를 이용한 차수와 흙막이공법을 살펴보면, 도 9 내지 도 10에서 도시한 바와 같이, 설치라인 형성단계(S10)와 천공단계(S20), H빔 설치단계(S30), 패널 설치단계(S40), 굴착단계(S50), 토류벽 설치단계(S60), 패널 제거단계(S70) 및 뒷채움단계(S80)로 구성된다.Looking at the order and the clogging method using the order and the clogging device 10, as shown in Figure 9 to 10, the installation line forming step (S10) and the drilling step (S20), H beam installation step (S30), Panel installation step (S40), excavation step (S50), earth wall installation step (S60), the panel removal step (S70) and the back filling step (S80).

먼저, 설치라인 형성단계(S10)는 지중터널 굴착을 위해 수직갱(40)을 굴착 시, 수직갱(40)의 외측을 따라 차수 및 흙막이를 하고자 하는 위치에 가상 설치라인(20)을 형성하게 된다.First, the installation line forming step (S10) is to form a virtual installation line 20 at the position to be ordered and clogs along the outside of the vertical shaft 40 when excavating the vertical shaft 40 for underground tunnel excavation.

그리고 천공단계(S20)는 설치라인(20)을 따라 일정 간격으로 수직공(30)을 천공하고, H빔 설치단계(S30)는 각각의 수직공(30)에 H빔(100)을 압입시켜 설치하되, H빔(100)의 중간 가로대 양단에 각각 직교되도록 형성된 한 쌍의 세로대의 면이 수직갱(40)의 내면과 굴착된 내부를 향하도록 설치된다.And the drilling step (S20) is to drill the vertical hole 30 at regular intervals along the installation line 20, H beam installation step (S30) by pressing the H beam 100 in each vertical hole (30) Although installed, the pair of longitudinal surfaces formed so as to be orthogonal to both ends of the intermediate crossbar of the H beam 100 is installed to face the inner surface of the vertical shaft 40 and excavated inside.

패널 설치단계(S40)는 압입 설치된 두 개의 H빔(100)에 의해 양측부가 가이드되어 하측으로 다수의 패널(200)을 압입 설치시키되, 패널(200)의 양측부 중앙 길이방향으로 가이드홈(212, 222)이 형성되어 H빔(100)의 세로대의 돌출된 단부에 끼워져 가이드되어 설치되며, 고압수 공급장치(500)에 의해 패널(200)의 하측 토사에 고압수를 분사하며 설치하게 된다.Panel installation step (S40) is guided by the two H-beams 100 installed by pressing the two sides are installed to press-install a plurality of panels 200 to the lower side, the guide groove 212 in the central longitudinal direction of both sides of the panel 200 , 222 is formed is inserted into the protruding end of the vertical longitudinal of the H beam 100 is guided and installed, and the high-pressure water supply device 500 is installed by spraying high-pressure water to the bottom soil of the panel 200.

굴착단계(S50)는 다수의 H빔(100)과 다수의 패널(200)이 설치된 후, H빔(100)과 패널(200)에 의해 구획된 지반(토사)을 굴착하여 수직갱(40)을 굴착하게 된다.In the excavation step (S50) after the plurality of H beams 100 and the plurality of panels 200 are installed, excavating the ground (soil) partitioned by the H beam 100 and the panel 200 to excavate the vertical shaft 40 Will be excavated.

토류벽 설치단계(S60)는 H빔(100)과 패널(200)에 의해 구획된 내부가 굴착된 후, H빔(100)과 패널(200)을 덮도록 콘크리트를 타설하여 토류벽(300)을 설치한다.In the earth wall installation step (S60), after the interior partitioned by the H beam 100 and the panel 200 is excavated, the earth wall 300 is installed by pouring concrete to cover the H beam 100 and the panel 200. do.

패널 제거단계(S70)는 토류벽(300) 설치 후, 설치된 패널(200)을 인발하여 제거하게 되고, 뒷채움단계(S80)는 패널(200)이 제거된 공간에 뒷채움재(400)가 충진됨에 따라 시공이 마무리된다.
The panel removing step (S70) is removed by removing the installed panel 200 after the earth wall 300 is installed, the backfilling step (S80) as the backfill material 400 is filled in the space in which the panel 200 is removed Construction is finished.

여기서, 도 11 내지 도 12에서 도시한 바와 같이, 패널 설치단계(S40)를 자세히 살펴보면, 선단 패널 거치단계(S41)과 송수관 설치단계(S42), 선단 패널 압입단계(S43), 송수관 분리단계(S44), 패널 결합단계(S45), 송수관 재연결단계(S46) 및 패널 재압입단계(S46)로 구성된다.Here, as shown in Figures 11 to 12, when looking at the panel installation step (S40) in detail, the front panel mounting step (S41) and the water pipe installation step (S42), the front panel pressing step (S43), the water pipe separation step ( S44), the panel coupling step (S45), water pipe reconnection step (S46) and the panel re-pressing step (S46).

선단 패널 거치단계(S41)는 선단 패널(210)의 가이드홈(212)이 설치된 두 개의 H빔(100) 세로대의 돌출된 단부에 끼워지도록 거치시킨다.The front panel mounting step (S41) is mounted so that the guide grooves 212 of the front panel 210 is fitted to the protruding ends of the two H beam 100 vertical.

그리고 송수관 설치단계(S42)는 거치된 선단 패널(210)의 유입공(214) 상단에 고압수 공급수단(500)의 송수관(510)을 연결한다.And the water pipe installation step (S42) is connected to the water pipe 510 of the high pressure water supply means 500 on top of the inlet hole 214 of the mounted front panel 210.

선단 패널 압입단계(S43)는 고압수 공급수단(500)에 의해 고압수가 선단 패널(210) 하측 토사에 분사됨과 동시에 선단 패널(210)을 하측으로 압입시키게 된다.In the front panel press-fitting step (S43), the high pressure water is injected into the earth and sand under the front panel 210 by the high pressure water supply unit 500 and simultaneously press-fits the front panel 210 downward.

송수관 분리단계(S44)는 선단 패널(210) 상단부만 노출되도록 압입시킨 다음, 고압수 공급을 중단하여 고압수 공급수단(500)의 송수관(510)을 분리한다.Water pipe separation step (S44) is press-fitted so that only the upper end of the front panel 210 is exposed, and then the high pressure water supply is stopped to separate the water pipe 510 of the high pressure water supply means (500).

그리고 패널 결합단계(S45)는 결합수단(600)에 의해 선단 패널(210)의 상측으로 연장 패널(220)을 측방향으로 슬라이딩 결합하게 된다.In the panel coupling step S45, the extension panel 220 is slidably coupled to the upper side of the front panel 210 by the coupling unit 600 in the lateral direction.

송수관 재연결단계(S46)는 송수관(510)이 결합수단(600)에 의해 선단 패널(210)에 결합된 연장 패널(220)의 유입공(224)을 통과한 후, 선단 패널(210)의 유입공(214) 상단에 송수관(510)을 연결하여 고압수를 분사할 수 있도록 한다.Water pipe reconnection step (S46) after the water pipe 510 passes through the inlet hole 224 of the extension panel 220 coupled to the front panel 210 by the coupling means 600, of the front panel 210 The water supply pipe 510 is connected to the top of the inlet hole 214 to inject high pressure water.

패널 재압입단계(S46)는 고압수 공급수단(500)에 의해 고압수가 선단 패널(210) 하측 토사에 분사됨과 동시에 선단 패널(210)과 연장 패널(220)을 하측으로 압입시키게 된다.In the panel repressurization step (S46), the high pressure water is injected into the earth and sand under the front panel 210 by the high pressure water supply unit 500 and simultaneously presses the front panel 210 and the extension panel 220 downward.

그리고 다시, 송수관 분리단계(S44), 패널 결합단계(S45), 송수관 재연결단계(S46) 및 패널 재압입단계(S46)가 반복되되, 선단 패널(210)이 수직갱(40)의 저면까지 압입 설치될 때까지 반복하는 것이다.
And again, the water pipe separation step (S44), the panel coupling step (S45), the water pipe reconnection step (S46) and the panel re-pressing step (S46) is repeated, the front panel 210 is press-fitted to the bottom of the vertical shaft 40 Repeat until it is installed.

또한 도 13에서 도시한 바와 같이, 패널 제거단계(S70)와 뒷채움단계(S80)는 압입된 패널(200)을 인발함과 동시에 패널(200)의 유입공(214, 224)을 통해 뒷채움재(400)를 공급하여 패널(200)이 제거된 공간으로 뒷채움재(400)가 충진된다.
In addition, as shown in FIG. 13, the panel removing step S70 and the back filling step S80 draw back the press-fitted panel 200 and at the same time the back filling material through the inlet holes 214 and 224 of the panel 200. The backfill material 400 is filled into the space where the panel 200 is removed by supplying 400.

한편, 도 14에서 도시한 바와 같이, 다른 실시 예의 패널 제거단계(S70)와 뒷채움단계(S80)는 토류벽 설치단계(S60)에서 콘크리트 타설 시, 다수의 뒷채움공(410)을 형성하고, 압입된 패널(200)을 인발함과 동시에 뒷채움공(410)을 통해 뒷채움재(400)를 공급하여 패널(200)이 제거된 공간으로 뒷채움재(400)가 충진될 수도 있다.
On the other hand, as shown in Figure 14, the panel removing step (S70) and the back filling step (S80) of another embodiment, when the concrete is poured in the earth wall installation step (S60), forms a plurality of back-filling holes 410, press-fitted The back fill material 400 may be filled into the space from which the panel 200 is removed by supplying the back fill material 400 through the back fill hole 410 while drawing the panel 200.

10 : 차수와 흙막이장치 20 : 설치라인
30 : 수직공 40 : 수직갱
100 : H빔 200, 200' : 패널
210 : 선단 패널 220 : 연장 패널
212, 222 : 가이드홈 214, 224 : 유입공
300 : 토류벽 400 : 뒷채움재
500 : 고압수 공급수단 510 : 송수관
600 : 결합수단 610 : 제1결합수단
620 : 제2결합수단
10: order and earth block device 20: installation line
30: vertical hole 40: vertical shaft
100: H beam 200, 200 ': panel
210: tip panel 220: extension panel
212, 222: guide grooves 214, 224: inlet hole
300: earth wall 400: backfill
500: high pressure water supply means 510: water pipe
600: coupling means 610: first coupling means
620: second coupling means

Claims (4)

지중터널 굴착을 위해 수직갱을 굴착 시, 수직갱의 외측을 따라 차수 및 흙막이를 하고자 하는 위치에 가상 설치라인을 형성하는 설치라인 형성단계;
상기 설치라인을 따라 일정 간격으로 수직공을 천공하는 천공단계;
각각의 수직공에 H빔을 압입시켜 설치하되, H빔의 중간 가로대 양단에 각각 직교되도록 형성된 한 쌍의 세로대의 면이 수직갱의 내면과 굴착된 내부를 향하도록 설치되는 H빔 설치단계;
상기 압입 설치된 두 개의 H빔에 의해 양측부가 가이드되어 하측으로 다수의 패널을 압입 설치시키되, 상기 패널의 양측부 중앙 길이방향으로 가이드홈이 형성되어 상기 H빔의 세로대의 돌출된 단부에 끼워져 가이드되어 설치되며, 고압수 공급장치에 의해 패널의 하측 토사에 고압수를 분사하며 설치되는 패널 설치단계;
상기 H빔과 패널에 의해 구획된 지반을 굴착하여 수직갱을 굴착하는 굴착단계;
설치된 패널과 H빔을 덮도록 콘크리트를 타설하여 토류벽을 설치하는 토류벽 설치단계;
상기 토류벽 설치 후, 설치된 패널을 인발하여 제거하는 패널 제거단계; 및
상기 패널이 제거된 공간에 뒷채움재가 충진되는 뒷채움단계를 포함하여 이루어지고,
상기 패널 설치단계는,
선단 패널의 가이드홈이 상기 설치된 두 개의 H빔 세로대의 돌출된 단부에 끼워지도록 거치시키는 선단 패널 거치단계;
거치된 상기 선단 패널의 유입공 상단에 고압수 공급수단의 송수관을 연결하는 송수관 설치단계;
상기 고압수 공급수단에 의해 고압수가 선단 패널 하측 토사에 분사됨과 동시에 선단 패널을 하측으로 압입시키는 선단 패널 압입단계;
상기 선단 패널 상단부만 노출되도록 압입시킨 다음, 고압수 공급을 중단하여 상기 고압수 공급수단의 송수관을 분리하는 송수관 분리단계;
결합수단에 의해 선단 패널의 상측으로 연장 패널을 측방향으로 슬라이딩 결합하는 패널 결합단계;
상기 송수관이 패널의 유입공을 통과한 후, 상기 선단 패널의 유입공 상단에 송수관을 연결하는 송수관 재연결단계; 및
상기 고압수 공급수단에 의해 고압수가 선단 패널 하측 토사에 분사됨과 동시에 결합된 선단 패널과 연장 패널을 하측으로 압입시키는 패널 재압입단계를 포함하여 이루어지고,
상기 선단 패널이 수직갱의 저면까지 압입되도록, 상기 송수관 분리단계와 패널 결합단계, 송수관 재연결단계 및 패널 재압입단계가 반복되는 것을 특징으로 하는 차수와 흙막이장치를 이용한 차수와 흙막이공법.
An installation line forming step of forming a virtual installation line at a position to be ordered and clogs along the outside of the vertical shaft when excavating the vertical shaft for underground tunnel drilling;
A perforating step of perforating vertical holes at predetermined intervals along the installation line;
An H-beam installation step of pressing each H-beam into each vertical hole, wherein the pair of longitudinal bars formed to be orthogonal to both ends of the intermediate crossbars of the H-beams are installed to face the inner surface of the vertical shaft and the excavated interior;
Both side portions are guided by two press-fitted H beams, and a plurality of panels are press-fitted downward, and guide grooves are formed in the longitudinal direction of the center of both sides of the panel, and are guided by being inserted into the protruding end portions of the H beams. It is installed, the panel installation step is installed by injecting high pressure water to the bottom soil of the panel by the high pressure water supply device;
An excavating step of digging a vertical shaft by digging the ground partitioned by the H beam and the panel;
An earth wall installation step of installing the earth wall by pouring concrete to cover the installed panel and the H beam;
A panel removing step of drawing and removing the installed panel after the earth wall is installed; And
It comprises a back filling step of filling the back filling material in the space from which the panel is removed,
The panel installation step,
A front panel mounting step of mounting the guide grooves of the front panel so as to be fitted to the protruding ends of the two H beam longitudinals;
A water pipe installation step of connecting a water pipe of the high pressure water supply unit to an upper end of the inlet hole of the front panel;
A tip panel press fitting step of pressurizing the tip panel downward while the high pressure water is injected to the bottom soil of the tip panel by the high pressure water supply means;
A water pipe separating step of pressing the exposed end portion of the front panel to stop the high pressure water supply and separating the water supply pipe of the high pressure water supply means;
A panel coupling step of slidingly coupling the extension panel to the upper side of the front panel by the coupling means;
A water pipe reconnection step of connecting the water pipe to an upper end of the inflow hole of the front panel after the water pipe passes through the inflow hole of the panel; And
And a panel re-pressing step of pressurizing the tip panel and the extension panel which are combined with the high pressure water by means of the high pressure water supplying means and sprayed onto the bottom soil of the front panel.
The water line and earth screening method using the water line and mud screen device, characterized in that the water pipe separation step, the panel coupling step, the water pipe reconnection step and the panel re-pressing step is repeated so that the front panel is press-fitted to the bottom of the vertical shaft.
삭제delete 제1항에 있어서, 상기 패널 제거단계와 뒷채움단계는,
압입된 패널을 인발함과 동시에 패널의 유입공을 통해 뒷채움재를 공급하여 패널이 제거된 공간으로 뒷채움재가 충진되는 것을 특징으로 하는 차수와 흙막이장치를 이용한 차수와 흙막이공법.
The method of claim 1, wherein the removing panel and backfilling step,
A drawer and mud-blocking method using a drawer and mudstone device, characterized in that the back-filler is filled into the space from which the panel is removed by drawing the press-fitted panel and supplying the back-filler through the inlet hole of the panel.
제1항에 있어서,
상기 토류벽 설치단계에서 콘크리트 타설 시, 다수의 뒷채움공을 형성하고,
압입된 패널을 인발함과 동시에 상기 뒷채움공을 통해 뒷채움재를 공급하여 패널이 제거된 공간으로 뒷채움재가 충진되는 것을 특징으로 하는 차수와 흙막이장치를 이용한 차수와 흙막이공법.
The method of claim 1,
When pouring concrete in the earth wall installation step, form a plurality of back-filled holes,
Drawing and press-fitting the panel and at the same time supplying the back filling material through the back filling hole is the order and earth blocking method using the order and occupant, characterized in that the back filling material is filled into the space in which the panel is removed.
KR1020130025841A 2013-03-11 2013-03-11 Water-proof and retaining method KR101327172B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130025841A KR101327172B1 (en) 2013-03-11 2013-03-11 Water-proof and retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130025841A KR101327172B1 (en) 2013-03-11 2013-03-11 Water-proof and retaining method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020110075238A Division KR101293329B1 (en) 2011-07-28 2011-07-28 Water-proof and retaining structure and method

Publications (2)

Publication Number Publication Date
KR20130030287A KR20130030287A (en) 2013-03-26
KR101327172B1 true KR101327172B1 (en) 2013-11-06

Family

ID=48179876

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130025841A KR101327172B1 (en) 2013-03-11 2013-03-11 Water-proof and retaining method

Country Status (1)

Country Link
KR (1) KR101327172B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2656399C1 (en) * 2017-01-17 2018-06-05 Общество с ограниченной ответственностью Научно-производственное предприятие "Норд-инжиниринг" (ООО НПП "Норд-инжиниринг") Method of construction of the port hydraulic structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10195865A (en) * 1997-01-10 1998-07-28 Taisei Corp Method for constructing continuous underground wall, and press fitting plate
KR20080026014A (en) * 2006-09-19 2008-03-24 주식회사 영창토건 Establishment method of soil guard structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10195865A (en) * 1997-01-10 1998-07-28 Taisei Corp Method for constructing continuous underground wall, and press fitting plate
KR20080026014A (en) * 2006-09-19 2008-03-24 주식회사 영창토건 Establishment method of soil guard structure

Also Published As

Publication number Publication date
KR20130030287A (en) 2013-03-26

Similar Documents

Publication Publication Date Title
KR101173045B1 (en) Earth retaining-cum-retaining wall, and construction method thereof
EP2064392A1 (en) Soil guard structure and establishment method
KR101057680B1 (en) Soil retaining wall and construction method of reuse and reinforcement steel panel
KR20100068597A (en) A shoring method using arch plate pile and h-pile
KR20170005991A (en) soil retaining wall using PHC pile and its construction method
KR20140055639A (en) A execution method of architecture beam
KR101793037B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR101065017B1 (en) A shoring method using arch plate pile and H-Pile
KR100375020B1 (en) a pole for mud wall and constrution method of fence for mud
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR101381325B1 (en) The non-open cut tunnel construction method using the multistage small diameter steel pipe
JP5351125B2 (en) Open shield machine start method of open shield method
KR101386275B1 (en) Reformed sheet plate and the method of installation of the same
KR101327172B1 (en) Water-proof and retaining method
KR101293329B1 (en) Water-proof and retaining structure and method
JP4782227B2 (en) Retaining wall structure
KR102072889B1 (en) Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
JP2009235807A (en) Dismantling and removal construction method of underground structure
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
KR100401330B1 (en) A method of construction for earth-protection walls of building
KR101732497B1 (en) Method for building a retaining wall
KR20200011637A (en) Casing used in cip method, temporary earth retaining structure and construction method of earth retaining structure
JPH11190024A (en) Earth retaining work

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161004

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20171011

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180920

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20191016

Year of fee payment: 7