KR101199561B1 - Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof - Google Patents

Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof Download PDF

Info

Publication number
KR101199561B1
KR101199561B1 KR1020120080241A KR20120080241A KR101199561B1 KR 101199561 B1 KR101199561 B1 KR 101199561B1 KR 1020120080241 A KR1020120080241 A KR 1020120080241A KR 20120080241 A KR20120080241 A KR 20120080241A KR 101199561 B1 KR101199561 B1 KR 101199561B1
Authority
KR
South Korea
Prior art keywords
arch
concrete
girder
fiber reinforced
reinforced concrete
Prior art date
Application number
KR1020120080241A
Other languages
Korean (ko)
Inventor
한상묵
정민선
Original Assignee
정민선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정민선 filed Critical 정민선
Priority to KR1020120080241A priority Critical patent/KR101199561B1/en
Application granted granted Critical
Publication of KR101199561B1 publication Critical patent/KR101199561B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/10Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal prestressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/10Ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal
    • E01D2101/32Metal prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: An arch bridge made of high-strength fiber reinforced concrete and a construction method thereof are provided to improve construction performance by minimizing environmental changes. CONSTITUTION: An arch bridge(100) made of high-strength fiber reinforced concrete comprises a pair of concrete footings(110,110'), an arch girder(120), strain prevention members(130), columns(140), and a slab(150). The concrete footings face each other to support the arch girder. The arch girder is formed by connecting end arches(121) and a center arch(122) to each other and inserting a PC steel member into the end and center arches. When the PC steel member is tensioned, the strain prevention members are formed between the arch girder and the concrete footings. The columns are protruded from the arch girder and support the slab. The slab has boreholes in which the columns are coupled and is connected to the arch girder.

Description

초고강도 섬유보강 콘크리트 아치교 및 이의 시공방법{Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof}Ultra high performance fiber reinforced concrete arch bridge and constructing method

본 발명은, 콘크리트 아치교에 관한 것으로, 보다 상세하게는, 120MPa급 초고강도 섬유보강 콘크리트로 일정길이 분절하여 제작된 아치거더의 중앙아치를 가설벤트에 설치하고, 단부아치를 기초콘크리트와 가설벤트에 설치하여 단부아치와 중앙아치의 전단키를 일치시켜 결합함으로, 아치교의 설치현장 환경변화를 최소로 함과 아울러 아치교의 길이를 늘려 설치할 수 있도록 하는 초고강도 섬유보강 콘크리트 아치교 및 이의 시공방법에 관한 것이다.
The present invention relates to a concrete arch bridge, and more specifically, 120MPa class super high strength fiber reinforced concrete, the arch arch girder made of a predetermined length segment is installed in the temporary vents, and the end arches in the foundation concrete and temporary vents The present invention relates to an ultra-high strength fiber reinforced concrete arch bridge and its construction method by minimizing the installation site environment change of the arch bridge and increasing the length of the arch bridge by matching the shear keys of the end arch and the center arch.

일반적으로 아치교는 좁은 하천 및 도로를 횡단하는 교량으로, 휨모멘트에 비하여 압축력이 지배적으로 작용하는 구조로 되어 있어 역학적으로 유리하며, 외관이 미려한 장점이 있다.In general, the arch bridge is a bridge that crosses narrow rivers and roads, and has a structure that compressive force predominates as compared to the bending moment, which is mechanically advantageous and has a beautiful appearance.

상기 아치교를 시공하기 위해서는, 거푸집과 동바리를 설치하고, 콘크리트를 타설하여 원호형상의 아치부를 제작한 후, 교량의 양단부에 교대를 설치함과 동시에 아치부의 상부로 슬래브용 거푸집을 설치하고 현장콘크리트를 타설하여 바닥판 슬래브를 제작한다.In order to construct the arch bridge, formwork and clubs are installed, concrete is poured to make arcuate arches, alternating parts are installed at both ends of the bridge, and slab formwork is installed on the upper part of the arch, and site concrete is installed. The slab is manufactured by pouring it.

그러나 상기와 같이 시공되는 아치교는, 거푸집에 현장콘크리트를 타설하고, 일정시간이 경과한 상태에서 다음의 제작이 가능하므로 아치교의 시공에 오랜 시간이 소요되는 문제점이 있었다.However, the arch bridge is constructed as described above, the site concrete in the formwork, and after a certain time has elapsed, it is possible to manufacture the next, there was a problem that takes a long time to construct the arch bridge.

상기의 문제점을 해결하기 위해 근래에는 대한민국 등록특허 제10-0941066호로 프리스트레스 프리캐스트 세그먼트 개복식 콘크리트 아치교 및 그의 시공방법이 등록된 바 있다.In order to solve the above problems, the pre-stressed precast segment open-type concrete arch bridge and its construction method have been registered as Korean Patent No. 10-0941066.

선 등록된 특허는, 프리캐스트 세그먼트를 PC강재로 결합한 아치리브 또는 외적 프리스트레스가 도입된 프래캐스트 세그먼트 아치리브를 수평으로 제작하여 교량 현장으로 운반한 후, 두 대의 크레인으로 거치는 방법으로 종래의 문제점을 해결할 수 있으나, 아치리브의 중량과 기하학적 변형으로 인한 아치길이의 한정성이 있으며, 아치를 결합하고 권양시킬 공간이 필요하여 많은 공간의 도로를 점령함과 아울러 시공시간이 늘어나 교통의 흐름을 방해하므로 도심 내에서는 시공이 어려울 뿐만 아니라 하천에 시공될 경우, 하천의 전 구간에 설치되어야 하므로 갈수기에만 시공이 가능하기 때문에 설치 제약이 따르는 문제점이 있었다.
The pre-registered patent solves the conventional problems by horizontally manufacturing the arch ribs in which the precast segment is made of PC steel or the precast segment arch ribs in which the external prestress is introduced, transporting them to the bridge site, and then mounting them with two cranes. It can be solved, but the arch length is limited due to the weight and geometrical deformation of the arch ribs, and it requires space for combining and hoisting the arch, thus occupying a lot of space and increasing the construction time, thus obstructing the flow of traffic. In the city center, the construction is not only difficult, but if the construction in rivers, because the installation must be installed in the entire section of the river, there was a problem that the installation is limited because the construction is possible only during the dry season.

이에 상술한 바와 같은 종래의 제반 문제점을 감안하여 이루어진 것으로, 본 발명의 목적은, 120MPa급 초고강도 섬유보강 콘크리트로 일정길이 분절하여 제작된 아치거더의 중앙아치를 가설벤트에 설치하고, 단부아치를 기초콘크리트와 가설벤트에 안착시켜 중앙아치와 연결되도록 함으로써, 설치현장의 환경변화를 최소로 유지함과 아울러 기존 콘크리트거더보다 부피 및 중량을 줄여 시공성을 향상시킬 수 있는 초고강도 섬유보강 콘크리트 아치교 및 이의 시공방법을 제공함에 있다.In view of the above-described conventional problems, the object of the present invention is to install a central arch of the arch girder fabricated by a predetermined length segment of 120MPa class super-high strength fiber reinforced concrete to the temporary construction vent, By connecting to the central arch by laying on the foundation concrete and temporary vents, the ultra-high-strength fiber reinforced concrete arch bridge and its construction can minimize construction changes and improve construction by reducing volume and weight than existing concrete girders. In providing a method.

또한, 본 발명의 다른 목적은, 일정길이 분절로 제작된 아치거더를 현장으로 이동시켜 가설벤트에 설치하기 때문에 아치교의 길이를 늘려 설치할 수 있도록 하는 초고강도 섬유보강 콘크리트 아치교 및 이의 시공방법을 제공함에 있다.In addition, another object of the present invention is to provide an ultra-high-strength fiber reinforced concrete arch bridge and its construction method that can be installed to increase the length of the arch bridge because the arch girder made of a certain length segment is moved to the site and installed in a temporary vent. have.

또한, 본 발명의 또 다른 목적은, 최적의 충전밀도를 가지는 초고강도 섬유보강 콘크리트로 아치거더가 제작되므로 공극이 적고 조직이 조밀 및 균일하여 기존 콘크리트거더보다 내구성이 월등하므로 제품의 수명을 연장시킬 수 있는 초고강도 섬유보강 콘크리트 아치교 및 이의 시공방법을 제공함에 있다.
In addition, another object of the present invention is that the arch girder is made of ultra-high strength fiber reinforced concrete having an optimal filling density, so the air gap is small and the structure is dense and uniform, which is superior to the existing concrete girder, thus extending the life of the product. The present invention provides an ultra high strength fiber reinforced concrete arch bridge and its construction method.

본 발명 초고강도 섬유보강 콘크리트 아치교는,The present invention ultra high strength fiber reinforced concrete arch bridge,

아치거더를 지지하도록 대향하는 한 쌍의 기초콘크리트와;A pair of foundation concrete facing each other to support the arch girder;

상기 기초콘크리트에 중앙아치와 단부아치를 연결하고, 상기 단부아치와 중앙아치의 덕트로 PC강재를 삽입하여 안착시키는 아치거더와;An arch girder connecting the central arch and the end arch to the basic concrete, and inserting and seating the PC steel into the duct of the end arch and the central arch;

상기 아치거더의 PC강재를 긴장시킬 때, PC강재의 긴장력에 의한 아치거더의 변형을 방지하도록 아치거더와 기초콘크리트 사이에 형성되는 변형방지부재와;A strain preventing member formed between the arch girder and the base concrete to prevent deformation of the arch girder by the tension force of the PC steel when the PC steel of the arch girder is tensioned;

상기 아치거더에 돌출되어 슬래브를 지지하도록 현장에서 콘크리트가 타설 및 양생되어 형성되는 기둥과;A pillar formed by placing and curing concrete in the field to protrude from the arch girder to support the slab;

상기 기둥이 결합되는 천공홀이 관통되면서 아치거더에 연결되는 슬래브를 포함하여 구성되는 것을 특징으로 하는 것입니다.
It is characterized in that it comprises a slab connected to the arch girder while the drilled hole is coupled to the pillar.

또한, 본 발명 초고강도 섬유보강 콘크리트 아치교의 시공방법은,In addition, the construction method of the ultra-high strength fiber reinforced concrete arch bridge of the present invention,

대향되면서 아치거더의 단부가 안착되는 공간이 형성되도록 한 쌍의 기초콘크리트를 형성하는 단계와;Forming a pair of foundation concrete to face a space in which an end of the arch girder is seated;

상기 기초콘크리트 사이에 일정거리 이격되도록 적어도 2개 이상의 가설벤트를 설치하는 단계와;Installing at least two or more temporary vents to be spaced apart by a predetermined distance between the base concretes;

상기 가설벤트에 철근이 둘출된 중앙아치를 안착시키는 단계와;Seating a central arch in which reinforcing bars are struck in the hypothesis vent;

상기 기초콘크리트와 가설벤트에 철근이 돌출된 단부아치를 안착시키는 단계와;Mounting an end arch in which reinforcing bars protrude from the base concrete and the temporary vent;

상기 기초콘크리트와 가설벤트에 안착된 단부아치에 위치조절부를 설치하고, 위치조절부를 조절하여 단부아치와 중앙아치의 전단키가 일치되도록 하는 단계와;Installing a position adjusting portion at the end arch seated on the basic concrete and the temporary vent, and adjusting the position adjusting portion so that the shear key of the end arch and the central arch match;

상기 단부아치와 중앙아치의 덕트로 PC강재를 삽입 및 긴장시켜 일체의 아치거더를 형성하는 단계와;Inserting and tensioning the PC steel into the ducts of the end arch and the center arch to form an integral arch girder;

상기 아치거더의 단부아치를 받쳐 지지하도록 기초콘크리트에 받침대를 형성하는 단계와;Forming a pedestal on the foundation concrete to support and support the end arch of the arch girder;

상기 아치거더의 변형을 방지하도록 받침대와 단부아치 사이에 변형방지부재를 형성하는 단계와;Forming a deformation preventing member between the pedestal and the end arch to prevent deformation of the arch girder;

상기 변형방지부재가 받침대와 단부아치 사이에 형성되면, 위치조절부 해체 및 기초콘크리트의 공간에 철근을 배근하고 콘크리트를 타설 및 양생하여 기초콘크리트와 아치거더의 단부를 일체로 형성하는 단계와;When the deformation preventing member is formed between the pedestal and the end arch, dismantle the position adjusting unit and reinforce the steel in the space of the foundation concrete, and cast and cure concrete to form the ends of the foundation concrete and the arch girder integrally;

상기 단부아치에 돌출된 철근에 기둥철근을 연결 및 콘크리트를 타설 및 양생하여 기둥을 형성하는 단계와;Connecting pillar reinforcement to the reinforcing bar projecting to the end arch and placing and curing concrete to form a pillar;

상기 중앙아치의 철근과 연결철근을 연결하면서 기둥이 천공홀에 결합되도록 슬래브를 설치하는 단계와;Installing a slab so that the column is coupled to the drilling hole while connecting the reinforcing bar and the connecting bar of the central arch;

상기 슬래브 설치 후, 가설벤트를 해체하는 단계로 이루어지는 것을 특징으로 하는 것이다.
After the slab installation, characterized in that the step consisting of dismantling the temporary vent.

본 발명에 의하면, 120MPa급 초고강도 섬유보강 콘크리트로 일정길이 분절하여 제작된 아치거더의 중앙아치를 가설벤트에 설치하고, 단부아치를 기초콘크리트와 가설벤트에 안착시켜 중앙아치와 연결되도록 함으로써, 설치현장의 환경변화를 최소로 유지함과 아울러 기존 콘크리트거더보다 부피 및 중량을 줄여 시공성을 향상시킬 수 있으므로 도심에서는 교통의 혼잡을 방지함은 물론 하천에서는 환경오염을 최소화할 수 있는 이점을 가질 수 있는 것이다.According to the present invention, by installing the central arch of the arch girder made of 120MPa-class ultra-high strength fiber reinforced concrete to a certain length, the end arch is connected to the central arch by mounting the end arch on the foundation concrete and the temporary vent The construction environment can be improved by reducing the volume and weight of the existing concrete girder while minimizing the environmental change of the site, thereby preventing traffic congestion in the city and minimizing environmental pollution in rivers. .

또한, 본 발명에 의하면, 일정길이 분절로 제작된 아치거더를 현장으로 이동시켜 가설벤트에 설치하기 때문에 아치길이를 늘려 아치길이의 한정성을 극복할 수 있는 이점을 가질 수 있는 것이다.In addition, according to the present invention, since the arch girder made of a certain length segment is moved to the site and installed in the temporary tent, the arch length may be increased to overcome the limitation of the arch length.

또한, 본 발명에 의하면, 최적의 충전밀도를 가지는 초고강도 섬유보강 콘크리트로 아치거더가 제작되므로 공극이 적고 조직이 조밀 및 균일하여 기존 콘크리트거더보다 내구성이 월등하므로 제품의 수명을 연장시켜 사용자로 하여금 제품에 대한 신뢰성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.
In addition, according to the present invention, since the arch girder is made of ultra-high strength fiber reinforced concrete having an optimal filling density, the air gap is small and the structure is dense and uniform, so that the durability is superior to the existing concrete girder, thereby prolonging the life of the product. It can have the advantage of improving the reliability of the product.

도 1은 본 발명의 정면구성도
도 2는 본 발명 아치거더의 사시도
도 3은 도 2의 중앙아치 측면구성도
도 4는 도 2의 단부아치 측면구성도
도 5는 본 발명 슬래브의 사시도
도 6 내지 12는 본 발명의 시공과정도
도 13은 본 발명에 의해 시공된 아치교의 정면구성도
1 is a front configuration diagram of the present invention
2 is a perspective view of the present invention arch girder
3 is a side view of the central arch of FIG.
Figure 4 is an end arch side configuration of Figure 2
5 is a perspective view of the present invention slab
6 to 12 is a construction process diagram of the present invention
13 is a front configuration diagram of the arch bridge constructed by the present invention

이하, 첨부된 도면에 의거하여 본 발명을 상세히 설명한다. 도 1은 본 발명의 정면구성도이고, 도 2는 본 발명 아치거더의 사시도이며, 도 3은 도 2의 중앙아치 측면구성도이고, 도 4는 도 2의 단부아치 측면구성도이며, 도 5는 본 발명 슬래브의 사시도이다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. Figure 1 is a front configuration diagram of the present invention, Figure 2 is a perspective view of the arch girder of the present invention, Figure 3 is a central arch side configuration of Figure 2, Figure 4 is an end arch side configuration of Figure 2, Figure 5 Is a perspective view of the slab of the present invention.

본 발명 초고강도 섬유보강 콘크리트 아치교(100)는, 아치거더(120)를 지지하도록 대향하는 한 쌍의 기초콘크리트(110)(110')가 구성되고, 상기 기초콘크리트(110)(110')에 단부아치(121)와 중앙아치(122) 및 상기 단부아치(121)와 중앙아치(122)에 관통된 덕트(123)로 PC강재(124)를 삽입하여 안착시키는 아치거더(120)가 구성되며, 상기 아치거더(120)의 PC강재(124)를 긴장시킬 때, PC강재(24)의 긴장력에 의한 아치거더(120)의 변형을 방지하도록 아치거더(120)와 기초콘크리트(110)(110') 사이에 형성되는 변형방지부재(130)가 구성되고, 상기 아치거더(120)에 돌출되어 슬래브(150)를 지지하도록 현장에서 콘크리트가 타설 및 양생되어 형성되는 기둥(140)이 구성되며, 상기 기둥(140)이 결합되는 천공홀(152)이 관통되면서 아치거더(120)에 연결되는 슬래브(150)를 포함하여 구성되는 것으로, 이를 좀더 구체적으로 설명하면 다음과 같다.The ultra-high strength fiber reinforced concrete arch bridge 100 of the present invention is composed of a pair of foundation concrete (110, 110 ') facing each other to support the arch girder 120, the foundation concrete (110, 110') An arch girder 120 is formed by inserting and seating the PC steel 124 into the end arch 121 and the central arch 122 and the duct 123 penetrated through the end arch 121 and the central arch 122. When the PC steel 124 of the arch girder 120 is tensioned, the arch girder 120 and the foundation concrete 110 and 110 to prevent deformation of the arch girder 120 due to the tension force of the PC steel 24. ') Is formed between the deformation preventing member 130 is formed, the pillar 140 is formed by the concrete is poured and cured in the field so as to protrude to the arch girder 120 to support the slab 150, The slab 150 is connected to the arch girder 120 while the drilling hole 152 through which the pillar 140 is coupled is formed. , If you described it in more detail as follows.

상기 변형방지부재(130)는, 기초콘크리트(110)(110')에 무수축모르타르로 형성되어 아치거더(120)의 단부를 받쳐 지지하는 받침대(130')에 고정되는 것이 바람직하다.The deformation preventing member 130 is preferably formed of non-contraction mortar on the base concrete (110) (110 ') is fixed to the pedestal (130') supporting the end of the arch girder 120.

상기 기둥(140)은, 아치거더(120)의 단부아치(121)에 내장된 철근(121')과 연결되어 슬래브(150)와 수직을 이루도록 돌출되는 기둥철근(141)이 구비되고, 상기 기둥철근(141)을 감싼 거푸집에 타설 및 양생되는 콘크리트(142)를 포함하여 구비된다.The pillar 140 is connected to the reinforcement 121 'built in the end arch 121 of the arch girder 120 is provided with a column reinforcement 141 protruding to be perpendicular to the slab 150, the pillar It is provided including a concrete 142 to be poured and cured in the formwork surrounding the rebar 141.

상기 슬래브(150)는, 슬래브철근(151')이 내장되어 형성된 판체(151)가 구비되고, 상기 판체(151) 내부에 기둥(140)이 결합되도록 천공된 천공홀(152)이 구비되며, 상기 슬래브철근(151')과 연결되면서 판체(151) 외부로 돌출되어 아치거더(120)의 중앙아치(122) 철근(122')과 연결되는 연결철근(153)을 포함하여 구비된다.The slab 150 is provided with a plate body 151 formed with a built-in slab reinforcing bar 151 ', and is provided with a drilled hole 152 bored so that the pillar 140 is coupled to the inside of the plate body 151, The slab reinforcing bar 151 ′ is provided to include a connecting reinforcing bar 153 protruding to the outside of the plate body 151 and connected to the reinforcement 122 ′ of the central arch 122 of the arch girder 120.

상기 초고강도 섬유보강 콘크리트는, 시멘트, 일반모래, 세사, 충전재, 실리카 흄, 고로슬래그, 감수제, 배합수, 강섬유 또는 플라스틱섬유로서, 이들의 배합 중량비는 각각 1 : 0.5~1.1 : 0.3~1.1 : 0.3~0.8 : 0.1~0.3 : 0.1~0.3 : 0.02~0.1 : 0.2~0.4 : 0.1~0.2 로 구성된다.The ultra-high strength fiber reinforced concrete is cement, general sand, fine yarn, filler, silica fume, blast furnace slag, water reducing agent, blended water, steel fiber or plastic fiber, the blending weight ratio thereof is 1: 0.5 to 1.1: 0.3 to 1.1: 0.3 ~ 0.8: 0.1 ~ 0.3: 0.1 ~ 0.3: 0.02 ~ 0.1: 0.2 ~ 0.4: 0.1 ~ 0.2

상기 아치거더(120)는 2개 이상 형성되는 것이 바람직하고, 2개 이상의 아치거더(120)를 연결하는 연결부(160)를 더 포함하여 구성된다.The arch girder 120 is preferably formed of two or more, and further comprises a connection portion 160 for connecting two or more arch girder 120.

상기 연결부(160)는, 상기 아치거더(120)의 양단부에 형성된 다수의 설치공(161)에 삽입 및 긴장하여 고정하는 프리스트레스 강봉(162)이 구비되고, 상기 아치거더(120)의 중앙에 형성된 설치공(163)에 삽입 및 긴장하여 고정하는 언본디드텐던(164)을 포함하여 구비된다.
The connecting portion 160 is provided with a prestressed steel bar 162 for inserting and tensioning a plurality of installation holes 161 formed at both ends of the arch girder 120, and formed in the center of the arch girder 120 It is provided including an unbonded tendon 164 is inserted into the installation hole 163 and fixed by tension.

상기와 같이 구성된 본 발명의 시공과정을 설명한다.The construction process of the present invention configured as described above will be described.

먼저, 도 6 내지 도 12에 도시된 바와 같이, 아치거더(120)를 지지하는 기초콘크리트(110)(110')를 대향하게 형성한 후, 상기 기초콘크리트(110)(110')에 안착되는 아치거더(120)를 형성하는데, 상기 아치거더(120)는 시멘트, 일반모래, 세사, 충전재, 실리카 흄, 고로슬래그, 감수제, 배합수, 강섬유 또는 플라스틱섬유를 혼합한 초고강도 섬유보강 콘크리트로 성형되며, 상기 초고강도 섬유보강 콘크리트의 배합 중량비는 각각 1 : 0.5~1.1 : 0.3~1.1 : 0.3~0.8 : 0.1~0.3 : 0.1~0.3 : 0.02~0.1 : 0.2~0.4 : 0.1~0.2 로 구성된다.First, as shown in FIGS. 6 to 12, the foundation concrete 110 and 110 ′ supporting the arch girder 120 are formed to face each other, and then, the foundation concrete 110 and 110 ′ are seated on the foundation concrete 110 and 110 ′. Arch girder 120 is formed, the arch girder 120 is formed of ultra-high strength fiber reinforced concrete mixed with cement, general sand, fine yarn, filler, silica fume, blast furnace slag, water reducing agent, blended water, steel fiber or plastic fiber The weight ratio of the super high strength fiber reinforced concrete is composed of 1: 0.5 to 1.1: 0.3 to 1.1: 0.3 to 0.8: 0.1 to 0.3: 0.1 to 0.3: 0.02 to 0.1: 0.2 to 0.4: 0.1 to 0.2.

여기서, 일반모래는 입경이 2.6mm 이하, 세사는 입경이 0.7mm 이하이며 규사성분이 90% 이상인 것이 바람직하고, 충전재는 평균입경이 20㎛ 이하이며, 규사성분이 90% 이상이고, 강섬유 또는 플라스틱섬유는 직경이 0.2~0.5mm 인 것이 바람직하다.Here, it is preferable that the general sand has a particle diameter of 2.6 mm or less, the fine thread has a particle diameter of 0.7 mm or less, and the silica sand component is 90% or more, and the filler has an average particle diameter of 20 μm or less, the silica sand component is 90% or more, and steel fibers or plastics. It is preferable that a fiber is 0.2-0.5 mm in diameter.

상기 초고강도 섬유보강 콘크리트는 다량의 섬유를 함유하고 있기 때문에 콘크리트 인장응력 향상, 압축응력 구역에서의 섬유구속에 의한 연성거동 유도 효과뿐만 아니라 전단응력을 향상시켜 충분한 구조적 성능을 발휘할 수 있는 것이다.Since the super high strength fiber reinforced concrete contains a large amount of fibers, it is possible to exhibit sufficient structural performance by improving the shear stress as well as the effect of inducing ductile behavior due to the improvement of tensile stress in the concrete and the binding of fibers in the compressive stress zone.

상기의 초고강도 섬유보강 콘크리트로 아치거더(120)를 형성하는데, 상기 아치거더(120)는 2분절 이상으로 형성할 수 있으나 3분절로 형성하여 용이하게 설치할 수 있도록 하는 것이 바람직하다.The arch girder 120 is formed of the ultra-high strength fiber reinforced concrete, but the arch girder 120 may be formed in two or more segments, but preferably formed in three segments so as to be easily installed.

상기 아치거더(120)는, 설계도면대로 공장에서 제작이 가능함은 물론, 단부아치(121)와 중앙아치(122)로 형성하며, 상기 단부아치(121)와 중앙아치(122) 내측 상,하부에 덕트(123)가 형성되면서 단부아치(121)에는 기둥철근(141)이 돌출되고, 중앙아치(122)에는 연결철근(153)이 돌출되도록 거푸집을 형성한 후, 초고강도 섬유보강 콘크리트를 타설하여 성형하고, 성형된 아치거더(120)를 아치거더(120)가 설치될 현장으로 이동시킨다.The arch girder 120 may be manufactured at the factory according to the design drawing, and may be formed of the end arch 121 and the center arch 122, and the upper and lower portions of the inner end arch 121 and the center arch 122 may be formed. As the duct 123 is formed in the end arch 121, the column reinforcement 141 protrudes, and the central arch 122 forms a form such that the connecting reinforcement 153 protrudes, and then places the super high strength fiber reinforced concrete. And the molded arch girder 120 is moved to the site where the arch girder 120 is to be installed.

여기서, 상기 기둥철근(141)은 단부아치(121)를 형성하는 철근(121')에 연결되어 수직으로 돌출됨과 아울러 연결철근(153)은 중앙아치(122)를 형성하는 철근(122')에 연결되어 수평으로 돌출됨은 물론이다.Here, the column reinforcing bar 141 is connected to the reinforcing bar 121 'forming the end arch 121 and protrudes vertically, and the connecting reinforcing bar 153 is connected to the reinforcing bar 122' forming the central arch 122. Of course, it is connected and protrudes horizontally.

또한, 상기 아치거더(120)의 단부가 안착되도록 공간이 형성되는 기초콘크리트(110)(110')를 아치교(100)가 설치되는 지점에 형성한 후, 상기 아치거더(120)를 기초콘크리트(110)(110')에 설치하기 위해 기초콘크리트(110)(110') 사이에 일정간격으로 가설벤트(170)를 설치한 상태에서 별도의 장비를 이용하여 아치거더(120)의 중앙아치(122)를 가설벤트(170)에 안착시킨다.In addition, after the foundation concrete 110, 110 ′ is formed at the point where the arch bridge 100 is installed, the space is formed so that the end of the arch girder 120 is seated, the arch girder 120 is the foundation concrete ( Central arch 122 of the arch girder 120 using a separate equipment in the state in which the temporary vent 170 is installed at a predetermined interval between the foundation concrete (110) (110 ') for installation in the 110 (110') ) Is placed on the temporary vent 170.

여기서, 상기 가설벤트(170)는 중앙아치(122)가 지면으로부터 이격되는 높이만큼 설치되는 것이 바람직하다.Here, the temporary vent 170 is preferably installed so that the center arch 122 is spaced apart from the ground.

상기 가설벤트(170)에 중앙아치(122)가 안착되면, 상기 가설벤트(170)와 기초콘크리트(110)(110')에 별도의 장비를 이용하여 단부아치(121)를 안착시킨 후, 상기 단부아치(121)의 양단부와 중앙아치(122)의 양단부에 위치조절부(200)의 상하높이조절부(210)를 설치하는데, 상기 상하높이조절부(210)의 브라켓(212)을 단부아치(212)와 중앙아치(122)의 양단부 측면에 고정시킨 상태에서 상기 브라켓(212)과 가설벤트(170) 사이에 높이조절유압잭(211)을 안착시킨다.When the central arch 122 is seated on the temporary vent 170, the end arch 121 is seated on the temporary vent 170 and the foundation concrete 110 and 110 ′ by using separate equipment. The upper and lower height adjusting portions 210 of the position adjusting portion 200 are installed at both ends of the end arch 121 and both ends of the central arch 122. The brackets 212 of the upper and lower height adjusting portions 210 are provided at the end arches. The height adjustment hydraulic jack 211 is seated between the bracket 212 and the temporary vent 170 in a state of being fixed to both ends of the 212 and the central arch 122.

또한, 상기 기초콘크리트(110)(110')와 대응하는 단부아치(121) 사이에는 위치조절부(200)의 종방향이동조절부(220)를 설치하는데, 상기 종방향이동조절부(220)의 브라켓(222)이 단부아치(121) 일단부 측면에 설치되고, 상기 브라켓(222)과 대응하는 기초콘크리트(110)(110') 사이에 종방향이동유압잭(221)이 설치된다.In addition, a longitudinal movement control unit 220 of the position adjusting unit 200 is installed between the basic concrete 110 and 110 ′ and the corresponding end arch 121. The longitudinal movement control unit 220 is provided. The bracket 222 of the end arch 121, one end side is installed, the longitudinal movement hydraulic jack 221 is installed between the bracket 222 and the corresponding concrete concrete 110, 110 '.

상기 브라켓(212)(222)은, 단부아치(121)와 중앙아치(122)가 기초콘크리트(110)(110')와 가설벤트(170)에 안착되기 전에 고정될 수도 있는 것이다.The brackets 212 and 222 may be fixed before the end arch 121 and the center arch 122 are seated on the base concrete 110 and 110 ′ and the temporary vent 170.

상기의 과정으로 설치된 상하높이조절부(210)의 높이조절유압잭(211)과 종방향이동조절부(220)의 작동으로 중앙아치(122)와 단부아치(121)의 높이를 조절함과 아울러 종방향이동유압잭(221)의 작동으로 단부아치(121)의 종방향 이동거리를 조절하면서 중앙아치(122)와 단부아치(121)의 전단키 즉, 단부아치(121)와 중앙아치(122)의 측면이 면접촉되어 일치되도록 조절한다.By adjusting the height of the height adjustment hydraulic jack 211 and the longitudinal movement control unit 220 of the vertical height adjustment unit 210 installed in the above process, the height of the central arch 122 and the end arch 121 and the longitudinal The end key 121 of the central arch 122 and the end arch 121, that is, the side surfaces of the end arch 121 and the center arch 122, while adjusting the longitudinal movement distance of the end arch 121 by the operation of the directional moving hydraulic jack 221. Adjust to match the surface contact.

상기의 과정으로 단부아치(121)와 중앙아치(122)의 전단키가 일치하면, 상기 단부아치(121)와 중앙아치(122)에 관통된 덕트(123)에 PC강재(124)를 삽입하고, 긴장시켜 단부아치(121)와 중앙아치(122)가 일체로 형성되는 아치거더(120)를 형성하게 된다.When the shear key of the end arch 121 and the center arch 122 coincides with the above process, the PC steel 124 is inserted into the duct 123 penetrated through the end arch 121 and the center arch 122, By tension, the end arch 121 and the central arch 122 are formed integrally to form an arch girder 120.

여기서, 상기 아치거더(120)는 하나를 예로 설명하였으나, 2개 이상 연결할 수도 있으며, 상기 아치거더(120) 두 개를 연결하여 설치할 경우는, 두 개의 아치거더(120)를 연결부(160)로 연결하는데, 단부아치(121)에 관통된 설치공(161)으로 프리스트레스 강봉(162)을 삽입하고 긴장시킨 후, 너트와 같은 별도의 고정부재(미도시)로 고정시키고, 중앙아치(122)에 관통된 설치공(163)으로 언본디드텐던(164)를 삽입하고 긴장시킨 후, 쐐기정착구와 같은 별도의 고정부재(미도시)로 고정시킨다.Here, although the arch girder 120 has been described as an example, two or more may be connected. When the two arch girders 120 are connected and installed, the two arch girders 120 are connected to the connection unit 160. To connect, insert the prestressed steel bar 162 into the mounting hole 161 through the end arch 121 and tension, and then fixed with a separate fixing member (not shown), such as a nut, to the central arch 122 The unbonded tendon 164 is inserted into the penetrating installation hole 163 and tensioned, and then fixed by a separate fixing member (not shown), such as a wedge fitting.

또한, 상기 고정부재(미도시)로 연결된 중앙아치(122)를 별도의 가로보(122')로 더 연결할 수도 있는 것이다.In addition, the central arch 122 connected by the fixing member (not shown) may be further connected to a separate cross beam 122 '.

상기 연결부(160)로 고정된 아치거더(120)의 단부아치(121)에 위치조절부(200)의 상하높이조절부(210)와 종방향이동조절부(220)를 설치할 수 있으며, 상기 상하높이조절부(210)와 종방향이동조절부(220)의 브라켓(212)(222)을 단부아치(121) 및 중앙아치(122)에 설치한 후, 상기 브라켓(212)(222)과 기초콘크리트(110)(110') 및 가설벤트(170) 사이에 높이조절유압잭(211)과 종방향이동유압잭(221)를 설치하여 중앙아치(122)와 단부아치(121)의 위치를 조절하여 단부아치(121)와 중앙아치(122)의 측면이 면접촉되는 전단키기 일치되도록 한 후, 단부아치(121)와 중앙아치(122)에 관통된 덕트(123)에 PC강재(124)를 삽입하고, 긴장시켜 단부아치(121)와 중앙아치(122)가 일체로 형성되는 아치거더(120)를 형성하게 된다.The vertical height adjusting part 210 and the longitudinal movement adjusting part 220 of the position adjusting part 200 may be installed on the end arch 121 of the arch girder 120 fixed to the connecting part 160, and the upper and lower parts After installing the brackets 212 and 222 of the height adjusting unit 210 and the longitudinal movement adjusting unit 220 to the end arch 121 and the central arch 122, the brackets 212 and 222 and the base The height adjustment hydraulic jack 211 and the longitudinal movement hydraulic jack 221 is installed between the concrete 110, 110 'and the temporary vent 170 to adjust the position of the central arch 122 and the end arch 121 to end After the arch 121 and the side of the central arch 122 is matched with the shear key that is in surface contact, the PC steel 124 is inserted into the duct 123 penetrated through the end arch 121 and the central arch 122 By tension, the end arch 121 and the central arch 122 is formed integrally to form an arch girder 120.

이때, 상기 아치거더(120) 내부로 인장력이 작용하므로 아치거더(120)의 단부를 받쳐 지지하도록 기초콘크리트(110)(110') 상면 무수축모르타르로 받침대(130')를 형성하면서 상기 받침대(130')에 하단부가 매몰되는 변형방지부재(130)가 상기 받침대(130')와 단부아치(121) 사이에 형성되므로 PC강재(124)의 긴장력으로 인한 아치거더(120)의 종방향 변형을 방지할 수 있는 것이다.At this time, since the tensile force acts inside the arch girder 120, the pedestal 130 ′ is formed of non-contraction mortar on the upper surface of the base concrete 110 and 110 ′ to support the end of the arch girder 120. 130 ') is formed between the pedestal 130' and the end arch 121 is the deformation preventing member 130 is buried in the lower end to prevent longitudinal deformation of the arch girder 120 due to the tension of the PC steel 124 It can be prevented.

상기 받침대(130')가 아치거더(120)를 지지하면, 가설벤트(170)를 해제시킨 상태에서 단부아치(121)의 철근(121')에 기둥철근(141)을 연결한 후, 상기 철근(121')과 기둥철근(141)을 수용하는 거푸집을 설치하고, 현장에서 콘크리트(142)를 타설 및 양생시켜 기둥(140)을 형성하는데, 상기 기둥철근(141)의 길이가 짧을 경우, 별도의 기둥철근을 더 연결하여 설치할 수 있는 것이다.When the pedestal 130 'supports the arch girder 120, the column reinforcing bar 141 is connected to the reinforcing bar 121' of the end arch 121 in a state where the temporary vent 170 is released, and then the reinforcing bar Install the formwork to accommodate the 121 'and the column reinforcement 141, and to form and pillar the concrete 142 in the field to form the pillar 140, if the length of the column reinforcement 141 is short, It can be installed by connecting more reinforcing bars.

여기서 상기 기둥(140)의 상단부는 슬래브(150)의 천공홀(152)에 결합되도록 설계도면대로 정확한 높이를 가져야한다.Here, the upper end of the pillar 140 should have a precise height as designed to be coupled to the drilling hole 152 of the slab 150.

또한, 상기 중앙아치(122)의 철근(122')과 연결된 슬래브(150)의 연결철근(153)에 슬래브철근(151')을 연결하면서 슬래브철근(151')이 내장된 판체(151)를 기둥(140)에 안착시키면서 판체(151)에 관통된 천공홀(152)을 기둥(140)의 상단부에 결합한 후, 상기 슬래브철근(151')과 연결철근(153)에 콘크리트를 타설 및 양생하면서 도 13에 도시된 바와 같이, 초고강도 섬유보강 콘크리트 아치교(100)를 형성할 수 있는 것이다.In addition, while connecting the slab reinforcing bars 151 'to the connecting reinforcing bars 153 of the slab 150 connected to the reinforcing bars 122' of the central arch 122, the slab reinforcing bars 151 'built-in plate 151 Coupled to the upper end of the pillar 140 while the perforation hole 152 penetrated through the plate body 151 while seated on the pillar 140, while placing and curing concrete in the slab reinforcing bars (151 ') and connecting reinforcing bars (153) As shown in Figure 13, it is possible to form the ultra-high strength fiber reinforced concrete arch bridge (100).

이상과 같이 본 발명은, 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정되어 해석되어서는 아니되며, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 일실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 발명의 청구범위를 벗어나지 않는 한도 내에서 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
As described above, the present invention, although described by the limited embodiments and drawings, terms or words used in the present specification and claims are not limited to the ordinary or dictionary meanings and should not be interpreted, the technical spirit of the present invention It must be interpreted to mean meanings and concepts. Therefore, the configuration shown in the embodiments and drawings described herein are only one embodiment of the present invention, and do not represent all of the technical spirit of the present invention, various changes within the scope of the claims of the present invention It should be understood that there may be equivalents and variations.

100: 초고강도 섬유보강 콘크리트 아치교
110,110': 기초콘크리트 120: 아치거더
121: 단부아치 122: 중앙아치
130: 변형방지부재 140: 기둥
150: 슬래브 151: 판체
152: 천공홀 153: 연결철근
160: 연결부 161,163: 설치공
162: 프리스트레스 강봉 162: 언본디드텐던
100: ultra-high strength fiber reinforced concrete arch bridge
110,110 ': Concrete foundation 120: Arch girder
121: end arch 122: center arch
130: deformation preventing member 140: pillar
150: slab 151: plate body
152: drill hole 153: connecting rebar
160: connection portion 161, 163: installation worker
162: Prestressed High Bar 162: Unbonded Tendon

Claims (15)

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 대향되면서 아치거더의 단부가 안착되는 공간이 형성되도록 한 쌍의 기초콘크리트를 형성하는 단계와;
상기 기초콘크리트 사이에 일정거리 이격되도록 적어도 2개 이상의 가설벤트를 설치하는 단계와;
상기 가설벤트에 철근이 둘출된 중앙아치를 안착시키는 단계와;
상기 기초콘크리트와 가설벤트에 철근이 돌출된 단부아치를 안착시키는 단계와;
상기 기초콘크리트와 가설벤트에 안착된 단부아치에 위치조절부를 설치하고, 위치조절부를 조절하여 단부아치와 중앙아치의 전단키가 일치되도록 하는 단계와;
상기 단부아치와 중앙아치의 덕트로 PC강재를 삽입 및 긴장시켜 일체의 아치거더를 형성하는 단계와;
상기 아치거더의 단부아치를 받쳐 지지하도록 기초콘크리트에 받침대를 형성하는 단계와;
상기 아치거더의 변형을 방지하도록 받침대와 단부아치 사이에 변형방지부재를 형성하는 단계와;
상기 변형방지부재가 받침대와 단부아치 사이에 형성되면, 위치조절부 해체 및 기초콘크리트의 공간에 철근을 배근하고 콘크리트를 타설 및 양생하여 기초콘크리트와 아치거더의 단부를 일체로 형성하는 단계와;
상기 단부아치에 돌출된 철근에 기둥철근을 연결 및 콘크리트를 타설 및 양생하여 기둥을 형성하는 단계와;
상기 중앙아치의 철근과 연결철근을 연결하면서 기둥이 천공홀에 결합되도록 슬래브를 설치하는 단계와;
상기 슬래브 설치 후, 가설벤트를 해체하는 단계로 이루어지는 것을 특징으로 하는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
Forming a pair of foundation concrete to face a space in which an end of the arch girder is seated;
Installing at least two or more temporary vents to be spaced apart by a predetermined distance between the base concretes;
Seating a central arch in which reinforcing bars are exposed to the temporary tent;
Mounting an end arch in which reinforcing bars protrude from the base concrete and the temporary vent;
Installing a position adjusting portion at the end arch seated on the basic concrete and the temporary vent, and adjusting the position adjusting portion so that the shear key of the end arch and the central arch match;
Inserting and tensioning the PC steel into the ducts of the end arch and the center arch to form an integral arch girder;
Forming a pedestal on the foundation concrete to support and support the end arch of the arch girder;
Forming a deformation preventing member between the pedestal and the end arch to prevent deformation of the arch girder;
When the deformation preventing member is formed between the pedestal and the end arch, dismantle the position adjusting unit and reinforce the steel in the space of the foundation concrete, and cast and cure concrete to form the ends of the foundation concrete and the arch girder integrally;
Connecting pillar reinforcement to the reinforcing bar projecting to the end arch and placing and curing concrete to form a pillar;
Installing a slab so that the column is coupled to the drilling hole while connecting the reinforcing bar and the connecting bar of the central arch;
After the slab is installed, the construction method of ultra-high strength fiber reinforced concrete arch bridge, characterized in that the step of dismantling the temporary vent.
청구항 9에 있어서, 위치조절부는,
상기 단부아치의 상,하 높이를 조절하는 상하높이조절부와;
상기 단부아치의 종방향 길이를 조절하는 종방향이동조절부를 포함하여 구성되는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
The method according to claim 9, Position adjustment unit,
An up and down height adjusting unit for adjusting the up and down heights of the end arches;
Construction method of ultra-high strength fiber reinforced concrete arch bridge comprising a longitudinal movement control for adjusting the longitudinal length of the end arch.
청구항 10에 있어서, 상기 상하높이조절부는,
높이조절유압잭과;
상기 높이조절유압잭의 가압이 원활하도록 단부아치에 고정되는 브라켓을 포함하여 구비되는 것을 특징으로 하는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
The method of claim 10, wherein the vertical height adjustment unit,
Height adjusting hydraulic jack;
Construction method of the ultra-high strength fiber reinforced concrete arch bridge, characterized in that it comprises a bracket fixed to the end arch so that the pressure of the height adjustment hydraulic jack smoothly.
청구항 10에 있어서, 상기 종방향이동조절부는,
기초콘크리트와 단부아치 사이에 장착되는 종방향이동유압잭과;
상기 종방향이동유압잭이 가압이 원활하도록 단부아치에 고정되는 브라켓을 포함하여 구비되는 것을 특징으로 하는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
The method of claim 10, wherein the longitudinal movement control unit,
A longitudinally moving hydraulic jack mounted between the base concrete and the end arch;
The longitudinal moving hydraulic jack is a construction method of ultra-high strength fiber reinforced concrete arch bridge, characterized in that it comprises a bracket fixed to the end arch so that the pressure is smooth.
청구항 9 내지 청구항 12 중 어느 하나의 항에 있어서,
상기 초고강도 섬유보강 콘크리트는, 시멘트, 일반모래, 세사, 충전재, 실리카 흄, 고로슬래그, 감수제, 배합수, 강섬유 또는 플라스틱섬유로서, 이들의 배합 중량비는 각각 1 : 0.5~1.1 : 0.3~1.1 : 0.3~0.8 : 0.1~0.3 : 0.1~0.3 : 0.02~0.1 : 0.2~0.4 : 0.1~0.2 로 구성되는 것을 특징으로 하는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
The method according to any one of claims 9 to 12,
The ultra-high strength fiber reinforced concrete is cement, general sand, fine yarn, filler, silica fume, blast furnace slag, water reducing agent, blended water, steel fiber or plastic fiber, the blending weight ratio thereof is 1: 0.5 to 1.1: 0.3 to 1.1: 0.3 ~ 0.8: 0.1 ~ 0.3: 0.1 ~ 0.3: 0.02 ~ 0.1: 0.2 ~ 0.4: 0.1 ~ 0.2 The construction method of ultra-high strength fiber reinforced concrete arch bridge, characterized in that consisting of.
청구항 9에 있어서,
2개 이상의 아치거더를 연결부로 연결하는 단계를 더 포함하여 이루어지는 것을 특징으로 하는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
The method according to claim 9,
Construction method of the ultra-high strength fiber reinforced concrete arch bridge, characterized in that further comprising the step of connecting two or more arch girders with a connecting portion.
청구항 14에 있어서, 상기 연결부로 연결하는 단계는,
상기 아치거더의 양단부에 형성된 다수의 설치공에 프리스트레스 강봉을 삽입 및 긴장하여 고정하는 단계와;
상기 아치거더의 중앙에 형성된 설치공에 언본디드텐던을 삽입 및 긴장하여 고정하는 단계를 포함하여 이루어지는 것을 특징으로 하는 초고강도 섬유보강 콘크리트 아치교의 시공방법.
The method of claim 14, wherein the connecting to the connection unit,
Inserting and tensioning a prestressed steel bar into a plurality of installation holes formed at both ends of the arch girder;
Construction method of ultra-high strength fiber reinforced concrete arch bridge, characterized in that comprising the step of inserting and tensioning the unbonded tendon in the installation hole formed in the center of the arch girder.
KR1020120080241A 2012-07-23 2012-07-23 Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof KR101199561B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120080241A KR101199561B1 (en) 2012-07-23 2012-07-23 Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120080241A KR101199561B1 (en) 2012-07-23 2012-07-23 Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof

Publications (1)

Publication Number Publication Date
KR101199561B1 true KR101199561B1 (en) 2012-11-12

Family

ID=47564323

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120080241A KR101199561B1 (en) 2012-07-23 2012-07-23 Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof

Country Status (1)

Country Link
KR (1) KR101199561B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114520A (en) * 2013-03-13 2013-05-22 湖南大学 Lattice-type large-span soil-filling composite corrugated steel arch bridge structure
KR101352560B1 (en) * 2013-05-14 2014-01-16 주식회사 씨알디 Strength arch passage and its construction method
KR20140144153A (en) * 2014-07-23 2014-12-18 홍석희 The hybrid girder structures prestressed by using the external prestressing mechanism, and the construction method by rigid connection
KR101934874B1 (en) * 2018-03-27 2019-03-18 주식회사 씨알디 Deck plate comprised of ultra high strength fiber reinforced concrete and construction method using thereof
CN110258290A (en) * 2019-05-29 2019-09-20 东南大学 FRP pipe seawater coral aggregate concrete arch bridge structure and its method of construction
CN112376427A (en) * 2020-09-28 2021-02-19 中铁二局集团有限公司 Installation platform, system and construction method for arch bridge outer concrete bottom die

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007205139A (en) 2006-02-06 2007-08-16 Sumitomo Mitsui Construction Co Ltd Construction method of arch bridge
KR100941066B1 (en) * 2009-08-31 2010-02-09 서평원 Prestressed-precast-segmental open spendral concrete arch bridge and its constructing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007205139A (en) 2006-02-06 2007-08-16 Sumitomo Mitsui Construction Co Ltd Construction method of arch bridge
KR100941066B1 (en) * 2009-08-31 2010-02-09 서평원 Prestressed-precast-segmental open spendral concrete arch bridge and its constructing method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114520A (en) * 2013-03-13 2013-05-22 湖南大学 Lattice-type large-span soil-filling composite corrugated steel arch bridge structure
KR101352560B1 (en) * 2013-05-14 2014-01-16 주식회사 씨알디 Strength arch passage and its construction method
KR20140144153A (en) * 2014-07-23 2014-12-18 홍석희 The hybrid girder structures prestressed by using the external prestressing mechanism, and the construction method by rigid connection
KR101691378B1 (en) * 2014-07-23 2017-01-09 홍석희 The hybrid girder structures prestressed by using the external prestressing mechanism, and the construction method by rigid connection
KR101934874B1 (en) * 2018-03-27 2019-03-18 주식회사 씨알디 Deck plate comprised of ultra high strength fiber reinforced concrete and construction method using thereof
CN110258290A (en) * 2019-05-29 2019-09-20 东南大学 FRP pipe seawater coral aggregate concrete arch bridge structure and its method of construction
CN112376427A (en) * 2020-09-28 2021-02-19 中铁二局集团有限公司 Installation platform, system and construction method for arch bridge outer concrete bottom die

Similar Documents

Publication Publication Date Title
KR101199561B1 (en) Ultra high performance fiber reinforced concrete arch bridge and constructing method thereof
US6036906A (en) Method for manufacturing an improved prestressed concrete joist
CN104847014B (en) The vertical connecting structure of assembly concrete shear wall and construction method
KR100999660B1 (en) multi span precast parts which has a construction improvement function
CN108343148B (en) A kind of frame structure system and its construction method
CN102979221A (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
KR101198897B1 (en) Top-opened and pre-stressed concrete-steel composite single span U-type girder bridge and method of constructing the same
KR102269141B1 (en) Deck plate wall installation method using underground pavement
KR100963488B1 (en) Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used
JP6675427B2 (en) Home door basic structure, construction method and screwing jig
KR101829424B1 (en) UHPC seismic retrofit structures and construction method thereof
KR102511425B1 (en) the half precast concrete type retaining wall structure
CN114197526B (en) Formwork system with vertical structure by reverse construction method and construction method
KR200352506Y1 (en) Supporting structure of mold
KR101799237B1 (en) Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same
KR101072258B1 (en) Column connectiom parts construction method
KR101655403B1 (en) Ultra high strength fiber reinforced concrete segmental box girder and its construction method
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR200457690Y1 (en) Block for the ground reinforcement structure
KR100452977B1 (en) Joint structure and construction method of RC beam and slab for slim floor system
KR101223265B1 (en) Precast high-strength concrete columns and constructing method thereof
KR20060062915A (en) Pre-stress precast box making method
KR200267873Y1 (en) the heigh control structure of supporter for concrete mold
KR102541549B1 (en) Expansion Footbridge for Bridge and Slope Installation
KR102597601B1 (en) Prestressed box structure and its construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150817

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161124

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180219

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181210

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191010

Year of fee payment: 8