KR101297706B1 - Construction method for prestressed girder using jack-up beam - Google Patents

Construction method for prestressed girder using jack-up beam Download PDF

Info

Publication number
KR101297706B1
KR101297706B1 KR1020130007398A KR20130007398A KR101297706B1 KR 101297706 B1 KR101297706 B1 KR 101297706B1 KR 1020130007398 A KR1020130007398 A KR 1020130007398A KR 20130007398 A KR20130007398 A KR 20130007398A KR 101297706 B1 KR101297706 B1 KR 101297706B1
Authority
KR
South Korea
Prior art keywords
girder
jack
bracket
prestress
construction method
Prior art date
Application number
KR1020130007398A
Other languages
Korean (ko)
Inventor
박정환
Original Assignee
박정환
대영스틸산업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박정환, 대영스틸산업주식회사 filed Critical 박정환
Priority to KR1020130007398A priority Critical patent/KR101297706B1/en
Application granted granted Critical
Publication of KR101297706B1 publication Critical patent/KR101297706B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal
    • E01D2101/32Metal prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A construction method of a prestressed girder using a jack-up beam is provided to shorten a construction period by introducing prestress during the construction of a girder and to facilitate the control of the size of the prestress. CONSTITUTION: A construction method of a prestressed girder using a jack-up beam comprises the following steps: preparing a girder (300) equipped with a first bracket (310) in both lower ends of a lower flange; joining a jack-up beam (400) to the girder which comprises a second bracket (410) at both upper ends of an upper flange and a jack (420) on the upper center of the upper flange by connecting the first and second bracket; jacking up the jack, introducing prestress, and rigid-joining the girder to the abutment (500) of a bridge; and separating the jack-up beam from the girder.

Description

잭업용 빔을 이용한 프리스트레스트 거더의 시공방법{Construction method for prestressed girder using jack-up beam}Construction method for prestressed girder using jack-up beam}

본 발명은 잭업(Jack-up)용 빔을 이용한 프리스트레스트 거더의 시공방법에 관한 것으로서, 보다 상세하게는 별도의 복잡한 프리스트레싱 과정을 거치지 않고, 거더를 교량의 교대 상에 시공해주는 과정 중에 프리스트레스를 도입할 수 있는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법에 관한 것이다.
The present invention relates to a method for constructing a prestress girder using a jack-up beam, and more particularly, to introduce a prestress during a process of constructing a girder on a bridge alternately without going through a separate complicated prestressing process. It is related with the construction method of the prestress girder which can use the jackup beam.

도로 및 하천을 횡단하는 교량의 건설시에는 교량 하부공간의 이용과 경제성을 고려하여 장경간을 실현할 수 있는 구조가 요구되는데, 이를 위하여 프리스트레스가 도입된 거더를 많이 사용하게 된다. In the construction of bridges crossing roads and rivers, a structure capable of realizing long spans in consideration of the use and economical efficiency of the bridge sub-space is required. For this, many girders in which prestresses are introduced are used.

거더에 프리스트레스를 도입하는 대표적인 방법 중 하나로, 철골빔에 하중을 재하한 상태에서 하중 재하에 의해 압축된 플랜지 측에 콘크리트를 타설·양생함으로써 압축력을 유지시켜 프리플렉스 합성빔을 형성시키는 방법이 있는데, 상기 프리플렉스 합성빔은 솟음이 형성된 철골보의 제작, 철골보에 하중 재하, 철골보의 하부 플랜지에 케이싱 콘크리트 타설·양생, 재하한 하중의 제거 등의 단계에 따라 제작되므로 그 제작과정이 복잡하고 별도의 넓은 작업장을 필요로 한다.One of the typical methods of introducing prestress to the girder is to form a preflex composite beam by maintaining the compressive force by placing and curing concrete on the flange side compressed by the load while the steel beam is loaded. The preflex composite beam is manufactured in accordance with the steps of fabricating the steel beams with the rise, loading the steel beams, placing and curing casing concrete on the lower flange of the steel beams, removal of the loads, etc. Needs a workshop.

이러한 문제점을 해결하기 위하여, 도 1에 도시된 등록번호 10-1178876의 '프리스트레스트 강합성 라멘교 시공방법'에서는, 공장에서 미리 제작된 강재빔(100)의 중앙부(C)에 인양고리 등을 달아 인양시킴으로써 인양하중(P)에 의해 상방으로 만곡되어 프리스트레스가 도입된 강재빔(100)을, 교량의 하부구조인 벽체부(200)의 상부에 설치되어 있는 상부면이 외측으로 경사지게 제작된 단부연결강재(210)에 강결시켜 도입된 프리스트레스가 강재빔(100)에 그대로 유지될 수 있도록 하였다.In order to solve this problem, in the 'prestressed composite ramen bridge construction method' of the registration number 10-1178876 shown in Figure 1, the lifting ring and the like in the central portion (C) of the steel beam 100 prepared in advance in the factory The end of the steel beam 100, which is bent upward by the lifting load P and introduced with the pre-stress by the lifting load, is inclined outward from the upper surface installed on the upper part of the wall portion 200, which is the lower structure of the bridge. The prestress introduced by hardening the connection steel 210 can be maintained in the steel beam 100 as it is.

이러한 프리스트레스트 강재빔(100)은 시공과정에서 자연스럽게 제작될 수 있어, 프리스트레스 도입을 위한 긴장재, 정착장치, 유압잭 등과 같은 제반설비가 불필요하다는 장점이 있지만, 상기 강재빔(100)에 도입되는 프리스트레스는 강재빔의 인양하중(P)에 의한 것으로서, 도입될 수 있는 크기가 그다지 크지 않고 전적으로 강재빔(100)의 하중 및 강성의 정도에 의해 결정되기 때문에 도입하고자 하는 프리스트레스의 크기에 대한 설계가 쉽지 않을 뿐만 아니라 더 큰 프리스트레스를 도입하기 위해서는 하중이 더 큰 강재빔(100)을 사용하여야 하는 불합리함이 발생하게 되는 단점이 있다.
The prestressed steel beam 100 can be naturally produced during the construction process, there is an advantage that a variety of equipment, such as tension material, a fixing device, a hydraulic jack for introducing the prestress is unnecessary, the prestress introduced to the steel beam 100 It is not easy to design the size of the prestress to be introduced because it is due to the lifting load P of the steel beam, and the size that can be introduced is not very large and is entirely determined by the load and rigidity of the steel beam 100. In addition, there is a disadvantage in that an unreasonable occurrence of using a steel beam 100 having a larger load in order to introduce a larger prestress.

본 발명은 상기와 같은 종래기술의 문제점을 해결하기 위한 것으로서, 거더를 시공하는 과정 중에 거더에 프리스트레스를 도입할 수 있어 시공이 용이하고 공기를 단축할 수 있으며, 프리스트레스를 거더의 소요 강성에 따라 용이하게 조절할 수 있는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법을 제공하는데 그 목적이 있다.
The present invention is to solve the problems of the prior art as described above, it is possible to introduce pre-stress to the girder during the construction of the girder, the construction is easy and can shorten the air, the prestress is easy according to the required rigidity of the girder The purpose of the present invention is to provide a method for constructing a prestress girder using a jack-up beam that can be adjusted.

상기와 같은 과제를 해결하기 위한 본 발명의 바람직한 실시예에 의하면, a) 하부플랜지 하면의 양단부에 제1브라켓이 구비되어 있는 거더를 준비하는 단계; b) 상기 거더에, 상부플랜지 상면의 양단부에는 제2브라켓이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭이 구비되어 있는 잭업용 빔을 접합하되, 상기 거더와 잭업용 빔은 제1브라켓과 제2브라켓을 연결시킴으로써 접합되도록 하는 단계; c) 상기 잭을 잭업하여 거더에 프리스트레스를 도입하는 단계; d) 상기 프리스트레스가 도입된 상태의 거더를 교량의 교대에 강접합시키는 단계; e) 상기 제1브라켓과 제2브라켓의 연결을 풀어, 거더에서 잭업용 빔을 분리해내는 단계; 를 포함하여 이루어지는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법이 제공된다.According to a preferred embodiment of the present invention for solving the above problems, a) preparing a girder having a first bracket on both ends of the lower flange; b) to the girder, a second bracket is provided at both ends of the upper flange upper surface and a jack-up beam having at least one jack at the center of the upper flange upper surface, wherein the girder and the jack-up beam are connected to the first bracket Allowing the second bracket to be joined to each other; c) jacking up the jack to introduce prestress into a girder; d) rigidly joining the girder in the prestress introduced state to the alternating bridge; e) separating the jack-up beam from the girder by releasing the connection between the first bracket and the second bracket; Provided is a construction method of a prestress girder using a jack-up beam, characterized in that comprises a.

본 발명의 또다른 실시예에 의하면, a) 하부플랜지 하면의 양단부에 제1브라켓과 돌출부재가 구비되어 있되, 상기 돌출부재는 제1브라켓보다 외측에 형성되어 있는 거더를 준비하는 단계; b) 상기 거더에, 상부플랜지 상면의 양단부에는 제2브라켓이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭이 구비되어 있는 잭업용 빔을 접합하되, 상기 거더와 잭업용 빔은 제1브라켓과 제2브라켓을 연결시킴으로써 접합되도록 하는 단계; c) 상기 잭을 잭업하여 거더에 프리스트레스를 도입하는 단계; d) 상기 프리스트레스가 도입된 상태의 거더를 교량의 교대 상면에 단순 거치시키되, 상기 교대의 상면에는 패드가 돌출 형성되어 있어 상기 돌출부재가 패드와 맞물리도록 거치시키는 단계; e) 상기 제1브라켓과 제2브라켓의 연결을 풀어, 거더에서 잭업용 빔을 분리해내는 단계; 를 포함하여 이루어지는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법이 제공된다.According to another embodiment of the present invention, a) a first bracket and a protruding member are provided at both ends of the lower flange, wherein the protruding member is prepared on the outside of the first bracket; b) to the girder, a second bracket is provided at both ends of the upper flange upper surface and a jack-up beam having at least one jack at the center of the upper flange upper surface, wherein the girder and the jack-up beam are connected to the first bracket Allowing the second bracket to be joined to each other; c) jacking up the jack to introduce prestress into a girder; d) simply mounting the girders of the pre-stress introduced state to the upper surface of the alternating bridge, the upper surface of the alternating protrusion is formed so that the protruding member is engaged with the pad; e) separating the jack-up beam from the girder by releasing the connection between the first bracket and the second bracket; Provided is a construction method of a prestress girder using a jack-up beam, characterized in that comprises a.

본 발명의 또다른 실시예에 의하면, 상기 제1브라켓과 제2브라켓에는 거더의 폭 방향으로 홀이 각각 형성되어 있고, 상기 b) 단계에서 제1브라켓과 제2브라켓의 연결은 상기 홀에 핀을 삽입하여 힌지결합시킴으로써 이루어지는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법이 제공된다.According to another embodiment of the present invention, the first bracket and the second bracket is formed with holes in the width direction of the girder, respectively, in step b) the connection of the first bracket and the second bracket pins in the hole There is provided a construction method of a prestress girder using a jack-up beam, characterized in that the hinge coupling by inserting.

본 발명의 또다른 실시예에 의하면, 상기 거더의 양단부와 수직으로 접하게 되는 교대의 내측면은, 프리스트레스가 도입된 상태의 거더 양단부의 형태에 맞추어 경사지게 형성되어 있는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법이 제공된다.According to another embodiment of the present invention, the jack inner beam, characterized in that the inner surface of the alternating contact with both ends of the girder is inclined in accordance with the shape of the both ends of the girder in the pre-stress introduced state. Provided is a method of constructing a used prestress girder.

본 발명의 또다른 실시예에 의하면, 상기 d)단계 이후에, 프리스트레스의 손실을 방지하기 위하여 거더의 단부와 교대를 연결시켜주는 인장강선을 형성시키는 단계가 더 포함되는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법이 제공된다.
According to another embodiment of the present invention, after the step d), further comprising the step of forming a tensile wire connecting the end of the girder and alternating to prevent the loss of prestress, jack-up A method of constructing a prestress girder using a beam is provided.

본 발명은 거더를 시공하는 과정 중에 프리스트레스를 도입할 수 있어 공기를 단축할 수 있으면서도, 별도의 특별한 장비가 필요하지 않아 시공이 용이하다.The present invention can introduce the prestress during the construction of the girder can shorten the air, it is easy to install because no special equipment is required.

또한, 거더를 잭업하여 프리스트레스를 도입하므로 잭업되는 양을 조절함으로써 도입되는 프리스트레스의 크기를 거더의 소요 강성에 맞추어 용이하게 조절할 수 있다.In addition, since the prestress is introduced by jacking up the girder, the size of the prestress introduced by adjusting the amount of jacking up can be easily adjusted according to the required rigidity of the girder.

그리고, 프리스트레스를 가해주는 부재인 잭업용 빔을 재사용하는 것이 가능해 경제적이다.
In addition, it is economical to reuse the jack-up beam, which is a member for applying prestress.

도 1은 종래기술로서 '프리스트레스트 강합성 라멘교 시공방법'에 대한 설명도이다.
도 2는 본 발명의 제1실시예에 따른 시공방법을 순서대로 도시한 설명도이다.
도 3은 본 발명에 이용되는 제1브라켓과 제2브라켓의 형상 및 연결된 모습을 도시한 사시도이다.
도 4는 본 발명에 이용되는 플레이트와 거더 및 교대와의 관계를 나타낸 설명도이다.
도 5는 본 발명의 제2실시예에 따른 시공방법을 순서대로 도시한 설명도이다.
도 6은 본 발명의 제2실시예에 있어서, 인장강선을 형성시키는 단계가 더 포함된 경우에 대한 설명도이다.
1 is an explanatory diagram of a 'prestressed steel composite ramen bridge construction method' as the prior art.
2 is an explanatory diagram showing a construction method in order according to the first embodiment of the present invention.
Figure 3 is a perspective view showing the shape and connected state of the first bracket and the second bracket used in the present invention.
4 is an explanatory diagram showing a relationship between a plate, a girder, and an alternating plate used in the present invention.
5 is an explanatory diagram showing the construction method according to the second embodiment of the present invention in order.
FIG. 6 is an explanatory diagram for a case in which the step of forming the tensile steel is further included in the second embodiment of the present invention. FIG.

이하에서는 본 발명의 실시예를 첨부된 도면을 참조하여 상세히 설명한다. 그러나 본 발명을 설명함에 있어 공지의 구성을 구체적으로 설명함으로 인하여 본 발명의 기술적 사상을 흐리게 하거나 불명료하게 하는 경우에는 위 공지의 구성에 관하여는 그 설명을 생략하기로 한다.
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, however, it is to be understood that the present invention is not limited to the disclosed embodiments.

본 발명을 설명함에 있어서, 프리스트레스트 거더가 교대에 시공되는 경우를 예시로 하여 설명하지만, 본 시공방법이 다경간을 갖는 교량에 적용되는 경우에는 프리스트레스트 거더가 교각에 시공될 수 있음은 당연하다.
In describing the present invention, a case in which the prestress girder is constructed in alternation is described as an example. However, when the present construction method is applied to a bridge having a multi span, it is natural that the prestress girder may be constructed in the piers. .

도 2는 본 발명에 의한 프리스트레스트 거더의 시공방법으로서, 그 제1실시예를 순서대로 도시하고 있다.Fig. 2 is a method of constructing a prestress girder according to the present invention, and the first embodiment is shown in order.

제1실시예에 따른 프리스트레스트 거더의 시공방법은, a) 하부플랜지 하면의 양단부에 제1브라켓(310)이 구비되어 있는 거더(300)를 준비하는 단계; b) 상기 거더(300)에, 상부플랜지 상면의 양단부에는 제2브라켓(410)이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비되어 있는 잭업용 빔(400)을 접합하되, 상기 거더(300)와 잭업용 빔(400)은 제1브라켓(310)과 제2브라켓(410)을 연결시킴으로써 접합되도록 하는 단계; c) 상기 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입하는 단계; d) 상기 프리스트레스가 도입된 상태의 거더(300)를 교량의 교대(500)에 강접합시키는 단계; e) 상기 제1브라켓(310)과 제2브라켓(410)의 연결을 풀어, 거더(300)에서 잭업용 빔(400)을 분리해내는 단계; 를 포함하여 이루어진다.
The construction method of the prestress girder according to the first embodiment, a) preparing a girder 300, the first bracket 310 is provided at both ends of the lower flange lower surface; b) to the girder 300, a second bracket 410 is provided at both ends of the upper flange upper surface and a jack-up beam 400, which is provided with one or more jacks 420 at the center of the upper flange upper surface, The girder 300 and the jack-up beam 400 are joined by connecting the first bracket 310 and the second bracket 410 to each other; c) jacking up the jack 420 to introduce prestress into the girder 300; d) rigidly joining the girder 300 in the prestress introduced state to the alternating bridge 500; e) separating the jack-up beam 400 from the girder 300 by releasing the connection between the first bracket 310 and the second bracket 410; .

이하에서는 제1실시예에 따른 프리스트레스트 거더의 시공방법을 각 단계별로 상세하게 설명하도록 한다.
Hereinafter, the construction method of the prestress girder according to the first embodiment will be described in detail for each step.

a) 하부플랜지 하면의 양단부에 제1브라켓(310)이 구비되어 있는 거더(300)를 준비하는 단계;
a) preparing a girder 300 having first brackets 310 provided at both ends of a lower surface of the lower flange;

본 발명에 사용되는 거더(300)로는, 상·하부플랜지 및 웨브로 이루어지는 일반적인 형강을 사용할 수 있는데, 단면이 대칭적인 I형강 또는 H형강을 사용하는 것이 바람직할 것이다.
As the girders 300 used in the present invention, a general shaped steel consisting of upper and lower flanges and a web can be used, but it will be preferable to use I-shaped steel or H-shaped steel having a symmetrical cross section.

형강의 하부플랜지 하면 양단부에 제1브라켓(310)이 구비되어 있는 거더(300)를 준비한다. 상기 제1브라켓(310)은, 후에 설명하게 될 잭업용 빔(400)의 제2브라켓(410)과 연결되어, 상기 거더(300)와 잭업용 빔(400)을 접합시켜주는 역할을 하게 된다.When the bottom flange of the steel beam is prepared, the girder 300 having the first bracket 310 is prepared at both ends. The first bracket 310 is connected to the second bracket 410 of the jack-up beam 400, which will be described later, and serves to bond the girder 300 and the jack-up beam 400 to each other. .

거더(300)의 제1브라켓(310)이 형성되는 부분에는 후술하는 c)단계에서의 프리스트레스 도입시 집중하중이 발생할 수 있으므로, 상·하부플랜지 사이에 스티프너로 보강할 수 있다.
In the part where the first bracket 310 of the girder 300 is formed, a concentrated load may occur when the prestress is introduced in step c) to be described later, and may be reinforced with a stiffener between the upper and lower flanges.

b) 상기 거더(300)에, 상부플랜지 상면의 양단부에는 제2브라켓(410)이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비되어 있는 잭업용 빔(400)을 접합하되, 상기 거더(300)와 잭업용 빔(400)은 제1브라켓(310)과 제2브라켓(410)을 연결시킴으로써 접합되도록 하는 단계;
b) to the girder 300, a second bracket 410 is provided at both ends of the upper flange upper surface and a jack-up beam 400, which is provided with one or more jacks 420 at the center of the upper flange upper surface, The girder 300 and the jack-up beam 400 are joined by connecting the first bracket 310 and the second bracket 410 to each other;

상기 거더(300)에 프리스트레스를 도입하기 위한 하중 재하수단으로서의 잭업용 빔(400)을 거더(300)와 연결해준다. 잭업용 빔(400)으로는 상기 거더(300)와 마찬가지로 일반적인 형강을 사용하되, 거더(300)의 길이보다는 짧은 형강을 사용하는 것이 바람직하다. 잭업용 빔(400)의 길이가 거더(300)의 길이보다 짧은 경우, 후술하는 c)단계 및 d)단계가 용이하게 이루어질 수 있다. 그리고 거더(300)와 잭업용 빔(400)은 길이의 중심이 일치하도록 연결하여, 프리스트레스가 거더(300) 길이의 중심을 기준으로 대칭적으로 형성될 수 있도록 해준다.The jack-up beam 400 as a load carrying means for introducing prestress to the girder 300 is connected to the girder 300. As the jack-up beam 400, a general shaped steel is used similarly to the girder 300, but a shorter steel than the length of the girder 300 is preferably used. When the length of the jack-up beam 400 is shorter than the length of the girder 300, steps c) and d) to be described later may be easily performed. And the girder 300 and the jack-up beam 400 is connected to match the center of the length, so that the prestress can be formed symmetrically with respect to the center of the girder 300 length.

잭업용 빔(400)에는, 상기 거더(300)의 제1브라켓(310)과 대응되는 구성으로서, 상부플랜지 상면의 양단부에 제2브라켓(410)이 구비된다. 상기 제2브라켓(410)은 거더(300)의 제1브라켓(310)이 형성된 간격과 같은 간격을 가지고 형성됨으로써 제1브라켓(310)과 용이하게 연결될 수 있도록 한다.The jack-up beam 400 has a configuration corresponding to the first bracket 310 of the girder 300, and the second bracket 410 is provided at both ends of the upper flange upper surface. The second bracket 410 is formed to have the same interval as the interval in which the first bracket 310 of the girder 300 is formed so that it can be easily connected to the first bracket (310).

그리고, 잭업용 빔(400)의 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비된다. 상기 잭(420)은 후속 단계인 c)단계에서 프리스트레스의 도입을 위한 하중 재하의 작용을 하게 된다.In addition, at least one jack 420 is provided at the center of the upper surface of the upper flange of the jack-up beam 400. The jack 420 acts as a load for introducing the prestress in a subsequent step c).

잭업용 빔(400)의 제2브라켓(410)과 잭(420)이 형성되는 부분에는 후에 이루어지는 c)단계에서의 프리스트레스 도입시 집중하중이 발생할 수 있으므로, 상·하부플랜지 사이에 스티프너로 보강할 수 있다.
In the part where the second bracket 410 and the jack 420 of the jack-up beam 400 are formed, concentrated load may occur during the introduction of the prestress in the step c), so that the stiffener may be reinforced between the upper and lower flanges. Can be.

잭(420)은 잭업용 빔(400)의 정중앙에 한 개가 구비되어 있을 수도 있으나, 안정적인 프리스트레스의 도입을 위하여 두 개 이상이 구비되어 있을 수도 있다. 두 개 이상의 잭(420)이 구비되어 있는 경우, 잭(420)은 홀수 개가 구비되어 잭업용 빔(400)의 정중앙에 하나가 위치하고 나머지는 정중앙의 잭(420)을 기준으로 하여 대칭적으로 형성되는 바람직하다. 이렇게 정중앙에 잭(420)이 구비된 경우, 정중앙에 하중 재하점을 가질 수 있어 프리스트레스를 효율적으로 도입할 수 있다.
One jack 420 may be provided at the center of the jack-up beam 400, but two or more jacks may be provided to introduce stable prestress. When two or more jacks 420 are provided, the odd number of jacks 420 is provided so that one is positioned at the center of the jack-up beam 400 and the other is formed symmetrically based on the jack 420 of the center. Is preferred. Thus, when the jack 420 is provided in the center, it is possible to have a load loading point in the center, and thus it is possible to efficiently introduce prestress.

도 3에는 제1브라켓(310)과 제2브라켓(410)의 형상 및 제1브라켓(310)과 제2브라켓(410)이 연결되어 있는 모습이 도시되어 있다.3 illustrates a shape of the first bracket 310 and the second bracket 410 and a state in which the first bracket 310 and the second bracket 410 are connected to each other.

제1브라켓(310)과 제2브라켓(410)에는 거더(300)의 폭 방향으로 홀(311, 411)이 각각 형성된다. 제1브라켓(310)과 제2브라켓(410)은 상기 홀(311, 411)에 핀을 삽입함으로써 힌지결합된다. 이렇게 힌지결합된 제1브라켓(310)과 제2브라켓(410)은, 후속 단계인 c)단계에서 거더(300)에 프리스트레스를 도입하기위하여 거더(300)와 잭업용 빔(400)에 하중을 가했을 때, 필요한 형태대로 변형되는 것은 허용하면서도 결합은 유지될 수 있도록 해준다.Holes 311 and 411 are formed in the first bracket 310 and the second bracket 410 in the width direction of the girder 300, respectively. The first bracket 310 and the second bracket 410 are hinged by inserting a pin into the holes 311 and 411. The first bracket 310 and the second bracket 410 hinge-coupled in this way, load the load on the girder 300 and the jack-up beam 400 to introduce prestress to the girder 300 in a subsequent step c). When applied, it allows the transformation to be in the required form while allowing the coupling to be maintained.

제1브라켓(310)과 제2브라켓(410)의 단면은, 하나는 요(凹)형, 다른 하나는 철(凸)형으로 형성되어 하나가 다른 하나에 삽입됨으로써 결합된 형태 또한 대칭적인 형태를 이룰 수 있도록 한다. 이렇게 대칭적인 형태로 결합된 제1브라켓(310)과 제2브라켓(410)은 프리스트레스에 의해 거더(300) 및 잭업용 빔(400)에 편심적인 변형이 발생하는 것을 방지해준다.
The cross section of the first bracket 310 and the second bracket 410 is one of a yaw type, the other is formed of iron (凸) shape is combined by inserting one into the other and also symmetrical form To achieve this. The first bracket 310 and the second bracket 410 coupled in a symmetrical form prevent eccentric deformation of the girder 300 and the jack-up beam 400 by prestressing.

c) 상기 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입하는 단계;
c) jacking up the jack 420 to introduce prestress into the girder 300;

거더(300)와 잭업용 빔(400)을 접합시킴으로써 거더(300)의 하면과 잭업용 빔(400)의 상면 사이에 위치하게 되는 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입한다. 두개 이상의 잭(420)을 통하여 프리스트레스를 도입하는 경우, 정중앙에 위치하는 잭(420)을 기준으로 대칭적으로 잭업이 이루어지도록 한다. 잭(420)을 잭업하더라도 거더(300)와 잭업용 빔(400)의 양단부는 서로 접합되어 있으므로, 거더(300)는 상향의 캠버를 갖는 형태로 변형된다.By joining the girder 300 and the jack-up beam 400, the jack 420 positioned between the lower surface of the girder 300 and the upper surface of the jack-up beam 400 is jacked up to introduce prestress into the girder 300. . When the prestress is introduced through two or more jacks 420, jack-up is performed symmetrically based on the jack 420 located at the center. Even when jacking up the jack 420, since both ends of the girder 300 and the jack-up beam 400 are joined to each other, the girder 300 is deformed to have an upward camber.

잭업용 빔(400)의 길이가 거더(300)의 길이보다 짧게 형성된 경우, 프리스트레스의 도입에 의해 잭업용 빔(400)과 거더(300)의 양단부에서 그 사이의 간격이 좁아지더라도 잭업용 빔(400)의 단부가 거더(300)의 단부에 닿지 않게 된다.
When the length of the jack-up beam 400 is formed to be shorter than the length of the girder 300, the jack-up beam may be narrowed at both ends of the jack-up beam 400 and the girders 300 by introduction of prestress. The end of 400 is not in contact with the end of the girder 300.

d) 상기 프리스트레스가 도입된 상태의 거더(300)를 교량의 교대(500)에 강접합시키는 단계;
d) rigidly joining the girder 300 in the prestress introduced state to the alternating bridge 500;

잭업용 빔(400)이 접합되어 있는 상태의 거더(300)를 교량의 교대(500)에 강접합시킨다. 상기 잭업용 빔(400)은 거더(300)에 접합되어 있지만 거더(300)보다 길이가 짧기 때문에 거더(300)를 교대(500)에 시공하는 데에 방해가 되지 않는다.The girder 300 in the state where the jack-up beam 400 is joined is strongly bonded to the alternating bridge 500 of the bridge. The jack-up beam 400 is bonded to the girder 300, but because the length is shorter than the girder 300 does not interfere with the construction of the girder 300 to the alternating 500.

교대(500)에는 앵커볼트(550)를 미리 형성시켜 두고, 거더(300)의 단부에는 상·하부플랜지와 수직하고 다수의 볼트공을 갖는 플레이트(350)를 용접하여, 상기 앵커볼트(550)와 플레이트(350)를 매개로 하여 교대(500)와 거더(300)를 접합시킨다.
Anchor bolt 550 is formed in advance on the alternating 500, and the anchor bolt 550 is welded to the end of the girder 300 by welding the plate 350 perpendicular to the upper and lower flanges and having a plurality of bolt holes. The shift 500 and the girder 300 are bonded to each other via the plate 350.

프리스트레스의 도입에 의해 거더(300)는 하부플랜지가 압축되고 상부플랜지가 인장되어 말단이 비스듬하게 형성되므로, 거더(300)의 단부와 접하는 교대(500)의 내측면을 프리스트레스가 도입된 상태의 거더(300) 단부의 형태와 맞추어 경사진 형태를 갖도록 형성시킨다.Since the lower flange is compressed and the upper flange is tensioned by the introduction of the prestress, the end of the girder 300 is obliquely formed, the girders in the state in which the prestress is introduced into the inner surface of the alternating portion 500 in contact with the end of the girder 300 are introduced. (300) It is formed to have a shape inclined to match the shape of the end.

교대(500)의 내측면을 경사진 형태로 형성시키기 위하여, 도 2의 (d)에 도시된 바와 같이 교대(500)의 콘크리트 몸체 자체를 경사지게 형성시킬 수도 있고, 도 4에 도시된 바와 같이 교대(500)의 콘크리트 몸체는 수직하게 형성시키고 그 내측면에 두께가 변화하는 플레이트(350)를 덧댐으로써 경사지게 형성시킬 수도 있다.
In order to form the inner surface of the shift 500 in an inclined shape, as shown in (d) of FIG. 2, the concrete body itself of the shift 500 may be inclined, and as shown in FIG. 4. The concrete body of 500 may be formed to be inclined by adding a plate 350, which is formed vertically and its thickness is changed on its inner surface.

잭업용 빔(400)에 의해 프리스트레스가 도입되었던 거더(300)를 교대(500)에 강접합시킴으로써, 이 강접합에 의해 잭업용 빔(400)이 없더라도 거더(300)에 프리스트레스가 유지될 수 있는 상태가 된다.
By tightly joining the girders 300 to which the prestress has been introduced by the jack-up beam 400 to the alternation 500, the pre-stress can be maintained in the girder 300 even if there is no jack-up beam 400 by this rigid bonding. It becomes a state.

e) 상기 제1브라켓(310)과 제2브라켓(410)의 연결을 풀어, 거더(300)에서 잭업용 빔(400)을 분리해내는 단계;
e) separating the jack-up beam 400 from the girder 300 by releasing the connection between the first bracket 310 and the second bracket 410;

거더(300)를 교대(500)에 강접합시킴으로 인하여 프리스트레스를 도입시키는 힘이 잭업용 빔(400)에서 교대(500)로 전이되었으므로, 교량의 사용시에 불필요한 잭업용 빔(400)을 거더(300)에서 분리하여 제거한다. 본 단계의 잭업용 빔(400) 분리작업은 제1브라켓(310)과 제2브라켓(410)에서 단순히 핀을 뽑아냄으로써 용이하게 이루어지게 된다.Since the force for introducing the prestress is transferred from the jack-up beam 400 to the shift 500 by tightly coupling the girder 300 to the shift 500, the unnecessary jack-up beam 400 is used when the bridge is used. ) And remove it. The jack-up beam 400 separation operation of this step is easily performed by simply extracting the pins from the first bracket 310 and the second bracket 410.

거더(300)와 분리된 잭업용 빔(400)은 다른 거더(300)에 프리스트레스를 도입하는 데에 다시 사용될 수 있다.
The jack up beam 400 separated from the girder 300 can be used again to introduce prestress to the other girder 300.

잭업용 빔(400)의 분리작업 이후에는 일반적인 방법에 의해 교량의 가로보, 슬래브 등을 시공해 나간다.
After the separation operation of the jack-up beam 400, the cross beams, slabs and the like of the bridge is constructed by a general method.

도 5는 본 발명에 의한 프리스트레스트 거더의 시공방법으로서, 그 제2실시예를 순서대로 도시하고 있다.
Fig. 5 shows a method of constructing a prestress girder according to the present invention, in which the second embodiment is shown in order.

제2실시예에 따른 프리스트레스트 거더의 시공방법은, a) 하부플랜지 하면의 양단부에 제1브라켓(310)과 돌출부재(330)가 구비되어 있되, 상기 돌출부재(330)는 제1브라켓(310)보다 외측에 형성되어 있는 거더(300)를 준비하는 단계; b) 상기 거더(300)에, 상부플랜지 상면의 양단부에는 제2브라켓(410)이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비되어 있는 잭업용 빔(400)을 접합하되, 상기 거더(300)와 잭업용 빔(400)은 제1브라켓(310)과 제2브라켓(410)을 연결시킴으로써 접합되도록 하는 단계; c) 상기 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입하는 단계; d) 상기 프리스트레스가 도입된 상태의 거더(300)를 교량의 교대(500) 상면에 단순 거치시키되, 상기 교대(500)의 상면에는 패드(530)가 돌출 형성되어 있어 상기 돌출부재(330)가 패드(530)와 맞물리도록 거치시키는 단계; e) 상기 제1브라켓(310)과 제2브라켓(410)의 연결을 풀어, 거더(300)에서 잭업용 빔(400)을 분리해내는 단계; 를 포함하여 이루어진다.
In the construction method of the prestress girder according to the second embodiment, a) the first bracket 310 and the protruding member 330 is provided at both ends of the lower flange, the protruding member 330 is the first bracket ( Preparing a girder 300 which is formed at an outer side of the 310; b) to the girder 300, a second bracket 410 is provided at both ends of the upper flange upper surface and a jack-up beam 400, which is provided with one or more jacks 420 at the center of the upper flange upper surface, The girder 300 and the jack-up beam 400 are joined by connecting the first bracket 310 and the second bracket 410 to each other; c) jacking up the jack 420 to introduce prestress into the girder 300; d) The girder 300 in the state in which the prestress is introduced is simply mounted on the upper surface of the shift 500 of the bridge, and the pad 530 protrudes from the upper surface of the shift 500 such that the protruding member 330 is formed. Mounting to engage the pad 530; e) separating the jack-up beam 400 from the girder 300 by releasing the connection between the first bracket 310 and the second bracket 410; .

이하에서는 제2실시예에 따른 프리스트레스트 거더의 시공방법을 각 단계별로 상세하게 설명하도록 한다.
Hereinafter, the construction method of the prestress girder according to the second embodiment will be described in detail for each step.

a) 하부플랜지 하면의 양단부에 제1브라켓(310)과 돌출부재(330)가 구비되어 있되, 상기 돌출부재(330)는 제1브라켓(310)보다 외측에 형성되어 있는 거더(300)를 준비하는 단계;
a) a first bracket 310 and a protruding member 330 are provided at both ends of a lower surface of the lower flange, and the protruding member 330 prepares the girder 300 which is formed on an outer side of the first bracket 310. Making;

본 발명의 제2실시예에 따른 프리스트레스트 거더의 시공방법에 사용되는 거더(300)는, 돌출부재(330)가 더 구비되어 있다는 점을 제외하면 제1실시예에 따른 프리스트레스트 거더의 시공방법에 사용되는 거더와 동일하므로, 돌출부재(330) 외의 구성에 관련된 작용 및 효과에 대한 설명은 생략하기로 한다.
The girder 300 used in the construction method of the prestress girder according to the second embodiment of the present invention, except that the protruding member 330 is further provided, the construction method of the prestress girder according to the first embodiment Since the same as the girder used in, the description of the operation and effects related to the configuration other than the protruding member 330 will be omitted.

돌출부재(330)는 제1브라켓(310)과 함께 거더(300)의 하부플랜지 하면 양단부에 구비되는데, 제1브라켓(310)의 외측으로 형성되게 된다. 상기 돌출부재(330)는, 후술하는 e)단계에서, 잭업용 빔(400)에 의해 도입되었던 프리스트레스를 받아 교대(500)로 전이시켜주는 역할을 하는 부재로서, 거더(300)의 하부플랜지와 수직한 일면을 갖도록 형성된다.Protruding member 330 is provided at both ends when the lower flange of the girder 300 together with the first bracket 310, it is formed to the outside of the first bracket (310). The protruding member 330 is a member that serves to transfer the prestress introduced by the jack-up beam 400 to the shift 500 in step e), and the lower flange of the girder 300 It is formed to have a vertical surface.

거더(300)의 돌출부재(330)가 형성되는 부분에는 집중하중이 발생하게 되므로 하부플랜지에 보조플레이트를 대어 보강할 수 있다.
Since the concentrated load is generated in the portion where the protruding member 330 of the girder 300 is formed, the auxiliary plate may be reinforced on the lower flange.

b) 상기 거더(300)에, 상부플랜지 상면의 양단부에는 제2브라켓(410)이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비되어 있는 잭업용 빔(400)을 접합하되, 상기 거더(300)와 잭업용 빔(400)은 제1브라켓(310)과 제2브라켓(410)을 연결시킴으로써 접합되도록 하는 단계;
b) to the girder 300, a second bracket 410 is provided at both ends of the upper flange upper surface and a jack-up beam 400, which is provided with one or more jacks 420 at the center of the upper flange upper surface, The girder 300 and the jack-up beam 400 are joined by connecting the first bracket 310 and the second bracket 410 to each other;

상기 거더(300)와 잭업용 빔(400)을 접합시키는데, 잭업용 빔(400)의 구성 및 거더(300)와의 연결 방법은 제1실시예와 동일하므로 자세한 설명은 생략한다.
Bonding the girder 300 and the jack-up beam 400, the configuration of the jack-up beam 400 and the connection method with the girder 300 is the same as in the first embodiment, detailed description thereof will be omitted.

c) 상기 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입하는 단계;
c) jacking up the jack 420 to introduce prestress into the girder 300;

d) 상기 프리스트레스가 도입된 상태의 거더(300)를 교량의 교대(500) 상면에 단순 거치시키되, 상기 교대(500)의 상면에는 패드(530)가 돌출 형성되어 있어 상기 돌출부재(330)가 패드(530)와 맞물리도록 거치시키는 단계;
d) The girder 300 in the state in which the prestress is introduced is simply mounted on the upper surface of the shift 500 of the bridge, and the pad 530 protrudes from the upper surface of the shift 500 such that the protruding member 330 is formed. Mounting to engage the pad 530;

프리스트레스가 도입된 상태의 거더(300)를 교대(500)의 상면에 단순 거치시킨다. 교대(500)의 상면에는 돌출부재(330)의 일면과 평행한 면을 갖는 패드(530)가 돌출 형성되어 있어, 돌출부재(330)의 일과 면접하게 된다.
The girder 300 in the state where the prestress is introduced is simply mounted on the upper surface of the shift 500. The pad 530 having a surface parallel to one surface of the protruding member 330 is formed to protrude from the upper surface of the alternating member 500 to be interviewed with the work of the protruding member 330.

e) 상기 제1브라켓(310)과 제2브라켓(410)의 연결을 풀어, 거더(300)에서 잭업용 빔(400)을 분리해내는 단계;
e) separating the jack-up beam 400 from the girder 300 by releasing the connection between the first bracket 310 and the second bracket 410;

거더(300)를 교대(500)에 거치시킴으로써 프리스트레스를 도입시키는 힘을 잭업용 빔(400)에서 교대(500)로 전이시킬 수 있게 되었으므로, 교량의 사용시에 불필요한 잭업용 빔(400)을 거더(300)에서 분리하여 제거한다.By mounting the girders 300 to the shift 500, the force for introducing the prestress can be transferred from the jack-up beam 400 to the shift 500, thereby girdering the unnecessary jack-up beam 400 when the bridge is in use. And remove it at 300).

잭업용 빔(400)을 제거하면 거더(300)의 하부플랜지에 작용하던 압축력은 교대(500) 상면에 형성되어 있는 패드(530)에 의해 유지된다.
When the jack-up beam 400 is removed, the compressive force acting on the lower flange of the girder 300 is maintained by the pad 530 formed on the upper surface of the shift 500.

상기 d)단계 이후에는, 도 6에 도시된 바와 같이, 거더(300)의 단부와 교대(500)를 연결시켜주는 인장강선(340)을 형성시키는 단계가 더 포함될 수 있다. 이렇게 인장강선(340)을 더 형성시키는 경우, 거더(300)에서 잭업용 빔(400)을 분리하더라도, 거더(300)의 상부에 작용하고 있던 인장력을 유지시킬 수 있어, 도입되었던 대부분의 프리스트레스를 보존할 수 있게 된다.
After the step d), as shown in Figure 6, it may further comprise the step of forming a tensile steel wire 340 connecting the end of the girder 300 and the alternating 500. In this case, when the tensile steel wire 340 is further formed, even if the jack-up beam 400 is separated from the girder 300, the tensile force acting on the upper part of the girder 300 can be maintained, and most of the prestresses introduced are I can save it.

본 단계가 더 포함되는 경우, 양단부의 상부측 웨브에 인장강선접합부재(355)가 미리 형성되어 있는 거더를 사용할 수 있다.
In the case where the step is further included, a girder in which the tensile steel wire joining member 355 is formed in advance on the upper side web of both ends may be used.

이상에서 본 발명은 구체적인 실시예를 참조하여 상세히 설명하였으나, 상기 실시예는 본 발명을 이해하기 쉽도록 하기 위한 예시에 불과한 것이므로, 이 분야에서 통상의 지식을 가진 자라면 본 발명의 기술적 사상의 범위 내에서 이를 다양하게 변형하여 실시할 수 있을 것임은 자명한 것이다. 따라서 그러한 변형 예들은 청구범위에 기재된 바에 의해 본 발명의 권리범위에 속한다고 할 것이다.
The present invention has been described in detail above with reference to specific embodiments, but the above embodiments are merely examples for easy understanding of the present invention, so that those skilled in the art have the scope of the technical idea of the present invention. It will be apparent that various modifications can be made within the scope of the invention. It is therefore intended that such modifications are within the scope of the invention as set forth in the claims.

300 : 거더 310 : 제1브라켓
311 : 홀 330 : 돌출부재
340 : 인장강선 350 : 플레이트
355 : 인장강선접합부재 400 : 잭업용 빔
410 : 제2브라켓 411 : 홀
420 : 잭 500 : 교대
530 : 패드 550 : 앵커볼트
300: girder 310: first bracket
311: hole 330: protruding member
340: tensile steel wire 350: plate
355: tensile steel joining member 400: jack-up beam
410: second bracket 411: hole
420: Jack 500: Shift
530: pad 550: anchor bolt

Claims (5)

a) 하부플랜지 하면의 양단부에 제1브라켓(310)이 구비되어 있는 거더(300)를 준비하는 단계;
b) 상기 거더(300)에, 상부플랜지 상면의 양단부에는 제2브라켓(410)이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비되어 있는 잭업용 빔(400)을 접합하되, 상기 거더(300)와 잭업용 빔(400)은 제1브라켓(310)과 제2브라켓(410)을 연결시킴으로써 접합되도록 하는 단계;
c) 상기 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입하는 단계;
d) 상기 프리스트레스가 도입된 상태의 거더(300)를 교량의 교대(500)에 강접합시키는 단계;
e) 상기 제1브라켓(310)과 제2브라켓(410)의 연결을 풀어, 거더(300)에서 잭업용 빔(400)을 분리해내는 단계;
를 포함하여 이루어지는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법.
a) preparing a girder 300 having first brackets 310 provided at both ends of a lower surface of the lower flange;
b) to the girder 300, a second bracket 410 is provided at both ends of the upper flange upper surface and a jack-up beam 400, which is provided with one or more jacks 420 at the center of the upper flange upper surface, The girder 300 and the jack-up beam 400 are joined by connecting the first bracket 310 and the second bracket 410 to each other;
c) jacking up the jack 420 to introduce prestress into the girder 300;
d) rigidly joining the girder 300 in the prestress introduced state to the alternating bridge 500;
e) separating the jack-up beam 400 from the girder 300 by releasing the connection between the first bracket 310 and the second bracket 410;
Construction method of the prestress girder using a jack-up beam, characterized in that comprising a.
a) 하부플랜지 하면의 양단부에 제1브라켓(310)과 돌출부재(330)가 구비되어 있되, 상기 돌출부재(330)는 제1브라켓(310)보다 외측에 형성되어 있는 거더(300)를 준비하는 단계;
b) 상기 거더(300)에, 상부플랜지 상면의 양단부에는 제2브라켓(410)이 구비되어 있고 상부플랜지 상면의 중앙부에는 하나 이상의 잭(420)이 구비되어 있는 잭업용 빔(400)을 접합하되, 상기 거더(300)와 잭업용 빔(400)은 제1브라켓(310)과 제2브라켓(410)을 연결시킴으로써 접합되도록 하는 단계;
c) 상기 잭(420)을 잭업하여 거더(300)에 프리스트레스를 도입하는 단계;
d) 상기 프리스트레스가 도입된 상태의 거더(300)를 교량의 교대(500) 상면에 단순 거치시키되, 상기 교대(500)의 상면에는 패드(530)가 돌출 형성되어 있어 상기 돌출부재(330)가 패드(530)와 맞물리도록 거치시키는 단계;
e) 상기 제1브라켓(310)과 제2브라켓(410)의 연결을 풀어, 거더(300)에서 잭업용 빔(400)을 분리해내는 단계;
를 포함하여 이루어지는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법.
a) a first bracket 310 and a protruding member 330 are provided at both ends of a lower surface of the lower flange, and the protruding member 330 prepares the girder 300 which is formed on an outer side of the first bracket 310. Making;
b) to the girder 300, a second bracket 410 is provided at both ends of the upper flange upper surface and a jack-up beam 400, which is provided with one or more jacks 420 at the center of the upper flange upper surface, The girder 300 and the jack-up beam 400 are joined by connecting the first bracket 310 and the second bracket 410 to each other;
c) jacking up the jack 420 to introduce prestress into the girder 300;
d) The girder 300 in the state in which the prestress is introduced is simply mounted on the upper surface of the shift 500 of the bridge, and the pad 530 protrudes from the upper surface of the shift 500 so that the protruding member 330 is formed. Mounting to engage the pad 530;
e) separating the jack-up beam 400 from the girder 300 by releasing the connection between the first bracket 310 and the second bracket 410;
Construction method of the prestress girder using a jack-up beam, characterized in that comprising a.
제1항 또는 제2항에 있어서,
상기 제1브라켓(310)과 제2브라켓(410)에는 거더(300)의 폭 방향으로 홀(311, 411)이 각각 형성되어 있고, 상기 b) 단계에서 제1브라켓(310)과 제2브라켓(410)의 연결은 상기 홀(311, 411)에 핀을 삽입하여 힌지결합시킴으로써 이루어지는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법.
The method according to claim 1 or 2,
Holes 311 and 411 are formed in the first bracket 310 and the second bracket 410 in the width direction of the girder 300, respectively, and in step b), the first bracket 310 and the second bracket are formed. Connection of 410 is characterized in that the pin is inserted into the holes (311, 411) by hinge coupling, the construction method of the prestress girder using a jack-up beam.
제1항에 있어서,
상기 거더(300)의 양단부와 수직으로 접하게 되는 교대(500)의 내측면은, 프리스트레스가 도입된 상태의 거더(300) 양단부의 형태에 맞추어 경사지게 형성되어 있는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법.
The method of claim 1,
The inner surface of the shift 500, which is in contact with both ends of the girder 300 perpendicularly, is formed to be inclined in accordance with the shape of both ends of the girder 300 in the pre-stress introduced state, using the jack-up beam Construction method of prestress girder.
제2항에 있어서,
상기 d)단계 이후에, 프리스트레스의 손실을 방지하기 위하여 거더(300)의 단부와 교대(500)를 연결시켜주는 인장강선(340)을 형성시키는 단계가 더 포함되는 것을 특징으로 하는, 잭업용 빔을 이용한 프리스트레스트 거더의 시공방법.
The method of claim 2,
After the step d), further comprising the step of forming a tensile steel wire 340 connecting the end of the girder 300 and the alternating 500 to prevent the loss of prestress, jack-up beam Construction method of prestress girder using
KR1020130007398A 2013-01-23 2013-01-23 Construction method for prestressed girder using jack-up beam KR101297706B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130007398A KR101297706B1 (en) 2013-01-23 2013-01-23 Construction method for prestressed girder using jack-up beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130007398A KR101297706B1 (en) 2013-01-23 2013-01-23 Construction method for prestressed girder using jack-up beam

Publications (1)

Publication Number Publication Date
KR101297706B1 true KR101297706B1 (en) 2013-08-22

Family

ID=49220791

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130007398A KR101297706B1 (en) 2013-01-23 2013-01-23 Construction method for prestressed girder using jack-up beam

Country Status (1)

Country Link
KR (1) KR101297706B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101509096B1 (en) 2014-08-08 2015-04-07 이경표 Structure using transverse prestressed structural members
KR101786758B1 (en) 2017-04-28 2017-10-17 김성 Construction method of prstressed steel composite bridge using temporary hydraulic jack
KR101791062B1 (en) * 2016-10-05 2017-10-27 주식회사 택한 Method of manufacturing steel girder and steel girder manufactured using same
KR102183913B1 (en) 2020-04-17 2020-11-30 김준영 Manufacturing method of prestressed girder and bridge construction method using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120120626A (en) * 2011-04-25 2012-11-02 이종란 Manufacturing method of prestressed steel beam using tightening forces of bolts
KR101209063B1 (en) 2010-05-28 2012-12-05 유호산업개발(주) Pre-stressed girder by plate and method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101209063B1 (en) 2010-05-28 2012-12-05 유호산업개발(주) Pre-stressed girder by plate and method thereof
KR20120120626A (en) * 2011-04-25 2012-11-02 이종란 Manufacturing method of prestressed steel beam using tightening forces of bolts

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101509096B1 (en) 2014-08-08 2015-04-07 이경표 Structure using transverse prestressed structural members
KR101791062B1 (en) * 2016-10-05 2017-10-27 주식회사 택한 Method of manufacturing steel girder and steel girder manufactured using same
KR101786758B1 (en) 2017-04-28 2017-10-17 김성 Construction method of prstressed steel composite bridge using temporary hydraulic jack
KR102183913B1 (en) 2020-04-17 2020-11-30 김준영 Manufacturing method of prestressed girder and bridge construction method using the same

Similar Documents

Publication Publication Date Title
KR101012759B1 (en) Box Girder Having Hybrid Cantilever and Bridge Using Such Box Girder
KR101297706B1 (en) Construction method for prestressed girder using jack-up beam
KR101270733B1 (en) Prestressed Concrete Box Girder Integrated with Steel Deck and Constructing Method of Bridge using Such Girder
KR100982974B1 (en) Method for manufacturing multi-span continuous re-prestressed preflex composite bridge
KR101655330B1 (en) Rahmem structure using composite steel beam and the construction method therefor
KR20100073363A (en) Prestressed segment concrete girder for bridge and manufacturing method thereof
KR100883809B1 (en) Structure for installing shear connector of steel concrete rahmen type complex integral bridge
JP6567355B2 (en) Joint structure of prestressed concrete structure
KR101458088B1 (en) Construction method for rahmen bridge using transverse prestressed girder
KR101354499B1 (en) Longitudinal and transverse pre-moment girder and its manufacturing method
KR20100007300A (en) A steel composite bridge having steel plates connected by using concrete cross beams and its constructing method
KR20100042448A (en) Concrete-composite crossbeam and construction methods using the same
KR20090027052A (en) Precast concrete panel, construction method and structure of precast concrete panel using steel plate
KR102076549B1 (en) CPI Steel girder fabrication method
KR101607485B1 (en) Curved-psc girder with outrigger and curved-psc girder bridge construction method therewith
JP2019002164A (en) Precast floor slab joint structure
KR101351806B1 (en) Rahmen bridge construction method with longitudinal and transverse pre-moment girder
KR20130090709A (en) Construction method for corrugated steel plate web-psc composite beam
KR101426155B1 (en) The hybrid rahmen structure which can add prestress on steel girder of horizontal member by gap difference of connection face between vertical member and steel girder of horizontal member
JP4056540B2 (en) Bridge girder construction method
KR20120054832A (en) Fcm construction method using i-girder
KR100562758B1 (en) Manufacturing method of precast composite beam
KR101477022B1 (en) Manufacturing method for girder using bended steel pipe and girder manufactured by this method
KR20090039903A (en) Multiful beam and manufacturing method of the same
KR20100125504A (en) Prestress concrete composite with prestress non-introducing portion selectively installed at upper and lower portions to which compression force is applied, manufacturing method thereof, slab structure and construction method using the same

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160810

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190515

Year of fee payment: 9