JP2004092377A - Fixing device for linear reinforcing member and reinforcing method for natural ground - Google Patents

Fixing device for linear reinforcing member and reinforcing method for natural ground Download PDF

Info

Publication number
JP2004092377A
JP2004092377A JP2003106461A JP2003106461A JP2004092377A JP 2004092377 A JP2004092377 A JP 2004092377A JP 2003106461 A JP2003106461 A JP 2003106461A JP 2003106461 A JP2003106461 A JP 2003106461A JP 2004092377 A JP2004092377 A JP 2004092377A
Authority
JP
Japan
Prior art keywords
ground
reinforcing member
linear reinforcing
hole
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003106461A
Other languages
Japanese (ja)
Other versions
JP4235022B2 (en
Inventor
Tomoyuki Aoki
青木 智幸
Katsumi Shibata
柴田 勝美
Isamu Otsuka
大塚 勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2003106461A priority Critical patent/JP4235022B2/en
Publication of JP2004092377A publication Critical patent/JP2004092377A/en
Application granted granted Critical
Publication of JP4235022B2 publication Critical patent/JP4235022B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a fixing device for a linear reinforcing member and a fixing method for a natural ground in which works for producing the linear reinforcing member and fixing the reinforcing member to the ground can be easily performed in a short time. <P>SOLUTION: The fixing device for the linear reinforcing member includes the linear reinforcing member (bolt 1) inserted into a hole 22 bored in the ground 21, an opening member (flanged steel pipe 2) having a tubular part 11 disposed to substantially pass the liner reinforcing member (bolt 1) in the opening part of the hole 22 and a plate part 12 for stopping the ground 21 before the opening part of the hole 22, and an anchoring member (mortar 3) with which the hole 22 is filled to anchor the linear reinforcing member (bolt 1) and the opening member (flanged steel pipe 2) in the ground and give a binding force to the linear reinforcing member (bolt 1) inside the opening member (flanged steel pipe 2) when tension is applied to the linear reinforcing member (bolt 1) in the direction along the hole 22. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、トンネルや法面などの掘削によって緩んだ地山、緩む可能性がある地山など(以下、地山という)を固定するために用いられる線状補強部材の固定装置及び地山の補強方法に関する。
【0002】
【従来の技術】
従来のこの種の線状補強部材の固定装置としては、例えば図7(図7(a)は斜視図、図7(b)は断面図)に示すように、地山131を貫通させる状態に削孔した孔132に挿入される線状補強部材たるボルト101(長さ2m〜4m程度,直径25mm程度)であって壁面側にねじ山101aが切られたものと、ボルト101壁面側のねじ山101aに螺着されるナット102及びナット102に反力をとって壁状部材たる吹付コンクリート133とともに地山131を孔132の口元部分の壁面側から抑止する板状部材たるベアリングプレート103と、孔132の内部に充填されることによりボルト101を地山に定着させる定着材たるモルタル104とから構成されるロックボルトがある(例えば非特許文献1参照)。
なお、吹付コンクリート133を用いないで、岩盤壁面に直接固定する場合もある。
【0003】
【非特許文献1】
「トンネル標準示方書(山岳工法編)・同解説」、社団法人土木学会、平成8年7月、p.79−85
【0004】
【発明が解決しようとする課題】
しかしながら、このような線状補強部材の固定装置では、ボルト101の製造時にあっては、ねじ山101aを形成させるための加工に時間と費用を要することとなり、施工時にあっては、ベアリングプレート103をナット102のねじ山101aへの螺着によって吹付コンクリート133面に押し付けて固定する作業が非常に煩雑であり、そのための時間を要することとなってしまうという問題がある。
一方、図8(図8(a)は斜視図、図8(b)は断面図)に示すような、ボルトにPC鋼より線111を用いる場合は、PC鋼より線111に定着したねじ山をもつ定着材111aに螺着したナット112に反力をとってベアリングプレート113で地山131をモルタル114を介して固定する場合や、図9(図9(a)は斜視図、図9(b)は断面図)に示すような、PC鋼より線等121に楔122aを介して定着したグリッパー122に反力をとってベアリングプレート123で地山131をモルタル124を介して固定する場合にあっても、同様な作業上の問題を生ずることとなる。しかも、これらの固定具は、ねじ・ナット式よりも加工工程が多く、より高価なものとなる。
【0005】
そこで、本発明の課題は、線状補強部材の製造コストの低減効果及び施工コストの低減効果が得られるように、線状補強部材の製造及び地山への固定作業を容易かつ短時間で行うことが可能となるような線状補強部材の固定装置及び地山の補強方法を提供することにある。
【0006】
【課題を解決するための手段】
すなわち、本発明は、第一発明と、第二発明とを含むものとして構成されている。第一発明は、線状補強部材の固定装置に係るものであり、第二発明は、地山の補強方法に係るものである。
【0007】
第一発明に係る線状補強部材の固定装置は、掘削によって緩んだ地山、緩む可能性がある地山その他の地山を補強するために用いられるものとして構成されている。
【0008】
このような線状補強部材の固定装置は、線状補強部材と、口元部材と、定着材とを含むものとして構成されている。
【0009】
ここで、線状補強部材は、地山に削孔した孔に挿入されるものとして構成されている。線状補強部材としては、その周囲を取り巻く材料との付着力が増大するように、部分的に断面の大きな箇所を有して形成されているものを使用するのが好ましく、例えば、通常のより線(プレーンストランドケーブル)の一部をより戻すことからその一部分に膨らみを作ったバルブストランドケーブルを用いることが好適である。
【0010】
口元部材は、孔の口元部分に線状補強部材を貫通した状態に配設される筒状部を含むものとして構成されている。
【0011】
定着材は、孔の内部に充填され硬化することにより線状補強部材及び口元部材を地山に定着させるとともに、線状補強部材に対して孔に沿う方向で引張力が付与された場合に口元部材の内側で線状補強部材に対して拘束力を付与する機能を果たす。これは、例えばセメントミルクやモルタルなどとして構成されるものである。
【0012】
このような第一発明に係る線状補強部材の固定装置によれば、このような筒状部及び板状部からなる口元部材を含むものとして構成されているので、線状補強部材の製造及び地山への固定作業を容易かつ短時間で行うことが可能となる。
【0013】
したがって、これによれば、線状補強部材の製造コストの低減効果及び施工コストの低減効果が得られることが可能となる。
【0014】
このような第一発明に係る線状補強部材の固定装置において、地山の拘束力が低い場合(例えば岩強度が低い場合)に線状補強部材から伝達される引張力に対抗することとして、地山との定着についての不安を解消しようとする観点からすれば、口元部材は、地山を孔の口元部分の壁面側から抑止する板状部を含むものとして構成されていることが好ましい。
【0015】
この場合において、線状補強部材の製造及び地山への固定作業をさらに容易かつ短時間で行うことを可能として、線状補強部材のもつ能力を最大限に得ようとする観点からすれば、口元部材の板状部は、壁状部材とともに地山を孔の口元部分の壁面側から抑止するものであることが好ましい。
【0016】
ただし、地山の拘束力が高く、地山の亀裂等が問題となる場合には、口元部材としては、拘束力を計算した上で筒状部材の表面を凹凸に加工したもののみによって構成することもできる。
【0017】
ここで、壁状部材は、例えば吹付コンクリートなどとして構成されるものである。
【0018】
一方、第二発明に係る地山の補強方法は、掘削によって緩んだ地山、緩む可能性がある地山その他の地山を補強するために用いられる方法として構成されている。
【0019】
これは、以下の各工程を含む方法として構成されている。
【0020】
すなわち、地山に削孔した孔に線状補強部材を挿入する線状補強部材挿入工程。
【0021】
孔の口元部分に筒状部及び板状部からなる口元部材を配設する工程であって、筒状部に線状補強部材を貫通した状態におくとともに、板状部を地山を孔の口元部分の壁面側から抑止可能な状態におく口元部材配設工程。
【0022】
そして、孔の内部に定着材を充填する工程であって、線状補強部材及び口元部材を地山に定着可能な状態におくとともに、線状補強部材に孔に沿う方向で引張力が付与された場合に口元部材の内側で線状補強部材への拘束力の付与が可能な状態におく定着材充填工程である。
【0023】
ここで、定着材は、例えばセメントミルクやモルタル、樹脂などとして構成されるものである。
【0024】
このような第二発明に係る地山の補強方法によれば、このような口元部材配設工程を含むものとして構成されているので、線状補強部材の製造及び地山への固定作業をきわめて容易にかつ短時間で行うことが可能となる。
【0025】
したがって、これによれば、線状補強部材の製造コストの低減効果及び施工コストの低減効果が確実かつ十分に得られることが可能となる。
【0026】
このような第二発明に係る地山の補強方法において、地山の拘束力が小さい場合では、線状補強部材の製造及び地山への固定作業をさらに容易かつ短時間で行うことを可能として、線状補強部材の製造コストの低減効果及び施工コストの低減効果を確実かつ十分に得ようとする観点からすれば、口元部材配設工程の前に、壁状部材を地山の壁面側であって孔の口元部分周りに配設する壁状部材配設工程を含み、口元部材配設工程が、壁状部材とともに地山を孔の口元部分の壁面側から抑止可能な状態におく工程を含む方法として構成されていることが好ましい。
【0027】
ここで、壁状部材は、例えば吹付コンクリートなどとして構成されるものである。
【0028】
【発明の実施の形態】
以下、添付図面に基づいて本発明の実施の形態を詳細に説明する。
【0029】
なお、ここでは、トンネル掘削による地山の補強にロックボルトに沿う形式で用いられる場合について説明するが、これに限られるものではなく、例えば法面掘削による地山の補強ボルトとして用いられるなどの場合でも、以下の説明が妥当する。
【0030】
◎実施の形態1
[線状補強部材の固定装置]
図1は本発明の実施の形態1に係る線状補強部材の固定装置の全体構成を示す斜視図、図2は該線状補強部材の固定装置の部分構成を示す断面図、図3は該線状補強部材の固定装置の作用を説明する断面図を示している。
【0031】
この実施の形態1において、線状補強部材の固定装置は、掘削によって緩んだ地山、緩む可能性がある地山その他の地山を線状補強部材で補強する場合に線状補強部材を地山に固定することを目的として用いられるものとして構成されている。
【0032】
具体的には、この線状補強部材の固定装置は、図1及び図2に示すように、線状補強部材たるボルト1と、口元部材たる鍔付管2と、セメントミルクやモルタル等からなる定着材3とからなっている。
【0033】
以下、これらの各構成要素についてさらに詳細に説明する。
【0034】
(1)ボルト1
ボルト1は、これらの図に示すように、地山21に削孔した孔22に挿入されるものとして構成されている。
【0035】
この実施の形態1において、ボルト1が挿入される孔22は、地山21を削孔されることとなっており、これにより、地山21を深部の健全な地山(図示外)に固定したり、全面定着により地山を補強したりすること等が可能となっている。
【0036】
(2)鍔付管2
鍔付管2は、これらの図に示すように、孔22の口元部分にボルト1を貫通した状態に配設される筒状部11と、地山21を孔22の口元部分の壁面側から抑止する板状部12とからなるものとして構成されている。
【0037】
ここで、鍔付管2の筒状部11は、所定の剛性をもつ管からなっている。
【0038】
つまり、この筒状部11の内側においては、孔22の内部に定着材3が充填された後であってこれが固化した後、ボルト1に孔22に沿う方向で引張力が付与された場合にボルト1への拘束力24(図3参照)が付与されることとなっている。
【0039】
このようなボルト1への拘束力24(図3参照)がボルト1に負荷される引張荷重よりも大きければ、この筒状部11の内側からボルト1は抜けず、これにより、ボルト1を地山21の孔22の口元部分に固定することが可能となっている。
【0040】
なお、このような拘束力24(図3参照)は、鍔付管2の筒状部11の長さに比例する関係にあるため、この関係を利用することにより、鍔付管2の筒状部11を必要な長さに設計することが可能となっている。
【0041】
一方、鍔付管2の鍔に相当する部分である板状部12は、所定の剛性をもつ板からなっており、これらの図に示すように、壁状部材たる吹付コンクリート23等とともに地山21を孔22の口元部分の壁面側から抑止するものとして構成されている。
【0042】
このような板状部12によれば、地山の拘束力が低い場合(例えば岩強度が低い場合)において線状補強部材から伝達される引張力に対抗することが可能となっており、これにより、筒状部11と地山との定着についての不安を解消することが可能となる。
【0043】
つまり、地山21は、これらの図に示すように、壁状部材たる吹付コンクリート23とともに鍔付管2板状部12によって孔22の口元部分の壁面側から抑止されることが可能となっている。
【0044】
このような鍔付管2によれば、ボルト1の製造及び地山21への固定作業をさらに容易かつ短時間で行うことが可能となっており、これにより、ボルト1の製造コストの低減効果及び施工コストの低減効果を確実かつ十分に得ることが可能となっている。
【0045】
また、これによれば、従来技術ではボルト材の種類毎に異なるものとなっていた地山21の固定方式が簡単な方式として一元化される効果も得られる。
【0046】
(3)定着材3
定着材3は、図1及び図2に示すように、孔22の内部に充填されることによりボルト1及び鍔付管2を地山に定着させる機能を果たす。
【0047】
加えて、定着材3は、図3に示すように、ボルト1に対して孔22に沿う方向で引張力が付与された場合には、鍔付管2の内側においてボルト1に対して拘束力24を付与する機能を果たす。
【0048】
上記したように、このような線状補強部材の固定装置によれば、このような筒状部11及び板状部12からなる鍔付管2を含むものとして構成されているので、ボルト1の製造及び地山21への固定作業を容易かつ短時間で行うことが可能となっている。
【0049】
したがって、これによれば、ボルト1の製造コストの低減効果及び施工コストの低減効果が確実かつ十分に得られることが可能となる。
【0050】
[地山21の補強方法]
図4は本発明のこの実施の形態1に係る地山21の補強方法の全体構成を説明するフローチャートの一例を示している。
【0051】
この実施の形態1において、地山21の補強方法は、上記したような地山21の固定装置を用いて行うものであり、図4にフローチャートとして示すように、壁状部材配設工程、ボルト挿入工程、口元部材配設工程及び定着材充填工程の各工程により構成されている。これらの各工程の前後については、前後関係を問わないこととなっている。以下、図4を用いて、図1〜図3を参照にしながら、各工程について説明する。
【0052】
(1)壁状部材配設工程(図1及び図2参照)
これは、壁状部材たる吹付コンクリート23を地山21の壁面側であって孔22の口元部分周りに配設する工程である。
【0053】
ここで、この壁状部材配設工程は、口元部材配設工程の前に実行されることとなっているが、このような順序に限られるものではなく、また、この壁状部材配設工程がなくても本発明が成立し得る。
【0054】
(2)線状補強部材挿入工程(図1及び図2参照)
これは、地山21を貫通させる状態に削孔した孔22に線状補強部材たるボルト1を挿入する工程である。
【0055】
(3)口元部材配設工程(図1及び図2参照)
これは、孔22の口元部分に筒状部11及び板状部12からなる口元部材たる鍔付管2を配設する工程であって、筒状部11にボルト1を貫通した状態におくとともに、板状部12を地山21の孔22の口元部分の壁面側から抑止可能な状態におく工程である。
【0056】
ここで、この口元部材配設工程は、定着材充填工程の前に実行されることとなっているが、このような順序に限られるものではなく、定着材充填工程の後にこれを実行することとなっても差し支えない。
【0057】
この実施の形態1において、この口元部材配設工程は、壁状部材たる吹付コンクリート23とともに地山21を孔22の口元部分の壁面側から抑止可能な状態におく工程を含むものとして構成されている。
【0058】
このような口元部材配設工程によれば、ボルト1の製造及び地山21への固定作業をさらに容易かつ短時間で行うことが可能となっており、これにより、ボルト1の製造コストの低減効果及び施工コストの低減効果を確実かつ十分に得られることが可能となっている。
【0059】
(4)定着材充填工程(図1〜図3参照)
これは、孔22の内部に定着材たる定着材3を充填する工程であって、ボルト1及び鍔付管2を地山に定着可能な状態におくとともに、ボルト1に孔22に沿う方向で引張力が付与された場合に鍔付管2の内側でボルト1への拘束力24の付与が可能な状態におく工程である。
【0060】
この実施の形態1において、この定着材充填工程は、口元部材配設工程の後に実行されることとなっているが、このような順序に限られるものではなく、口元部材配設工程の前にこれを実行することとなっても差し支えない。
【0061】
ここで、ボルト1に孔22に沿う方向で引張力が伝達された場合には、以下のようなプロセスによって図3に示すようなボルト1への拘束力24の付与が具現化されることとなる。
【0062】
すなわち、ボルト1に対して孔22に沿う方向で引張力が加えられると、ボルト1周辺にある硬化した定着材3において図示しない微細な亀裂が発生する。
すると、孔22の内部における硬化した定着材3としては、周囲が所定の剛性をもつ硬い筒状部11で囲われていることから、そのような微細な亀裂が硬化した定着材3の破壊へと発展することはないが、微細な亀裂分だけの体積変化(膨張)が生ずる。
このような形状の変形により、ボルト1への拘束力24を生じさせる結果となる。
【0063】
これにより、この実施の形態1に係る地山21の補強方法が終了する。
【0064】
すなわち、このような地山の補強方法によれば、このような口元部材配設工程及び定着材充填工程を含むものとして構成されているので、ボルト1の製造及び地山21への固定作業をきわめて容易にかつ短時間で行うことが可能となる。
【0065】
したがって、これによれば、ボルト1の製造コストの低減効果及び施工コストの低減効果が確実かつ十分に得られることが可能となる。
【0066】
◎実施の形態2
図5は本発明の実施の形態2に係る線状補強部材の固定装置の部分構成を示す断面図である。なお、実施の形態1と同様な構成要素については、実施の形態1と同様な符号を付してここではその詳細な説明を省略する。
【0067】
この実施の形態2に係る線状補強部材の固定装置は、実施の形態1とほぼ同様であるが、口元部材が筒状部及び板状部からなる実施の形態1と異なり、口元部材が筒状部のみからなる鍔なし管32として構成されている。
【0068】
この鍔なし管32は、鍔付管2よりも地山との固定が不安定であるため、主に良好な地山に用いられる。
【0069】
具体的には、この鍔なし管32は、図5に示すように、孔22の口元部分にボルト1を貫通した状態に配設される筒状部41で構成される。
【0070】
ここで、鍔なし管32の筒状部41は、所定の剛性をもち、筒状部41の表面には、凹凸の加工が施された管となっている。
【0071】
つまり、この筒状部41の内側においては、孔22の内部に充填材が充填された後であってこれが固化した後、ボルト1に孔22に沿う方向で引張力が付与された場合にボルト1への拘束力が付与されることとなっている。
【0072】
このようなボルト1への拘束力によって発揮される充填材とボルト1との間のせん断抵抗力がボルト1に負荷される引張荷重よりも大きければ、この筒状部41の内側からボルト1は抜けず、これにより、ボルト1は筒状部41と固定することが可能となる。
【0073】
一方、鍔なし管32と地山の固定については、例えば鋼管などの表面が滑らかなものであって、鍔なし管32がボルト1の引張力を受けた場合、地山と鍔なし管32の間の拘束力が発揮されにくい。しかし、筒状部41の表面に設けられた凹凸により、地山からの拘束力が付与されることとなる。
【0074】
このような口元部分への拘束力によって発揮されるせん断抵抗力が口元部分へ負荷される引張荷重よりも大きければ、地山内で口元部分が動くことはなく、これにより、鍔なし管32は、地山と固定することが可能となる。
【0075】
したがって、このような実施の形態2に係る線状補強部材の固定装置によっても、以上のような条件を満たすことにより、実施の形態1とほぼ同様な効果が得られることとなる。
【0076】
◎実施の形態3
図6は本発明の実施の形態3に係る線状補強部材の固定装置の各部分構成を示す断面図であり、(a)は線状補強部材を挿入した状態の孔の口元部分を示す部分断面図、(b)はボルト1’の一般部の拡大断面図、(c)はボルト1’に設けたバルブ13の拡大断面図である。なお、実施の形態1又は2と同様な構成要素については、実施の形態1又は2と同様な符号を付してここではその詳細の説明を省略する。
【0077】
この実施の形態3に係る線状補強部材の固定装置は、実施の形態1と略同様であるが、線状補強部材たるボルト1’としてより線を使用する。ボルト1’は、図6(b)で示すように複数本の鋼線(本実施の形態では7本)をより合わせた断面を有するいわゆるより線であり、その一部について図6(c)で示すようにより線をより戻すことにより、膨らみ部分(以下「バルブ」という場合がある)13を設けて、部分的に断面の大きい箇所を設けたものである。なお、ボルト1’のバルブ13は、鍔付管2の筒状部11内に収まる位置に設けるものとする。
【0078】
ここで、ボルト1’に使用するより線には、あらかじめ工場にてバルブ13を加工してあるより線であるバルブストランドを使用しても、バルブ13の無い通常のより線であるプレーンストランドを、ボルト1’の孔22への挿入時に、より戻してバルブ13を設けたものを使用しても良い。
【0079】
図6(a)に示すように、ボルト1’にバルブ13を設けることにより、ボルト1’を取り巻く材料との付着が増大し、線状補強部材の定着効果の増大を図ることができる。つまり、筒状部11の内側においては、孔22の内部に定着材3が充填された後であってこれが固化した後、ボルト1’に孔22に沿う方向で引張力が付与された場合にボルト1’への拘束力24が付与されるのとともに、バルブ13が定着材のような働きを示し、引張力に対する抵抗力が増加することとなる。
【0080】
このようなボルト1’への拘束力24とバルブ13による抵抗力が、ボルト1’に負荷される引張荷重よりも大きければ、この筒状部11の内側からボルト1’は抜けず、これにより、ボルト1’を地山21の孔22の口元部分に固定することが可能となる。
【0081】
すなわち、実施の形態3に係る線状補強部材の固定装置によれば、ボルト1’にバルブ13を設けた分、抵抗力が増加するため、より効果的な地山の補強が可能となる。
【0082】
なお、本実施の形態では、線状補強部材たるボルト1’の線材としてより線を使用したが、ボルト1’の線材はこれに限らず、あらかじめ部分的に断面を大きく加工した鋼線を使用するなど、同様の効果をもたらすものであれば、その材料は限定されるものではない。
【0083】
【発明の効果】
本発明に係る線状補強部材の固定装置及び地山の補強方法によれば、ボルトの製造コストの低減効果及び施工コストの低減効果が確実かつ十分に得られることとなる。
【図面の簡単な説明】
【図1】本発明の実施の形態1に係る線状補強部材の固定装置の全体構成を示す斜視図である。
【図2】本発明の実施の形態1に係る線状補強部材の固定装置の部分構成を示す断面図である。
【図3】本発明の実施の形態1に係る線状補強部材の固定装置の作用を説明する断面図である。
【図4】本発明の実施の形態1に係る地山21の補強方法の全体構成を説明するフローチャートの一例である。
【図5】本発明の実施の形態2に係る線状補強部材の固定装置の部分構成を示す断面図である。
【図6】本発明の実施の形態3に係る線状補強部材の固定装置の各部分構成を示す断面図であり、(a)は線状補強部材を挿入した状態の孔の口元部分を示す部分断面図、(b)はボルトの一般部の拡大断面図、(c)はボルトに設けたバルブの拡大断面図である。
【図7】従来技術である線状補強部材の固定装置の概略構成を示す図7(図7(a)は斜視図、図7(b)は断面図)である。
【図8】従来技術である線状補強部材の固定装置の概略構成を示す図8(図8(a)は斜視図、図8(b)は断面図)である。
【図9】従来技術である線状補強部材の固定装置の概略構成を示す図9(図9(a)は斜視図、図9(b)は断面図)である。
【符号の説明】
1  ボルト
2  鍔付管
3  定着材
11  筒状部
12  板状部
13  バルブ
21  地山
22  孔
23  吹付コンクリート
24  拘束力
32  鍔なし管
41  筒状部
101  ボルト
101a ねじ山
102  ナット
103  ベアリングプレート
104  定着材
111  PC鋼より線
111a 定着材
112  ナット
113  ベアリングプレート
114  定着材
121  PC鋼より線等
122  グリッパー
122a 楔
123  ベアリングプレート
124  定着材
131  地山
132  孔
133  吹付コンクリート
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a fixing device for a linear reinforcing member used to fix a ground loosened by excavation of a tunnel or a slope, a ground possibly loosened, etc. Related to reinforcement method.
[0002]
[Prior art]
As a conventional fixing device for a linear reinforcing member of this type, for example, as shown in FIG. 7 (FIG. 7A is a perspective view, and FIG. A bolt 101 (about 2 m to 4 m in length, about 25 mm in diameter), which is a linear reinforcing member inserted into the drilled hole 132, having a thread 101 a cut on the wall side; A nut 102 screwed to the mountain 101a and a bearing plate 103 serving as a plate-like member that takes a reaction force against the nut 102 and suppresses the ground 131 together with the sprayed concrete 133 serving as a wall-like member from the wall surface side of the mouth portion of the hole 132; There is a lock bolt composed of a mortar 104 serving as a fixing material for fixing the bolt 101 to the ground by filling the inside of the hole 132 (for example, see Non-Patent Document 1).
In some cases, the shotcrete 133 is not used, but directly fixed to the wall surface of the bedrock.
[0003]
[Non-patent document 1]
"Tunnel Standard Instructions (Mountain Construction Method), Commentary", Japan Society of Civil Engineers, July 1996, p. 79-85
[0004]
[Problems to be solved by the invention]
However, in such a fixing device for a linear reinforcing member, when manufacturing the bolt 101, processing for forming the screw thread 101a requires time and expense, and at the time of construction, the bearing plate 103 is required. There is a problem that the work of pressing and fixing the nut 102 onto the sprayed concrete 133 surface by screwing the nut 102 onto the screw thread 101a is very complicated, and it takes time for the operation.
On the other hand, as shown in FIG. 8 (FIG. 8A is a perspective view and FIG. 8B is a cross-sectional view), when the PC steel stranded wire 111 is used for the bolt, the thread fixed to the PC steel stranded wire 111 9 (a) is a perspective view, FIG. 9 (a) is a perspective view, and FIG. 9 () shows a case where a ground force 131 is fixed via a mortar 114 with a bearing plate 113 by applying a reaction force to a nut 112 screwed to a fixing material 111a having b) is a cross-sectional view) in which a ground force 131 is fixed via a mortar 124 with a bearing plate 123 by applying a reaction force to a gripper 122 fixed via a wedge 122 a to a PC steel strand 121 or the like. Even so, a similar operational problem arises. Moreover, these fixtures require more processing steps than the screw and nut type and are more expensive.
[0005]
Therefore, an object of the present invention is to perform the manufacturing of the linear reinforcing member and the fixing work to the ground easily and in a short time so that the effect of reducing the manufacturing cost of the linear reinforcing member and the effect of reducing the construction cost are obtained. It is an object of the present invention to provide a fixing device for a linear reinforcing member and a method for reinforcing the ground that can be used.
[0006]
[Means for Solving the Problems]
That is, the present invention is configured to include the first invention and the second invention. The first invention relates to a fixing device for a linear reinforcing member, and the second invention relates to a method for reinforcing ground.
[0007]
The fixing device for a linear reinforcing member according to the first invention is configured to be used to reinforce a ground that has been loosened by excavation, a ground that may loosen, and other grounds.
[0008]
Such a fixing device for a linear reinforcing member is configured to include a linear reinforcing member, a mouth member, and a fixing material.
[0009]
Here, the linear reinforcing member is configured to be inserted into a hole drilled in the ground. As the linear reinforcing member, it is preferable to use a linear reinforcing member which is formed to have a part with a large cross section so that the adhesive force with a material surrounding the linear reinforcing member is increased. It is preferable to use a valve strand cable in which a part of the wire (plain strand cable) is bulged in order to return part of the wire.
[0010]
The mouth member is configured to include a tubular portion disposed at a mouth portion of the hole so as to penetrate the linear reinforcing member.
[0011]
The fixing material fills the inside of the hole and hardens to fix the linear reinforcing member and the lip member to the ground, and when a tensile force is applied to the linear reinforcing member in the direction along the hole, the lip is formed. It functions to apply a restraining force to the linear reinforcing member inside the member. This is configured as, for example, cement milk or mortar.
[0012]
According to the fixing device for a linear reinforcing member according to the first aspect of the invention, since the linear reinforcing member is configured to include the mouth member including the cylindrical portion and the plate-like portion, the manufacturing of the linear reinforcing member and The fixing work to the ground can be performed easily and in a short time.
[0013]
Therefore, according to this, it is possible to obtain the effect of reducing the manufacturing cost of the linear reinforcing member and the effect of reducing the construction cost.
[0014]
In the fixing device of the linear reinforcing member according to the first aspect, when the restraining force of the ground is low (for example, when the rock strength is low), it is possible to counter the tensile force transmitted from the linear reinforcing member. From the viewpoint of relieving anxiety about fixing to the ground, it is preferable that the lip member is configured to include a plate-shaped portion that suppresses the pit from the wall surface side of the lip portion of the hole.
[0015]
In this case, it is possible to perform the manufacturing of the linear reinforcing member and the fixing work to the ground more easily and in a short time, from the viewpoint of maximizing the capability of the linear reinforcing member, It is preferable that the plate-shaped portion of the mouth member suppresses the ground with the wall-shaped member from the wall surface side of the mouth portion of the hole.
[0016]
However, when the binding force of the ground is high and cracks or the like of the ground become a problem, the mouth member is configured only by processing the surface of the cylindrical member into irregularities after calculating the binding force. You can also.
[0017]
Here, the wall-shaped member is configured as, for example, sprayed concrete.
[0018]
On the other hand, the ground reinforcement method according to the second invention is configured as a method used to reinforce a ground loosened by excavation, a ground possibly loosened, and other grounds.
[0019]
This is configured as a method including the following steps.
[0020]
That is, a linear reinforcing member inserting step of inserting the linear reinforcing member into a hole drilled in the ground.
[0021]
A step of arranging a mouth member consisting of a tubular portion and a plate portion at the mouth portion of the hole, while keeping the linear reinforcing member penetrating the tubular portion, A step of arranging the lip member so that the lip portion can be suppressed from the wall side of the lip portion.
[0022]
Then, in the step of filling the inside of the hole with the fixing material, while keeping the linear reinforcing member and the mouth member in a state capable of fixing to the ground, a tensile force is applied to the linear reinforcing member in the direction along the hole. In this case, the fixing material filling step is performed in such a manner that a binding force can be applied to the linear reinforcing member inside the mouth member.
[0023]
Here, the fixing material is configured as, for example, cement milk, mortar, resin, or the like.
[0024]
According to the method of reinforcing a ground according to the second aspect of the present invention, since the method includes the step of arranging the mouth member, the manufacturing of the linear reinforcing member and the fixing work to the ground are extremely performed. This can be performed easily and in a short time.
[0025]
Therefore, according to this, the effect of reducing the manufacturing cost of the linear reinforcing member and the effect of reducing the construction cost can be reliably and sufficiently obtained.
[0026]
In the method for reinforcing the ground according to the second aspect of the invention, when the binding force of the ground is small, it is possible to perform the manufacturing of the linear reinforcing member and the fixing work to the ground more easily and in a short time. From the viewpoint of reliably and sufficiently obtaining the effect of reducing the manufacturing cost of the linear reinforcing member and the effect of reducing the construction cost, the wall-like member is placed on the wall side of the ground before the mouth member arranging step. A wall-shaped member arranging step of arranging around the mouth portion of the hole, wherein the mouth member arranging step includes a step of placing the ground together with the wall member in a state where the ground can be suppressed from the wall side of the mouth portion of the hole. It is preferable that the method is configured as a method including the method.
[0027]
Here, the wall-shaped member is configured as, for example, sprayed concrete.
[0028]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0029]
In addition, although the case where it is used in the form along a rock bolt for reinforcement of the ground by tunnel excavation is explained here, it is not limited to this, for example, it is used as a reinforcement bolt of the ground by slope excavation. Even in this case, the following explanation is valid.
[0030]
◎ Embodiment 1
[Fixing device for linear reinforcing member]
FIG. 1 is a perspective view showing an entire configuration of a fixing device for a linear reinforcing member according to Embodiment 1 of the present invention, FIG. 2 is a cross-sectional view showing a partial configuration of the fixing device for the linear reinforcing member, and FIG. FIG. 4 is a cross-sectional view illustrating an operation of a fixing device for a linear reinforcing member.
[0031]
In the first embodiment, the fixing device for the linear reinforcing member is used to reinforce the linear reinforcing member when the ground loosened by the excavation, the ground that is likely to be loosened, and other grounds are strengthened by the linear reinforcing member. It is configured to be used for fixing to a mountain.
[0032]
Specifically, as shown in FIGS. 1 and 2, the fixing device of the linear reinforcing member includes a bolt 1 as a linear reinforcing member, a flanged tube 2 as a mouth member, cement milk, mortar, and the like. The fixing material 3 is included.
[0033]
Hereinafter, each of these components will be described in more detail.
[0034]
(1) Bolt 1
The bolt 1 is configured to be inserted into a hole 22 formed in the ground 21 as shown in these figures.
[0035]
In the first embodiment, the hole 22 into which the bolt 1 is inserted is formed by drilling the ground 21, thereby fixing the ground 21 to a deep sound ground (not shown). It is possible to reinforce the ground by fixing the entire surface.
[0036]
(2) Flanged tube 2
As shown in these figures, the flanged tube 2 is configured such that the cylindrical portion 11 disposed in a state where the bolt 1 penetrates through the mouth portion of the hole 22 and the ground 21 from the wall surface side of the mouth portion of the hole 22. It is comprised as what consists of the plate-shaped part 12 to suppress.
[0037]
Here, the tubular portion 11 of the flanged tube 2 is formed of a tube having a predetermined rigidity.
[0038]
That is, inside the cylindrical portion 11, after the fixing material 3 is filled in the hole 22 and after the fixing material 3 is solidified, when the bolt 1 is given a tensile force in the direction along the hole 22, A restraining force 24 (see FIG. 3) is applied to the bolt 1.
[0039]
If the restraining force 24 (see FIG. 3) applied to the bolt 1 is larger than the tensile load applied to the bolt 1, the bolt 1 does not come off from the inside of the cylindrical portion 11, and as a result, the bolt 1 is grounded. It can be fixed to the mouth of the hole 22 of the mountain 21.
[0040]
Since such a restraining force 24 (see FIG. 3) is in a relationship proportional to the length of the tubular portion 11 of the flanged tube 2, the cylindrical force of the flanged tube 2 is obtained by utilizing this relationship. The portion 11 can be designed to have a required length.
[0041]
On the other hand, the plate-like portion 12 which is a portion corresponding to the flange of the flanged tube 2 is made of a plate having a predetermined rigidity. 21 is configured to be suppressed from the wall surface side of the mouth portion of the hole 22.
[0042]
According to such a plate-shaped portion 12, when the binding force of the ground is low (for example, when the rock strength is low), it is possible to counter the tensile force transmitted from the linear reinforcing member. Thereby, it is possible to eliminate anxiety about fixing between the tubular portion 11 and the ground.
[0043]
That is, as shown in these figures, the ground 21 can be restrained from the wall surface side of the mouth portion of the hole 22 by the flanged tube 2 plate-shaped portion 12 together with the sprayed concrete 23 as the wall-shaped member. I have.
[0044]
According to such a flanged tube 2, the production of the bolt 1 and the fixing work to the ground 21 can be performed more easily and in a short time, thereby reducing the production cost of the bolt 1. In addition, it is possible to reliably and sufficiently obtain the effect of reducing the construction cost.
[0045]
In addition, according to this, an effect is obtained in which the fixing method of the ground 21 which has been different for each type of bolt material in the related art is unified as a simple method.
[0046]
(3) Fixing material 3
As shown in FIGS. 1 and 2, the fixing material 3 has a function of fixing the bolt 1 and the flanged tube 2 to the ground by filling the inside of the hole 22.
[0047]
In addition, as shown in FIG. 3, when a tensile force is applied to the bolt 1 in a direction along the hole 22, the fixing material 3 restrains the bolt 1 inside the flanged tube 2. 24.
[0048]
As described above, according to the fixing device of the linear reinforcing member, since the flanged tube 2 including the cylindrical portion 11 and the plate-shaped portion 12 is included, the bolt 1 Manufacturing and fixing work to the ground 21 can be performed easily and in a short time.
[0049]
Therefore, according to this, the effect of reducing the manufacturing cost of the bolt 1 and the effect of reducing the construction cost can be reliably and sufficiently obtained.
[0050]
[Method of reinforcing ground 21]
FIG. 4 shows an example of a flowchart for explaining the overall configuration of the method for reinforcing the ground 21 according to the first embodiment of the present invention.
[0051]
In the first embodiment, the method of reinforcing the ground 21 is performed by using the fixing device for the ground 21 as described above, and as shown in the flowchart of FIG. It comprises an insertion step, a mouth member disposing step, and a fixing material filling step. The order before and after each of these steps is not specified. Hereinafter, each step will be described with reference to FIG. 4 and FIGS. 1 to 3.
[0052]
(1) Wall-like member arranging step (see FIGS. 1 and 2)
This is a step of disposing the sprayed concrete 23 as the wall-shaped member on the wall surface side of the ground 21 and around the mouth portion of the hole 22.
[0053]
Here, the wall-like member arranging step is to be performed before the mouth member arranging step, but is not limited to such an order. The present invention can be realized without the above.
[0054]
(2) Step of inserting a linear reinforcing member (see FIGS. 1 and 2)
This is a step of inserting the bolt 1 as a linear reinforcing member into the hole 22 drilled so as to penetrate the ground 21.
[0055]
(3) Mouth member disposing process (see FIGS. 1 and 2)
This is a step of arranging the flanged tube 2 which is a mouth member composed of the tubular portion 11 and the plate-shaped portion 12 at the mouth portion of the hole 22, while keeping the bolt 1 penetrating the tubular portion 11. This is a step in which the plate-like portion 12 is placed in a state where it can be suppressed from the wall surface side of the mouth portion of the hole 22 of the ground 21.
[0056]
Here, the mouth member arranging step is to be performed before the fixing material filling step. However, the order is not limited to such an order, and it may be performed after the fixing material filling step. It does not matter.
[0057]
In the first embodiment, this mouth member arranging step is configured to include a step of keeping the ground 21 together with the shotcrete 23 as the wall-shaped member in a state where the ground 21 can be suppressed from the wall surface side of the mouth part of the hole 22. I have.
[0058]
According to such a mouth member arranging step, the production of the bolt 1 and the fixing work to the ground 21 can be performed more easily and in a short time, thereby reducing the production cost of the bolt 1. The effect and the effect of reducing the construction cost can be reliably and sufficiently obtained.
[0059]
(4) Fixing material filling step (see FIGS. 1 to 3)
This is a step of filling the fixing material 3 serving as a fixing material into the hole 22, while keeping the bolt 1 and the flanged tube 2 in a state where the fixing can be performed on the ground, and the bolt 1 in the direction along the hole 22. This is a step in which a restraining force 24 can be applied to the bolt 1 inside the flanged tube 2 when a tensile force is applied.
[0060]
In the first embodiment, the fixing material filling step is performed after the mouth member disposing step. However, the order is not limited to such an order. You can do this.
[0061]
Here, when the tensile force is transmitted to the bolt 1 in the direction along the hole 22, the application of the constraint force 24 to the bolt 1 as shown in FIG. Become.
[0062]
That is, when a tensile force is applied to the bolt 1 in the direction along the hole 22, minute cracks (not shown) occur in the cured fixing material 3 around the bolt 1.
Then, the hardened fixing material 3 inside the hole 22 is surrounded by the hard cylindrical portion 11 having a predetermined rigidity. However, a volume change (expansion) of only a minute crack occurs.
Such deformation of the shape results in a binding force 24 on the bolt 1.
[0063]
Thus, the method of reinforcing the ground 21 according to the first embodiment ends.
[0064]
That is, according to such a method of reinforcing the ground, since it is configured to include such a mouth member disposing step and a fixing material filling step, the production of the bolt 1 and the fixing work to the ground 21 are performed. This can be performed very easily and in a short time.
[0065]
Therefore, according to this, the effect of reducing the manufacturing cost of the bolt 1 and the effect of reducing the construction cost can be reliably and sufficiently obtained.
[0066]
Embodiment 2
FIG. 5 is a sectional view showing a partial configuration of a fixing device for a linear reinforcing member according to Embodiment 2 of the present invention. Note that components similar to those of the first embodiment are denoted by the same reference numerals as those of the first embodiment, and detailed description thereof will be omitted.
[0067]
The fixing device of the linear reinforcing member according to the second embodiment is almost the same as that of the first embodiment, but is different from the first embodiment in which the mouth member includes a cylindrical portion and a plate-like portion, and the mouth member is a cylindrical member. It is configured as a flangeless tube 32 composed of only a flange.
[0068]
The flangeless tube 32 is used mainly for a good ground because the fixation to the ground is more unstable than the flanged tube 2.
[0069]
Specifically, as shown in FIG. 5, the flange-less tube 32 is configured by a tubular portion 41 that is disposed at a mouth portion of the hole 22 so as to penetrate the bolt 1.
[0070]
Here, the tubular portion 41 of the flangeless tube 32 has a predetermined rigidity, and the surface of the tubular portion 41 is a tube whose surface is processed to have irregularities.
[0071]
That is, inside the cylindrical portion 41, after the filler is filled into the hole 22 and after the filler is solidified, when the bolt 1 is given a tensile force in the direction along the hole 22, the bolt 1 1 is to be given a binding force.
[0072]
If the shearing resistance between the filler and the bolt 1 exerted by such a restraining force on the bolt 1 is larger than the tensile load applied to the bolt 1, the bolt 1 from the inside of the tubular portion 41 Thus, the bolt 1 can be fixed to the tubular portion 41.
[0073]
On the other hand, for fixing the flangeless tube 32 to the ground, for example, when the surface of a steel pipe or the like is smooth and the flangeless tube 32 receives the tensile force of the bolt 1, the ground and the flangeless tube 32 are fixed. It is difficult for the binding force between them to be exhibited. However, the concavities and convexities provided on the surface of the tubular portion 41 apply a restraining force from the ground.
[0074]
If the shear resistance exerted by such a restraining force on the lip portion is larger than the tensile load applied to the lip portion, the lip portion does not move in the ground, and as a result, the flangeless tube 32 is It can be fixed to the ground.
[0075]
Therefore, even with the fixing device of the linear reinforcing member according to the second embodiment, by satisfying the above conditions, substantially the same effects as in the first embodiment can be obtained.
[0076]
Embodiment 3
FIG. 6 is a cross-sectional view illustrating each configuration of a fixing device for a linear reinforcing member according to Embodiment 3 of the present invention, and (a) is a portion illustrating a mouth portion of a hole in a state where the linear reinforcing member is inserted. FIG. 4B is an enlarged sectional view of a general portion of the bolt 1 ′, and FIG. 4C is an enlarged sectional view of a valve 13 provided on the bolt 1 ′. The same components as those in the first or second embodiment are denoted by the same reference numerals as those in the first or second embodiment, and the detailed description thereof will be omitted.
[0077]
The fixing device of the linear reinforcing member according to the third embodiment is substantially the same as that of the first embodiment, but uses a stranded wire as the bolt 1 ′ as the linear reinforcing member. The bolt 1 ′ is a so-called stranded wire having a cross section in which a plurality of steel wires (seven wires in this embodiment) are stranded as shown in FIG. 6B, and a part of the stranded wire is shown in FIG. The bulging portion (hereinafter, sometimes referred to as a “valve”) 13 is provided by returning the wire more as shown by (1), and a portion having a partially large cross section is provided. Note that the valve 13 of the bolt 1 ′ is provided at a position that fits within the tubular portion 11 of the flanged tube 2.
[0078]
Here, for the stranded wire used for the bolt 1 ′, a plain stranded wire that is a normal stranded wire without the valve 13 is used even if a stranded wire that is a stranded wire that has been processed in the factory in advance is used. When the bolt 1 ′ is inserted into the hole 22, a bolt provided with the valve 13 may be used.
[0079]
As shown in FIG. 6A, by providing the valve 1 on the bolt 1 ', adhesion to the material surrounding the bolt 1' is increased, and the fixing effect of the linear reinforcing member can be increased. In other words, when the fixing material 3 is filled inside the hole 22 inside the cylindrical portion 11, and after the solidification of the fixing material 3, a tensile force is applied to the bolt 1 ′ in the direction along the hole 22. As the restraining force 24 is applied to the bolt 1 ', the valve 13 acts like a fixing material, and the resistance to tensile force increases.
[0080]
If the restraining force 24 on the bolt 1 ′ and the resistance by the valve 13 are larger than the tensile load applied to the bolt 1 ′, the bolt 1 ′ will not come off from the inside of the tubular portion 11, thereby And the bolt 1 ′ can be fixed to the mouth of the hole 22 of the ground 21.
[0081]
That is, according to the fixing device of the linear reinforcing member according to the third embodiment, the resistance is increased by the provision of the valve 13 on the bolt 1 ′, so that the ground can be more effectively reinforced.
[0082]
In the present embodiment, a stranded wire is used as the wire material of the bolt 1 ', which is a linear reinforcing member. However, the wire material of the bolt 1' is not limited to this, and a steel wire having a partially enlarged cross section is used in advance. The material is not limited as long as the same effect can be obtained.
[0083]
【The invention's effect】
ADVANTAGE OF THE INVENTION According to the fixing device of the linear reinforcing member and the method of reinforcing the ground according to the present invention, the effect of reducing the manufacturing cost of the bolt and the effect of reducing the construction cost can be reliably and sufficiently obtained.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an entire configuration of a fixing device for a linear reinforcing member according to Embodiment 1 of the present invention.
FIG. 2 is a cross-sectional view showing a partial configuration of a fixing device of the linear reinforcing member according to the first embodiment of the present invention.
FIG. 3 is a cross-sectional view illustrating an operation of the fixing device for the linear reinforcing member according to the first embodiment of the present invention.
FIG. 4 is an example of a flowchart illustrating an entire configuration of a method for reinforcing the ground 21 according to the first embodiment of the present invention.
FIG. 5 is a sectional view showing a partial configuration of a fixing device for a linear reinforcing member according to Embodiment 2 of the present invention.
FIGS. 6A and 6B are cross-sectional views each showing a partial configuration of a fixing device for a linear reinforcing member according to Embodiment 3 of the present invention, and FIG. 6A illustrates a mouth portion of a hole in which the linear reinforcing member is inserted. FIG. 2B is a partial sectional view, FIG. 2B is an enlarged sectional view of a general portion of the bolt, and FIG. 2C is an enlarged sectional view of a valve provided on the bolt.
7 (a) is a perspective view, and (b) is a cross-sectional view of a schematic configuration of a conventional linear reinforcing member fixing device.
FIGS. 8A and 8B are schematic diagrams showing a schematic configuration of a conventional linear reinforcing member fixing device (FIG. 8A is a perspective view, and FIG. 8B is a cross-sectional view).
FIGS. 9A and 9B show a schematic configuration of a conventional linear reinforcing member fixing device (FIG. 9A is a perspective view, and FIG. 9B is a cross-sectional view).
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Bolt 2 Flanged tube 3 Fixing material 11 Cylindrical portion 12 Plate portion 13 Valve 21 Ground 22 Hole 23 Shotcrete 24 Binding force 32 Flangeless tube 41 Cylindrical portion 101 Bolt 101a Thread 102 Nut 103 Bearing plate 104 Fixing Material 111 PC steel strand 111a Fixing material 112 Nut 113 Bearing plate 114 Fixing material 121 PC steel strand etc. 122 Gripper 122a Wedge 123 Bearing plate 124 Fixing material 131 Ground pile 132 Hole 133 Shotcrete

Claims (4)

掘削によって緩んだ地山、緩む可能性がある地山その他の地山を補強するための線状補強部材の固定装置であって、
前記地山に穿設した孔に挿入される線状補強部材と、
前記孔の口元部分に前記線状補強部材を貫通させる状態に配設される筒状
部を含む口元部材とを含み、
前記孔の内部にセメントミルク、モルタルその他の定着材を充填することにより前記線状補強部材及び前記口元部材を地山に定着させるとともに、該線状補強部材に対して前記孔に沿う方向で引張力が付与された場合に該口元部材の内側で該線状補強部材に対して拘束力を付与するものであることを特徴とする、
線状補強部材の固定装置。
A fixing device of a linear reinforcing member for reinforcing a ground loosened by excavation, a ground possibly loosened, or other ground,
A linear reinforcing member inserted into a hole drilled in the ground,
A mouth member including a tubular portion disposed in a state where the linear reinforcing member penetrates the mouth portion of the hole,
By filling the inside of the hole with cement milk, mortar or other fixing material, the linear reinforcing member and the mouth member are fixed to the ground, and the linear reinforcing member is pulled in the direction along the hole with respect to the linear reinforcing member. Characterized in that when a force is applied, a restraining force is applied to the linear reinforcing member inside the mouth member.
Fixing device for linear reinforcing members.
前記口元部材は、前記地山を前記孔の口元部分の壁面側から抑止する板状部を含むことを特徴とする、
請求項1に記載の線状補強部材の固定装置。
The mouth member includes a plate-like portion that suppresses the ground from the wall surface side of the mouth portion of the hole,
The fixing device for a linear reinforcing member according to claim 1.
前記線状補強部材が部分的に断面の大きい箇所を有して形成されていることを特徴とする、
請求項1又は請求項2に記載の線状補強部材の固定装置。
The linear reinforcing member is partially formed with a portion having a large cross section,
The fixing device for a linear reinforcing member according to claim 1 or 2.
掘削によって緩んだ地山、緩む可能性がある地山その他の地山を補強するための地山の補強方法であって、
前記地山に削孔した孔に、線状補強部材を挿入する線状補強部材挿入工程と、前記孔の口元部分に筒状部及び板状部からなる口元部材を配設する工程であって、該筒状部に前記線状補強部材を貫通した状態におくとともに、該板状部を前記地山を該孔の口元部分の壁面側から抑止可能な状態におく口元部材配設工程と、
前記孔の内部にセメントミルク、モルタルその他の定着材を充填する工程であって、前記線状補強部材及び前記口元部材を地山に定着可能な状態におくとともに、該線状補強部材に前記孔に沿う方向で引張力が付与された場合に該口元部材の内側で該線状補強部材への拘束力の付与が可能な状態におく定着材充填工程と、を含むことを特徴とする、
地山の補強方法。
A method of reinforcing a ground to reinforce a ground that has been loosened by drilling, a ground that may loosen, or other ground,
A linear reinforcing member inserting step of inserting a linear reinforcing member into the hole drilled in the ground, and a step of arranging a mouth member consisting of a cylindrical portion and a plate portion at the mouth portion of the hole. An opening member disposing step of keeping the plate-shaped portion in a state in which the ground portion can be suppressed from the wall surface side of the opening portion of the hole while keeping the linear reinforcing member penetrating the cylindrical portion,
A step of filling the inside of the hole with cement milk, mortar or other fixing material, while keeping the linear reinforcing member and the mouth member in a state capable of fixing to the ground, and forming the hole in the linear reinforcing member. A fixing material filling step of placing a restraining force on the linear reinforcing member inside the mouth member when a tensile force is applied in a direction along the fixing member.
How to reinforce the ground.
JP2003106461A 2002-07-08 2003-04-10 Fixing device for linear reinforcing member and method for reinforcing natural ground Expired - Fee Related JP4235022B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003106461A JP4235022B2 (en) 2002-07-08 2003-04-10 Fixing device for linear reinforcing member and method for reinforcing natural ground

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2002198103 2002-07-08
JP2003106461A JP4235022B2 (en) 2002-07-08 2003-04-10 Fixing device for linear reinforcing member and method for reinforcing natural ground

Publications (2)

Publication Number Publication Date
JP2004092377A true JP2004092377A (en) 2004-03-25
JP4235022B2 JP4235022B2 (en) 2009-03-04

Family

ID=32072051

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003106461A Expired - Fee Related JP4235022B2 (en) 2002-07-08 2003-04-10 Fixing device for linear reinforcing member and method for reinforcing natural ground

Country Status (1)

Country Link
JP (1) JP4235022B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101188709B1 (en) 2010-01-29 2012-10-09 김정열 Anchor hole sealing apparatus in an diaphragm walls

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101188709B1 (en) 2010-01-29 2012-10-09 김정열 Anchor hole sealing apparatus in an diaphragm walls

Also Published As

Publication number Publication date
JP4235022B2 (en) 2009-03-04

Similar Documents

Publication Publication Date Title
JP2011106147A (en) Structure and method for reinforcing steel tower foundation
JP2005068931A (en) Reinforcing construction method of concrete structure
KR100971147B1 (en) Reinforce unit for grouting and soil nailing reinforce method using the same
JP5926615B2 (en) Shaft wall structure and construction method
JPH08291631A (en) Reinforcing method of concrete structure with steel plate
JP2006016893A (en) Shearing reinforcing method of existing structure
KR20030028518A (en) apparatus and method for retaining wall using ground anchor
JP2004092377A (en) Fixing device for linear reinforcing member and reinforcing method for natural ground
JP7211779B2 (en) Shield start-side shaft wall and shield start-side shaft wall construction method
JP2008031759A (en) Ground anchor and ground anchoring method
JP2003328430A (en) Repairing member for existing conduit and repairing structure for the same
JP2819103B2 (en) How to attach steel plates to concrete structures
KR100776620B1 (en) Bar Type Anchor
JP4205827B2 (en) Reinforcement structure and reinforcement method for existing underground structures
JP2006045997A (en) Anchoring structure of prestress force introducing device and prestressed joint structure
JP2021001450A (en) Wall balustrade reinforcement method and reinforcement structure
JP2002061170A (en) Underground outer wall of structure and its construction method
JP2000297480A (en) Reinforcing method for steel-pipe structure column base section
JP2509159B2 (en) Embankment anchor
JPH08189515A (en) Concrete or anchor similar to concrete
JP3851643B2 (en) Shear force reinforcement method
JP2008280760A (en) Shear reinforcing method and filler injection method
JP2894223B2 (en) Adhesion transfer method ground anchor
JP2008308935A (en) Construction method of truss structure
JPH09184136A (en) Bearing plate and stabilization method for cut slope using the bearing plate

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060127

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080711

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080729

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080911

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20081202

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20081212

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 3

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131219

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees