KR101262357B1 - Inclined Earth Retaining Structure Method - Google Patents

Inclined Earth Retaining Structure Method Download PDF

Info

Publication number
KR101262357B1
KR101262357B1 KR1020120030306A KR20120030306A KR101262357B1 KR 101262357 B1 KR101262357 B1 KR 101262357B1 KR 1020120030306 A KR1020120030306 A KR 1020120030306A KR 20120030306 A KR20120030306 A KR 20120030306A KR 101262357 B1 KR101262357 B1 KR 101262357B1
Authority
KR
South Korea
Prior art keywords
holding
pile
steel pipe
support
exposed
Prior art date
Application number
KR1020120030306A
Other languages
Korean (ko)
Other versions
KR20120109418A (en
Inventor
임재욱
Original Assignee
임재욱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임재욱 filed Critical 임재욱
Publication of KR20120109418A publication Critical patent/KR20120109418A/en
Application granted granted Critical
Publication of KR101262357B1 publication Critical patent/KR101262357B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 지주식 흙막이 공법에 관한 것으로, 더욱 상세하게는 지주형태의 높은 수평저항력을 이용하여 배후토사의 토압의 영향을 감소시킴으로써 공기단축 및 공사비 절감효과를 얻을 수 있는 새로운 지주식 흙막이 공법에 관한 것이다.The present invention relates to a strut type retaining method, and more particularly, to a new strut type retaining method that can reduce the effect of earth pressure on the back soil by using high horizontal resistance in the form of a strut, thereby achieving air shortening and construction cost reduction effect. will be.

Description

지주식 흙막이 공법{Inclined Earth Retaining Structure Method}Inclined Earth Retaining Structure Method

본 발명은 지주식 흙막이 공법에 관한 것으로, 더욱 상세하게는 지주형태의 높은 수평저항력을 이용하여 배후토사의 토압의 영향을 감소시킴으로써 공기단축 및 공사비 절감효과를 얻을 수 있는 새로운 지주식 흙막이 공법에 관한 것이다.The present invention relates to a strut type retaining method, and more particularly, to a new strut type retaining method that can reduce the effect of earth pressure on the back soil by using high horizontal resistance in the form of a strut, thereby achieving air shortening and construction cost reduction effect. will be.

일반적으로 흙막이 공법이란 지하공사를 원활하게 할 수 있도록 굴토벽면의 붕괴나 토사의 유입을 방지하기 위한 목적으로 설치되는 가설구조물로써 안전성과 시공성은 물론 경제성도 동시에 요구되는 시설이다.In general, the earthquake construction method is a temporary structure installed for the purpose of preventing the collapse of oyster walls or the inflow of earth and sand to facilitate the underground construction.

또한, 흙막이 공법은 H.PILE+토류판설치공법이나 SHEET PILE설치공법 및 조립식 간이 흙막이 설치공법등이 주로 사용되고 있으며 설치현장의 토질 및 지하수위등 제반조건 등에 따라 적합한 공법이 선택되어 설치되며 지하매설물의 노선선정, 매설형태(매설폭 및 심도)결정, 토압계산, 안전율적용, 흙막이의 필요, 강도계산, 공사비비교, 흙막이 공법의 선정 및 설계 시공순으로 결정된다.In addition, the soil barrier method is mainly used for H.PILE + earth plate installation method, sheet PILE installation method, and prefabricated simple soil installation method, and suitable methods are selected and installed according to the soil conditions and groundwater level of the installation site. It is decided in the order of selection, burying type (burying width and depth), earth pressure calculation, safety factor application, need of masonry, calculation of strength, comparison of construction, selection of masonry construction method and design construction.

상기와 같은 흙막이 공법의 일 실시예로써 지지말뚝 토류판 공법을 도 1을 참조하여 설명하면 다음과 같다.Referring to FIG. 1, the support pile earth plate method is described as an example of the above-described earth retaining method.

먼저, 홈부(1a)가 마주 보도록 수직하게 설치된 복수개의 지지말뚝(H 빔)(1)과, 상기 홈부(1a)에 삽입지지되어 후방의 흙더미 등이 전방을 향하여 무너지는 것을 방지하기 위한 토류판(2)에 의해 구성된다.First, a plurality of support piles (H beams) 1 vertically installed so that the grooves 1a face each other, and a soil plate for being inserted into and supported by the grooves 1a to prevent the dirt piles at the rear thereof from falling forward. It is composed by 2).

상기 토류판(2)으로는 소정 규격의 목재판 또는 강재판이 사용되며, 이를 적층하여 벽체를 형성하고, 그 적층된 토류판(2)을 고정하기 위하여 끼움목(쐐기)을 설치한 구조를 채용하는 것이 일반적이었다.As the earth plate 2, a wooden plate or steel plate of a predetermined standard is used, and a wall is formed by stacking the earth plate, and a structure in which a fitting (wedge) is installed to fix the laminated earth plate 2 is adopted. It was common.

또한, 상기 지지말뚝(1')은 내부에 철근배근된 콘크리트 파일을 서로 밀착되게 근입하여 별도의 토류판 없이 콘크리트 파일 만으로 토압에 저항하는 구성을 갖는다.In addition, the support pile (1 ') is in close contact with the reinforced concrete piles in close contact with each other has a configuration that resists earth pressure with only a concrete pile without a separate earth plate.

이와 같은 종래의 엄지말뚝 흙막이 공법은 고심도의 터파기 공사를 수행하는 경우, H 빔만으로는 배후토사의 토압에 저항할 수 없으므로, 이를 보강하기 위하여 많은 수의 지보재(Strut, Earth Anchor, Raker 등)를 사용해야 하는데, 이러한 방식은 공사기간이 많이 소요되고 비경제적일 뿐만 아니라, 작업공간의 확보를 어렵게 하고, 구조적으로 비효율적이므로 주변지반 침하의 우려도 높다.The conventional thumb pile earthquake construction method can not resist the earth pressure of the rear soil soil by the H beam alone in the case of the high-depth digging work, so that a large number of support materials (Strut, Earth Anchor, Raker, etc.) This method is not only time-consuming and inexpensive, but also makes it difficult to secure a working space and is structurally inefficient.

또한, 종래의 공법에 의한 흙막이 구조물은 강성체로서 토류벽 역할을 할 수는 있으나, 상부두부 변위가 상대적으로 크게 발생하므로 배면부 지반의 이완이 크게 발생한다는 점이다.In addition, the earthquake structure according to the conventional method may act as an earth wall as a rigid body, but because the displacement of the upper head is relatively large, the loosening of the back ground occurs.

상기와 같은 문제점을 해결하기 위한 목적으로 대한민국 특허등록 제10-0964993호에는 고심도의 터파기 작업을 수행하는 경우에도 지보재(Strut, Earth Anchor, Raker 등) 없이 배후토사의 토압에 충분히 저항하도록 하고, 흙막이 구조물의 전체적인 변위의 발생을 억제할 수 있도록 하는 고심도 2열 억지말뚝 흙막이 공법을 제시하고 있으며 이러한 2열 흙막이 공법을 통하여 배후토사의 토압에 충분히 저항하도록 하고 흙막이 구조물의 전체적인 변위발생을 억제할 수 있는 기술이 제공되었다.For the purpose of solving the above problems, Korean Patent Registration No. 10-0964993 is sufficient to resist the earth pressure of the earth and sand without the support material (Strut, Earth Anchor, Raker, etc.) In addition, this paper proposes a high-depth two-row deterrent pile clogging method that can suppress the occurrence of overall displacement of the earthen block structure. The technology to do this was provided.

상기와 같은 2열 흙막이 공법의 구성적 특징을 살펴보면 도 4에 도시한 바와 같이 1열 엄지말뚝과 2열 억지말뚝을 일정간격 이격된 상태로 지면과 수직되게 근입한 상태에서 상부를 연결부재를 통하여 연결함으로써 대략 "П"의 형태로 말뚝을 설치함으로써 기존 1열의 말뚝을 이용한 흙막이 공법에 비하여 더욱 우수하게 배후토사의 압력에 충분히 저항함으로써 흙막이 말뚝의 변형을 방지할 수 있는 공법이 개시되어 있다.Looking at the constitutional features of the two-row soil membrane construction method as shown in FIG. 4 through the connecting member in the state in which the first row thumb pile and the second row interference pile are vertically perpendicular to the ground in a state spaced apart at regular intervals. By connecting the piles in the form of "П" by connecting them, a method that can prevent deformation of the soil piling piles by better resisting the pressure of the back soil is better than the conventional piling technique using a single row pile.

그러나 상기와 같이 2열 억지말뚝 흙막이 공법 또한 1열 흙막이 공법에 비하여 높은 토압에 대한 저항치수가 높은 것은 확인할 수 있으나 구조적인 휨으로 인해 변위가 크게 발생하는 문제점이 계속하여 발생하였다.However, as described above, it can be confirmed that the resistance of the high earth pressure is higher than that of the first-row earthquake method in the two-row hard pile earthquake method, but a large displacement occurs due to structural bending.

또한, 이러한 2열 억지말뚝의 저항력을 높이기 위하여 말뚝의 내측으로 앵커 또는 네일을 부가적으로 설치함으로써 흙막이 공사의 공기가 길어지고 설치비가 증가하는 문제점이 발생하였다.
In addition, in order to increase the resistance of the two-row interference pile by installing an anchor or nail to the inside of the pile additionally, the air of the earthquake construction is long and the installation cost increases.

본 발명은 상기와 같은 사정을 고려하여 이루어진 것으로, 본 발명의 목적은 고심도의 터파기 작업을 수행하는 경우에도 지보재 없이 배후토사의 토압에 충분히 저항하도록 하고, 흙막이 구조물의 전체적인 변위의 발생을 억제할 수 있도록 하는 지주식 흙막이 공법을 제공함에 있다.The present invention has been made in consideration of the above circumstances, and an object of the present invention is to sufficiently resist the earth pressure of the rearing soil without supporting materials even when carrying out a high-depth excavation work, and suppress the occurrence of the overall displacement of the earthquake structure. It is to provide a holding mudstone method that can be used.

또한, 본 발명의 또 다른 목적으로는 흙막이 부재 중 내측 지주에 고정부를 설치하여 토압에 의해 흙막이가 전도되는 것을 보다 확실히 방지하고 변위발생을 크게 억제할 수 있도록 하되. 추후 내측지주는 쉽게 인발제거하여 재사용 할 수 있도록함으로써 역학적 안전성과 경제성을 크게 높일 수 있는 새로운 형태의 지주식 흙막이 공법을 제공함에 있다.In addition, another object of the present invention is to provide a fixed portion to the inner support of the earth member, so that it is possible to more reliably prevent the earth fence from falling by earth pressure and to greatly suppress the occurrence of displacement. In the future, the inner circumference can be easily removed and reused to provide a new type of prop retaining method that can greatly improve mechanical safety and economic efficiency.

본 발명은 상기와 같은 목적을 달성하기 위해 안출된 것으로써, 보링장치(미도시)로 일정간격을 두고 다수개의 흙막이용 지주구멍(10a, 20a)을 "

Figure 112013033197078-pat00022
", "
Figure 112013033197078-pat00023
" 중 선택되는 하나의 형태로 천공하는 구멍천공단계와, 천공된 지주구멍(10a, 20a)에 제1지주말뚝(10)과 제2지주말뚝(20)을 각각 근입하는 지주설치단계와, 상기 제1지주말뚝(10)과 제2지주말뚝(20)의 상단 연결부분을 결속수단(30)을 이용하여 연결하는 결속단계와, 상기 제1지주말뚝(10)과 제2지주말뚝(20)이 연결된 상태에서 제1지주말뚝(10)의 일측면이 노출되도록 지면을 굴착하는 굴착단계와, 상기 노출된 제1지주말뚝(10)과 노출된 제1지주말뚝(10') 사이에 흙막이판(40)을 설치하는 흙막이판 설치단계;를 포함하고, 상기 제2지주말뚝(20)은 하단부에 고정부(22)가 가접(假接)되어 인발부(21)와 고정부(22)로 분할 형성하고 상기 제2지주말뚝(20)의 외주면에 하나 이상의 와이어(231)가 밀착되며 끝부분을 피복하여 노출된 강선(23)이 고정부(22)에 연결되는 지주식 흙막이 공법에 있어서, 상기 고정부(22)는 일측이 상기 제2지주말뚝(20)의 끝부분에 가접되며 표면에 여러 개의 구멍(221)을 갖는 강관(222)과, 상기 강관(222)의 내부에 형성되는 여러 개의 스페이서(223)와, 상기 강관(222) 내부에서 여러 개의 스페이서(223)를 연결고정하는 결속선(224) 및 상기 강관(222)의 내부에 삽입되며 와이어(231)로부터 피복되어 노출된 하나 이상의 강선(23)을 포함하며, 여기서, 상기 강관(222)의 외측에 콘크리트를 타설함으로서 콘크리트가 강관(222)의 구멍(221)을 통하여 강관(222)의 내부와 외부로 고르게 타설되어 고정부(22)와 내부에 삽입된 강선(23)을 견고하게 양생함을 특징으로 하는 지주식 흙막이 공법을 제공함에 있다.
또한, 상기 강관의 끝부분에는 철판을 용접하여 연약지반에서 제2지주말뚝을 근입시 고정부의 콘크리트 타설 공간을 보호할 수 있도록 함에 특징이 있다.
The present invention has been made in order to achieve the above object, a plurality of retaining holes (10a, 20a) for the retaining at intervals with a boring device (not shown) "
Figure 112013033197078-pat00022
","
Figure 112013033197078-pat00023
And a perforation step of perforating to one of the selected forms, and a periphery installation step of indenting the first support stake 10 and the second support stake 20 into the perforated support holes 10a and 20a, respectively; Bonding step of connecting the upper connecting portion of the first holding pile 10 and the second holding pile 20 using the binding means 30, and the first holding pile 10 and the second holding pile 20 Excavation step of excavating the ground so that one side of the first holding pile 10 is exposed in the state that is connected to the ground, and between the exposed first holding pile 10 and the exposed first holding pile 10 ' Including a step of installing the retaining plate plate 40, wherein the second column stake 20 is fixed to the lower end portion 22 is a temporary draw (21) and the fixing portion 22 One or more wires 231 are formed in close contact with the outer circumferential surface of the second support pile 20 and the end portion covering the end portion of the holding steel wire 23 is connected to the fixing portion 22. In the construction method, the fixing portion 22 is a steel pipe 222, one side of which is in contact with the end of the second holding pile 20 and has a plurality of holes 221 on the surface, and the inside of the steel pipe 222 A plurality of spacers 223 formed in the plurality of spacers, a binding line 224 connecting and fixing the plurality of spacers 223 in the steel pipe 222, and inserted into the steel pipe 222 and covered by a wire 231. And one or more steel wires 23 exposed to each other, wherein the concrete is poured evenly into and out of the steel pipe 222 through the hole 221 of the steel pipe 222 by pouring concrete outside the steel pipe 222. It is to provide a holding type earthquake construction method characterized in that the hardened portion of the fixed portion 22 and the steel wire 23 inserted therein is firmly cured.
In addition, the end portion of the steel pipe is characterized in that to protect the concrete placing space of the fixing portion when the second holding pile in the welded steel plate by welding the soft ground.

삭제delete

삭제delete

삭제delete

삭제delete

본 발명은 종래에 사용되는 흙막이 공법에 비하여 제1지주말뚝과 제2지주말뚝의 경사각을 이루며 근입되는 형태와 각각 근입된 지주말뚝이 만나는 상부를 결속수단을 이용하여 견고하게 유지시킴으로써 우수한 측방 변위억제 효과를 갖는다.Advantageous Effects of the Invention The present invention provides an excellent lateral displacement suppression effect by maintaining the inclined angle of the first support pile and the second support pile and the upper portion where the adjacent support piles meet each other using the binding means, as compared with the conventional soil barrier method. Has

또한, 종래 수직으로 굴착하는 공법에 비하여 본원발명의 지주식 흙막이 공법은 굴착면이 경사지게 형성됨으로써 경감된 흙무게 만큼의 토압감소 효과를 갖는다.In addition, compared to the conventional vertical excavation method, the holding earth retaining method of the present invention has an effect of reducing earth pressure as much as the weight of soil reduced by the inclined excavation surface.

또한, 제2지주말뚝의 구성을 통하여 하부에 앵커링(Anchoring)효과가 발생되는 효과가 있다.In addition, there is an effect that the anchoring effect (Anchoring) occurs in the lower portion through the configuration of the second holding pile.

또한, 보조적인 띠장, 앵커, 네일 등의 설치가 필요없어 흙막이 공사를 위한 숙련된 기술이 필요없고 작업공간이 좁은 상황에서도 원활하게 흙막이 공사를 수행할 수 있어 부지매입에 따른 비용을 절감할 수 있는 효과가 있다.In addition, it does not require the installation of auxiliary strips, anchors, nails, etc., and therefore does not require skilled skills for earthquake construction and can smoothly perform earthquake construction even in a narrow working space, thereby reducing the cost of site purchase. It works.

또한, 흙막이 공법에 사용된 각종 자재(H빔, 흙막이판 등)가 용접 등에 의하여 변형됨이 없이 설치하여 사용함으로써 해체시 자재의 변형이 없음으로 준비작업 없이 다른 흙막이 공사에 바로 사용할 수 있어 자재의 효율성을 높이고 준비작업 등에 소요되는 비용을 절감할 수 있는 효과가 있다.
In addition, since various materials used in the earthen construction method (H beam, earthen board, etc.) are installed and used without being deformed by welding, etc., there is no deformation of the material when dismantling, so it can be used directly in other earthen works without preparation work. There is an effect that can increase the efficiency and reduce the cost of preparation work.

도 1은 종래의 흙막이 구조물의 사시도.
도 2는 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물의 사시도.
도 3은 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물의 측단면도.
도 4 는 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물 중 제2지주말뚝의 고정부 부분의 단면도.
도 5 내지 도 10은 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물의 다른 실시예의 측단면도.
1 is a perspective view of a conventional retaining structure.
Figure 2 is a perspective view of a retaining structure using a holding retaining method according to the present invention.
Figure 3 is a side cross-sectional view of a retaining structure using a holding retaining method according to the present invention.
Figure 4 is a cross-sectional view of the fixing portion portion of the second column stake of the earthquake structure using the strut method according to the present invention.
5 to 10 is a side cross-sectional view of another embodiment of a holding structure using a holding type holding method according to the present invention.

이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.

도 2는 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물의 사시도이고, 도 3은 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물의 측단면도이다.Figure 2 is a perspective view of the structure of the earth block using the holding earth retaining method according to the present invention, Figure 3 is a side cross-sectional view of the earth structure using the holding earth retaining method according to the present invention.

도시한 바와 같이 본 발명에 따른 지주식 흙막이 공법은 먼저 흙막이를 설치할 지면에 수직방향으로부터 10도 ~ 15도 기울인방향으로 제1지주말뚝(10)을 근입설치하고 다시 제2지주말뚝(20)을 제1지주말뚝(10)과 대항되는 각도로 근입설치함으로써 각각의 제1지주말뚝(10)과 제2지주말뚝(20)의 상부가 서로 x자 형태로 밀착되도록 형성한다.As shown in the figure, the holding soil retaining method according to the present invention firstly installs the first holding stake 10 in a direction inclined 10 degrees to 15 degrees from the vertical direction on the ground on which the soil retaining ground is to be installed, and then again the second holding stake 20. The upper and upper portions of each of the first holding pile 10 and the second holding pile 20 are formed so as to be in close contact with each other in an X-shape by being installed in close proximity to the first holding pile 10.

또한, 제1지주말뚝(10)과 제2지주말뚝(20)을 설치한 후 상부 연결부분과 띠장(30)을 철판 등을 이용하여 결속함으로써 넝쿨식물을 기를때의 지주와 같은 형상으로 구성한다.In addition, after installing the first holding stake 10 and the second holding stake 20, by binding the upper connection portion and the band 30 by using an iron plate or the like to form the shape of the post when raising the vine plant. .

또한, 상기와 같이 각각의 지주말뚝(10, 20)을 굴착영역의 경계선을 따라 일정간격 이격되게 계속하여 근입한다.Further, as described above, each of the pillar piles 10 and 20 is continuously moved along the boundary line of the excavation area to be spaced apart by a predetermined interval.

한편, 상기 제2지주말뚝(20)은 끝부분에 고정부(22)를 가접(假接)하여 인발부(21)와 고정부(22)로 분할구성한다.On the other hand, the second holding pile 20 is divided into a drawing portion 21 and the fixing portion 22 by the temporary fixing part 22 to the end.

상기 인발부(21)는 통상 제1지주말뚝(10)과 같은 형태의 H빔을 이용하여 형성하고 상기 인발부(21) 끝부분에 고정부(22)의 일부분을 가접하여 형성한다.The drawing portion 21 is usually formed by using the H beam of the same shape as the first support pile 10 and is formed by welding a portion of the fixing portion 22 to the end of the drawing portion 21.

상기 고정부(22)는 도 4에 도시한 바와 같이 길이방향으로 여러 개의 구멍(221)이 형성되는 강관(222)의 일측이 상기 인발부(21)의 끝부분과 부분적으로 가접되고 내부에는 여러 개의 스페이서(223)가 결속선(224)에 의하여 고정된다.As shown in FIG. 4, one side of the steel pipe 222, in which a plurality of holes 221 are formed in the longitudinal direction, is partially in contact with an end portion of the drawing part 21, and several inside Spacers 223 are fixed by the tie lines 224.

또한, 상기 강관(222)의 내부에는 여러 개의 강선(23)이 삽입되는데, 상기 강선(23)은 제2지주말뚝(20)의 길이보다 길게 형성된 와이어(231)의 고정부(22) 부분을 피복하여 형성한다.In addition, a plurality of steel wires 23 are inserted into the steel pipe 222, the steel wire 23 is a portion of the fixing portion 22 of the wire 231 formed longer than the length of the second support pile (20) Formed by coating.

상기와 같이 구성되는 제2지주말뚝(20)을 지주구멍(20a)에 삽입한 상태에서 고정부(22) 부분에 콘크리트를 타설하는데, 타설되는 콘크리트는 강관(222)에 형성된 여러 개의 구멍(221)을 통하여 강관(222)의 내부와 외부에 고르게 타설되어 양생된다.In the state of inserting the second holding pile 20 configured as described above in the holding hole (20a), the concrete is poured into the fixed portion 22, the concrete to be poured is a plurality of holes 221 formed in the steel pipe 222 Through) is poured into the inside and outside of the steel pipe 222 is cured.

이때, 강관(222) 내부에 형성된 강선(23)이 콘크리트와 같이 양생되어 고정부(22)에 강선(23)이 견고하게 연결된다.At this time, the steel wire 23 formed inside the steel pipe 222 is cured like concrete, and the steel wire 23 is firmly connected to the fixing part 22.

또한, 상기 강선(23)의 상부 와이어(231)는 인발부(21)를 통하여 외부로 노출되어 띠장(30)과 연결되는데, 상기 와이어(231)가 연결되는 과정에서 인발부(21) 부분에서 인장된 상태로 연결시킴으로써 인발부(21)와 고정부(22)가 견고하게 밀착된 상태로 형성된다.In addition, the upper wire 231 of the steel wire 23 is exposed to the outside through the drawing portion 21 is connected to the strip 30, in the process of connecting the wire 231 in the drawing portion 21 By connecting in a tensioned state, the drawing portion 21 and the fixing portion 22 are formed in a tightly contacted state.

한편, 지주말뚝이 설치되는 지반이 점토와 같이 연약한 경우 지주구멍이 메워져 고정부(22)의 콘크리트 타설이 원활하지 못한 경우 고정부(22)의 끝부분에 철판(24)을 용접하여 형성함으로써 지주구멍의 변형을 방지하고 원활하게 콘크리트를 타설할 공간을 확보한다.On the other hand, if the ground on which the support pile is installed is soft, such as clay, the support hole is filled, and when the concrete placing of the fixing part 22 is not smooth, the holding plate is formed by welding the iron plate 24 at the end of the fixing part 22. Prevents deformation and secures the space for concrete casting.

상기와 같이 제1지주말뚝(10)과 제2지주말뚝(20)을 근입한 후 제1지주말뚝(10)이 노출되도록 굴착하면서 제1지주말뚝(10)과 다른 노출된 제1지주말뚝(10') 사이에 흙막이판(40)을 순차적으로 설치하여 흙막이 구조물을 완성한다.As described above, after the first holding pile 10 and the second holding pile 20 are inserted, the first holding pile 10 is exposed and the first holding pile 10 is different from the exposed first holding pile ( 10 ') between the sequential plate 40 is installed sequentially to complete the masonry structure.

한편, 도 5는 본 발명에 따른 지주식 흙막이 공법을 이용한 흙막이 구조물의 다른 실시예의 측단면도이다.On the other hand, Figure 5 is a side cross-sectional view of another embodiment of a holding structure using a holding type holding method according to the present invention.

도시한 바와 같이 본 실시예에서는 상기 제1지주말뚝(10)과 제2지주말뚝(20) 사이에 보조지주말뚝(60)을 지면과 수직되게 형성함으로써 토압의 저항력을 더욱 우수히 할 수 있는 실시예가 도시되어 있다.As shown in the present embodiment, the auxiliary support stake 60 is formed perpendicularly to the ground between the first support stake 10 and the second support stake 20 to further improve the resistance of earth pressure. Is shown.

또한, 지주말뚝(10, 20, 60)의 상부(제1지주말뚝(10)과 제2지주말뚝(20) 및 보조지주말뚝(60)이 연결되는 부분)는 띠장(30)으로 연결하여 서로 견고히 결속되도록 형성한다.In addition, the upper portion of the support stake (10, 20, 60) (parts where the first holding stake 10 and the second holding stake 20 and the auxiliary holding stake (60) is connected) is connected to each other by the band 30. Form to be solidly bound.

한편, 도 6 내지 도 7은 도심지에서의 공사와 같이 굴착구역에 제한을 받는 공사현장에서 흙막이 시설을 시공시 공사범위를 축소하더라도 배후토사의 토압에 대한 충분한 저항력을 갖을 수 있는 흙막이 시설의 실시예가 도시되어 있다.On the other hand, Figures 6 to 7 is an embodiment of the earthquake facilities that can have a sufficient resistance to earth pressure of the rear soil soil even if the construction scope is reduced when constructing the earthquake facilities at construction sites that are limited to the excavation area, such as construction in the downtown area Is shown.

도시한 바와 같이 제1지주말뚝(10)과 제2지주말뚝(20) 중 시공현장 상황에 맞는 하나의 지주말뚝(10 또는 20)을 지면과 수직방향으로 근입하고 지면과 수직근입된 지주말뚝(10 또는 20)의 전방이나 후방으로 10도 ~ 15도 범위로 기울인 상태로 근입하고 연결부분을 띠장(30)으로 연결하여 설치하며 굴착 경계선을 따라 굴착하고 굴착에 의하여 노출된 제1지주말뚝(10) 또는 제2지주말뚝(20)과 이웃하는 제1지주말뚝 또는 제2지주말뚝의 사이에 흙막이판(40)을 연결하여 배후토사의 압력에 저항하며 구조물의 전체적인 변위를 억제할 수 있도록 한다.As shown, one of the holding pillar (10 or 20) of the first holding pile (10) and the second holding pile (20) in accordance with the construction site situation in the vertical direction to the ground and vertically inclined with the ground (10 or 20) to the front or rear in the inclined state in the range of 10 degrees to 15 degrees, and installed by connecting the connection portion with the band 30 (30) excavated along the excavation boundary line and exposed by the excavation of the first column stake ( 10) Alternatively, by connecting the retaining plate 40 between the second holding pile 20 and the adjacent first holding pile or the second holding pile to resist the pressure of the rear soil soil and to suppress the overall displacement of the structure. .

또한, 도 8 내지 도 9는 별도의 지지판(70)을 제1지주말뚝(10)과 제2지주말뚝(20) 사이에 연결설치함으로써 각각의 지주말뚝의 결합력을 극대화함과 동시에 배수토사의 압력에 저항하도록 형성한다.In addition, FIGS. 8 to 9 are connected to the first holding pile 10 and the second holding pile 20 by installing a separate support plate 70 to maximize the coupling force of each holding pile and at the same time the pressure of the drained soil Form to resist.

도 10은 제 2지주말뚝의 설치에 따른 다른 실시예로써 도시한 바와 같이 인발부(21)와 고정부(22)가 연결된 제2지주말뚝(20)을 지주구멍에 삽입한 후 콘크리트 타설하여 고정부(22)를 완성하고 가접된 인발부(21)를 제거하고 지주구멍을 마감한 후 외부로 노출된 외이어(231)을 인장시켜 띠장(30)에 견고하게 연결함으로써 고정부(22)만으로 제2지주말뚝의 효과를 기대할 수 있도록함으로써 자재의 효율성을 극대화 할 수 있도록 한다.10 is another embodiment according to the installation of the second column pile as shown in the concrete after pouring the second column pile 20 connected to the drawing portion 21 and the fixing portion 22 into the holding hole After completing the government 22 and removing the welded drawing part 21 and closing the support hole, the outer ear 231 exposed to the outside is tensioned and firmly connected to the band 30, so that only the fixing part 22 is provided. The effect of the second stake is expected to be maximized to maximize the efficiency of the material.

상기와 같은 특징은 말뚝이 설치되는 지반이 견고하고 단단한 경우에 사용이 가능하다.Such a feature can be used when the ground on which the pile is installed is firm and hard.

이상과 같은 공정에 의하여 설치되는 흙막이 구조물을 단계별로 설명하면 다음과 같다.Referring to step by step the structure of the earth structure installed by the above process as follows.

구멍천공단계Hole drilling step

보링장치(미도시)로 일정간격을 두고 다수개의 흙막이용 지주구멍(10a, 20a)을 "

Figure 112013033197078-pat00003
", "
Figure 112013033197078-pat00004
" 중 선택되는 하나의 형태로 천공한다.A plurality of retaining holes 10a and 20a for the retaining blocks at a predetermined interval with a boring device (not shown)
Figure 112013033197078-pat00003
","
Figure 112013033197078-pat00004
Perforation in one form selected.

상기 지주구멍(10a, 20a)은 대략 지면과 수직상태에서 10도 ~ 15도 범위 내로 기울여 천공하며 한 쌍의 구멍이 대략 20도 ~ 30도 범위에서 형성되도록 함이 바람직하다.The holding holes 10a and 20a are inclined to be drilled in a range of 10 degrees to 15 degrees in a substantially perpendicular state to the ground, and a pair of holes are preferably formed in a range of approximately 20 degrees to 30 degrees.

또한, 각각의 지주구멍(10a, 20a) 사이에 지면으로부터 수직으로 형성되는 보조지주구멍(61)을 형성하여 보조지주말뚝(60)을 설치할 수 있다.In addition, the auxiliary holding pillars 60 can be installed by forming the auxiliary holding holes 61 formed vertically from the ground between the respective holding holes 10a and 20a.

지주설치단계Shoring installation stage

천공된 지주구멍(10a, 20a)에 제1지주말뚝(10)과 고정부(22)가 형성된 제2지주말뚝(20)을 각각 근입하여 지주말뚝을 적절한 간격으로 설치한다.The second support piles 20 having the first support piles 10 and the fixing portion 22 are respectively inserted into the perforated support holes 10a and 20a to install the support piles at appropriate intervals.

이때, 지주말뚝은 천공된 구멍에 삽입한 상태에서 고정부(22)에는 콘크리트와 같은 그라우트재를 주입하여 고정부를 완성하고 인발부(21)의 외측은 모래채움하여 완성한다.At this time, the holding pile is inserted into the perforated hole, the fixing portion 22 is injected into the grout material such as concrete to complete the fixing portion and the outside of the drawing portion 21 is completed by sand filling.

지주말뚝 결속단계Shoring Pile Bonding Stage

상기 제1지주말뚝(10)과 제2지주말뚝(20)의 상단 연결부분을 띠장(30)을 이용하여 연결함으로써 넝쿨식물을 기를때 설치하는 지주와 유사한 형태를 갖도록 지주말뚝을 형성한다.By connecting the upper connection portion of the first holding stake 10 and the second holding stake 20 using the belt 30 to form a holding stake to have a form similar to the support for installing when the vine plant is raised.

상기와 같이 각각의 지주말뚝 상부를 결속함으로써 좌우로 흔들림을 방지하는 효과를 극대화시킬 수 있는 특징이 있다.As described above, by binding the upper portion of each holding pile is characterized by maximizing the effect of preventing shaking from side to side.

굴착단계Excavation stage

상기와 같이 제1지주말뚝(10)과 제2지주말뚝(20)을 상부가 엇갈리게 지면에 근입한 상태를 굴착 경계선을 따라 여러 부분 설치한 후 제1지주말뚝(10)의 일측면이 노출되도록 지면을 제1지주말뚝(10)과 동일한 각도로 굴착한다.As described above, after installing the first holding stake 10 and the second holding stake 20 in a state in which the upper portion is staggered in the ground along the excavation boundary line, one side of the first holding stake 10 is exposed. Excavate the ground at the same angle as the first column stake (10).

흙막이판Earthen board 설치단계 Installation Step

상기와 같이 제1지주말뚝(10)이 지면의 굴착에 의하여 외부로 노출된 상태에서 제1지주말뚝(10)과 다른 노출된 제1지주말뚝(10')의 사이에 흙막이판(40)을 끼워 설치함으로써 배후토사의 압력에 저항하며 구조물의 전체적인 변위를 억제할 수 있도록 한다.As described above, in the state in which the first holding stake 10 is exposed to the outside by excavation of the ground, the soil plate 40 is disposed between the first holding stake 10 and the other exposed first holding stake 10 '. By installing it, it resists the pressure of the background soil and can suppress the overall displacement of the structure.

이하, 상기와 같이 설치된 지주식 흙막이 공법과 종래 흙막이 공법에 따른 구조를 케이스별로 대비하여 수치해석함으로써 본원발명의 지주식 흙막이 공법이 종래 흙막이 구조물에 비하여 월등한 저항력을 가짐을 설명한다.Hereinafter, the numerical analysis of the structure according to the holding soil construction method and the conventional soil construction method installed as described above will be described that the holding soil construction method of the present invention has a superior resistance compared to the conventional construction structure.

< 해석 방법 ><Method of interpretation>

본원발명의 지주식 흙막이 공법의 역학적 효과를 확인하기 위하여 아래그림과 같이 종래기술인 1열지주말뚝식(CASE 1)과 2열지주말뚝식(CASE 2) 및 본발명의 지주식 말뚝(CASE 3)의 세가지 케이스를 비교하였다.In order to confirm the mechanical effect of the prop retaining method of the present invention, as shown in the figure below, the conventional single column pedestal (CASE 1) and the double column pedestal (CASE 2) and the prop type stake of the present invention (CASE 3) Three cases were compared.

상기에서 지주말뚝(H-빔)의 단면치는 H-350 * 350 * 12 * 19 : A = 173.9 σcm2, lx = 40.300 cm4, Zx = 2.300㎤, rx = 15.2㎝, ry = 8.84㎝ 으로 한다.In the above, the cross-sectional value of the holding pile (H-beam) is H-350 * 350 * 12 * 19: A = 173.9 σ cm 2 , lx = 40.300 cm 4 , Zx = 2.300 cm 3 , rx = 15.2 cm, ry = 8.84 cm .

Figure 112012023798871-pat00005
Figure 112012023798871-pat00005

( CASE 1 )(CASE 1)

▶ 최대수평력 계산▶ Maximum horizontal force calculation

외력 M1 = HㆍLExternal force M1 = H ・ L

내력 M2 = ZxㆍσaStrength M2 = Zx

M1 = M1 이므로Since M1 = M1

H =

Figure 112012023798871-pat00006
=
Figure 112012023798871-pat00007
= 1.891.3kgf = 1.9tonfH =
Figure 112012023798871-pat00006
=
Figure 112012023798871-pat00007
= 1.891.3kgf = 1.9tonf

▶ 수평변위 계산▶ Horizontal displacement calculation

δ = 211.80 cm (MIDAS 해석결과 참조)
δ = 211.80 cm (see Midas analysis results)

( CASE 2 )(CASE 2)

▶ 최대수평력 계산▶ Maximum horizontal force calculation

Figure 112012023798871-pat00008
Figure 112012023798871-pat00008

여기서,

Figure 112012023798871-pat00009
here,
Figure 112012023798871-pat00009

Figure 112012023798871-pat00010
Figure 112012023798871-pat00010

σbag = 1400.0σbag = 1400.0

Figure 112012023798871-pat00011
Figure 112012023798871-pat00011

Figure 112012023798871-pat00012
Figure 112012023798871-pat00012

P = 4.900 tonf 이면, 1.00 < 1 (O.K)If P = 4.900 tonf, 1.00 <1 (O.K)

▶ 수평변위 계산▶ Horizontal displacement calculation

δ = 30.00 cm (MIDAS 해석결과 참조)
δ = 30.00 cm (see Midas analysis results)

( CASE 3 )(CASE 3)

▶ 최대수평력 계산▶ Maximum horizontal force calculation

Figure 112012023798871-pat00013
Figure 112012023798871-pat00013

여기서,

Figure 112012023798871-pat00014
here,
Figure 112012023798871-pat00014

Figure 112012023798871-pat00015
Figure 112012023798871-pat00015

σbag = 1400.0σbag = 1400.0

Figure 112012023798871-pat00016
Figure 112012023798871-pat00016

Figure 112012023798871-pat00017
Figure 112012023798871-pat00017

P = 52.500 tonf 이면, 0.99 < 1 (O.K)If P = 52.500 tonf, 0.99 <1 (O.K)

▶ 수평변위 계산▶ Horizontal displacement calculation

δ = 4.10 cm (MIDAS 해석결과 참조)
δ = 4.10 cm (see Midas analysis results)

< 해석 결과 > < Analysis result>

아래 표에서 확인되는 바와 같이 본원발명의 지주식 흙막이 공법(CASE 3)이 최대수평지지하중이 가장 커서 토압에 가장 효과적으로 저항할 수 있으며, 벽체의 변위 또한 크게 억제됨을 확인할 수 있다.As can be seen in the table below, the holding scaffolding method of the present invention (CASE 3) has the largest horizontal support load, so it can be most effectively resistant to earth pressure, and the displacement of the wall can be confirmed to be greatly suppressed.

즉, 본원발명인 지주식흙막이 공법(CASE 3)이 2열 흙막이 공법(CASE 2)에 비하여 최대수평하중은 10.7배 증가하고 변위는 0.1배로 감소하였다.In other words, the maximum horizontal load increased by 10.7 times and the displacement decreased by 0.1 times compared to the two-stage earthquake method (CASE 2).

세가지 케이스 흙막이 공법의 최대 수평지지하중 및 그때의 변위Maximum horizontal support loads and displacements of the three-case cladding method 흙막이 형태Earthen form 최대수평지지하중
P(ton)
Horizontal load capacity
P (ton)
변위
δ(㎝)
Displacement
δ (cm)
최대수평지지하중 비Maximum horizontal load capacity ratio 변위비Displacement ratio
CASE 1CASE 1 1.91.9 221.8221.8 0.40.4 7.47.4 CASE 2CASE 2 4.94.9 30.030.0 1.01.0 1.01.0 CASE 3CASE 3 52.552.5 4.14.1 10.710.7 0.10.1

본 발명은 첨부된 도면에 도시된 일 실시예를 참고로 설명한 것이나, 당해 기술 분야의 통상의 지식을 가진 자들에게는 다양한 변형 및 다른 실시예가 가능하다는 점이 이해될 것이다.
Although the present invention has been described with reference to one embodiment shown in the accompanying drawings, it will be understood that various modifications and other embodiments are possible to those skilled in the art.

10 ... 제1지주말뚝 20 ... 제2지주말뚝
21 ... 인발부 22 ... 고정부
30 ... 띠장 40 ... 흙막이판
60 ... 보조지주말뚝
10 ... First stakes 20 20 Second stakes
21 ... drawing part 22 ... fixing part
30 ... Belt 40 ... Clapboard
60 ... Auxiliary Support Pile

Claims (4)

보링장치(미도시)로 일정간격을 두고 다수개의 흙막이용 지주구멍(10a, 20a)을 "
Figure 112013033197078-pat00018
", "
Figure 112013033197078-pat00019
" 중 선택되는 하나의 형태로 천공하는 구멍천공단계와, 천공된 지주구멍(10a, 20a)에 제1지주말뚝(10)과 제2지주말뚝(20)을 각각 근입하는 지주설치단계와, 상기 제1지주말뚝(10)과 제2지주말뚝(20)의 상단 연결부분을 결속수단(30)을 이용하여 연결하는 결속단계와, 상기 제1지주말뚝(10)과 제2지주말뚝(20)이 연결된 상태에서 제1지주말뚝(10)의 일측면이 노출되도록 지면을 굴착하는 굴착단계와, 상기 노출된 제1지주말뚝(10)과 노출된 제1지주말뚝(10') 사이에 흙막이판(40)을 설치하는 흙막이판 설치단계;를 포함하고,
상기 제2지주말뚝(20)은 하단부에 고정부(22)가 가접(假接)되어 인발부(21)와 고정부(22)로 분할 형성하고 상기 제2지주말뚝(20)의 외주면에 하나 이상의 와이어(231)가 밀착되며 끝부분을 피복하여 노출된 강선(23)이 고정부(22)에 연결되는 지주식 흙막이 공법에 있어서,
상기 고정부(22)는 일측이 상기 제2지주말뚝(20)의 끝부분에 가접되며 표면에 여러 개의 구멍(221)을 갖는 강관(222)과, 상기 강관(222)의 내부에 형성되는 여러 개의 스페이서(223)와, 상기 강관(222) 내부에서 여러 개의 스페이서(223)를 연결고정하는 결속선(224) 및 상기 강관(222)의 내부에 삽입되며 와이어(231)로부터 피복되어 노출된 하나 이상의 강선(23)을 포함하며,
여기서, 상기 강관(222)의 외측에 콘크리트를 타설함으로서 콘크리트가 강관(222)의 구멍(221)을 통하여 강관(222)의 내부와 외부로 고르게 타설되어 고정부(22)와 내부에 삽입된 강선(23)을 견고하게 양생함을 특징으로 하는 지주식 흙막이 공법.
A plurality of retaining holes 10a and 20a for the retaining blocks at a predetermined interval with a boring device (not shown)
Figure 112013033197078-pat00018
","
Figure 112013033197078-pat00019
And a perforation step of perforating to one of the selected forms, and a periphery installation step of indenting the first support stake 10 and the second support stake 20 into the perforated support holes 10a and 20a, respectively; Bonding step of connecting the upper connecting portion of the first holding pile 10 and the second holding pile 20 using the binding means 30, and the first holding pile 10 and the second holding pile 20 Excavation step of excavating the ground so that one side of the first holding pile 10 is exposed in the state that is connected to the ground, and between the exposed first holding pile 10 and the exposed first holding pile 10 'Includes; earth plate installation step of installing the plate 40,
The second support pile 20 is fixed to the lower end portion 22 is formed in the draw portion 21 and the fixed portion 22 is divided into one and one on the outer peripheral surface of the second support pile 20 In the above-mentioned wire 231 is in close contact with the end portion of the holding type earthenware construction method in which the exposed steel wire 23 is connected to the fixing portion 22,
The fixing part 22 is a steel pipe 222, one side of which is in contact with the end of the second holding pile 20 and has a plurality of holes 221 on the surface, and the various formed inside the steel pipe 222 Two spacers 223, a binding line 224 connecting and fixing the plurality of spacers 223 in the steel pipe 222, and one inserted into the steel pipe 222 and covered and exposed from the wire 231. It includes more than the steel wire 23,
Here, by pouring concrete on the outside of the steel pipe 222 concrete is placed evenly into the interior and exterior of the steel pipe 222 through the hole 221 of the steel pipe 222, the steel wire inserted into the fixing portion 22 and the inside (23) A holding type earthenware construction characterized by solid curing.
삭제delete 삭제delete 제 1항에 있어서, 상기 강관(222)의 끝부분에는 철판(24)을 용접하여 연약지반에서 제2지주말뚝(20)을 근입시 고정부(22)의 콘크리트 타설 공간을 확보함을 특징으로 하는 지주식 흙막이 공법.The method of claim 1, wherein the steel pipe 222 is welded to the iron plate 24 to secure the concrete placing space of the fixing portion 22 when entering the second support pile 20 in the soft ground Holding earthen construction method.
KR1020120030306A 2011-03-25 2012-03-26 Inclined Earth Retaining Structure Method KR101262357B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20110027038 2011-03-25
KR1020110027038 2011-03-25

Publications (2)

Publication Number Publication Date
KR20120109418A KR20120109418A (en) 2012-10-08
KR101262357B1 true KR101262357B1 (en) 2013-05-08

Family

ID=47280700

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120030306A KR101262357B1 (en) 2011-03-25 2012-03-26 Inclined Earth Retaining Structure Method

Country Status (1)

Country Link
KR (1) KR101262357B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160115276A (en) 2015-03-26 2016-10-06 (주)힐건설 Soil retaining structure of two rows pile by using anchors and method thereof
KR20200124949A (en) 2019-04-25 2020-11-04 주식회사 일정건설 Anchor Tension way sheathing structure and sheathing method of construction
KR20230080094A (en) 2021-11-29 2023-06-07 형제기초건설 (주) Retaining wall structure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101379088B1 (en) * 2013-06-05 2014-03-28 박성언 Soil retaining structure of two rows pile and construction method for soil retaining structure
CN114059552A (en) * 2021-12-02 2022-02-18 江苏建院营造股份有限公司 Foundation pit supporting device and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200405207Y1 (en) 2005-10-05 2006-01-11 (주) 경화엔지니어링 Mounting structure in temporary facility for road
KR100797185B1 (en) * 2007-07-23 2008-01-23 대한주택공사 Construction method and the apparatus of a ground retaining structures or walls

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200405207Y1 (en) 2005-10-05 2006-01-11 (주) 경화엔지니어링 Mounting structure in temporary facility for road
KR100797185B1 (en) * 2007-07-23 2008-01-23 대한주택공사 Construction method and the apparatus of a ground retaining structures or walls

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160115276A (en) 2015-03-26 2016-10-06 (주)힐건설 Soil retaining structure of two rows pile by using anchors and method thereof
KR20200124949A (en) 2019-04-25 2020-11-04 주식회사 일정건설 Anchor Tension way sheathing structure and sheathing method of construction
KR20230080094A (en) 2021-11-29 2023-06-07 형제기초건설 (주) Retaining wall structure

Also Published As

Publication number Publication date
KR20120109418A (en) 2012-10-08

Similar Documents

Publication Publication Date Title
KR102071225B1 (en) Construction method of sheathing temporary facility using steel sheet pile
KR100855098B1 (en) Strut structure as temporary system using a vertical truss at the end and the method thereof
KR100967497B1 (en) Method for constructing an underground structure
KR20090002344A (en) Land-side protection wall that use ground structure
KR100743474B1 (en) Earth of building land-side protection wall structure
KR101341679B1 (en) Device for constructing an underground structure and method thereof
KR101262357B1 (en) Inclined Earth Retaining Structure Method
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
KR100831332B1 (en) Underground retaining wall for public works and method for constructing the same
KR20200124949A (en) Anchor Tension way sheathing structure and sheathing method of construction
CN113417300B (en) Slope support system and construction method thereof
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
KR101296856B1 (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR200492883Y1 (en) Braced wall
KR100967496B1 (en) Device for constructing an underground structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
KR101310677B1 (en) Top down method using precast composite retaining wall and raker in slope
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
KR20080059951A (en) Underground outer wall construction method using temporary retaining wall and connecting member strengthening shearing force therefor
KR100568988B1 (en) a retaining panel and manufacturing process
KR101218825B1 (en) Method of land-side protection wall using bracing
JP4749858B2 (en) Method for enhancing bearing capacity in extension or reconstruction of superstructures of existing buildings

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160328

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170302

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180329

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190328

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20200226

Year of fee payment: 8