KR101188709B1 - Anchor hole sealing apparatus in an diaphragm walls - Google Patents

Anchor hole sealing apparatus in an diaphragm walls Download PDF

Info

Publication number
KR101188709B1
KR101188709B1 KR1020100008428A KR20100008428A KR101188709B1 KR 101188709 B1 KR101188709 B1 KR 101188709B1 KR 1020100008428 A KR1020100008428 A KR 1020100008428A KR 20100008428 A KR20100008428 A KR 20100008428A KR 101188709 B1 KR101188709 B1 KR 101188709B1
Authority
KR
South Korea
Prior art keywords
sleeve
corrugated
flange
hole
anchor
Prior art date
Application number
KR1020100008428A
Other languages
Korean (ko)
Other versions
KR20110088768A (en
Inventor
김정열
홍범석
정종기
서준희
Original Assignee
김정열
주식회사 삼우기초기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김정열, 주식회사 삼우기초기술 filed Critical 김정열
Priority to KR1020100008428A priority Critical patent/KR101188709B1/en
Publication of KR20110088768A publication Critical patent/KR20110088768A/en
Application granted granted Critical
Publication of KR101188709B1 publication Critical patent/KR101188709B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/12Geometrical or physical properties corrugated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 철근망에 앵커공을 위한 파형 슬리브를 설치하고, 연속벽 구축 후 그라우트 투입이 가능한 나선형 마감캡을 파형 슬리브에 체결함으로써 지수작업을 간단하고, 신뢰적으로 행할 수 있는 지하연속벽의 앵커공 지수장치에 관한 것이다.
본 발명은 지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서, 상기 철근망에 간격을 두고 하향 경사지게 설치되며 주름진 외관을 갖는 파형부와, 상기 파형부의 일면에 장착되되 상기 파형부와 연통하는 홀을 가지고 철근망 외측면에 고정되는 플랜지부를 포함하는 슬리브; 및 상기 슬리브의 파형부측으로 투입되는 그라우트가 누출되지 못하도록 상기 플랜지부의 홀에 끼워져 결합되는 마감캡을 포함하는 지하연속벽의 앵커공 지수장치를 제공한다.
상기한 바와 같이 본 발명의 특징에 따르면, 연속벽체를 구축하기 위한 뼈대인 철근망에 파형 슬리브를 설치하여 트렌치에 건입하고, 콘크리트 타설을 행함으로써, 상기 파형 슬리브가 견고하게 콘크리트에 고정되며, 상기 파형 슬리브에 나선형 마감캡을 나사체결원리로 쉽게 체결할 수 있어 슬리브의 지수작업을 매우 간단하게 행할 수 있는 효과가 있다.
The present invention is to install a corrugated sleeve for anchor holes in the reinforcing bar, and fastening the spiral finish cap that can be grouted after constructing the continuous wall to the corrugated sleeve, anchoring of the continuous continuous underground wall can be done simply and reliably Ball exponent system.
The present invention is an anchor hole indexing device installed in the reinforcing bar network for the construction of the underground continuous wall, the corrugated part is installed inclined downward at intervals on the reinforcing bar network and having a corrugated appearance, and is mounted on one surface of the corrugated part, the corrugated part A sleeve having a hole in communication with the flange portion fixed to the reinforcing bar outer surface; And it provides an anchor hole indexing device of the continuous underground wall including a closing cap that is fitted into the hole of the flange portion is coupled to prevent the grout is injected into the corrugated portion side of the sleeve.
According to the features of the present invention as described above, by installing a corrugated sleeve in the reinforcing steel bar, which is a skeleton for constructing a continuous wall, and entering into the trench, and placing concrete, the corrugated sleeve is firmly fixed to the concrete, Spiral closing cap can be easily fastened to the corrugated sleeve by screwing principle, so that the indexing work of the sleeve can be performed very simply.

Description

지하연속벽의 앵커공 지수장치{Anchor hole sealing apparatus in an diaphragm walls}Anchor hole sealing apparatus in an diaphragm walls}

본 발명은 지하에 차수벽 또는 가설 토류벽의 기능과 함께 구조체의 역할을 수행하는 지하연속벽(slurry walls or diaphragm walls)의 구축공법에 있어서, 지하연속벽에 설치된 앵커공을 통해 지하수가 유출되는 것을 방지하기 위한 앵커공 지수장치에 관한 것으로, 더욱 상세하게는 지하수위가 높거나 피압대수층이 존재하는 지반에 지하연속벽을 구축시 철근망에 설치된 앵커공용 슬리브(sleeve)를 나선형 구조로 형성하고, 이에 맞는 나선형 마감캡으로 체결하는 작업으로 상기 슬리브를 차폐함으로써 지층의 지하수가 앵커공용 슬리브를 통해 유출되는 것을 차단할 수 있는 지하연속벽의 앵커공 지수장치에 관한 것이다.
The present invention, in the construction method of the slurry walls or diaphragm walls to serve as a structure of the order wall or temporary earth wall in the basement, preventing the groundwater outflow through the anchor hole installed in the underground continuous wall The anchor hole indexing device for the purpose of, in more detail, when constructing the underground continuous wall in the ground where the groundwater level or the aquifer aquifer is present in the ground, the anchor hole sleeve (sleeve) installed in the reinforcing steel network is formed, The present invention relates to an anchor hole indexing device for underground continuous walls that can block groundwater from flowing through the sleeve for anchor holes by shielding the sleeve by fastening with a fitting spiral closure cap.

일반적으로, 지하 연속벽 공법(Daiphragm walls or slurry walls construction)은 굴착면 붕괴와 지하수의 침투를 방지하기 위해 주로 지하 차수벽이나 가설 토류벽으로 사용되었으나, 시공기술의 진보와 장비의 발달로 최근에는 토지 이용률의 극대화가 가능하고 도심지 건물 밀집지역에서 저진동, 저소음으로 강성이 큰 안전한 벽체를 형성할 수 있다는 장점으로 인하여 도심지 지하 구조물의 영구벽체로도 이용되고 있다. In general, the Daiphragm walls or slurry walls construction has been mainly used as underground order walls or temporary earth walls to prevent the collapse of the excavation surface and penetration of groundwater, but in recent years due to the advancement of construction technology and the development of equipment It is also used as a permanent wall of urban underground structures because of its advantages of being able to maximize rigidity and to form a large rigid wall with low vibration and low noise in dense areas of urban buildings.

상기 지하 연속벽 공법의 시공과정을 도1을 참조하여 살펴보면, 도면에 도시한 바와 같이, 먼저 굴삭기(210) 등의 소형 굴착기를 이용하여 터파기를 한다(S1). 터파기는 지표면 일부를 파내는 것이며, 파진 곳의 양쪽 벽에는 붕괴 방지를 위한 가이드 벽(도시하지 않음)을 형성하고 그 내부에는 벤토나이트(bentonite) 용액 등의 안정액을 채워 여굴을 방지한다. 터파기 후에는 안정액을 충분히 채운 후, 대형 굴착기(220)를 이용하여 선행 트렌치(trench)(202)를 굴삭한다(S2-1, S2-2). 선행 트랜치(202)가 넓은 경우, 선행 트렌치(202)의 양쪽을 먼저 굴착한 후(S2-1) 중앙을 추후 굴착한다(S2-2). 선행 트렌치(202)의 굴착이 이루어지면, 굴착된 선행 트렌치(202)에 철근망(110)을 삽입한다(S3). 상기 철근망(110)이 삽입된 선행 트렌치(202)에는 레미콘(240) 장비에 의해 콘크리트(140)가 타설된다(S4). Looking at the construction process of the underground continuous wall method with reference to Figure 1, as shown in the drawing, first using a small excavator, such as an excavator 210 is excavated (S1). The trench is to dig a part of the surface, and both walls of the pit are formed with guide walls (not shown) to prevent collapse, and the inside is filled with a stabilizer such as a bentonite solution to prevent overbreak. After the trench is sufficiently filled with the stabilizer, the pretreatment trench 202 is excavated using the large excavator 220 (S2-1, S2-2). When the preceding trench 202 is wide, both sides of the preceding trench 202 are first excavated (S2-1) and then the center is excavated later (S2-2). When the excavation of the preceding trench 202 is made, the rebar network 110 is inserted into the excavated preceding trench 202 (S3). Concrete 140 is poured into the preceding trench 202 into which the rebar network 110 is inserted by the ready-mixed concrete 240 (S4).

한편, 상기 선행 트렌치(202)는 소정의 간격을 두고 여러 개를 굴착하고, 굴착된 각 선행 트렌치(202)에 철근망(110)을 건입한 후 콘크리트(140)를 타설한다. 선행 트렌치(202)들 사이의 공간은 굴착기(220)를 이용하여 굴착하여 후행 트렌치(203)를 형성하고, 철근망(210)을 삽입한 후 콘크리트를 타설하여 연속벽체(100)를 구축하게 된다(S5, S6, S7).On the other hand, the preceding trench 202 excavates a plurality of predetermined intervals, and the concrete 140 is poured after the reinforcing bar (110) in each of the excavated preceding trench 202. The space between the preceding trenches 202 is excavated using the excavator 220 to form the trailing trench 203, inserts the reinforcing bar 210 and then casts concrete to build the continuous wall 100. (S5, S6, S7).

상기 지하연속벽체를 구축한 후 토공작업에서 생성된 내부의 토사를 반출하게 되며, 이때 지하연속벽체 후측의 지반 토압에 저항할 수 있도록 하기 위한 방식으로 스트러트(strut) 지지방식과 앵커(anchor) 지지방식 등이 일반적인 흙막이공법으로 사용되고 있다.After the underground continuous wall is constructed, the earth and sand generated inside the earthworks are taken out, and at this time, the strut support method and the anchor support in such a way as to be able to resist the ground pressure on the rear side of the underground continuous wall. The method is used as a general earth clogging method.

상기 앵커지지방식을 적용하여 지하 연속벽을 지지하는 경우, 종래에는 천공홀의 구축을 위하여 앵커공용 민자 슬리브(straight sleeve)를 철근망에 경사로 설치한 후 트렌치에 건입하여 지하 연속벽의 구축을 완료한다. 그리고, 상기 연속벽 안쪽의 토공작업을 실시한 후, 슬리브를 통해 지중 천공장을 형성한다. 상기 슬리브에 앵커 인장용 브라켓을 용접하여 고정하고, 상기 슬리브를 통해 천공장으로 앵커를 삽입한 후 인장력을 제공하여 지반 보강을 하는 일련의 과정을 거치게 된다. In the case of supporting the underground continuous wall by applying the anchor support method, conventionally, the construction of the underground continuous wall is completed by installing the anchor sleeve for the construction of the anchor hole on the reinforcing steel bar inclined to the rebar network, and then entering the trench. . Then, after performing the earthwork inside the continuous wall, through the sleeve to form an underground fabrication factory. The anchor tension bracket is welded and fixed to the sleeve, and the anchor is inserted into the fabric mill through the sleeve and then subjected to a series of processes for reinforcing the ground by providing a tensile force.

상기한 일련의 앵커시공 과정에서, 지하수위가 높거나 피압대수층이 존재하는 지반에 지하연속벽이 구축되는 경우, 상기 철근망에 설치된 슬리브측으로 지하수가 유출되어 연속벽의 강도뿐만 아니라, 후속하는 지하구축물 시공에도 악영향을 미치는 문제점이 있었다. 이를 방지하기 위하여, 종래에는 지하연속벽의 슬리브를 통해 삽입된 앵커의 인장력 제거 후 시멘트 몰탈을 슬리브에 투입하여 차폐하거나, 인장용 브라켓 제거후 별도의 차폐판을 슬리브에 용접하고, 재차 숏크리트를 약 150mm 정도의 두께로 타설하여 지수를 행하고 있다. In the above-described anchor construction process, when the underground continuous wall is constructed on the ground where the groundwater level is high or the aqueous aquifer is present, the groundwater flows out to the sleeve side installed in the reinforcing bar network, and the subsequent underground as well as the strength of the continuous wall. There was a problem that adversely affects the construction of the construction. In order to prevent this, conventionally, after removing the tensile force of the anchor inserted through the sleeve of the underground continuous wall, the cement mortar is put into the sleeve to shield it, or after the removal of the tensioning bracket, the separate shield plate is welded to the sleeve, and the shotcrete is again weakened. The water is poured in a thickness of about 150 mm.

이러한 슬리브의 지수공정은 공정자체가 매우 번거로울 뿐만 아니라 슬리브의 차폐작업에 많은 시간이 소요되며 시공비용을 증가시키는 문제점이 있었다.
The process of indexing such a sleeve is not only very cumbersome, but also takes a long time to shield the sleeve and increases the construction cost.

따라서, 본 발명은 상기한 제반 문제점을 해결하기 위하여 제안된 것으로서, 철근망에 앵커공을 위한 파형 슬리브를 설치하고, 연속벽 구축 후 그라우트 투입이 가능한 나선형 마감캡을 파형 슬리브에 체결함으로써 신뢰적인 지수를 유지함과 동시에 지수작업을 간단하게 행할 수 있는 지하연속벽의 앵커공 지수장치를 제공함에 그 목적이 있다.
Therefore, the present invention has been proposed to solve the above problems, by installing a corrugated sleeve for anchor holes in the reinforcing bar, and fastening the spiral finish cap that can be grouted into the corrugated sleeve after construction of the continuous wall reliable index The purpose of the present invention is to provide an anchor hole indexing device for the continuous wall of the underground, which can easily perform the exponential work.

상기 목적을 달성하기 위하여 본 발명의 제1 실시예는, 지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서, 상기 철근망에 간격을 두고 하향 경사지게 설치되며 주름진 외관을 갖는 파형부와, 상기 파형부의 일면에 장착되되 상기 파형부와 연통하는 홀을 가지고 철근망 외측면에 고정되는 플랜지부를 포함하는 슬리브; 및 상기 슬리브의 파형부측으로 투입되는 그라우트가 누출되지 못하도록 상기 플랜지부의 홀에 끼워져 결합되는 마감캡을 포함하는 지하연속벽의 앵커공 지수장치를 제공한다.In order to achieve the above object, the first embodiment of the present invention is an anchor hole indexing device installed in a reinforcing bar network for constructing a continuous underground wall. And a flange mounted on one surface of the corrugated portion and having a hole communicating with the corrugated portion, the flange including a flange portion fixed to an outer side of the rebar network. And it provides an anchor hole indexing device of the continuous underground wall including a closing cap that is fitted into the hole of the flange portion is coupled to prevent the grout is injected into the corrugated portion side of the sleeve.

여기서, 상기 슬리브의 파형부와 플랜지부가 스틸(steel)로 이루어진 것을 특징으로 한다.Here, the corrugated portion and the flange portion of the sleeve is characterized in that made of steel (steel).

본 발명의 제2 실시예는 지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서, 상기 철근망에 일정 간격을 두고 하향 경사지게 설치되며, 주름진 외관을 갖는 파형 슬리브; 나선형 외관으로 형성되어 상기 파형 슬리브에 체결되는 체결부와, 상기 체결부 일면에 설치되되 그라우트를 투입하기 위한 주입공이 관통되게 형성되어 있는 플랜지를 포함하여 상기 파형 슬리브를 차폐하는 마감캡; 및 상기 마감캡의 플랜지에 형성된 그라우트 주입공에 끼워져 투입된 그라우트가 주입공으로 누출되는 것을 차단하기 위한 지수수단을 포함하는 지하연속벽의 앵커공 지수장치를 제공한다.A second embodiment of the present invention is an anchor hole indexing device installed in the reinforcing bar network for the construction of a continuous underground wall, the inclined downward at a predetermined interval to the reinforcing bar network, the corrugated sleeve having a corrugated appearance; A closing cap formed to have a spiral appearance and including a fastening portion fastened to the corrugated sleeve, and a flange which is installed on one surface of the fastening portion and has a flange formed therein so as to allow an injection hole for injecting grout; And it provides an anchor hole indexing device of the underground continuous wall including a water supply means for blocking the grout injected into the grout injection hole formed in the flange of the closing cap to leak into the injection hole.

여기서, 상기 파형 슬리브는 합성수지 재질로 이루어지고, 마감캡은 금속재질로 이루어진 것을 특징으로 한다. 또한, 상기 파형 슬리브는 마감캡이 끼워지는 선단부에 관통홀이 형성된 플랜지가 더 설치되어 있는 것을 특징으로 한다.
Here, the corrugated sleeve is made of a synthetic resin material, the finishing cap is characterized in that made of a metallic material. In addition, the corrugated sleeve is characterized in that the flange is further provided with a through hole formed in the front end portion is fitted with a closing cap.

상기한 바와 같이 본 발명의 특징에 따르면, 연속벽체를 구축하기 위한 뼈대인 철근망에 파형 슬리브를 설치하여 트렌치에 건입하고, 콘크리트 타설을 행함으로써, 상기 파형 슬리브가 견고하게 콘크리트에 고정되며, 상기 파형 슬리브에 나선형 마감캡을 나사체결원리로 쉽게 체결할 수 있어 슬리브의 지수작업을 매우 간단하게 행할 수 있는 효과가 있다.According to the features of the present invention as described above, by installing a corrugated sleeve in the reinforcing steel bar, which is a skeleton for constructing a continuous wall, and entering into the trench, and placing concrete, the corrugated sleeve is firmly fixed to the concrete, Spiral closing cap can be easily fastened to the corrugated sleeve by screwing principle, so that the indexing work of the sleeve can be performed very simply.

또한, 상기 나선형 마감캡은 스틸로 형성되지만 파형 슬리브를 합성수지관으로 구성할 경우 제조비용을 감소할 수 있는 다른 효과가 있다.
In addition, the helical finishing cap is formed of steel, but when the corrugated sleeve is made of a synthetic resin tube has another effect that can reduce the manufacturing cost.

도1은 일반적인 지하연속벽 구축과정을 나타낸 시공순서도,
도2는 본 발명에 의한 지하연속벽의 앵커공 지수장치의 일실시예 구성을 나타낸 사시도,
도3은 철근망에 파형 슬리브가 설치된 상태를 나타낸 사시도,
도4는 본 발명의 요부인 파형 슬리브의 사시도,
도5는 도4에 도시된 파형 슬리브의 측면도,
도6은 본 발명의 제2 실시예의 요부인 슬리브에 마감캡이 끼워지는 상태를 나타낸 측면도,
도7은 마감캡에 지수핀이 끼워지는 상태를 나타낸 사시도,
도8은 본 발명의 제3 실시예 구성을 나타낸 결합단면도,
도9a 및 도9b는 본 발명이 제4 실시예 구성을 나타낸 단면도 및 라이너 스크류의 구성을 나타낸 사시도이다.
1 is a construction flow chart showing a general underground continuous wall construction process,
Figure 2 is a perspective view showing an embodiment configuration of the anchor hole indexing device of the continuous underground wall according to the present invention,
3 is a perspective view showing a state in which a corrugated sleeve is installed in a rebar network;
4 is a perspective view of a corrugated sleeve which is a main part of the present invention;
5 is a side view of the corrugated sleeve shown in FIG. 4;
Figure 6 is a side view showing a state that the closing cap is fitted to the sleeve that is the main portion of the second embodiment of the present invention,
Figure 7 is a perspective view showing a state where the index pin is fitted to the closing cap,
8 is a cross-sectional view showing a configuration of a third embodiment of the present invention;
9A and 9B are sectional views showing the configuration of the fourth embodiment of the present invention and a perspective view showing the configuration of the liner screw.

이하, 첨부된 도2 내지 도9을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, with reference to the accompanying Figures 2 to 9 will be described in detail a preferred embodiment of the present invention.

본 발명에 의한 지하연속벽의 앵커공 지수장치는 철근망에 파형 슬리브를 설치한 후 연속벽 시공시 트렌치에 매립하고, 파형 슬리브에 마감캡을 체결함으로써 간단히 지수시공을 행할 수 있도록 구현한 것이다. The anchor hole indexing device of the continuous continuous wall according to the present invention is to be installed in the trench when the continuous wall construction after installing the corrugated sleeve in the reinforcing bar, and to implement the exponential construction simply by fastening the closing cap to the corrugated sleeve.

도2는 본 발명에 의한 지하연속벽의 앵커공 지수장치의 일실시예 구성을 나타낸 사시도이고, 도3은 철근망에 파형 슬리브가 설치된 상태를 나타낸 사시도이고, 도4는 본 발명의 요부인 파형 슬리브의 사시도이고, 도5는 도4에 도시된 파형 슬리브의 측면도이다.Figure 2 is a perspective view showing an embodiment configuration of the anchor hole indexing device of the continuous underground wall according to the present invention, Figure 3 is a perspective view showing a state in which the corrugated sleeve is installed in the reinforcing bar network, Figure 4 is a waveform of the main part of the present invention 5 is a perspective view of the sleeve, and FIG. 5 is a side view of the corrugated sleeve shown in FIG.

도면에 도시한 바와 같이, 본 발명의 제1 실시예에 따른 지하연속벽(100)의 앵커공 지수장치는 지하 연속벽 구축을 위해 트렌치(trench)에 건입되는 철근망(2)에 간격을 두고 하향 경사지게 설치되며, 주름진 외관을 갖는 파형부(4a)와, 상기 파형부(4a)의 일면에 장착되되 상기 파형부(4a)와 연통하는 홀(4c)을 가지고 철근망(2) 외측면에 고정되는 플랜지부(4b)를 포함하는 슬리브(4); 및 상기 슬리브(4)의 파형부(4a)측으로 투입되는 그라우트가 누출되지 못하도록 상기 플랜지부(4b)의 홀(4c)에 끼워져 결합되는 나선형 마감캡(6)을 포함한다.As shown in the figure, the anchor hole indexing device of the underground continuous wall 100 according to the first embodiment of the present invention at intervals in the reinforcing bar (2) to be built into the trench (trench) for the construction of the underground continuous wall It is installed to be inclined downward and has a corrugated portion 4a having a corrugated appearance and a hole 4c mounted on one surface of the corrugated portion 4a and communicating with the corrugated portion 4a. A sleeve 4 comprising a fixed flange portion 4b; And a spiral closure cap 6 fitted into the hole 4c of the flange portion 4b to prevent the grout from leaking into the corrugated portion 4a side of the sleeve 4.

여기서, 상기 슬리브(4)의 파형부(4a)와 플랜지부(4b)는 스틸로 이루어진다. 따라서, 상기 슬리브(4)를 통해 앵커가 삽입되어 인장력을 도입할 때, 상기 플랜지부(4b)는 앵커인장기(도시하지 않음)의 지지를 위한 브라켓으로서 역할을 대신하게 된다. Here, the corrugated portion 4a and the flange portion 4b of the sleeve 4 are made of steel. Thus, when the anchor is inserted through the sleeve 4 to introduce the tensile force, the flange portion 4b takes over as a bracket for supporting the anchor tensioner (not shown).

본 실시예에서 상기 파형부(4a)는 나선형태의 굴곡면을 갖는 구조이다. 이는 상기 파형부(4a)가 철근망(2)에 거치된 상태에서 콘크리트를 타설할 때 상기 파형부(4a)의 굴곡면이 콘크리트에 더욱 견고하게 고착되도록 하기 위함이다. In the present embodiment, the corrugated portion 4a has a helical curved surface. This is to allow the curved surface of the corrugated portion 4a to be more firmly fixed to the concrete when the concrete is poured while the corrugated portion 4a is mounted on the rebar network 2.

또한, 상기 파형부에 대응하는 마감캡(6)도 나선형태로 구성된다. 따라서, 상기 나선형태의 파형부(4a)에 마감캡(6)을 나사체결형태로 쉽게 결합할 수 있다. In addition, the finishing cap 6 corresponding to the corrugated portion is also configured in a spiral shape. Therefore, it is possible to easily combine the finishing cap 6 in the form of a screw fastening to the spiral portion 4a.

상기와 같이 구성된 본 발명의 제1 실시예의 설치공정을 살펴보면 다음과 같다.Looking at the installation process of the first embodiment of the present invention configured as described above are as follows.

철근망(2)에 슬리브(4)를 일정 간격마다 설치하고 트렌치에 건입한 후, 콘크리트 타설을 통해 지하 연속벽을 구축하게 된다. 상기 지하 연속벽(100)의 구축후 슬리브(4)를 통해 앵커를 천공장으로 삽입하여 인장력을 도입하게 된다. 이때, 상기 슬리브(4)의 플랜지부(4b)가 앵커용 인장기 브라켓의 역할을 대신함으로써 앵커의 인장을 위한 별도의 지지브라켓을 지하연속벽에 설치할 필요가 없게 된다. After the sleeve 4 is installed in the rebar network 2 at regular intervals and entered into the trench, the underground continuous wall is constructed through concrete pouring. After the construction of the underground continuous wall 100 is inserted into the anchor through the sleeve (4) to introduce a tensile force. At this time, the flange portion 4b of the sleeve 4 replaces the role of the anchor tensioner bracket, thereby eliminating the need for installing a separate support bracket for tensioning the anchor on the underground continuous wall.

상기 앵커의 인장작업이 완료되면, 인장력을 해제하고 시멘트 몰탈 등의 채움재로 슬리브(4)의 내부를 채운 후 나선형 마감캡(6)을 상기 슬리브(4)의 파형부(4a)에 체결함으로써 슬리브의 플랜지 홀(4c)이 차폐되며, 이를 통해 상기 슬리브(4)의 지수를 행하게 된다.When the tensioning of the anchor is completed, the tension is released and the sleeve is filled by filling the inside of the sleeve 4 with a filler such as cement mortar, and then the spiral closure cap 6 is fastened to the corrugated portion 4a of the sleeve 4 by the sleeve. The flange hole 4c of the is shielded, through which the index of the sleeve 4 is performed.

다음, 본 발명의 제2 실시예에 대하여 도6 및 도7을 참조하여 설명한다.Next, a second embodiment of the present invention will be described with reference to Figs.

도6은 본 발명의 제2 실시예의 요부인 슬리브에 마감캡이 끼워지는 상태를 나타낸 측면도이고, 도7은 마감캡에 지수핀이 끼워지는 상태를 나타낸 사시도이다. Figure 6 is a side view showing a state in which the closing cap is fitted to the sleeve which is the main portion of the second embodiment of the present invention, Figure 7 is a perspective view showing a state in which the index pin is fitted to the closing cap.

본 발명의 제2 실시예에서는 도면에 도시한 바와 같이, 철근망(2)에 일정 간격을 두고 하향 경사지게 설치되며, 주름진 나선형 단면을 갖는 파형 슬리브(14)와; 나선형 외관으로 형성되어 상기 파형 슬리브(14)에 체결되는 체결부(16a)와, 상기 체결부(16a)의 일면에 설치되되, 그라우트를 투입하기 위한 주입공(16c)이 관통되게 형성되어 있는 플랜지(16b)를 포함하여 상기 파형 슬리브를 차폐하는 마감캡(16); 및 상기 마감캡(16)의 플랜지(16b)에 형성된 그라우트 주입공(16c)에 끼워지며, 지하연속벽(100)의 앵커공에 투입된 그라우트가 주입공(16c)을 통해 외부로 누출되는 것을 차단하기 위한 지수핀(18)을 포함한다.In the second embodiment of the present invention, as shown in the figure, the corrugated sleeve 14 is installed to be inclined downward at a predetermined interval on the reinforcing bar network 2 and has a corrugated spiral cross section; Flange which is formed in a spiral appearance and is fastened to the corrugated sleeve 14 and is fastened to the fastening portion 16a and is installed on one surface of the fastening portion 16a, and has an injection hole 16c for introducing grout therethrough. A closing cap (16) including a shield (16b) to shield the corrugated sleeve; And it is fitted into the grout injection hole (16c) formed in the flange (16b) of the closing cap 16, blocking the grout injected into the anchor hole of the underground continuous wall 100 to leak through the injection hole (16c) to the outside Including a pin (18) for the.

여기서, 상기 파형 슬리브(14)는 합성수지 재질로 이루어질 수 있으며, 마감캡(16)은 금속재질로 이루어진다. Here, the corrugated sleeve 14 may be made of a synthetic resin material, the closing cap 16 is made of a metallic material.

본 발명의 제2 실시예에서는 상기 슬리브(14)를 파형 관으로 형성된 구조를 제시하고 있지만, 제1 실시예에서와 같은 플랜지를 갖는 파형 관으로 이루어질 수 있음은 주지의 사실이다.In the second embodiment of the present invention, a structure in which the sleeve 14 is formed of a corrugated pipe is shown, but it is well known that the sleeve 14 can be made of a corrugated pipe having a flange as in the first embodiment.

상기와 같이 구성된 본 발명의 제2 실시예에서의 설치공정은 제1 실시예와 유사하며, 이를 다시 설명하면 다음과 같다.The installation process in the second embodiment of the present invention configured as described above is similar to the first embodiment, which will be described again as follows.

철근망(2)에 파형 슬리브를 설치한 상태로 트렌치에 건입되고, 콘크리트 타설에 의해 지하연속벽(100)을 구축하게 된다.It enters into the trench with the corrugated sleeve installed in the reinforcing bar network 2, and the underground continuous wall 100 is constructed by concrete pouring.

상기 지하 연속벽의 설치후 파형슬리브(14)를 통해 앵커를 천공장으로 삽입하여 인장력을 도입하게 된다. 이때, 별도의 앵커용 인장기 브라켓을 지하 연속벽에 설치하여 앵커의 인장력을 도입하게 된다. 상기 앵커의 인장작업이 완료되면, 인장력을 해제하고 상기 파형 슬리브(14)에 마감캡(16)을 체결하여 상기 슬리브(14)를 차폐하게 된다. 그리고, 상기 마감캡(16)의 플랜지(16b)에 형성된 주입공(16c)을 통해 그라우트를 파형 슬리부(14)에 주입하여 메운 후에 지수핀(18)을 주입공(16c)에 끼워 지수를 행하게 된다.After the installation of the underground continuous wall, the anchor is inserted into the fabric mill through the corrugated sleeve 14 to introduce the tensile force. At this time, a separate anchor tensioner bracket is installed on the underground continuous wall to introduce the tension force of the anchor. When the tensioning of the anchor is completed, the tension is released and the closing cap 16 is fastened to the corrugated sleeve 14 to shield the sleeve 14. Then, the grout is injected into the corrugated slitting portion 14 through the injection hole 16c formed in the flange 16b of the closing cap 16, and the index pin 18 is inserted into the injection hole 16c. Will be done.

도8은 본 발명의 제3 실시예를 나타낸 결합단면도이다.8 is a cross sectional view showing a third embodiment of the present invention.

도면에 도시한 바와 같이, 본 발명의 제3 실시예는 철근망(2)에 간격을 두고 하향 경사지게 설치되며, 외관이 민자(straight)이며 내면에 체결을 위한 나선홈(22a)이 형성되어 있는 원통형 슬리브(22)와; 상기 원통형 슬리브(22)의 일면에 장착되되 상기 슬리브(22)와 연통하는 홀을 가지고 철근망(2) 외측면에 고정되는 제1 플랜지(24); 및 상기 원통형 슬리브(22)에 투입되는 그라우트가 누출되지 못하도록 상기 제1 플랜지(24)의 홀을 통해 슬리브의 나선홈(22a)에 체결되는 나선형 돌기부(26a)와, 상기 나선형 돌기부(26a)의 일면에 형성되어 상기 제1 플랜지(24)에 밀착되는 제2 플랜지(26b)를 포함하는 마감캡(26)을 포함한다.As shown in the figure, the third embodiment of the present invention is installed to be inclined downward at intervals in the reinforcing bar (2), the exterior is a straight (straight) is formed in the spiral groove (22a) for fastening on the inner surface Cylindrical sleeve 22; A first flange 24 mounted to one surface of the cylindrical sleeve 22 and having a hole communicating with the sleeve 22 and fixed to an outer surface of the rebar network 2; And a spiral protrusion 26a fastened to the spiral groove 22a of the sleeve through the hole of the first flange 24 to prevent the grout from leaking into the cylindrical sleeve 22 and the spiral protrusion 26a. It includes a closing cap 26 formed on one surface including a second flange (26b) in close contact with the first flange (24).

상기한 구성을 갖는 본 발명의 제3 실시예는 원통형 슬리브(22)의 나선홈(22a)에 마감캡(26)의 나선형 돌기부(26a)를 회전시켜 나사체결 형태로 결합하게 된다.In the third embodiment of the present invention having the above-described configuration, the spiral protrusion 26a of the closing cap 26 is rotated in the spiral groove 22a of the cylindrical sleeve 22 to be coupled in the form of screwing.

이 밖의 다른 설치공정은 전술한 제1 실시예와 동일므로 여기서의 상세한 설명은 생략한다.Other installation steps are the same as in the above-described first embodiment, and thus detailed description thereof will be omitted.

도9a 및 도9b는 본 발명이 제4 실시예 구성을 나타낸 결합단면도 및 라이너 스크류의 구성을 나타낸 사시도이다.9A and 9B are perspective views showing the configuration of a liner screw and a coupling cross section showing the configuration of the fourth embodiment of the present invention.

본 실시예에서는 도8에 도시된 제3 실시예에서 나타날 수 있는 문제점을 보완한 구조를 제시한 것으로, 제3 실시예와 동일 구성에 대해서는 동일부호를 병기한다. In the present embodiment, a structure that compensates for the problems that may appear in the third embodiment shown in FIG. 8 is provided, and the same reference numerals are used for the same configuration as the third embodiment.

제3 실시에에서 원통형 슬리브(22)의 나선홈(22a)과 상기 나선홈(22a)에 끼워지는 마감캡(26)의 돌기부(26a)가 상호 치수가 맞지 않은 경우 그 틈새로 누수되거나 천공홀에 채워진 그라우트가 누출될 수 있는 문제점이 발생될 수 있다.In the third embodiment, when the spiral groove 22a of the cylindrical sleeve 22 and the projection 26a of the closing cap 26 fitted into the spiral groove 22a do not match each other, they leak into the gap or drill holes. A problem may occur in which grout filled in may leak.

본 발명의 제4 실시예에서는 상기 원통형 슬리브(22)와 마감캡 사이에 위치되며 축소 및 확장이 가능하도록 3개편으로 분할된 라이너 스크류(liner screw)(32)와; 상기 라이너 스크류(32)에 끼워지도록 민자 형태의 돌기부(34a)를 갖는 마감캡(34)을 포함하는 구조를 제시한다. In a fourth embodiment of the present invention, there is provided a liner screw 32, which is located between the cylindrical sleeve 22 and the closing cap and is divided into three pieces so as to be reduced and expanded; A structure including a closing cap 34 having a bulge-shaped protrusion 34a to be fitted to the liner screw 32 is provided.

상기한 구조에 의해 마감캡이 헐겁게 결합되는 것을 방지할 수 있고, 마감캡(34)이 조립성을 양호하게 할 수 있다. By the above structure, the closing cap can be prevented from being loosely coupled, and the closing cap 34 can improve the assemblability.

이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능하다는 것이 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.
The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various substitutions, modifications, and changes are possible in the art without departing from the technical spirit of the present invention. It will be clear to those of ordinary knowledge.

2: 철근망 4: 슬리브
4a: 파형부 4b: 플랜지부
6, 16, 26, 34: 마감캡 14: 파형 슬리브
16a: 체결부 16b, 24, 26b: 플랜지
16c: 주입공 18: 지수핀
22: 원통형 슬리브 32: 라이너 스크류
100: 지하연속벽
2: rebar mesh 4: sleeve
4a: wavy portion 4b: flange portion
6, 16, 26, 34: finish cap 14: corrugated sleeve
16a: fastening portion 16b, 24, 26b: flange
16c: injection hole 18: exponential pin
22: cylindrical sleeve 32: liner screw
100: continuous wall

Claims (7)

지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서,
상기 철근망에 간격을 두고 하향 경사지게 설치되며 주름진 외관을 갖는 파형부와, 상기 파형부의 일면에 장착되되 상기 파형부와 연통하는 홀을 가지고 철근망 외측면에 고정되는 플랜지부를 포함하는 슬리브; 및
상기 슬리브의 파형부측으로 투입되는 그라우트가 누출되지 못하도록 상기 플랜지부의 홀에 끼워져 결합되는 마감캡
을 포함하는 지하연속벽의 앵커공 지수장치.
In the anchor hole indexing device installed in the rebar network for the construction of underground continuous wall,
A sleeve including a corrugated portion installed at an inclined downward angle with the rebar network and having a corrugated appearance, and a flange portion mounted on one surface of the corrugated portion and having a hole communicating with the corrugated portion and fixed to an outer side of the rebar network; And
Closing cap fitted to the hole of the flange to prevent the grout from leaking into the corrugated portion of the sleeve
Anchor ball index device of the continuous continuous wall including a.
제 1 항에 있어서,
상기 슬리브의 파형부와 플랜지부가 스틸(steel)로 이루어진 것을 특징으로 하는 지하연속벽의 앵커공 지수장치.
The method of claim 1,
Anchor hole index device of the continuous underground wall, characterized in that the corrugated portion and the flange portion of the sleeve made of steel (steel).
지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서,
상기 철근망에 일정 간격을 두고 하향 경사지게 설치되며, 주름진 외관을 갖는 파형 슬리브;
나선형 외관으로 형성되어 상기 파형 슬리브에 체결되는 체결부와, 상기 체결부 일면에 설치되되 그라우트를 투입하기 위한 주입공이 관통되게 형성되어 있는 플랜지를 포함하여 상기 파형 슬리브를 차폐하는 마감캡; 및
상기 마감캡의 플랜지에 형성된 그라우트 주입공에 끼워지며, 투입된 그라우트가 주입공을 통해 외부로 누출되는 것을 차단하기 위한 지수핀
을 포함하는 지하연속벽의 앵커공 지수장치.
In the anchor hole indexing device installed in the rebar network for the construction of underground continuous wall,
A corrugated sleeve installed downwardly at a predetermined interval on the rebar network and having a corrugated appearance;
A closing cap formed to have a spiral appearance and including a fastening portion fastened to the corrugated sleeve, and a flange which is installed on one surface of the fastening portion and has a flange formed therein so as to allow an injection hole for injecting grout; And
Inserted into the grout injection hole formed in the flange of the closing cap, the index pin for preventing the injected grout from leaking to the outside through the injection hole
Anchor ball index device of the continuous continuous wall including a.
제 3 항에 있어서,
상기 파형 슬리브는 합성수지 재질로 이루어지고, 마감캡은 금속재질로 이루어진 것을 특징으로 하는 지하연속벽의 앵커공 지수장치.
The method of claim 3, wherein
The corrugated sleeve is made of a synthetic resin material, the finishing cap anchor hole index device, characterized in that made of a metallic material.
제 3 항 또는 제 4 항에 있어서,
상기 파형 슬리브는 마감캡이 끼워지는 선단부에 관통홀이 형성된 플랜지가 더 설치되어 있는 것을 특징으로 하는 지하연속벽의 앵커공 지수장치.
The method according to claim 3 or 4,
The corrugated sleeve is anchor hole indexing device of the underground continuous wall, characterized in that the through-hole is further formed with a flange formed in the front end of the end cap is fitted.
지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서,
상기 철근망에 일정 간격을 두고 하향 경사지게 설치되며, 외관이 민자(straight)이고 내면에 체결을 위한 나선홈이 형성되어 있는 원통형 슬리브;
상기 원통형 슬리브의 일면에 장착되되 상기 슬리브와 연통하는 홀을 가지고 철근망 외측면에 고정되는 제1 플랜지; 및
상기 원통형 슬리브에 투입되는 그라우트가 누출되지 못하도록 상기 플랜지의 홀을 통해 슬리브의 나선홈에 체결되는 나선형 돌기부와, 상기 나선형 돌기부의 일면에 형성되어 상기 제1 플랜지에 밀착되는 제2 플랜지를 포함하는 마감캡
을 포함하는 지하연속벽의 앵커공 지수장치.
In the anchor hole indexing device installed in the rebar network for the construction of underground continuous wall,
A cylindrical sleeve which is installed to be inclined downward at a predetermined interval to the reinforcing bar network, and has an external appearance and is formed with a spiral groove for fastening on an inner surface thereof;
A first flange mounted to one surface of the cylindrical sleeve, the first flange having a hole communicating with the sleeve and fixed to an outer surface of the rebar network; And
A finish including a spiral protrusion fastened to a spiral groove of the sleeve through a hole of the flange to prevent the grout injected into the cylindrical sleeve from leaking, and a second flange formed on one surface of the spiral protrusion to be in close contact with the first flange; cap
Anchor ball index device of the continuous continuous wall including a.
지하 연속벽 구축을 위한 철근망에 설치되는 앵커공 지수장치에 있어서,
상기 철근망에 일정 간격을 두고 하향 경사지게 설치되며, 외관이 민자(straight)이고 내면에 체결을 위한 나선홈이 형성되어 있는 원통형 슬리브;
상기 원통형 슬리브의 일면에 장착되되 상기 슬리브와 연통하는 홀을 가지고 철근망 외측면에 고정되는 제1 플랜지;
상기 원통형 슬리브의 나선홈에 체결되도록 외면에 나선이 형성되어 있으며, 축소 및 확장이 가능하도록 3개편으로 분할된 라이너 스크류(liner screw); 및
상기 라이너 스크류에 끼워지는 민자 형태의 돌기부와, 상기 돌기부의 일면에 형성되어 상기 제1 플랜지에 밀착되는 제2 플랜지를 포함하는 마감캡
을 포함하는 지하연속벽의 앵커공 지수장치.
In the anchor hole indexing device installed in the rebar network for the construction of underground continuous wall,
A cylindrical sleeve which is installed to be inclined downward at a predetermined interval to the reinforcing bar network, and has an external appearance and is formed with a spiral groove for fastening on an inner surface thereof;
A first flange mounted to one surface of the cylindrical sleeve, the first flange having a hole communicating with the sleeve and fixed to an outer surface of the rebar network;
A spiral formed on an outer surface of the cylindrical sleeve to be fastened to the spiral groove, and a liner screw divided into three pieces so as to be reduced and expanded; And
A closing cap including a bulge-shaped protrusion fitted to the liner screw, and a second flange formed on one surface of the protrusion to be in close contact with the first flange.
Anchor ball index device of the continuous continuous wall including a.
KR1020100008428A 2010-01-29 2010-01-29 Anchor hole sealing apparatus in an diaphragm walls KR101188709B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100008428A KR101188709B1 (en) 2010-01-29 2010-01-29 Anchor hole sealing apparatus in an diaphragm walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100008428A KR101188709B1 (en) 2010-01-29 2010-01-29 Anchor hole sealing apparatus in an diaphragm walls

Publications (2)

Publication Number Publication Date
KR20110088768A KR20110088768A (en) 2011-08-04
KR101188709B1 true KR101188709B1 (en) 2012-10-09

Family

ID=44927170

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100008428A KR101188709B1 (en) 2010-01-29 2010-01-29 Anchor hole sealing apparatus in an diaphragm walls

Country Status (1)

Country Link
KR (1) KR101188709B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101902536B1 (en) * 2017-01-17 2018-09-28 이상섭 Street inlet having angle adjustable bellows and rainwater conduit construction method using this same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004092377A (en) 2002-07-08 2004-03-25 Taisei Corp Fixing device for linear reinforcing member and reinforcing method for natural ground
KR200375550Y1 (en) 2004-11-10 2005-03-11 우량건설 주식회사 Anchor Plate of Corrugating Drain Pipe and Drainage Apparatus Thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004092377A (en) 2002-07-08 2004-03-25 Taisei Corp Fixing device for linear reinforcing member and reinforcing method for natural ground
KR200375550Y1 (en) 2004-11-10 2005-03-11 우량건설 주식회사 Anchor Plate of Corrugating Drain Pipe and Drainage Apparatus Thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101902536B1 (en) * 2017-01-17 2018-09-28 이상섭 Street inlet having angle adjustable bellows and rainwater conduit construction method using this same

Also Published As

Publication number Publication date
KR20110088768A (en) 2011-08-04

Similar Documents

Publication Publication Date Title
KR100978314B1 (en) Reinforced Concrete Tunnels by Using Corrugated Steel Plate and the Construction Method thereof
KR20110043017A (en) The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
KR101260292B1 (en) Grouting device and tunnel reinforce method
CN102660955B (en) Quick construction method for foundation pit slope support
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
CN110924976A (en) Surrounding rock outer ring grouting reinforcement method
KR100914158B1 (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
KR20220030686A (en) Construction method and construction structure of water expansion index to prevent leakage of underground continuous wall
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
CN101161947A (en) Integration method of lagging pile and dewatering well for foundation ditch support
CN116816389A (en) Tunnel water-rich karst collapse cavity treatment method
KR101188709B1 (en) Anchor hole sealing apparatus in an diaphragm walls
CN104480945A (en) Inversed construction method for foundation pit
CN111560964A (en) Construction method of rear anti-seepage system of foundation pit
JP2009180035A (en) Method of connecting caisson
CN104499489A (en) Foundation pit construction method
KR101745363B1 (en) complex Temporary utility and its construction Method
KR100476839B1 (en) Construction method for installing concrete underground structures
KR101267688B1 (en) The shore protection construction method using a precast finish panel
KR20190072213A (en) Method Of Ground Half-Openning For Tunnel Excavation
KR100432782B1 (en) Supporting structure for tunnel and underground tunnel construction method using the same
KR100968431B1 (en) Jacket Installing process of jacket facility structure using R.C.D. reamming bit for excavating enlarged hole in the earth
KR101625101B1 (en) Steel pipe wall temporary construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee